02_-_Project_Drawings.pdf

PDF 20 MB Posted

Attached to
Repair Environmental Back Shops Federal contract opportunity
Solicitation number
FA487718B0002
Issued by
Department of the Air Force Air Combat Command

About this file

2. Project Drawings

View the file

Other files for this federal contract opportunity

Other files attached to Repair Environmental Back Shops, newest first.
File Type Posted
RFI_Responses-Rpr_Environmental_Back_Shops.pdf PDF
Site_Visit_Meeting_Minutes.pdf PDF
FA487718B00020001_-_Amendment_0001.pdf PDF
01_-_Project_Specifications.pdf PDF
09_-_Contract_Security_Requirements.pdf PDF
08_-_Special_Instruction.pdf PDF
07_-_WD_AZ180033__5_Jan_2018__AZ33.pdf PDF
04_-_AF_Form_66.pdf PDF
03_-_ColorBoard.pdf PDF
FA487718B0002.pdf PDF
06_-_DMAFB_2017_Design_Compatibility_Guidelines_2017.pdf PDF
05_-_AF_Form_3052.xlsx XLSX spreadsheet
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RPR/CNS BACK SHOPS

ENVIRONMENTAL SYSTEMS, FAC 5045

FBNV 130026

AT

DAVIS-MONTHAN

AIR FORCE BASE, ARIZONA

ENGINEERS

CIVIL

DEPARTMENT

FIRE

CONTRACTING

OFFICE

SITE

PROJECT

HAUL

ROUTE

SWAN

GATE

CRAYCROFT GATE;

VISITOR CONTROL

CENTER

G-001

\\tt.local\IER\Projects\Louisville\IER\01297\200-01297-16030\CAD\SheetFiles\G-001.dwg

AutoCAD SHX Text

CONSTRUCTION NOTES:

AutoCAD SHX Text EXISTING UTILITIES ARE SHOWN IN AN APPROXIMATE LOCATION. THE CONTRACTOR SHALL FIELD VERIFY THE EXACT LOCATIONS OF ALL EXISTING FACILITIES AND UTILITIES PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR SHALL CONTACT ARIZONA BLUESTAKE (1-800-782-5348) ALLOWING TW0 (2) WORKING DAYS ADVANCE NOTICE IN ORDER THAT UNDERGROUND TELEPHONE CABLES CAN BE LOCATED AND MARKED PRIOR TO CONSTRUCTION SO AS NOT TO IMPEDE CONSTRUCTION PROGRESS. THE CONTRACTOR SHALL CONTACT THE BASE ENGINEER (520-228-8999) ALLOWING TEN (10) WORKING DAYS ADVANCE NOTICE FOR ALL OTHER UNDERGROUND UTILITY LOCATIONS. SUBMIT AF 103 (DIG PERMIT) THROUGH THE 355 CES; ALLOW TWENTY ONE (21) DAYS TO PROCESS AF 103.

AutoCAD SHX Text THE PRIMARY HAUL ROUTE FOR THIS PROJECT IS THROUGH THE SWAN GATE AND EAST ON SUNGLOW ROAD AS SHOWN. THIS GATE IS NORMALLY OPEN FROM 0600 TO 1800 DAILY, MONDAY THRU FRIDAY. IT IS NOT OPEN AT NIGHT OR ON WEEKENDS, HOLIDAYS, NOT OPEN AT NIGHT OR ON WEEKENDS, HOLIDAYS, OPEN AT NIGHT OR ON WEEKENDS, HOLIDAYS, OR MILITARY "DOWN DAYS". IF THE CONTRACTOR IS PERMITTED TO WORK ON DAYS THAT THE SWAN GATE IS CLOSED, HE WILL BE REQUIRED TO USE THE CRAYCROFT GATE. VISITOR CONTROL CENTER HOURS OF OPERATION: 0700-1600 HRS

AutoCAD SHX Text

HAUL ROUTE NOTE:

AutoCAD SHX Text N

AutoCAD SHX Text Flagstaff

AutoCAD SHX Text

TUCSON

AutoCAD SHX Text

PHOENIX

AutoCAD SHX Text N

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text %%uSTATE MAP%%u

AutoCAD SHX Text N

AutoCAD SHX Text %%uVICINITY MAP%%u

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

DMAFB

AutoCAD SHX Text

VALENCIA

AutoCAD SHX Text

ALVERNON

AutoCAD SHX Text

ALVERNON

AutoCAD SHX Text

SWAN

AutoCAD SHX Text

CRAYCROFT

AutoCAD SHX Text

WILMOT

AutoCAD SHX Text

KOLB

AutoCAD SHX Text

GOLF LINKS

AutoCAD SHX Text

TUCSON, ARIZONA

AutoCAD SHX Text

SWAN GATE

AutoCAD SHX Text

ENTRANCE

AutoCAD SHX Text p

AutoCAD SHX Text I-10

AutoCAD SHX Text I-19

AutoCAD SHX Text p

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE: 1"=800'

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

BY

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FIRE DEPARTMENT

AutoCAD SHX Text

SAFETY OFFICE

AutoCAD SHX Text

ENVIRONMENTAL QUALITY

AutoCAD SHX Text

SECURITY

AutoCAD SHX Text

COMMUNICATIONS

AutoCAD SHX Text

CE OPERATIONS

AutoCAD SHX Text

CONTRACT MANAGEMENT

AutoCAD SHX Text

AIRFIELD MANAGEMENT

AutoCAD SHX Text

CASA GRANDE

AutoCAD SHX Text

MESA STREET

AutoCAD SHX Text

PHOENIX STREET

AutoCAD SHX Text

YUMA STREET

AutoCAD SHX Text

PICACHO STREET

AutoCAD SHX Text

ALAMO AVENUE

AutoCAD SHX Text

ORD STREET

AutoCAD SHX Text

WASHINGTON AVENUE

AutoCAD SHX Text

CASS AVENUE

AutoCAD SHX Text

ALBRO BLVD

AutoCAD SHX Text

AMERICAN AVENUE

AutoCAD SHX Text

MITCHELL AVENUE

AutoCAD SHX Text

DAVENPORT

AutoCAD SHX Text

SKYLINE

AutoCAD SHX Text

DRIVE

AutoCAD SHX Text

CHAPTER

AutoCAD SHX Text

HYDER DRIVE

AutoCAD SHX Text

ALBRO BLVD

AutoCAD SHX Text

NATIONAL BLVD

AutoCAD SHX Text

QUIJOTA BLVD

AutoCAD SHX Text

MARDON DRIVE

AutoCAD SHX Text

PHANTOM DRIVE

AutoCAD SHX Text

DRIVE

AutoCAD SHX Text

TRACKER

AutoCAD SHX Text

DRIVE

AutoCAD SHX Text

NEPTUNE

AutoCAD SHX Text

CIRCLE

AutoCAD SHX Text

RAMSGATE ROAD

AutoCAD SHX Text

CASA GRANDE

AutoCAD SHX Text

GLCM AVENUE

AutoCAD SHX Text

GOLF LINKS ROAD

AutoCAD SHX Text

SUNGLOW ROAD

AutoCAD SHX Text

JEDDITO STREET

AutoCAD SHX Text

STREET

AutoCAD SHX Text

IRONWOOD

AutoCAD SHX Text

STREET

AutoCAD SHX Text

FLORA

AutoCAD SHX Text

EL DORADO STREET

AutoCAD SHX Text

FIRST

AutoCAD SHX Text

TEMPE ST

AutoCAD SHX Text

STREET

AutoCAD SHX Text

WINSLOW ST

AutoCAD SHX Text

FLAGSTAFF ST

AutoCAD SHX Text

DOUGLAS ST

AutoCAD SHX Text

PHOENIX

AutoCAD SHX Text

STREET

AutoCAD SHX Text

YUMA

AutoCAD SHX Text

NUGGAT STREET

AutoCAD SHX Text

STREET

AutoCAD SHX Text

MADERA

AutoCAD SHX Text

STREET

AutoCAD SHX Text

KACHINA

AutoCAD SHX Text

EIGHTH STREET

AutoCAD SHX Text

SEVENTH

AutoCAD SHX Text

SIXTH

AutoCAD SHX Text

FIFTH

AutoCAD SHX Text

STREET

AutoCAD SHX Text

STREET

AutoCAD SHX Text

STREET

AutoCAD SHX Text

SIXTH

AutoCAD SHX Text

CRAYCROFT ROAD

AutoCAD SHX Text

CRAYCROFT

AutoCAD SHX Text

COMMUNITY CENTER ROAD

AutoCAD SHX Text

STREET

AutoCAD SHX Text

SEVENTH

AutoCAD SHX Text

STREET

AutoCAD SHX Text

AVENUE

AutoCAD SHX Text

FOURTH

AutoCAD SHX Text

STREET

AutoCAD SHX Text

FOURTH

AutoCAD SHX Text

STREET

AutoCAD SHX Text

THIRD

AutoCAD SHX Text

STREET

AutoCAD SHX Text

SECOND

AutoCAD SHX Text

STREET

AutoCAD SHX Text

DURANGO

AutoCAD SHX Text

STREET

AutoCAD SHX Text

COMANCHE

AutoCAD SHX Text

STREET

AutoCAD SHX Text

BOLA

AutoCAD SHX Text

STREET

AutoCAD SHX Text

ARIZOLA

AutoCAD SHX Text

TENTH STREET

AutoCAD SHX Text

QUIJOTA BLVD

AutoCAD SHX Text

ORD STREET

AutoCAD SHX Text

ELEVENTH STREET

AutoCAD SHX Text

TENTH STREET

AutoCAD SHX Text

KACHINA STREET

AutoCAD SHX Text

LIBRE STREET

AutoCAD SHX Text

JEDDITO STREET

AutoCAD SHX Text

HINDEN BLVD

AutoCAD SHX Text

ELEVENTH STREET

AutoCAD SHX Text

AIRFIELD LIGHTING

AutoCAD SHX Text

FIFTH

AutoCAD SHX Text

STREET

AutoCAD SHX Text

SUNGLOW ROAD

AutoCAD SHX Text

GOLF LINKS ROAD

AutoCAD SHX Text

ZAPPER AVE.

AutoCAD SHX Text

FALCON ST.

AutoCAD SHX Text

JAMMER WAY

AutoCAD SHX Text

HERKY BLVD.

