CN-370000-HW689-DC019B.pdf

PDF 8 MB Posted

Attached to
Master Agreement FL|HW689|a751b87398beb5bfc7861f19a403533e
Contract number
HW689
Issued by
Florida

About this file

This document is a Task Assignment (TA) between the State of Florida Department of Environmental Protection (FDEP) and Aptim Environmental & Infrastructure, LLC for environmental assessment services at the Forest Cleaners (Former) site located at 15912 East Highway 40, Silver Springs, Marion County, Florida. The site is referenced under FDEP Facility ID ERIC_4907 (formerly FAC ID #429500885) and was accepted into the Drycleaning Solvent Cleanup Program in 1998. The task is identified as TA Number DC019B under Contract Number HW689, with a completion date of May 31, 2024, and a final deliverable deadline of March 29, 2024. The engagement operates under an indefinite delivery vehicle structure, with Nicole Knutson serving as the Department Project Manager and Eric Kramer as the Contractor's Project Manager.

The scope of work requires Aptim to conduct Modified Active Gas Sample (MAGS) testing, soil sampling via direct push technology (DPT), groundwater sampling, and well sampling, with oversight of four monitoring well installations. Field activities and results are to be documented in a Site Assessment Report (SAR). The contract establishes a fixed unit rate payment structure with a total TA value of $119,629.80, to be invoiced upon completion of specific deliverables: $99,633.29 upon FDEP approval of the Analytical Results and Field Notes Package (Subtasks 2-4), due January 31, 2024, and $19,996.51 upon FDEP approval of the Site Assessment Report and Project Management (Subtasks 5 and 1), due March 29, 2024. Subcontractor costs included in the estimate are Ambient Technology for DPT drilling services ($16,330.00), SurvTech Solutions for professional surveying ($8,940.00), Atlantic Supply for well materials ($1,327.31), and multiple disposal and utility locating services totaling approximately $3,450.00. The cost estimate reflects 468 total labor hours across five subtasks, with overhead, general and administrative costs, and fringe benefits applied at established rates.

View the file

Other files

File Type Posted
CN-370000-HW689-BF01A.pdf.crdownload CRDOWNLOAD file
CN-370000-HW689-BF01D.pdf PDF
CN-370000-HW689-BIL01G.pdf PDF
CN-370000-HW689-BIL1BCO1.pdf PDF
CN-370000-HW689-BIL1BCO3.pdf PDF
CN-370000-HW689-DC001A.pdf PDF
CN-370000-HW689-DC001B.pdf PDF
CN-370000-HW689-DC001C.pdf PDF
CN-370000-HW689-DC001D.pdf PDF
CN-370000-HW689-DC002A.pdf PDF
CN-370000-HW689-DC003B.pdf PDF
CN-370000-HW689-DC004A.pdf PDF
CN-370000-HW689-DC004B.pdf PDF
CN-370000-HW689-DC005C.pdf PDF
CN-370000-HW689-DC006A.pdf PDF
CN-370000-HW689-DC008B.pdf PDF
CN-370000-HW689-DC010B.pdf PDF
CN-370000-HW689-DC011B.pdf PDF
CN-370000-HW689-DC011D.pdf PDF
CN-370000-HW689-DC012A.pdf PDF
CN-370000-HW689-DC013B.pdf PDF
CN-370000-HW689-DC014B.pdf PDF
CN-370000-HW689-DC015E.pdf PDF
CN-370000-HW689-DC019A.pdf PDF
CN-370000-HW689-DC024A.pdf PDF
CN-370000-HW689-DC025A.pdf PDF
CN-370000-HW689-DC028A.pdf PDF
CN-370000-HW689-DC029A.pdf PDF
CN-370000-HW689-DC02ACO1.pdf PDF
CN-370000-HW689-DC031A.pdf PDF
CN-370000-HW689-DC034A.pdf PDF
CN-370000-HW689-DC035A.pdf PDF
CN-370000-HW689-DC037A.pdf PDF
CN-370000-HW689-DC03ACO1.pdf PDF
CN-370000-HW689-DC03ACO2.pdf PDF
CN-370000-HW689-DC03CC01.pdf PDF
CN-370000-HW689-DC03DCO1.pdf PDF
CN-370000-HW689-DC05CCO1.pdf PDF
CN-370000-HW689-DC05DCO1.pdf PDF
CN-370000-HW689-DC08CCO1.pdf PDF
CN-370000-HW689-DC08CCO2.pdf PDF
CN-370000-HW689-DC08CCO3.pdf PDF
CN-370000-HW689-DC11CCO5.pdf PDF
CN-370000-HW689-DC11CCO6.pdf PDF
CN-370000-HW689-DC12BCO4.pdf PDF
CN-370000-HW689-DC13BCO2.pdf PDF
CN-370000-HW689-DC13BCO4.pdf PDF
CN-370000-HW689-DC13BCO7.pdf PDF
CN-370000-HW689-DC16CCO1.pdf PDF
CN-370000-HW689-DC18BCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW689

DC019B Completion May 31, 2024

APTIM will conduct MAGS, soil sampling, DPT groundwater sampling, and well sampling. APTIM will also oversee the installation of four monitoring wells. Field activities will be documented in the SAR.

Nicole Knutson 850-245-8763 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Aptim Environmental & Infrastructure, LLC

Aptim Environmental & Infrastructure, LLC

Eric Kramer 407-287-3216

ERIC_4907

15912 East Highway 41, Silver Springs, Marion County

Forest Cleaners (Former)

✔ $ 119,629.80

$ 119,629.80

Scope of Work

Eric Kramer Digitally signed by Eric Kramer Date: 2023.06.29 11:43:06 -04'00'

Teresa Booeshaghi

Teresa Booeshaghi Digitally signed by Teresa Booeshaghi Date: 2023.06.29 10:45:52 -04'00'

6/29/2023

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Analytical Results and Field Notes Package - Subtasks 2-4 01/31/2024

Site Assessment Report & Project Management - Subtasks 5 & 1 03/29/2024

FDEP Approval of Analytical Results and Field Notes Package - Subtasks 2-4 $ 99,633.29

FDEP Approval of Site Assessment Report & Project Management - Subtasks 5 & 1 $ 19,996.51

$ 119,629.80

HW689

DC019B

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO:

FROM:

ERIC_4907

Forest Cleaners (Former)

Nicole Knutson, Project Manager

SUBJECT: Negotiation Summary

HW689 DC019B

DATE: June 28, 2023

APTIM will conduct MAGS, soil sampling, DPT groundwater sampling, and well sampling. APTIM will also oversee the installation of four monitoring wells. Field activities will be documented in the SAR.

Total task amount is $119,629.80. APTIM’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date is March 29, 2024. Task completion date is May 31, 2024.

