This document constitutes Task Assignment Change Order (TACO) #2 under Contract HW689 between the State of Florida Department of Environmental Protection (FDEP) and APTIM Environmental & Infrastructure, LLC. The agreement pertains to environmental remediation services at Krause's Coin Laundry and Dry Cleaner, located at 2049 U.S. Highway 1 South, Fort Pierce, Saint Lucie County, Florida (Project Number ERIC_5411). The primary contacts are Nicole Knutson, Project Manager for FDEP, and Eric Kramer, Project Manager for APTIM. The change order was executed on August 18, 2025, following an initial Task Assignment (DC008C) that authorized installation and startup of a soil vapor extraction (SVE) remedial system.
TACO #2 extends remedial system operation and maintenance for three additional months and authorizes collection of eight vapor samples to document conditions for system shutdown. The amended total task value increased from $55,923.12 to $73,551.61, representing an increase of $17,628.49. The fixed unit rate increased from $51,123.12 to $66,651.61, while cost reimbursement increased from $4,800.00 to $6,900.00. The task completion date was extended from August 22, 2025, to December 5, 2025 (105 additional days). Key deliverables include quarterly O&M reports, utilities invoicing, groundwater monitoring, and analytical reports, with final deliverable due dates ranging from December 20, 2024, to September 19, 2025. APTIM will perform system shutdown and, 30 days thereafter, restart the system and collect additional vapor samples, followed by submission of a letter report summarizing analytical results and operational recommendations.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
DC008C 2 HW689
Nicole Knutson 850-245-8763 APTIM Environmental & Infrastructure, LLC
Eric Kramer 407-287-3216
ERIC_5411
Krause's Coin Laundry and Dry Cleaner
$ 66,651.61 $ 51,123.12
$ 6,900.00 $ 4,800.00
$ 73,551.61 $ 55,923.12
08/22/2025 12/05/2025 105
1 1 2
Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2025.08.18 13:03:21 -04'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2025.08.18 12:04:46 -04'00'
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Alexis A. Lambert Secretary
Memorandum
TO: ERIC_5411
Krause’s Coin Laundry and Dry Cleaner
FROM: Nicole Knutson, Project Manager
SUBJECT: Negotiation Summary
HW689 DC008C-2
DATE: August 7, 2025
This Change Order adds three months of remedial system operation and maintenance and authorizes APTIM to shut down the remedial system at the end of the final quarter of O&M. In addition, 30 days after system shutdown APTIM will return to the site and restart the system and repeat collection of eight vapor samples for analysis.
Total task amount has increased by $17,628.49. The original price was $55,923.12, and the amended price is $73,551.61. APTIM’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date has been extended from June 20, 2025 to September 19, 2025.
Task completion date has been extended from August 22, 2025 to December 5, 2025.
F D
E P
C O
S T
E S
T
IM
A T
E
C on tr ac to r:
A pt im
E nv iro nm en ta l & I nf ra st ru ct ur e, L
LC
D at e:
7/
/2
T as k
H
W
D C
8C
T A
C O
S ub
T as k
P ro je ct
M an ag em en t
S ub
T as k
6- Q tr eb -A pr
S ite
K ra us e C le an er s
E R
IC
_5
S ub
T as k
2- C om pl et e
Q tr
O
M
S ep t- O ct
S ub
T as k
7- U til iti es Q tr
A ct iv ity
/P ha se
O
M a nd A nn ua l G W
S am pl in g S ub T as k
3-
S em i-A nn ua l R ep or t Q tr
S ub
T as k
8- A nn ua l G ro un dw at er
S am pl in g
P ro je ct
M an ag er
N ik ki K nu ts on r/
E ric
K ra m er
S ub
T as k
4- U til iti es C om pl et e
Q tr
S ep t- O ct
S ub
T as k
9- A nn ua l O
M a nd G
W M on ito rin g
R pt
S ub
T as k
5- Q tr
O
M N ov
4-
Ja n
S ub
T as k
S V
E R ep ai r
T o ta ls
L ab o r
R at e C at eg o ry
$7 1.
P ro je ct M an ag
E
K ra m er
.1 $7
1.
E ng in ee r/ S ci en tis t
E
K ra m er
$6
6.
E ng in ee r/ S ci en tis t
G
R ob er ts
$3
6.
E ng in ee r/ S ci en tis t
K
H ow ar d
$2
8.
E ng in ee r/ S ci en tis t
R
Li nd sa y
$2 4.
E ng in ee r/
S ci en tis t
B
B lo un t
$3 6.
E ng in ee r/
S ci en tis t
K
M cD on al d
$3 4.
D es ig ne r
S
F er ia nc
$2
9.
T ec hn ic al P ub lic at io ns S pe ci al is t
H
V in in g
$0 .0
T o ta l H o u rs
D ire ct L ab or
$1
9, 2.
$2 ,2
.1
$1
,4
.0
$1 ,5
.2
$0
.0
$2 ,0
.4
$6
,2
.1
$0 .0
$1
,4
.0
$3 ,9
.1
$7
.0
O ve rh ea d
.5 8%
$1 7, 6.
$1
,9
.5
$1 ,2
.0
$1
,3
.8
$0 .0
$1
,7
.0
$5 ,3
.7
$0
.0
$1 ,2
.7
$3
,3
.4
$6
.2
G en
A dm in
.3
8% $3
,8
.2
$4
.0
$2
.5
$3
.2
$0 .0
$4
.7
$1
,2
.0
$0 .0
$2
.3
$7
.3
$1
.9
F rin g e
.9 6%
$6 ,3
.1
$7
.6
$4
.5
$4
.1
$0
.0
$6
.8
$2 ,0
.7
$0
.0
$4
.1
$1 ,2
.8
$2
.1
T o ta l L ab o r
$4 7, 1.
$5
,4
.4
$3 ,4
.2
$3
,6
.5
$0 .0
$4
,9
.1
$1 4, 0.
