Amendment 0001 - Questions and Answers.pdf

PDF 117 KB Posted

Attached to
Sewer Lines CIPP Federal contract opportunity
Solicitation number
FA303020B0001
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document includes an amendment with questions and answers pertaining to a solicitation for cured-in-place pipe lining of sewer lines at Goodfellow Air Force Base in San Angelo, Texas. The scope of work involves cleaning and video inspection of approximately 3,165 linear feet of 6, 8, and 10-inch sewer mains, followed by cured-in-place pipe lining rehabilitation. Bypass pumping will be required during inspection and lining. The contractor must furnish all labor, equipment, materials, and incidentals to complete the work within 120 calendar days. The solicitation is set aside for small businesses with a NAICS code of 237110 and size standard of $36.5 million. The invitation for bid is expected to issue on October 25, 2019 with bid opening on November 26, 2019. Questions must be submitted in writing to the points of contact by the specified dates.

View the file

Other files for this federal contract opportunity

Other files attached to Sewer Lines CIPP, newest first.
File Type Posted
Amendment 0001 - FA303020B00010001 SF 30.pdf PDF
Amendment 0001 - Site Visit Attendance.pdf PDF
Attachment_4_-_AF_Form_66.pdf PDF
Attachment_1_-_Drawings.pdf PDF
Solicitation_-_FA303020B0001.pdf PDF
Attachment_3_-_SOW.pdf PDF
Attachment_5_-_Wage_Determination.pdf PDF
Attachment_2_-_BAL_Request.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers – FA303020B0001

Q: Will the Government clarify the number of MHs to be replaced?

A: No manholes will be replaced on this project

Q: Will the Government clarify the number of MHs to be added?

A: No manholes will be added until the video is completed. The video will provide us with a pic of what we have, and what is needed to complete lining.

Q: Will the Government verify the depths of the MHs and sewer lines?

A: We will not provide depths of manholes or the sewer lines. We do not have this information.

Q: Will the Government clarify the flow direction and flow rates for each line?

A: We know flow direction. Everything flow from South to the North. We can’t provide flow rates for each line.

Q: Will the Government clarify the type of soil encompasses Goodfellow AFB?

A: Our soil is typically sand/clay with limestone. This varies throughout the base.

Q: Does the Government have as-builts pertaining to all other UG utilities?

A: Yes we have utility drawings

Q: The brick MH along Schertz Blvd, is this to be replaced?

A: No manholes replaced on this project.

Q: What is the structural integrity of the brick MH along Schertz Blvd?

A: Not sure of structural integrity on this manholes. We have not had any problems with these manholes.

Q: Will the Government provide a laydown area? Where?

A: Yes a laydown area will be provide. After contract is awarded, we will provide a lay down area that best works for Contractor. Last sewer project we used parking lot B-812.

Q: Is the contractor to install 6” clean outs at each building?

A: We will only install 6” if needed after the video is completed.

Q: Will the Owner/Engineer please provide the budget for this project?

A: The magnitude of this project is between $500,000 and $1,000,000.

Q: Will the Owner/Engineer please provide any previous itemized bid tabulations for projects of similar scope?

A: The past two Sewer projects have been awarded at $774,945 and $661,828, however linear footage of sewer line and piping size has varied on each project.

Q: Will the Owner/Engineer please provide a copy of the current plan holders list?

A: We do not have a copy of the current plan holders list to provide.

Q: Will the Owner/Engineer please provide the anticipated NTP date for this project?

A: The NTP will be issued dependent upon the date of award. Projected date of award/funds availability is mid-December.

Q: Will the Owner/Engineer please confirm if there are any prevailing wage requirements for this job?

A: Minimum wage requirements are determined by the Davis-Bacon Act, which is attached to the solicitation.

Q: Is hot water and steam curing allowed for the CIPP lining?

A: On the last two project we used UV CIPP. We would prefer using UV CIPP process.

Q: The 6” lining is of mainline sewers and not laterals?

A: Your bid should be for all lines identified on the drawings. After video has been complete we will re-evaluate the requirements.

Q: Will the owner cover the cost for water? If not where can the contractor access water?

A: If water is needed the base will provide. You will need a current inspected back flow preventer in order to connect to our fire hydrants.

Q: Will the owner provide access and cost for disposal of debris from cleaning the main lines?

A: We do not provide any disposal sites. Contractors are responsible for all disposal of debris off base at Contractor expense. I would think the cleaning debris would flow downhill.

Q: Will the owner or contractor cover the cost for the testing of cured liners?

A: All testing and cost related to testing is provided by Contractor. Owner covers no cost for testing.

Q: Can the owner provide profile views of the lines showing the depths of the lines and manholes? If not, can the owner provide the depths of the manholes?

A: We can’t provide profile views of the lines showing depths, nor can we provide depths of manholes.

Q: Is this work to be done during the day or is any night work allowed?

A: The work will done during the day 0730-1630. Working late and at night could be approved on a case by case if needed.