ATTACHMENT A

COST ESTIMATE FORM/

LEVEL OF EFFORT

FDEP COST ESTI MATE

Contractor: Aptim Environmental & Infrastructure, LLC

Date: 6/28/2023

Task #: HW689 HW019B ERIC_4907 SubTask 1 Project Management SubTask 6

Site: Forest Cleaners SubTask 2 2-SiteMeeting, MAGS SubTask 7

Activity/Phase: SAR SubTask 3 3-Soil and Groundwater Field Activities SubTask 8

Project Manager: Kelly Crain (FDEP)/Eric Kramer (APTIM) SubTask 4 4-Final Well Installations SubTask 9

SubTask 5 5-Reporting SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$68.41 Project Manager E. Kramer 35 35.3 $68.41 Engineer/Scientist 5 E. Kramer 29 17 2 2 8 0 0 0 0 0 $64.45 Engineer/Scientist 5 G. Roberts 52 9 13 6 24 0 0 0 0 0 $55.66 Engineer/Scientist 4 J. Cheze 53 8 0 0 45 0 0 0 0 0 $36.08 Engineer/Scientist 2 K. Howard 175 58 90 27 0 0 0 0 0 0 $35.31 Engineer/Scientist 2 K. McDonald 43 37 0 0 6 0 0 0 0 0 $30.25 Engineer/Scientist 2 D. McConnaug 67 25 28 14 0 0 0 0 0 0 $34.03 Designer 2 S. Ferianc 8 0 0 0 8 0 0 0 0 0 $28.89 Technical Publications Specialist 3 H. Vining 6 0 0 0 6 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0 Total Hours 468 35 154 133 49 97 0 0 0 0 0

Direct Labor $21,006.62 $2,416.69 $6,343.66 $5,068.87 $1,921.18 $5,256.22 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 85.58% $17,977.46 $2,068.20 $5,428.90 $4,337.94 $1,644.15 $4,498.27 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 19.38% $4,071.08 $468.35 $1,229.40 $982.35 $372.32 $1,018.66 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 31.96% $6,713.71 $772.37 $2,027.43 $1,620.01 $614.01 $1,679.89 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $49,768.87 $5,725.61 $15,029.39 $12,009.17 $4,551.66 $12,453.04 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $2,120.00 $920.00 $840.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $2,120.00 $920.00 $840.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) Well Materials $1,327.31 $1,327.31 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $1,327.31 $1,327.31 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $132.73 $132.73 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $1,460.04 $1,460.04 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $16,330.00 $0.00 $12,450.00 $3,880.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $8,940.00 $8,940.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $1,000.00 $0.00 $0.00 $1,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $750.00 $750.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $27,020.00 $9,690.00 $12,450.00 $4,880.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $2,702.00 $969.00 $1,245.00 $488.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $29,722.00 $10,659.00 $13,695.00 $5,368.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $24,004.00 $8,800.00 $13,500.00 $1,704.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $300.00 $300.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $24,304.00 $9,100.00 $13,500.00 $1,704.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

FDEP COST ESTI MATE

Contractor: Aptim Environmental & Infrastructure, LLC

Date: 6/28/2023

Task #: HW689 HW019B ERIC_4907 SubTask 1 Project Management SubTask 6

Site: Forest Cleaners SubTask 2 2-SiteMeeting, MAGS SubTask 7

Activity/Phase: SAR SubTask 3 3-Soil and Groundwater Field Activities SubTask 8

Project Manager: Kelly Crain (FDEP)/Eric Kramer (APTIM) SubTask 4 4-Final Well Installations SubTask 9

SubTask 5 5-Reporting SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $600.00 $240.00 $280.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $1,950.00 $0.00 $1,625.00 $325.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $4,528.00 $2,128.00 $1,770.00 $630.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $200.00 $100.00 $0.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $7,278.00 $2,468.00 $3,675.00 $1,135.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $114,652.91 $5,725.61 $39,636.43 $43,719.17 $13,118.66 $12,453.04 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $4,976.89 $572.56 $1,502.94 $1,200.92 $455.17 $1,245.30 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $119,629.80 $6,298.17 $41,139.37 $44,920.09 $13,573.83 $13,698.34 $0.00 $0.00 $0.00 $0.00 $0.00

LEVEL OF EFFORT / EXPENSE WORKSHEET

SITE : Forest Cleaners

SUBTASK:

DATE: June 28, 2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer

Engineer/Scientist 5 G. Roberts

Engineer/Scientist 4 J. Cheze

Engineer/Scientist 2 K. Howard

Engineer/Scientist 2 K. McDonald

Engineer/Scientist 2 D. McConnaughey

Designer 2 S. Ferianc Technical Publications Specialis H. Vining

TOTAL LABOR 154

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 1 $80.00 Van or Truck $120.00 Day 3 $360.00 Van or Truck $480.00 Week 1 $480.00

TOTAL VEHICLE $920.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE TOTALS

Survtech Solutions Survey and Benchmark Placement $8,940.00 LS 1 $8,940.00 GeoTek Utility Locate Services $750.00 LS 1 $750.00 Atlantic Supply MAGS/Well Supplies (Casing, Screen, Sand) $1,327.31 LS 1 $1,327.31

TOTAL $11,017.31

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method TO-15 (VOC Soil Vapor) $200.00 8 0 $1,600.00 EPA Method 8260 (Full List) Soil $150.00 48 0 $7,200.00 EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $55.00 0 0 Contingency $0.00 EPA Method 8260 (VOHs) Leachate $73.00 0 0 Contingency $0.00 EPA Method 8260 (Full List) Well $150.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 2 $300.00

TOTAL LAB $9,100.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 6 $240.00 Soil Sampling Kit (concrete) $235.00 Day 2 $470.00 MAGS Investigation Kit $500.00 Day 1 $500.00 Tedlar Bags $20.00 bag 5 $100.00 Shallow GW Sampling Kit $290.00 Day 1 $290.00 Encore Sampler $16.00 each 48 $768.00 55 Gallon Drums $100.00 each 1 $100.00

TOTAL EQUIPMENT $2,468.00

MAGS Testing and Soil Sampling Mobilization and Field Event Preparation (2 hrs), Travel for MAGS Well Installations Two Days (6 hrs), Perform Onsite H&S and Scoping meetings (1 hr), Installation and Construction of 8 MAGS Testing Wells, including coring (9 hrs), Installation of 4 Vapor Monitoring Point Locations, including coring (4 hrs), Travel round trip for MAGS Tesing (3 hrs), Perform MAGS Tests at 8 locations and collection of 8 Vapor Samples (10 hrs), Surface and Site Restoration (2 hrs).

2-SiteMeeting, MAGS

Note: Air Analysis by TO-15, Soil Samples by VOCs by EPA Method 8260 (Full List)

Onsite Meeting with Property Owner and Property Manager (4 hrs) and Utility White-lines for Markouts including travel (4 hrs), Oversight of GPR Utility Subcontract Survey (10 hrs), Oversight of Professional Site Survey (10 hrs), MAGS Testing and Soil Sampling Mobilization and Field Event Preparation (2 hrs), Round Trip Travel for two days to site for MAGS Soil Sampling and Well Installations (6 hrs), Perform Onsite H&S and Scoping meetings (1 hr), Advancement of 8 MAGS Soil Borings for the collection of 48 soil samples at depths of 6", 2', 4, 6', 8' and 10' (6 hrs), Assistance with Installation and Construction of 8 MAGS Testing Wells (4 hrs), Assistance with Installation of 4 Vapor Monitoring Point Locations, including coring (2 hrs), Installation of Interior Monitoring Well, including Coring (3 hrs), Surface and Site Restoration, Drum Handling and Demobilization (3 hrs).