$0
.0
$3 ,5
.2
$9
,2
.7
$1 ,8
.4
T ra ve l
V eh ic le
R en ta l
$1 ,6
.0
$2
.0
$0
.0
$0 .0
$3
.0
$7
.0
$0
.0
$2
.0
$0 .0
$1
.0
M ile ag e
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
A ir
F ar e $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P er d ie m
H ot el $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al T ra ve l $1
,6
.0
$2
.0
$0 .0
$0
.0
$3
.0
$7
.0
$0 .0
$2
.0
$0
.0
$1
.0
S u b co n tr ac to r (E q u ip m en t
P ro cu re m en t)
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P ro cu re m en t F ee
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al S ub co nt ra ct or
C os t $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S u b co n tr ac to r (S er vi ce s
P ro cu re m ril lin g
(C on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
D ril lin g
(N on
-c on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ob ile L ab or at or y $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ur ve yi ng $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
ID
W
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$1
.0
$0 .0
$0
.0
U til iti es
$6 ,9
.0
$0
.0
$0 .0
$6
.0
$0
.0
$0 .0
$6
,3
.0
$0 .0
$0
.0
$0 .0
P um p A la rm
T el em en tr y
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$3 ,0
.8
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$3
,0
.8
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
R E V
C E F
S H A W
P a g e
E P
C O
S T
E S
T
IM
A T
E C on tr ac im E nv iro nm en ta l &
I nf ra st ru ct ur e, L
LC
D
/2
D C
8C
T A
C O
S ub
T as k
P ro je ct
M an ag em en t
S ub
T as k
6- Q
-A pr
S ite
K ra us e C le an er s
E R
IC
_5
S ub
T as k
2- C om pl et e
Q tr
O
M
S ep t- O ct
S ub
T as k
7- U til iti es Q tr
A ct iv ity
/P ha se
O
M a nd A nn ua l G W
S am pl in g S ub T as k
3-
S em i-A nn ua l R ep or t Q tr
S ub
T as k
8- A nn ua l G ro un dw at er
S am pl in g
P ro je ct
M an ag ki K nu ts on r/
E ric
K ra m er
S ub
T as k
4- U til iti es C om pl et e
Q tr
S ep t- O ct
S ub
T as k
9- A nn ua l O
M a nd G
W M on ito rin g
R pt
S ub
T as k
5- Q tr
O
M N ov
4-
Ja n
S ub
T as k
S V
E R ep ai r
T o ta ls
S ub co nt ra ct or S ub to ta l
$1 0, 1.
$0
.0
$0 .0
$6
.0
$0
.0
$0 .0
$6
,3
.0
$1
.0
$0 .0
$3
,0
.8
H an dl in g F ee $5
.1
$0
.0
$0 .0
$4
0.
$0 .0
$0
.0
$1
.0
$1 9.
$0
.0
$3
.6
T ot al S ub co nt ra ct or
C os t $1
0, 6.
$0 .0
$0
.0
$6
.0
$0 .0
$0
.0
$6 ,4
.0
$2
.5
$0
.0
$3 ,3
.5
L ab o ra ry na ly tic al C os ts
$2 ,6
.0
$2
.0
$0
.0
$0 .0
$2
.0
$1
,4
.0
$0 .0
$8
.0
$0
.0
$0 .0
F as t T ur na ro un d C ha rg es $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S am pl e
S hi pp in g $5
.0
$1
.0
$0
.0
$0 .0
$1
.0
$2
.0
$0
.0
$1
.0
$0 .0
$0
.0
T ot al L ab or at or y $3
,2
.0
$3
.0
$0 .0
$0
.0
$3
.0
$1 ,6
.0
$0
.0
$1 ,0
.0
$0
.0
$0 .0
F ie ld E xp en se s
P so na l P ro te ct io n
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E xp en da bl es
$5
.0
$8 0.
$0
.0
$0 .0
$1
.0
$2
.0
$0
.0
$4 0.
$0
.0
$4 0.
E q ui pm en t
(D ril lin g r el at ed
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E q ui pm en t
(A na ly tic al r el at ed
$2
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$2
.0
$0 .0
$0
.0
E q ui pm en t
(I D
W r el at ed
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$1
.0
$0 .0
$0
.0
E q ui pm en t
(O th er
$5 ,2
.0
$8
.0
$0
.0
$0 .0
$1
,3
.0
$2 ,6
.0
$0
.0
$0 .0
$0
.0
$4
.0
T ot al F ie ld
E xp en se s $6
,1
.0
$9
.0
$0 .0
$0
.0
$1 ,4
.0
$2
,8
.0
$0 .0
$4
.0
$0
.0
$4
.0
S u b to ta l
$6 8, 3.
$5
,4
.4
$4 ,9
.2
$3
,6
.5
$6
.0
$7 ,0
.1
$2
0, 0.
$6 ,4
.0
$5
,4
.7
$9 ,2
.7
$5
,8
.9
C o m p le ti o n
F ee
$4 ,7
.1
$5
.6
$3
.6
$3
.0
$0
.0
$4
.6
$1 ,4
.0
$0
.0
$3
.7
$9
.4
$1
.9
T o ta l E st im at ed
C o st $7
3, 1.
$5 ,9
.0
$5
,3
.8
$4 ,0
.6
$6
.0
$7
,5
.7
$2 1, 9.
$6
,4
.0
$5 ,8
.4
$1
0, 4.
$6 ,0
.9
C os t fr om P rio r
C E
F
$5 5, 3.
C os t fr om
D el ta C
E F
$1
7, 8.
C os t (P rio r
D el ta
$7
3, 1.
R ou nd in g E rr or
0.
F in al
T o ta l
C o st
$7 3, 1.
