This is a Task Assignment (TA) executed under Contract Number HW689 between the State of Florida Department of Environmental Protection (FDEP) and APTIM Environmental & Infrastructure, LLC. The task assignment authorizes work at the Center West Plaza Touch of Class Dry Cleaners site located at 3215 US Highway 1, Ft. Pierce, St. Lucie County, Florida (ERIC_5417). The FDEP Project Manager is Kelly Crain, and the contractor's Project Manager is Eric Kramer. The task assignment was signed on June 15, 2023, with a completion date of August 30, 2023.
The task assignment authorizes APTIM to decommission and remove the soil vapor extraction (SVE) system at the Center West Plaza Touch of Class Dry Cleaners site in accordance with the attached Cost Estimate and Scope of Work dated April 20, 2023. The total contract value is $12,771.14 on a fixed unit rate basis, comprised of three subtasks: Subtask 1 (Project Management) at $777.14, Subtask 2 (SVE Decommission/Removal and Site Restoration) at $10,558.99, and Subtask 3 (Reporting) at $1,435.01. The scope includes removal of electrical service (subcontracted to J.H. Ham Engineering for $2,000.00), removal of SVE equipment and piping, abandonment of vapor extraction wells, capping of remaining structures below grade, site restoration, and preparation of a Remediation System Decommissioning Letter Report with photo documentation. The labor effort totals 75 hours. The single deliverable requires submittal and FDEP approval of the Remediation System Decommissioning Letter Report and revised Property Reporting Form by July 28, 2023, with invoice payment upon approval of the deliverable.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW689
DC010B Completion August 30, 2023
This Task Assignment authorizes APTIM to decommission and remove the SVE system at the Center West Plaza Touch of Class Dry Cleaners site in accordance with the attached Cost Estimate and Scope of Work dated April 20 2023.
Kelly Crain 850-245-8953 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
APTIM
APTIM
Eric Kramer 407-287-3216
ERIC_5417
3215 US Hwy 1, Ft Pierce, St. Lucie County
Center West Plaza Touch of Class Dry Cleaners
✔ $ 12,771.14
$ 12,771.14
Scope of Work
Eric Kramer Digitally signed by Eric Kramer Date: 2023.06.15 11:12:15 -04'00' Kelly Crain Digitally signed by Kelly Crain
Date: 2023.06.15 08:18:26 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Remediation System Decommissioning Letter Report and revised Property Reporting Form; Project Management - Subtasks 1-3 07/28/2023
Upon submittal and FDEP approval of Remediation System Decommissioning Letter Report and revised Property Reporting Form; Project Management - Subtasks 1-3 $ 12,771.14
$ 12,771.14
HW689
DC010B
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Secretary
To:
From:
Date:
HW689 Contract Negotiation File Center West Plaza Touch of Class Dry Cleaners Ft. Pierce, St. Lucie County
ERIC_5417
Kelly Crain, Project Manager June 9, 2023
Subject: Negotiation Summary
HW689 DC010B
This Task Assignment authorizes APTIM to conduct SVE decommissioning activities in accordance with the April 20, 2023, Scope of Work, and Cost Estimate.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: SVE Decommission/Removal This task includes costs associated with the removal of the SVE equipment, piping, and electrical connections above ground, removal of the manholes, exposing the vapor extraction wells and abandonment, capping all remaining system structures below grade, restoration of all interior and exterior damage to the facility, and trailer preparation and transportation to APTIM's Winter Garden office.
Subtask 3: Reporting This task includes costs associated with the preparation of a Letter Report documenting the removal and transportation of the system, with picture log and required paperwork, and updated Final Tables.
APTIM confirmed site access at the Center West Plaza Touch of Class Dry Cleaners on April 20, 2023.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $12,771.14 with 75 labor hours.
Printed on recycled paper.