Round Trip Travel for two days to site for MAGS Testing (6 hrs), Perform Onsite H&S and Scoping meetings (1 hr), Assist with Collection of 8 MAGS Soil Boring Location Samples, for the collection of 48 soil samples at depths of 6", 2', 4, 6', 8' and 10' (6 hrs), Assistance with Installation and Construction of 8 MAGS Testing Wells (4 hrs), Assistance with Installation of 4 Vapor Monitoring Point Locations (2 hrs), Assitance with Installation of Interior Monitoring Well, including Coring (3 hrs), Surface and Site Restoration, Drum Handling and Demobilization (3 hrs).

Round Trip Travel to Site (3 hrs), Perform MAGS Tests at 8 locations and collection of 8 Vapor Samples (10 hrs), Surface and Site Restoration (2 hrs), MAGS Analytical Data and Graph Reviews for Reporting to FDEP (2 hrs)

Research and Prepare Site Access Agreement for Adjacent Properties including to the east (Domino's) and to the south (Marion County) (4 hrs), Site Work Notifications, Submit Sunshine One Markout Requests (2 hrs), Summarize MAGS and MAGS Soil Data for Preliminary Reporting to FDEP (3 hrs).

Onsite Meeting with Property Owner and Property Manager to determine how to Access Traffic Areas and for Assessment (4 hrs) and Utility White-lines for Markouts including travel (4 hrs).

2-Meeting & MAGS Page 3 of 6 HW689 DC019B est (Forest Cleaners) Revised

SUBTASK:

DATE: June 28, 2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer

Engineer/Scientist 5 G. Roberts

Engineer/Scientist 4 J. Cheze

Engineer/Scientist 2 K. Howard

Engineer/Scientist 2 K. McDonald

Engineer/Scientist 2 D. McConnaughe

Designer 2 S. Ferianc Technical Publications Special H. Vining

TOTAL LABOR 133

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 3 $360.00 Van or Truck $480.00 Week 1 $480.00

TOTAL VEHICLE $840.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE TOTALS

Ambient Technology DPT Drilling $12,450.00 Lump 1 $12,450.00

TOTAL $12,450.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00 EPA Method 8260 (Full List) Soil $150.00 60 0 $9,000.00 EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $55.00 0 0 Contingency $0.00 EPA Method 8260 (VOHs) Leachate $73.00 0 0 Contingency $0.00 EPA Method 8260 (Full List) DPT Groundwater $150.00 27 0 $4,050.00 EPA Method 8260 (Full List) Well/Piezometers $150.00 3 0 $450.00 EPA Method 8260 (Full List) IDW $150.00 0 0 $0.00 EPA Method 6010 (As, Cd, Cr and Pb) IDW $52.00 0 0 $0.00 EPA Method 1311 TCLP Extraction (Zero Headspace Method/VOCs)-Solid $55.00 0 0 $0.00 EPA Method 1311 TCLP Extraction (Bottle Extraction for Metals)-Solid $45.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $13,500.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 7 $280.00 Soil Sampling Kit (concrete) $235.00 Day 2 $470.00 Monitor Well Installation Kit $325.00 Day 5 $1,625.00 Total Survey Station $50.00 Day 1 $50.00 Shallow GW Sampling Kit $290.00 Day 1 $290.00 Encore Sampler $16.00 each 60 $960.00 55 Gallon Drums $100.00 each 0 $0.00

TOTAL EQUIPMENT $3,675.00

Finalize Proposed DPT Locations (1 hr), Finalize Proposed Piezometer Locations (1 hr).

Contacting Property Owner, Business Manager and Offsite Property Owners of Proposed Sampling Schedule and Confirming Access (2 hrs), Compilation of Field Soil Analytical Data, Preparation of Soil Summary Maps for FDEP (3 hrs), Preparation and Review of Cross Section from DPT Core for Recommendations of Proposed GW Sampling Depths with FDEP (3 hrs), Calculation of Well and Watertable Elevations for Flow Direction, Preparation of Groundwater Flow Map for FDEP (2 hrs), Conference with FDEP for Final Proposed DPT Locations (1 hr), Conference with FDEP for Final Proposed Well Locations (2 hrs).

3-Soil and Groundwater Field Activities

Soil and Groundwater Samples by VOCs by EPA Method 8260 (Full List)

Collect Remaining Soil Samples at 10 locations including Travel, Coring, Collection of Soil Samples (16 hrs), Site Restoration, Drum Labeling (2 hrs), Soil Sample Packaging, Chain of Custody and Sample Delivery to Laboratory (2 hrs), Groundwater Sampling and Survey Piezometers with Travel

Remaining Soil Sampling Field Event Preparation and Mobilization (2 hrs), Travel to site (3 hrs), Collect Remaining Soil Samples at 10 locations including, Coring, Collection of 60 Soil Samples (16 hrs), DPT Drilling Field Event Preparation and Mobilization (2 hrs), Travel to Site (3 hrs), Installation of two DPT Macrocores to 60 ft bls and installation of 3 Piezometers, DPT Groundwater Sampling at 9 locations (50 hrs), Survey Piezometers (1 hr), Daily DPT and Piezometer Groundwater Chain of Custody preparation, Sample Packaging and Sample Delivery (3 hrs), Preparation of Soil Boring and Well Construction Logs (4 hrs), Preparation of Summary Tables and Figures of Groundwater Sampling Results for Preliminary Reporting to FDEP (6 hrs).

3-Soil & GW Sampling Page 4 of 6 HW689 DC019B est (Forest Cleaners) Revised

SUBTASK:

DATE: June 28, 2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer 2

Engineer/Scientist 5 G. Roberts

Engineer/Scientist 4 J. Cheze

Engineer/Scientist 2 K. Howard

Engineer/Scientist 2 K. McDonald

Engineer/Scientist 2 D. McConnaughey

Designer 2 S. Ferianc Technical Publications Specialis H. Vining

TOTAL LABOR 49

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 3 $360.00 Van or Truck $480.00 Week 0 $0.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE TOTALS

Ambient Technology Well Installations $3,880.00 LS 1 $3,880.00 Erwin Remediation IDW T&D $125.00 LS 8 $1,000.00

TOTAL $4,880.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00 EPA Method 8260 (Full List) Soil $150.00 0 0 $0.00 EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $55.00 0 0 Contingency $0.00 EPA Method 8260 (VOHs) Leachate $73.00 0 0 Contingency $0.00 EPA Method 8260 (Full List) Wells $150.00 8 0 $1,200.00 EPA Method 8260 (Full List) IDW $150.00 2 0 $300.00 EPA Method 6010 (As, Cd, Cr and Pb) IDW $52.00 2 0 $104.00 EPA 1311 TCLP Extraction (Zero Headspace Method/VOCs)-Soil IDW $55.00 1 0 $55.00 EPA 1311 TCLP Extraction (Bottle Extraction/Metals)-Soil IDW $45.00 1 0 $45.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $1,704.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 2 $80.00 Soil Sampling Kit (concrete) $235.00 Day 0 $0.00 Monitor Well Installation Kit $325.00 Day 1 $325.00 Total Survey Station $50.00 Day 1 $50.00 Shallow GW Sampling Kit $290.00 Day 2 $580.00 Encore Sampler $16.00 each 0 $0.00 55 Gallon Drums $100.00 each 1 $100.00

TOTAL EQUIPMENT $1,135.00

Groundwater Samples by VOCs by EPA Method 8260 (Full List)

4-Final Well Installations

Installation of final well network of 3 shallow/1 deep, including travel (14 hrs). Collection of Final Groundwater Samples (8 wells) with travel and Survey Wells (9 hrs), Deliver final samples to laboratory (2 hrs), Preparation of Well Construction Logs (2 hrs).

