Contract Summary
This is a Task Assignment Change Order (TACO #1) issued by the State of Florida Department of Environmental Protection (FDEP) to APTIM Environmental & Infrastructure, LLC for environmental remediation services at the former Lamb's Recycling Facility located at 1067 Highway 79 North in Esto, Holmes County, Florida (Site ID: ERIC_7390). The change order amends the original Task Assignment BIL01B under Contract HW689 and modifies work previously authorized under the indefinite delivery vehicle between FDEP and APTIM.
The TACO authorizes APTIM to perform supplemental soil sampling, investigative derived waste (IDW) management, and additional field activities at the site. The amended total cost is $66,679.88, an increase of $19,451.99 from the prior cost of $47,227.91, comprising 399 total labor hours. Key scope elements include: reconciliation of Work Change Directive #1 ($8,777.21); additional field activities for collection of broken soil samples and IDW composite samples ($9,440.44); updates to Subtask 3 personnel and analytical costs reflecting actual work performed; and a 30-day extension of the task completion date from April 27, 2024 to May 27, 2024. Deliverables include a Work Plan/QAPP (due 11/17/2023), field notes and boring logs (due 12/29/2023), and a Supplemental Site Assessment Report (due 04/29/2024). The work involves comprehensive environmental analysis including EPA Methods for volatile organic compounds, semi-volatiles, pesticides, PCBs, petroleum hydrocarbons, TCLP extraction, and RCRA metals analysis on both soil and liquid IDW samples. The TACO was executed on February 21, 2024, by both APTIM (Eric Kramer, Senior Environmental Engineer) and FDEP (Jennifer Farrell, Secretary or Designee).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
BIL01B 1 HW689
Nancy Murchison 850-241-6131 Contractor APTIM Environmental & Infrastructure, LLC Contractor
Contractor Eric Kramer Contractor 407-287-3216
ERIC_7390
Town of Esto-Lamb's Recycling
✔ $ 66,679.88 $ 47,227.91
$ 66,679.88 $ 47,227.91 Completion
✔ Completion 04/27/2024 05/27/2024 30
1 1 1
Contractor Eric Kramer
Senior Environmental Engineer
Eric Kramer Digitally signed by Eric Kramer Date: 2024.02.21 12:33:49 -05'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2024.02.21 12:18:31 -05'00'
This TACO is issued to inc accordance with WCD-1reconcile WCD-1 and authorizes additional field activities to collect replacement soil samples that were broken during transportation to the laboratory and collection of IDW samples for disposal purposes.
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW689
BIL01B
$ 66,679.88
Submittal of Work Plan/QAPP
Submittal of Field notes, boring logs, laboratory chain of custody
Submittal Supplemental Site Assessment Report (SSAR)
DEP approval of Work Plan/QAPP (Subtask 2)
DEP approval of SSAR/Project Management (Subtasks 1, 4, 5 & 6
DEP approval of Field notes, borling logs, laboratory chain of custody (Subtask 3)
11/17/2023
12/29/2023
04/29/2024
$ 29,246.95
$ 2,978.27
$ 34,454.66 www.FloridaDEP.gov
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette NNuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: APTIM Environmental & Infrastructure, LLC (APTIM)
HW689 Contract File
FROM: Nancy Murchison, Project Manager
DATE: February 15, 2024
SUBJECT: Negotiation Summary – SRP28
Task Assignment Change Order (TACO) – BIL01B-1 Lambs Recycling, City of Esto – ERIC_7390 Reconcile WCD-1, Additional Field Work and Supplemental Site Assessment Report Time Extension
This Task Assignment Change order authorizes APTIM to complete additional field work to replace soil samples that were damaged during transport, additional soil sampling for laboratory analysis, sample drums containing investigative derived waste (IDW) for disposal purposes and reconcile costs for Work Change Directive (WCD) #1.
Subtask - 1: Project Management
This task includes project management activities associated with the completion of Subtasks 2 through 6, as calculated in accordance with Contract HW689.
Subtask 2 SSA Work Plan/WAPP, and Health and Safety Plan: No Changes
Subtask - 3: Soil & Groundwater Sampling
Subtask 3 updates the onsite personnel to the actual, removing the proposed Engineer/Scientist 2, who was not available, based on the schedule and replaced with an available Engineering Technician 3 who performed the work. Subtask 3 also adjusts the analytical costs to the actual sample count collected and/or analyzed following the event.
Subtask - 4: Supplemental Soil Sampling Reporting: No Changes
Subtask - 5: WCD #1
Subtask 5 resolves WCD #1 which was approved for additional time to complete the soil and groundwater sampling at the Lamb’s property. The Subtask includes labor, equipment and materials (drums) required for completion of the proposed original scope of work. WCD #1 was approved for a total of $9,600 and is
Negotiation Summary – Task Assignment Change Order (TACO) BIL01B-1 Lambs Recycling-City of Esto
ERIC_7390
Calhoun County SSA Activities February 15, 2024 www.FloridaDEP.gov being resolved for a total of $8,777.21, including allowable labor markups, project management and completion fees.
Subtask - 6: Additional Field Activities
Subtask 6 includes additional time to revisit the site for the collection of several soil and IDW samples.
Following the initial sampling event, several samples were broken during transit, including samples collected for TRPH at sample location SB-74 (depths 0-0.5', 0.5'-2', 2'-4' depth intervals), and mercury at (SB-84 0-0.5', 0.5'-2', 2'-4' depth intervals). Although these samples were ultimately run from soils remaining from other analysis, the analysis was performed outside of holding times, therefore additional samples will be collected and analyzed.
IDW composite samples of soil and liquid will also be collected. The IDW will be characterized by analysis for:
Liquid:
1. EPA Method 8260 for Volatile Organic Compounds (full list)
2. EPA Method 8270 for Semi-Volatiles including Base, Neutral & Acid Extractables
3. EPA Method 8081 Organochlorine Pesticides
4. EPA Method 8082 Polychlorinated Biphenyls (PCBs)
5. FL-Pro for Total Recoverable Petroleum Hydrocarbons (TRPH)
6. EPA Method 6020/7470 for RCRA 8 Metals (As, Ba, Cd, Cr, Pb, Hg, Se, Ag)
Soil:
1. EPA Method 8260 for Volatile Organic Compounds (full list)
2. EPA Method 8270 for Semi-Volatiles including Base, Neutral & Acid Extractables
3. EPA Method 8081 Organochlorine Pesticides
4. EPA Method 8082 Polychlorinated Biphenyls (PCBs)
5. FL-Pro for Total Recoverable Petroleum Hydrocarbons (TRPH)
6. EPA Method 1311 for TCLP Extraction and Leachate analysis for EPA Method 6020/7470 for
RCRA 8 Metals (As, Ba, Cd, Cr, Pb, Hg, Se, Ag)
To allow for the completion of the additional field activities and reporting, a 60-day extension is included for submittal of the Supplemental Soil Assessment Report (SSAR) and the Task Assignment (TA) completion date. The extension would adjust the SSAR submittal date to April 29, 2024, and the TA completion date would shift to June 26, 2024.
The FDEP project manager agrees to the scope of work and proposed cost. The final cost associated with this task assignment change order is $66,679.88 with 399 total hours.
