Attachment_6_-_AF_Form_66_Submittal_Register_dated_17_August_2015.pdf

PDF 3 MB Posted

Attached to
DKGV 12-2035 Construct Fire Station Addition, Bldg. 90 Federal contract opportunity
Solicitation number
FA4418-19-R-0004
Issued by
Department of the Air Force Air Mobility Command

About this file

Submittal Register

View the file

Other files for this federal contract opportunity

Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL LOG (AF Form 66)

FINAL SUBMITTAL

CONSTRUCT FIRE

STATION ADDITION,

BUILDING 90

AT

JOINT BASE CHARLESTON

WEAPON STATION, SOUTH CAROLINA

PROJECT No: DKGV 12-2035

SUBMITTAL DATE: 17 AUGUST 2015 (INCLUDES 14 JULY 2017 EDITS)

ARCHITECTURE / PLANNING / INTERIOR DESIGN

493 King Street, Suite 100 Charleston, South Carolina 29403

Telephone: 843.577.6377 / Fax: 722.1768 Internet: www.glickboehmarchitecture.com

GBA Project No.: 1429

Attachment 7 Construct Fire Station Addition Building 90 FA441817R0019

Project Design Team

Architect: Glick/Boehm & Associates, Inc.

493 King Street, Suite 100 Charleston, South Carolina 29403 843.577.6377

Civil Consultant Forsberg Engineering & Surveying 1587 Savannah Hwy, Suite B Charleston, SC 29407 (843)571.2622

Mechanical / Plumbing / DWG Consulting Engineers, Inc.

Electrical Consultant/ 1009 Anna Knapp Blvd., Suite 202 Fire Protection: Mt. Pleasant, South Carolina 29464 843.849.1141

Structural Consultant: ADC Engineering 1226 Yeamans Hall Road Hanahan, South Carolina 29406 843.566.0161

Environmental: S&ME, Inc.

620 Wando Park Blvd.

Mt. Pleasant, South Carolina 29464 843.884.0005

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 53 PAGES

ADDITION TO BLDG 90 FIRE STATION

01 14 00 SD-01 Preconstruction Submittals

1.2.1.1 GList of Contact Personnel

01 30 00 SD-01 Preconstruction Submittals

1.3 GView location map

1.4 GProgress and completion pictures

SD-04 Samples

1.2 GColor boards

01 32 16.00 20 SD-01 Preconstruction Submittals

1.2 GQualifications

1.3.1 GBaseline Project Schedule

1.4.1 GInitial Contract Progress Report

(AF IMT 3065)

1.4.2 GInitial Contract Progress

Schedule (AF IMT 3064) SD-07 Certificates

1.3.3 GMonthly Project Schedule Update

1.4.1 GMonthly Contract Progress

Reports (AF IMT 3065)

1.4.2 GMonthly Contract Progress

Schedule (AF IMT 3064) 01 33 00 SD-01 Preconstruction Submittals

1.7 GSubmittal register

01 35 26 SD-01 Preconstruction Submittals

1.6 GAccident Prevention Plan (APP)

1.7 GActivity Hazard Analysis (AHA)

1.6.1 GCrane Critical Lift Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 53 PAGES

01 35 26 1.11.4 GCertificate of Compliance

1.5.1.2 GCrane Operators

SD-06 Test Reports 1.11Notifications and Reports

1.11.2 GAccident Reports

1.11.3Crane Reports

SD-07 Certificates 1.8Confined Space Entry Permit 1.8Hot work permit 1.5.1License Certificates

01 35 40.00 20 SD-01 Preconstruction Submittals

1.8 GEnvironmental Protection Plan

1.9.1Instructor Qualifications

SD-06 Test Reports 3.2Field Quality Control Reports

SD-07 Certificates 1.6Environmental Regulatory

Requirements SD-08 Manufacturer’s Instructions

1.7.1Material Safety Data Sheets SD-11 Closeout Submittals

1.9.3Training Program 3.1Protection of Natural Resources

01 45 00 SD-01 Preconstruction Submittals

1.6.1 GConstruction Quality Control (QC)

Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 53 PAGES

01 45 35 SD-07 Certificates

1.4 GSpecial Inspector

1.3 GSpecial Inspection Quality

Control Plan 01 50 00 SD-01 Preconstruction Submittals

1.4 GConstruction site plan

SD-06 Test Reports

2.2.5 GBackflow Preventer Tests

SD-07 Certificates

1.5.1 GBackflow Tester

1.5Backflow Preventers

01 50 10 SD-01 Preconstruction Submittals

1.4.1 GMaterial Safety Data Sheet

(MSDS)

SD-06 Test Reports

1.8 GMonthly Green Procurement

Report

1.8 GAnnual Green Procurement

Report

1.3 GMonthly Recycling Report

1.3 GAnnual Recycling Report

01 57 50 SD-01 Preconstruction Submittals

1.7.1 GPreconstruction Survey

1.7.2 GSolid Waste Disposal Permit

1.7.6 GRegulatory Notifications

1.5 GEnvironmental Protection Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 53 PAGES

01 57 50 1.6 GDirt and Dust Control Plan SD-06 Test Reports

3.9.2Disposal Requirements 1.7.7Erosion and Sediment Control

Inspection Reports 3.4Erosion and Sediment Control

Inspection Reports

1.7.8 GSolid Waste Disposal Report

SD-07 Certificates

1.7.5 GContractor 40 CFR employee

training records SD-11 Closeout Submittals

3.4.2 GStorm Water Pollution Prevention

Plan compliance notebook

1.7.3Waste Determination Documentation

1.7.4Disposal Documentation for Hazardous and Regulated Waste

1.7.5Contractor 40 CFR Employee Training Records

1.7.2Solid Waste Disposal Permit 1.7.8Solid Waste Disposal Report 1.7.6Regulatory Notifications

01 58 00 SD-02 Shop Drawings GPreliminary one line

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 53 PAGES

01 58 00 Gpreliminary drawing indicating layout and text content

GSign Legend Orders SD-04 Samples

GFinal rendering GFinal framed rendering

01 78 00 SD-03 Product Data 1.2.2As-Built Record of Equipment and Materials 1.6.1Warranty Management Plan 1.6.4Warranty Tags 1.3Spare Parts Data

SD-08 Manufacturer’s Instructions 1.4Preventative Maintenance 1.4Condition Monitoring (Predictive

Testing) 1.4Inspection 1.6.1Instructions

SD-10 Operation and Maintenance Data

1.7Operation and Maintenance Manuals

SD-11 Closeout Submittals 1.2.1Record Drawings

1.5 GCertification of EPA Designated

Items

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 53 PAGES

02 41 00 SD-01 Preconstruction Submittals

1.10 GExisting Conditions

SD-07 Certificates

1.2.1 GDemolition Plan

1.6 GNotification

SD-11 Closeout Submittals 3.3.4Receipts

02 41 13 SD-07 Certificates

1.9 GDemolition plan

02 82 16.00 20 SD-03 Product Data

3.1.4 GLocal exhaust equipment

3.1.5 GVacuums

3.1.1.1 GRespirators

3.1.4 GPressure differential automatic

recording instrument

1.2.2 GAmended water

3.1.6 GGlovebags

1.3.8 GMaterial Safety Data Sheets

(MSDS) for all materials

2.1 GEncapsulants

SD-06 Test Reports

1.5.5 GAir sampling results

1.5.6 GPressure differential recordings

for local exhaust system

3.3.3.2 GAsbestos disposal quantity report

GEncapsulation test patches

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 53 PAGES

02 82 16.00 20 3.2.6.3 GClearance sampling SD-07 Certificates

1.3.9 GAsbestos hazard abatement plan

1.3.10 GTesting laboratory

1.5.1 GPrivate qualified person

documentation

1.5.4 GContractor's license

1.5.2 GCompetent person

1.5.3 GWorker's license

1.3.11 GLandfill approval

1.3.3 GEmployee training

1.3.12 GMedical certification

1.3.11 GWaste shipment records

1.3.6 GRespiratory Protection Program

1.3.11 GDelivery tickets

3.1.5 GVacuums

3.1.2.3 GWater filtration equipment

3.1.5 GVentilation systems

3.1 Gequipment used to contain

airborne asbestos fibers

2.1 Gencapsulants

1.3.4Notifications 1.3.4Notifications

SD-11 Closeout Submittals

1.3.4 GNotifications

1.3.4 GNotifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 53 PAGES

02 82 16.00 20 1.6.1 GRental equipment

1.3.6.1 GRespirator program records

1.3.4 GPermits and licenses

1.5.7 GProtective clothing

decontamination quality control records

1.5.8 GProtective clothing

decontamination facility notification

03 15 00.00 10 SD-03 Product Data 2.2Preformed Expansion Joint Filler 2.3Sealant

03 20 00.00 10 SD-02 Shop Drawings

3.1 GReinforcement

SD-03 Product Data 1.3.1Welding

SD-07 Certificates 2.3Reinforcing Steel 1.3.2Qualification of Steel Bar

Butt-Splicers 03 30 00 SD-03 Product Data

2.4.7 GMaterials for curing concrete

2.4.1 GCement

2.4.1.2 GPortland Cement

2.3.2 GReady-Mix Concrete

2.4.6 GVapor retarder and Vapor barrier

2.5 GBonding Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 53 PAGES

03 30 00 2.3.3 GConcrete Curing Materials SD-05 Design Data

2.3.1 Gmix design

SD-06 Test Reports

1.6.2.1 GConcrete mix design

1.6.2.2 GFly ash

1.6.2.2 GPozzolan

1.6.2.3 GGround granulated blast-furnace

slag

3.11.2.3 GCompressive strength tests

3.11.2.4 GAir Content

04 20 00 SD-02 Shop Drawings

1.4.2 GDetail Drawings

SD-04 Samples

2.2 GConcrete Masonry Units (CMU)

2.7 GAnchors, Ties, and Bar

Positioners

2.11 GExpansion-Joint Materials

2.8 GJoint Reinforcement

SD-05 Design Data

2.5.4 GPre-mixed Mortar

1.2.1.1 GUnit Strength Method

SD-06 Test Reports

3.20.1 GField Testing of Mortar

3.20.2 GField Testing of Grout

2.5.3 GMasonry Cement

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 53 PAGES

04 20 00 GMasonry Inspector Qualifications SD-07 Certificates

2.2Concrete Masonry Units (CMU) 2.7Anchors, Ties, and Bar

Positioners 2.11Expansion-Joint Materials 2.8Joint Reinforcement 2.5.3Masonry Cement 2.3Precast Concrete Items 2.5.1Admixtures for Masonry Mortar 2.6.1Admixtures for Grout

Contamination SD-08 Manufacturer’s Instructions

2.5.3Masonry Cement 05 05 23 SD-03 Product Data

1.5 GWelding Procedure Qualifications

1.5.5Welder, Welding Operator, and

Tacker Qualification 1.5.6Inspector Qualification 1.5.2Previous Qualifications 1.5.3Pre-qualified Procedures

SD-06 Test Reports 3.2Quality Control 3.3.1Nondestructive Examination

05 12 00 SD-02 Shop Drawings

1.6.1 GFabrication drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 53 PAGES

05 12 00 SD-03 Product Data

2.4 GShop primer

2.3.1 GWelding electrodes and rods

2.2.4 GLoad indicator washers

2.3.2 GNon-Shrink Grout

SD-06 Test Reports

2.4 GClass B coating

2.2 GBolts, nuts, and washers

SD-07 Certificates

2.1 GSteel

2.2 GBolts, nuts, and washers

2.5 GGalvanizing

1.4 GAISC Quality Certification

05 21 00 SD-01 Preconstruction Submittals 1.3.2Welder Qualification

SD-02 Shop Drawings

1.3.1 GSteel Joist Framing

SD-05 Design Data

2.2 GDesign Calculations

SD-06 Test Reports 3.4Erection Inspection 3.4Welding Inspections

SD-07 Certificates 1.3.2Certification of Compliance

05 30 00 SD-02 Shop Drawings 1.3.5Fabrication Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 53 PAGES

05 30 00 2.3.1.1Cant Strips 2.3.1.2Ridge and Valley Plates 2.3.1.3Metal Closure Strips

SD-03 Product Data 2.2Accessories 2.1.6Galvanizing Repair Paint 2.2.8Mechanical Fasteners 1.3.2Powder-Actuated Tool Operator 2.3.4Repair Paint 1.3.3Welder Qualifications 1.3.3Welding Equipment 1.3.3Welding Rods and Accessories

SD-05 Design Data 2.3.1Roof Deck

SD-07 Certificates 1.3.3Welding Procedures 1.3.4.1Fire Safety 1.3.4.2Wind Storm Resistance

06 41 16.00 10 SD-02 Shop Drawings 1.4.2Shop Drawings 2.10Shop Drawings

; G 3.1Installation

SD-03 Product Data 2.1Wood Materials

Wood Finishes

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 53 PAGES

06 41 16.00 10 2.10.7.3Finish Schedule Certification

SD-04 Samples 2.3Plastic Laminates

; G 2.6Cabinet Hardware

SD-07 Certificates 1.4Quality Assurance 3.1Laminate Clad Casework

06 61 16 SD-02 Shop Drawings

1.4.2 GDetail Drawings

3.1 GInstallation

SD-03 Product Data 2.1Solid polymer material 1.4.1Qualifications 2.3Fabrications

SD-04 Samples

2.1 GMaterial

2.3.4 GCountertops

SD-06 Test Reports 2.1Solid polymer material

SD-07 Certificates 2.3Fabrications 1.4.1Qualifications

SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 53 PAGES

06 61 16 3.2Clean-up SD-11 Closeout Submittals LEED Documentation

07 21 13 SD-03 Product Data GBoard insulation

Vapor retarder Pressure sensitive tape Protection board or coating Accessories

SD-08 Manufacturer’s Instructions Board Insulation Adhesive

07 52 00 SD-02 Shop Drawings

1.4.7 GRoof plan

SD-03 Product Data

2.1 GModified Bitumen Sheets

2.3Asphalt

GCold-Applied Membrane Adhesive

2.5 GPrimer

2.6 GModified Bitumen Roof Cement

Pre-Manufactured Accessories

2.8 GFasteners And Plates

1.8 GWarranty

SD-05 Design Data

1.4.6 GWind Uplift Calculations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 53 PAGES

07 52 00 SD-07 Certificates 1.4.1Qualification of Manufacturer 1.4.2Qualification of Applicator 1.4.4Qualification of Engineer of

Record 1.5.1Bill of Lading

1.4.6 GWind Uplift Resistance

1.4.5 GFire Resistance

SD-08 Manufacturer’s Instructions

3.3.4 GModified Bitumen Membrane

Application

3.3.5 GFlashing

3.2.3.1Temperature Limitations for

Asphalt 2.5Primer 2.8.1Fasteners

Ventilating Base Sheets GCoating Application

1.6 GCold Weather Installation

SD-11 Closeout Submittals

1.8Warranty 3.8Information Card 3.7Instructions To Government

Personnel 07 60 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 53 PAGES

07 60 00 3.1.25 GCovering on flat, sloped, or curved surfaces

3.1.17 GGutters

3.1.18 GDownspouts

3.1.26 GExpansion joints

3.1.15 GGravel stops and fascias

3.1.22 GSplash pans

3.1.19 GFlashing for roof drains

3.1.11 GBase flashing

3.1.12 GCounterflashing

3.1.27 GFlashing at roof penetrations

3.1.13 GReglets

3.1.20 GScuppers

3.1.30 GCopings

3.1.16 GDrip edge

3.1.21Conductor heads

3.1.23 GOpen valley flashing

3.1.24 GEave flashing

SD-11 Closeout Submittals 3.5Quality Control Plan

07 84 00 SD-02 Shop Drawings

2.1 GFirestopping Materials

SD-06 Test Reports

3.3 GInspection

SD-07 Certificates Inspector Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 53 PAGES

07 84 00 2.1Firestopping Materials

1.4.1 GInstaller Qualifications

07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops

SD-07 Certificates 3.3.6Sealant

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.1 GDoors

2.4 GFrames

2.4 GFrames

2.2Accessories

SD-03 Product Data

2.1 GDoors

2.4 GFrames

2.2Accessories

08 14 00 SD-02 Shop Drawings

2.1 GDoors

SD-03 Product Data

2.1 GDoors

2.2Accessories 1.4warranty

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 53 PAGES

08 14 00 2.1Doors

2.3.6.2 GDoor finish colors

08 71 00 SD-02 Shop Drawings

1.3 GHardware schedule

2.3.5Keying system

SD-03 Product Data

2.3 GHardware items

SD-08 Manufacturer’s Instructions 3.1Installation

SD-10 Operation and Maintenance Data

1.3 GHardware Schedule

SD-11 Closeout Submittals

1.4Key Bitting 08 81 00 SD-02 Shop Drawings

Installation SD-03 Product Data

1.6.1Insulating Glass 1.3Glazing Accessories

SD-04 Samples 1.6.1Insulating Glass

Impact Rated Glass Safety Glass Float Glass Glazing Compound

2.3.3Tape

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 53 PAGES

08 81 00 2.3.1.1Sealant SD-07 Certificates

1.6.1Insulating Glass Impact Rated Glass Safety Glass

SD-08 Manufacturer’s Instructions 2.3Setting and sealing materials 3.2Glass setting

09 22 00 SD-02 Shop Drawings

2.1 GMetal support systems

09 29 00 SD-03 Product Data 2.1.5Cementitious backer units 2.1.3Glass Mat Water-Resistant

Gypsum Tile Backing Board 2.1.2Water-Resistant Gypsum

Backing Board 2.1.4Glass Mat Covered or Reinforced

Gypsum Sheathing 2.1.4.1Glass Mat Covered or Reinforced

Gypsum Sheathing Sealant Impact Resistant Gypsum Board

2.1.10Accessories SD-07 Certificates

2.1 GAsbestos Free Materials

SD-08 Manufacturer’s Instructions Material Safety Data Sheets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 53 PAGES

09 29 00 SD-10 Operation and Maintenance Data Manufacturer maintenance instructions

3.7Waste Management 09 30 00 SD-02 Shop Drawings

1.3 GDetail Drawings

SD-03 Product Data

GTile

2.2 GSetting-Bed

2.4 GMortar, Grout, and Adhesive

SD-04 Samples GTile GAccessories

2.4 GGrout

SD-07 Certificates

GTile

2.4 GMortar, Grout, and Adhesive

09 51 00 SD-02 Shop Drawings 1.2Approved Detail Drawings

SD-03 Product Data Acoustical Ceiling Systems

SD-04 Samples 2.1Acoustical Units 2.1.1Acoustic Ceiling Tiles

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 53 PAGES

09 51 00 2.1Acoustical Units 2.1.1Acoustic Ceiling Tiles

09 65 00 SD-02 Shop Drawings

2.8 GResilient Flooring and

Accessories SD-03 Product Data

2.8 GResilient Flooring and

Accessories

2.4Adhesives SD-04 Samples

2.8 GResilient Flooring and

Accessories

SD-06 Test Reports

3.3 GMoisture, Alkalinity and Bond

Tests SD-08 Manufacturer’s Instructions

3.2 GSurface Preparation

3.1 GInstallation

SD-10 Operation and Maintenance Data

2.8 GResilient Flooring and

Accessories

09 68 00 SD-02 Shop Drawings

3.4 GInstallation

2.4 GMoldings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 53 PAGES

09 68 00 GCarpet

3.1 GSurface Preparation

3.4 GInstallation

SD-04 Samples GCarpet

2.4 GMoldings

SD-06 Test Reports

3.2 GMoisture and Alkalinity Tests

SD-07 Certificates

GCarpet

1.4 GRegulatory Requirements

SD-10 Operation and Maintenance Data

GCarpet

3.5 GCleaning and Protection

Maintenance Service 09 90 00 SD-02 Shop Drawings

3.10Piping identification 3.10stencil

SD-03 Product Data

2.1 GCoating

2.1Manufacturer's Technical Data

Sheets Sealant

SD-04 Samples

1.9 GColor

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 53 PAGES

09 90 00 SD-07 Certificates 1.3Applicator's qualifications

1.4.1.2 GQualification Testing

SD-08 Manufacturer’s Instructions Application instructions

3.6.2Mixing 1.7.2Manufacturer's Material Safety

Data Sheets SD-10 Operation and Maintenance Data

2.1 GCoatings:

10 21 13 SD-02 Shop Drawings

1.2Fabrication Drawings

3.1 GInstallation Drawings

SD-03 Product Data 1.2Cleaning and Maintenance

Instructions 2.1.1Anchoring Devices and

Fasteners 2.1.3Hardware and Fittings

Brackets 2.1.4Door Hardware 2.4Pilaster Shoes

SD-04 Samples

2.6 GColors and Finishes

2.1.3Hardware and Fittings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 53 PAGES

10 21 13 2.1.1Anchoring Devices and Fasteners

SD-07 Certificates 1.6Warranty

10 28 13 SD-03 Product Data

2.1.2 GFinishes

2.2 GAccessory Items

SD-04 Samples

2.1.2 GFinishes

2.2 GAccessory Items

SD-07 Certificates 2.2Accessory Items

21 13 13.00 20 SD-02 Shop Drawings

1.5.2 GShop Drawings

SD-03 Product Data

2.2.1 GPipe

2.2.1 GFittings

2.2.6 GAlarm valves

2.2.4 GValves

2.2.7 GWater motor alarms

2.2.3 GSprinklers

2.2.5 GPipe hangers and supports

2.3.1 GSprinkler Alarm Switches

2.2.8 GFire department connections

2.2.1 GMechanical couplings

2.2.9 GBackflow Prevention Assembly

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 53 PAGES

21 13 13.00 20 2.2.5 GSeismic Bracing SD-05 Design Data

1.3 GHydraulic Calculations

SD-06 Test Reports

3.6 Grequest to schedule Preliminary

Tests

3.6 GPreliminary Test Report

3.7 Grequest to schedule Final

Acceptance Test

3.7 GFinal Acceptance Test Report

SD-07 Certificates

3.1 GInspection by Fire Protection

Engineer

1.5.1 GFire Protection Engineer

1.5.2 GSprinkler System Installer

SD-10 Operation and Maintenance Data

3.8Operating and Maintenance Instructions

SD-11 Closeout Submittals 3.7As-built drawings 3.8On-site training

22 00 00 SD-02 Shop Drawings

3.8.1 GPlumbing System

SD-03 Product Data 2.4Fixtures

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 53 PAGES

22 00 00 2.4.2Flush valve water closets 2.4.3Flush valve urinals 2.4.5Wall hung lavatories 2.4.6Countertop lavatories 2.4.7Kitchen sinks 2.4.8Service sinks

Plastic shower stalls

2.9 GWater heaters

3.8.1.1 GBackflow prevention assemblies

2.6.2 GShower Faucets

1.5.1Welding

GVibration-Absorbing Features 3.8.1Plumbing System

SD-06 Test Reports 3.8Tests, Flushing and Disinfection

3.8.1.1 GTest of Backflow Prevention

Assemblies SD-07 Certificates

1.3Materials and Equipment 2.1.1Bolts

SD-10 Operation and Maintenance Data

3.8.1 GPlumbing System

22 05 48.00 20 SD-02 Shop Drawings

2.7Inertia bases 2.6Machinery bases

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 53 PAGES

22 05 48.00 20 2.6Platforms 2.6Rails

SD-03 Product Data 2.3Isolators 2.8Flexible connectors 2.9Flexible duct connectors 2.11Pipe guides 2.10Seismic snubbers 3.1.3Vertical stops 2.12Thrust restraints 2.7Inertia bases 2.6Machinery bases 3.1.12Machinery foundations and subbases 2.6Platforms 2.6Rails 2.6Saddles 1.4.2Machinery manufacturer's sound data SD-05 Design Data

2.7Inertia bases 2.6Machinery bases 2.6Platforms 2.6Rails 2.6Saddles 1.4.3machinery

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 53 PAGES

22 05 48.00 20 1.4.4machinery over 300 pounds SD-06 Test Reports

2.10Seismic snubbers 3.2.3.1Equipment vibration tests 3.2.3.2Equipment sound level tests 2.4Protected spring isolators

SD-08 Manufacturer’s Instructions 3.1.1Vibration and noise isolation components 2.13Seismic protection components

23 00 00 SD-02 Shop Drawings

1.4.5 GDetail Drawings

SD-03 Product Data Metallic Flexible Duct; G Insulated Nonmetallic Flexible Duct Runouts; G

Duct Connectors; G

2.9.2 GDuct Access Doors

Fire Dampers; G GManual Balancing Dampers

Diffusers; G Registers and Grilles; G Louvers; G Air Vents, Penthouses, and Goosenecks; G

Ceiling Exhaust Fans; G

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 53 PAGES

23 00 00 2.11 GAir Handling Units GRoom Fan-Coil Units

2.12 GEnergy Recovery Devices

Test Procedures; G

1.2.1.2 GDiagrams

SD-06 Test Reports

3.11 GPerformance Tests

3.9 GDamper Acceptance Test

SD-07 Certificates 1.4.1Bolts

SD-08 Manufacturer’s Instructions 3.2Manufacturer's Installation

Instructions 3.13.2Operation and Maintenance

Training SD-10 Operation and Maintenance Data

3.13.1 GOperation and Maintenance

Manuals

2.9.3 GFire Dampers

GManual Balancing Dampers GCeiling Exhaust Fans

2.11 GAir Handling Units

GRoom Fan-Coil Units

2.12 GEnergy Recovery Devices

23 03 00.00 20 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 53 PAGES

23 03 00.00 20 1.4.5.3Certification 23 07 00 SD-02 Shop Drawings

3.2.2.4 GMICA Plates

2.3Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems 3.4Equipment Insulation Systems

SD-03 Product Data

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

3.4 GEquipment Insulation Systems

SD-04 Samples

2.2.1.2 GThermal Insulation

GDisplay Samples SD-08 Manufacturer’s Instructions

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

3.4 GEquipment Insulation Systems

23 23 00 SD-02 Shop Drawings

2.3 GRefrigerant Piping System

SD-03 Product Data 2.3Refrigerant Piping System 1.5.2Spare Parts 1.3.1Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 53 PAGES

23 23 00 3.5Refrigerant Piping Tests 3.1Verification of Dimensions

SD-06 Test Reports 3.5Refrigerant Piping Tests

SD-07 Certificates 2.1Service Organization

SD-10 Operation and Maintenance Data

1.5 GMaintenance

3.4 GOperation and Maintenance

Manuals

3.4 GDemonstrations

23 31 13.00 40 SD-01 Preconstruction Submittals Part 2 GMaterial, Equipment, and Fixture

Lists

2.1.1 GRecords of Existing Conditions

SD-02 Shop Drawings

2.1 GConnection Diagrams

1.3 GRecord Drawings

2.3.1 GOffset Fitting Configurations

2.3.3 GOffset Fitting Configurations

SD-03 Product Data

2.1.1 GEquipment and Performance

Data

2.2.1 GGalvanized Steel Ductwork

Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 53 PAGES

23 31 13.00 40 2.2.2 GMill-Rolled Reinforcing and Supporting Materials

2.3.1 GRound Sheet Metal Duct Fittings

2.3.4 GTurning Vanes

2.3.6 GFlexible Connectors

2.3.9 GFlexible Duct Materials

2.3.12 GPower Operated Dampers

2.3.13 GFire Dampers and Wall Collars

2.3.11 GGravity Backdraft and Relief

Dampers

2.3.10 GManual Volume Dampers

SD-05 Design Data

2.1 GDesign Analysis and Calculations

2.1.1 GDesign Analysis and Calculations

SD-06 Test Reports

3.4.2 GDuctwork Leakage Tests

3.4.1 GOperational Tests

SD-07 Certificates

3.2 GListing of Product Installations

2.2.1 GGalvanized Steel Ductwork

Materials

2.2.2 GMill-Rolled Reinforcing and

Supporting Materials

2.3.1 GRound Sheet Metal Duct Fittings

2.3.4 GTurning Vanes

2.3.5 GDampers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 53 PAGES

23 31 13.00 40 2.3.6 GFlexible Connectors SD-10 Operation and Maintenance Data

3.6 GOperation and Maintenance

Manuals

2.3.12 GPower Operated Dampers

2.3.13 GFire Dampers and Wall Collars

23 37 13.00 40 SD-01 Preconstruction Submittals

2.1 GMaterial, Equipment, and Fixture

Lists

2.1 GRecords of Existing Conditions

SD-02 Shop Drawings

2.1 GFabrication Drawings

3.1 GInstallation Drawings

SD-03 Product Data

1.3 GEquipment and Performance

Data SD-10 Operation and Maintenance Data

GType TS Supply Troffer GType TSR Combination Supply and Return Troffer 23 74 33.00 00 SD-02 Shop Drawings

Shop Drawings G, Include Plans, Elevations and Attachment Details

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 53 PAGES

23 74 33.00 00 SD-03 Product Data Product Data G, Include dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection

SD-05 Design Data Delegated Design Data G, Design of Vibration Isolation, seismic restraints, wind restraints, including analysis data - signed and sealed by the qualified professional engineer responsible for their preparation

SD-08 Manufacturer’s Instructions GMaterial Safety Data

SD-09 Manufacturer’s Field Reports

GFactory test reports SD-10 Operation and Maintenance Data

GMaintenance Manuals 23 81 43 SD-01 Preconstruction Submittals

1.5.1 GQualifications

SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 53 PAGES

23 81 43 1.5.3Control System Wiring Diagrams SD-03 Product Data

2.1 GRoom Air Conditioners

2.2 GAir-Cooled Condenser

2.3 GBranch Selector Boxes

2.4 GCentral Controller

2.5Coatings For Finned Tube Coils

SD-06 Test Reports 2.7.1Salt-Spray Tests

23 84 16.00 20 SD-03 Product Data Desiccant Dehumidification Unit

SD-06 Test Reports 2.1.1Filter sections 3.3.1Preliminary tests 2.1.1Dampers

SD-07 Certificates Desiccant dehumidification unit

SD-10 Operation and Maintenance Data Desiccant dehumidification unit

26 05 00.00 40 SD-01 Preconstruction Submittals

2.1 GMaterial, Equipment, and Fixture

Lists SD-03 Product Data

2.1.1 GConduits and Raceways

2.1.3 GWire and Cable

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 53 PAGES

26 05 00.00 40 3.2.1.8 GSplices and Connectors

2.1.4 GSwitches

2.1.5 GReceptacles

2.1.6 GOutlets, Outlet Boxes, and Pull

Boxes

2.1.8 GCircuit Breakers

2.1.7 GPanelboards

2.1.9 GLamps and Lighting Fixtures

2.1.12 GDry-Type Distribution

Transformers SD-06 Test Reports

3.3 GContinuity Test

3.3 GPhase-Rotation Tests

3.3 GInsulation Resistance Test

SD-07 Certificates

1.4 GCertification

SD-08 Manufacturer’s Instructions Part 2 GManufacturer's Instructions

26 05 13.00 40 SD-03 Product Data 2.4Single-Conductor Shielded

Cables SD-06 Test Reports

3.2Dielectric Absorption Tests 3.2High-Voltage Tests

SD-07 Certificates 1.3Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 53 PAGES

26 05 13.00 40 Lead Sheath 2.3Flammability 3.1.4Minimum Bending Radius 3.2High-Voltage Tests 3.2Dielectric Absorption Tests 1.5Cable Splicers

SD-08 Manufacturer’s Instructions 1.6Medium-Voltage Power Cables 3.1.5Pothead Terminations

26 05 48.00 10 SD-02 Shop Drawings 3.2Lighting Fixtures in Buildings 1.3Equipment Requirements

SD-03 Product Data

3.2 GLighting Fixtures in Buildings

1.3 GEquipment Requirements

1.2.4 GContractor Designed Bracing

26 08 00 SD-06 Test Reports

3.1 GAcceptance tests and inspections

SD-07 Certificates

1.4.1 GQualifications

1.4.3 GAcceptance test and inspections

procedure 26 09 23.00 40 SD-03 Product Data

2.1Photoconductive Control Devices

2.5 GLighting Contactor

2.6 GTime Switch

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 53 PAGES

26 09 23.00 40 2.7 GPhotocell Switch

2.8 GOccupancy Sensors

SD-06 Test Reports 3.2System Operation Tests

SD-10 Operation and Maintenance Data

2.1 GLighting Control System, Data

Package 5

26 12 19.00 40 SD-02 Shop Drawings

1.4.1 GPad-Mounted Transformer

Drawings SD-03 Product Data

2.1.1 GPad-Mounted Transformers

SD-06 Test Reports

3.3.1 GAcceptance Checks And Tests

SD-07 Certificates

GTransformer Losses SD-09 Manufacturer’s Field Reports

2.3.2 GDesign Tests

2.3.3 GRoutine and Other Tests

SD-10 Operation and Maintenance Data

1.5.1 GTransformer(s)

SD-11 Closeout Submittals

2.3.1 GTransformer Test Schedule

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 53 PAGES

26 12 19.00 40 1.6 GWarranty 26 18 23.00 40 SD-02 Shop Drawings

Part 2 GFabrication Drawings GInstallation Drawings

SD-03 Product Data Part 2 GEquipment and Performance

Data

2.1.2 GMounting Brackets

SD-08 Manufacturer’s Instructions

1.3.1 GInstallation Instructions

SD-10 Operation and Maintenance Data

1.3.2 GOperation and Maintenance

Manuals

26 20 00 SD-02 Shop Drawings

2.12 GPanelboards

2.24 GWireways

SD-03 Product Data

2.11 GReceptacles

2.12.3 GCircuit breakers

2.9 GSwitches

2.13 GEnclosed circuit breakers

GMotor controllers GCombination motor controllers

2.25 GMetering

2.18.1 GCATV outlets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 53 PAGES

26 20 00 2.19.3 GGrounding Busbar

2.26 GSurge protective devices

SD-06 Test Reports

3.5.2 G600-volt wiring test

3.5.5 GGrounding system test

SD-07 Certificates

2.10 GFuses

SD-10 Operation and Maintenance Data

1.5.1 GElectrical Systems

2.25 GMetering

26 24 16.00 40 SD-02 Shop Drawings

2.1.1 GDetail Drawings

2.1.1 GOutline Drawings

SD-03 Product Data

1.3 GPanelboards

2.1.1 GPanelboards

2.1.3Directory Card and Holder

GFiltered Panelboards SD-06 Test Reports

3.2Continuity Tests 3.2Insulation Tests

SD-07 Certificates 1.4Statements

SD-08 Manufacturer’s Instructions

1.3 GPanelboards

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 53 PAGES

26 24 16.00 40 2.1.1 GPanelboards 26 27 13.10 30 SD-03 Product Data

2.1 GPower meters

2.1.3 GCurrent

2.1.2 GPotential transformer

2.2.2 GCommunications module

1.6.1 GProtocol modules

1.6.2 GData recorder

1.6.2 GModem

SD-06 Test Reports

3.3.1 GAcceptance checks and tests

SD-10 Operation and Maintenance Data

2.1 GPower meters

2.2.2 GCommunications module

1.6.1 GProtocol modules

1.6.2 GData recorder

1.6.2 GModem

SD-11 Closeout Submittals

3.3.2 GSystem function verification

26 32 14.00 10 SD-02 Shop Drawings

1.4.6 GDetailed Drawings

3.11 GAcceptance

SD-03 Product Data 2.4Manufacturer's Catalog

3.10 GInstructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 53 PAGES

26 32 14.00 10 1.4.3Experience 1.4.4Field Engineer 1.4.2Site Welding 3.2General Installation 3.1Site Visit

SD-05 Design Data

2.8 GSound Limitations

2.14Generator 2.5.4Integral Main Fuel Storage Tank 2.5.5Day Tank 3.6.2.2Power Factor 2.7.2Heat Exchanger 2.18.5Time-Delay on Alarms 2.7Cooling System 1.2.4Vibration Isolation

SD-06 Test Reports 3.6.6Performance Tests

3.6 GOnsite Inspection and Tests

SD-07 Certificates 1.2.4Vibration Isolation 3.4Prototype Tests 1.2.5Reliability and Durability 2.11Emissions 2.8Sound limitations 2.14.1Current Balance 2.3Materials and Equipment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 53 PAGES

26 32 14.00 10 2.27Factory Inspection and Tests 3.6.4Inspections 2.7Cooling System

SD-10 Operation and Maintenance Data

1.6.1Operation Manual 1.6.2Maintenance Manual…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.