Collection of Final Groundwater Samples and IDW Samples, with Travel, Survey Wells, Site Restoration, Collect IDW Samples, Drum Handling (12 hrs), Chain of Custody Completion, Packaging and Delivery of FDEP PFAS Samples to Shipper (2 hrs)

Prepare Recommendations for Final Well Locations (2 hrs) Property Owner and Property Manager Site Work Notifications (1 hr), Prepare Proposed Location Maps and Recommendations (3 hrs), Characterization and Waste Profile for Transportation and Disposal of IDW Drums (2 hours).

4-Final Well Installations Page 5 of 6 HW689 DC019B est (Forest Cleaners) Revised

SITE :

SUBTASK:

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer

Engineer/Scientist 5 G. Roberts

Engineer/Scientist 4 J. Cheze

Engineer/Scientist 2 K. Howard

Engineer/Scientist 2 K. McDonald

Engineer/Scientist 2 D. McConnaug Designer 2 S. Ferianc 8

Technical Publications Specia H. Vining

TOTAL LABOR 97

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST TOTALS

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method 8270 (PAHs) Soil $110.00 0 0 $0.00 EPA Method 8290 (Dioxins&Furans) Soil $950.00 0 0 $0.00 EPA Method 6010 (Total Arsenic) Soil $13.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00 Global Positioning System (Handheld G $175.00 Day 0 $0.00 55-gallon Drum $100.00 each 0 $0.00

TOTAL EQUIPMENT $0.00

Vapor Data Tabulation (3 hrs), Step Test and Radius of Influence calculations and graphs (3 hrs)

General Report Drafting

Report Document Production, Formating Tables and Text, Compilation into Adobe Format for Submittal

Compilation of Logs and Prepartion of SAR Cross Sections, Preparation of Physiography, Regional Geology and Regional Hydrogeology Sections, Preparation of Conceptual Model based on Findings, Preparation of Laboratory QA/QC Summary and Data Recommendations, Preparation of Site Assessment Conclusions, Recommendations for Additional Soil and Groundwater Assessment (24 hrs).

Forest Cleaners

Preparation of MAGS Assessment Findings text (2 hrs), Revise and Provide Edits to Site Assessment Report (5 hrs), Preparation of Deliverable Email and Submittal of Report (1 hr)

Preparation of SAR text including, Operational History, Previous Investigations, Site Specific Soil and Groundwater Site Characterization, Preparation of Tables, Preparation of Draft Soil, Groundwater Flow and Analytical Summary Figures, Cross Sections, Preparation of Assessment Findings (lithologic borings, soil borings, DPT Sampling, Piezometer and Monitoring Well Installations, Groundwater Sampling).

5-Reporting 6/28/2023

ATTACHMENT B

PROPOSED SOW

DOCUMENTS

725 U.S. HIGHWAY 301 SOUTH

TAMPA, FLORIDA 33619

(813) 612-3600 office

(813) 626-1663 fax

INFRASTRUCTURE, LLC

APTIM ENVIRONMENTAL &

SITE LOCATION MAP

LOCATION

SITE

AutoCAD SHX Text

%%UREFERENCE:%%U

AutoCAD SHX Text

7.5 MINUTE U.S.G.S. TOPOGRAPHIC

AutoCAD SHX Text

QUADRANGLE MAP, LYNNE, FLORIDA,

AutoCAD SHX Text

DATED 2015.

AutoCAD SHX Text

PROJECT NO.:

AutoCAD SHX Text

CLIENT:

AutoCAD SHX Text

LOCATION:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

PM:

AutoCAD SHX Text

GHR

AutoCAD SHX Text

JAW

AutoCAD SHX Text

SDJF

AutoCAD SHX Text 631030250

AutoCAD SHX Text

FIGURE:

AutoCAD SHX Text

FOREST CLEANERS

AutoCAD SHX Text

FLORIDA DEPARTMENT OF

AutoCAD SHX Text

ENVIRONMENTAL PROTECTION

AutoCAD SHX Text

OFFICE:

AutoCAD SHX Text

TAMPA

AutoCAD SHX Text

DATE:

AutoCAD SHX Text 0250A1

AutoCAD SHX Text

ACAD FILE:

AutoCAD SHX Text 2-27-23

AutoCAD SHX Text

15912 E. HIGHWAY 40

AutoCAD SHX Text

SILVER SPRINGS, MARION COUNTY, FLORIDA

AutoCAD SHX Text FORMER FDEP FACILITY ID No. 429500885

AutoCAD SHX Text FDEP FACILITY ID No. ERIC_4907

FOREST CENTER

TAMPA, FLORIDA 33619

(813) 612-3600 office

(813) 626-1663 fax

INFRASTRUCTURE, LLC

APTIM ENVIRONMENTAL &

SITE PLAN

AutoCAD SHX Text

%%ULEGEND:

AutoCAD SHX Text

APPROXIMATE PROPERTY

AutoCAD SHX Text

BOUNDARY

AutoCAD SHX Text

FOREST CLEANERS

AutoCAD SHX Text

(15912 E. HIGHWAY 40)

AutoCAD SHX Text

WINN DIXIE

AutoCAD SHX Text

AutoCAD SHX Text

(15912 E. HIGHWAY 40)

AutoCAD SHX Text

PROJECT NO.:

AutoCAD SHX Text

CLIENT:

AutoCAD SHX Text

LOCATION:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

PM:

AutoCAD SHX Text

GHR

AutoCAD SHX Text

JAW

AutoCAD SHX Text

SDJF

AutoCAD SHX Text 631030250

AutoCAD SHX Text

FIGURE:

AutoCAD SHX Text

FOREST CLEANERS

AutoCAD SHX Text

FLORIDA DEPARTMENT OF

AutoCAD SHX Text

ENVIRONMENTAL PROTECTION

AutoCAD SHX Text

OFFICE:

AutoCAD SHX Text

TAMPA

AutoCAD SHX Text

DATE:

AutoCAD SHX Text 0250B1

AutoCAD SHX Text

ACAD FILE:

AutoCAD SHX Text 2-27-23

AutoCAD SHX Text

15912 E. HIGHWAY 40

AutoCAD SHX Text

SILVER SPRINGS, MARION COUNTY, FLORIDA

AutoCAD SHX Text FORMER FDEP FACILITY ID No. 429500885

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DOLLAR TREE

AutoCAD SHX Text

(15928 E. HIGHWAY 40)

AutoCAD SHX Text

OPTIMAL CLINIC

AutoCAD SHX Text

(15924 E. HIGHWAY 40)

AutoCAD SHX Text

REGIONS BANK

AutoCAD SHX Text

(451 S. HIGHWAY 314A)

AutoCAD SHX Text

DOMINO'S PIZZA

AutoCAD SHX Text

(15990 E. HIGHWAY 40)

AutoCAD SHX Text

MARION COUNTY SHERIFF DEPT

AutoCAD SHX Text

(16000 E. HIGHWAY 40)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MARION COUNTY FIRE-RESCUE