R E V
C E F
S H A W
P a g
SITE :
SUBTASK: 2-Complete Qtr 2 O&M Sept-Oct 2024
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 4
Engineer/Scientist 5 G. Roberts
Engineer/Scientist 2 K. Howard
Engineer/Scientist 1 R. Lindsay 30
Engineer/Scientist 1 B. Blount
Engineer/Scientist 1 K. McDonald 9
Designer 2 S. Ferianc
Technical Pub Specialist 3 H. Vining
TOTAL LABOR 43
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 0 $0.00
Van or Truck $120.00 Day 2 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE TOTALS
Hotel 0 $110.00 Day 0 $0.00
Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00
Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00
Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00
Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE TOTALS
$0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method TO-15 (VOC Soil Vapor) $200.00 1 0 $200.00
EPA Method 8260 (Halos Only) $73.00 0 0 $0.00
EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00
Sample Shipping (Small cooler) $110.00 1 $110.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $310.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 2 $80.00
Construction/O&M Kit $360.00 Day 2 $720.00
Construction O&M Supplies $75.00 Day 2 $150.00
TOTAL EQUIPMENT $950.00
Monthly Base Work - Loadout prep. (1 hr), Travel Round Trip (6 hrs), SVE O&M (6 hrs) {total = 13 hrs x 2 mo = 26 hrs. Additional work (each quarter) includes SVE Vacuum Readings and collection of VOC Vapor Sample (total 4 hrs).
Daily telemetry checks to verify the SVE system is operating as scheduled (3 hrs per month x 2 months = 6 hrs). SVE performance evaluation and system optimization (3 hrs).
Krause Cleaners
8/26/2024
Engineering evaluation of monthly data, direct staff engineer for system adjustments (2 hrs.). Submital of Quarterly reports of monthly O&M data collection sheets. (2 hrs.)
SUBTASK:
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 4
Engineer/Scientist 5 G. Roberts 2 Engineer/Scientist 2 K. Howard
Engineer/Scientist 1 R. Lindsay Engineer/Scientist 1 B. Blount
Engineer/Scientist 1 K. McDonald 25
Designer 2 S. Ferianc 4 Technical Pub Specialist 3 H. Vining 3
TOTAL LABOR 38
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 0 $0.00
Van or Truck $120.00 Day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE TOTALS
Hotel 0 $110.00 Day 0 $0.00
Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00
Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00
Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00
Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE TOTALS
$0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00
EPA Method 8260 (Halos Only) $73.00 0 0 $0.00
EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00
Sample Shipping (Small cooler) $110.00 0 $0.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 0 $0.00
Construction/O&M Kit $360.00 Day 0 $0.00
Construction O&M Supplies $75.00 Day 0 $0.00
TOTAL EQUIPMENT $0.00
Semi-Annual O&M Report (Document Production)
Preparation of Semi-Annual O&M Report includes preparation of SVE operational tables, calculations, figures, O&M site visit summary, SVE system operation & performance.
Semi-Annual O&M Report (Drafting)
Krause Cleaners
3-Semi-Annual Report Qtr 1&2
8/26/2024
Engineering evaluation of monthly data for first six months system operation, PE seal of Semi-Annual O&M report, evaluate data, develop recommendations and conclusions (4 hrs.)
Data quality evaluation and report documentation
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer Engineer/Scientist 5 G. Roberts
Engineer/Scientist 2 K. Howard
Engineer/Scientist 1 R. Lindsay Engineer/Scientist 1 B. Blount
Engineer/Scientist 1 K. McDonald Designer 2 S. Ferianc
Technical Pub Specialist 3 H. Vining
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 0 $0.00
Van or Truck $120.00 Day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE TOTALS
Hotel 0 $110.00 Day 0 $0.00
Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00
Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00
Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00
Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE TOTALS
FPUA-Electrical Service Sept-Oct $300.00 Month 2 $600.00
Handling fee Electrical $20.00 Month 2 $40.00
TOTAL $640.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00
EPA Method 8260 (Halos Only) $73.00 0 0 $0.00
EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00
Sample Shipping (Small cooler) $110.00 0 $0.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 0 $0.00
Construction/O&M Kit $360.00 Day 0 $0.00
Construction O&M Supplies $75.00 Day 0 $0.00
TOTAL EQUIPMENT $0.00
Krause Cleaners
-Utilities Complete Qtr 2 (Sept-Oc
8/26/2024
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 6
Engineer/Scientist 5 G. Roberts
Engineer/Scientist 2 K. Howard
Engineer/Scientist 1 R. Lindsay 43
Engineer/Scientist 1 B. Blount
Engineer/Scientist 1 K. McDonald 12
Designer 2 S. Ferianc
Technical Pub Specialist 3 H. Vining
TOTAL LABOR 61
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 0 $0.00
Van or Truck $120.00 Day 3 $360.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE TOTALS
Hotel 0 $110.00 Day 0 $0.00
Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00
Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00
Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00
Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE TOTALS
$0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method TO-15 (VOC Soil Vapor) $200.00 1 0 $200.00
EPA Method 8260 (Halos Only) $73.00 0 0 $0.00
EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00
Sample Shipping (Small cooler) $110.00 1 $110.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $310.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 3 $120.00
Construction/O&M Kit $360.00 Day 3 $1,080.00
Construction O&M Supplies $75.00 Day 3 $225.00
TOTAL EQUIPMENT $1,425.00
Monthly Base Work - Loadout prep. (1 hr), Travel Round Trip (6 hrs), SVE O&M (6 hrs) {total = 13 hrs x 3 mo = 39 hrs. Additional work (each quarter) includes SVE Vacuum Readings and collection of VOC Vapor Sample (total 4 hrs).
Daily telemetry checks to verify the SVE system is operating as scheduled (3 hrs per month x 3 months = 9 hrs). SVE performance evaluation and system optimization (3 hrs).
Krause Cleaners
5-Qtr 3 O&M Nov 2024-Jan 2025
8/26/2024
Engineering evaluation of monthly data, direct staff engineer for system adjustments (3 hrs.). Submital of Quarterly reports of monthly O&M data collection sheets. (3 hrs.)
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 28
Engineer/Scientist 5 G. Roberts
Engineer/Scientist 2 K. Howard
Engineer/Scientist 1 R. Lindsay 90
Engineer/Scientist 1 B. Blount
Engineer/Scientist 1 K. McDonald 48
Designer 2 S. Ferianc
Technical Pub Specialist 3 H. Vining
TOTAL LABOR 166
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 0 $0.00
Van or Truck $120.00 Day 6 $720.00
TOTAL VEHICLE $720.00
PER DIEM STAFF RATE UNIT USEAGE TOTALS
Hotel 0 $110.00 Day 0 $0.00
Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00
Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00
Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00
Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE TOTALS
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method TO-15 (VOC Soil Vapor) $200.00 7 0 $1,400.00
EPA Method 8260 (Halos Only) $73.00 0 0 $0.00
EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00
Sample Shipping (Small cooler) $110.00 2 $220.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $1,620.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 6 $240.00
Construction/O&M Kit $360.00 Day 6 $2,160.00
Construction O&M Supplies $75.00 Day 6 $450.00
TOTAL EQUIPMENT $2,850.00
Monthly Base Work - Loadout prep. (1 hr), Travel Round Trip (6 hrs), SVE O&M (6 hrs) {total = 13 hrs x 6 mo = 78 hrs. Additional work (two quarters) includes SVE Vacuum Readings and collection of VOC Vapor Sample (total 4 hrs). Additional work last quarter collection of vapor samples from six SVE legs and influent from two zones (8 total vapor samples) for system shut down protocol (total 8 hrs).
Daily telemetry checks to verify the SVE system is operating as scheduled (3 hrs per month x 6 months = 18 hrs). SVE performance evaluation and system optimization (6 hrs). Return to site 30 days after system shut down and collect vapor samples from six SVE legs and influent from both zones (8 hrs.) plus travel (6 hrs). Preparation of table summarizing vapor analytical including graphs and text. (10hrs.)
Krause Cleaners
6-Qtr 4 Feb-Apr 2025
7/25/2025
Engineering evaluation of monthly data, direct staff engineer for system adjustments (3 hrs.). Submittal of quarterly O&M data collections sheets (3 hrs.), Engineering evaluation of monthly data, direct staff engineer for system adjustments (2 hrs). Submittal of quarterly O&M data collections sheets (2 hrs).
Prepare letter report of vapor analyticals collected in support of remedial system shutdown. (18 hrs).
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer Engineer/Scientist 5 G. Roberts
Engineer/Scientist 2 K. Howard
Engineer/Scientist 1 R. Lindsay Engineer/Scientist 1 B. Blount
Engineer/Scientist 1 K. McDonald Designer 2 S. Ferianc
Technical Pub Specialist 3 H. Vining
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 0 $0.00
Van or Truck $120.00 Day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE TOTALS
Hotel 0 $110.00 Day 0 $0.00
Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00
Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00
Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00
Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE TOTALS
FPUA-Electrical Service Three Months $700.00 Month 9 $6,300.00
Handling fee Electrical $20.00 Month 9 $180.00
TOTAL $6,480.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 0 $0.00
Construction/O&M Kit $360.00 Day 0 $0.00
Construction O&M Supplies $75.00 Day 0 $0.00
TOTAL EQUIPMENT $0.00
Krause Cleaners
7-Utilities Qtr 3&4
7/25/2025
LEVEL OF EFFORT / EXPENSE WORKSHEET
SUBTASK:
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 2
Engineer/Scientist 5 G. Roberts
Engineer/Scientist 2 K. Howard
Engineer/Scientist 1 R. Lindsay
Engineer/Scientist 1 B. Blount
Engineer/Scientist 1 K. McDonald Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining
TOTAL LABOR 43
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 2 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE TOTALS
Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE TOTALS
Erwin Remediation IDW T&D $195.00 LS 1 $195.00
TOTAL $195.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00
EPA Method 8260 (Halos Only) $73.00 11 0 $803.00
EPA Method 8260 (Halos Only/IDW) $73.00 1 $73.00
Sample Shipping (Small cooler) $110.00 0 $0.00
Sample Shipping (large cooler) $150.00 1 $150.00
TOTAL LAB $1,026.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 1 $40.00 Shallow GW Sampling Kit $290.00 Day 1 $290.00 Deep Groundwater Sampling Kit $415.00 Day 0 $0.00 Diffusion Sampler (2" well) $36.00 Day 0 $0.00 55-gallon Drum $100.00 each 1 $100.00
TOTAL EQUIPMENT $430.00
Proposed Monitoring Well sampling; MW001, MW003, MW004, MW006, MW008, MW009, MW010, MW014, MW015, MW016 and PZ003.
Krause Cleaners
Travel Preparation and Mobilization (1 hr), Round trip travel to site (6 hrs). Collect Depth to Groundwater Measurements from site wells (2 hrs). Conventional sampling of twelve wells (6 hrs.), Sample preparation, Chain of custody preparation, Sample Packaging and Delivery to Laboratory (2 hrs). Collection of Drum purge Water IDW Sample (1 hr), Site Restoration and Cleanup (1 hr).
8-Annual Groundwater Sampling 8/26/2024
Technical evaluation of groundwater analytical data with respect to currect remedial strategy and screening of potential remedial strategies to hasten site cleanup.
Order Laboratory Sampling Kits (1 hr), evaluate data for quality and appropriateness for site monitoring (2 hrs.)
Travel Preparation and Mobilization (1 hr), Round trip travel to site (6 hrs). Collect Depth to Groundwater Measurements from site wells (2 hrs). Conventional sampling of twelve wells (6 hrs.), Sample preparation, Chain of custody preparation, Sample Packaging and Delivery to Laboratory (2 hrs). Collection of Drum purge Water IDW Sample (1 hr), Site Restoration and Cleanup (1 hr).
8-GW Sampling Page 9 of 17 HW689 DC008C est (Krause Cleaners)TACO #1
SUBTASK: 9-Annual O&M and GW Monitoring Rpt
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 4
Engineer/Scientist 5 G. Roberts
Engineer/Scientist 2 K. Howard
Engineer/Scientist 1 R. Lindsay Engineer/Scientist 1 B. Blount
Engineer/Scientist 1 K. McDonald 28
Designer 2 S. Ferianc 4 Technical Pub Specialist 3 H. Vining 3
TOTAL LABOR 75
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 0 $0.00
Van or Truck $120.00 Day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE TOTALS
Hotel 0 $110.00 Day 0 $0.00
Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00
Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00
Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00
Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE TOTALS
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Annual Groundwater and O&M Report (Document Production)
Preparation of Annual O&M Report that includes SVE operational tables, calculations, figures, O&M site visit summary, SVE system operation & performance (28 hrs.)
