This document is a Task Assignment Change Order (TACO #6) for Contract HW689 between the State of Florida Department of Environmental Protection (FDEP) and APTIM Environmental & Infrastructure, LLC. The project involves environmental remediation work at the former Spot Busters Cleaners facility located at 6750 North State Road 7, Coconut Creek, Broward County, Florida (ERIC_4244). The contract is administered by FDEP Project Manager Nicole Knutson and APTIM Project Manager Eric Kramer.
TACO #6 authorizes additional funding of $1,621.93 to increase the total task value from $167,815.16 to $169,437.10 to cover permit costs from the City of Coconut Creek ($618.48) and the purchase of vapor granular activated carbon (VGAC) for treatment of extracted contaminated vapors ($856.00 from TetraSolv, selected as the lowest of three competitive bids). The change order extends the task completion date from July 18, 2025 to November 28, 2025 (133 days) and the final deliverable due date from May 16, 2025 to September 26, 2025. The work includes soil vapor extraction system (SVE) startup, construction completion reporting, groundwater sampling, and operations and maintenance activities. APTIM's time, labor, and subcontractor costs for these activities were reviewed and determined to be reasonable for the scope of services. The cost structure includes fixed unit rates of $168,937.10 and cost reimbursement of $500.00, with deliverables tied to submittal and FDEP approval milestones.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
DC011C 6 HW689
Nicole Knutson 850-245-8763 APTIM Environmental & Infrastructure
Eric Kramer 407-287-3216
ERIC_4244
Spot Busters Cleaners
$ 168,937.10 $ 167,315.16
$ 500.00 $ 500.00
$ 169,437.10 $ 167,815.16
07/18/2025 11/28/2025 133
1 1 6
Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2025.07.16 15:40:41 -04'00' Tim Bahr Digitally signed by Tim Bahr
Date: 2025.07.16 15:35:18 -04'00'
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Alexis A. Lambert Secretary
Memorandum
TO: ERIC_4244
Spot Busters Cleaners
FROM: Nicole Knutson, Project Manager
SUBJECT: Negotiation Summary
HW689 DC011C-6
DATE: July 16, 2025
This Change Order increases costs to provide funding for the purchase of a permit from the City of Coconut Creek and VGAC. The quote from TetraSolv was selected for VGAC, as it was the lowest of three bids.
Total task amount has increased from $167,815.16 to $169,437.10. The difference between the amended price and the previous price is $1,621.93. APTIM’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date has been extended from May 16, 2025 to September 26, 2025. Task completion date has been extended from July 18, 2025 to November 28, 2025.
LEVEL OF EFFORT / EXPENSE WORKSHEET
SITE : Spot Busters Cleaners
SUBTASK:
DATE: February 13, 2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer Engineer/Scientist 1 R. Lindsay Engineer/Scientist 5 G. Roberts Engineer/Scientist 4 S. Flynn Engineer/Scientist 2 K. Howard
Engineer/Scientist 1 B. Blount Engineer/Scientist 1 K. McDonald Engineering Technician 3 B. Skipper Engineering Technician 2 J. Bell
Engineering Technician 2 C. Ramey Engineering Technician 1 C. Janssen Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00
Van or Truck $480.00 Week 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE TOTALS
Hotel 2 C.Jannsen, B.Skipper $130.00 Day 0 $0.00 Hotel 2 B.Blount, C.Ramey $130.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 2 C.Jannsen, B.Skipper $30.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 2 B.Blount, C.Ramey $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 2 C.Jannsen, B.Skipper $36.00 Day 0 $0.00 Day 2 B.Blount, C.Ramey $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE TOTALS
United Rental Air Excavator Soft Dig Trenching $1,740.96 LS -1 ($1,740.96) J.H. Ham Electrical Service Electrician $12,900.00 LS 0 $0.00 United Rental Compact Track Loader $706.27 LS 0 $0.00 Atlantic Supply Additional SVE Well Materials $1,492.92 LS 0 $0.00 Fence Outlet Fencing Materials $1,901.39 LS 0 $0.00
TOTAL ($1,740.96)
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00 EPA Method 8260 (Full List) Soil $150.00 0 0 $0.00
EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $55.00 0 0 Contingency $0.00
EPA Method 8260 (VOHs) Leachate $73.00 0 0 Contingency $0.00
EPA Method 8260 (Full List) Wells $150.00 0 0 $0.00
EPA Method 8260 (Full List) IDW $150.00 0 0 $0.00
EPA Method 6010 (As, Cd, Cr and Pb) IDW $52.00 0 0 $0.00
EPA 1311 TCLP Extraction (Zero Headspace Method/VOCs)-Soil IDW $55.00 0 0 $0.00
EPA 1311 TCLP Extraction (Bottle Extraction/Metals)-Soil IDW $45.00 0 0 $0.00
Sample Shipping (Small cooler) $110.00 0 $0.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 0 $0.00
Construction/O&M/Pilot Test Kit $1,440.00 Week 0 $0.00
Construction/O&M Supplies $300.00 Week 0 $0.00
55 Gallon Drums $100.00 each 0 $0.00
TOTAL EQUIPMENT $0.00
3-ISR Installation (Interior)
3-Delta Page 8 of 12 Copy of HW689 DC011C TACO #5 (002)
SUBTASK:
DATE: February 13, 2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer Engineer/Scientist 1 R. Lindsay Engineer/Scientist 5 G. Roberts Engineer/Scientist 4 S. Flynn Engineer/Scientist 2 K. Howard
Engineer/Scientist 1 B. Blount
Engineer/Scientist 1 K. McDonald Engineering Technician 3 B. Skipper Engineering Technician 2 J. Bell Engineering Technician 2 C. Ramey Engineering Technician 1 C. Janssen 11 Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining
TOTAL LABOR 11
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 1 $80.00 Van or Truck $120.00 Day $0.00
Van or Truck $480.00 Week $0.00
TOTAL VEHICLE $80.00
PER DIEM STAFF RATE UNIT USEAGE TOTALS
Hotel 2 C.Jannsen, B.Skipper $130.00 Day $0.00 Hotel 2 B.Blount, C.Ramey $130.00 Day $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day $0.00 Day 1-Leave between 6 - Noon 2 C.Jannsen, B.Skipper $30.00 Day $0.00 Day 1-Leave between 6 - Noon 2 B.Blount, C.Ramey $30.00 Day $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day $0.00 Day 2 C.Jannsen, B.Skipper $36.00 Day $0.00 Day 2 B.Blount, C.Ramey $36.00 Day $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE TOTALS
Sunbelt Rental limestone excavation $471.66 day 1 $471.66 Waste Management T&D construction debris $444.65 wk 1 $444.65
$0.00 $0.00 $0.00
TOTAL $916.31
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00
EPA Method 8260 (Full List) Soil $150.00 0 0 $0.00
EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $55.00 0 0 Contingency $0.00
EPA Method 8260 (VOHs) Leachate $73.00 0 0 Contingency $0.00
EPA Method 8260 (Full List) Wells $150.00 0 0 $0.00
EPA Method 8260 (Full List) IDW $150.00 0 0 $0.00
EPA Method 6010 (As, Cd, Cr and Pb) IDW $52.00 0 0 $0.00
EPA 1311 TCLP Extraction (Zero Headspace Method/VOCs)-Soil IDW $55.00 0 0 $0.00
EPA 1311 TCLP Extraction (Bottle Extraction/Metals)-Soil IDW $45.00 0 0 $0.00
Sample Shipping (Small cooler) $110.00 0 $0.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 1 $40.00
Construction/O&M/Pilot Test Kit $1,440.00 Week $0.00
Construction/O&M Supplies $300.00 Week $0.00 Paint, roller, brush, cleaning $338.25 each 1 $338.25
TOTAL EQUIPMENT $378.25
6-WCDs 3&4
Procure cleaning & paint (2 hrs.), pressure wase trailer (3 hrs.), paint trailer 2 coats (6 hrs.)
6-Delta Page 9 of 12 Copy of HW689 DC011C TACO #5 (002)
SUBTASK:
DATE: February 13, 2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 5
Engineer/Scientist 1 R. Lindsay
Engineer/Scientist 5 G. Roberts 10
Engineer/Scientist 4 S. Flynn
Engineer/Scientist 2 K. Howard 32
Engineer/Scientist 1 B. Blount
Engineer/Scientist 1 K. McDonald
Engineering Technician 3 B. Skipper
Engineering Technician 2 J. Bell 15
Engineering Technician 2 C. Ramey
Engineering Technician 1 C. Janssen
Designer 2 S. Ferianc 9
Technical Pub Specialist 3 H. Vining
TOTAL LABOR 96
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day $0.00 Van or Truck $120.00 Day 1 $120.00
Van or Truck $480.00 Week $0.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE TOTALS
Hotel $130.00 Day $0.00 Day 1-leave before 6:00 AM $36.00 Day $0.00 Day 1-Leave between 6 - Noon $30.00 Day $0.00 Day 1-leave before 6:00 PM $19.00 Day $0.00 Day $36.00 Day $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE TOTALS
$0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method 8260 (VOHs) GW $73.00 7 0 $511.00
Sample Shipping (Small cooler) $110.00 0 $0.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $511.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 1 $40.00
Shallow GW Sampling Kit $290.00 Day 1 $290.00
Construction/O&M Supplies $300.00 Week $0.00 Poly Drums $75.00 each 1 $75.00
TOTAL EQUIPMENT $405.00
7-GW Sampling
Engineering evaluation of permit submittal, coordinating application with permitting personnel and PE sealing document
Preparation of report conclusions and recommendations for completion of assessment (10 hrs.)
Preparation of analytical tables and isocontour figures (6 hrs.), Preparation of Groundwater Sampling Report text (25 hrs.), Preparation of IDW manifest and profile (1 hr.)
Prepare resubmittal of permitting package for remedial system installation including preparation of permit drawings, engineering calculations, material vender documentation and application for two additional permitting items (25 hrs.)
Project equipment preparation/loadout (1 hr.), Travel roundtrip (3 hrs). Collection of groundwater elevation measurements (2 hrs.), Collect groundwater samples from seven wells (7 hrs), Deliver samples to laboratory (2 hrs)
Develop Permitting Figures and Updates (5 hrs) Preparation of isocontour maps (4 hrs)
Groundwater sampling seven wells;MW-1, MW-2, MW-3, DW-1, PZ-1, PZ-2, PZ-3 for EPA Method
8260 VOH
7-Delta Page 10 of 12 Copy of HW689 DC011C TACO #5 (002)
SUBTASK:
DATE: July 15, 2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer
Engineer/Scientist 1 R. Lindsay
Engineer/Scientist 5 G. Roberts
Engineer/Scientist 4 S. Flynn
Engineer/Scientist 2 K. Howard
Engineer/Scientist 1 B. Blount
Engineer/Scientist 1 K. McDonald
Engineering Technician 4 A. Escobar
Engineering Technician 3 B. Skipper
Engineering Technician 2 J. Bell
Engineering Technician 2 C. Ramey
Engineering Technician 1 C. Janssen
Designer 2 S. Ferianc
Technical Pub Specialist 3 H. Vining
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day $0.00 Van or Truck $120.00 Day $0.00
Van or Truck $480.00 Week $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE TOTALS
Hotel $130.00 Day $0.00 Day 1-leave before 6:00 AM $36.00 Day $0.00 Day 1-Leave between 6 - Noon $30.00 Day $0.00 Day 1-leave before 6:00 PM $19.00 Day $0.00 Day $36.00 Day $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE TOTALS
Coconut Creek Permit fee $618.48 each 1 $618.48
TetraSolv VGAC $856.00 each 1 $856.00
TOTAL $1,474.48
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method 8260 (VOHs) GW $73.00 0 $0.00
Sample Shipping (Small cooler) $110.00 0 $0.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Day $0.00
Day $0.00
Week $0.00 each $0.00
TOTAL EQUIPMENT $0.00
8-Permit fee & VGAC
8-Total Page 3 of 6 Copy of HW689 DC011C TACO #6
SUBTASK:
DATE: July 15, 2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer
Engineer/Scientist 1 R. Lindsay
Engineer/Scientist 5 G. Roberts
Engineer/Scientist 4 S. Flynn
Engineer/Scientist 2 K. Howard
Engineer/Scientist 1 B. Blount
Engineer/Scientist 1 K. McDonald
Engineering Technician 4 A. Escobar
Engineering Technician 3 B. Skipper
Engineering Technician 2 J. Bell
Engineering Technician 2 C. Ramey
Engineering Technician 1 C. Janssen
Designer 2 S. Ferianc
Technical Pub Specialist 3 H. Vining
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day $0.00 Van or Truck $120.00 Day $0.00
Van or Truck $480.00 Week $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE TOTALS
Hotel $130.00 Day $0.00 Day 1-leave before 6:00 AM $36.00 Day $0.00 Day 1-Leave between 6 - Noon $30.00 Day $0.00 Day 1-leave before 6:00 PM $19.00 Day $0.00 Day $36.00 Day $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE TOTALS
Coconut Creek Permit fee $618.48 each 1 $618.48
TetraSolv VGAC $856.00 each 1 $856.00
TOTAL $1,474.48
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method 8260 (VOHs) GW $73.00 0 $0.00
Sample Shipping (Small cooler) $110.00 0 $0.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Day $0.00
Day $0.00
Week $0.00 each $0.00
TOTAL EQUIPMENT $0.00
8-Permit fee & VGAC
8-Delta Page 6 of 6 Copy of HW689 DC011C TACO #6
Proposed Scope of Work Spot Busters Cleaners Site Assessment and Reporting Task Assignment DC011C TACO #6 6750 North State Road 7, Coconut Creek, Broward County, FL ERIC_4244 (Former Facility No. 069801109) Aptim Environmental & Infrastructure, LLC July 15, 2025
This Task Assignment Change Order (TACO) #6 for the former Spot Busters Cleaners provides authorization for reimbursement of permit costs for the construction of the remedial system, and purchase of vapor granular activated carbon (VGAC) for treatment of the recovered vapors that was not previously authorized.
Subtask - 1: Project Management This task includes project management activities associated with the completion of the Subtasks, as calculated in accordance with Contract HW689.
Subtask 2: ISR Design Preparation:
No adjustments are proposed for this subtask as TACO #4 resolved WCD #1 and WCD #2 that were authorized for this subtask.
Subtask 3: Complete ISRP Construction:
No adjustments are necessary for this subtask.
Subtask 4: ISRP Startup and 1st Month O&M:
No adjustments proposed for this subtask as it has not been performed yet.
Subtask 5: Utilities:
No adjustments proposed for this subtask as it has not been performed yet.
Subtask 6: WCD :
This subtask has been reconciled, and no adjustments are needed.
Subtask 7: Groundwater Sampling and Reporting:
No adjustments are required for this subtask.
Subtask 8: Groundwater Sampling and Reporting:
The addition of subtask 8 is to provide funding for the permit cost and purchase of VGAC for treatment of the extracted contaminated vapors. The receipt for the permit is included in this submittal. Three bids were obtained for the VGAC and TetraSolv provided the lowest competent bid and is recommended by APTIM for purchase.
APTIM proposes the following project schedule, which incorporates the estimated duration for remedial system fabrication.
Deliverable Initial Due Date Revised Due Date
Construction Completion documentation October 4, 2024 Completed
Groundwater Sampling May 16, 2025 Completed
SVE Startup & CCR and GW Monitoring May 16, 2025 September 26, 2025
Utility setup and 1st month April 25, 2025 September 26, 2025
Task Completion Date June 18, 2025 November 28, 2025
APTIM proposes to perform this scope of work in accordance with the terms and conditions of the DEP Contract No. HW689, dated December 21, 2021, that was executed between the Florida Department of Environmental Protection and APTIM. APTIM will begin the proposed scope of work upon issuance of the Task Assignment Notification.
If you have any questions, please contact us for clarification.
Tetrasolv Filtration Anderson, IN Houston, TX Kissimmee, FL Philadelphia, PA tetrasolv.com
July 9, 2025
APTIM
1228 Winter Garden Vineland Rd Winter Garden, FL 34787 Attn: Eric Kramer
Thank you for the opportunity to provide pricing for your project:
Spot Busters Cleaners Coconut Creek, FL
Scope of work:
One(1) low pressure 55-gallon drum vapor phase vessel with 4” top in/top out connections and reactivated vapor phase carbon.
Broward County’s 7.0% sales tax.
The price, as described above, will be $856.00. Terms are Net 30. Pricing is valid 30 days.
Thank you again for this opportunity. We look forward to working with you on this project.
Very truly, Jennifer Belmore Tetrasolv Filtration jbelmore@tetrasolv.com 407.683.5950
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department�s Project Manager: Department�s Project Manager Phone:
Contractor Name: (Contractor ) ntractor�st �s Project Manager: ontractor�s t�s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
DC011C 5 HW689
Nicole Knutson 850-245-8763 Contractor APTIM Environmental & Infrastructure Contractor
Contractor Eric Kramer Contractor 407-287-3216
ERIC_4244
Spot Busters Cleaners
$ 167,315.16 $ 154,839.50
$ 500.00 $ 500.00
$ 167,815.16 $ 155,339.50
Completion Completion 03/21/2025 07/18/2025 119
1 1 5
Contractor
Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2025.02.18 14:13:12 -05'00'
Teresa Booeshaghi
Teresa Booeshaghi Digitally signed by Teresa Booeshaghi Date: 2025.02.18 14:06:16 -05'00'
2/18/2025
This Change Order reconciles WCDs 3 & 4 and authorizes groundwater sampling and reporting.
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW689
DC011C
$ 167,815.16
Initial Construction Completion documentation- Subtasks 2 & 3
SVE Startup & Construction Completion Report - Subtasks 4 & 6
Utility setup ($725.00), first month of utilities (not to exceed $450.00), first month of telemetry (not to exceed $50.00), plus handling and telemetry fees ($40.00) - Subtask 5
Groundwater Sampling Report & PM - Subtasks 7 & 1
Submittal and DEP approval of Initial Construction Completion documentation- Subtasks 2 & 3
Submittal of Utility setup ($725.00), first month of utilities (not to exceed $450.00), first month of telemetry (not to exceed $50.00), plus handling and telemetry fees ($40.00) - Subtask 5
Submittal and DEP approval of Groundwater Sampling Report & PM - Subtasks 7 & 1
Submittal and DEP approval of SVE Startup & Construction Completion Report - Subtasks 4 & 6
10/04/2024
05/16/2025
04/25/2025
05/16/2025
$ 21,560.24
$ 122,448.24
$ 1,265.00
$ 22,541.68
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor�st �s Project Manager: ontractor�s t�s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department
Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
HW689
DC011C Completion October 20, 2023
APTIM will create a Soil Vapor Extraction System (SVE) Interim Source Removal Plan
(ISRP) as detailed in the June 7, 2023 proposal
Nicole Knutson 850-245-8763 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Aptim Environmental & Infrastructure, LLC (APTIM)
Aptim Environmental & Infrastructure, LLC (APTIM
Eric Kramer 407-287-3216
ERIC_4244
6750 North State Road 7, Coconut Creek, Broward County
Spot Busters Cleaners
$ 10,680.53
$ 10,680.53
Scope of Work
Eric Kramer Digitally signed by Eric Kramer Date: 2023.06.28 10:50:55 -04'00' Kelly Crain Digitally signed by Kelly Crain
Date: 2023.06.28 10:10:22 -04'00'
N/A
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
ISR Report & Project Management- Subtasks 2 & 1 08/25/2023
FDEP Approval of ISR Report & Project Management- Subtasks 2 & 1 $ 10,680.53
$ 10,680.53