AutoCAD SHX Text

(16004 E. HIGHWAY 40)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FAMILY DOLLAR

AutoCAD SHX Text

(15965 E. HIGHWAY 40)

AutoCAD SHX Text

AutoCAD SHX Text

BIG PINES HARDWARE & SUPPLY

AutoCAD SHX Text

(15997 E. HIGHWAY 40)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ADVANCE AUTO PARTS

AutoCAD SHX Text

(16045 E. HIGHWAY 40)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE (FEET)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MARION COUNTY TAX COLLECTOR

AutoCAD SHX Text

(15956 E. HIGHWAY 40)

AutoCAD SHX Text

AutoCAD SHX Text

WINN DIXIE WINE & SPIRITS

AutoCAD SHX Text

(15916 E. HIGHWAY 40)

AutoCAD SHX Text

AutoCAD SHX Text

VACANT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CHINA KING

AutoCAD SHX Text

(15924 E. HIGHWAY 40)

AutoCAD SHX Text

AutoCAD SHX Text

NON-TRANSIENT/NON-COMMUNITY

AutoCAD SHX Text

WATER WELL (AAG9438)

AutoCAD SHX Text

NON-TRANSIENT/NON-COMMUNITY

AutoCAD SHX Text

WATER WELL (AAG9439)

(813) 612-3600 office

(813) 626-1663 fax

APTIM ENVIRONMENTAL & INFRASTRUCTURE, LLC

FOREST CLEANERS

FACILITY SITE PLAN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE (FEET)

AutoCAD SHX Text

DSCP APPLICATION SOIL

AutoCAD SHX Text

SAMPLE LOCATION (5 FT BLS),

AutoCAD SHX Text PCE 10 ug/kg.

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

BOILER

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

DRYCLEANING

AutoCAD SHX Text MACHINE and

AutoCAD SHX Text

PAN LOCATION

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

CUSTOMER

AutoCAD SHX Text

AREA

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

VENT

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

DRIVE-THRU

AutoCAD SHX Text

WINDOW

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

SINK

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

ABOVEGROUND

AutoCAD SHX Text

DIESEL TANK

AutoCAD SHX Text

(~300 GALLONS)

AutoCAD SHX Text

WINDOW

AutoCAD SHX Text

SANITARY SEWER MANHOLE

AutoCAD SHX Text

SANITARY SEWER CLEANOUT

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text

WALL MOUNTED POWER POLE

AutoCAD SHX Text

ROOF DOWNSPOUT

AutoCAD SHX Text

BOLLARD

AutoCAD SHX Text

OVERHEAD POWER LINE

AutoCAD SHX Text

OHP

AutoCAD SHX Text

%%ULEGEND:

AutoCAD SHX Text

APPROXIMATE PROPERTY

AutoCAD SHX Text

BOUNDARY

AutoCAD SHX Text

FENCE

AutoCAD SHX Text x x x x

AutoCAD SHX Text x x x x x x x

AutoCAD SHX Text x x x x x

AutoCAD SHX Text x x x x x

AutoCAD SHX Text

BUILDING

AutoCAD SHX Text

US WATER SERVICES

AutoCAD SHX Text

CORPORATION TANK

AutoCAD SHX Text

DUMPSTER

AutoCAD SHX Text

(60 FT FROM SITE)

AutoCAD SHX Text

OHP

AutoCAD SHX Text

PROJECT NO.:

AutoCAD SHX Text

CLIENT:

AutoCAD SHX Text

LOCATION:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

PM:

AutoCAD SHX Text

GHR

AutoCAD SHX Text

JAW

AutoCAD SHX Text

SDJF

AutoCAD SHX Text 631030250

AutoCAD SHX Text

FIGURE:

AutoCAD SHX Text

FOREST CLEANERS

AutoCAD SHX Text

FLORIDA DEPARTMENT OF

AutoCAD SHX Text

ENVIRONMENTAL PROTECTION

AutoCAD SHX Text

OFFICE:

AutoCAD SHX Text

TAMPA

AutoCAD SHX Text

DATE:

AutoCAD SHX Text 0250B2

AutoCAD SHX Text

ACAD FILE:

AutoCAD SHX Text 2-27-23

AutoCAD SHX Text

15912 E. HIGHWAY 40

AutoCAD SHX Text

SILVER SPRINGS, MARION COUNTY, FLORIDA

AutoCAD SHX Text FDEP FACILITY ID No. ERIC_4907

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

FAN

FORMER FDEP FACILITY ID No. 429500885

(813) 612-3600 office

(813) 626-1663 fax

APTIM ENVIRONMENTAL & INFRASTRUCTURE, LLC

PROPOSED LITHOLOGIC BORING

and PIEZOMETER LOCATION MAP

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE (FEET)

AutoCAD SHX Text

DSCP APPLICATION SOIL

AutoCAD SHX Text

SAMPLE LOCATION (5 FT BLS),

AutoCAD SHX Text PCE 10 ug/kg.

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

BOILER

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

DRYCLEANING

AutoCAD SHX Text MACHINE and

AutoCAD SHX Text

PAN LOCATION

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

CUSTOMER

AutoCAD SHX Text

AREA

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

VENT

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

DRIVE-THRU

AutoCAD SHX Text

WINDOW

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

SINK

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

ABOVEGROUND

AutoCAD SHX Text

DIESEL TANK

AutoCAD SHX Text

(~300 GALLONS)

AutoCAD SHX Text

WINDOW

AutoCAD SHX Text

SANITARY SEWER MANHOLE

AutoCAD SHX Text

SANITARY SEWER CLEANOUT

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text

WALL MOUNTED POWER POLE

AutoCAD SHX Text

ROOF DOWNSPOUT

AutoCAD SHX Text

BOLLARD

AutoCAD SHX Text

OVERHEAD POWER LINE

AutoCAD SHX Text

OHP

AutoCAD SHX Text

%%ULEGEND:

AutoCAD SHX Text

APPROXIMATE PROPERTY

AutoCAD SHX Text

BOUNDARY

AutoCAD SHX Text

FENCE

AutoCAD SHX Text x x x x

AutoCAD SHX Text x x x x x x x

AutoCAD SHX Text x x x x x

AutoCAD SHX Text x x x x x

AutoCAD SHX Text

BUILDING

AutoCAD SHX Text

US WATER SERVICES

AutoCAD SHX Text

CORPORATION TANK

AutoCAD SHX Text

DUMPSTER

AutoCAD SHX Text

(60 FT FROM SITE)

AutoCAD SHX Text

OHP

AutoCAD SHX Text

PROJECT NO.:

AutoCAD SHX Text

CLIENT:

AutoCAD SHX Text

LOCATION:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

PM:

AutoCAD SHX Text

GHR

AutoCAD SHX Text

JAW

AutoCAD SHX Text

SDJF

AutoCAD SHX Text 631030250

AutoCAD SHX Text

FIGURE:

AutoCAD SHX Text

FOREST CLEANERS

AutoCAD SHX Text

FLORIDA DEPARTMENT OF

AutoCAD SHX Text

ENVIRONMENTAL PROTECTION

AutoCAD SHX Text

OFFICE:

AutoCAD SHX Text

TAMPA

AutoCAD SHX Text

DATE:

AutoCAD SHX Text 0250B3

AutoCAD SHX Text

ACAD FILE:

AutoCAD SHX Text 2-27-23

AutoCAD SHX Text

15912 E. HIGHWAY 40

AutoCAD SHX Text

SILVER SPRINGS, MARION COUNTY, FLORIDA

AutoCAD SHX Text FDEP FACILITY ID No. ERIC_4907

AutoCAD SHX Text

PROPOSED DPT LITHOLOGY

AutoCAD SHX Text

PROPOSED SHALLOW

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

FAN

AutoCAD SHX Text FORMER FDEP FACILITY ID No. 429500885

AutoCAD SHX Text

CORE LOCATION

PIEZOMETER LOCATION

(813) 612-3600 office

(813) 626-1663 fax

APTIM ENVIRONMENTAL & INFRASTRUCTURE, LLC

PROPOSED MODIFIED ACTIVE GAS

SAMPLE LOCATION MAP

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE (FEET)

AutoCAD SHX Text

DSCP APPLICATION SOIL

AutoCAD SHX Text

SAMPLE LOCATION (5 FT BLS),

AutoCAD SHX Text PCE 10 ug/kg.

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

BOILER

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

DRYCLEANING

AutoCAD SHX Text MACHINE and

AutoCAD SHX Text

PAN LOCATION

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

CUSTOMER

AutoCAD SHX Text

AREA

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

VENT

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

DRIVE-THRU

AutoCAD SHX Text

WINDOW

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

SINK

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

ABOVEGROUND

AutoCAD SHX Text

DIESEL TANK

AutoCAD SHX Text

(~300 GALLONS)

AutoCAD SHX Text

WINDOW

AutoCAD SHX Text

SANITARY SEWER MANHOLE

AutoCAD SHX Text

SANITARY SEWER CLEANOUT

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text

WALL MOUNTED POWER POLE

AutoCAD SHX Text

ROOF DOWNSPOUT

AutoCAD SHX Text

BOLLARD

AutoCAD SHX Text

OVERHEAD POWER LINE

AutoCAD SHX Text

OHP

AutoCAD SHX Text

%%ULEGEND:

AutoCAD SHX Text

APPROXIMATE PROPERTY

AutoCAD SHX Text

BOUNDARY

AutoCAD SHX Text

FENCE

AutoCAD SHX Text x x x x

AutoCAD SHX Text x x x x x x x

AutoCAD SHX Text x x x x x

AutoCAD SHX Text x x x x x

AutoCAD SHX Text

BUILDING

AutoCAD SHX Text

US WATER SERVICES

AutoCAD SHX Text

CORPORATION TANK

AutoCAD SHX Text

DUMPSTER

AutoCAD SHX Text

(60 FT FROM SITE)

AutoCAD SHX Text

OHP

AutoCAD SHX Text

PROJECT NO.:

AutoCAD SHX Text

CLIENT:

AutoCAD SHX Text

LOCATION:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

PM:

AutoCAD SHX Text

GHR

AutoCAD SHX Text

JAW

AutoCAD SHX Text

SDJF

AutoCAD SHX Text 631030250

AutoCAD SHX Text

FIGURE:

AutoCAD SHX Text

FOREST CLEANERS

AutoCAD SHX Text

FLORIDA DEPARTMENT OF

AutoCAD SHX Text

ENVIRONMENTAL PROTECTION

AutoCAD SHX Text

OFFICE:

AutoCAD SHX Text

TAMPA

AutoCAD SHX Text

DATE:

AutoCAD SHX Text 0250B4

AutoCAD SHX Text

ACAD FILE:

AutoCAD SHX Text 2-27-23

AutoCAD SHX Text

15912 E. HIGHWAY 40

AutoCAD SHX Text

SILVER SPRINGS, MARION COUNTY, FLORIDA

AutoCAD SHX Text FDEP FACILITY ID No. ERIC_4907

AutoCAD SHX Text

PROPOSED MODIFIED ACTIVE GAS

AutoCAD SHX Text

SAMPLE (MAGS) LOCATION

AutoCAD SHX Text

PROPOSED VAPOR MONITORING

AutoCAD SHX Text

POINT LOCATION

AutoCAD SHX Text

RADIUS OF INFLUENCE (10')

AutoCAD SHX Text

MONITORING WELL LOCATION

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

FAN

(813) 612-3600 office

(813) 626-1663 fax

APTIM ENVIRONMENTAL & INFRASTRUCTURE, LLC

PROPOSED SOIL BORING

LOCATION MAP

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE (FEET)

AutoCAD SHX Text

DSCP APPLICATION SOIL

AutoCAD SHX Text

SAMPLE LOCATION (5 FT BLS),

AutoCAD SHX Text PCE 10 ug/kg.

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

BOILER

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

DRYCLEANING

AutoCAD SHX Text MACHINE and

AutoCAD SHX Text

PAN LOCATION

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

CUSTOMER

AutoCAD SHX Text

AREA

AutoCAD SHX Text

VENT

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

DRIVE-THRU

AutoCAD SHX Text

WINDOW

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

SINK

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

ABOVEGROUND

AutoCAD SHX Text

DIESEL TANK

AutoCAD SHX Text

(~300 GALLONS)

AutoCAD SHX Text

WINDOW

AutoCAD SHX Text

SANITARY SEWER MANHOLE

AutoCAD SHX Text

SANITARY SEWER CLEANOUT

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text

WALL MOUNTED POWER POLE

AutoCAD SHX Text

ROOF DOWNSPOUT

AutoCAD SHX Text

BOLLARD

AutoCAD SHX Text

OVERHEAD POWER LINE

AutoCAD SHX Text

OHP

AutoCAD SHX Text

%%ULEGEND:

AutoCAD SHX Text

APPROXIMATE PROPERTY

AutoCAD SHX Text

BOUNDARY

AutoCAD SHX Text

FENCE

AutoCAD SHX Text x x x x

AutoCAD SHX Text x x x x x x x

AutoCAD SHX Text x x x x x

AutoCAD SHX Text x x x x x

AutoCAD SHX Text

BUILDING

AutoCAD SHX Text

US WATER SERVICES

AutoCAD SHX Text

CORPORATION TANK

AutoCAD SHX Text

DUMPSTER

AutoCAD SHX Text

(60 FT FROM SITE)

AutoCAD SHX Text

OHP

AutoCAD SHX Text

PROJECT NO.:

AutoCAD SHX Text

CLIENT:

AutoCAD SHX Text

LOCATION:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

PM:

AutoCAD SHX Text

GHR

AutoCAD SHX Text

JAW

AutoCAD SHX Text

SDJF

AutoCAD SHX Text 631030250

AutoCAD SHX Text

FIGURE:

AutoCAD SHX Text

FOREST CLEANERS

AutoCAD SHX Text

FLORIDA DEPARTMENT OF

AutoCAD SHX Text

ENVIRONMENTAL PROTECTION

AutoCAD SHX Text

OFFICE:

AutoCAD SHX Text

TAMPA

AutoCAD SHX Text

DATE:

AutoCAD SHX Text 0250B5

AutoCAD SHX Text

ACAD FILE:

AutoCAD SHX Text 2-27-23

AutoCAD SHX Text

15912 E. HIGHWAY 40

AutoCAD SHX Text

SILVER SPRINGS, MARION COUNTY, FLORIDA

AutoCAD SHX Text FDEP FACILITY ID No. ERIC_4907

AutoCAD SHX Text

PROPOSED SOIL BORING LOCATION

AutoCAD SHX Text

PROPOSED MODIFIED ACTIVE GAS

AutoCAD SHX Text

SAMPLE (MAGS)/SOIL BORING

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

FAN

AutoCAD SHX Text

FORMER

AutoCAD SHX Text FORMER FDEP FACILITY ID No. 429500885

LOCATION

(813) 612-3600 office

(813) 626-1663 fax

APTIM ENVIRONMENTAL & INFRASTRUCTURE, LLC

PROPOSED DPT PUSH GROUNDWATER

SAMPLE LOCATION MAP

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE (FEET)

AutoCAD SHX Text

DSCP APPLICATION SOIL

AutoCAD SHX Text

SAMPLE LOCATION (5 FT BLS),

AutoCAD SHX Text PCE 10 ug/kg.