Annual Groundwater and O&M Reporting (Drafting)
Krause Cleaners
8/26/2024
Engineering evaluation of monthly data, PE seal of Annual O&M report, evaluate data, develop recommendations and conclusions (4 hrs.)
Assimilate field notes and laboratory report (2 hrs). Prepare GW Elevation and GW Analytical Data figures (8 hrs), Prepare Groundwater Related Data Summary Text (26 hrs).
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 5
Engineer/Scientist 5 G. Roberts Engineer/Scientist 2 K. Howard
Engineer/Scientist 1 R. Lindsay Engineer/Scientist 1 B. Blount
Engineer/Scientist 1 K. McDonald 12
Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining
TOTAL LABOR 17
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE TOTALS
Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE TOTALS
PRM
Modifications toSVE VFD, EOS Program, Includes Power Filtering
$3,046.85 Lump sum 1 $3,046.85
TOTAL $3,046.85
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00
EPA Method 8260 (Halos Only) $73.00 0 0 $0.00
EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00
Sample Shipping (Small cooler) $110.00 0 $0.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 1 $40.00 Construction/O&M Kit $360.00 Day 1 $360.00
Construction O&M Supplies $75.00 Day 1 $75.00
TOTAL EQUIPMENT $475.00
Krause Cleaners
10- SVE Repair
5/7/2025
Engineering evaluation of VFD modification and selection of power filter (3 hrs.). Review of programming changes and photodocumentation of modification (2 hrs.)
Travel to site and return (6 hrs.), Oversee contractor make modifications to remedial system, test operation of modifications locally and remotely (6hrs.)
C
O S
T I
M A
T E
C on tr ac im
E nv iro nm en ta l & I nf ra st ru ct ur e, L
LC
D
/2
D C
8C
T A
C O
S ub
T as k
P ro je ct
M an ag em en t
S ub
T as k
6- Q
-A pr
S ite
K ra us e C le an er s
E R
IC
_5
S ub
T as k
2- C om pl et e
Q tr
O
M
S ep t- O ct
S ub
T as k
7- U til iti es Q tr
A ct iv ity
/P ha se
O
M a nd A nn ua l G W
S am pl in g S ub T as k
3-
S em i-A nn ua l R ep or t Q tr
S ub
T as k
8- A nn ua l G ro un dw at er
S am pl in g
P ro je ct
M an ag ki K nu ts on r/
E ric
K ra m er
S ub
T as k
4- U til iti es C om pl et e
Q tr
S ep t- O ct
S ub
T as k
9- A nn ua l O
M a nd G
W M on ito rin g
R pt
S ub
T as k
5- Q tr
O
M N ov
4-
Ja n
S ub
T as k
S V
E R ep ai r
T o ta ls
L ab o r
R at e C at eg o ry
$7 1.
P ro je ct M an
K ra m er
7.
$7
1.
E ng in ee r/ S ci en tis t
E
K ra m er
$6
6.
E ng in ee r/ S ci en tis t
G
R ob er ts
$3
6.
E ng in ee r/ S ci en tis t
K
H ow ar d
$2
8.
E ng in ee r/ S ci en tis t
R
Li nd sa y
$2
4.
E ng in ee r/ S ci en tis t
B
B lo un t
$3
6.
E ng in ee r/ S ci en tis t
K
M cD on al d
$3 4.
D es ig ne r
S
F er ia nc
$2
9.
T ec hn ic al P ub lic at io ns S pe ci al is t
H
V in in g
$0 .0
T o ta l H o u rs
D ire ct L
$4
,7
.8
$5
.2
$0 .0
$0
.0
$0 .0
$0
.0
$4 ,2
.6
$0
.0
$0 .0
$0
.0
$0 .0
O ve rh ea d
.5 8%
$4 ,0
.2
$4
.4
$0
.0
$0 .0
$0
.0
$0 .0
$3
,5
.7
$0 .0
$0
.0
$0 .0
$0
.0
G en
A dm in
.3
8% $9
.1
$1
.8
$0
.0
$0 .0
$0
.0
$0 .0
$8
.2
$0
.0
$0 .0
$0
.0
$0 .0
F rin g e
.9
6% $1
,5
.4
$1
.5
$0 .0
$0
.0
$0 .0
$0
.0
$1 ,3
.8
$0
.0
$0 .0
$0
.0
$0 .0
T o ta l L ab o r $1
1, 8.
$1 ,2
.0
$0
.0
$0 .0
$0
.0
$0 .0
$9
,9
.5
$0 .0
$0
.0
$0 .0
$0
.0
T ra ve l
V eh ic le
R en ta l
$3
.0
$0 .0
$0
.0
$0 .0
$0
.0
$3
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ile ag e
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
A ir
F ar e $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P er d ie m
H ot el $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al T ra ve l $3
.0
$0
.0
$0 .0
$0
.0
$0 .0
$3
.0
$0
.0
$0 .0
$0
.0
$0 .0
S u b co n tr ac to r (E q u ip m en t
P ro cu re m
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P ro cu re m en t F ee
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al S ub co nt ra ct or
C os t $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S u b co n tr ac to r (S er vi ce s
P ro cu re m lin g
(C on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
D ril lin g
(N on
-c on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ob ile L ab or at or y $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ur ve yi ng $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
ID
W
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til iti es
$2 ,1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$2 ,1
.0
$0
.0
$0 .0
$0
.0
P um p A la rm
T el em en tr y
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P M
I $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
R E V
C E F
S H A W
P a g
T I
M A
T E
C on tr ac im
E nv iro nm en ta l & I nf ra st ru ct ur e, L
LC
D
/2
D C
8C
T A
C O
S ub
T as k
P ro je ct
M an ag em en t
S ub
T as k
6- Q
-A pr
S ite
K ra us e C le an er s
E R
IC
_5
S ub
T as k
2- C om pl et e
Q tr
O
M
S ep t- O ct
S ub
T as k
7- U til iti es Q tr
A ct iv ity
/P ha se
O
M a nd A nn ua l G W
S am pl in g S ub T as k
3-
S em i-A nn ua l R ep or t Q tr
S ub
T as k
8- A nn ua l G ro un dw at er
S am pl in g
P ro je ct
M an ag ki K nu ts on r/
E ric
K ra m er
S ub
T as k
4- U til iti es C om pl et e
Q tr
S ep t- O ct
S ub
T as k
9- A nn ua l O
M a nd G
W M on ito rin g
R pt
S ub
T as k
5- Q tr
O
M N ov
4-
Ja n
S ub
T as k
S V
E R ep ai r
T o ta ls
S ub co nt ra ct or S ub to ta l
$2 ,1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$2 ,1
.0
$0
.0
$0 .0
$0
.0
H an dl in g F ee $6
0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$6
0.