FD
EP
C O
ST
E
ST
IM
A
TE
C on tra ct or
A pt im E nv iro nm en ta l &
In fra st ru ct ur e, L
LC
D at e:
2/ 9/
Ta sk
H W
B
IL
B
T A
C O
E R
IC
_7
S ub
Ta sk
P ro je ct M an ag em en t S ub Ta sk
A dd iti on al F ie ld
A ct iv iti es
S ite
U
S
S ol id
W as te M an ag em en t F ac ilit y
S ub
Ta sk
2-
S S
A Q
A P
P W or kp la n
S ub
Ta sk
A ct iv ity
/P ha se
S up pl em en ta l S ite
A ss es sm en t (
S S
A
S ub
Ta sk
3-
S S
A F ie ld
A ct iv iti es S ub Ta sk
P ro je ct
M an ag er
Ju st in
C ro ss (F
D E
P )/E ric K ra m er (A
P
TI
M
S ub
Ta sk
4-
S S
A R ep or tin g
S ub
Ta sk
S ub
Ta sk
5-
W C
D
S ub Ta sk
TTo ta ls
La bo r
R at e C at eg or y
$6 8.
P P ro je ct M an ag er
E . K ra m er
.6
$6 8.
En gi ne er /S ci en tis t 5
E . K ra m er
$6
4.
En gi ne er
/S ci en tis t 5 G
. R ob er ts
$4 5.
En gi ne er /S ci en tis t 4
W . D em ps e
$3
6.
En gi ne er
/S ci en tis t 3 K
. H ow ar d
$3
1.
En gi ne er
/S ci en tis t 2 M
. D on el ic k
$3
1.
En gi ne er in g
Te ch ni ci an
B . S ki pp er
$3 4.
D es ig ne r 2
S . F er ia nc
$2
8.
Te ch ni ca l P ub lic at io ns
S pe ci al is t 3
H . V in in g
$0
.0
To ta l H ou rs
D ire ct L ab or
$1
6, 5.
$1 ,9
.2
$1
,1
.8
$5 ,0
.3
$4
,2
.3
$2 ,4
.0
$2
,1
.9
$0 .0
$0
.0
$0 .0
$0
.0
O ve rh ea d
.5 8%
$1 4, 4.
$1
,6
.3
$9
.0
$4 ,3
.0
$3
,6
.5
$2 ,0
.0
$1
,8
.8
$0 .0
$0
.0
$0 .0
$0
.0
G en
A dm in
.3
8% $3
,2
.7
$3
.9
$2
.4
$9
.6
$8
.9
$4
.3
$4
.3
$0 .0
$0
.0
$0 .0
$0
.0
Fr in ge
.9 6%
$5 ,4
.8
$6
.9
$3
.2
$1
,6
.3
$1 ,3
.0
$7
.6
$6
.5
$0
.0
$0 .0
$0
.0
$0 .0
To ta l L
$4
0, 6.
$4 ,6
.4
$2
,7
.5
$1 1, 5.
$1
0, 3.
$5 ,7
.1
$5
,1
.7
$0 .0
$0
.0
$0 .0
$0
.0
Tr av el V eh ic le R en ta l $1
,8
.0
$0 .0
$1
,1
.0
$0 .0
$4
.0
$2
.0
$0
.0
$0 .0
$0
.0
$0 .0
M ile ag e C os ts
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
A ir
Fa re
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P er d ie m
H ot el $5
,0
.0
$0 .0
$3
,6
.0
$0 .0
$9
.0
$3
.0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l T ra ve l $6
,8
.0
$0 .0
$4
,8
.0
$0 .0
$1
,4
.0
$6
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (E qu ip m en t P ro cu re m en t)
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P ro cu re m en t F ee $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l S ub co nt ra ct or
C os t $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
(S er vi ce s P ro cu re m ril lin g (C on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
D ril lin g
(N on
-c on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ob ile
L ab or at or y
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ur ve yi ng $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
ID
W $5
.0
$0
.0
$0 .0
$0
.0
$0 .0
$5
.0
$0
.0
$0 .0
$0
.0
$0 .0
U til iti es $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
RE
V:
2/
CE
F
SH
AW
Pa ge
C O
ST
E
ST
IM
A
TE
C on tra ct or
A pt im E nv iro nm en ta l &
In fra st ru ct ur e, H W
B
IL
B
T A
C O
E R
IC
_7
S ub
Ta sk
P ro je ct M an ag em en t S ub Ta sk
A dd iti on al F ie ld
A ct iv iti es
S ite
U
S
S ol id
W as te M an ag em en t F ac ilit y
S ub
Ta sk
2-
S S
A Q
A P
P W or kp la n
S ub
Ta sk
A ct iv ity
/P ha se
S up pl em en ta l S ite
A ss es sm en t (
S S
A
S ub
Ta sk
3-
S S
A F ie ld
A ct iv iti es S ub Ta sk
P ro je ct
M an ag er
Ju st in
C ro ss (F
D E
P )/E ric K ra m er (A
P
TI
M
S ub
Ta sk
4-
S S
A R ep or tin g
S ub
Ta sk
S ub
Ta sk
5-
W C
D
S ub Ta sk
TTo ta ls
S ub co nt ra ct or
S ub to ta l $5
.0
$0
.0
$0 .0
$0
.0
$0 .0
$5
.0
$0
.0
$0 .0
$0
.0
$0 .0
H an dl in g
Fe e
$5 5.
$0
.0
$0 .0
$0
.0
$0 .0
$5
5.
$0 .0
$0
.0
$0 .0
$0
.0
To ta l S ub co nt ra ct or C os t
$ $6
.0
$0 .0
$0
.0
$0 .0
$0
.0
$6
.0
$0 .0
$0
.0
$0 .0
$0
.0
La bo ra to ry
A na ly tic al C os ts
$9 ,6
.0
$0
.0
$7 ,6
.0
$0
.0
$0 .0
$1
,9
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fa st
T ur na ro un d
C ha rg es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S am pl e
S hi pp in g $7
.0
$0
.0
$6
.0
$0 .0
$0
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l L ab or at or y
$1 0, 4.
$0
.0
$8 ,3
.0
$0
.0
$0 .0
$2
,0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fi el d E xp en se s
P so na l P ro te ct io n $5
.0
$0
.0
$4
.0
$0 .0
$7
0.
$7 0.
$0
.0
$0 .0
$0
.0
$0 .0
E xp en da bl es $4
.0
$0
.0
$2
.0
$0 .0
$8
0.
$8 0.
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( D ril lin g re la te
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( A na ly tic al re la te d)
$3 ,0
.0
$0
.0
$2 ,3
.0
$0
.0
$3
.0
$3
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
ID
W re la te d)
$5
.0
$0 .0
$0
.0
$0 .0
$5
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
O th er
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l F ie ld E xp en se s
$4 ,5
.0
$0
.0
$3 ,0
.0
$0
.0
$1 ,0
.0
$5
.0
$0
.0
$0 .0
$0
.0
$0 .0
S ub to ta l $6
2, 3.
$4 ,6
.4
$2
,7
.5
$2 8, 5.
$1
0, 3.
$8 ,1
.1
$8
,9
.7
$0 .0
$0
.0
$0 .0
$0
.0
C om pl et io n
Fe e
$4 ,0
.6
$4
.2
$2
.7
$1
,1
.5
$1 ,0
.4
$5
.0
$5
.6
$0
.0
$0 .0
$0
.0
$0 .0
To ta l E st im at ed C os t
$6 6, 9.
$5
,0
.6
$2 ,9
.2
$2
9, 6.
$1 1, 7.
$8
,7
.2
$9 ,4
.4
$0
.0
$0 .0
$0
.0
$0 .0
C os t f ro m P rio r C
E F:
$4 7, 7.