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

BOILER

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

DRYCLEANING

AutoCAD SHX Text MACHINE and

AutoCAD SHX Text

PAN LOCATION

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

CUSTOMER

AutoCAD SHX Text

AREA

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

VENT

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

DRIVE-THRU

AutoCAD SHX Text

WINDOW

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

SINK

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

ABOVEGROUND

AutoCAD SHX Text

DIESEL TANK

AutoCAD SHX Text

(~300 GALLONS)

AutoCAD SHX Text

WINDOW

AutoCAD SHX Text

SANITARY SEWER MANHOLE

AutoCAD SHX Text

SANITARY SEWER CLEANOUT

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text

WALL MOUNTED POWER POLE

AutoCAD SHX Text

ROOF DOWNSPOUT

AutoCAD SHX Text

BOLLARD

AutoCAD SHX Text

OVERHEAD POWER LINE

AutoCAD SHX Text

OHP

AutoCAD SHX Text

%%ULEGEND:

AutoCAD SHX Text

APPROXIMATE PROPERTY

AutoCAD SHX Text

BOUNDARY

AutoCAD SHX Text

FENCE

AutoCAD SHX Text x x x x

AutoCAD SHX Text x x x x x x x

AutoCAD SHX Text x x x x x

AutoCAD SHX Text x x x x x

AutoCAD SHX Text

BUILDING

AutoCAD SHX Text

US WATER SERVICES

AutoCAD SHX Text

CORPORATION TANK

AutoCAD SHX Text

DUMPSTER

AutoCAD SHX Text

(60 FT FROM SITE)

AutoCAD SHX Text

OHP

AutoCAD SHX Text

PROJECT NO.:

AutoCAD SHX Text

CLIENT:

AutoCAD SHX Text

LOCATION:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

PM:

AutoCAD SHX Text

GHR

AutoCAD SHX Text

JAW

AutoCAD SHX Text

SDJF

AutoCAD SHX Text 631030250

AutoCAD SHX Text

FIGURE:

AutoCAD SHX Text

FOREST CLEANERS

AutoCAD SHX Text

FLORIDA DEPARTMENT OF

AutoCAD SHX Text

ENVIRONMENTAL PROTECTION

AutoCAD SHX Text

OFFICE:

AutoCAD SHX Text

TAMPA

AutoCAD SHX Text

DATE:

AutoCAD SHX Text 0250B6

AutoCAD SHX Text

ACAD FILE:

AutoCAD SHX Text 2-27-23

AutoCAD SHX Text

15912 E. HIGHWAY 40

AutoCAD SHX Text

SILVER SPRINGS, MARION COUNTY, FLORIDA

AutoCAD SHX Text FDEP FACILITY ID No. ERIC_4907

AutoCAD SHX Text

PROPOSED DIRECT PUSH

AutoCAD SHX Text

GROUNDWATER SAMPLE LOCATION

AutoCAD SHX Text

FORMER

AutoCAD SHX Text

FAN

ATTACHMENT C

BID SUMMARIES

Item Description Days Estimated Total Days Estimated Total Days Estimated Total Services (Mobilization 1) 5 Lump $12,450.00 4 Lump $13,400.00 Services (Mobilization 2) 1 Lump $3,880.00 1.5 Lump $7,940.00 Estimated Total Drums

Totals

Item Description Units Unit Price Total

Amount Units Unit Price Total

Amount Units Unit Price Total

Amount Pickup/Transporation Included in Drum Disposal Cost Included in Drum Disposal Cost Included in Drum Disposal Cost Disposal (soil) 4 $277.20 $1,108.80 4 $120.00 $480.00 4 $125.00 $500.00 Disposal (liquid) 4 $294.80 $1,179.20 4 $120.00 $480.00 4 $125.00 $500.00 Additional 1 $307.00 $307.00 1 $96.00 $96.00

Totals $2,595.00 $1,056.00 $1,000.00 Estimated 8 Total Drums

Vendor Bid Site Lines $800.00

GPRS $1,300.00

$750.00

Vendor Bid Hole Products $1,352.53 Atlantic Supply $1,327.31 Drillers Service Inc. No Response

Vendor Bid $8,940.00

Safety-Kleen EnviroServe IDW Disposal

$16,330.00 $21,340.00 6 Total Drums 15 Total Drums

June 1, 2023

Preferred Drilling Solutions

SurvTech Solutions, Inc.

Bid Summaries Forest Cleaners (Former)

15912 East Highway 40 Silver Springs, Marion County, Florida 34488

FDEP Site No. ERIC_4907 (Former FAC ID #429500885)

Well Supplies

Professional Survey

Groundwater Protection Ambient Technology

Erwin Remediation

None

GeoTek

No Bid Received

DPT Drilling

GPR Survey

Roberts, Gregg

From: Roberts, Gregg Sent: Friday, May 26, 2023 5:09 PM To: Todd Hodgson; Jim Hinst Cc: Kramer, Eric Subject: DPT Drilling Request for Quotation - Forest Cleaners, Silver Springs, FL Attachments: Forest DPT Drilling RFQ 0523.pdf

Hello Todd and Jim:

Please see the attached request for drilling quotation for the Forest Cleaners Assessment in Silver Springs.

Please call should you have any questions, and have a good weekend.

Gregg

GREGG ROBERTS, PG

Project Manager

APTIM | ENVIRONMENT & SUSTAINABILITY

O 813 612 3687 M 863 670 0215 E gregg.roberts@aptim.com

725 US Highway 301 South Tampa, FL 33619

APTIM.com

Request for Quotation (RFQ) FDEP Hazardous Waste Cleanup Section (HWCS)

DPT Cores, DPT GW Sampling and Well Installations

RE: Forest Cleaners (Former) 15912 East Highway 40 Silver Springs, Marion County, Florida 34488 ERIC_4907 (Former FAC ID No. 429500885)

Vendors:

SECTION 1

You are hereby invited to submit a quotation in accordance with the instructions and items below in support of Aptim Environmental & Infrastructure, Inc. (APTIM), www.aptim.com.

Please submit your complete proposal, prepared as specified herein, to APTIM by close of business 5/31/23. Proposal submission before or on the required date by e-mail is acceptable.

SECTION 2

YOUR PROPOSAL SHOULD INCLUDE THE FOLLOWING: The omission of any of the following may deem your response as non-responsive. Note, for regular bidders only provide the following red highlighted, if the information has not been submitted within the last month.

A. Submit your proposal on the Attached Lump Sum DPT Drilling Quote Form. You may include additional backup as required.

B. Schedule of values (individual hourly rates) C. Your proposal is valid for 120 days.

D. Provide Insurance Certificate, show evidence that your Workman’s Comp insurance is valid in

Florida (if not on file with APTIM).

E. Provide Experience Modification Rate (EMR) certified by your carrier for Workmen’s Comp (if not on file with APTIM).

F. Please identify any restrictions on your ability to meet the period of performance.

SECTION 3

REQUIREMENT AND SCHEDULE:

Technical issues will be addressed by the Project Manager, Gregg Roberts at 813-612-3687 or gregg.roberts@aptim.com.

General

1. Drilling locations have the potential for exposure to chlorinated solvents. Assume Level D PPE, with APTIM conducting health and safety monitoring.

2. Sunshine Utility mark outs must be requested and performed prior to the work being performed.

In addition, the drilling contractor will also hand auger each location to a depth of 10 feet or to refusal (but not less than 5 ft bls) below the surface to check for utilities.

3. Property access arrangements will be made by APTIM. However, the drilling contractor is responsible for any necessary State or Local drilling permits, including Water Management District requirements.

4. The drycleaning facility was located within the Forest Center Shopping Plaza in the last space on the east side of the single story business strip. Working areas will be extremely restricted due to the site parking limitations, brush, landscaping, and an active delivery alleyway. Water and electricity may not be available during the work. APTIM will have more information regarding access to water and power before the work begins.

5. Drillers are to provide and utilize safety vests and cones in pedestrian, active parking and vehicle traffic areas. Some of the work will be performed within an alley easement, and possibly on adjacent properties.

6. Drilling equipment must be properly decontaminated between locations in accordance with FDEP 2017 DEP-SOP-001/01 Standard Operating Procedures for Field Activities procedures.

7. Driller to provide NEW 55-gallon drums for all IDW containment (decon fluids, soil, and groundwater purge water). At the end of the project, all drums are to be consolidated to one location, likely to be located at the southeast corner of the property.

18. Approximate start and completion date of the project is August 2023.

Specific:

The site location:

The former Forest Cleaners was located at the east end of the Forest Center Shopping Plaza in Silver Springs at 15912 East Highway 40 in Marion County, Florida. The space is currently vacant.

The former Forest Cleaners facility appears to have operated within the space from December 1992 to 2011, approximately 19 years.

The property was originally developed in 1986.

The former Forest Cleaners was accepted into the Drycleaning Solvent Cleanup Program in 1998 under FDEP Facility Identification Number 429500885 (now listed as ERIC_4907). The work is being performed for the FDEP Waste Cleanup Section.

Scope-of-Work: For bidding purposes, please consider the following scope of work for the site:

1. Advance two (2) Lithologic Cores:

a. Installation of two (2) continuous soil cores by direct push to 60 ft bls (or first refusal). The Macro cores will be installed to identify the depth to groundwater and log the lithology at the boring location. Upon completion of the lithologic core, the borehole must be properly abandoned by tremie-grouting the hole under pressure from the bottom to the surface. The approximate proposed location of the DPT lithologic core is shown on the attached figure.

2. Installation of three (3) Shallow Piezometers:

a. Utilize 3 1/4 inch OD or equivalent rods

b. 1-inch diameter, schedule 40, PVC well riser and 0.006” slotted screen installed to a total depth of 15 feet bls (or shallower, dependent on the depth to groundwater).

c. 10 feet Pre-Pak Well Screen with a 30/65 grade sand pack.

d. Flush-threaded PVC bottom caps and well riser piping.

e. Allow for borehole collapse to top of screen at 5 feet bls, then place silica sand seal (30/65 grade or equivalent) to 4 ft bls.

f. Grout borehole to within 0.5 feet bls

g. At surface, flush, 8-inch diameter steel bolt-down manhole set in high strength 2ft x 2ft concrete, pad with water-tight expandable plug well seal.

h. Please utilize a wood frame for the construction of the manhole pad, if not within concrete or asphalt.

i. The piezometers will require development by rigorously over-pumping and surging.

j. Consolidate IDW to an area on south side of the Property at a designated area for future characterization, removal and disposal.

k. The proposed locations for the three (3) Piezometers are shown on the attached figures.

3. Outdoor DPT Groundwater Sampling (Exterior):

a. Nine (9) outdoor DPT groundwater locations are proposed within the parking areas and offsite surrounding the former cleaners. Three (3) screen point groundwater samples will be collected from each location at approximately 15, 25, and 35 ft bls for the collection of a groundwater samples.

b. All bores, including DPT groundwater locations will be properly abandoned by tremie-grouting the hole under pressure from the bottom up.

c. Please include all equipment and supplies, pumps, tubing, foot valves, connectors and miscellaneous materials necessary for the collection of the groundwater samples. Sample containers will be provided by the laboratory.

d. The proposed locations for the DPT groundwater sampling are shown in the attached figures.

4. Additional Monitoring Well Installations (Separate Mobilization):

a. Note that the installation of wells will be performed separately from the DPT groundwater sampling, therefore, the Driller should include a separate mobilization for the well installations.

b. After conferring with the FDEP, the quote should include the installation of three (3) additional shallow wells and one (1) deep monitoring well.

c. The shallow wells will be installed similar to the piezometers, utilizing a direct push drilling rig.

The shallow wells will also be similarly constructed of 1-inch diameter PVC with 10 feet of fine mesh pre-pack 0.006-inch slotted screen with a 30/65 sand pack and installed to a 15 ft total depth or shallower, dependent on the depth to groundwater encountered at the site. The wells will also be flush mounted within 8-inch diameter steel bolt-down manholes.

d. The deep well will also be installed by direct push to an estimated total depth of 35 ft bls. The well will be constructed of 1-inch diameter PVC with 5 feet of fine mesh pre-pack 0.006-inch slotted screen with a 30/65 sand pack installed from 30 to 35 ft bls. A two to three foot fine silica sand seal will be installed above the screen and the remaining annulus will be tremie grouted to just below the surface. The deep well will also be flush mounted within 8-inch diameter steel bolt-down manholes.

e. The location of the final wells has not determined at this time.

Please call Gregg Roberts at (863) 670-0215 should you have any questions.

Provide the following:

1. All bidders please include the make and model of the rig intended to perform this scope-of-work.

2. Note that the actual construction and depth of the shallow wells will be dependent on the depth to shallow groundwater determined in the field.

3. Also note that all IDW will need to be consolidated to a designated area for future characterization, removal, and disposal.

3. All bidders please include an estimated number of drums in their bid.

4. All bidders please include an estimated time required to complete the scope at the site.

5. Please provide an all-inclusive price quote by close of business Wednesday, May 31, 2023, if possible.

SECTION 4

This request for proposal does not constitute a commitment on the part of APTIM, Offeror's proposal shall in no way be binding upon APTIM unless and until it is accepted in writing. APTIM reserves the right to reject any and/or all proposals received, and to negotiate separately with any offeror if such action is considered to be in the best interest of APTIM. APTIM shall not be liable to Offeror for any costs incurred by Offeror in the submission of its proposal in reply hereto. Offerors are cautioned to initially submit their most favorable proposal price and other factors considered.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .