Attachment_6_-_AF_Form_66_Submittal_Register_dated_17_August_2015.pdf
PDF 3 MB Posted
- Attached to
- DKGV 12-2035 Construct Fire Station Addition, Bldg. 90 Federal contract opportunity
- Solicitation number
- FA4418-19-R-0004
About this file
Submittal Register
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL LOG (AF Form 66)
FINAL SUBMITTAL
CONSTRUCT FIRE
STATION ADDITION,
BUILDING 90
AT
JOINT BASE CHARLESTON
WEAPON STATION, SOUTH CAROLINA
PROJECT No: DKGV 12-2035
SUBMITTAL DATE: 17 AUGUST 2015 (INCLUDES 14 JULY 2017 EDITS)
ARCHITECTURE / PLANNING / INTERIOR DESIGN
493 King Street, Suite 100 Charleston, South Carolina 29403
Telephone: 843.577.6377 / Fax: 722.1768 Internet: www.glickboehmarchitecture.com
GBA Project No.: 1429
Attachment 7 Construct Fire Station Addition Building 90 FA441817R0019
Project Design Team
Architect: Glick/Boehm & Associates, Inc.
493 King Street, Suite 100 Charleston, South Carolina 29403 843.577.6377
Civil Consultant Forsberg Engineering & Surveying 1587 Savannah Hwy, Suite B Charleston, SC 29407 (843)571.2622
Mechanical / Plumbing / DWG Consulting Engineers, Inc.
Electrical Consultant/ 1009 Anna Knapp Blvd., Suite 202 Fire Protection: Mt. Pleasant, South Carolina 29464 843.849.1141
Structural Consultant: ADC Engineering 1226 Yeamans Hall Road Hanahan, South Carolina 29406 843.566.0161
Environmental: S&ME, Inc.
620 Wando Park Blvd.
Mt. Pleasant, South Carolina 29464 843.884.0005
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 53 PAGES
ADDITION TO BLDG 90 FIRE STATION
01 14 00 SD-01 Preconstruction Submittals
1.2.1.1 GList of Contact Personnel
01 30 00 SD-01 Preconstruction Submittals
1.3 GView location map
1.4 GProgress and completion pictures
SD-04 Samples
1.2 GColor boards
01 32 16.00 20 SD-01 Preconstruction Submittals
1.2 GQualifications
1.3.1 GBaseline Project Schedule
1.4.1 GInitial Contract Progress Report
(AF IMT 3065)
1.4.2 GInitial Contract Progress
Schedule (AF IMT 3064) SD-07 Certificates
1.3.3 GMonthly Project Schedule Update
1.4.1 GMonthly Contract Progress
Reports (AF IMT 3065)
1.4.2 GMonthly Contract Progress
Schedule (AF IMT 3064) 01 33 00 SD-01 Preconstruction Submittals
1.7 GSubmittal register
01 35 26 SD-01 Preconstruction Submittals
1.6 GAccident Prevention Plan (APP)
1.7 GActivity Hazard Analysis (AHA)
1.6.1 GCrane Critical Lift Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 53 PAGES
01 35 26 1.11.4 GCertificate of Compliance
1.5.1.2 GCrane Operators
SD-06 Test Reports 1.11Notifications and Reports
1.11.2 GAccident Reports
1.11.3Crane Reports
SD-07 Certificates 1.8Confined Space Entry Permit 1.8Hot work permit 1.5.1License Certificates
01 35 40.00 20 SD-01 Preconstruction Submittals
1.8 GEnvironmental Protection Plan
1.9.1Instructor Qualifications
SD-06 Test Reports 3.2Field Quality Control Reports
SD-07 Certificates 1.6Environmental Regulatory
Requirements SD-08 Manufacturer’s Instructions
1.7.1Material Safety Data Sheets SD-11 Closeout Submittals
1.9.3Training Program 3.1Protection of Natural Resources
01 45 00 SD-01 Preconstruction Submittals
1.6.1 GConstruction Quality Control (QC)
Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 53 PAGES
01 45 35 SD-07 Certificates
1.4 GSpecial Inspector
1.3 GSpecial Inspection Quality
Control Plan 01 50 00 SD-01 Preconstruction Submittals
1.4 GConstruction site plan
SD-06 Test Reports
2.2.5 GBackflow Preventer Tests
SD-07 Certificates
1.5.1 GBackflow Tester
1.5Backflow Preventers
01 50 10 SD-01 Preconstruction Submittals
1.4.1 GMaterial Safety Data Sheet
(MSDS)
SD-06 Test Reports
1.8 GMonthly Green Procurement
Report
1.8 GAnnual Green Procurement
Report
1.3 GMonthly Recycling Report
1.3 GAnnual Recycling Report
01 57 50 SD-01 Preconstruction Submittals
1.7.1 GPreconstruction Survey
1.7.2 GSolid Waste Disposal Permit
1.7.6 GRegulatory Notifications
1.5 GEnvironmental Protection Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 53 PAGES
01 57 50 1.6 GDirt and Dust Control Plan SD-06 Test Reports
3.9.2Disposal Requirements 1.7.7Erosion and Sediment Control
Inspection Reports 3.4Erosion and Sediment Control
Inspection Reports
1.7.8 GSolid Waste Disposal Report
SD-07 Certificates
1.7.5 GContractor 40 CFR employee
training records SD-11 Closeout Submittals
3.4.2 GStorm Water Pollution Prevention
Plan compliance notebook
1.7.3Waste Determination Documentation
1.7.4Disposal Documentation for Hazardous and Regulated Waste
1.7.5Contractor 40 CFR Employee Training Records
1.7.2Solid Waste Disposal Permit 1.7.8Solid Waste Disposal Report 1.7.6Regulatory Notifications
01 58 00 SD-02 Shop Drawings GPreliminary one line
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 53 PAGES
01 58 00 Gpreliminary drawing indicating layout and text content
GSign Legend Orders SD-04 Samples
GFinal rendering GFinal framed rendering
01 78 00 SD-03 Product Data 1.2.2As-Built Record of Equipment and Materials 1.6.1Warranty Management Plan 1.6.4Warranty Tags 1.3Spare Parts Data
SD-08 Manufacturer’s Instructions 1.4Preventative Maintenance 1.4Condition Monitoring (Predictive
Testing) 1.4Inspection 1.6.1Instructions
SD-10 Operation and Maintenance Data
1.7Operation and Maintenance Manuals
SD-11 Closeout Submittals 1.2.1Record Drawings
1.5 GCertification of EPA Designated
Items
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 53 PAGES
02 41 00 SD-01 Preconstruction Submittals
1.10 GExisting Conditions
SD-07 Certificates
1.2.1 GDemolition Plan
1.6 GNotification
SD-11 Closeout Submittals 3.3.4Receipts
02 41 13 SD-07 Certificates
1.9 GDemolition plan
02 82 16.00 20 SD-03 Product Data
3.1.4 GLocal exhaust equipment
3.1.5 GVacuums
3.1.1.1 GRespirators
3.1.4 GPressure differential automatic
recording instrument
1.2.2 GAmended water
3.1.6 GGlovebags
1.3.8 GMaterial Safety Data Sheets
(MSDS) for all materials
2.1 GEncapsulants
SD-06 Test Reports
1.5.5 GAir sampling results
1.5.6 GPressure differential recordings
for local exhaust system
3.3.3.2 GAsbestos disposal quantity report
GEncapsulation test patches
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 53 PAGES
02 82 16.00 20 3.2.6.3 GClearance sampling SD-07 Certificates
1.3.9 GAsbestos hazard abatement plan
1.3.10 GTesting laboratory
1.5.1 GPrivate qualified person
documentation
1.5.4 GContractor's license
1.5.2 GCompetent person
1.5.3 GWorker's license
1.3.11 GLandfill approval
1.3.3 GEmployee training
1.3.12 GMedical certification
1.3.11 GWaste shipment records
1.3.6 GRespiratory Protection Program
1.3.11 GDelivery tickets
3.1.5 GVacuums
3.1.2.3 GWater filtration equipment
3.1.5 GVentilation systems
3.1 Gequipment used to contain
airborne asbestos fibers
2.1 Gencapsulants
1.3.4Notifications 1.3.4Notifications
SD-11 Closeout Submittals
1.3.4 GNotifications
1.3.4 GNotifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 53 PAGES
02 82 16.00 20 1.6.1 GRental equipment
1.3.6.1 GRespirator program records
1.3.4 GPermits and licenses
1.5.7 GProtective clothing
decontamination quality control records
1.5.8 GProtective clothing
decontamination facility notification
03 15 00.00 10 SD-03 Product Data 2.2Preformed Expansion Joint Filler 2.3Sealant
03 20 00.00 10 SD-02 Shop Drawings
3.1 GReinforcement
SD-03 Product Data 1.3.1Welding
SD-07 Certificates 2.3Reinforcing Steel 1.3.2Qualification of Steel Bar
Butt-Splicers 03 30 00 SD-03 Product Data
2.4.7 GMaterials for curing concrete
2.4.1 GCement
2.4.1.2 GPortland Cement
2.3.2 GReady-Mix Concrete
2.4.6 GVapor retarder and Vapor barrier
2.5 GBonding Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 53 PAGES
03 30 00 2.3.3 GConcrete Curing Materials SD-05 Design Data
2.3.1 Gmix design
SD-06 Test Reports
1.6.2.1 GConcrete mix design
1.6.2.2 GFly ash
1.6.2.2 GPozzolan
1.6.2.3 GGround granulated blast-furnace
slag
3.11.2.3 GCompressive strength tests
3.11.2.4 GAir Content
04 20 00 SD-02 Shop Drawings
1.4.2 GDetail Drawings
SD-04 Samples
2.2 GConcrete Masonry Units (CMU)
2.7 GAnchors, Ties, and Bar
Positioners
2.11 GExpansion-Joint Materials
2.8 GJoint Reinforcement
SD-05 Design Data
2.5.4 GPre-mixed Mortar
1.2.1.1 GUnit Strength Method
SD-06 Test Reports
3.20.1 GField Testing of Mortar
3.20.2 GField Testing of Grout
2.5.3 GMasonry Cement
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 53 PAGES
04 20 00 GMasonry Inspector Qualifications SD-07 Certificates
2.2Concrete Masonry Units (CMU) 2.7Anchors, Ties, and Bar
Positioners 2.11Expansion-Joint Materials 2.8Joint Reinforcement 2.5.3Masonry Cement 2.3Precast Concrete Items 2.5.1Admixtures for Masonry Mortar 2.6.1Admixtures for Grout
Contamination SD-08 Manufacturer’s Instructions
2.5.3Masonry Cement 05 05 23 SD-03 Product Data
1.5 GWelding Procedure Qualifications
1.5.5Welder, Welding Operator, and
Tacker Qualification 1.5.6Inspector Qualification 1.5.2Previous Qualifications 1.5.3Pre-qualified Procedures
SD-06 Test Reports 3.2Quality Control 3.3.1Nondestructive Examination
05 12 00 SD-02 Shop Drawings
1.6.1 GFabrication drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 53 PAGES
05 12 00 SD-03 Product Data
2.4 GShop primer
2.3.1 GWelding electrodes and rods
2.2.4 GLoad indicator washers
2.3.2 GNon-Shrink Grout
SD-06 Test Reports
2.4 GClass B coating
2.2 GBolts, nuts, and washers
SD-07 Certificates
2.1 GSteel
2.2 GBolts, nuts, and washers
2.5 GGalvanizing
1.4 GAISC Quality Certification
05 21 00 SD-01 Preconstruction Submittals 1.3.2Welder Qualification
SD-02 Shop Drawings
1.3.1 GSteel Joist Framing
SD-05 Design Data
2.2 GDesign Calculations
SD-06 Test Reports 3.4Erection Inspection 3.4Welding Inspections
SD-07 Certificates 1.3.2Certification of Compliance
05 30 00 SD-02 Shop Drawings 1.3.5Fabrication Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 53 PAGES
05 30 00 2.3.1.1Cant Strips 2.3.1.2Ridge and Valley Plates 2.3.1.3Metal Closure Strips
SD-03 Product Data 2.2Accessories 2.1.6Galvanizing Repair Paint 2.2.8Mechanical Fasteners 1.3.2Powder-Actuated Tool Operator 2.3.4Repair Paint 1.3.3Welder Qualifications 1.3.3Welding Equipment 1.3.3Welding Rods and Accessories
SD-05 Design Data 2.3.1Roof Deck
SD-07 Certificates 1.3.3Welding Procedures 1.3.4.1Fire Safety 1.3.4.2Wind Storm Resistance
06 41 16.00 10 SD-02 Shop Drawings 1.4.2Shop Drawings 2.10Shop Drawings
; G 3.1Installation
SD-03 Product Data 2.1Wood Materials
Wood Finishes
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 53 PAGES
06 41 16.00 10 2.10.7.3Finish Schedule Certification
SD-04 Samples 2.3Plastic Laminates
; G 2.6Cabinet Hardware
SD-07 Certificates 1.4Quality Assurance 3.1Laminate Clad Casework
06 61 16 SD-02 Shop Drawings
1.4.2 GDetail Drawings
3.1 GInstallation
SD-03 Product Data 2.1Solid polymer material 1.4.1Qualifications 2.3Fabrications
SD-04 Samples
2.1 GMaterial
2.3.4 GCountertops
SD-06 Test Reports 2.1Solid polymer material
SD-07 Certificates 2.3Fabrications 1.4.1Qualifications
SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 53 PAGES
06 61 16 3.2Clean-up SD-11 Closeout Submittals LEED Documentation
07 21 13 SD-03 Product Data GBoard insulation
Vapor retarder Pressure sensitive tape Protection board or coating Accessories
SD-08 Manufacturer’s Instructions Board Insulation Adhesive
07 52 00 SD-02 Shop Drawings
1.4.7 GRoof plan
SD-03 Product Data
2.1 GModified Bitumen Sheets
2.3Asphalt
GCold-Applied Membrane Adhesive
2.5 GPrimer
2.6 GModified Bitumen Roof Cement
Pre-Manufactured Accessories
2.8 GFasteners And Plates
1.8 GWarranty
SD-05 Design Data
1.4.6 GWind Uplift Calculations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 53 PAGES
07 52 00 SD-07 Certificates 1.4.1Qualification of Manufacturer 1.4.2Qualification of Applicator 1.4.4Qualification of Engineer of
Record 1.5.1Bill of Lading
1.4.6 GWind Uplift Resistance
1.4.5 GFire Resistance
SD-08 Manufacturer’s Instructions
3.3.4 GModified Bitumen Membrane
Application
3.3.5 GFlashing
3.2.3.1Temperature Limitations for
Asphalt 2.5Primer 2.8.1Fasteners
Ventilating Base Sheets GCoating Application
1.6 GCold Weather Installation
SD-11 Closeout Submittals
1.8Warranty 3.8Information Card 3.7Instructions To Government
Personnel 07 60 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 53 PAGES
07 60 00 3.1.25 GCovering on flat, sloped, or curved surfaces
3.1.17 GGutters
3.1.18 GDownspouts
3.1.26 GExpansion joints
3.1.15 GGravel stops and fascias
3.1.22 GSplash pans
3.1.19 GFlashing for roof drains
3.1.11 GBase flashing
3.1.12 GCounterflashing
3.1.27 GFlashing at roof penetrations
3.1.13 GReglets
3.1.20 GScuppers
3.1.30 GCopings
3.1.16 GDrip edge
3.1.21Conductor heads
3.1.23 GOpen valley flashing
3.1.24 GEave flashing
SD-11 Closeout Submittals 3.5Quality Control Plan
07 84 00 SD-02 Shop Drawings
2.1 GFirestopping Materials
SD-06 Test Reports
3.3 GInspection
SD-07 Certificates Inspector Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 53 PAGES
07 84 00 2.1Firestopping Materials
1.4.1 GInstaller Qualifications
07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops
SD-07 Certificates 3.3.6Sealant
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.4 GFrames
2.4 GFrames
2.2Accessories
SD-03 Product Data
2.1 GDoors
2.4 GFrames
2.2Accessories
08 14 00 SD-02 Shop Drawings
2.1 GDoors
SD-03 Product Data
2.1 GDoors
2.2Accessories 1.4warranty
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 53 PAGES
08 14 00 2.1Doors
2.3.6.2 GDoor finish colors
08 71 00 SD-02 Shop Drawings
1.3 GHardware schedule
2.3.5Keying system
SD-03 Product Data
2.3 GHardware items
SD-08 Manufacturer’s Instructions 3.1Installation
SD-10 Operation and Maintenance Data
1.3 GHardware Schedule
SD-11 Closeout Submittals
1.4Key Bitting 08 81 00 SD-02 Shop Drawings
Installation SD-03 Product Data
1.6.1Insulating Glass 1.3Glazing Accessories
SD-04 Samples 1.6.1Insulating Glass
Impact Rated Glass Safety Glass Float Glass Glazing Compound
2.3.3Tape
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 53 PAGES
08 81 00 2.3.1.1Sealant SD-07 Certificates
1.6.1Insulating Glass Impact Rated Glass Safety Glass
SD-08 Manufacturer’s Instructions 2.3Setting and sealing materials 3.2Glass setting
09 22 00 SD-02 Shop Drawings
2.1 GMetal support systems
09 29 00 SD-03 Product Data 2.1.5Cementitious backer units 2.1.3Glass Mat Water-Resistant
Gypsum Tile Backing Board 2.1.2Water-Resistant Gypsum
Backing Board 2.1.4Glass Mat Covered or Reinforced
Gypsum Sheathing 2.1.4.1Glass Mat Covered or Reinforced
Gypsum Sheathing Sealant Impact Resistant Gypsum Board
2.1.10Accessories SD-07 Certificates
2.1 GAsbestos Free Materials
SD-08 Manufacturer’s Instructions Material Safety Data Sheets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 53 PAGES
09 29 00 SD-10 Operation and Maintenance Data Manufacturer maintenance instructions
3.7Waste Management 09 30 00 SD-02 Shop Drawings
1.3 GDetail Drawings
SD-03 Product Data
GTile
2.2 GSetting-Bed
2.4 GMortar, Grout, and Adhesive
SD-04 Samples GTile GAccessories
2.4 GGrout
SD-07 Certificates
GTile
2.4 GMortar, Grout, and Adhesive
09 51 00 SD-02 Shop Drawings 1.2Approved Detail Drawings
SD-03 Product Data Acoustical Ceiling Systems
SD-04 Samples 2.1Acoustical Units 2.1.1Acoustic Ceiling Tiles
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 53 PAGES
09 51 00 2.1Acoustical Units 2.1.1Acoustic Ceiling Tiles
09 65 00 SD-02 Shop Drawings
2.8 GResilient Flooring and
Accessories SD-03 Product Data
2.8 GResilient Flooring and
Accessories
2.4Adhesives SD-04 Samples
2.8 GResilient Flooring and
Accessories
SD-06 Test Reports
3.3 GMoisture, Alkalinity and Bond
Tests SD-08 Manufacturer’s Instructions
3.2 GSurface Preparation
3.1 GInstallation
SD-10 Operation and Maintenance Data
2.8 GResilient Flooring and
Accessories
09 68 00 SD-02 Shop Drawings
3.4 GInstallation
2.4 GMoldings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 53 PAGES
09 68 00 GCarpet
3.1 GSurface Preparation
3.4 GInstallation
SD-04 Samples GCarpet
2.4 GMoldings
SD-06 Test Reports
3.2 GMoisture and Alkalinity Tests
SD-07 Certificates
GCarpet
1.4 GRegulatory Requirements
SD-10 Operation and Maintenance Data
GCarpet
3.5 GCleaning and Protection
Maintenance Service 09 90 00 SD-02 Shop Drawings
3.10Piping identification 3.10stencil
SD-03 Product Data
2.1 GCoating
2.1Manufacturer's Technical Data
Sheets Sealant
SD-04 Samples
1.9 GColor
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 53 PAGES
09 90 00 SD-07 Certificates 1.3Applicator's qualifications
1.4.1.2 GQualification Testing
SD-08 Manufacturer’s Instructions Application instructions
3.6.2Mixing 1.7.2Manufacturer's Material Safety
Data Sheets SD-10 Operation and Maintenance Data
2.1 GCoatings:
10 21 13 SD-02 Shop Drawings
1.2Fabrication Drawings
3.1 GInstallation Drawings
SD-03 Product Data 1.2Cleaning and Maintenance
Instructions 2.1.1Anchoring Devices and
Fasteners 2.1.3Hardware and Fittings
Brackets 2.1.4Door Hardware 2.4Pilaster Shoes
SD-04 Samples
2.6 GColors and Finishes
2.1.3Hardware and Fittings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 53 PAGES
10 21 13 2.1.1Anchoring Devices and Fasteners
SD-07 Certificates 1.6Warranty
10 28 13 SD-03 Product Data
2.1.2 GFinishes
2.2 GAccessory Items
SD-04 Samples
2.1.2 GFinishes
2.2 GAccessory Items
SD-07 Certificates 2.2Accessory Items
21 13 13.00 20 SD-02 Shop Drawings
1.5.2 GShop Drawings
SD-03 Product Data
2.2.1 GPipe
2.2.1 GFittings
2.2.6 GAlarm valves
2.2.4 GValves
2.2.7 GWater motor alarms
2.2.3 GSprinklers
2.2.5 GPipe hangers and supports
2.3.1 GSprinkler Alarm Switches
2.2.8 GFire department connections
2.2.1 GMechanical couplings
2.2.9 GBackflow Prevention Assembly
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 53 PAGES
21 13 13.00 20 2.2.5 GSeismic Bracing SD-05 Design Data
1.3 GHydraulic Calculations
SD-06 Test Reports
3.6 Grequest to schedule Preliminary
Tests
3.6 GPreliminary Test Report
3.7 Grequest to schedule Final
Acceptance Test
3.7 GFinal Acceptance Test Report
SD-07 Certificates
3.1 GInspection by Fire Protection
Engineer
1.5.1 GFire Protection Engineer
1.5.2 GSprinkler System Installer
SD-10 Operation and Maintenance Data
3.8Operating and Maintenance Instructions
SD-11 Closeout Submittals 3.7As-built drawings 3.8On-site training
22 00 00 SD-02 Shop Drawings
3.8.1 GPlumbing System
SD-03 Product Data 2.4Fixtures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 53 PAGES
22 00 00 2.4.2Flush valve water closets 2.4.3Flush valve urinals 2.4.5Wall hung lavatories 2.4.6Countertop lavatories 2.4.7Kitchen sinks 2.4.8Service sinks
Plastic shower stalls
2.9 GWater heaters
3.8.1.1 GBackflow prevention assemblies
2.6.2 GShower Faucets
1.5.1Welding
GVibration-Absorbing Features 3.8.1Plumbing System
SD-06 Test Reports 3.8Tests, Flushing and Disinfection
3.8.1.1 GTest of Backflow Prevention
Assemblies SD-07 Certificates
1.3Materials and Equipment 2.1.1Bolts
SD-10 Operation and Maintenance Data
3.8.1 GPlumbing System
22 05 48.00 20 SD-02 Shop Drawings
2.7Inertia bases 2.6Machinery bases
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 53 PAGES
22 05 48.00 20 2.6Platforms 2.6Rails
SD-03 Product Data 2.3Isolators 2.8Flexible connectors 2.9Flexible duct connectors 2.11Pipe guides 2.10Seismic snubbers 3.1.3Vertical stops 2.12Thrust restraints 2.7Inertia bases 2.6Machinery bases 3.1.12Machinery foundations and subbases 2.6Platforms 2.6Rails 2.6Saddles 1.4.2Machinery manufacturer's sound data SD-05 Design Data
2.7Inertia bases 2.6Machinery bases 2.6Platforms 2.6Rails 2.6Saddles 1.4.3machinery
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 53 PAGES
22 05 48.00 20 1.4.4machinery over 300 pounds SD-06 Test Reports
2.10Seismic snubbers 3.2.3.1Equipment vibration tests 3.2.3.2Equipment sound level tests 2.4Protected spring isolators
SD-08 Manufacturer’s Instructions 3.1.1Vibration and noise isolation components 2.13Seismic protection components
23 00 00 SD-02 Shop Drawings
1.4.5 GDetail Drawings
SD-03 Product Data Metallic Flexible Duct; G Insulated Nonmetallic Flexible Duct Runouts; G
Duct Connectors; G
2.9.2 GDuct Access Doors
Fire Dampers; G GManual Balancing Dampers
Diffusers; G Registers and Grilles; G Louvers; G Air Vents, Penthouses, and Goosenecks; G
Ceiling Exhaust Fans; G
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 53 PAGES
23 00 00 2.11 GAir Handling Units GRoom Fan-Coil Units
2.12 GEnergy Recovery Devices
Test Procedures; G
1.2.1.2 GDiagrams
SD-06 Test Reports
3.11 GPerformance Tests
3.9 GDamper Acceptance Test
SD-07 Certificates 1.4.1Bolts
SD-08 Manufacturer’s Instructions 3.2Manufacturer's Installation
Instructions 3.13.2Operation and Maintenance
Training SD-10 Operation and Maintenance Data
3.13.1 GOperation and Maintenance
Manuals
2.9.3 GFire Dampers
GManual Balancing Dampers GCeiling Exhaust Fans
2.11 GAir Handling Units
GRoom Fan-Coil Units
2.12 GEnergy Recovery Devices
23 03 00.00 20 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 53 PAGES
23 03 00.00 20 1.4.5.3Certification 23 07 00 SD-02 Shop Drawings
3.2.2.4 GMICA Plates
2.3Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems 3.4Equipment Insulation Systems
SD-03 Product Data
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
3.4 GEquipment Insulation Systems
SD-04 Samples
2.2.1.2 GThermal Insulation
GDisplay Samples SD-08 Manufacturer’s Instructions
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
3.4 GEquipment Insulation Systems
23 23 00 SD-02 Shop Drawings
2.3 GRefrigerant Piping System
SD-03 Product Data 2.3Refrigerant Piping System 1.5.2Spare Parts 1.3.1Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 53 PAGES
23 23 00 3.5Refrigerant Piping Tests 3.1Verification of Dimensions
SD-06 Test Reports 3.5Refrigerant Piping Tests
SD-07 Certificates 2.1Service Organization
SD-10 Operation and Maintenance Data
1.5 GMaintenance
3.4 GOperation and Maintenance
Manuals
3.4 GDemonstrations
23 31 13.00 40 SD-01 Preconstruction Submittals Part 2 GMaterial, Equipment, and Fixture
Lists
2.1.1 GRecords of Existing Conditions
SD-02 Shop Drawings
2.1 GConnection Diagrams
1.3 GRecord Drawings
2.3.1 GOffset Fitting Configurations
2.3.3 GOffset Fitting Configurations
SD-03 Product Data
2.1.1 GEquipment and Performance
Data
2.2.1 GGalvanized Steel Ductwork
Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 53 PAGES
23 31 13.00 40 2.2.2 GMill-Rolled Reinforcing and Supporting Materials
2.3.1 GRound Sheet Metal Duct Fittings
2.3.4 GTurning Vanes
2.3.6 GFlexible Connectors
2.3.9 GFlexible Duct Materials
2.3.12 GPower Operated Dampers
2.3.13 GFire Dampers and Wall Collars
2.3.11 GGravity Backdraft and Relief
Dampers
2.3.10 GManual Volume Dampers
SD-05 Design Data
2.1 GDesign Analysis and Calculations
2.1.1 GDesign Analysis and Calculations
SD-06 Test Reports
3.4.2 GDuctwork Leakage Tests
3.4.1 GOperational Tests
SD-07 Certificates
3.2 GListing of Product Installations
2.2.1 GGalvanized Steel Ductwork
Materials
2.2.2 GMill-Rolled Reinforcing and
Supporting Materials
2.3.1 GRound Sheet Metal Duct Fittings
2.3.4 GTurning Vanes
2.3.5 GDampers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 53 PAGES
23 31 13.00 40 2.3.6 GFlexible Connectors SD-10 Operation and Maintenance Data
3.6 GOperation and Maintenance
Manuals
2.3.12 GPower Operated Dampers
2.3.13 GFire Dampers and Wall Collars
23 37 13.00 40 SD-01 Preconstruction Submittals
2.1 GMaterial, Equipment, and Fixture
Lists
2.1 GRecords of Existing Conditions
SD-02 Shop Drawings
2.1 GFabrication Drawings
3.1 GInstallation Drawings
SD-03 Product Data
1.3 GEquipment and Performance
Data SD-10 Operation and Maintenance Data
GType TS Supply Troffer GType TSR Combination Supply and Return Troffer 23 74 33.00 00 SD-02 Shop Drawings
Shop Drawings G, Include Plans, Elevations and Attachment Details
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 53 PAGES
23 74 33.00 00 SD-03 Product Data Product Data G, Include dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection
SD-05 Design Data Delegated Design Data G, Design of Vibration Isolation, seismic restraints, wind restraints, including analysis data - signed and sealed by the qualified professional engineer responsible for their preparation
SD-08 Manufacturer’s Instructions GMaterial Safety Data
SD-09 Manufacturer’s Field Reports
GFactory test reports SD-10 Operation and Maintenance Data
GMaintenance Manuals 23 81 43 SD-01 Preconstruction Submittals
1.5.1 GQualifications
SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 53 PAGES
23 81 43 1.5.3Control System Wiring Diagrams SD-03 Product Data
2.1 GRoom Air Conditioners
2.2 GAir-Cooled Condenser
2.3 GBranch Selector Boxes
2.4 GCentral Controller
2.5Coatings For Finned Tube Coils
SD-06 Test Reports 2.7.1Salt-Spray Tests
23 84 16.00 20 SD-03 Product Data Desiccant Dehumidification Unit
SD-06 Test Reports 2.1.1Filter sections 3.3.1Preliminary tests 2.1.1Dampers
SD-07 Certificates Desiccant dehumidification unit
SD-10 Operation and Maintenance Data Desiccant dehumidification unit
26 05 00.00 40 SD-01 Preconstruction Submittals
2.1 GMaterial, Equipment, and Fixture
Lists SD-03 Product Data
2.1.1 GConduits and Raceways
2.1.3 GWire and Cable
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 53 PAGES
26 05 00.00 40 3.2.1.8 GSplices and Connectors
2.1.4 GSwitches
2.1.5 GReceptacles
2.1.6 GOutlets, Outlet Boxes, and Pull
Boxes
2.1.8 GCircuit Breakers
2.1.7 GPanelboards
2.1.9 GLamps and Lighting Fixtures
2.1.12 GDry-Type Distribution
Transformers SD-06 Test Reports
3.3 GContinuity Test
3.3 GPhase-Rotation Tests
3.3 GInsulation Resistance Test
SD-07 Certificates
1.4 GCertification
SD-08 Manufacturer’s Instructions Part 2 GManufacturer's Instructions
26 05 13.00 40 SD-03 Product Data 2.4Single-Conductor Shielded
Cables SD-06 Test Reports
3.2Dielectric Absorption Tests 3.2High-Voltage Tests
SD-07 Certificates 1.3Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 53 PAGES
26 05 13.00 40 Lead Sheath 2.3Flammability 3.1.4Minimum Bending Radius 3.2High-Voltage Tests 3.2Dielectric Absorption Tests 1.5Cable Splicers
SD-08 Manufacturer’s Instructions 1.6Medium-Voltage Power Cables 3.1.5Pothead Terminations
26 05 48.00 10 SD-02 Shop Drawings 3.2Lighting Fixtures in Buildings 1.3Equipment Requirements
SD-03 Product Data
3.2 GLighting Fixtures in Buildings
1.3 GEquipment Requirements
1.2.4 GContractor Designed Bracing
26 08 00 SD-06 Test Reports
3.1 GAcceptance tests and inspections
SD-07 Certificates
1.4.1 GQualifications
1.4.3 GAcceptance test and inspections
procedure 26 09 23.00 40 SD-03 Product Data
2.1Photoconductive Control Devices
2.5 GLighting Contactor
2.6 GTime Switch
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 53 PAGES
26 09 23.00 40 2.7 GPhotocell Switch
2.8 GOccupancy Sensors
SD-06 Test Reports 3.2System Operation Tests
SD-10 Operation and Maintenance Data
2.1 GLighting Control System, Data
Package 5
26 12 19.00 40 SD-02 Shop Drawings
1.4.1 GPad-Mounted Transformer
Drawings SD-03 Product Data
2.1.1 GPad-Mounted Transformers
SD-06 Test Reports
3.3.1 GAcceptance Checks And Tests
SD-07 Certificates
GTransformer Losses SD-09 Manufacturer’s Field Reports
2.3.2 GDesign Tests
2.3.3 GRoutine and Other Tests
SD-10 Operation and Maintenance Data
1.5.1 GTransformer(s)
SD-11 Closeout Submittals
2.3.1 GTransformer Test Schedule
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 53 PAGES
26 12 19.00 40 1.6 GWarranty 26 18 23.00 40 SD-02 Shop Drawings
Part 2 GFabrication Drawings GInstallation Drawings
SD-03 Product Data Part 2 GEquipment and Performance
Data
2.1.2 GMounting Brackets
SD-08 Manufacturer’s Instructions
1.3.1 GInstallation Instructions
SD-10 Operation and Maintenance Data
1.3.2 GOperation and Maintenance
Manuals
26 20 00 SD-02 Shop Drawings
2.12 GPanelboards
2.24 GWireways
SD-03 Product Data
2.11 GReceptacles
2.12.3 GCircuit breakers
2.9 GSwitches
2.13 GEnclosed circuit breakers
GMotor controllers GCombination motor controllers
2.25 GMetering
2.18.1 GCATV outlets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 53 PAGES
26 20 00 2.19.3 GGrounding Busbar
2.26 GSurge protective devices
SD-06 Test Reports
3.5.2 G600-volt wiring test
3.5.5 GGrounding system test
SD-07 Certificates
2.10 GFuses
SD-10 Operation and Maintenance Data
1.5.1 GElectrical Systems
2.25 GMetering
26 24 16.00 40 SD-02 Shop Drawings
2.1.1 GDetail Drawings
2.1.1 GOutline Drawings
SD-03 Product Data
1.3 GPanelboards
2.1.1 GPanelboards
2.1.3Directory Card and Holder
GFiltered Panelboards SD-06 Test Reports
3.2Continuity Tests 3.2Insulation Tests
SD-07 Certificates 1.4Statements
SD-08 Manufacturer’s Instructions
1.3 GPanelboards
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 53 PAGES
26 24 16.00 40 2.1.1 GPanelboards 26 27 13.10 30 SD-03 Product Data
2.1 GPower meters
2.1.3 GCurrent
2.1.2 GPotential transformer
2.2.2 GCommunications module
1.6.1 GProtocol modules
1.6.2 GData recorder
1.6.2 GModem
SD-06 Test Reports
3.3.1 GAcceptance checks and tests
SD-10 Operation and Maintenance Data
2.1 GPower meters
2.2.2 GCommunications module
1.6.1 GProtocol modules
1.6.2 GData recorder
1.6.2 GModem
SD-11 Closeout Submittals
3.3.2 GSystem function verification
26 32 14.00 10 SD-02 Shop Drawings
1.4.6 GDetailed Drawings
3.11 GAcceptance
SD-03 Product Data 2.4Manufacturer's Catalog
3.10 GInstructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 53 PAGES
26 32 14.00 10 1.4.3Experience 1.4.4Field Engineer 1.4.2Site Welding 3.2General Installation 3.1Site Visit
SD-05 Design Data
2.8 GSound Limitations
2.14Generator 2.5.4Integral Main Fuel Storage Tank 2.5.5Day Tank 3.6.2.2Power Factor 2.7.2Heat Exchanger 2.18.5Time-Delay on Alarms 2.7Cooling System 1.2.4Vibration Isolation
SD-06 Test Reports 3.6.6Performance Tests
3.6 GOnsite Inspection and Tests
SD-07 Certificates 1.2.4Vibration Isolation 3.4Prototype Tests 1.2.5Reliability and Durability 2.11Emissions 2.8Sound limitations 2.14.1Current Balance 2.3Materials and Equipment
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 53 PAGES
26 32 14.00 10 2.27Factory Inspection and Tests 3.6.4Inspections 2.7Cooling System
SD-10 Operation and Maintenance Data
1.6.1Operation Manual 1.6.2Maintenance Manual…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.