M an ua l E nt ry C os t f ro m
D el ta C
E F;
$1 9, 1.
M an ua l E nt ry C os t (
P rio r + D el ta
$6
6, 9.
Au to
-C al cu la te d
R ou nd in g E rr or
0.
Au to -C al cu la te d Fi na l T ot al
C os t:
$6
6, 9.
Au to
-C al cu la te d
RE
V:
2/
CE
F
SH
AW
Pa
LEVEL OF EFFORT / EXPENSE WORKSHEET
SITE : Former Lamb's Recycling Facility
SUBTASK:
DATE: February 09, 2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer Engineer/Scientist 5 G. Roberts 2 Engineer/Scientist 4 W. Dempsey
Engineer/Scientist 3 K. Howard 76
Engineer/Scientist 2 M. Donelick
Engineering Technician 3 B. Skipper 69
Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining
TOTAL LABOR 147
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 2 $160.00 Van or Truck $120.00 Day 0 $0.00 Van or Truck $480.00 Week 2 $960.00
TOTAL VEHICLE $1,120.00
PER DIEM STAFF RATE UNIT USEAGE TOTALS
Hotel 2 Howard, Skipper $115.00 Day 12 $2,760.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 2 Howard, Skipper $30.00 Day 1 $60.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 2 Howard, Skipper $36.00 Day 12 $864.00
TOTAL PER DIEM $3,684.00
SUBCONTRACTOR COSTS
NAME PURPOSE RATE UNITS COUNT TOTALS
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method 6020-Arsenic (Soil) $14.00 155 3 $2,212.00 EPA Method 6020-Arsenic (automotive fluff) $14.00 0 0 $0.00
Analytical breakdown outlined in Table 6 attached
Preparation of field equipment and sample materials for site work (2 hrs.), Round trip Travel to Site (4 hrs). Perform Onsite H&S and Scoping meetings, Record DTW from onsite wells, collect water samples from seven onsite wells for analyses of arsenic, cadmium, mercury, chromium, lead, TRPH and dieldrin (10 hrs.). Lay out sampling grid 29 soil borings (3 hrs), Collection of 188 soil samples for the following analysis performed by fixed base laboratory: 111 soil samples for arsenic using EPA Method 6020 of which 51 samples will be held for analysis pending analytical results of the soil samples in the same boring collected at shallower depths, and one arsenic sample (SB-43R @0.0-
0.5 ft bls) will be extracted for leachability testing using EPA Method 1312; Ten samples for chromium using EPA Method 6020 with 23 samples held pending analytical results of the soil samples in the same boring collected at shallower depths; One sample for cadmium leachability analysis using EPA Method 1312; and 38 samples for lead analysis using EPA Method 6010 with one leachability analysis; and three mercury analysis using EPA Method 7470 with six samplesheld pending analytical results of the soil samples in the same boring collected at shallower depths; and one sample for mercury leachability analysis; and eight samples analyzed for TRPH with two sasamples held analytical results of the soil samples in the same boring collected at shallower depths, two other soil samples will be analyzed for leachability using EPA Method 1312, in addition two samples analyzed for TRPH fractionation using MADEP; and three samples analyzed for dieldrin leachability (47 hrs), Site Cleanup, Chain of custody preparation, Sample Packaging, and shipping to Laboratory (3 hrs)
Preparation of field equipment and sample materials for site work (2 hrs.), Round trip Travel to Site (11 hrs). Perform Onsite H&S and Scoping meetings, Record DTW from onsite wells, sample seven onsite wells for analysis of arsenic, cadmium, mercury, chromium, lead, TRPH and dieldrin (10 hrs.). Lay out sampling grid 29 soil borings (3 hrs), Collection of 188 soil samples for the following analysis performed by fixed base laboratory: 111 soil samples for arsenic using EPA Method 6020 of which 51 samples will be held for analysis pending analytical results of the soil samples in the same boring collected at shallower depths, and one arsenic sample (SB-43R @0.0-
0.5 ft bls) will be extracted for leachability testing using EPA Method 1312; Ten samples for chromium using EPA Method 6020 with 23 samples held pending analytical results of the soil samples in the same boring collected at shallower depths; One sample for cadmium leachability analysis using EPA Method 1312; and 38 samples for lead analysis using EPA Method 6010 with one leachability analysis; and three mercury analysis using EPA Method 7470 with six samplesheld pending analytical results of the soil samples in the same boring collected at shallower depths; and one sample for mercury leachability analysis; and eight samples analyzed for TRPH with two sasamples held analytical results of the soil samples in the same boring collected at shallower depths, two other soil samples will be analyzed for leachability using EPA Method 1312, in addition two samples analyzed for TRPH fractionation using MADEP; and three samples analyzed for dieldrin leachability (47 hrs) Site Cleanup Chain of custody preparation Sample Packaging and
3-SSA Field Activities
Site Work Notifications and Access (1 hr), Order Sampling Kits (1 hr)
3-Total Page 3 of 23 CEF_LOE_BIL01B TACO #1
SPLP Extraction Method 1312-Arsenic (Soil) $45.00 1 0 $45.00 EPA Method 6020-Arsenic (Leachate) $14.00 1 0 $14.00 EPA Method 6020-Lead (Soil) $14.00 38 0 $532.00 SPLP Extraction EPA 1312-Lead (Soil) $45.00 1 0 $45.00 EPA Method 6020-Lead (Leachate) $14.00 1 0 $14.00 EPA Method 8081-Organochlorine Hydrocarbons (Soil) $105.00 3 0 $315.00 FL-PRO-TRPH (Soil) $88.00 10 0 $880.00 TPHCWG Fractionation (Soil) $250.00 2 0 $500.00 SPLP Extraction Method 1312-FLPRO (Soil) $45.00 2 0 $90.00 FL-PRO-TRPH (Leachate) $88.00 2 0 $176.00 EPA Method 6020-Cadmium (Soil) $14.00 0 0 $0.00 SPLP Extraction EPA 1312-Cadmium (Soil) $45.00 1 0 $45.00 EPA Method 6020-Cadmium (Leachate) $14.00 1 0 $14.00 EPA Method 7470-Mercury (Soil) $28.00 9 0 $252.00 SPLP Extraction EPA 1312-Mercury (Soil) $45.00 1 0 $45.00 EPA Method 7470-Mercury (Leachate) $28.00 1 0 $28.00 EPA Method 6020 (Chromium) soil $14.00 13 1 $196.00 EPA Method 6020 (Lead) Aq $14.00 6 1 $98.00 EPA Method 6020 (Cadmium) Aq $14.00 6 1 $98.00 EPA Method 6020 (Chromium) Aq $14.00 6 1 $98.00 EPA Method 7471 (Mercury) Aq $26.00 6 1 $182.00 EPA Method 6020 (Arsenic) Aq $14.00 6 1 $98.00 EPA Method 8081 (Dieldrin) Aq $105.00 6 1 $735.00 FL-PRO-TRPH (Aq) $88.00 6 0 $528.00 EPA Method 8082 (PCBs soil) $74.00 6 $444.00 Sample Shipping (Small Cooler) $104.00 0 $0.00 Sample Shipping (Large Cooler) $150.00 4 $600.00 Ice (Bag/Day) $6.50 8 $52.00
TOTAL LAB $8,336.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Personnel Protection Equipment (2 man crew $35.00 Day 12 $420.00 Expendables $40.00 Day 6 $240.00 Soil Assessment Sampling Kit $175.00 Day 6 $1,050.00 Deep Groundwater Sampling Kit $415.00 Day 1 $415.00 Water Level Indicator $25.00 Day 0 $0.00 Global Positioning System $175.00 Day 5 $875.00
