This document contains a schedule of material submittals for a federal contract solicitation to rehabilitate sewer pipelines at Goodfellow Air Force Base in San Angelo, Texas by installing cured-in-place piping. The contractor must submit 38 items by various deadlines, including a traffic control plan, as-built drawings, field quality control documentation, testing reports for the installed piping and flexible membrane, and closeout activities. The work includes cleaning and inspecting approximately 3,165 linear feet of sewer mains ranging from 6 to 10 inches in diameter, installing cured-in-place piping using resin-impregnated fabric tubes, providing new manholes, and bypass pumping during rehabilitation. The period of performance is 120 calendar days. The solicitation number is FA303020B0001 and is set aside 100% for small businesses with a NAICS code of 237110 and size standard of $36.5 million. The invitation for bid will be issued on or around October 25, 2019 with bid opening on November 26, 2019.
AF Form 66 - Sewer CIPP
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0001 - Questions and Answers.pdf | ||
| Amendment 0001 - FA303020B00010001 SF 30.pdf | ||
| Amendment 0001 - Site Visit Attendance.pdf | ||
| Attachment_1_-_Drawings.pdf | ||
| Attachment_2_-_BAL_Request.pdf | ||
| Solicitation_-_FA303020B0001.pdf | ||
| Attachment_3_-_SOW.pdf | ||
| Attachment_5_-_Wage_Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF MATERIAL SUBMITTALS
SOLICITATION/CONTRACT NO.:
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
Written Notification, Utility Outages, para 1.7.3
4 c GA
Written Notification, Sewer Outages, para 1.7.5
4 c GA
Traffic Control Plan, para 1.7.9
4 c GA
DD Form 1354, para 1.10
4 e GA
As built Drawings, para 1.14
4 e GA
Work Requests, para 1.21
Min. 3 days prior c
GA
FFP CIPP System Description, para 2.4
4 b GA
Hydrophilic Seals, 2.4.2.1.8
4 GA
9 Assembly, para 2.5 4 b GA
Fabric Tube Certification, para 2.5.5.1
4 c GA
11 Resin, para 2.5.6 4 b GA
12 Materials, para 2.5.7 4 b GA
Manufacturing Certificate, para 2.5.8
4 b GA
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
C
ER
TI
FI
C
A
TI
O N
O F
C O
M
PL
IA
N
C E
O
PE
R A
TI
N
G
IN
ST
R
U C
TI
O
N S
SH
O
P D
R A
W
IN
G S
M A
N U
FA
C
TU
R
ER
'S
W A
R R
A N
TY
REMARKS
DATE
RECEIVED IN
CON-TRACTING
DATE TO CIVIL
ENGINEER-ING
RETURN
SUSPENSE
DATE
FOLLOW UP
CONTRACT-TOR
RE-SUBMITTAL
PROJECT NUMBER: JCGU 09-1007
SA
M
PL
ES
PROJECT TITLE: Repair Sanitary Sewer Outfalls
FINAL
APPROVAL
M A
N U
FA
C
TU
R
ER
'S
R
EC
O M
M
EN
D A
TI
O
N S
C O
LO
R
S
EL
EC
TI
O N
SE
E
P A
R A
O N
C O
PI
ES
O
TH
ER
S
A S
SP
EC
IF
IE
D
REQUIRED
SUBMISSION
DATE
FORM66.xls
SOLICITATION/CONTRACT NO.:
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
C
ER
TI
FI
C
A
TI
O N
O F
C O
M
PL
IA
N
C E
O
PE
R A
TI
N
G
IN
ST
R
U C
TI
O
N S
SH
O
P D
R A
W
IN
G S
M A
N U
FA
C
TU
R
ER
'S
W A
R R
A N
TY
REMARKS
DATE
RECEIVED IN
CON-TRACTING
DATE TO CIVIL
ENGINEER-ING
RETURN
SUSPENSE
DATE
FOLLOW UP
CONTRACT-TOR
RE-SUBMITTAL
PROJECT NUMBER: JCGU 09-1007
SA
M
PL
ES
PROJECT TITLE: Repair Sanitary Sewer Outfalls
FINAL
APPROVAL
M A
N U
FA
C
TU
R
ER
'S
R
EC
O M
M
EN
D A
TI
O
N S
C O
LO
R
S
EL
EC
TI
O N
SE
E
P A
R A
O N
C O
PI
ES
O
TH
ER
S
A S
SP
EC
IF
IE
D
REQUIRED
SUBMISSION
DATE
14 Catalyst, para 2.5.9 4 b GA
Flexible Membrane, para 2.5.11
4 c GA
16 Lubricant, 2.5.12 4 c GA
17 Resin Dye, 2.5.13 4 c GA
18 Preparation, para 3.1
4 c GA
Bypassing Existing Sewage Flows, para 3.1.3
4 d GA
Pre-TV Inspection, para 3.1.4
4 d GA
Installation of CIPP Liner, para 3.2
4 b GA
Temperature Logs, para 3.3.2
4 c GA
Water Disposal, Procedures, para 3.4
4 c GA
24 Curing Logs, para 3.6 4 e GA
Field Quality Control, para 3.10
4 a GA
Testing of CIPP, para 3.11
4 c GA
SOLICITATION/CONTRACT NO.:
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
C
ER
TI
FI
C
A
TI
O N
O F
C O
M
PL
IA
N
C E
O
PE
R A
TI
N
G
IN
ST
R
U C
TI
O
N S
SH
O
P D
R A
W
IN
G S
M A
N U
FA
C
TU
R
ER
'S
W A
R R
A N
TY
REMARKS
DATE
RECEIVED IN
CON-TRACTING
DATE TO CIVIL
ENGINEER-ING
RETURN
SUSPENSE
DATE
FOLLOW UP
CONTRACT-TOR
RE-SUBMITTAL
PROJECT NUMBER: JCGU 09-1007
SA
M
PL
ES
PROJECT TITLE: Repair Sanitary Sewer Outfalls
FINAL
APPROVAL
M A
N U
FA
C
TU
R
ER
'S
R
EC
O M
M
EN
D A
TI
O
N S
C O
LO
R
S
EL
EC
TI
O N
SE
E
P A
R A
O N
C O
PI
ES
O
TH
ER
S
A S
SP
EC
IF
IE
D
REQUIRED
SUBMISSION
DATE
Testing of Installed FFP, para 3.14
4 e GA
Testing of Installed CIPP, para 3.15
4 e GA
Post-TV Inspection, para 3.13
4 e GA
Closeout Activities, para 3.17
4 e GA
Post Inspection Documentation, para 3.13
4 e GA
BCE Work Request, para 4.1.1
4 c GA
Hazardous Waste Manifest, para 5.3
4 c GA
List of Materials/Hax Mat, para 5.5
4 c GA
35 Pesticides, para 5.8 4 c GA
36 PI-7 Form, para 5.9 4 c GA
Drinking Water, para 5.10
4 c GA
Solid Waste Disposal Report, para 5.12.1
4 c GA
AF Form 66
(a) As soon as possible but no later than 7 calendar days from NTP.
(b) Within 21 calendar days of NTP.
(c ) Prior to Use.
SOLICITATION/CONTRACT NO.:
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
C
ER
TI
FI
C
A
TI
O N
O F
C O
M
PL
IA
N
C E
O
PE
R A
TI
N
G
IN
ST
R
U C
TI
O
N S
SH
O
P D
R A
W
IN
G S
M A
N U
FA
C
TU
R
ER
'S
W A
R R
A N
TY
REMARKS
DATE
RECEIVED IN
CON-TRACTING
DATE TO CIVIL
ENGINEER-ING
RETURN
SUSPENSE
DATE
FOLLOW UP
CONTRACT-TOR
RE-SUBMITTAL
PROJECT NUMBER: JCGU 09-1007
SA
M
PL
ES
PROJECT TITLE: Repair Sanitary Sewer Outfalls
FINAL
APPROVAL
M A
N U
FA
C
TU
R
ER
'S
R
EC
O M
M
EN
D A
TI
O
N S
C O
LO
R
S
EL
EC
TI
O N
SE
E
P A
R A
O N
C O
PI
ES
O
TH
ER
S
A S
SP
EC
IF
IE
D
REQUIRED
SUBMISSION
DATE
(d) Within 60 calendar days of NTP.
(e ) Final Inspection.