CN-370000-HW689-DC001B.pdf
PDF 1 MB Posted
- Contract number
- HW689
- Issued by
- Florida
About this file
This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) under Contract Number HW689. The task assignment DC001B authorizes APTIM Environmental & Infrastructure, LLC to conduct a site review meeting with FDEP. Key personnel include Melissa Walsh as the FDEP Department Project Manager and Eric Kramer as APTIM's Project Manager. The task assignment covers multiple project locations and is effective through June 30, 2022.
The scope of work, dated March 17, 2022, consists of two subtasks: Subtask 1 involves project management with labor hours automatically calculated based on total direct labor, and Subtask 2 involves conducting a 2022 site review meeting with APTIM sending two personnel to attend the annual review and submit meeting notes. The deliverable—site review meeting notes and project management documentation—is due May 5, 2022. The total task assignment value is $11,193.44 on a fixed unit rate basis, comprising $1,222.17 for project management and $9,971.27 for the site review meeting. Costs include direct labor (64 total hours at $4,076.34), overhead (85.58%), general and administrative costs (19.38%), fringe benefits (31.96%), and travel expenses including vehicle rental ($240.00) and per diem plus hotel ($330.00). No subcontractor or laboratory costs are included in this task assignment.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW689
DC001B Completion June 30, 2022
This Task Assignment authorizes APTIM to have a site review meeting conducted with FDEP as schedules allow. Work will be done according to the attached scope of work dated March 17, 2022
Melissa Walsh 850-245-8960 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
APTIM
APTIM
Eric Kramer 407-287-3216 Multiple
Multiple
Multiple
$ 0.00 ✔ $ 11,193.44
$ 0.00
$ 11,193.44
Scope of Work
Eric Kramer
APTIM Contract Manager
Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2022.03.28 13:17:53 -04'00'
William E. Burns, Jr.
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.03.28 09:06:41 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Site Review Meeting Notes and Project Management 05/05/2022
Subtasks 1 & 2: Submittal and FDEP approval of Site Review Meeting Notes and Project Management $ 11,193.44
$ 11,193.44
HW689
DC001B
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Secretary
Memorandum TO: Contract File
Contract No. HW689
FROM: Melissa A Walsh, Project Manager
SUBJECT: Site Review Meeting Task Assignment #DC001B Meeting
DATE: March 25, 2022
This Task Assignment authorizes APTIM to have a site review meeting conducted with FDEP as schedules allow. Work will be done according to the attached scope of work dated March 17, 2022
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: 2022 Site Review Meeting APTIM will send two personnel to attend the Annual Site Review Meeting with FDEP and submit meeting notes.
Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and the APTM proposal. The final deliverable due date is May 5, 2022, and the completion date for the Task Assignment is June 30, 2022The final cost for this Task Assignment is $11,193.44.
FDEP COST ESTIMATE
Contractor: Aptim Environmental & Infrastructure, LLC
Date: 3/17/2022
Task #: HW689 - DC001B SubTask 1 Project Management
Site: Critical Response SubTask 2 Site Review Meeting
Activity/Phase: Site Review Meetoing SubTask 3
Project Manager: Eric Kramer SubTask 4
SubTask 5
Totals 1 2 3 4 5 Labor Rate Category
$65.22 Project Manager E. Kramer 7 7.2 $65.22 Engineer/Scientist 5 E. Kramer 23 23 0 0 0 $61.98 Engineer/Scientist 5 G. Roberts 34 34 0 0 0 $36.20 Engineering Technician 4 A. Escobar 0 0 0 0 0 $32.56 Designer 2 S. Ferianc 0 0 0 0 0 $27.64 Technical Publications Specialist 3 H. Vining 0 0 0 0 0
$0.00 0 0 0 0 0 Total Hours 64 7 57 0 0 0
Direct Labor $4,076.34 $468.96 $3,607.38 $0.00 $0.00 $0.00
Overhead 85.58% $3,488.54 $401.34 $3,087.20 $0.00 $0.00 $0.00 Gen & Admin 19.38% $789.99 $90.88 $699.11 $0.00 $0.00 $0.00 Fringe 31.96% $1,302.80 $149.88 $1,152.92 $0.00 $0.00 $0.00 Total Labor $9,657.67 $1,111.06 $8,546.61 $0.00 $0.00 $0.00
Travel Vehicle Rental $240.00 $240.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $330.00 $330.00 $0.00 $0.00 $0.00 Total Travel $570.00 $570.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF SHAW Page 2
FDEP COST ESTIMATE
Contractor: Aptim Environmental & Infrastructure, LLC
Date: 3/17/2022
Task #: HW689 - DC001B SubTask 1 Project Management
Site: Critical Response SubTask 2 Site Review Meeting
Activity/Phase: Site Review Meetoing SubTask 3
Project Manager: Eric Kramer SubTask 4
SubTask 5
Totals 1 2 3 4 5 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $10,227.67 $1,111.06 $9,116.61 $0.00 $0.00 $0.00 Completion Fee $965.77 $111.11 $854.66 $0.00 $0.00 $0.00
Total Estimated Cost $11,193.44 $1,222.17 $9,971.27 $0.00 $0.00 $0.00
REV: 02/03 CEF SHAW Page 3
SITE :
SUBTASK:
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 23
Engineer/Scientist 5 G. Roberts 34
TOTAL LABOR 57
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 2 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel 0 $110.00 Day 2 $220.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 2 $38.00 Day 0 $36.00 Day 2 $72.00
TOTAL PER DIEM $330.00
SUBCONTRACTOR COSTS
NAME PURPOSE USAGE COST
Drum $0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00
Sample Shipping (Small cooler) $110.00 $0.00 Sample Shipping (large cooler) $150.00 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 0 $0.00 55-gallon Drum $100.00 Each 0 $0.00
TOTAL EQUIPMENT $0.00
Critical Response
3/17/2022
Preparation of project summary (6 hrs.), Round Trip Travel (10 hrs), Attend Program/Project Review Meeting (6 hrs), Review Meeting Notes (1 hr)
Research Project Questions and Preparation of Review Documents/Presentation for Meeting (16 hrs), Round Trip Travel to Meeting (10 hrs), Attend Program/Project Review Meeting (6 hrs), Preparation of Summary Notes for Deliverable (2 hrs)
Site Review Meeting
Proposed Scope of Work APTIM Environmental & Infrastructure Project Meeting Contract HW689, Task Assignment DC001B APTIM Environmental & Infrastructure, LLC 3/17/22
Task Assignment (TA) DC001B has been prepared for the requested project review meeting to be conducted in Tallahassee as schedules allow. The LOE includes preparation of project review materials in accordance with the provided FDEP Contractor Site Review Meeting Tasking Guidance document. The TA will also include travel to and from Tallahassee, hotel and per diem expenses and meeting time. The deliverable will include a list of action items identified during the meeting for each site and will be submitted approximately two weeks following the meeting.
A task completion date of June 30, 2022 is recommended. If you have any questions please contact us for clarification.
| 2-Meeting |
| Cost Estimate |
File details come from the government source that posted it. Updated .