$0 .0
$0
.0
$0 .0
T ot al S ub co nt ra ct or
C os t $2
,1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$2
,1
.0
$0 .0
$0
.0
$0 .0
L ab o ra to ry
A na ly tic al C os ts
$1 ,2
.0
$0
.0
$0 .0
$0
.0
$0 .0
$1
,2
.0
$0 .0
$0
.0
$0 .0
$0
.0
F as t T ur na ro un d C ha rg es $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S am pl e
S hi pp in g $1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$1
.0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al L ab or at or y $1
,3
.0
$0 .0
$0
.0
$0 .0
$0
.0
$1 ,3
.0
$0
.0
$0 .0
$0
.0
$0 .0
F ie ld E xp en so na l P ro te ct io n
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E xp en da bl es
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
E q ui pm en t
(D ril lin g r el at ed
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E q ui pm en t
(A na ly tic al r el at ed
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E q ui pm en t
(I D
W r el at ed
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E q ui pm en t
(O th er
$1 ,3
.0
$0
.0
$0 .0
$0
.0
$0 .0
$1
,3
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al F ie ld
E xp en se s $1
,4
.0
$0 .0
$0
.0
$0 .0
$0
.0
$1 ,4
.0
$0
.0
$0 .0
$0
.0
$0 .0
S u b to ta l
$1 6, 3.
$1
,2
.0
$0 .0
$0
.0
$0 .0
$0
.0
$1 3, 9.
$2
,1
.0
$0 .0
$0
.0
$0 .0
C o m p le ti o n
F ee
$1 ,1
.8
$1
.4
$0
.0
$0 .0
$0
.0
$0 .0
$9
.4
$0
.0
$0 .0
$0
.0
$0 .0
T o ta l E st im at ed
C o st $1
7, 8.
$1 ,4
.5
$0
.0
$0 .0
$0
.0
$0 .0
$1
4, 5.
$2 ,1
.0
$0
.0
$0 .0
$0
.0
R E V
C E F
S H A W
P a g
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 22
Engineer/Scientist 5 G. Roberts
Engineer/Scientist 2 K. Howard
Engineer/Scientist 1 R. Lindsay 47
Engineer/Scientist 1 B. Blount
Engineer/Scientist 1 K. McDonald 36
Designer 2 S. Ferianc
Technical Pub Specialist 3 H. Vining
TOTAL LABOR 105
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 0 $0.00
Van or Truck $120.00 Day 3 $360.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE TOTALS
Hotel 0 $110.00 Day 0 $0.00
Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00
Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00
Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00
Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE TOTALS
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method TO-15 (VOC Soil Vapor) $200.00 6 0 $1,200.00
EPA Method 8260 (Halos Only) $73.00 0 0 $0.00
EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00
Sample Shipping (Small cooler) $110.00 1 $110.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $1,310.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 3 $120.00
Construction/O&M Kit $360.00 Day 3 $1,080.00
Construction O&M Supplies $75.00 Day 3 $225.00
TOTAL EQUIPMENT $1,425.00
Krause Cleaners
6-Qtr 4 Feb-Apr 2025
7/25/2025
Engineering evaluation of monthly data, direct staff engineer for system adjustments (2 hrs). Submittal of quarterly O&M data collections sheets (2 hrs).
Prepare letter report of vapor analyticals collected in support of remedial system shutdown. (18 hrs).
Monthly Base Work - Loadout prep. (1 hr), Travel Round Trip (6 hrs), SVE O&M (6 hrs) {total = 13 hrs x 3 mo = 39 hrs. Additional work collection of vapor samples from six SVE legs and influent from two zones (8 total vapor samples) for system shut down protocol (total 8 hrs).
Daily telemetry checks to verify the SVE system is operating as scheduled (3 hrs per month x 3 months = 9 hrs). SVE performance evaluation and system optimization (3 hrs). Return to site 30 days after system shut down and collect vapor samples from six SVE legs and influent from both zones (8 hrs.) plus travel (6 hrs). Preparation of table summarizing vapor analytical including graphs and text (10hrs )
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer Engineer/Scientist 5 G. Roberts
Engineer/Scientist 2 K. Howard
Engineer/Scientist 1 R. Lindsay Engineer/Scientist 1 B. Blount
Engineer/Scientist 1 K. McDonald Designer 2 S. Ferianc
Technical Pub Specialist 3 H. Vining
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 0 $0.00
Van or Truck $120.00 Day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE TOTALS
Hotel 0 $110.00 Day 0 $0.00
Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00
Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00
Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00
Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE TOTALS
FPUA-Electrical Service Three Months $700.00 Month 3 $2,100.00
Handling fee Electrical $20.00 Month 3 $60.00
TOTAL $2,160.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 0 $0.00
Construction/O&M Kit $360.00 Day 0 $0.00
Construction O&M Supplies $75.00 Day 0 $0.00
TOTAL EQUIPMENT $0.00
Krause Cleaners
7-Utilities Qtr 3&4
7/25/2025
T I
M A
T E
C on tr ac im
E nv iro nm en ta l & I nf ra st ru ct ur e, L
LC
5/
D C
8C
T A
C O
S ub
T as k
P ro je ct
M an ag em en t
S ub
T as k
6- Q
-A pr
S ite
K ra us e
C le an er s E
R
IC
_5
S ub T as k
2-
C om pl et e Q tr
O
M S ep t-
O ct
S ub T as k
7-
U til iti es
Q tr
A ct iv ity
/P ha
M a nd
A nn ua l G
W S am pl in g
S ub
T as k
3- S em i-A nn ua l R ep or t
Q tr
S ub T as k
8-
A nn ua l G ro un dw at er S am pl in g
P ro je ct
M an ag ki K nu ts on r/
E ric
K ra m er
S ub
T as k
4- U til iti es C om pl et e
Q tr
S ep t- O ct
S ub
T as k
9- A nn ua l O
M a nd G
W M on ito rin g
R pt
S ub
T as k
5- Q tr
O
M N ov
4-
Ja n
S ub
T as k
S V
E R ep ai r
T o ta ls
L ab o r
R at e C at eg o ry
$7 1.
P ro je ct M an
K ra m er
.4 $7
1.
E ng in ee r/ S ci en tis t
E
K ra m er
$6
6.
E ng in ee r/ S ci en tis t
G
R ob er ts
$3
6.
E ng in ee r/ S ci en tis t
K
H ow ar d
$2
8.
E ng in ee r/ S ci en tis t
R
Li nd sa y
$2 4.
E ng in ee r/
S ci en tis t
B
B lo un t
$3 6.
E ng in ee r/
S ci en tis t
K
M cD on al d
$3
4.
D es ig ne r
S
F er ia nc
$2 9.
T ec hn ic al
P ub lic at io ns
S pe ci al is t
H
V in in g
$0 .0
T o ta l H o u rs
D ire ct L
$1
5, 4.
$1 ,7
.9
$1
,4
.0
$1 ,5
.2
$0
.0
$2 ,0
.4
$2
,0
.4
$0 .0
$1
,4
.0
$3 ,9
.1
$7
.0
O ve rh ea d
.5 8%
$1 2, 3.
$1
,4
.0
$1 ,2
.0
$1
,3
.8
$0 .0
$1
,7
.0
$1 ,7
.0
$0
.0
$1 ,2
.7
$3
,3
.4
$6
.2
G en
A dm in
.3
8% $2
,9
.1
$3
.2
$2
.5
$3
.2
$0 .0
$4
.7
$4
.7
$0
.0
$2
.3
$7
.3
$1
.9
F rin g e
.9
6% $4
,8
.7
$5
.1
$4
.5
$4
.1
$0 .0
$6
.8
$6
.8
$0
.0
$4
.1
$1 ,2
.8
$2
.1
T o ta l L ab o r $3
5, 2.
$4 ,1
.3
$3
,4
.2
$3 ,6
.5
$0
.0
$4 ,9
.1
$4
,9
.1
$0 .0
$3
,5
.2
$9 ,2
.7
$1
,8
.4
T ra ve l
V eh ic le
R en ta l
$1 ,3
.0
$2
.0
$0
.0
$0 .0
$3
.0
$3
.0
$0
.0
$2
.0
$0 .0
$1
.0
M ile ag e
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
A ir
F ar e $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P er d ie m
H ot el $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al T ra ve l $1
,3
.0
$2
.0
$0 .0
$0
.0
$3
.0
$3
.0
$0 .0
$2
.0
$0
.0
$1
.0
S u b co n tr ac to r (E q u ip m en t
P ro cu re m
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P ro cu re m en t F ee
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al S ub co nt ra ct or
C os t $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S u b co n tr ac to r (S er vi ce s
P ro cu re m lin g
(C on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
D ril lin g
(N on
-c on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ob ile L ab or at or y $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ur ve yi ng $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
ID
W
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$1
.0
$0 .0
$0
.0
U til iti es
$4 ,8
.0
$0
.0
$0 .0
$6
.0
$0
.0
$0 .0
$4
,2
.0
$0 .0
$0
.0
$0 .0
P um p A la rm
T el em en tr y
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$3 ,0
.8
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$3
,0
.8
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
R E V
C E F
S H A W
P a g
T I
M A
T E
C on tr ac im
E nv iro nm en ta l & I nf ra st ru ct ur e, L
LC
5/
D C
8C
T A
C O
S ub
T as k
P ro je ct
M an ag em en t
S ub
T as k
6- Q
-A pr
S ite
K ra us e
C le an er s E
R
IC
_5
S ub T as k
2-
C om pl et e Q tr
O
M S ep t-
O ct
S ub T as k
7-
U til iti es
Q tr
A ct iv ity
/P ha
M a nd
A nn ua l G
W S am pl in g
S ub
T as k
3- S em i-A nn ua l R ep or t
Q tr
S ub T as k
8-
A nn ua l G ro un dw at er S am pl in g
P ro je ct
M an ag ki K nu ts on r/
E ric
K ra m er
S ub
T as k
4- U til iti es C om pl et e
Q tr
S ep t- O ct
S ub
T as k
9- A nn ua l O
M a nd G
W M on ito rin g
R pt
S ub
T as k
5- Q tr
O
M N ov
4-
Ja n
S ub
T as k
S V
E R ep ai r
T o ta ls
S ub co nt ra ct or S ub to ta l
$8 ,0
.8
$0
.0
$0 .0
$6
.0
$0
.0
$0 .0
$4
,2
.0
$1
.0
$0 .0
$3
,0
.8
H an dl in g F ee $4
.1
$0
.0
$0 .0
$4
0.
$0 .0
$0
.0
$1
.0
$1 9.
$0
.0
$3
.6
T ot al S ub co nt ra ct or
C os t $8
,5
.0
$0 .0
$0
.0
$6
.0
$0 .0
$0
.0
$4 ,3
.0
$2
.5
$0
.0
$3 ,3
.5
L ab o ra ry na ly tic al C os ts
$1 ,4
.0
$2
.0
$0
.0
$0 .0
$2
.0
$2
.0
$0
.0
$8
.0
$0 .0
$0
.0
F as t T ur na ro un d C ha rg es $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S am pl e
S hi pp in g $4
.0
$1
.0
$0
.0
$0 .0
$1
.0
$1
.0
$0
.0
$1
.0
$0 .0
$0
.0
T ot al L ab or at or y $1
,9
.0
$3
.0
$0 .0
$0
.0
$3
.0
$3
.0
$0 .0
$1
,0
.0
$0 .0
$0
.0
F ie ld E xp en so na l P ro te ct io n
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E xp en da bl es
$4
.0
$8 0.
$0
.0
$0 .0
$1
.0
$1
.0
$0
.0
$4 0.
$0
.0
$4 0.
E q ui pm en t
(D ril lin g r el at ed
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E q ui pm en t
(A na ly tic al r el at ed
$2
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$2
.0
$0 .0
$0
.0
E q ui pm en t
(I D
W r el at ed
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$1
.0
$0 .0
$0
.0
E q ui pm en t
(O th er
$3 ,9
.0
$8
.0
$0
.0
$0 .0
$1
,3
.0
$1 ,3
.0
$0
.0
$0 .0
$0
.0
$4
.0
T ot al F ie ld
E xp en se s $4
,7
.0
$9
.0
$0 .0
$0
.0
$1 ,4
.0
$1
,4
.0
$0 .0
$4
.0
$0
.0
$4
.0
S u b to ta l
$5 2, 9.
$4
,1
.3
$4 ,9
.2
$3
,6
.5
$6
.0
$7 ,0
.1
$7
,0
.1
$4 ,3
.0
$5
,4
.7
$9 ,2
.7
$5
,8
.9
C o m p le ti o n
F ee
$3 ,5
.2
$4
.2
$3
.6
$3
.0
$0
.0
$4
.6
$4
.6
$0 .0
$3
.7
$9
.4
$1
.9
T o ta l E st im at ed
C o st $5
5, 3.
$4 ,5
.6
$5
,3
.8
$4 ,0
.6
$6
.0
$7
,5
.7
$7 ,5
.7
$4
,3
.0
$5 ,8
.4
$1
0, 4.
$6 ,0
.9
R E V
C E F
S H A W
P a g e
Proposed Scope of Work Krause’s Coin Laundry and Dry Cleaner 2049 U.S. Highway 1 South, Fort Pierce, FL SVE Installation and Startup Proposal Task Assignment DC008C TACO #2 ERIC_5411 (Former FAC ID No. 569501010) APTIM Environmental & Infrastructure, LLC (APTIM) 7/25/25
The following Task Assignment Change Order (TACO) #2 has been prepared for the former Krause’s Coin Laundry and Dry Cleaner located in Fort Pierce, Saint Lucie County, to extend remedial system operation three additional months and collection of vapor samples to document conditions for system shut down.
Subtask - 1: Project Management: No Changes
This task includes project management activities associated with the completion of all subtasks in DC008C, as calculated in accordance with Contract HW689.
Subtask 2: Complete Qtr 2 O&M Sept-Oct: No Changes Subtask 3: Semi-Annual Report Qtr. 1&2: No Changes Subtask 4: Utilities Complete Qtr. 2: No Changes Subtask 5: Qtr. 3 O&M Nov 2024 - Jan 2025: No Changes Subtask 6: Qtr. 4 Feb-Apr 2025:
Three months of remedial system operation and maintenance will be added to this subtask to allow coordination of activities associated with the remedial system shutdown.
This will include O&M services during system operation, collection of eight vapor samples as recommended in the Annual Remedial Action Status Report for analysis using EPA Method Modified TO 15. In addition, 30 days after system shutdown APTIM will return to the site and restart the system and repeat collection of eight vapor samples for analysis. After completion of the vapor sample collection APTIM will prepare a letter report that summarizes the analytical results and provides recommendations for operation of the remedial system.
Subtask 7: Utilities Qtrs. 3&4:
Three months of electrical power usage is included in the subtask.
Subtask 8: Annual Groundwater Sampling: No Changes Subtask 9: Annual O&M and Groundwater Monitoring Report: No Changes Subtask 10: No changes
The extension of remedial system operation requires a schedule adjustment to the project. APTIM proposes submittal data of letter report summarizing vapor analysis due
September 19, 2025 and task expiration date of December 5, 2025. APTIM proposes to perform this scope of work in accordance with the terms and conditions of the DEP Contract No. HW689 between the Florida Department of Environmental Protection and APTIM dated December 21, 2021. APTIM will begin the proposed scope of work upon issuance of the Task Assignment Notification.
If you have any questions, please contact us for clarification.
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department�s Project Manager: Department�s Project Manager Phone:
Contractor Name: (Contractor ) ntractor�st �s Project Manager: ontractor�s t�s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
DC008C 1 HW689
Nicole Knutson 850-245-8763 Contractor APTIM Environmental & Infrastructure, LLC Contractor
Contractor Eric Kramer Contractor 407 287 3216
ERIC_5411
Krause's Coin Laundry and Dry Cleaner
$ 51,123.12 $ 44,852.88
$ 4,800.00 $ 2,400.00
$ 55,923.12 $ 47,252.88
Completion Completion 08/22/2025 08/22/2025 0
1 1 1
Contractor
Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2025.05.12 10:18:29 -04'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2025.05.12 09:53:51 -04'00'
This TACO allows APTIM to modify the SVE system's variable frequency drive and reconciles WCD 1 which increased the monthly allotment for utilities.
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW689
DC008C
$ 55,923.12
Subtasks 2 & 3: Qtr 2 O&M Reporting and Semi-Annual O&M Report
Subtask 4: Utilities for two months
Subtask 5: Qtr 3 O&M Reporting
Subtask 6: Qtr 4 O&M Reporting
Subtask 7: Utilities for six months
Subtasks 8, 9, 10, & 1: Groundwater Monitoring and Annual O&M Report
FDEP Approval of Subtasks 2 & 3: Qtr 2 O&M Reporting and Semi-Annual O&M Report
Subtask 5: Qtr 3 O&M ReportingFDEP Approval of
FDEP Approval of Subtask 6: Qtr 4 O&M Reporting
FDEP Approval of Subtasks 8, 9, 10, & 1: Groundwater Monitoring and Annual O&M Report
FDEP Approval of Subtask 7: Utilities for six months
FDEP Approval of Subtask 4: Utilities for two months
01/31/2025
12/20/2024
03/21/2025
05/23/2025
06/20/2025
06/20/2025
$ 640.00
$ 9,350.50
$ 7,524.72
$ 7,524.72
$ 4,320.00
$ 26,563.18