FDEP COST ESTIMATE
Contractor: Aptim Environmental & Infrastructure, LLC
Date: 4/20/2023
Task #: HW689 - DC010B ERIC_5417 SubTask 1 Project Management
Site: Center West Touch of Class Ft Pierce SubTask 2 2-SVE System Decom/Site Restoration
Activity/Phase: Remedial System Decommissioning SubTask 3 3- Reporting
Project Manager: Skylar Schwed FDEP/Eric Kramer APTIM SubTask 4
SubTask 5
Totals 1 2 3 4 5
Labor Rate Category
$68.41 Project Manager E. Kramer 4 4.4
$68.41 Engineer/Scientist 5 E. Kramer 5 2 3 0 0
$35.31 Engineer/Scientist 2 K. McDonald 10 2 8 0 0
$31.28 Engineering Technician 3 B. Skipper 27 27 0 0 0
$25.60 Engineering Technician 1 K. Gartland 27 27 0 0 0
$34.03 Designer 2 S. Ferianc 1 0 1 0 0
$28.89 Technical Publications Spec H. Vining 1 0 1 0 0
$0.00 0 0 0 0 0
Total Hours 75 4 58 13 0 0
Direct Labor $2,592.03 $298.20 $1,743.20 $550.63 $0.00 $0.00
Overhead 85.58% $2,218.26 $255.20 $1,491.83 $471.23 $0.00 $0.00
Gen & Admin 19.38% $502.33 $57.79 $337.83 $106.71 $0.00 $0.00
Fringe 31.96% $828.41 $95.30 $557.13 $175.98 $0.00 $0.00
Total Labor $6,141.03 $706.49 $4,129.99 $1,304.55 $0.00 $0.00
Travel
Vehicle Rental $360.00 $360.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $684.00 $684.00 $0.00 $0.00 $0.00
Total Travel $1,044.00 $1,044.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00
Electrical Contractor $2,000.00 $2,000.00 $0.00 $0.00 $0.00
Permitting $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $2,000.00 $2,000.00 $0.00 $0.00 $0.00
Handling Fee $200.00 $200.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $2,200.00 $2,200.00 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00
Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $210.00 $210.00 $0.00 $0.00 $0.00
Expendables $120.00 $120.00 $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) $2,442.00 $2,442.00 $0.00 $0.00 $0.00
Total Field Expenses $2,772.00 $2,772.00 $0.00 $0.00 $0.00
Subtotal $12,157.03 $706.49 $10,145.99 $1,304.55 $0.00 $0.00
Completion Fee $614.11 $70.65 $413.00 $130.46 $0.00 $0.00
Total Estimated Cost $12,771.14 $777.14 $10,558.99 $1,435.01 $0.00 $0.00
REV: 02/03 CEF SHAW Page 1
SITE : Center West Touch of Class Ft Pierce
SUBTASK: 2-SVE System Decom/Site Restoration
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 2 Engineer/Scientist 2 K. McDonald 2
Engineering Technician 3 B. Skipper 27
Engineering Technician 1
K. Gartland 27
Designer 2 S. Ferianc
Technical Pub Specialist 3 H. Vining
TOTAL LABOR 58
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Day 0 $0.00
Van or Truck $120.00 Day 3 $360.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel 2 $120.00 Day 4 $480.00
Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00
Day 1-Leave between 6 - Noon 2 $30.00 Day 2 $60.00
Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00
Day 2 $36.00 Day 4 $144.00
TOTAL PER DIEM $684.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
J.H. Ham Electrical service decommission $2,000.00 each 1 $2,000.00
TOTAL $2,000.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00
Sample Shipping (large cooler) $110.00 0 $0.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 3 $120.00
Portable compressor $50.00 Day 3 $150.00
Portable generator $70.00 Day 3 $210.00
Jack hammer $87.00 Day 3 $261.00
Concrete /Asphalt saw $60.00 Day 3 $180.00
Concrete Core Drill $105.00 Day 3 $315.00
Concrete Core Bit $82.00 Day 3 $246.00
Construction Kit $360.00 Day 3 $1,080.00
PPE Level D 2 person crew $35.00 Day 6 $210.00
TOTAL EQUIPMENT $2,772.00
4/20/2023
Engineering evaluation of field notes (2 hrs.)
Permit close out with City (1 hr.), Electrical power disconnect (1 hr.)
Shop preparation for loadout (1 hr.), Travel to site round trip (5 hrs.), Removal of remedial equipment, piping, electrical connections above ground, removal of the manholes, exposing the vapor extraction wells and abandonment, capping all remaining system structures below grade, and restoration of all interior and exterior damage to the facility (20 hrs), Prepare trailer for transport to APTIM Winter Garden office for temporary stoarge until transferred to former Carmen's Cleaners (1 hr)
Shop preparation for loadout (1 hr.), Travel to site round trip (5 hrs.), Removal of remedial equipment, piping, electrical connections above ground, removal of the manholes, exposing the vapor extraction wells and abandonment, capping all remaining system structures below grade, and restoration of all interior and exterior damage to the facility (20 hrs), Prepare trailer for transport to APTIM Winter Garden office for temporary stoarge until transferred to former Carmen's Cleaners (1 hr)
SITE : Center West Touch of Class Ft Pierce
SUBTASK:
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 3
Engineer/Scientist 2 K. McDonald
Engineering Technician 3 B. Skipper Engineering Technician 1 K. Gartland Designer 2 S. Ferianc 1
Technical Pub Specialist 3 H. Vining 1
TOTAL LABOR 13
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Day 0 $0.00
Van or Truck $120.00 Day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel 0 $110.00 Day 0 $0.00
Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00
Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00
Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00
Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method 8260 (VOHs Only) GW $73.00 0 $0.00
EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00
Sample Shipping (Small cooler) $110.00 0 $0.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day $0.00
Shallow GW Sampling Kit $290.00 Day $0.00
55-gallon Drum $100.00 Each $0.00
TOTAL EQUIPMENT $0.00
3- Reporting
4/20/2023
Engineering evaluation of decommissioning documentation
Preparation and submittal of Letter Report of Documenting Removal and Transportation of System, with picture log and required paperwork, Update Final Tables (8 hrs).
Drafting Final Site Plan
Vapor and Groundwater Sampling Report Compilation, Formatting, Production
Proposed Scope of Work Center West Plaza Touch of Class Dry Cleaners 3215 US Hwy 1 South, Ft Pierce, FL ERIC_5417 (Former Facility No. 569800013) Remedial System Decommissioning Task Assignment DC010B APTIM Environmental & Infrastructure, LLC April 20, 2023
Following review of the recommendations provided in APTIM’s document titled Submittal of Site Closure Vapor Sampling dated March 11, 2022, the FDEP approved the removal of the SVE system and remedial system infrastructure at the site on March 18, 2022. APTIM has prepared the following Scope of Work and LOE to remove the aboveground portions of the Center West Plaza Touch of Class Cleaners (Center West Cleaners) remediation system. The proposed scope of work includes removal of the SVE remediation system components existing aboveground and decommissioning the soil vapor extraction (SVE) system housed in a trailer.
APTIM is working on an ISR design for the former Carmen’s Cleaner’s (ERIC_4903) and although the design has not been completed APTIM believes the SVE remedial system at the Center West Cleaners would meet the design specifications. Consequently, APTIM proposes the SVE remedial trailer from the Center West Cleaners site be temporarily relocated to the APTIM Winter Garden facility and then transferred to the former Carmen’s Cleaner until ready for use.
The scope of work generally includes:
1) Remove electrical power attached to the remedial system, meter can and pole (subcontracted to licensed electrical contractor).
2) Detach piping from system remedial trailer, excavate around stubups next to trailer, cap pipes and fill excavation with concrete
3) Remove manholes at VE-1 through VE04, excavate around pipe and cut below grade. Tremie fill SVE wells with grout, concrete around pipes to match existing grade. Replace floor tile with spare tiles, as applicable.
4) Remove interior vertical piping and horizontal above drop ceiling.
5) Repair walls the pipes penetrated.
6) Repair all external and internal bracket mounting fastener holes,
7) Retain vapor GAC as loading was minimal on this site and should be adequate to treat the estimated vapor discharge from the Carmen’s Cleaners.
8) Disconnect hurricane ties and remove system trailer from work area for transport to APTIM’s Winter Garden office.
9) General cleanup miscellaneous trash and sweep area,
10) Perform a final walk though and complete any necessary touchups,
11) Document final site conditions using photo documentation and prepare report summarizing field activities.
All construction debris will be removed from the site and transported to an approved waste collection and/or waste recycling facility for proper disposal. The SVE system removal activities will be documented in a Remediation System Decommissioning letter report, which will include photo documentation of the equipment and site conditions before and after removal of the system, and a revised Property Reporting Form to designate location of equipment.
The deliverables for this task assignment will include:
1. System Decommissioning by June 30, 2023
2. Completion of Remediation System Decommissioning Letter Report and revised
Property Reporting Form (July 28, 2023)
3. Task Assignment date August 25, 2023
APTIM proposes to perform this scope of work in accordance with the terms and conditions of the contract No. HW689 executed on December 21, 2021 between the Florida Department of Environmental Protection and APTIM Environmental & Infrastructure, LLC. APTIM will begin the proposed scope of work upon written authorization.
Note that the 2017 FDEP Permission to Enter Property remains in effect. If you have any questions, please contact APTIM for clarification.
Item Description Units Unit Price Total
Amount Units Unit Price Total
Amount Units Unit Price Total
Amount
Electrical Service 1 LS $4,900.00 1 LS $2,000.00 1 LS $3,875.00
Total $4,900.00 $2,000.00 $3,875.00
MTK Electric J.H. Ham Engineering ABP Electric
Electric Bid Summary Center West Plaza Touch of Class Cleaners
3215 US Hwy 1 South
Ft. Pierce, FL
J. H. HAM ENGINEERING, INC.
Electrical & Instrumentation Engineering &Construction
602 BRANNEN ROAD P.O. BOX 5106 LAKELAND, FLORIDA 33807-510
OFFICE: (863) 646-1448 FAX: (863) 644-0784
3-8-23
Aptim
Attn: Christine Hidalgo Re: J.H. Ham Engineering, Inc. Proposal P50032
Mrs. Hidalgo, We are pleased to submit our proposal for the disconnection of remedial services at the following site. 3215 U.S. Highway 1 South, Fort Pierce Fl.
The price for this disconnection is TOTAL $2,000.00
Clarifications:
1. Our proposal is based solely on the written information received, as well as the above-mentioned scope of work.
2. This Proposal, Scope of Work, Clarifications and Exclusions shall become part of the contract by reference.
3. We have included Florida Sales Tax on materials which we furnish.
4. We have based our price on working a standard forty-hour week exclusive of
Saturdays, Sundays, or holidays. We have not included any premium time.
5. Terms of Payment: Monthly progress payments for installed work and materials stored on site; NET thirty (30) days.
6. J.H. Ham Engineering is a licensed contractor in the state of Florida.
7. Due to the unstable market prices of ferrous and non-ferrous raw materials and the rapidly rising cost of finished goods and materials from our suppliers, this proposal is valid for 30 days for labor, 15-days for raw materials except copper wire. Copper wire price is valid for 5-days only. Orders received after 5 days will be subject to a copper price escalation based on the revised Copper Price index. The current Copper Price index on 1-16-23 is $4.21 per pound.
We would like to thank you for the opportunity you have afforded us in presenting this proposal and we hope the above information meets with your approval. If you have any questions or require additional information, please contact our office.
Sincerely, Stephen E. Carter Estimator, J.H. Ham Engineering Office 863-646-1448 Cell 813-267-5777
MTK Electric Inc 6619 Banyan Street
Cocoa, Fl 32927 Electrical Division License
#EC13010970
John Taggart 321-607-1507
ELECTRICAL PROPOSAL
DATE: 02/20/2023
ATTN: CHRISTINE HIDALGO
APTIM ENVIRONMENTAL SERVICES
1228 WINTER GARDEN VINELAND ROAD
WINTER GARDEN, FLORIDA 34787
REMEDIATION PROJECT LOCATION: CENTER WEST PLAZA (FORMER TOUCH OF CLASS) 3215
US HIGHWAY 1 SOUTH, FORT PIERCE, SAINT LUCIE COUNTY, FLORIDA 34982
WE HEREBY SUBMIT ESTIMATES TO PERFORM THE FOLLOWING
• Remove and secure any electrical power “overhead service pole not included” associated with the existing remediation trailer prior to removal efforts and to make sure of a power free working environment.
• Scope includes removal of electrical conduit and wire and securing the area of electrical hazards.
• All wastes generated from work to be disposed of offsite. Site shall be clean upon completion of work
• All work to be performed in accordance with NEC and local regulations related to electrical service
• Electrical contractor to provide license, permits and insurances to complete the project as applicable
• Proposal shall be valid for 90 days
1) TOTAL ELECTRICAL PROPOSAL PRICE: $4900.00 (FOUR THOUSAND NINE HUNDRED)
INCLUDES PERMIT THRU COUNTY BUILDING DEPARTMENT
SPECIAL CONDITIONS:
1) ALL WORK TO BE PERFORMED ACCORDING TO NEC
2) CONTRACTOR IS NOT RESPONSIBLE FOR ANY LOSS OR DAMAGE, SCHEDULING DELAYS DUE
TO CAUSE BEYOND HIS CONTROL.
3) ELECTRIC CONTRACTOR TO PROVIDE LICENSE, PERMITS AND INSURANCES TO COMPLETE
ABOVE PROJECT.
ACCEPTANCE OF THIS PROPOSAL:
APTIM ENVIRONMENTAL SERVICES
By: _______________________________
Title: _____________________________
Date: _____________________________
863-816-7313
Fax: 863-853-2694
Email: abpelectric1@verizon.net
8717 Park Byrd Rd
Lakeland, FL 33810
February 20, 2023
Christine Hidalgo-Office Director
APTIM
1228 Winter Garden Vineland Rd.
Winter Garden, FL 34787
Re: Demo of the electrical for Groundwater Remediation System
Center West Plaza (Former Touch of Class) 3215 U.S. Hwy. 1 South Fort Pierce, FL
Dear Christine:
We are pleased to submit our proposal for furnishing labor, tools, material and supervision for the following:
Electrical Scope Includes:
• Remove and secure any electrical power “overhead service pole not included” associated with the existing remediation trailer prior to removal efforts and to make sure of a power free working environment.
• Scope includes removal of electrical conduit and wire and securing the area of electrical hazards.
• All wastes generated from work to be disposed of offsite. Site shall be clean upon completion of work
• All work to be performed in accordance with NEC and local regulations related to electrical service
• Electrical contractor to provide license, permits and insurances to complete the project as applicable
• Proposal shall be valid for 90 days Total Price for This Proposal Including Tax…. $3,875.00
Thank you for allowing ABP Electric the opportunity to serve you.
Sincerely, Bradley N. Plough
President
ABP Electric, Inc.
mailto:abpelectric1@verizon.net