Attachment 7 - AF Form 66 Design-Build 11-17-08.xls

XLS spreadsheet 73 KB Posted

Attached to
Pedestrian Gate Federal contract opportunity
Solicitation number
FA2816-09-R-0024
Issued by
Department of the Air Force Space Command Space and Missile Systems Center

About this file

Attachment 7 - AF Form 66

View the file

Other files for this federal contract opportunity

Other files attached to Pedestrian Gate, newest first.
File Type Posted
Attachment 10 - ACJP082130CS101.pdf PDF
Attachment 6 - SECTION 02086.pdf PDF
Attachment 3 - HHEK082139 SOW.pdf PDF
Attachment 13 - wagedetermination.doc DOC document
Attachment 2 - HHEK082129 SOW.pdf PDF
Attachment 4 - SECTION 01010.pdf PDF
Solicitation.pdf PDF
Attachment 11 - HHEK082129CS101.pdf PDF
Attachment 12 - HHEK082139CS101.pdf PDF
Attachment 5 - SECTION 02085.pdf PDF
Attachment 1 - ACJP082130 SOW.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER:PROJECT TITLE:SOLICITATION / CONTRACT NO.:
ACJP082130Add Pedestrian Gate, B/261, Douglas Street, LAAFBxxx
(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTSDRAWINGSCOST ESTIMATETECHNICAL DATATEST REPORTSFIELD REPORTSELECTRONIC VERSION (CD or DVD)REQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
1Project Manager and designated representatives contact information (SOW Sec 5.8.1)21At time of NTP
2Project Schedule (SOW Sec 5.2)21NTP plus 5 working days - Updated weekly
3Meeting Minutes (SOW Sec 5.5.1)215 working days after event
4A-E Design Professionals List (SOW Sec 6.1)21Prior to start of Design Phase
5Preliminary Design submittal (35 percent) (SOW Sec 6.3.1)222Per Project Schedule
6Pre-Final Design Submittal (90 percent) (SOW Sec 6.3.2)222Per Project Schedule
7Issued for Construction Submittal (100 percent) (SOW Sec 6.3.3)332Per Project Schedule
8Site Safety Plan (SOW Sec 7.4.3215 working days prior to onsite work
9Work Phasing Plan (SOW Sec 7.2.1)215 working days after NTP
10Environmental Protection Plan (Spec Sec 01010 - Section 1.6)215 working days prior to onsite work
11List of Equipment Requiring Air Permit (Spec Sec 01010 - Section 1.7)215 working days prior to onsite work
12Hazardous Waste Certification & Hazardous Waste Transporter Documentation (Spec Sec 01010 - Section 1.8)21As required
13AF form 3952, MSDS Chemical/Hazardous Material Request Authorization (Spec Sec 01010 - Section 1.9)215 working days prior to use
14Hazardous Material Spill/Release Report (Spec Sec 01010 - Section 1.10)21As required
15Green Procurement Determination Form and Estimate/Certification Form (Spec Sec 01010 - Section 1.11)215 working days prior to onsite work
16Construction & Demolition Debris Report (Spec Sec 01010 - Section 1.13)21As required
17NPDES General Permit Notice of Intent, SWPPP and Draft Notice of Termination (Spec Sec 01010 - Section 1.14)215 working days prior to onsite work
18Lead-Based Paint Abatement Submittals (Spec Sec 01010 - Section 1.15)215 working days prior to onsite work
19Asbestos Abatement Submittals (Spec Sec 01010 - Section 1.16)215 working days prior to onsite work
20AST Technical Information and Site Specific Spill Plan (Spec Sec 01010 - Section 1.19)21As required
21Construction Material and Shop Drawing Submittals Schedule/Log (SOW Sec 7.2.2)21At start of Construction Phase - Updated weekly
22AF Form 3000, Material Submittals (SOW Sec 7.2.2)22222222222As required
23A-E Site Visit Report (SOW Sec 6.4.2)215 working days after meeting
24Operations and Maintenance Manuals (SOW Sec 8.3)2230 days after BOD
25Operations and Maintenance Training Video (SOW Sec 8.3)230 days after BOD
26Equipment/Workmanship Warranty Letter (SOW Sec 8.4)2230 days after BOD
27DD-1354 Transfer and Acceptance of Real Property (Draft / Interim) (SOW Sec 8.5)2120 days prior to BOD
28DD-1354 Transfer and Acceptance of Real Property (Final) (SOW Sec 8.5)2130 days after BOD
29Construction Record Drawings (SOW Sec 8.6 and 8.7)2130 days after BOD
30
31
32
33
34

&L&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) AF Form 66 (11-6-08)&C&"Arial,Bold"&8&P of &N&R&"Arial,Bold"&8Design-Build Attachment 3 (11/17/08) Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)

Enter any comments pertaining to the submittal

File details come from the government source that posted it. Updated .