About this file
This Task Assignment (TA) is a contract document issued by the State of Florida Department of Environmental Protection (FDEP) to APTIM, an environmental services contractor. The TA is designated as DC012A under master Contract HW689 and was authorized on July 8, 2022, with a completion date of September 30, 2022. The assigned project manager for FDEP is Melissa Walsh (407-287-3216), and the contractor's project manager is Eric Kramer (407-287-3216). The work is focused on the 60-MINUTE CLEANERS site located at 1090 E Hillsboro Boulevard, Deerfield Beach, Broward County, Florida.
APTIM is contracted to generate a Site Assessment Work Plan (SAWP) for the drycleaning facility under a fixed unit rate payment structure. The total TA value is $5,000.00, with no cost reimbursement component. Payment is contingent upon APTIM's submittal and FDEP's approval of the Site Assessment Work Plan and associated project management deliverables, with a due date of August 31, 2022. The SAWP scope includes a comprehensive site review of ERIC portal documents, a detailed site visit with checklist completion, and the production of technical figures, sampling plans, proposed schedules, and cost estimate worksheets. The contractor must provide PFAS screening in the scope of work and is prohibited from including documents already available in ERIC, EDR reports, or offsite property surveys.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW689
DC012A Completion September 30, 2022
This Task Assignment authorizes APTIM. to generate a Site Assessment Work Plan for the 60-MINUTE CLEANERS site located in DEERFIELD BEACH, FL in accordance with the attached Site Assessment Work Plan Task List.
Melissa Walsh 407-287-3216 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
APTIM
APTIM
Eric Kramer 407-287-3216
ERIC_4134
1090 E HILLSBORO BLVD, DEERFIELD BEACH, Broward County
60-MINUTE CLEANERS
✔ $ 5,000.00
$ 0.00
$ 5,000.00
Scope of Work
Eric Kramer
APTIM Contract Manager
Eric Kramer Digitally signed by Eric Kramer Date: 2022.07.08 10:49:08 -04'00'
William E. Burns, Jr.
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.07.08 09:20:38 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Site Assessment Work Plan; Project management 08/31/2022
Subtasks 1 & 2: Upon submittal and FDEP approval of the Site Assessment Work Plan + Project Management $ 5,000.00
$ 5,000.00
HW689
DC012A
Site Assessment Work Plan (SAWP) Task List
Site Review:
1. Information Portal/ERIC/OCULUS Review
a. Review applicable documents
b. Application
c. Site Screening Report
d. Other assessment data
e. Permitting/Compliance/Enforcement history
2. Additional information as available and as needed
a. Google maps, aerial photographs, topographical maps, building/planning department records, land use maps, insurance maps
b. Other regulatory agency records
c. Contact DC operator for operations history. May be able to find operator even if DC is no longer operating
Site Visit:
1. Complete Drycleaning Site Visit Checklist
2. Verify Site Screening Report information, especially sample location(s)
3. Identify likely source/release areas (machine location, service door, floor drains, lint trap, sewer line, septic tank, dumpster, ASTs/USTs). Look for evidence on floors/walls for former machine location.
4. Identify above/below ground utilities and potential impediments to assessment activities
5. Verify accuracy of site map, revise as necessary
6. Interview operator/owner for site history
7. Discuss work plan elements with property owner and get direction regarding approach to tenants, and schedule.
SAWP:
1. Completed Drycleaning Site Visit Checklist
2. Site summary/narrative – Initial conceptual site model (brief text)
- Current status and history of DC operations
- Primary solvents used both prior to and after eligibility determination
- Owner/operator/tenant information
- Status of site structures (original, renovated, razed/redeveloped, vacant)
- Historical site assessment/remediation information
- Anticipated lithology, depth to water, and groundwater flow direction
- Known or anticipated source areas -Site Assessment Approach
3. Figures
- Topo
- Site features, aerial view, facility layout, waste storage areas, utilities, etc.
- Proposed sampling locations (soil, MAGS, DPT profiling, MWs, sediment, surface water, sewer/septic/lint trap)
4. Sampling Plan/Checklist (templated, see Word SAWP Summary Checklist) - Including proposed number of samples for soil, MAGs, groundwater, etc.
5. Proposed schedule from approval of SAWP to submittal of SAR
6. Cost Estimate (CE)/Level of Effort (LOE) Worksheets, including subcontractor quotes, as appropriate. The CE/LOE should be submitted upon approval of the SAWP and under separate cover.
Notes: 1) No documents that are available in ERIC or HASPs should be included with the SAWP, 2) No EDR or other ESA-like reports are required, 3) No offsite property owner/use or well survey information is required, 4) No potable well survey, 5) SOW should include PFAS screening (see guidance)
| Cost Estimate |
| 2-Vapor Sampling |
| 3-GW Samp&Rpt |
File details come from the government source that posted it. Updated .