TOTAL EQUIPMENT $3,000.00
3-Total Page 4 of 23 CEF_LOE_BIL01B TACO #1
SUBTASK:
DATE: February 09, 2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 2 Engineer/Scientist 5 G. Roberts Engineer/Scientist 4 W. Dempsey
Engineer/Scientist 3 K. Howard 34
Engineer/Scientist 2 M. Donelick
Engineering Technician 3 B. Skipper
Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining
TOTAL LABOR 70
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 4 $480.00 Van or Truck $480.00 Week 0 $0.00
TOTAL VEHICLE $480.00
PER DIEM STAFF RATE UNIT USEAGE TOTALS
Hotel 2 Howard, Skipper $115.00 Day 3 $690.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 2 Howard, Skipper $30.00 Day 1 $60.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 2 Howard, Skipper $36.00 Day 3 $216.00
TOTAL PER DIEM $966.00
SUBCONTRACTOR COSTS
NAME PURPOSE RATE UNITS COUNT TOTALS
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method 6020-Arsenic (Soil) $14.00 0 0 $0.00 SPLP Extraction Method 1312-Arsenic (Soil) $45.00 0 0 $0.00 EPA Method 6020-Arsenic (Leachate) $14.00 0 0 $0.00 Sample Shipping (Small Cooler) $110.00 0 $0.00 Sample Shipping (Large Cooler) $150.00 0 $0.00 Ice (Bag/Day) $6.50 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Personnel Protection Equipment (2 man crew $35.00 Day 2 $70.00 Expendables $40.00 Day 2 $80.00 Soil Assessment Sampling Kit $175.00 Day 2 $350.00 55-Gallon Drums $100.00 Day 5 $500.00
TOTAL EQUIPMENT $1,000.00
Additional Field work scoping meeting and Project Status Reporting
Pickup IDW drums, remobilization, Round trip Travel to Site (14 hrs), Completion of soil sampling (20 hrs)
Pickup IDW drums, remobilization, Round trip Travel to Site (14 hrs), Completion of soil sampling (20 hrs)
5-WCD #1
5-Total Page 5 of 23 CEF_LOE_BIL01B TACO #1
SUBTASK:
DATE: February 09, 2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer
Engineer/Scientist 5 G. Roberts Engineer/Scientist 4 W. Dempsey
Engineer/Scientist 3 K. Howard 24
Engineer/Scientist 2 M. Donelick
Engineering Technician 3 B. Skipper
Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining
TOTAL LABOR 56
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 2 $240.00 Van or Truck $480.00 Week $0.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE TOTALS
Hotel 2 Howard, Skipper $115.00 Day 1 $230.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 2 Howard, Skipper $30.00 Day 1 $60.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 2 Howard, Skipper $36.00 Day 1 $72.00
TOTAL PER DIEM $362.00
SUBCONTRACTOR COSTS
NAME PURPOSE RATE UNITS COUNT TOTALS
Erwin Remediation IDW Drum Disposals $110.00 Each 5 $550.00
TOTAL $550.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
FL-PRO-TRPH (Soil) $88.00 3 0 $264.00 EPA Method 7470-Mercury (Soil) $28.00 3 0 $84.00 EPA Method 8260 for VOCs (full list) IDW-Soil $150.00 1 $150.00 EPA 8270-SVOCs (full list) w/Base, Neutral & Acid Extractables IDW-Soil $240.00 1 $240.00 EPA Method 8081 Organochlorine Pesticides IDW-Soil $105.00 1 $105.00 EPA Method 8082 Polychlorinated Biphenyls (PCBs) IDW-Soil $74.00 1 $74.00 FL-Pro for Total Recoverable Petroleum Hydrocarbons (TRPH) IDW-Soil $88.00 1 $88.00 EPA Method 1311 for TCLP Extraction IDW-Soil $45.00 1 $45.00 EPA Method 8260 for VOCs (full list) IDW-Liquid $150.00 1 $150.00 EPA 8270 SVOCs (full list) w/Base, Neutral & Acid Extractables IDW-Liquid $240.00 1 $240.00 EPA Method 8081 Organochlorine Pesticides IDW-Liquid $105.00 1 $105.00 EPA Method 8082 Polychlorinated Biphenyls (PCBs) IDW-Liquid $74.00 1 $74.00 FL-Pro for Total Recoverable Petroleum Hydrocarbons (TRPH) IDW-Liquid $88.00 1 $88.00 EPA Method 6020 Metal Arsenic (As) IDW-Liquid/Leachate $14.00 2 $28.00 EPA Method 6020 Metal Barium (Ba) IDW-Liquid/Leachate $14.00 2 $28.00 EPA Method 6020 Metal Cadmium (Cd) IDW-Liquid/Leachate $14.00 2 $28.00 EPA Method 6020 Metal Cromium (Cr) IDW-Liquid/Leachate $14.00 2 $28.00 EPA Method 6020 Metal Lead (Pb) IDW-Liquid/Leachate $14.00 2 $28.00 EPA Method 6020 Metal Selenium (Se) IDW-Liquid/Leachate $14.00 2 $28.00
Preparation of field equipment and sample materials for site work (2 hrs.), Round trip Travel to Site (12 hrs). Perform Onsite H&S and Scoping meetings, Collection of Mercury soil samples (EPA Method 7470) from SB-84 (0-0.5', 0.5'-2', 2'-4' depth intervals), collection of TRPH soil samples (FLPro) from SB-74 SB-84 (0-0.5', 0.5'-2', 2'-4' depth intervals), collection of soil and liquid composite IDW samples, Site Cleanup, Drum Handling (relocation to entry area), Chain of custody preparation, Sample Packaging, and shipping to Laboratory (10 hrs).
Preparation of field equipment and sample materials for site work (2 hrs.), Round trip Travel to Site (12 hrs). Perform Onsite H&S and Scoping meetings, Collection of Mercury soil samples (EPA Method 7470) from SB-84 (0-0.5', 0.5'-2', 2'-4' depth intervals), collection of TRPH soil samples (FLPro) from SB-74 SB-84 (0-0.5', 0.5'-2', 2'-4' depth intervals), collection of soil and liquid composite IDW samples, Site Cleanup, Drum Handling (relocation to entry area), Chain of custody preparation, Sample Packaging, and shipping to Laboratory (10 hrs).
Additional Field Activities
Additional Field work scoping meeting and Project Status Reporting (3 hrs.), Data review and analysis (3 hrs.), Site Work Notifications and Access (1 hr), Order Sampling Kits (1 hr)
6-Total Page 6 of 23 CEF_LOE_BIL01B TACO #1
EPA Method 6020 Metal Silver (Ag) IDW-Liquid/Leachate $14.00 2 $28.00 EPA Method 7471 Metal Mercury (Hg) IDW-Liquid/Leachate $26.00 2 $52.00 Sample Shipping (Small Cooler) $110.00 1 $110.00 Sample Shipping (Large Cooler) $150.00 0 $0.00 Ice (Bag/Day) $6.50 2 $13.00
TOTAL LAB $2,078.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Personnel Protection Equipment (2 man crew $35.00 Day 2 $70.00 Expendables $40.00 Day 2 $80.00 Soil Assessment Sampling Kit $175.00 Day 2 $350.00 Encore Sampler $16.00 each 1 $16.00
TOTAL EQUIPMENT $516.00
6-Total Page 7 of 23 CEF_LOE_BIL01B TACO #1
C
OS
T
ES
TI
MA
TE
C on tra ct or
A pt im
E nv iro nm en ta l & In fra st ru ct ur e, H W
B
IL
B
T A
C O
E R
IC
_7
S ub
Ta sk
P ro je ct M an ag em en t S ub Ta sk
A dd iti on al F ie ld
A ct iv iti es
S ite
U
S
S ol id
W as te M an ag em en t F ac ilit y
S ub
Ta sk
2-
S S
A Q
A P
P W or kp la n
S ub
Ta sk
A ct iv ity
/P ha se
S up pl em en ta l S ite
A ss es sm en t (
S S
A
S ub
Ta sk
3-
S S
A F ie ld
A ct iv iti es S ub Ta sk
P ro je ct
M an ag er
Ju st in
C ro ss (F
D E
P )/E ric K ra m er (A
P
TI
M
S ub
Ta sk
4-
S S
A R ep or tin g
S ub
Ta sk
S ub
Ta sk
5-
W C
D
S ub Ta sk
TTo ta ls
La bo r
R at e C at eg or y
$6 8.
P P ro je ct M an ra m er
8.
$6 8.
En gi ne er /S ci en tis t 5
E . K ra m er
$6
4.
En gi ne er
/S ci en tis t 5 G
. R ob er ts
$4 5.
En gi ne er /S ci en tis t 4
W . D em ps e
$3
6.
En gi ne er
/S ci en tis t 3 K
. H ow ar d
$3 1.
En gi ne er /S ci en tis t 2
M . D on el ic k
-6
-6
$3 1.
En gi ne er in g Te ch ni ci an
B
. S ki pp er
$3
4.
D es ig ne r 2 S
. F er ia nc
$2 8.
Te ch ni ca l P ub lic at io ns S pe ci al is t 3 H
. V in in g
$0 .0
To ta l H ou rs
D ire ct L
$5
,1
.2
$5
.6
$0 .0
1.
$0
.0
$2 ,4
.0
$2
,1
.9
$0 .0
$0
.0
$0 .0
$0
.0
O ve rh ea d
.5 8%
$4 ,4
.3
$5
.6
$0
.0
1.
$0 .0
$2
,0
.0
$1 ,8
.8
$0
.0
$0 .0
$0
.0
$0 .0
G en
A dm in
.3 8%
$1 ,0
.0
$1
.6
$0
.0
0.
$0 .0
$4
.3
$4
.3
$0
.0
$0 .0
$0
.0
$0 .0
Fr in ge
.9
6% $1
,6
.5
$1
.6
$0 .0
0.
$0
.0
$7
.6
$6
.5
$0 .0
$0
.0
$0 .0
$0
.0
To ta l L
2, 7.
$1
,4
.5
$0 .0
3.
$0
.0
$5 ,7
.1
$5
,1
.7
$0 .0
$0
.0
$0 .0
$0
.0
Tr av el V eh ic le R en ta l $7
.0
$0
.0
$0 .0
$0
.0
$4
.0
$2
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ile ag e
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
A ir Fa re $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P er d ie m
H ot el
$1 ,3
.0
$0
.0
$0 .0
$0
.0
$9
.0
$3
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l T ra ve l
$2 ,0
.0
$0
.0
$0 .0
$0
.0
$1 ,4
.0
$6
.0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
(E qu ip m en t P ro cu re m
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P ro cu re m en t F ee
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l S ub co nt ra ct or C os t
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (S er vi ce s
P ro cu re m lin g
(C on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
D ril lin g (N on -c on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ob ile L ab or at or y $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ur ve yi ng
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
ID
W
$5
.0
$0 .0
$0
.0
$0 .0
$0
.0
$5
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til iti es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
RE
V:
2/
CE
F
SH
AW
Pa
C
OS
T
ES
TI
MA
TE
C on tra ct or
A pt im
E nv iro nm en ta l & In fra st ru ct ur e, H W
B
IL
B
T A
C O
E R
IC
_7
S ub
Ta sk
P ro je ct M an ag em en t S ub Ta sk
A dd iti on al F ie ld
A ct iv iti es
S ite
U
S
S ol id
W as te M an ag em en t F ac ilit y
S ub
Ta sk
2-
S S
A Q
A P
P W or kp la n
S ub
Ta sk
A ct iv ity
/P ha se
S up pl em en ta l S ite
A ss es sm en t (
S S
A
S ub
Ta sk
3-
S S
A F ie ld
A ct iv iti es S ub Ta sk
P ro je ct
M an ag er
Ju st in
C ro ss (F
D E
P )/E ric K ra m er (A
P
TI
M
S ub
Ta sk
4-
S S
A R ep or tin g
S ub
Ta sk
S ub
Ta sk
5-
W C
D
S ub Ta sk
TTo ta ls
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $5
.0
$0
.0
$0 .0
$0
.0
$0 .0
$5
.0
$0
.0
$0 .0
$0
.0
$0 .0
H an dl in g
Fe e
$5 5.
$0
.0
$0 .0
$0
.0
$0 .0
$5
5.
$0 .0
$0
.0
$0 .0
$0
.0
To ta l S ub co nt ra ct or C os t
$ $6
.0
$0 .0
$0
.0
$0 .0
$0
.0
$6
.0
$0 .0
$0
.0
$0 .0
$0
.0
La bo ra ly tic al C os ts
$1 ,6
.0
$0
.0
1.
$0
.0
$0 .0
$1
,9
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fa st
T ur na ro un d
C ha rg es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S am pl e
S hi pp in g $1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$1
.0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l L ab or at or y $1
,7
.0
$0 .0
1.
$0 .0
$0
.0
$2 ,0
.0
$0
.0
$0 .0
$0
.0
$0 .0
Fi el d
E xp en so na l P ro te ct io n
$1
.0
$0 .0
$0
.0
$0 .0
$7
0.
$7 0.
$0
.0
$0 .0
$0
.0
$0 .0
E xp en da bl es $1
.0
$0
.0
$0 .0
$0
.0
$8 0.
$8
0.
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
D ril lin g re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
A na ly tic al re la te
d) $7
.0
$0
.0
$0 .0
$0
.0
$3
.0
$3
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
ID
W re la te d)
$5
.0
$0 .0
$0
.0
$0 .0
$5
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
O th er
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l F ie ld E xp en se s
$1 ,5
.0
$0
.0
$0 .0
$0
.0
$1 ,0
.0
$5
.0
$0
.0
$0 .0
$0
.0
$0 .0
S ub to ta l $1
8, 3.
$1 ,4
.5
$0
.0
4.
$0
.0
$8 ,1
.1
$8
,9
.7
$0 .0
$0
.0
$0 .0
$0
.0
C om pl et io n
Fe e
$1 ,2
.7
$1
.3
$0
.0
0.
$0 .0
$5
.0
$5
.6
$0
.0
$0 .0
$0
.0
$0 .0
To ta l E st im at ed C os t
$1 9, 1.
$1
,5
.9
$0 .0
4.
