04_-_AF_Form_66.pdf
PDF 126 KB Posted
- Attached to
- Repair Environmental Back Shops Federal contract opportunity
- Solicitation number
- FA487718B0002
About this file
4. AF Form 66
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI_Responses-Rpr_Environmental_Back_Shops.pdf | ||
| Site_Visit_Meeting_Minutes.pdf | ||
| FA487718B00020001_-_Amendment_0001.pdf | ||
| 09_-_Contract_Security_Requirements.pdf | ||
| 08_-_Special_Instruction.pdf | ||
| 07_-_WD_AZ180033__5_Jan_2018__AZ33.pdf | ||
| 03_-_ColorBoard.pdf | ||
| 01_-_Project_Specifications.pdf | ||
| 02_-_Project_Drawings.pdf | ||
| FA487718B0002.pdf | ||
| 06_-_DMAFB_2017_Design_Compatibility_Guidelines_2017.pdf | ||
| 05_-_AF_Form_3052.xlsx | XLSX spreadsheet |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NUMBER : PROJECT TITLE: SOLICITATION/CONTRACT NO.:
Awarded:
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVED
1 AF Form 103 Job Order Sec 01010, Para 1.3c 3
Hazardous Material Usage Sec 01010, Para 2.5c Env Cont Guide Sec 3.3 Hazardous Material
HAZMAT Usage Reports Sec 01010, Para 2.5c Env Cont Guide Sec 3.4 HAZMAT Usage
(1st of the month for projects >60days) (End of project for projects <60 days)
Air Quality Activity Permit Sec 01010, Para 2.5d Env Cont Guide Sec 3.3 Air Quality
7 Days after Reciept of Permit
Asbestos Removal/Demolition Activity Permit Sec 01010, Para 2.5d Env Cont Guide Sec 3.3 Asbestos
7 Days after Reciept of Permit
LBP Removal/Demolition Activity Permit Sec 01010, Para 2.5d Env Cont Guide Sec 3.3 Lead-Based Paint
7 Days after Reciept of Permit
Asbestos Removal/Demolition Abatement Plan Sec 01010, Para 2.5e Env Cont Guide Sec 3.3 Asbestos
2 7 Days after Reciept of Asbestos Demolition Permit
Construction & Demolition Debris Diversion Plan Sec 01010, Para 2.5e Env Cont Guide Sec 3.3 C&D Plan
Asbestos Manifests Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Asbestos Removal
7 Days After Reciept of Manifest
Non-Regulated Waste Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Regulated Hazardous Waste
3 days after Disposal
Regulated Waste Disposal Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Regulated Hazardous Waste
2 Coordinated Prior to Removal from Installation
Regulated Waste Manifests Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Regulated Hazardous Waste
3 Days after Disposal
Recycling Manifests Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Waste & Recyclables
(1st of the month for projects >60days) (End of project for projects <60 days)
Non-Hazardous Waste Manifests Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Waste & Recyclables
(1st of the month for projects >60days) (End of project for projects <60 days)
15 Progress Photographs Sec 01010, Para 2.8 1
16 Record As-Builts Sec 01010, Para 3.2.2.a
OT
HE
R
REMARKS
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
DATE CONTRACTOR NOTIFIED
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
FI
NA
L
AP
PR
OV
AL
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
AS
-B
UI
LT
S
SCHEDULE OF MATERIAL SUBMITTALS FBNV130026 Repair Back Shops Environmental Systems, Fac 5045
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVEDOT
HE
R
REMARKS
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
DATE CONTRACTOR NOTIFIED
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
FI
NA
L
AP
PR
OV
AL
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
AS
-B
UI
LT
S
SCHEDULE OF MATERIAL SUBMITTALS FBNV130026 Repair Back Shops Environmental Systems, Fac 5045
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
17 Record Disks Sec 01010, Para 3.2.2.b 1
18 DD Form 1354 Sec 01010, Para 3.2.2.c.1
19 DD Form 1354 Checklist Sec 01010, Para 3.2.2.c.2 1
20 Warranty/Guarantee Items Sec 01010, Para 3.2.2.c.3 1
21 O&M Manual Sec 01010, Para 3.2.2.d 3
22 AF Form 3064 2
23 EMS Awareness Training Env Cont Guide Sec 3.3 & Appendix F
At PreCon Meeting
24 Recovered Materials Certification Env Cont Guide Sec 3.5 Recovered Materials
2 7 Days after Construction Complete (Only for Contracts >$100,000)
25 Demolition/Deconstruction Plan Sec 02 41 00, Para. 1.6 2 Preconstruction Submittals
26 Microbial Remediation Plan Sec 02 85 00.00 20, Para. 1.4.1.2 2 Preconstruction Submittals
27 Installation Drawings - Shop Drawings Sec 03 30 53, Para. 1.5 2
28 Mix Design Data - Product Data Sec 03 30 53, Para. 2.3 2
29 Concrete Mixture Proportions - Test Reports Sec 03 30 53, Para. 2.1.3 2
30 Compressive Strength Testing - Test Reports Sec 03 30 53, Para. 3.9.3 2
31 Slump - Test Reports Sec 03 30 53, Para. 3.9.3 2
32 Hardware and Accessories - Product Data Sec 06 20 00, Para. 2.4 2
33 Certificates of Grade - Certificates Sec 06 20 00, Para. 1.7.1.1 2
34 Firestopping Materials - Shop Drawings Sec 07 84 00, Para. 2.1 2
35 Installer Qualifications - Certificates Sec 07 84 00, Para. 1.3 2
36 Inspection - Certificates Sec 07 84 00, Para. 1.3 2
37 Doors - Shop Drawings Sec 08 11 13, Para. 2.1 2
38 Frames - Shop Drawings Sec 08 11 13, Para. 2.4 2
39 Doors - Product Data Sec 08 11 13, Para. 2.1 2
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVEDOT
HE
R
REMARKS
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
DATE CONTRACTOR NOTIFIED
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
FI
NA
L
AP
PR
OV
AL
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
AS
-B
UI
LT
S
SCHEDULE OF MATERIAL SUBMITTALS FBNV130026 Repair Back Shops Environmental Systems, Fac 5045
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
40 Frames - Product Data Sec 08 11 13, Para. 2.4 2
41 Verification of Existing Conditions - Shop Drawings Sec 08 71 00, Para. 1.3 2
42 Keying System - Shop Drawings Sec 08 71 00, Para. 2.3.4 2
43 Hardware Items - Product Data Sec 08 71 00, Para. 2.3 2
44 Hardware Schedule - Operation and Maintenance Data Sec 08 71 00, Para. 1.5
45 Asbestos Free Materials - Certificates Sec 09 29 00, Para. 1.2 2
46 Detail Drawings - Shop Drawings Sec 09 30 10, Para. 3.2 2
47 Tile - Product Data Sec 09 30 10, Para. 2.1 2
48 Setting-Bed - Product Data Sec 09 30 10, Para. 2.2 2
49 Mortar, Grout, and Adhesive - Product Data Sec 09 30 10, Para. 2.4 2
50 Acoustical Ceiling Systems - Product Data Sec 09 51 00, Para. 2.1
51 Sealer and Resin - Product Data Sec 09 67 23.14, Para. 2.5 2
52 Floor Surfacing - Product Data Sec 09 67 23.14, Para. 3.3.2 2
53 Conductive Sparkproof Flooring - Product Data Sec 09 67 23.14, Para. 2.4 2
54 Mixing - Product Data Sec 09 67 23.14, Para. 3.2 2
55 Testing - Test Reports Sec 09 67 23.14, Para. 3.4 2
56 Coating - Product Data Sec 09 90 00, Para. 2.1 2
57 Approved Detail Drawings - Shop Drawings Sec 10 14 00.10, Para. 3.1 2
58 Exterior Signage - Product Data Sec 10 14 00.10, Para. 1.2 2
59 Warranty - Product Data Sec 10 14 00.20, Para. 1.5 2
60 Finishes - Product Data Sec 10 28 13, Para. 2.1.2 2
61 Accessory Items - Product Data Sec 10 28 13, Para. 2.2 2
62 Fabrication - Shop Drawings Sec 12 36 00, Para. 2.3 2
63 Synthetic Resin - Product Data Sec 12 36 00, Para. 2.3.1 2
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVEDOT
HE
R
REMARKS
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
DATE CONTRACTOR NOTIFIED
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
FI
NA
L
AP
PR
OV
AL
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
AS
-B
UI
LT
S
SCHEDULE OF MATERIAL SUBMITTALS FBNV130026 Repair Back Shops Environmental Systems, Fac 5045
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
64 Manufacturer's Standard Color Charts - Samples Sec 12 36 00, Para. 2.2 1
65 Backflow Prevention Assemblies - Product Data Sec 22 00 00, Para. 3.8.1.1 2
66 Shower Faucets - Product Data Sec 22 00 00, Para. 2.5.2 2
67 Vibration-Absorbing Features - Product Data Sec 22 00 00, Para. 3.3 2
68 Test of Backflow Prevention Assemblies - Test Reports Sec 22 00 00, Para. 3.8.1.1 2
69 Plumbing System - Operation and Maintenance Data Sec 22 00 00, Para. 3.8.1 2
70 Air Handling Units - Product Data Sec 23 00 00, Para. 1.3 2
71 Variable Volume, Single Duct Terminal Units - Product Data Sec 23 00 00, Para. 1.3
72 Test Procedures - Product Data Sec 23 00 00, Para. 1.3 2
73 Performance Tests - Test Reports Sec 23 00 00, Para. 3.13 2
74 Damper Acceptance Test - Test Reports Sec 23 00 00, Para. 3.11 2
Operation and Maintenance Manuals - Operation and Maintenance Data Sec 23 00 00, Para. 3.15.1
76 Manual Balancing Dampers - Operation and Maintenance Data Sec 23 00 00, Para. 2.9.3
77 Centrifugal Fans - Operation and Maintenance Data Sec 23 00 00, Para. 2.10.1.1 2
Panel Type Power Wall Ventilators - Operation and Maintenance Data Sec 23 00 00, Para. 2.10.1.2
Centrifugal Type Power Wall Ventilators - Operation and Maintenance Data Sec 23 00 00, Para. 2.10.1.3
Centrifugal Type Power Roof Ventilators - Operation and Maintenance Data Sec 23 00 00, Para. 2.10.1.4
81 Air Handling Units - Operation and Maintenance Data Sec 23 00 00, Para. 2.11 2
Variable Volume, Single Duct Terminal Units - Operation and Maintenance Data Sec 23 00 00, Para. 2.12.1.1
83 TAB Schematic Drawings and Report Forms - Shop Drawings Sec 23 05 93, Para. 1.3.3
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVEDOT
HE
R
REMARKS
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
DATE CONTRACTOR NOTIFIED
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
FI
NA
L
AP
PR
OV
AL
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
AS
-B
UI
LT
S
SCHEDULE OF MATERIAL SUBMITTALS FBNV130026 Repair Back Shops Environmental Systems, Fac 5045
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
84 Equipment and Performance Data - Product Data Sec 23 05 93, Para. 1.3 2
85 TAB Related HVAC Submittals - Product Data Sec 23 05 93, Para. 1.3 2
Independent TAB Agency and Personnel Qualifications - Certificates Sec 23 05 93, Para. 1.5.1
87 TAB Pre-Field Engineering Report - Certificates Sec 23 05 93, Para. 3.4.2 2
88 Pipe Insulation Systems - Product Data Sec 23 07 00, Para. 1.3 2
89 Duct Insulation Systems - Product Data Sec 23 07 00, Para. 3.2 2
90 Equipment Insulation Systems - Product Data Sec 23 07 00, Para. 3.3 2
91 DDC Contractor Design Drawings - Shop Drawings Sec 23 09 00, Para. 3.3 2
92 Draft As-Built Drawings - Shop Drawings Sec 23 09 00, Para. 3.3 2
93 Final As-Built Drawings - Shop Drawings Sec 23 09 00, Para. 3.3 2
94 Programming Software - Product Data Sec 23 09 00, Para. 1.8.1 2
95 Controller Application Programs - Product Data Sec 23 09 00, Para. 1.8.2 2
96 Configuration Software - Product Data Sec 23 09 00, Para. 1.5 2
97 Manufacturer's Product Data - Product Data Sec 23 09 00, Para. 2.2 2
98 XIF files - Product Data Sec 23 09 00, Para. 2.2.1 2
99 Final LNS Database - Product Data Sec 23 09 00, Para. 3.6.4 2
100 LNS Plug-ins - Product Data Sec 23 09 00, Para. 1.8.3 2
101 Start-Up Testing Report - Test Reports Sec 23 09 00, Para. 3.5.2 2
102 PVT Procedures - Test Reports Sec 23 09 00, Para. 3.6.1 2
103 PVT Report - Test Reports Sec 23 09 00, Para. 3.6.3 2
104 Pre-Construction Quality Control (QC) Checklist - Test Reports Sec 23 09 00, Para. 1.9.1
105 Post-Construction Quality Control (QC) Checklist - Test Reports Sec 23 09 00, Para. 1.9.2
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVEDOT
HE
R
REMARKS
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
DATE CONTRACTOR NOTIFIED
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
FI
NA
L
AP
PR
OV
AL
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
AS
-B
UI
LT
S
SCHEDULE OF MATERIAL SUBMITTALS FBNV130026 Repair Back Shops Environmental Systems, Fac 5045
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Operation and Maintenance (O&M) Instructions - Operation and Maintenance Data Sec 23 09 00, Para. 3.7
107 Training Documentation - Operation and Maintenance Data Sec 23 09 00, Para. 3.9.1 2
108 Enclosure Keys - Closeout Submittals Sec 23 09 00, Para. 2.5
109 Password Summary Report - Closeout Submittals Sec 23 09 00, Para. 3.2.6.1 2
110 Closeout Quality Control (QC) Checklist - Closeout Submittals Sec 23 09 00, Para. 1.9.3
111 Gas Piping System - Shop Drawings Sec 23 11 25, Para. 1.5.3, 2.2, & 3.2 2
112 Pipe and Fittings - Product Data Sec 23 11 25, Para. 1.6.1 2
113 Gas Equipment Connectors - Product Data Sec 23 11 25, Para. 1.5.3 2
114 Gas Piping System - Product Data Sec 23 11 25, Para. 1.5.3, 2.2, & 3.2 2
115 Pipe Coating Materials - Product Data Sec 23 11 25, Para. 2.1 2
116 Pressure Regulators - Product Data Sec 23 11 25, Para. 2.6 2
117 Risers - Product Data Sec 23 11 25, Para. 2.4 2
118 Transition Fittings - Product Data Sec 23 11 25, Para. 2.2.8 2
119 Valves - Product Data Sec 23 11 25, Para. 2.3 2
120 Warning and Identification Tape - Product Data Sec 23 11 25, Para. 2.2.4 2
121 Testing - Test Reports Sec 23 11 25, Para. 3.14 2
122 Pressure Tests - Test Reports Sec 23 11 25, Para. 3.14.1 2
123 Test with Gas - Test Reports Sec 23 11 25, Para. 3.14.2 2
124 PE Pipe and Fittings - Manufacturer’s Instructions Sec 23 11 25, Para. 1.5.2 2
125 Pipe Coating Materials - Manufacturer’s Instructions Sec 23 11 25, Para. 2.1 2
Gas Facility System and Equipment Operation - Operation and Maintenance Data Sec 23 11 25, Para. 1.3.1
Gas Facility System Maintenance - Operation and Maintenance Data Sec 23 11 25, Para. 1.3.2
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVEDOT
HE
R
REMARKS
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
DATE CONTRACTOR NOTIFIED
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
FI
NA
L
AP
PR
OV
AL
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
AS
-B
UI
LT
S
SCHEDULE OF MATERIAL SUBMITTALS FBNV130026 Repair Back Shops Environmental Systems, Fac 5045
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Gas Facility Equipment Maintenance - Operation and Maintenance Data Sec 23 11 25, Para. 1.3.3
129 Refrigerant Piping System - Shop Drawings Sec 23 23 00, Para. 2.3 2
130 Maintenance - Operation and Maintenance Data Sec 23 23 00, Para. 1.5 2
Operation and Maintenance Manuals - Operation and Maintenance Data Sec 23 23 00, Para. 3.4
132 Demonstrations - Operation and Maintenance Data Sec 23 23 00, Para. 3.4 2
133 Shutoff Single-Duct Air Terminal Units - Shop Drawings Sec 23 36 00.00 40, Para. 2.1.2 2
134 Shutoff Single-Duct Air Terminal Units - Product Data Sec 23 36 00.00 40, Para. 2.1.2 2
135 Grooved Mechanical Connections For Steel - Product Data Sec 23 64 26, Para. 1.3 2
136 Grooved Mechanical Connections For Copper - Product Data Sec 23 64 26, Para. 1.3
137 Calibrated Balancing Valves - Product Data Sec 23 64 26, Para. 2.4.8 2
138 Automatic Flow Control Valves - Product Data Sec 23 64 26, Para. 2.4.9 2
139 Pumps - Product Data Sec 23 64 26, Para. 2.6 2
140 Pressure Tests Reports - Test Reports Sec 23 64 26, Para. 3.4.2 2
Lesson plan for the Instruction Course - Manufacturer’s Instructions Sec 23 64 26, Para. 3.5
142 Calibrated Balancing Valves - Operation and Maintenance Data Sec 23 64 26, Para. 2.4.8
Automatic Flow Control Valves - Operation and Maintenance Data Sec 23 64 26, Para. 2.4.9
144 Pump Discharge Valve - Operation and Maintenance Data Sec 23 64 26, Para. 2.4.10 2
145 Pressure Relief Valve - Operation and Maintenance Data Sec 23 64 26, Para. 2.4.11 2
Combination Pressure and Temperature Relief Valves - Operation and Maintenance Data Sec 23 64 26, Para. 2.4.12
147 Pumps - Operation and Maintenance Data Sec 23 64 26, Para. 2.6 2
148 Installation Drawings - Shop Drawings Sec 23 76 00.00 10, Para. 1.3.2 2
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVEDOT
HE
R
REMARKS
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
DATE CONTRACTOR NOTIFIED
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
FI
NA
L
AP
PR
OV
AL
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
AS
-B
UI
LT
S
SCHEDULE OF MATERIAL SUBMITTALS FBNV130026 Repair Back Shops Environmental Systems, Fac 5045
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
149 Equipment - Product Data Sec 23 76 00.00 10, Para. 3.2 2
150 Test Procedures - Product Data Sec 23 76 00.00 10, Para. 1.3.2 2
151 Installation - Product Data Sec 23 76 00.00 10, Para. 3.2 2
152 Manufacturer's Representative - Product Data Sec 23 76 00.00 10, Para. 1.3.2 2
153 Service Organization - Product Data Sec 23 76 00.00 10, Para. 1.3.3 2
154 Performance Tests - Product Data Sec 23 76 00.00 10, Para. 3.7 2
155 Training Course - Product Data Sec 23 76 00.00 10, Para. 3.5 2
156 Testing, Adjusting, and Balancing - Test Reports Sec 23 76 00.00 10, Para. 3.6 2
157 Installation Drawings - Certificates Sec 23 76 00.00 10, Para. 1.3.2 2
Operation and Maintenance Manuals - Operation and Maintenance Data Sec 23 76 00.00 10, Para. 3.5
159 Materials and Equipment - Product Data Sec 23 82 02.00 10, Para. 1.3 2
160 Demonstrations - Product Data Sec 23 82 02.00 10, Para. 3.4 2
161 Refrigerant Tests, Charging, and Start-Up - Test Reports Sec 23 82 02.00 10, Para. 3.5 2
162 System Performance Tests - Test Reports Sec 23 82 02.00 10, Para. 3.6 2
Operation and Maintenance Manuals - Operation and Maintenance Data Sec 23 82 02.00 10, Para. 3.4
164 Receptacles - Product Data Sec 26 20 00, Para. 2.10 2
165 Switches - Product Data Sec 26 20 00, Para. 2.9 2
166 Enclosed circuit breakers - Product Data Sec 26 20 00, Para. 2.11 2
167 Motor controllers - Product Data Sec 26 20 00, Para. 2.13 2
168 Manual motor starters - Product Data Sec 26 20 00, Para. 2.14 2
169 600-volt wiring test - Test Reports Sec 26 20 00, Para. 3.5.2 2
170 Grounding system test - Test Reports Sec 26 20 00, Para. 3.5.4 2
171 Ground-fault receptacle test - Test Reports Sec 26 20 00, Para. 3.5.3 2
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVEDOT
HE
R
REMARKS
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
DATE CONTRACTOR NOTIFIED
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
FI
NA
L
AP
PR
OV
AL
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
AS
-B
UI
LT
S
SCHEDULE OF MATERIAL SUBMITTALS FBNV130026 Repair Back Shops Environmental Systems, Fac 5045
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
172 Detail Drawings - Shop Drawings Sec 26 24 16.00 40, Para. 2.1.1 2
173 Panelboards - Product Data Sec 26 24 16.00 40, Para. 2.1.1 2
174 Directory Card and Holder - Product Data Sec 26 24 16.00 40, Para. 2.1.3 2
175 Continuity Tests - Test Reports Sec 26 24 16.00 40, Para. 3.2 2
176 Insulation Tests - Test Reports Sec 26 24 16.00 40, Para. 3.2 2
177 Certification - Certificates Sec 26 24 16.00 40, Para. 1.3.1 2
178 Power Meters - Product Data Sec 26 27 13.10 30, Para. 2.1 2
179 Current - Product Data Sec 26 27 13.10 30, Para. 2.1.3 2
180 Communications Module - Product Data Sec 26 27 13.10 30, Para. 2.2.2 2
181 Protocol Modules - Product Data Sec 26 27 13.10 30, Para. 1.6.1 2
182 Data Recorder - Product Data Sec 26 27 13.10 30, Para. 1.6.2 2
183 Modem - Product Data Sec 26 27 13.10 30, Para. 1.6.2 2
184 Acceptance Checks and Tests - Test Reports Sec 26 27 13.10 30, Para. 3.3.1 2
185 Power Meters - Operation and Maintenance Data Sec 26 27 13.10 30, Para. 2.1 2
186 Communications Module - Operation and Maintenance Data Sec 26 27 13.10 30, Para. 2.2.2 2
187 Protocol Modules - Operation and Maintenance Data Sec 26 27 13.10 30, Para. 1.6.1 2
188 Data Recorder - Operation and Maintenance Data Sec 26 27 13.10 30, Para. 1.6.2
189 Modem - Operation and Maintenance Data Sec 26 27 13.10 30, Para. 1.6.2
190 System Function Verification - Closeout Submittals Sec 26 27 13.10 30, Para. 3.3.2 2
191 Schematic diagrams - Shop Drawings Sec 26 29 23, Para. 1.5.1 2
192 Interconnecting diagrams - Shop Drawings Sec 26 29 23, Para. 1.5.2 2
193 Installation drawings - Shop Drawings Sec 26 29 23, Para. 1.5.3 2
194 Variable frequency drives - Product Data Sec 26 29 23, Para. 2.1 2
195 VFD Factory Test Plan - Manufacturer’s Field Reports Sec 26 29 23, Para. 2.5.1 2
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVEDOT
HE
R
REMARKS
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
DATE CONTRACTOR NOTIFIED
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
FI
NA
L
AP
PR
OV
AL
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
AS
-B
UI
LT
S
SCHEDULE OF MATERIAL SUBMITTALS FBNV130026 Repair Back Shops Environmental Systems, Fac 5045
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Lightning Protection & Grounding System Test Plan - Test Reports Sec 26 41 00, Para. 1.4.3
197 Lightning Protection & Grounding System Test - Test Reports Sec 26 41 00, Para. 3.3.1
Lightning Protection System Installers Documentation - Certificates Sec 26 41 00, Para. 1.2.3
199 Component UL Listed and Labeled - Certificates Sec 26 41 00, Para. 1.4.2 2
200 Lightning Protection System Inspection Certificate - Certificates Sec 26 41 00, Para. 1.4.4
201 Roof manufacturer's warranty - Certificates Sec 26 41 00, Para. 3.1.1 2
202 Luminaires - Product Data Sec 26 51 00, Para. 2.2 2
203 Light Sources - Product Data Sec 26 51 00, Para. 2.4 2
204 Drivers, Ballasts and Generators - Product Data Sec 26 51 00, Para. 1.4 2
205 LED Luminaire Warranty - Product Data Sec 26 51 00, Para. 1.6.1 2
206 Luminaire Design Data - Product Data Sec 26 51 00, Para. 1.5.4 2
207 Vacancy Sensors - Product Data Sec 26 51 00, Para. 2.5.3.2 2
208 Dimming Controllers (Dimmers) - Product Data Sec 26 51 00, Para. 2.5.2 2
209 Power Hook Luminaire Hangers - Product Data Sec 26 51 00, Para. 2.8 2
210 Exit Signs - Product Data Sec 26 51 00, Para. 2.6.1 2
211 Emergency Lighting Unit (EBU) - Product Data Sec 26 51 00, Para. 3.1.5 2
212 LED Emergency Drivers - Product Data Sec 26 51 00, Para. 2.6.2 2
213 Occupancy Sensors - Product Data Sec 26 51 00, Para. 2.5.3.1 2
214 Ambient Light Level Sensor - Product Data Sec 26 51 00, Para. 3.1.8 2
215 LED Luminaire - IES LM-79 Test Report - Test Reports Sec 26 51 00, Para. 1.5.5 2
216 LED Light Source - IES LM-80 Test Report - Test Reports Sec 26 51 00, Para. 1.5.6 2
217 LED Light Source - IES TM-21 Test Report - Test Reports Sec 26 51 00, Para. 1.5.7 2
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVEDOT
HE
R
REMARKS
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
DATE CONTRACTOR NOTIFIED
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
FI
NA
L
AP
PR
OV
AL
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
AS
-B
UI
LT
S
SCHEDULE OF MATERIAL SUBMITTALS FBNV130026 Repair Back Shops Environmental Systems, Fac 5045
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
218 Occupancy/Vacancy Sensor Verification Tests - Test Reports Sec 26 51 00, Para. 1.5.8 2
219 Energy Efficiency - Test Reports Sec 26 51 00, Para. 1.5.11.3 2
220 Telecommunications cabling - Product Data Sec 27 10 00, Para. 2.1 2
221 Technical Data And Computer Software - Product Data Sec 28 31 76, Para. 1.6 2
Fire Alarm Control Unit and Mass Notification Control Unit (FMCP) - Product Data Sec 28 31 76, Para. 2.13
223 Terminal Cabinets - Product Data Sec 28 31 76, Para. 3.2.2 2
224 Manual Stations - Product Data Sec 28 31 76, Para. 2.15 2
225 Transmitters - Product Data Sec 28 31 76, Para. 2.19 2
226 Batteries - Product Data Sec 28 31 76, Para. 2.12.1 2
227 Battery Chargers - Product Data Sec 28 31 76, Para. 2.12.2 2
228 Smoke Sensors - Product Data Sec 28 31 76, Para. 2.10 2
229 Notification Appliances - Product Data Sec 28 31 76, Para. 2.16 2
230 Addressable Interface Devices - Product Data Sec 28 31 76, Para. 2.7 2
231 Amplifiers - Product Data Sec 28 31 76, Para. 2.14 2
232 Tone Generators - Product Data Sec 28 31 76, Para. 2.14 2
233 Digitalized Voice Generators - Product Data Sec 28 31 76, Para. 2.14 2
234 Radio Transmitter and Interface Panels - Product Data Sec 28 31 76, Para. 2.19.1 2
235 Local Operating Console (LOC) - Product Data Sec 28 31 76, Para. 1.4.3 2
236 Battery Power - Design Data Sec 28 31 76, Para. 2.12.1.2 2
237 Battery Chargers - Design Data Sec 28 31 76, Para. 2.12.2 2
238 Testing Procedures - Test Reports Sec 28 31 76, Para. 3.7.1 2
239 Smoke Sensor Testing - Test Reports Sec 28 31 76, Para. 2.10.3 2
240 System Operation - Manufacturer’s Field Reports Sec 28 31 76, Para. 2.3 2
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVEDOT
HE
R
REMARKS
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
DATE CONTRACTOR NOTIFIED
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
FI
NA
L
AP
PR
OV
AL
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
AS
-B
UI
LT
S
SCHEDULE OF MATERIAL SUBMITTALS FBNV130026 Repair Back Shops Environmental Systems, Fac 5045
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Operation and Maintenance (O&M) Instructions - Operation and Maintenance Data Sec 28 31 76, Para. 3.10
Instruction of Government Employees - Operation and Maintenance Data Sec 28 31 76, Para. 3.8
File details come from the government source that posted it.