AutoCAD SHX Text

YUMA STREET

AutoCAD SHX Text

AIRFIELD BARRIER MAINTENANCE

AutoCAD SHX Text

KACHINA ST

AutoCAD SHX Text

FIRST STREET

AutoCAD SHX Text

COVER SHEET

AutoCAD SHX Text

TCL

AutoCAD SHX Text

AutoCAD SHX Text

IRONWOOD STREET

AutoCAD SHX Text

GRANITE STREET

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FIRE DEPARTMENT

AutoCAD SHX Text

SAFETY OFFICE

AutoCAD SHX Text

ENVIRONMENTAL QUALITY

AutoCAD SHX Text

SECURITY

AutoCAD SHX Text

COMMUNICATIONS

AutoCAD SHX Text

CE OPERATIONS

AutoCAD SHX Text

CONTRACT MANAGEMENT

AutoCAD SHX Text

AIRFIELD MANAGEMENT

AutoCAD SHX Text

DAVIS-MONTHAN AFB, ARIZONA

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

CIVIL ENGINEER OFFICE

AutoCAD SHX Text

APPROVED USING AGENCY

AutoCAD SHX Text

APPROVED CECN

AutoCAD SHX Text

APPROVED CEC

AutoCAD SHX Text

APPROVED CE

AutoCAD SHX Text

CHECKED PROJ. ENGR.

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

OF

AutoCAD SHX Text

DATE

AutoCAD SHX Text

AIR COMBAT COMMAND

AutoCAD SHX Text

DEPARTMENT OF THE AIR FORCE

AutoCAD SHX Text

AutoCAD SHX Text

01 SEP 17

AutoCAD SHX Text

06 SEP 17

AutoCAD SHX Text

ENVIRONMENTAL, FAC 5045

AutoCAD SHX Text

RPR/CNS BACKSHOPS

AutoCAD SHX Text

FBNV 130026

AutoCAD SHX Text

FBNV 130026

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

AIRFIELD LIGHTING

AutoCAD SHX Text

AIRFIELD BARRIER MAINTENANCE

AutoCAD SHX Text

FOR CONSTRUCTION

SHEET INDEX

REF SHT

NUMBER

SHEET

NUMBER

SHEET TITLE

PLUMBING

P-001 35 PLUMBING NOTES AND LEGENDS

PD-101 36 PLUMBING DEMOLITION PLAN - AREA A

PD-102 37 PLUMBING DEMOLITION PLAN - AREA B

P-101 38 PLUMBING PLAN - AREA A

P-102 39 PLUMBING PLAN - AREA B

P-601 40 PLUMBING SCHEDULES

P-901 41 PLUMBING RISER DIAGRAM

FIRE PROTECTION

FP-001 42 LIFE SAFETY PLAN

FP-101 43 LIFE SAFETY PLAN

FP-102 44 FIRE ALARM PLAN - AREA A

FP-103 45 FIRE ALARM PLAN - AREA B

FP-104 46 FIRE ALARM DETAILS

ELECTRICAL

E-001 47 ELECTRICAL NOTES & LEGEND

ED-101 48 LIGHTING DEMOLITION PLAN - AREA A

ED-102 49 LIGHTING DEMOLITION PLAN - AREA B

ED-103 50 POWER DEMOLITION PLAN - AREA A

ED-104 51 POWER DEMOLITION PLAN - AREA B

ED-601 52 ELECTRICAL DEMOLITION ONE-LINE DIAGRAM

E-101 53 ELECTRICAL LIGHTING PLAN - AREA A

E-102 54 ELECTRICAL LIGHTING PLAN - AREA B

E-103 55 ELECTRICAL POWER PLAN - AREA A

E-104 56 ELECTRICAL POWER PLAN - AREA B

E-191 57 ELECTRICAL LIGHTNING PLAN - AREA A

E-192 58 ELECTRICAL LIGHTNING PLAN - AREA B

E-501 59 ELECTRICAL DETAILS

E-502 60 ELECTRICAL DETAILS

E-503 61 ELECTRICAL DETAILS

E-504 62 ELECTRICAL DETAILS

E-601 63 ELECTRICAL ONE-LINE DIAGRAM

E-602 64 ELECTRICAL PANEL SCHEDULES

E-603 65 ELECTRICAL PANEL SCHEDULES

E-604 66 ELECTRICAL PANEL SCHEDULES

G-002

SHEET INDEX

REF SHT

NUMBER

SHEET

NUMBER

SHEET TITLE

GENERAL

G-001 1 COVER SHEET

G-002 2 SHEET INDEX

G-003 3 PHASING PLAN

CIVIL

C-101 4 SITE PLAN

STRUCTURAL

S-101 5 MECHANICAL EQUIPMENT SUPPORT FRAMING

ARCHITECTURAL

A-001 6

ABBREVIATIONS, GENERAL NOTES, SYMBOLS

AD-101 7 FLOOR PLAN - DEMOLITION - AREA A

AD-102 8 FLOOR PLAN - DEMOLITION - AREA B

A-101 9 FLOOR PLAN - AREA A

A-102 10 FLOOR PLAN - AREA B

A-103 11 REFLECTED CEILING PLAN - AREA A

A-104 12 REFLECTED CEILING PLAN - AREA B

A-401 13 ENLARGED FLOOR PLANS

A-402 14 INTERIOR ELEVATIONS

A-501 15 INTERIOR DETAILS

A-601 16 FINISH SCHEDULE

A-602 17 SIGNAGE SCHEDULE

MECHANICAL

M-001 18 MECHANICAL LEGEND AND NOTES

MD-101 19 MECHANICAL DEMOLITION PLAN - AREA A

MD-102 20 MECHANICAL DEMOLITION PLAN - AREA B

M-101 21 MECHANICAL PLAN - AREA A

M-102 22 MECHANICAL PLAN - AREA B

M-501 23 MECHANICAL DETAILS

M-502 24 MECHANICAL DETAILS

M-503 25 MECHANICAL DETAILS

M-601 26 MECHANICAL SCHEDULES

M-602 27 MECHANICAL SCHEDULES

M-901 28 MECHANICAL CONTROLS

M-902 29 MECHANICAL CONTROLS

M-903 30 MECHANICAL CONTROLS

M-904 31 MECHANICAL CONTROLS

M-905 32 MECHANICAL CONTROLS

M-906 33 MECHANICAL CONTROLS

M-907 34 MECHANICAL CONTROLS

\\tt.local\IER\Projects\Louisville\IER\01297\200-01297-16030\CAD\SheetFiles\G-002 - DRAWING INDEX.dwg

AutoCAD SHX Text

SHEET INDEX

AutoCAD SHX Text

TCL

AutoCAD SHX Text

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FIRE DEPARTMENT

AutoCAD SHX Text

SAFETY OFFICE

AutoCAD SHX Text

ENVIRONMENTAL QUALITY

AutoCAD SHX Text

SECURITY

AutoCAD SHX Text

COMMUNICATIONS

AutoCAD SHX Text

CE OPERATIONS

AutoCAD SHX Text

CONTRACT MANAGEMENT

AutoCAD SHX Text

AIRFIELD MANAGEMENT

AutoCAD SHX Text

DAVIS-MONTHAN AFB, ARIZONA

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

CIVIL ENGINEER OFFICE

AutoCAD SHX Text

APPROVED USING AGENCY

AutoCAD SHX Text

APPROVED CECN

AutoCAD SHX Text

APPROVED CEC

AutoCAD SHX Text

APPROVED CE

AutoCAD SHX Text

CHECKED PROJ. ENGR.

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

OF

AutoCAD SHX Text

DATE

AutoCAD SHX Text

AIR COMBAT COMMAND

AutoCAD SHX Text

DEPARTMENT OF THE AIR FORCE

AutoCAD SHX Text

AutoCAD SHX Text

01 SEP 17

AutoCAD SHX Text

06 SEP 17

AutoCAD SHX Text

ENVIRONMENTAL, FAC 5045

AutoCAD SHX Text

RPR/CNS BACKSHOPS

AutoCAD SHX Text

FBNV 130026

AutoCAD SHX Text

FBNV 130026

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

AIRFIELD LIGHTING

AutoCAD SHX Text

AIRFIELD BARRIER MAINTENANCE

M A

T C

H

L I N

E

MACHINE SHOP

NICAD BATT LEAD BATT

BATTERY

OFFICE

MECH

ROOM

SHEET METAL SHOP SHEET METAL SHOP

TESTING SHOP

RECOVERY ROOMTOOL STORAGEELECTRONICS SHOPS

BREAK ROOM

WELDING METAL TECH

BREAK ROOMLOCKERS

CONF

OFFOFFOFFOFF GERBER

POWER

MECH

PHASE B1

PHASE A1

OFF OFF

OFF

ADMIN

MENS

WOMENS

OFF

PHASE A2

MACHINE SHOP

NICAD BATT LEAD BATT

BATTERY

OFFICE

MECH

ROOM

SHEET METAL SHOP SHEET METAL SHOP

TESTING SHOP

RECOVERY ROOMTOOL STORAGEELECTRONICS SHOPS

BREAK ROOM

WELDING METAL TECH

BREAK ROOMLOCKERS

CONF

OFFOFFOFFOFF GERBER

POWER

PHASE B2

OFF OFF

OFF

M A

T C

H

L I N

E

ADMIN

MENS

WOMENS

OFF

PHASING LEGEND

PHASE A1

PHASE A2

PHASE B1

PHASE B2

G-003

BUILDING 5045

CONSTRUCTION PHASE - 11

SCALE: 1/8"=1'-0"

N

BUILDING 5045

CONSTRUCTION PHASE - 2

SCALE: 1/8"=1'-0"

N

KEY PLAN

N

AREA A AREA B

PHASING NOTES

1. PHASE A AND B DO NOT HAVE TO OCCUR ON THE SAME SCHEDULE.

2. PHASE A1 TO OCCUR BEFORE A2. CONTRACTOR TO INCLUDE IN THE

PHASING SCHEDULE A 1-WEEK GAP BETWEEN THE END OF PHASE A1 AND

THE BEGINNING OF PHASE A2 TO ALLOW GOVERNMENT TO RELOCATE

EQUIPMENT.

3. PHASE B1 TO OCCUR BEFORE B2. CONTRACTOR TO INCLUDE IN THE

PHASING SCHEDULE A 2-WEEK GAP BETWEEN THE END OF PHASE B1 AND

THE BEGINNING OF PHASE B2 TO ALLOW GOVERNMENT TO RELOCATE

EQUIPMENT.

4. MAINTAIN EXIT CORRIDORS FOR OCCUPANT EGRESS THROUGHOUT ALL

PHASES OF CONSTRUCTION.

SCALE:

8'-0" 16'-0" 32'-0"

1/16"=1'-0"

\\tt.local\IER\Projects\Louisville\IER\01297\200-01297-16030\CAD\SheetFiles\G-003 - PHASING PLAN.dwg

AutoCAD SHX Text

PHASING PLAN

AutoCAD SHX Text

TCL

AutoCAD SHX Text

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FIRE DEPARTMENT

AutoCAD SHX Text

SAFETY OFFICE

AutoCAD SHX Text

ENVIRONMENTAL QUALITY

AutoCAD SHX Text

SECURITY

AutoCAD SHX Text

COMMUNICATIONS

AutoCAD SHX Text

CE OPERATIONS

AutoCAD SHX Text

CONTRACT MANAGEMENT

AutoCAD SHX Text

AIRFIELD MANAGEMENT

AutoCAD SHX Text

DAVIS-MONTHAN AFB, ARIZONA

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

CIVIL ENGINEER OFFICE

AutoCAD SHX Text

APPROVED USING AGENCY

AutoCAD SHX Text

APPROVED CECN

AutoCAD SHX Text

APPROVED CEC

AutoCAD SHX Text

APPROVED CE

AutoCAD SHX Text

CHECKED PROJ. ENGR.

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

OF

AutoCAD SHX Text

DATE

AutoCAD SHX Text

AIR COMBAT COMMAND

AutoCAD SHX Text

DEPARTMENT OF THE AIR FORCE

AutoCAD SHX Text

AutoCAD SHX Text

06 OCT 17

AutoCAD SHX Text

10 OCT 17

AutoCAD SHX Text

ENVIRONMENTAL, FAC 5045

AutoCAD SHX Text

RPR/CNS BACKSHOPS

AutoCAD SHX Text

FBNV 130026

AutoCAD SHX Text

FBNV 130026

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

AIRFIELD LIGHTING

AutoCAD SHX Text

AIRFIELD BARRIER MAINTENANCE

WV

TEL

WV

WV

WV

WV

WV

WV

WV

GV

x x x x x x x x x x x x x x

S S

S S

S S

S S

S S

S S

S S

SS

CO

CO

CO

CO

FIP

FH

WV

WV

CO?

U

E

U

E

TB

TB

U

T

U

T

FH

WV

ICV

WV

FH

(2616)

(E) CURB

(E) WALKWAY

(E) CONC DRIVEWAY

CONC PARKING

S

T

S

T R

E E

T

(E) WALKWAY

(E) CURB

(E) CURB

(E) CURB

(E) CURB

(E) CURB

(E) CURB

(E) CURB

SSMH

FOUND MONUMENT

DORM

EL = 2639.07

N: 11681394.49

E:1678981.79

BASIS OF BEARING N59°30'07"E 5829.02'

.4

1.22%

10.53%

FOUND MONUMENT

DRY

EL = 2615.78'

N: 11678436.20

E:1673959.24

(E) EQUIPMENT YARD

(E) EQUIPMENT YARD

(E) GAS METER

N

E

N

GG

G

G

G

G

G

G

G

G

G

G

G

G

G

G

(E) 4" GAS LINE

(E) 8" WATER LINE

(E) 4" GAS LINE

(E) 2" GAS LINE

W

W W

W

W

W

W W

W W

W

W

W

W W W

W

W

W

W W

W

S

S

S S

S S

S S

S S

S S

S S

S S

(E) 8" SEWER LINE

(E) 8" WATER LINE

(E) 8" WATER LINE

SS

SS

W

G

G

(E) 2" GAS LINE

(E) 10" WATER LINE

W

W

(E) 8" WATER LINE

(E) 8" WATER LINE

(E) 10" SEWER LINE

(E) 8" WATER LINE

SCALE:

10' 20' 40'

1"=20'

\\tt.local\IER\Projects\Louisville\IER\01297\200-01297-16030\CAD\SheetFiles\C-101-SITE PLAN.dwg

ANT ANTENNA

BM BENCHMARK

(C) CALCULATED

CB CATCH BASIN

CO CLEANOUT

CONC CONCRETE

CM CONCRETE

MONUMENT

CMP CORRUGATED METAL

PIPE

CPP CORRUGATED

PLASTIC PIPE

(D) AS DESCRIBED

DIP DUCTILE IRON PIPE

(E) EXISTING

EB ELECTRIC RISER

ELEC ELECTRIC

EOA EDGE OF ASPHALT

EM ELECTRIC METER

EOC EDGE OF CONCRETE

ET ELECTRIC

TRANSFORMER

F FOUND

FDC FIRE DEPT

CONNECTION

FF FINISHED FLOOR

FH FIRE HYDRANT

FO FIBER OPTIC

G GAS

GM GAS METER

GV GAS VALVE

INV INVERT

IP IRON PIPE

IR IRON ROD

IRRV IRRIGATION VALVE

JBL JURISDICTIONAL

BOUNDARY LINE

(M) MEASURED

MH MANHOLE

MW MONITORING WELL

ND NAIL & DISK

NL NAIL

OE OVERHEAD UTILITY

LINES

P POST

(P) PER PLAT

PB PLAT BOOK

PG PAGE

PK PK NAIL

RCP REINFORCED CONC

PIPE

RR RAILROAD

S SET

SC SECTION CORNER

SPIG WATER SPIGOT

SS SANITARY SEWER

SD STORM DRAIN

SV SANITARY SEWER

VALVE

TB TELEPHONE RISER

TEL TELEPHONE

TP TRAVERSE POINT

TSC TRAFFIC SIGNAL

CONTROL

TSP TRAFFIC SIGNAL POLE

TV CABLE TELEVISION

UE UNDERGROUND

UTILITY LINES

W WATER

WM WATER METER

WV WATER VALVE

XC X CUT

ABBREVIATIONS

UTILITIES REPRESENT A COMBINATION

OF FACILITIES LOCATED IN FIELD AND

GIS FILE PROVIDED BY BASE PERSONNEL.

REFER TO THE MECHANICAL, ELECTRICAL,

PLUMBING, AND ARCHITECTURAL SHEETS FOR

FACILITY DEMOLITION PLANS.

NOTES

P

UTILITY METER (AS SHOWN)

UTILITY RISER (AS SHOWN)

UTILITY MANHOLE (AS SHOWN)

UTILITY VALVE (AS SHOWN)

LIGHT POLE

FIRE HYDRANT

POST

TRAFFIC SIGN

SPIGOT

DECIDUOUS TREE

CLEANOUT

FLAG (AS SHOWN)

CO

UTILITY POLE (AS SHOWN)

GUY ANCHOR

UE

(E) ELECTRICAL

(E) SEWER LINE

W (E) WATER LINE

SS

LEGEND

DRAINAGE ARROW

G

(E) GAS LINE

BACKFLOW PREVENTER

(E) FENCE

x x x x

MONUMENT

UT

(E)COMMUNICATIONS CABLE

BUILDING 5045

SITE PLAN1

1"=20'

N

C-101

Bar Measures 1 inch

CONSTRUCTION NOTES

1. CONCRETE PAD PER MECHANICAL DETAIL SHEETS

REMOVE EXISTING-PROTECT IN PLACE

CONSTRUCT

PROPOSED CONCRETE PAD

REMOVE EXISTING CONCRETE

09/01/2017

H

S

S x x

H

S

S x x

H

S

S x x

H

S

S x x

H

S

S x x

H

S

S x x

1'-0"

EQUAL EQUAL

1'-0"

12'-0" MAX

SEE NOTE 3

M

A X

S E

E

N

O T

E

B

S-101

A

S-101

D

S-101

EQUAL EQUAL

S E

E

N

O T

E

± 11'-2

SEE NOTE 3

EVAPORATOR,SEE

MECH. DWGS.

W8x15W8x15

W8x15W8x15

W x

W x

W x

B

S-101

A

S-101

KNEE BRACE (TYP)

RE: SECTION C

W8x15, SEE PLANW8x15, SEE PLAN

HSS4x4x1/4, SEE PLAN

L3x3x1/4 L3x3x1/4 L3x3x1/4 L3x3x1/4

3/4" CHAMFER,

(TYP)

C

S-101

GRADE

(SEE CIVIL)

1' - 6" MIN ENGR'D

FILL BELOW SLAB

EVAPORATOR NOT

SHOWN FOR CLARITY

RE: MECH

4" CRUSHED STONE

ENGINEER FILL PER

EARTHWORK SPEC

(TYP)

2'-0"

(TYP)

L3x3x1/4

(TYP)

2'-0

W.P.

2'-0

W.P.

6'-1

HSS4x4x1/4

(TYP)

3/4" CHAMFER

(TYP)

WORK POINT

(TYP)

#5 @ 12" O.C.

E.W., T&B

GRADE

(SEE CIVIL)

C

S-101

C

L R

3" CLR 3" CLR

C

L R

HSS4x4x1/4

(TYP)

3/4" CHAMFER

(TYP)

2'-0

W.P.

PL. 5/16"x3 1/2"x0'-6"

(2) 3/4" DIA. A-325 BOLTS

" 1

WORK POINT

(TYP)

3/16

CAP PLATE (TYP)

2" 6" 2"

10"

(4) 3/4" DIA. EXPANSION

ANCHORS W/ 6" MIN. EMBED.

HSS4x4x1/4 POST

PL. 5/8 x REQ'D

3/16

\\TTS024FS1\Projects\IER\01297\200-01297-16030\CAD\SheetFiles\S-101 EVAPORATOR PLAN.dwg

EVAPORATOR SUPPORT FOUNDATION PLAN

SCALE: 1/2" = 1'-0"

EVAPORATOR SUPPORT FRAMING PLAN

SCALE: 1/2" = 1'-0"

FRAMING SECTIONA

SCALE: 1/2" = 1'-0"

FRAMING SECTIONB

SCALE: 3/4" = 1'-0"

TYPICAL CONNECTIONSC

SCALE: 3/4" = 1'-0"

TYPICAL BASE PLATED

SCALE: 1 1/2" = 1'-0"

S-101

NOTES:

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING DIMENSIONS AND

COORDINATE ALL NEW WORK WITH THE EXISTING CONDITIONS. THIS

SHALL BE COMPLETED PRIOR TO PROCUREMENT OR FABRICATION OF

ANY MATERIALS.

2. ALL EXTERIOR STEEL SHALL BE GALVANIZED, INCLUDING HOT ROLLED

MEMBERS, CONNECTION PIECES, AND ANCHOR BOLTS.

3. THE DETAILS SHOWN ON THIS SHEET ARE ONLY INTENDED TO BE USED

FOR SCHEMATIC PURPOSES. THE CONTRACTOR SHALL COORDINATE

ALL DIMENSIONS AND REQUIRED ATTACHMENTS OF THE SELECTED

FOAM GENERATORS. ANY ADDITIONAL STEEL SUPPORTS, CONNECTIONS,

OR ATTACHMENTS THAT ARE REQUIRED BY THE SELECTED FOAM

GENERATOR SHALL BE SUPPLIED AS NO ADDITIONAL COST TO THE

GOVERNMENT.

4. THE STRUCTURAL HAS BEEN DESIGNED FOR A MAXIMUM OPERATING

WEIGHT OF 3,000 lbs. FOR THE EVAPORATOR. THE CONTRACTOR

SHALL VERIFY THE SELECTED EVAPORATOR WEIGHS LESS THAN

THIS DESIGN LOAD.