$0 .0
$8
,7
.2
$9 ,4
.4
$0
.0
$0 .0
$0
.0
$0 .0
RE
V:
2/
CE
F
SH
AW
Pa
SUBTASK:
DATE: February 09, 2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer Engineer/Scientist 5 G. Roberts Engineer/Scientist 4 W. Dempsey Engineer/Scientist 3 K. Howard
Engineer/Scientist 2 M. Donelick -69
Engineering Technician 3 B. Skipper 69
Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00 Van or Truck $480.00 Week 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE TOTALS
Hotel 0 Howard, Skipper $115.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 Howard, Skipper $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 Howard, Skipper $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE RATE UNITS COUNT TOTALS
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method 6020-Arsenic (Soil) $14.00 -8 -1 ($126.00) EPA Method 6020-Arsenic (automotive fluff) $14.00 -1 0 ($14.00)
Remove: Preparation of field equipment and sample materials for site work (2 hrs.), Round trip Travel to Site (4 hrs). Perform Onsite H&S and Scoping meetings, Record DTW from onsite wells, collect water samples from seven onsite wells for analyses of arsenic, cadmium, mercury, chromium, lead, TRPH and dieldrin (10 hrs.). Lay out sampling grid 29 soil borings (3 hrs), Collection of 188 soil samples for the following analysis performed by fixed base laboratory: 111 soil samples for arsenic using EPA Method 6020 of which 51 samples will be held for analysis pending analytical results of the soil samples in the same boring collected at shallower depths, and one arsenic sample (SB-43R @0.0-0.5 ft bls) will be extracted for leachability testing using EPA Method 1312; Ten samples for chromium using EPA Method 6020 with 23 samples held pending analytical results of the soil samples in the same boring collected at shallower depths; One sample for cadmium leachability analysis using EPA Method 1312; and 38 samples for lead analysis using EPA Method 6010 with one leachability analysis; and three mercury analysis using EPA Method 7470 with six samplesheld pending analytical results of the soil samples in the same boring collected at shallower depths; and one sample for mercury leachability analysis; and eight samples analyzed for TRPH with two sasamples held analytical results of the soil samples in the same boring collected at shallower depths, two other soil samples will be analyzed for leachability using EPA Method 1312, in addition two samples analyzed for TRPH fractionation using MADEP; and three samples analyzed for dieldrin leachability (47 hrs), Site Cleanup, Chain of custody preparation, Sample Packaging, and shipping to Laboratory (3 hrs).
Preparation of field equipment and sample materials for site work (2 hrs.), Round trip Travel to Site (4 hrs). Perform Onsite H&S and Scoping meetings, Record DTW from onsite wells, collect water samples from seven onsite wells for analyses of arsenic, cadmium, mercury, chromium, lead, TRPH and dieldrin (10 hrs.). Lay out sampling grid 29 soil borings (3 hrs), Collection of 188 soil samples for the following analysis performed by fixed base laboratory: 111 soil samples for arsenic using EPA Method 6020 of which 51 samples will be held for analysis pending analytical results of the soil samples in the same boring collected at shallower depths, and one arsenic sample (SB-43R @0.0-
0.5 ft bls) will be extracted for leachability testing using EPA Method 1312; Ten samples for chromium using EPA Method 6020 with 23 samples held pending analytical results of the soil samples in the same boring collected at shallower depths; One sample for cadmium leachability analysis using EPA Method 1312; and 38 samples for lead analysis using EPA Method 6010 with one leachability analysis; and three mercury analysis using EPA Method 7470 with six samplesheld pending analytical results of the soil samples in the same boring collected at shallower depths; and one sample for mercury leachability analysis; and eight samples analyzed for TRPH with two sasamples held analytical results of the soil samples in the same boring collected at shallower depths, two other soil samples will be analyzed for leachability using EPA Method 1312, in addition two samples analyzed for TRPH fractionation using MADEP; and three samples analyzed for
3-SSA Field Activities
3-Delta Page 10 of 23 CEF_LOE_BIL01B TACO #1
SPLP Extraction Method 1312-Arsenic (Soil) $45.00 0 0 $0.00 EPA Method 6020-Arsenic (Leachate) $14.00 0 0 $0.00 EPA Method 6020-Lead (Soil) $14.00 -1 0 ($14.00) SPLP Extraction EPA 1312-Lead (Soil) $45.00 0 0 $0.00 EPA Method 6020-Lead (Leachate) $14.00 0 0 $0.00 EPA Method 8081-Organochlorine Hydrocarbons (Soil) $105.00 0 0 $0.00 FL-PRO-TRPH (Soil) $88.00 -2 0 ($176.00) TPHCWG Fractionation (Soil) $250.00 0 0 $0.00 SPLP Extraction Method 1312-FLPRO (Soil) $45.00 0 0 $0.00 FL-PRO-TRPH (Leachate) $88.00 0 0 $0.00 EPA Method 6020-Cadmium (Soil) $14.00 -1 0 ($14.00) SPLP Extraction EPA 1312-Cadmium (Soil) $45.00 0 0 $0.00 EPA Method 6020-Cadmium (Leachate) $14.00 0 0 $0.00 EPA Method 7470-Mercury (Soil) $28.00 -1 0 ($28.00) SPLP Extraction EPA 1312-Mercury (Soil) $45.00 0 0 $0.00 EPA Method 7470-Mercury (Leachate) $28.00 0 0 $0.00 EPA Method 6020 (Chromium) soil $14.00 -20 0 ($280.00) EPA Method 6020 (Lead) Aq $14.00 -1 0 ($14.00) EPA Method 6020 (Cadmium) Aq $14.00 -1 0 ($14.00) EPA Method 6020 (Chromium) Aq $14.00 -1 0 ($14.00) EPA Method 7471 (Mercury) Aq $26.00 -1 0 ($26.00) EPA Method 6020 (Arsenic) Aq $14.00 -1 0 ($14.00) EPA Method 8081 (Dieldrin) Aq $105.00 -1 0 ($105.00) FL-PRO-TRPH (Aq) $88.00 6 0 $528.00 EPA Method 8082 (PCBs soil) $74.00 0 0 $0.00 Sample Shipping (Small Cooler) $104.00 0 $0.00 Sample Shipping (Large Cooler) $150.00 0 $0.00 Ice (Bag/Day) $6.50 0 $0.00
TOTAL LAB ($311.00)
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Personnel Protection Equipment (2 man crew $35.00 Day 0 $0.00 Expendables $40.00 Day 0 $0.00 Soil Assessment Sampling Kit $175.00 Day 0 $0.00 Deep Groundwater Sampling Kit $415.00 Day 0 $0.00 Water Level Indicator $25.00 Day 0 $0.00 Global Positioning System $175.00 Day 0 $0.00
TOTAL EQUIPMENT $0.00
3-Delta Page 11 of 23 CEF_LOE_BIL01B TACO #1
SUBTASK:
DATE: February 09, 2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 2 Engineer/Scientist 5 G. Roberts Engineer/Scientist 4 W. Dempsey
Engineer/Scientist 3 K. Howard 34
Engineer/Scientist 2 M. Donelick
Engineering Technician 3 B. Skipper
Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining
TOTAL LABOR 70
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 4 $480.00 Van or Truck $480.00 Week 0 $0.00
TOTAL VEHICLE $480.00
PER DIEM STAFF RATE UNIT USEAGE TOTALS
Hotel 2 Howard, Skipper $115.00 Day 3 $690.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 2 Howard, Skipper $30.00 Day 1 $60.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 2 Howard, Skipper $36.00 Day 3 $216.00
TOTAL PER DIEM $966.00
SUBCONTRACTOR COSTS
NAME PURPOSE RATE UNITS COUNT TOTALS
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method 6020-Arsenic (Soil) $14.00 0 0 $0.00 SPLP Extraction Method 1312-Arsenic (Soil) $45.00 0 0 $0.00 EPA Method 6020-Arsenic (Leachate) $14.00 0 0 $0.00 Sample Shipping (Small Cooler) $110.00 0 $0.00 Sample Shipping (Large Cooler) $150.00 0 $0.00 Ice (Bag/Day) $6.50 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Personnel Protection Equipment (2 man crew $35.00 Day 2 $70.00 Expendables $40.00 Day 2 $80.00 Soil Assessment Sampling Kit $175.00 Day 2 $350.00 55-Gallon Drums $100.00 Day 5 $500.00
TOTAL EQUIPMENT $1,000.00
Pickup IDW drums, remobilization, Round trip Travel to Site (14 hrs), Completion of soil sampling (20 hrs)
Pickup IDW drums, remobilization, Round trip Travel to Site (14 hrs), Completion of soil sampling (20 hrs)
5-WCD #1
Additional Field work scoping meeting and Project Status Reporting
5-Delta Page 12 of 23 CEF_LOE_BIL01B TACO #1
SUBTASK:
DATE: February 09, 2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer
Engineer/Scientist 5 G. Roberts Engineer/Scientist 4 W. Dempsey
Engineer/Scientist 3 K. Howard 24
Engineer/Scientist 2 M. Donelick
Engineering Technician 3 B. Skipper
Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining
TOTAL LABOR 56
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 2 $240.00 Van or Truck $480.00 Week $0.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE TOTALS
Hotel 2 Howard, Skipper $115.00 Day 1 $230.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 2 Howard, Skipper $30.00 Day 1 $60.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 2 Howard, Skipper $36.00 Day 1 $72.00
TOTAL PER DIEM $362.00
SUBCONTRACTOR COSTS
NAME PURPOSE RATE UNITS COUNT TOTALS
Erwin Remediation IDW Drum Disposals $110.00 Each 5 $550.00
TOTAL $550.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
FL-PRO-TRPH (Soil) $88.00 3 0 $264.00 EPA Method 7470-Mercury (Soil) $28.00 3 0 $84.00 EPA Method 8260 for VOCs (full list) IDW-Soil $150.00 1 $150.00 EPA 8270-SVOCs (full list) w/Base, Neutral & Acid Extractables IDW-Soil $240.00 1 $240.00 EPA Method 8081 Organochlorine Pesticides IDW-Soil $105.00 1 $105.00 EPA Method 8082 Polychlorinated Biphenyls (PCBs) IDW-Soil $74.00 1 $74.00 FL-Pro for Total Recoverable Petroleum Hydrocarbons (TRPH) IDW-Soil $88.00 1 $88.00 EPA Method 1311 for TCLP Extraction IDW-Soil $45.00 1 $45.00 EPA Method 8260 for VOCs (full list) IDW-Liquid $150.00 1 $150.00 EPA 8270 SVOCs (full list) w/Base, Neutral & Acid Extractables IDW-Liquid $240.00 1 $240.00 EPA Method 8081 Organochlorine Pesticides IDW-Liquid $105.00 1 $105.00 EPA Method 8082 Polychlorinated Biphenyls (PCBs) IDW-Liquid $74.00 1 $74.00 FL-Pro for Total Recoverable Petroleum Hydrocarbons (TRPH) IDW-Liquid $88.00 1 $88.00 EPA Method 6020 Metal Arsenic (As) IDW-Liquid/Leachate $14.00 2 $28.00 EPA Method 6020 Metal Barium (Ba) IDW-Liquid/Leachate $14.00 2 $28.00 EPA Method 6020 Metal Cadmium (Cd) IDW-Liquid/Leachate $14.00 2 $28.00 EPA Method 6020 Metal Cromium (Cr) IDW-Liquid/Leachate $14.00 2 $28.00 EPA Method 6020 Metal Lead (Pb) IDW-Liquid/Leachate $14.00 2 $28.00
Preparation of field equipment and sample materials for site work (2 hrs.), Round trip Travel to Site (12 hrs). Perform Onsite H&S and Scoping meetings, Collection of Mercury soil samples (EPA Method 7470) from SB-84 (0-0.5', 0.5'-2', 2'-4' depth intervals), collection of TRPH soil samples (FLPro) from SB-74 SB-84 (0-0.5', 0.5'-2', 2'-4' depth intervals), collection of soil and liquid composite IDW samples, Site Cleanup, Drum Handling (relocation to entry area), Chain of custody preparation, Sample Packaging, and shipping to Laboratory (10 hrs).
Preparation of field equipment and sample materials for site work (2 hrs.), Round trip Travel to Site (12 hrs). Perform Onsite H&S and Scoping meetings, Collection of Mercury soil samples (EPA Method 7470) from SB-84 (0-0.5', 0.5'-2', 2'-4' depth intervals), collection of TRPH soil samples (FLPro) from SB-74 SB-84 (0-0.5', 0.5'-2', 2'-4' depth intervals), collection of soil and liquid composite IDW samples, Site Cleanup, Drum Handling (relocation to entry area), Chain of custody preparation, Sample Packaging, and shipping to Laboratory (10 hrs).
Additional Field Activities
Additional Field work scoping meeting and Project Status Reporting (3 hrs.), Data review and analysis (3 hrs.), Site Work Notifications and Access (1 hr), Order Sampling Kits (1 hr)
6-Delta Page 13 of 23 CEF_LOE_BIL01B TACO #1
EPA Method 6020 Metal Selenium (Se) IDW-Liquid/Leachate $14.00 2 $28.00 EPA Method 6020 Metal Silver (Ag) IDW-Liquid/Leachate $14.00 2 $28.00 EPA Method 7471 Metal Mercury (Hg) IDW-Liquid/Leachate $26.00 2 $52.00 Sample Shipping (Small Cooler) $110.00 1 $110.00 Sample Shipping (Large Cooler) $150.00 0 $0.00 Ice (Bag/Day) $6.50 2 $13.00
TOTAL LAB $2,078.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Personnel Protection Equipment (2 man crew $35.00 Day 2 $70.00 Expendables $40.00 Day 2 $80.00 Soil Assessment Sampling Kit $175.00 Day 2 $350.00 Encore Sampler $16.00 each 1 $16.00
TOTAL EQUIPMENT $516.00
6-Delta Page 14 of 23 CEF_LOE_BIL01B TACO #1
C
OS
T
ES
TI
MA
TE
C on tra ct or
A pt im
E nv iro nm en ta l & In fra st ru ct ur e, /2
4/
H W
B
IL
B
E R
IC
_7
S ub
Ta sk
P ro je ct M an ag em en t S ub Ta sk
A dd iti on al F ie ld
A ct iv iti es
S ite
Fo rm er
L am b' s
R ec yc lin g Fa ci lit y S ub Ta sk
2- S
S A
Q A
P P
W or kp la n S ub Ta sk
A ct iv ity
/P ha se
S up pl em en ta l S ite
A ss es sm en t (
S S
A
S ub
Ta sk
3-
S S
A F ie ld
A ct iv iti es S ub Ta sk
P ro je ct
M an ag er
N an cy
M ur ch is on (F
D E
P )/E ric K ra m er (A
P
TI
M
S ub
Ta sk
4-
S S
A R ep or tin g
S ub
Ta sk
S ub
Ta sk
5-
W C
D
S ub Ta sk
TTo ta ls
La bo r
R at e C at eg or y
$6 8.
P P ro je ct M an ra m er
.9
$6 8.
En gi ne er /S ci en tis t 5
E . K ra m er
$6
4.
En gi ne er
/S ci en tis t 5 G
. R ob er ts
$4 5.
En gi ne er /S ci en tis t 4
W . D em ps ey
$3
6.
