RFI_Responses-Rpr_Environmental_Back_Shops.pdf

PDF 71 KB Posted

Attached to
Repair Environmental Back Shops Federal contract opportunity
Solicitation number
FA487718B0002
Issued by
Department of the Air Force Air Combat Command

View the file

Other files for this federal contract opportunity

Other files attached to Repair Environmental Back Shops, newest first.
File Type Posted
Site_Visit_Meeting_Minutes.pdf PDF
FA487718B00020001_-_Amendment_0001.pdf PDF
FA487718B0002.pdf PDF
06_-_DMAFB_2017_Design_Compatibility_Guidelines_2017.pdf PDF
05_-_AF_Form_3052.xlsx XLSX spreadsheet
04_-_AF_Form_66.pdf PDF
03_-_ColorBoard.pdf PDF
09_-_Contract_Security_Requirements.pdf PDF
08_-_Special_Instruction.pdf PDF
07_-_WD_AZ180033__5_Jan_2018__AZ33.pdf PDF
01_-_Project_Specifications.pdf PDF
02_-_Project_Drawings.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FBNV130026

Rpr/Cns Back Shops Environmental Systems, Fac 5045

Contractor RFI Questions & Government Response

Q1: Will staging be allowed around building for materials?

A1: Staging will be allowed nearby in an approved area that does not impede any traffic or work continuing in the opposite phase.

Q2: Will an office trailer be allowed?

A2: Yes there is space in the surrounding area for an office trailer. Approval will be obtained for the final location before bringing the trailer.

Q3: When will we have a copy of the sign-in sheet?

A3: The sign-in sheet was posted on FBO on 9 Apr 18.

Q4: Please confirm that Room 118 does not exist in the Northwest corner of Room 119, Machine Shop.

A4: Room 118 does exist and is in that corner.

Q5: At the job walk, it was observed that doors on rooms 103, 104, 105 and 106 within room 119 all would have lead based paint, as well as many other doors in the south-end sheet metal shops i.e. rm 111, 101. The plans only call for LBP abatement on Room 107 door. Please confirm no other doors are to have the LBP sealed and prepared for new paint coating systems.

A5: Correct there is no work to be done on or near doors to rooms 103, 104, 105, 106, 111, and 101.

They should be protected in place and remain undisturbed.

Q6: Please advise if there is any area that requires asbestos abatement as there is nothing noted on the drawings.

A6: Refer to Appendix A of Specification Section 02 85 00.00 20.

Q7: Please advise working hours within the different phases?

A7: The government project manager will be working between the hours 0700 – 1700 however there are no restrictions or requirements due to the building occupants within the phases.