GRID / COLUMN LINE

DESIGNATOR

DOOR TAG

INTERIOR ELEVATION MARK

WALL TAG

SECTION OR DETAIL MARK

EXTERIOR ELEVATION MARK

REVISION TAG

DETAIL CALLOUT MARK

SHEET NUMBER WHERE INTERIOR

ELEVATION IS DRAWN

X

EQUIPMENT TAG

CASEWORK TAG

CEILING TYPE

SHEET NUMBER WHERE EXTERIOR

ELEVATION IS DRAWN

SHEET NUMBER WHERE

SECTION OR DETAIL IS DRAWN

SHEET NUMBER WHERE

DETAIL IS DRAWN

KEYNOTE

REVISION CLOUD

ROOM TAG

X

X-XXX

X

X-XXX

X

X

XX

X

X-XXX

CEILING HEIGHT (A.F.F.)

TOILET ACCESSORY TAG

ROOM NAME

WINDOW TAG

N

NORTH ARROW

A

101A

C01

EQ-01

TA01

XX

0'-0"

X

X-XXX

ABBREVIATIONS GENERAL NOTES

DRAWING SYMBOLS

1. THE DRAWINGS INDICATE THE GENERAL EXTENT OF

WORK. THE DRAWINGS ARE NOT INTENDED TO INDICATE

OR DESCRIBE ALL WORK REQUIRED FOR THE FULL

PERFORMANCE AND COMPLETION OF THE

REQUIREMENTS OF THE CONTRACT DOCUMENTS.

REPETITIVE FEATURES NOT NOTED ON THE DRAWINGS

SHALL BE COMPLETELY PROVIDED AS IF DRAWN IN FULL.

2. ROOM AND DOOR NUMBERS SHOWN ON DRAWINGS ARE

FOR CONSTRUCTION PURPOSES ONLY.

3. DIMENSIONS ON DRAWINGS ARE TAKEN FROM THE

LOCATIONS LISTED BELOW:

FACE OF CMU WALLS / FACE OF STUD

ROUGH OPENING OF DOORS

ROUGH OPENING OF WINDOWS

GRID LINES

MASONRY OPENINGS

4. DIMENSIONS ON INTERIOR ELEVATIONS ARE TAKEN

FROM THE LOCATIONS LISTED BELOW:

FINISHED GYPSUM WALLBOARD

FACE OF PLASTIC LAMINATE

FACE OF CABINETRY

CENTERLINE OF FIXTURES

5. ALL WORK SHALL COMPLY WITH APPLICABLE BUILDING

CODES, ORDINANCES AND REGULATORY AGENCIES.

6. NFPA 241, STANDARD FOR SAFEGUARDING

CONSTRUCTION, AND ALTERATION OPERATIONS SHALL

BE APPLIED TO THIS PROJECT.

7. BUILDING HEIGHTS AND ELEVATIONS ARE BASED UPON

PROJECT FINISH ELEVATION OF 0'-0" AT THE FIRST

FLOOR. REFERENCE CIVIL DRAWINGS FOR FIRST FLOOR

ELEVATIONS RELATIVE TO SEA LEVEL - 2,635.41'

8. NOT USED

9. REFER TO LIFE SAFETY DRAWINGS FOR FIRE-RATED

FLOOR, WALL, CEILING AND ROOF LOCATIONS. INSTALL

FIRESTOPPING AT PENETRATIONS IN RATED

CONSTRUCTION AND AT TOPS OF RATED WALLS.

10. CIVIL, MECHANICAL, PLUMBING, FIRE PROTECTION,

ELECTRICAL, AND COMMUNICATIONS INFORMATION ON

THE ARCHITECTURAL DRAWINGS IS PROVIDED FOR

CLARITY AND / OR LOCATION COORDINATION PURPOSES

ONLY, SEE RELEVANT DISCIPLINE DRAWINGS FOR

SPECIFIC INFORMATION.

11. DO NOT BEGIN WORK THAT MAY REQUIRE

COORDINATION, SUCH AS CEILING INSTALLATION, PRIOR

TO FINAL SUBMITTAL OF MECHANICAL AND ELECTRICAL

COORDINATION DRAWINGS TO CONTRACTING OFFICER

NOR PRIOR TO RESOLUTION AND APPROVAL OF

COORDINATION ISSUES.

12. WORK SHALL CONFORM TO APPLICABLE INDUSTRY AND

MANUFACTURER'S PUBLISHED STANDARDS FOR QUALITY

OF MATERIALS AND WORKMANSHIP, AS WELL AS

REQUIREMENTS IN THESE DRAWINGS AND

SPECIFICATIONS. ANY CONFLICTING REQUIREMENTS OF

THE SOURCES LISTED ABOVE SHALL BE BROUGHT TO

THE CONTRACTING OFFICER'S ATTENTION PRIOR TO

PROCEEDING WITH THE WORK.

13. PROTECT EXISTING, IN-PLACE AND NEW WORK

14. CONTRACTOR SHALL VERIFY DIMENSIONS AND EXISTING

CONDITIONS, SHOWN ON THESE DRAWINGS, AT THE SITE.

THE CONTRACTOR SHALL NOTIFY THE CONTRACTING

OFFICER IN WRITING OF ANY DISCREPANCIES,

OMISSIONS AND OR CONFLICTS BEFORE

COMMENCEMENT OF WORK. COMMENCEMENT OF WORK

SHALL CONSTITUTE ACCEPTANCE OF ALL NEW OR

EXISTING CONDITIONS.

A-001

15. PROVIDE UNDERSLAB TERMITE PROTECTION AS

REQUIRED BY GOVERNING BUILDING CODE

REQUIREMENTS.

16. PIPE DUCTS AND BUSS DUCTS THAT PENETRATE FLOOR

SLABS OR WALL PARTITIONS SHALL BE INSTALLED IN A

MANNER THAT WILL PRESERVE THE MOISTURE

RESISTANCE, FIRE RATING, AIR AND/OR VAPOR BARRIER,

AND STRUCTURAL INTEGRITY OF THE BUILDING.

17. VERIFY MOUNTING HEIGHTS OF ACCESSORIES,

EQUIPMENT, DOOR HARDWARE, CASEWORK, ETC., AND

PROVIDE SOLID BLOCKING BEHIND ITEMS REQUIRING

ANCHORAGE. PROVIDE FIRE-TREATED WOOD BLOCKING

OR METAL STRAPS BETWEEN FRAMING MEMBERS AS

REQUIRED TO SUPPORT WEIGHT AND USE OF ITEMS TO

BE SUPPORTED. WHERE MOUNTING HEIGHTS ARE NOT

INDICATED, MOUNT ITEMS IN ACCORDANCE WITH

RECOGNIZED INDUSTRY STANDARDS, COORDINATE

LOCATIONS WITH MANUFACTURER OR SUPPLIER AND

REFER MOUNTING HEIGHT QUESTIONS TO CONTRACTING

OFFICER FOR INTERPRETATION.

18. ALL CONCEALED WOOD FRAMING, AND PLYWOOD SHALL

BE FIRE RETARDANT TREATED (FRT) EXCEPT THAT

NON-FRT BLOCKING, NAILERS AND FURRING MAY BE

USED WHERE INSTALLED IN ACCORDANCE WITH IBC 718

(INCLUDING DIMENSIONAL WOOD BLOCKING, FIRE

BLOCKING, REQUIREMENTS, ETC.). WOOD BLOCKING

INSTALLED IN ACCORDANCE WITH IBC SECTION 603 FOR

HANDRAILS, MILLWORK, CABINETS, WINDOWS AND

DOORS IS NOT REQUIRED TO BE FRT. AT COPINGS AND

ROOFING TERMINATIONS ALL BLOCKING SHALL BE

PRESSURE TREATED (PT).

19. AT EXTERIOR MASONRY WALLS, CMU SHALL BE

EXTENDED TIGHT TO FLOOR AND / OR ROOF DECKS,

INCLUDING AROUND ALL PENETRATIONS SUCH AS

BEAMS, JOIST ENDS, AND ETC. FILLING VOIDS IN EXT.

CMU BACK-UP WITH INSULATION IN LIEU OF A SOLID

MASONRY ENCLOSURE SHALL NOT BE PERMITTED.

20. VERTICAL COURSING FOR NEW MASONRY WALL

CONSTRUCTION SHALL EQUAL EIGHT INCHES (8") FOR

ONE CONCRETE MASONRY UNIT PLUS ONE MORTAR

JOINT AND THREE BRICK COURSES PLUS THREE MORTAR

JOINTS, UNLESS NOTED OTHERWISE.

21. PROVIDE CONTROL JOINTS (C.J.) IN MASONRY WALL

CONSTRUCTION AS INDICATED. WHERE NOT SHOWN,

PROVIDE MAXIMUM SPACING BETWEEN JOINTS OF 40'-0"

AND MAXIMUM DISTANCE BETWEEN OUTSIDE CORNERS

AND JOINTS OF 10'-0." PROVIDE JOINTS BETWEEN

INTERIOR LOAD BEARING AND NON-LOAD BEARING

PARTITIONS, AT ALL ABRUPT CHANGES IN WALL HEIGHT,

AT CHANGES IN PARTITION THICKNESS AND AT PILASTER

LOCATIONS. VERIFY FINAL CONTROL JOINT LOCATIONS

WHETHER OR NOT INDICATED ON THE DRAWINGS WITH

CONTRACTING OFFICER PRIOR TO STARTING WORK.

22. PROVIDE CONTROL JOINTS (C.J.) IN GYPSUM BOARD

WALL CONSTRUCTION AS INDICATED. WHERE NOT

SHOWN, PROVIDE MAXIMUM SPACING BETWEEN JOINTS

OF 30'-0." VERIFY FINAL CONTROL JOINT LOCATIONS

WHETHER OR NOT INDICATED ON THE DRAWINGS WITH

CONTRACTING OFFICER PRIOR TO STARTING WORK.

23. INTERIOR PARTITION MOVEMENT CONTROL: (A).

VERTICAL CONTROL JOINTS FOR ANY WALL ARE TO

OCCUR AT NOT MORE THAN 30'-0" O.C. IN THE

HORIZONTAL DIRECTION, UNO. (B). THE TYPICAL

MOVEMENT OF THE STRUCTURE DUE TO DEFLECTION AT

THE HEAD OF THE WALL CONSTRUCTION RUNNING TO

THE UNDERSIDE OF THE STRUCTURE SHALL BE +/- 1/2".

24. INTERIOR STUD SPACING SHALL BE MINIMUM 16" ON

CENTER, UNLESS NOTED OTHERWISE.

25. PROVIDE WATER-RESISTANT GYPSUM BOARD ON WALLS

WITH OPERABLE PLUMBING FIXTURES AND WITHIN 4'-0"

OF DRINKING FOUNTAINS OR WATER COOLERS.

26. PROVIDE FINISHED END PANELS, FILLERS, SUPPORTS,

ETC. REQUIRED FOR A COMPLETE CABINETRY

INSTALLATION. PROVIDE CUTOUTS, ACCESS PANELS AND

REMOVABLE COMPONENTS AS REQUIRED BY NEW OR

EXISTING CONDITIONS SUCH AS ELECTRICAL OUTLETS,

JUNCTION BOXES, CLEANOUTS, ETC.

27. PROVIDE SEALANT BETWEEN HOLLOW METAL FRAME

PERIMETERS AND SURROUNDING WALL CONSTRUCTION

UNLESS OTHERWISE INDICATED.

28. PROVIDE SEALANT BETWEEN INTERIOR AND EXTERIOR

WINDOW AND STOREFRONT FRAME PERIMETERS AND

SURROUNDING CONSTRUCTION UNLESS OTHERWISE

INDICATED.

29. PROVIDE SEALANT BETWEEN DISSIMILAR MATERIALS

SUCH AS GYPSUM BOARD AND MASONRY, MASONRY AND

CONCRETE, COUNTERTOPS AND WALLS, ETC.

30. MANUFACTURERS ARE REFERENCED TO ESTABLISH

STYLE, SIZE, COLOR AND MATERIAL CHARACTERISTICS

AND ARE NOT INTENDED TO LIMIT SELECTIONS FROM

OTHER MANUFACTURERS. WHEN AN ALTERNATE

SELECTION IS SUBMITTED, SUBMITTALS SHALL HAVE

INCLUDED THE MATERIAL LISTED FOR COMPARISON.

31. FLASHING COLOR TO MATCH ADJACENT WALL COLOR

UNLESS NOTED OTHERWISE.

32. ALL DOORS IN STUD WALLS NOT LOCATED BY DIMENSION

ON PLANS OR DETAILS SHALL BE 4" (100mm) FROM

FRAMING TO ADJACENT PERPENDICULAR WALL TO EDGE

OF DOOR OPENING.

33. ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY

SHALL BE PRESERVATIVE TREATED WOOD.

34. UNLESS NOTED OTHERWISE ALL GYPSUM WALLBOARD IS

TO RECEIVE ONE PRIMER COAT AND TWO COATS OF

PAINT AS PER SPECIFICATION 099000.

35. PROVIDE EXPANSION AND CONTROL JOINTS IN ALL WORK

AS PER PRODUCT MANUFACTURER'S STANDARDS.

36. ALL DISSIMILAR MATERIALS SHALL BE ISOLATED FROM

EACH OTHER TO AVOID GALVANIC CORROSION.

37. PROVIDE ACCESS PANELS AS REQUIRED BY APPLICABLE

CODES AND AS REQUIRED FOR MECHANICAL EQUIPMENT

AND PLUMBING WORK. ALL ACCESS PANEL LOCATIONS

SHALL BE REVIEWED WITH THE CONTRACTING OFFICER

PRIOR TO PROCEEDING.

38. "ALIGN" AS USED IN THESE DOCUMENTS SHALL MEAN TO

ACCURATELY LOCATE FINISHED FACES IN THE SAME

PLAN AND/OR TO INSTALL NEW CONSTRUCTION

ADJACENT TO EXISTING CONSTRUCTION WITHOUT ANY

VISIBLE JOINTS OR SURFACE IRREGULARITIES.

39. "CLEAR" AS USED IN THESE DOCUMENTS SHALL MEAN

THAT THE CONDITION IS NOT ADJUSTABLE WITHOUT

APPROVAL OF THE CONTRACTING OFFICER. CLEAR

DIMENSIONS ARE TYPICAL.

40. "MAXIMUM" OR "MAX" AS USED IN THESE DOCUMENTS

SHALL MEAN THAT THE CONDITION IS SLIGHTLY

ADJUSTABLE BUT MAY NOT VARY TO A DIMENSION OR

QUANTITY GREATER THAN THAT SHOWN WITHOUT

APPROVAL OF THE CONTRACTING OFFICER.

41. "MINIMUM" OR "MIN" AS USED IN THESE DOCUMENTS

SHALL MEAN THAT THE CONDITION IS SLIGHTLY

ADJUSTABLE BUT MAY NOT VARY TO A DIMENSION OR

QUANTITY LESS THAN THAT SHOWN WITHOUT APPROVAL

OF THE CONTRACTING OFFICER.

42. "TYPICAL" AS USED IN THESE DOCUMENTS SHALL MEAN

THAT THE CONDITION OR DIMENSION IS THE SAME OR

REPRESENTATIVE FOR SIMILAR CONDITIONS

THROUGHOUT.

43. "+/-" AS USED IN THESE DOCUMENTS SHALL MEAN THAT

THE DIMENSION OR QUALITY IS SLIGHTLY ADJUSTABLE

TO ACCOMMODATE ACTUAL CONDITIONS, FIELD

VERIFICATION AND COORDINATION WITH OTHER

ELEMENTS AS MIGHT BE NECESSARY.

A

(A) AS DESCRIBED

A LABEL A LABEL CLASS DOOR

A/C AIR CONDITIONING

UNIT

AB ANCHOR BOLT

ABDN ABANDON

ACC ACCESSIBLE

ACI AMERICAN CONCRETE

INSTITUTE

ACOUST ACOUSTIC(AL)

ACP ACOUSTICAL CEILING

PANEL

ACS AUTOMATIC CONTROL

SYSTEM

ACT ACOUSTICAL CEILING

TILE

ACU AIR CONDITIONING

UNIT

ADA AMERICANS WITH

DISABILITIES ACT

ADD ADDITIONAL ADMIN

ADMINISTRATION

AFF ABOVE FINISH FLOOR

AFG ABOVE FINISH GRADE

AHU AIR HANDLING UNIT

AIB AIR INFILTRATION

BARRIER

AISC AMERICAN INSTITUTE

OF STEEL

CONSTRUCTION

ALT ALTERNATE

ALUM ALUMINUM

ANOD ANODIZE

ANT ANTENNA

APPROX APPROXIMATE(LY)

APVD APPROVED

AR AS REQUIRED

ARCH ARCHITECT(URAL)

ASC ABOVE SUSPENDED

CEILING

ASSY ASSEMBLY

ATFP ANTI-TERRORISM /

FORCE PROTECTION

AVG AVERAGE

AW ARCHITECTURAL

WOODWORK

AWT ACOUSTICAL WALL

TREATMENT

B

B LABEL B LABEL CLASS DOOR

BALC BALCONY

BB BASEBOARD

BD BOARD

BFF BELOW FINISH FLOOR

BHMA BUILDER'S HARDWARE

MANUFACTURER'S

ASSOCIATION

BL BASELINE

BLDG BUILDING

BLKG BLOCKING

BLT IN BUILT-IN

BM BEAM

BM BENCH MARK

BN BULLNOSE

BOF BOTTOM OF FOOTING

BOS BOTTOM OF STEEL

BOT BOTTOM

BP BUILDING PAPER

BRG BEARING

BRKT BRACKET

BSMT BASEMENT

BTWN BETWEEN

BUR BUILT UP ROOF

C

C CENTER POINT

(C) CALCULATED

C CONC CAST CONCRETE

C LABEL C LABEL CLASS DOOR

C-C CENTER TO CENTER

CAB CABLE

CATW CATWALK

CAV CAVITY

CB CATCH BASIN

CB CEMENTITIOUS

(BACKER) BOARD

CBB CEMENTITIOUS

BACKER BOARD

CD CONSTRUCTION

DOCUMENT(S)

CDW CHILLED DRINKING

WATER

CEM PLAS CEMENT PLASTER

CER CERAMIC

CF CONTRACTOR

FURNISHED

CF/CI CONTRACTOR

FURNISHED/

CONTRACTOR

INSTALLED

CFE CONTRACTOR

FURNISHED

EQUIPMENT

CFLG COUNTER FLASHING

CFM CUBIC FEET PER

MINUTE

CFMF COLD FORM METAL

FRAMING

CFS CUBIC FEET PER

SECOND

CFT CERAMIC FLOOR TILE

CG CORNER GUARD

CI CAST IRON

CJ CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLG DIFF CEILING DIFFUSER

CLG HT CEILING HEIGHT

CLL COLUMN LINE

CLO CLOSET

CLR CLEAR

CLRM CLASSROOM

CM CONCRETE

MONUMENT

CMP CORRUGATED METAL

PIPE

CMU CONCRETE MASONRY

UNIT

CNDS CONDENSATE

CO CLEANOUT

COL COLUMN

COMM COMMUNICATIONS

CONC CONCRETE

CONC FLR CONCRETE FLOOR

CONF CONFERENCE

CONST CONSTRUCTION

CONT CONTINUOUS

COORD COORDINATE

CORR CORRIDOR

CP CONCRETE PIPE

CPP CORRUGATED

PLASTIC PIPE

CPT CARPET

CR CONTROL ROOM

CS CAST STONE

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE - BASE

CTF CERAMIC TILE - FLOOR

CTR CENTER

CTW CERAMIC TILE - WALL

CU FT CUBIC FEET

CW CASEMENT WINDOW

CWT CERAMIC WALL TILE

D

D DEPTH

D LABEL D LABEL CLASS DOOR

DBL DOUBLE

DEMO DEMOLISH

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DIP DUCTILE IRON PIPE

DIST DISTANCE

DK DECK

DN DOWN

DOC DOCUMENT

DR DOOR

DS DOWNSPOUT

DWG(S) DRAWING(S)

E

E EAST

E LABEL E LABEL CLASS DOOR

EA EACH

EB ELECTRICAL RISER

EF EACH FACE

EIFS EXTERIOR INSULATION

AND FINISH SYSTEM

EJ EXPANSION JOINT

EL ELEVATOR

ELEC ELECTRIC(AL)

ELEV ELEVATION

ENGR ENGINEER

ENTR ENTRY

EOA EDGE OF ASPHALT

EOC EDGE OF CONCRETE

EOG EDGE OF GUTTER

EM ELECTRICAL METER

EP EXPLOSION PROOF

EPS EXPANDED

POLYSTYRENE BOARD

EQ EQUAL

EQUIP EQUIPMENT

ET ELECTRICAL

TRANSFORMER

EW EACH WAY

EWC ELECTRIC WATER

COOLER

EXIST EXISTING

EXP EXPOSED

EXP AB EXPANSION ANCHOR

BOLT

EXPN EXPANSION

EXPT EXTERIOR PAINT

EXT EXTERIOR

EXT GR EXTERIOR GRADE

F

F FOUND

FA FIRE ALARM

FAAP FIRE ALARM

ANNUNCIATOR PANEL

FAS BD FASCIA BOARD

FC BRK FACE BRICK

FCO FLOOR CLEAN OUT

FD FLOOR DRAIN

FDC FIRE DEPT

CONNECTION

FDTN FOUNDATION

FEC FIRE EXTINGUISHER

CABINET

FED FEDERAL

FF FINISH FLOOR

FF INSUL FOIL FACED

INSULAITON

FFE FINISH FLOOR

ELEVATION

FG FINISH GRADE

FGL FIBERGLASS

FH FIRE HOSE

FH FIRE HYDRANT

FIG FIGURE

FIN FINISH (ED)

FIXT FIXTURE

FL FLOOR

FLDG FOLDING

FLEX FLEXIBLE

FLMT FLUSH MOUNTED

FLR FLOOR

FLUOR FLUORESCENT

FM FACTORY MUTUAL

FO FIBER OPTIC

FOC FACE OF CONCRETE

FOM FACE OF MASONRY

FOS FACE OF STEEL

FR FIRE RESISTANT

FRG FIBER REINFORCED

GYPSUM

FRMG FRAMING

FRP FIBERGLASS

REINFORCED PLASTIC

FRT FIRE RETARDANT

TREATED

FT FOOT

FTG FOOTING

FUR FURRING

FWC FABRIC

WALLCOVERING

G

G GAS

GA GAUGE

GAL GALLON

GALV GALVANIZED

GB GRAB BAR

GFCI GOVERNMENT

FURNISHED /

CONTRACTOR

INSTALLED

GFCMU GROUND FACE

CONCRETE MASONRY

UNIT

GL GRID LINE

GLZ GLAZING

GM GAS METER

GR FL GROUND FLOOR

GRTG GRATING

GS GRATING SUPPORT

GV GRAVEL

GV GAS VALVE

GWB GYPSUM WALL BOARD

GYP GYPSUM

H

H HORN

HB HOSE BIB

HC HOLLOW CORE

HDPE HIGH DENSITY

POLYETHYLENE

HDW HARDWARE

HDWD HARDWOOD

HEPA HIGH EFFICIENCY

PARTICULATE AIR

FILTER

HGT HEIGHT

HK HOOK

HM HOLLOW METAL

HORIZ HORIZONTAL

HT HEIGHT

HVAC HEATING VENTILATION

AND AIR

CONDITIONING

HW, HARDWARE

HDWR

HYD HYDRAULIC

I

IBC INTERNATIONAL

BUILDING CODE

ICF INSULATED

CONCRETE FORM

IF INSIDE FACE

IG INSULATING GLASS

IJ ISOLATION JOINT

ILO IN LIEU OF

IN INCH

INCAND INCANDESCENT

INSUL INSULATION

INV INVERT

IP IRON PIPE

IR IRON ROD

IRP INSULATED ROOF

PANEL

IRRV IRRIGATION VALVE

ITG INSULATED

TEMPERED GLASS

IWP INSULATED WALL

PANEL

J

J JUNCTION BOX

JAN JANITOR

JBL JURISDICTIONAL

BOUNDARY LINE

JST JOIST

JT JOINT

K

KIT KITCHEN

KPD KEYPAD

KPL KICKPLATE

L

LAM LAMINATE

LAV LAVATORY

LBR LUMBER

LBS POUNDS

LDG LANDING

LF LINEAR FOOT (FEET)

LG LONG

LIB LIBRARY

LIN LINEAR

LKR LOCKER

LLH LONG LEG

HORIZONTAL

LLV LONG LEG VERTICAL

LNT LINTEL LOC LOCATION

LP LIGHT POLE

LS LABORATORY SINK

LT LIGHT

LVDR LOUVER DOOR

LVR LOUVER

M

M METERS

(M) MEASURED

MATL MATERIAL

MAX MAXIMUM

MB MOISTURE BARRIER

MC MOISTURE CONTENT

MD METAL DECK

MECH MECHANICAL (ROOM)

MEMB MEMBRANE

MF MILL FINISH

MFR MANUFACTURER

MH MAN HOLE

MID MIDDLE

MIN MINIMUM

MIRR MIRROR

MO MASONRY OPENING

MOD MODIFY

MRGWB MOISTURE RESISTANT

GYPSUM WALLBOARD

MTD MOUNTED

MTG MOUNTING

MTL METAL

MW MONITORING WELL

MWP MEMBRANE

WATERPROOFING

N

N NORTH

NA NOT APPLICABLE

ND NAIL & DISK

ND NAPKIN DISPOSAL

NDS NAPKIN DISPENSER

NE NORTH EAST

NFPA NATIONAL FIRE

PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NL NAIL

NO NUMBER

NOM NOMINAL

NP NO PAINT

NRC NOISE REDUCTION

COEFFICIENT

NTS NOT TO SCALE

NW NORTHWEST

O

OTO OUT TO OUT

OA OVERALL

OC ON CENTER

OCC OCCUPANCY

OD OUTSIDE DIAMETER

OE OVERHEAD UTILITY

LINES

OFCI OWNER FURNISHED

CONTRACTOR

INSTALLED

OFD OVERFLOW DRAIN

OFF OFFICE

OFOI OWNER FURNISHED

OWNER INSTALLED

OGL OBSCURE GLASS

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPQ OPAQUE

OPR OPERABLE

ORIG ORIGINAL

OSB ORIENTED STRAND

BOARD

OTS OPEN TO STRUCTURE

OWSJ OPEN WEB STEEL

JOIST

OZ OUNCE

P

P POST

(P) PER PLAT

PA PUBLIC ADDRESS

PAR PARAPET

PAT PATTERN

PB PLAT BOOK

PB PULL BOX

PBD PARTICLE BOARD

PCC PRECAST CONCRETE

PCF POUND PER CUBIC

FOOT

PCT PERCENT

PEMB PRE-ENGINEERED

METAL BUILDING

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PG PAGE

PH PHASE

PIL PILASTER

PK PK NAIL

PL PROPERTY LINE

PL GL PLATE GLASS

PLAM PLASTIC LAMINATE

PLAS PLASTIC

PLBG PLUMBING

PLG PILING

PLYWD PLYWOOD

PNL PANEL

POC POINT OF CONTACT

POLY POLYSTYRENE

PP PL PUSH/PULL PLATE

PR PAIR

PRCST PRECAST

PREFAB PREFABRICATED

PRKG PARKING

PS CONC PRESTRESSED

CONCRETE

PSF POUNDS PER SQUARE

FOOT

PSI POUNDS PER SQUARE

INCH

PT PRESSURE TREATED,

PAINT

PTD PAPER TOWEL

DISPENSER

PTDR PAPER TOWEL

DISPENSER AND

RECEPTACLE

PTN PARTITION

PWR POWER

Q

QT QUARRY TILE

QTY QUANTITY

R

R RISER

RB RUBBER BASE

RCP REFLECTED CEILING

PLAN

RCP REINFORCED CONC

PIPE

RD ROOF DRAIN

REC RECESSED

REF REFERENCE

REFR REFRIGERATOR

REM REMOVABLE

REP REPAIR

REQ REQUIRE

REQ'D REQUIRED

RESIL RESILIENT

REV REVISION

RF RESILIENT FLOORING

RH RIGHT HAND

RHR RIGHT HAND REVERSE

RL ROOF LEADER

RLG RAILING

RM ROOM

RO ROUGH OPENING

RR RESTROOM

RR RAILROAD

RSD ROLLING STEEL DOOR

RV ROOF VENT

RVL REVEAL

S

S SET

S SOUTH

S2S SURFACE TWO SIDES

S4S SURFACE FOUR SIDES

SAPC SUSPENDED

ACOUSTICAL PANEL

CEILING

SATC SUSPENDED

ACOUSTICAL TILE

CEILING

SB SPLASH BLOCK

SC SHOWER CURTAIN

SC SECTION CORNER

SCHED SCHEDULE

SCR SHOWER CURTAIN

ROD

SCW SOLID CORE WOOD

SCWD SOLID CORE WOOD

DOOR

SD SMOKE DETECTOR

SD STORM DRAIN

SE SOUTH EAST

SF SQUARE FOOT

SF SQUARE FEET

SFTWD SOFT WOOD

SGL SINGLE

SH SOAP HOLDER

SHR SHOWER

SHT MTL SHEET METAL

SHTHG SHEATHING

SHV SHELVING

SIM SIMILAR

SJ SCORED JOINT

SKLT SKYLIGHT

SLNT SEALANT

SLR SEALER

SM SQUARE METER

SMHD SHELF METAL HEAVY

DUTY

SMK SMOKE

SMLS SEAMLESS

SND SANITARY NAPKIN

AND TAMPON

DISPENSER

SP EL SPOT ELEVATION

SPEC SPECIFICATIONS

SPF SPRAY APPLIED

POLYURETHANE FOAM

INSULATION

SPIG WATER SPIGOT

SQ SQUARE

SQ FT SQUARE FOOT (FEET)

SQ IN SQUARE INCH

SQ M SQUARE METER

SQ YD SQUARE YARD

SS STAINLESS STEEL

SS SANITARY SEWER

SSMR STANDING SEAM

METAL ROOF

ST STAIRS, STAIN

STC SOUND

TRANSMISSION CLASS

STD STANDARD

STL STEEL

STL JST STEEL JOIST

STL RF DK STEEL ROOF DECK

STOR STORAGE

STR STRINGER

STRB/HRN STROBE / HORN

STRUCT STRUCTURE(AL)

SUB FL SUB FLOOR

SUSP SUSPENDED

SV SHEET VINYL

SV SANITARY SEWER

VALVE

SW SOUTHWEST

SYM SYMMETRICAL

T

T TREAD

T&G TONGUE AND GROOVE

T/S TUB / SHOWER

TB TOWEL BAR

TB TELEPHONE RISER

TC TERRA COTTA

TD TRAVEL DISTANCE

TEL TELEPHONE

TEMP TEMPORARY

TER TERRAZZO

TFF TOP OF FINISH FLOOR

THK THCKNESS

TK BD TACK BOARD

TLT TOILET

TMPD GL TEMPERED GLASS

TN TRUE NORTH

TOF TOP OF FOOTING

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOPO TOPOGRAPHY

TOS TOP OF SLAB

TP TRANSVERSE POINT

TRANS TRANSOM

TRTD TREATED

TS TUBE STEEL

TSC TRAFFIC SIGNAL

CONTROL

TSP TRAFFIC SIGNAL POLE

TV CABLE TELEVISION

TYP TYPICAL

U

UE UNDERGROUND

UTILITY LINES

UNF UNFINISHED

UNO UNLESS NOTED

OTHERWISE

UR URINAL

V VB VAPOR BARRIER

VCT VINYL COMPOSITION

TILE

VERT VERTICAL

VR VAPOR RETARDER

VTC VIDEO

TELECONFERENCE

VTR VENT THROUGH ROOF

W

W WATER

W WEST

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WD WOOD

WG WIRE GLASS

WM WATER METER

WOM WALK OFF MAT

WR WASTE RECEPTACLE

WRB WEATHER RESISTANT

BARRIER

WRGWB WATER RESISTANT

GYPSUM WALLBOARD

WS WATER STOP

WTP WATER TREATMENT

PLANT

WV WATER VALVE

WWTP WASTE WATER

TREATMENT PLANT

X

XC X CUT

\\tt.local\IER\Projects\Louisville\IER\01297\200-01297-16030\CAD\SheetFiles\A-001.dwg

AutoCAD SHX Text

ABBREVIATIONS, GENERAL NOTES, SYMBOLS

AutoCAD SHX Text

TCL

AutoCAD SHX Text

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FIRE DEPARTMENT

AutoCAD SHX Text

SAFETY OFFICE

AutoCAD SHX Text

ENVIRONMENTAL QUALITY

AutoCAD SHX Text

SECURITY

AutoCAD SHX Text

COMMUNICATIONS

AutoCAD SHX Text

CE OPERATIONS

AutoCAD SHX Text

CONTRACT MANAGEMENT

AutoCAD SHX Text

AIRFIELD MANAGEMENT

AutoCAD SHX Text

DAVIS-MONTHAN AFB, ARIZONA

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

CIVIL ENGINEER OFFICE

AutoCAD SHX Text

APPROVED USING AGENCY

AutoCAD SHX Text

APPROVED CECN

AutoCAD SHX Text

APPROVED CEC

AutoCAD SHX Text

APPROVED CE

AutoCAD SHX Text

CHECKED PROJ. ENGR.

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

OF

AutoCAD SHX Text

DATE

AutoCAD SHX Text

AIR COMBAT COMMAND

AutoCAD SHX Text

DEPARTMENT OF THE AIR FORCE

AutoCAD SHX Text

AutoCAD SHX Text

01 SEP 17

AutoCAD SHX Text

06 SEP 17

AutoCAD SHX Text

ENVIRONMENTAL, FAC 5045

AutoCAD SHX Text

RPR/CNS BACKSHOPS

AutoCAD SHX Text

FBNV 130026

AutoCAD SHX Text

FBNV 130026

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

AIRFIELD LIGHTING

AutoCAD SHX Text

AIRFIELD BARRIER MAINTENANCE

MACHINE SHOP

WELDING

METAL TECH

ROOM

LOCKERS

BATTERY

OFFICE

MECH ROOM

OFFICE

8'-9"±

01 01 01 01

CONF

ADMIN OFF

OFFICE

OFFICE

OFFICE

OFFICE

WOMENS

CORRIDOR

JANITOR

TOOL STORAGE

WORK BAY

ELECTRONIC SHOPS

BREAK ROOM

STOR

OFFICE

OFFICE

NICAD BATT

LEAD BATT

02 04

123'-8"±

110'-0"±

27'-6"± 13'-4"± 27'-2"±

74'-4"±

M A

T C

H

L

I N

E

R E

F E

R E

N C

E

S H

E E

T

A

D

SCALE:

4' 8' 16'

1/8" = 1'-0''

BUILDING 5045

FLOOR PLAN - DEMOLITION - AREA A

SCALE: 1/8"=1'-0"

N

AD-101

GENERAL NOTES

1. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND LAYOUTS

PRIOR TO INITIATION OF DEMOLITION WORK.

2. CONTRACTOR SHALL USE ALL MEANS NECESSARY TO PROTECT ALL

ITEMS NOT DESIGNATED FOR REPLACEMENT WORK AND SHALL PROVIDE

APPROPRIATE DUST CONTROL AND PROTECTION.

EXISTING WALLS AND DOORS TO

REMAIN

EXISTING WALLS AND DOORS TO BE

DEMOLISHED

LEGEND

KEY NOTES - DEMOLITION

01 REMOVE EXISTING SUSPENDED ACOUSTICAL PANEL CEILING SYSTEM (I.E.

CEILING PANELS, SUSPENSION/SUPPORT SYSTEMS) FOR INSTALLATION

OF NEW MECHANICAL AND ELECTRICAL SYSTEMS. TEMPORARILY

SUPPORT AND PROTECT EQUIPMENT TO REMAIN WITHIN OPEN CEILING

AREAS DURING THE DEMOLITION PROCESS AND RECONSTRUCTION

PHASES. PREPARE OPEN CEILING AREA TO RECEIVE NEW SUSPENDED

CEILING SYSTEM AND SUBSEQUENT MECHANICAL, FIRE PROTECTION AND

ELECTRICAL FIXTURES. REFER TO REFLECTED CEILING PLAN FOR NEW

CEILING TYPES.

02 REMOVE EXISTING SUSPENDED GYPSUM WALL-BOARD CEILING SYSTEM

(I.E. GWB, SUSPENSION/FRAMING SYSTEMS) FOR INSTALLATION OF NEW

MECHANICAL AND ELECTRICAL SYSTEMS. TEMPORARILY SUPPORT AND

PROTECT EQUIPMENT TO REMAIN WITHIN OPEN CEILING AREAS DURING

THE DEMOLITION PROCESS AND RECONSTRUCTION PHASES. PREPARE

OPEN CEILING AREA TO RECEIVE NEW GWB CEILING SYSTEM AND

SUBSEQUENT MECHANICAL, FIRE PROTECTION AND ELECTRICAL

FIXTURES. REFER TO REFLECTED CEILING PLAN FOR NEW CEILING TYPES.

03 EXISTING PARTITION TO BE REMOVED:

- REMOVE EXISTING 8'-6" HIGH (PARTIAL-HEIGHT) GWB FINISHED STUD

FRAMED PARTITION.

- REMOVE EXISTING HOLLOW METAL DOUBLE DOOR UNIT, FRAME AND

ASSOCIATED HARDWARE AND ACCESSORIES.

- REMOVE EXISTING 6'-0" HIGH, VERTICALLY PLACED, OVERHEAD METAL

FRAMED EXPANDED METAL MESH PARTITION.

04 REMOVE EXISTING TOILET ROOM FIXTURES, TOILET/URINAL PARTITIONS,

SHOWER UNITS, ACCESSORIES AND COUNTERS/CABINETS. REMOVE

WALL AND FLOOR TILE INCLUSIVE OF GROUT, MORTAR AND ADHESIVE.

PREPARE SURFACE AREAS FOR NEW TILE AND PAINT FINISHES, SINK

COUNTER, TOILET FIXTURES AND PARTITIONS, SHOWER ENCLOSURE AND

ACCESSORIES.

05 SEAL LEAD BASED DOOR PAINT - ALL SURFACE AREAS; PREPARE DOOR

AND FRAME UNITS FOR NEW PAINT COATING SYSTEM.

06 REMOVE RESILIENT FLOOR SYSTEM AND ASSOCIATED BASE. PREPARE

CONCRETE FLOOR SURFACE FOR INSTALLATION OF NEW FLOOR SYSTEM

AND PERIMETER BASE.

07 REMEDIATE EXISTING MOLD CONDITIONS AT INTERIOR PARTITION.

PREPARE WALL SURFACE FOR NEW PAINT FINISH.

08 REMOVE AND STORE EXISTING LOCKER UNITS FOR ACCESS TO

MENS/WOMENS ROOMS FOR IMPROVEMENT WORK; REINSTALL AFTER

COMPLETION OF INTERIOR FINISH WORK.

09 NOT USED THIS SHEET

EXISTING FLOOR SURFACE AND

BASE TO BE DEMOLISHED

KEY PLAN

N

AREA A AREA B

\\tt.local\IER\Projects\Louisville\IER\01297\200-01297-16030\CAD\SheetFiles\AD-101-FLOOR PLAN - DEMO.dwg

AutoCAD SHX Text

FLOOR PLAN - DEMOLITION - AREA A

AutoCAD SHX Text

TCL

AutoCAD SHX Text

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FIRE DEPARTMENT

AutoCAD SHX Text

SAFETY OFFICE

AutoCAD SHX Text

ENVIRONMENTAL QUALITY

AutoCAD SHX Text

SECURITY

AutoCAD SHX Text

COMMUNICATIONS

AutoCAD SHX Text

CE OPERATIONS

AutoCAD SHX Text

CONTRACT MANAGEMENT

AutoCAD SHX Text

AIRFIELD MANAGEMENT

AutoCAD SHX Text

DAVIS-MONTHAN AFB, ARIZONA

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

CIVIL ENGINEER OFFICE

AutoCAD SHX Text

APPROVED USING AGENCY

AutoCAD SHX Text

APPROVED CECN

AutoCAD SHX Text

APPROVED CEC

AutoCAD SHX Text

APPROVED CE

AutoCAD SHX Text

CHECKED PROJ. ENGR.

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

OF

AutoCAD SHX Text

DATE

AutoCAD SHX Text

AIR COMBAT COMMAND

AutoCAD SHX Text

DEPARTMENT OF THE AIR FORCE

AutoCAD SHX Text

AutoCAD SHX Text

01 SEP 17

AutoCAD SHX Text

06 SEP 17

AutoCAD SHX Text

ENVIRONMENTAL, FAC 5045

AutoCAD SHX Text

RPR/CNS BACKSHOPS

AutoCAD SHX Text

FBNV 130026

AutoCAD SHX Text

FBNV 130026

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

AIRFIELD LIGHTING

AutoCAD SHX Text

AIRFIELD BARRIER MAINTENANCE

BREAK ROOM

SHEET METAL SHOP

POWER

GERBER

SHEET METAL SHOP

TESTING SHOP

MECH

TOOL STORAGE

RECOVERY ROOM

OFFICE

02 04

MENS

CORRIDOR

85'-8"±

48'-4"± 37'-4"± 40'-0"±

40'-0"±

24'-0"±

MENS

ENTRY VESTIBULE

S H

E E

T

A

D

M A

T C

H

L I N

E

R E

F E

R E

N C

E

SCALE:

4' 8' 16'

1/8" = 1'-0''

BUILDING 5045

FLOOR PLAN - DEMOLITION - AREA B

SCALE: 1/8"=1'-0"

N

GENERAL NOTES

1. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND LAYOUTS

PRIOR TO INITIATION OF DEMOLITION WORK.

2. CONTRACTOR SHALL USE ALL MEANS NECESSARY TO PROTECT ALL

ITEMS NOT DESIGNATED FOR REPLACEMENT WORK AND SHALL PROVIDE

APPROPRIATE DUST CONTROL AND PROTECTION.

AD-102

KEY NOTES - DEMOLITION

01 REMOVE EXISTING SUSPENDED ACOUSTICAL PANEL CEILING SYSTEM (I.E.

CEILING PANELS, SUSPENSION/SUPPORT SYSTEMS) FOR INSTALLATION

OF NEW MECHANICAL AND ELECTRICAL SYSTEMS. TEMPORARILY

SUPPORT AND PROTECT EQUIPMENT TO REMAIN WITHIN OPEN CEILING

AREAS DURING THE DEMOLITION PROCESS AND RECONSTRUCTION

PHASES. PREPARE OPEN CEILING AREA TO RECEIVE NEW SUSPENDED

CEILING SYSTEM AND SUBSEQUENT MECHANICAL, FIRE PROTECTION AND

ELECTRICAL FIXTURES. REFER TO REFLECTED CEILING PLAN FOR NEW

CEILING TYPES.

02 REMOVE EXISTING SUSPENDED GYPSUM WALL-BOARD CEILING SYSTEM

(I.E. GWB, SUSPENSION/FRAMING SYSTEMS) FOR INSTALLATION OF NEW

MECHANICAL AND ELECTRICAL SYSTEMS. TEMPORARILY SUPPORT AND

PROTECT EQUIPMENT TO REMAIN WITHIN OPEN CEILING AREAS DURING

THE DEMOLITION PROCESS AND RECONSTRUCTION PHASES. PREPARE

OPEN CEILING AREA TO RECEIVE NEW GWB CEILING SYSTEM AND

SUBSEQUENT MECHANICAL, FIRE PROTECTION AND ELECTRICAL

FIXTURES. REFER TO REFLECTED CEILING PLAN FOR NEW CEILING TYPES.

03 NOT USED THIS SHEET.

04 REMOVE EXISTING TOILET ROOM FIXTURES, TOILET/URINAL PARTITIONS,

SHOWER UNITS, ACCESSORIES AND COUNTERS/CABINETS. REMOVE

WALL AND FLOOR TILE INCLUSIVE OF GROUT, MORTAR AND ADHESIVE.

PREPARE SURFACE AREAS FOR NEW TILE AND PAINT FINISHES, COUNTER,

TOILET FIXTURES AND PARTITIONS, SHOWER ENCLOSURE AND

ACCESSORIES.

05 SEAL LEAD BASED DOOR PAINT - ALL SURFACE AREAS; PREPARE DOOR

AND FRAME UNITS FOR NEW PAINT COATING SYSTEM.

06 NOT USED THIS SHEET.

07 NOT USED THIS SHEET.

08 REMOVE AND STORE EXISTING LOCKER UNITS FOR ACCESS TO

MENS/WOMENS ROOMS FOR IMPROVEMENT WORK; REINSTALL AFTER

COMPLETION OF INTERIOR FINISH WORK.

09 REMOVE EXISTING HOLLOW METAL FRAME, ANCHOR ATTACHMENT,

GROUT FILL AND ACCESSORIES. PREPARE ROUGH OPENING FOR

INSTALLATION OF WALL TILE WAINSCOT SYSTEM AND GWB FINISH AND

PAINT.

KEY PLAN

EXISTING WALLS AND DOORS TO

REMAIN

EXISTING WALLS AND DOORS TO BE

DEMOLISHED

LEGEND

EXISTING FLOOR SURFACE AND

BASE TO BE DEMOLISHED

N

AREA A AREA B

\\tt.local\IER\Projects\Louisville\IER\01297\200-01297-16030\CAD\SheetFiles\AD-102-FLOOR PLAN - DEMO.dwg

AutoCAD SHX Text

FLOOR PLAN - DEMOLITION - AREA B

AutoCAD SHX Text

TCL

AutoCAD SHX Text

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FIRE DEPARTMENT

AutoCAD SHX Text

SAFETY OFFICE

AutoCAD SHX Text

ENVIRONMENTAL QUALITY

AutoCAD SHX Text

SECURITY

AutoCAD SHX Text

COMMUNICATIONS

AutoCAD SHX Text

CE OPERATIONS

AutoCAD SHX Text

CONTRACT MANAGEMENT

AutoCAD SHX Text

AIRFIELD MANAGEMENT

AutoCAD SHX Text

DAVIS-MONTHAN AFB, ARIZONA

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

CIVIL ENGINEER OFFICE

AutoCAD SHX Text

APPROVED USING AGENCY

AutoCAD SHX Text

APPROVED CECN

AutoCAD SHX Text

APPROVED CEC

AutoCAD SHX Text

APPROVED CE

AutoCAD SHX Text

CHECKED PROJ. ENGR.

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

OF

AutoCAD SHX Text

DATE

AutoCAD SHX Text

AIR COMBAT COMMAND

AutoCAD SHX Text

DEPARTMENT OF THE AIR FORCE

AutoCAD SHX Text

AutoCAD SHX Text

06 OCT 17

AutoCAD SHX Text

10 OCT 17

AutoCAD SHX Text

ENVIRONMENTAL, FAC 5045

AutoCAD SHX Text

RPR/CNS BACKSHOPS

AutoCAD SHX Text

FBNV 130026

AutoCAD SHX Text

FBNV 130026

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

AIRFIELD LIGHTING

AutoCAD SHX Text

AIRFIELD BARRIER MAINTENANCE

T C

H

L I N

E

MACHINE SHOP

WELDING

METAL TECH

TOOL STORAGE

ROOM

LOCKERS

LEAD BATT

NICAD BATT

WORK BAY

ELECTRONIC SHOPS

BREAK ROOM

STOR

OFFICE

OFFICE

CONF

ADMIN OFF

OFFICE

OFFICE

OFFICE

OFFICE

8'-9"±

A

119A

A

WOMENS

CORRIDOR

JANITOR

A-401

01 01

01 01 01 01

BATTERY

OFFICE

MECH ROOM

03 03

123'-8"±

110'-0"±

27'-6"± 13'-4"± 27'-2"±

74'-4"±

70'-4"± 8'-0"±

25'-0"± 21'-0"± 12'-0"± 12'-4"±

R E

F E

R E

N C

E

S H

E E

T

A

SCALE:

4' 8' 16'

1/8" = 1'-0''

BUILDING 5045

FLOOR PLAN1

SCALE: 1/8"=1'-0"

N

GENERAL NOTES

1. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND LAYOUTS

PRIOR TO INITIATION OF CONSTRUCTION WORK.

2. CONTRACTOR SHALL USE ALL MEANS NECESSARY TO PROTECT ALL

ITEMS NOT DESIGNATED FOR REPLACEMENT WORK AND SHALL PROVIDE

APPROPRIATE DUST CONTROL AND PROTECTION.

3. PARTITION TYPE - FULL HEIGHT - COMPONENTS:

- 5/8" GWB SHEATHING, TYPE X; PAINT FINISH - REFER TO FINISH

SCHEDULE.

- 6" x 20 GAUGE METAL STUDS AT 16" SPACING; EXTEND STUDS

VERTICALLY TO UNDERSIDE OF ROOF DECK; CONNECT TO ROOF DECK

AND ROOF JOIST FRAMING WITH DEFLECTION TRACK.

- 5/8" GWB SHEATHING TYPE X - BOTH SIDES; PAINT FINISH - IPT-1.

4. DOOR 119A

- MATERIAL: HOLLOW METAL DOOR AND FRAME UNIT; PRIMED FOR FIELD

PAINT FINISH.

- DOOR SIZE: PAIR OF 3'-0" WIDE x 8'-0" HIGH DOOR UNITS

- FRAME SIZE: 2" HEAD AND JAMB FRAME - 7/A-501

- DOOR TYPE: FLUSH; IPT-2 PAINT FINISH

- HARDWARE SET: 101

- DOOR HEAD/JAMB DETAIL: 7/A-501

- DOOR HEAD/JAMB - PAINT FINISH: IPT-2

5. REFER TO SHEETS P-101 AND P-601 FOR PLUMBING FIXTURE SCHEDULE.

A-101

A

KEY NOTES - FLOOR PLAN

01 INSTALL NEW SUSPENDED 2x2 ACOUSTICAL TILE CEILING SYSTEM.

02 INSTALL NEW SUSPENDED GYPSUM WALL BOARD (GWB) CEILING SYSTEM

WITH PAINT FINISH. PATCH AND TRANSITION GWB FINISH WORK ONTO

CONNECTING GWB WALL SURFACE AREAS.

03 INSTALL NEW CHEMICAL-RESISTANT URETHANE (CRU-1) FLOORING

SYSTEM AND RUBBER COVE BASE (RB-1).

04 PREP AND PAINT EXISTING DOUBLE DOOR AND FRAME UNIT - IPT-2 FINISH.

05 CONFIRM COMPLETION OF MOLD REMEDIATION WORK AT DESIGNATED

LOCATIONS. PREP AND PAINT FULL SURFACE OF PARTITION WALL WHERE

MOLD REMEDIATION WORK IS PERFORMED; EXTEND PAINT FINISH

VERTICALLY FROM FLOOR SURFACE TO UNDERSIDE OF STRUCTURE

ABOVE AND HORIZONTALLY TO PARTITION ENDS (I.E. CHANGE IN

DIRECTION). MATCH, ROOM SPECIFIC, INTERIOR WALL PAINT COLOR.

KEY PLAN

N

AREA A AREA B

\\tt.local\IER\Projects\Louisville\IER\01297\200-01297-16030\CAD\SheetFiles\A-101-FLOOR PLAN.dwg

AutoCAD SHX Text

FLOOR PLAN - AREA A

AutoCAD SHX Text

TCL

AutoCAD SHX Text

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FIRE DEPARTMENT

AutoCAD SHX Text

SAFETY OFFICE

AutoCAD SHX Text

ENVIRONMENTAL QUALITY

AutoCAD SHX Text

SECURITY

AutoCAD SHX Text

COMMUNICATIONS

AutoCAD SHX Text

CE OPERATIONS

AutoCAD SHX Text

CONTRACT MANAGEMENT

AutoCAD SHX Text

AIRFIELD MANAGEMENT

AutoCAD SHX Text

DAVIS-MONTHAN AFB, ARIZONA

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

CIVIL ENGINEER OFFICE

AutoCAD SHX Text

APPROVED USING AGENCY

AutoCAD SHX Text

APPROVED CECN

AutoCAD SHX Text

APPROVED CEC

AutoCAD SHX Text

APPROVED CE

AutoCAD SHX Text

CHECKED PROJ. ENGR.

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

OF

AutoCAD SHX Text

DATE

AutoCAD SHX Text

AIR COMBAT COMMAND

AutoCAD SHX Text

DEPARTMENT OF THE AIR FORCE

AutoCAD SHX Text

AutoCAD SHX Text

01 SEP 17

AutoCAD SHX Text

06 SEP 17

AutoCAD SHX Text

ENVIRONMENTAL, FAC 5045

AutoCAD SHX Text

RPR/CNS BACKSHOPS

AutoCAD SHX Text

FBNV 130026

AutoCAD SHX Text

FBNV 130026

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

AIRFIELD LIGHTING

AutoCAD SHX Text

AIRFIELD BARRIER MAINTENANCE

BREAK ROOM

SHEET METAL SHOP

POWER

GERBER

MENS

CORRIDOR

MECH

RECOVERY ROOM

OFFICE

SHEET METAL SHOP

TESTING SHOP

TOOL STORAGE

A-401

85'-8"±

48'-4"± 37'-4"± 40'-0"±

40'-0"±

24'-0"±

44'-4"±8'-0"±

MENS

ENTRY VESTIBULE

8'-0"±

28'-2"± 16'-2"±

S H

E E

T

A

M A

T C

H

L

I N

E

R E

F E

R E

N C

E

SCALE:

4' 8' 16'

1/8" = 1'-0''

BUILDING 5045

FLOOR PLAN

SCALE: 1/8"=1'-0"

N

A-102

KEY NOTES - FLOOR PLAN

01 INSTALL NEW SUSPENDED 2x2 ACOUSTICAL TILE CEILING SYSTEM.

02 INSTALL NEW SUSPENDED GYPSUM WALL BOARD (GWB) CEILING…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.