En gi ne er
/S ci en tis t 3 K
. H ow ar d
$3 1.
En gi ne er /S ci en tis t 2
M . D on el ic k
$3 1.
En gi ne er in g Te ch ni ci an
B
. S ki pp er
$3 4.
D es ig ne r 2
S . F er ia nc
$2
8.
Te ch ni ca l P ub lic at io ns
S pe ci al is t 3
H . V in in g
$0
.0
To ta l H ou rs
D ire ct L
1, 9.
$1 ,3
.6
$1
,1
.8
$5 ,0
.6
$4
,2
.3
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
O ve rh ea d
.5 8%
$1 0, 6.
$1
,1
.7
$9
.0
$4 ,3
.2
$3
,6
.5
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
G en
A dm in
.3
8% $2
,2
.6
$2
.3
$2
.4
$9
.9
$8
.9
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fr in ge
.9 6%
$3 ,7
.3
$4
.2
$3
.2
$1
,6
.8
$1 ,3
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l L
$2
7, 9.
$3 ,2
.8
$2
,7
.5
$1 1, 8.
$1
0, 3.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Tr av el V eh ic le R en ta l $1
,1
.0
$0 .0
$1
,1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ile ag e C os ts
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
A ir
Fa re
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P er d ie m
H ot el $3
,6
.0
$0 .0
$3
,6
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l T ra ve l $4
,8
.0
$0 .0
$4
,8
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
(E qu ip m en t P ro cu re m
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P ro cu re m en t F ee
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l S ub co nt ra ct or C os t
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (S er vi ce s
P ro cu re m lin g
(C on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
D ril lin g (N on -c on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ob ile L ab or at or y $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ur ve yi ng
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
ID
W
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til iti es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
RE
V:
2/
CE
F
SH
AW
Pa ge
C
OS
T
ES
TI
MA
TE
C on tra ct or
A pt im
E nv iro nm en ta l & In fra st ru ct ur e, 4/
H W
B
IL
B
E R
IC
_7
S ub
Ta sk
P ro je ct M an ag em en t S ub Ta sk
A dd iti on al F ie ld
A ct iv iti es
S ite
Fo rm er
L am b' s
R ec yc lin g Fa ci lit y S ub Ta sk
2- S
S A
Q A
P P
W or kp la n S ub Ta sk
A ct iv ity
/P ha se
S up pl em en ta l S ite
A ss es sm en t (
S S
A
S ub
Ta sk
3-
S S
A F ie ld
A ct iv iti es S ub Ta sk
P ro je ct
M an ag er
N an cy
M ur ch is on (F
D E
P )/E ric K ra m er (A
P
TI
M
S ub
Ta sk
4-
S S
A R ep or tin g
S ub
Ta sk
S ub
Ta sk
5-
W C
D
S ub Ta sk
TTo ta ls
S ub co nt ra ct or
S ub to ta l $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
H an dl in g
Fe e
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l S ub co nt ra ct or C os t
$ $0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
La bo ra ly tic al C os ts
$7 ,9
.0
$0
.0
$7 ,9
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fa st
T ur na ro un d
C ha rg es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S am pl e
S hi pp in g $6
.0
$0
.0
$6
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l L ab or at or y $8
,6
.0
$0 .0
$8
,6
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
RE
V:
2/
CE
F
SH
AW
Pa ge
C
OS
T
ES
TI
MA
TE
C on tra ct or
A pt im
E nv iro nm en ta l & In fra st ru ct ur e, 4/
H W
B
IL
B
E R
IC
_7
S ub
Ta sk
P ro je ct M an ag em en t S ub Ta sk
A dd iti on al F ie ld
A ct iv iti es
S ite
Fo rm er
L am b' s
R ec yc lin g Fa ci lit y S ub Ta sk
2- S
S A
Q A
P P
W or kp la n S ub Ta sk
A ct iv ity
/P ha se
S up pl em en ta l S ite
A ss es sm en t (
S S
A
S ub
Ta sk
3-
S S
A F ie ld
A ct iv iti es S ub Ta sk
P ro je ct
M an ag er
N an cy
M ur ch is on (F
D E
P )/E ric K ra m er (A
P
TI
M
S ub
Ta sk
4-
S S
A R ep or tin g
S ub
Ta sk
S ub
Ta sk
5-
W C
D
S ub Ta sk
TTo ta ls
FFi el d
E xp en so na l P ro te ct io n
$4
.0
$0 .0
$4
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E xp en da bl es
$2
.0
$0 .0
$2
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
D ril lin g re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
A na ly tic al re la te
d) $2
,3
.0
$0 .0
$2
,3
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t (
ID
W re la te
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( O th er
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l F ie ld
E xp en se s $ $3
,0
.0
$0 .0
$3
,0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub to ta l $4
4, 0.
$3 ,2
.8
$2
,7
.5
$2 8, 9.
$1
0, 3.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
C om pl et io n
Fe e
$2 ,7
.9
$3
.8
$2
.7
$1
,1
.8
$1 ,0
.4
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l E st im at ed C os t
$4 7, 7.
$3
,5
.7
$2 ,9
.2
$2
9, 1.
$1 1, 7.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
RE
V:
2/
CE
F
SH
AW
Pa ge
SUBTASK:
DATE: October 24, 2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer
Engineer/Scientist 5 G. Roberts
Engineer/Scientist 3 W. Dempsey 14 Engineer/Scientist 3 K. Howard Engineer/Scientist 2 M. Donelick Engineering Technician 3 B. Skipper Designer 2 S. Ferianc General Drafting 3 Technical Pub Specialist 3 H. Vining 3
TOTAL LABOR 25
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method 6020 (As) Groundwater $14.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 0 $0.00 Shallow GW Sampling Kit $290.00 day 0 $0.00 Water Level Indicator $25.00 Day 0 $0.00 55-gallon Drum $100.00 each 0 $0.00
TOTAL EQUIPMENT $0.00
Prepare QAPP Plan Report (10 hrs), prepare site specific HASP (4 hrs)
2-SSA QAPP Workplan
Completion and Submittal of QAPP Plan, Tables, Figures, Work Plan in Email Deliverable (4 hrs.), formulation of technical plan execution with FDEP (1 hrs)
Report Document Production, Formating Text, Compilation into Adobe Format for Submittal
2-Work Plan&QAPP Page 18 of 23 CEF_LOE_BIL01B TACO #1
SUBTASK:
DATE: October 24, 2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer Engineer/Scientist 5 G. Roberts 2 Engineer/Scientist 4 W. Dempsey
Engineer/Scientist 3 K. Howard 76
Engineer/Scientist 2 M. Donelick 69
Engineering Technician 3 B. Skipper Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining
TOTAL LABOR 147
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 2 $160.00 Van or Truck $120.00 Day 0 $0.00 Van or Truck $480.00 Week 2 $960.00
TOTAL VEHICLE $1,120.00
PER DIEM STAFF RATE UNIT USEAGE TOTALS
Hotel 2 Howard, Donelick $115.00 Day 12 $2,760.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 2 Howard, Donelick $30.00 Day 1 $60.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 2 Howard, Donelick $36.00 Day 12 $864.00
TOTAL PER DIEM $3,684.00
SUBCONTRACTOR COSTS
NAME PURPOSE RATE UNITS COUNT TOTALS
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method 6020-Arsenic (Soil) $14.00 163 4 Equip(2), Field (2) $2,338.00 EPA Method 6020-Arsenic (automotive fluff) $14.00 1 0 $14.00
Site Work Notifications and Access (1 hr), Order…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .