Task Assignment Change Order Summary
This document represents a Task Assignment Change Order (TACO #1) between the State of Florida Department of Environmental Protection (FDEP) and APTIM Environmental & Infrastructure, LLC (Contractor). The change order amends the original Task Assignment DC003C under Contract HW689, executed on December 21, 2021. The project site is the former One Stop Cleaners facility located at 3303 University Drive, Coral Springs, Broward County, Florida (ERIC_4123). Department Project Manager Nicole Knutson and Contractor Project Manager Eric Kramer serve as the primary contacts for this engagement.
The change order reconciles Work Change Directive #1, which authorized APTIM to install rotometer flow meters at the existing vapor extraction wells to improve vapor flow measurement accuracy. The total task amount increased from $49,200.52 to $51,985.02, representing an increase of $2,784.49. Compensation consists of a fixed unit rate of $48,385.02 and cost reimbursement of $3,600.00. The task completion date remains July 26, 2025, with final deliverables due May 23, 2025. Services include quarterly operations and maintenance reports, semi-annual and annual groundwater sampling reports, utility cost reimbursement at $300 per month with a $20 monthly handling fee, and analytical laboratory costs. Invoice schedules are structured upon FDEP approval of deliverables, with amounts ranging from $6,374.62 to $24,745.34 per invoice milestone. APTIM's time, labor, and subcontractor costs have been reviewed and determined appropriate for the scope of services.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
DC003C 1 HW689
Nicole Knutson 850-245-8763 Contractor APTIM Environmental & Infrastructure, LLC Contractor
Contractor Eric Kramer Contractor 407-287-3216
ERIC_4123
One Stop Cleaners
✔ $ 48,385.02 $ 45,600.52 ✔ $ 3,600.00 $ 3,600.00
$ 51,985.02 $ 49,200.52 ✔ Completion
Completion 07/26/2025 07/26/2025 0
✔ 1 1 1
Contractor
Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2025.06.18 17:05:34 -04'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2025.06.18 13:06:40 -04'00'
This Change Order reconciles WCD #1, which authorized APTIM to repair the remedial system.
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW689
DC003C
$ 51,985.02
Q1 O&M Report - Subtask 2
Q2 O&M Report and Semi-Annual O&M Report - Subtasks 3 & 4
Q1 & Q2 Utilities - Subtask 5
Q3 O&M Report - Subtask 6
Q4 O&M Report, Annual O&M Report, and PM - Subtasks 7, 9, & 1
Q3 & Q4 Utilities - Subtask 8
Upon DEP Approval of Q1 O&M Report - Subtask 2
Upon Receipt of Q1 & Q2 Utilities - Subtask 5 Cost reimbursement - $300/month Handling fee - $20/month
Upon DEP Approval of Q3 O&M Report - Subtask 6
Upon Receipt of Q3 & Q4 Utilities - Subtask 8 Cost reimbursement - $300/month Handling fee - $20/month
Upon DEP Approval of Q4 O&M Report, Annual O&M Report, and PM - Subtasks 7, 9, & 1
Upon DEP Approval of Q2 O&M Report and Semi-Annual O&M Report - Subtasks 3 & 4
07/15/2024
11/15/2024
11/15/2024
01/17/2025
05/23/2025
05/23/2025
$ 10,321.44
$ 6,374.62
$ 2,249.00
$ 6,374.62
$ 24,745.34
$ 1,920.00
FFLORIDAA DEPARTMENTT OF
EEnvironmentall Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ronn DeSantis Governor
Alexiss A.. Lambert
Secretary
Memorandum
TO: ERIC_4123
One Stop Cleaners
FROM: Nicole Knutson, Project Manager
SUBJECT: Negotiation Summary
HW689 DC003C-1
DATE: June 12, 2025
This Change Order reconciles WCD #1, which authorized APTIM to repair the remedial system.
Engineering staff travelled to the site to install a rotometer flow meter at each of the existing vapor extraction wells.
Total task amount has increased from $49,200.52 to $51,985.02. This is an increase of $2,784.50.
APTIM’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate.
The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date remains May 23, 2025. Task completion date remains July 26, 2025.
FD
EP
C
OS
T
ES
TI
MA
TE
C on tra ct or
A pt im
E nv iro nm en ta l & In fra st ru ct ur e, L
LC
D at e:
6/
/2
Ta sk
H W
- D C
3C
T A
C O
Su bT as k
Pr oj ec t M an ag em en t
Su bT as k
Q tr
O ct
-D ec
S ite
O ne
S to p C le an er s
E R
IC
_4
Su bT as k
Q tr
O &M
A pr
-J un e
Su bT as k
Q tr
Ja n- M ar
A ct iv ity
/P ha se
O
M a nd A nn ua l G W
S am pl in g Su bT as k
Q tr
Ju l-S ep t 2
Su bT as k
U til iti es
Q tr
P ro je ct M an ag er
N ik ki K nu ts on /E ric K ra m er Su bT as k
Se m i-A nn ua l R ep or t Su bT as k
An nu al R ep or t Su bT as k
U til ite s
Q ua rte rs
Su bT as k
TTo ta ls
La bo r
R at e C at eg or y
$7 1.
Pr oj ec t M an ag er
E.
K ra m er
.4 $7
1.
En gi ne er
/S ci en tis t 5 E.
K ra m er
$6 6.
En gi ne er /S ci en tis t 5
G . R ob er ts
$3
6.
En gi ne er
/S ci en tis t 2 K.
M cD on al d
$2 7.
En gi ne er in g Te ch ni ci an
J.
B el l
$3 4.
D es ig ne r 2
S.
F er ia nc
$2
9.
Te ch ni ca l P ub lic at io ns
S pe ci al is t 3
H . V in in g
$0
.0
T To ta l H ou rs
D ire ct L ab or
$1
3, 4.
$1 ,5
.8
$1
,6
.1
$1 ,6
.1
$1
,5
.4
$0 .0
$1
,6
.1
$3 ,0
.6
$0
.0
$2 ,6
.6
$0
.0
O ve rh ea d
.5 8%
$1 1, 7.
$1
,3
.2
$1 ,4
.3
$1
,4
.3
$1 ,2
.0
$0
.0
$1 ,4
.3
$2
,6
.3
$0 .0
$2
,2
.5
$0 .0
G en
A dm in
.3 8%
$2 ,6
.5
$3
.3
$3
.2
$3
.2
$2
.5
$0
.0
$3
.2
$5
.0
$0 .0
$5
.9
$0
.0
Fr in ge
.9 6%
$4 ,4
.6
$5
.8
$5
.8
$5
.8
$4
.0
$0
.0
$5
.8
$9
.5
$0 .0
$8
.7
$0
.0
To ta l L
$3 2, 9.
$3
,7
.2
$3 ,8
.5
$3
,8
.5
$3 ,5
.0
$0
.0
$3 ,8
.5
$7
,2
.5
$0 .0
$6
,3
.8
$0 .0
Tr av el V eh ic le R en ta l $1
,8
.0
$3
.0
$3
.0
$0 .0
$0
.0
$3
.0
$7
.0
$0 .0
$0
.0
$0 .0
M ile ag e C os ts
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
A ir
Fa re
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P er d ie m
H ot el $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l T ra ve l $1
,8
.0
$3
.0
$3
.0
$0 .0
$0
.0
$3
.0
$7
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
(E qu ip m en t P ro cu re m en t)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P ro cu re m en t F ee
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l S ub co nt ra ct or C os t
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (S er vi ce s
P ro cu re m ril lin g
(C on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
D ril lin g (N on -c on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ob ile L ab or at or y $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ur ve yi ng
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
ID
W
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$1
.0
$0
.0
$0 .0
$0
.0
U til iti es
$3 ,9
.0
$0
.0
$0 .0
$0
.0
$2 ,1
.0
$0
.0
$0 .0
$1
,8
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$4 ,0
.0
$0
.0
$0 .0
$0
.0
$2 ,1
.0
$0
.0
$1
.0
$1 ,8
.0
$0
.0
$0 .0
H an dl in g
Fe e
$2
.7
$0 .0
$0
.0
$0 .0
$1
.0
$0
.0
$1 8.
$1
.0
$0
.0
$0 .0
Pa ge
Pa ge
C
OS
T
ES
TI
MA
TE
C on tra ct or
A pt im
E nv iro nm en ta l & In fra st ru ct ur e, /2
H W
- D C
3C
T A
C O
Su bT as k
Pr oj ec t M an ag em en t
Su bT as k
Q tr
O ct
-D ec
S ite
O ne
S to p C le an er s
E R
IC
_4
Su bT as k
Q tr
O &M
A pr
-J un e
Su bT as k
Q tr
Ja n- M ar
A ct iv ity
/P ha se
O
M a nd A nn ua l G W
S am pl in g Su bT as k
Q tr
Ju l-S ep t 2
Su bT as k
U til iti es
Q tr
P ro je ct M an ag er
N ik ki K nu ts on /E ric K ra m er Su bT as k
Se m i-A nn ua l R ep or t Su bT as k
An nu al R ep or t Su bT as k
U til ite s
Q ua rte rs
Su bT as k
TTo ta ls
To ta l S ub co nt ra ct or
C os t $ $4
,3
.7
$0 .0
$0
.0
$0 .0
$2
,2
.0
$0 .0
$2
.7
$1
,9
.0
$0 .0
$0
.0
L La bo ra to ry
A na ly tic al C os ts
$1 ,5
.0
$2
.0
$2
.0
$0
.0
$0 .0
$2
.0
$9
.0
$0
.0
$0 .0
$0
.0
Fa st
T ur na ro un d
C ha rg es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S am pl e
S hi pp in g $5
.0
$1
.0
$1
.0
$0
.0
$0 .0
$1
.0
$2
.0
$0
.0
$0 .0
$0
.0
To ta l L ab or at or y
$ $2 ,0
.0
$3
.0
$3
.0
$0
.0
$0 .0
$3
.0
$1
,1
.0
$0 .0
$0
.0
$0 .0
Fi el d
E xp en se s
P so na l P ro te ct io n
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E xp en da bl es
$6
.0
$1
.0
$1
.0
$0 .0
$0
.0
$1
.0
$2
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( D ril lin g re la te
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( A na ly tic al re la te d)
$6 ,6
.0
$1
,3
.0
$1 ,3
.0
$0
.0
$0 .0
$1
,3
.0
$2 ,7
.0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
ID
W re la te d)
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$1
.0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
O th er
$4
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$4
.0
$0
.0
$0 .0
$0
.0
To ta l F ie ld E xp en se s
$7 ,8
.0
$1
,4
.0
$1 ,4
.0
$0
.0
$0 .0
$1
,4
.0
$3 ,5
.0
$0
.0
$0 .0
$0
.0
S ub to ta l $4
8, 9.
$3 ,7
.2
$5
,9
.5
$5 ,9
.5
$3
,5
.0
$2 ,2
.0
$5
,9
.5
$1 2, 4.
$1
,9
.0
$6 ,3
.8
$0
.0
C om pl et io n
Fe e
$3 ,2
.9
$3
.7
$3
.0
$3
.0
$3
.8
$0
.0
$3
.0
$7
.8
$0 .0
$6
.3
$0
.0
To ta l E st im at ed C os t
$5 1, 5.
$4
,1
.0
$6 ,3
.6
$6
,3
.6
$3 ,9
.8
$2
,2
.0
$6 ,3
.6
$1
3, 4.
$1 ,9
.0
$6
,9
.2
$0 .0
C os t f ro m P rio r C
E F:
$4 9, 0.
M an ua l E nt ry C os t f ro m
D el ta C
E F;
$2 ,7
.4
M an ua l E nt ry C os t (
P rio r + D el ta
$5
1, 5.
Au to
-C al cu la te d
R ou nd in g E rr or
$0
.0
Au to
-C al cu la te d
Fi na l T ot al C os t:
$5 1, 5.
Au to -C al cu la te d
Pa ge
Pa
SITE :
SUBTASK:
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 6
Engineer/Scientist 5 G. Roberts
Engineer/Scientist 1 K. McDonald 12
Engineering Technician 2 J. Bell 28
Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining
TOTAL LABOR 46
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 3 $360.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
$0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method TO-15 (VOC Soil Vapor) $200.00 1 0 $200.00 EPA Method 8260 (Halos Only) $73.00 0 0 $0.00 EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00 Sample Shipping (Small cooler) $110.00 1 $110.00 Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $310.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 3 $120.00 Construction/O&M Kit $360.00 Day 3 $1,080.00 Construction O&M Supplies $75.00 Day 3 $225.00
TOTAL EQUIPMENT $1,425.00
One Stop Cleaners
Qtr 1 O&M Apr-June 2024 4/15/2024
Engineering evaluation of monthly data, direct staff engineer for system adjustments (3 hrs.). Submital of Quarterly reports of monthly O&M data collection sheets. (3 hrs.)
Daily telemetry checks to verify the SVE system is operating as scheduled (3 hrs per month x 3 months = 9 hrs). SVE performance evaluation and system optimization (3 hrs).
Monthly Base Work - {Mob (1 hr), Travel Round Trip (2 hrs), SVE O&M (5 hrs) {total = 8 hrs x 3 mo = 24 hrs}. Additional work (each quarter) includes SVE Vacuum Readings and collection of VOC Vapor Sample (total 4 hrs).
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 6
Engineer/Scientist 5 G. Roberts
Engineer/Scientist 1 K. McDonald 12
Engineering Technician 2 J. Bell 28
Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining
TOTAL LABOR 46
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 3 $360.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
$0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method TO-15 (VOC Soil Vapor) $200.00 1 0 $200.00 EPA Method 8260 (Halos Only) $73.00 0 0 $0.00 EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00 Sample Shipping (Small cooler) $110.00 1 $110.00 Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $310.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 3 $120.00 Construction/O&M Kit $360.00 Day 3 $1,080.00 Construction O&M Supplies $75.00 Day 3 $225.00
TOTAL EQUIPMENT $1,425.00
One Stop Cleaners
Qtr 2 Jul-Sept 2024 4/15/2024
Engineering evaluation of monthly data, direct staff engineer for system adjustments (3 hrs.). Submital of Quarterly reports of monthly O&M data collection sheets. (3 hrs.)
Daily telemetry checks to verify the SVE system is operating as scheduled (3 hrs per month x 3 months = 9 hrs). SVE performance evaluation and system optimization (3 hrs).
Monthly Base Work - {Mob (1 hr), Travel Round Trip (2 hrs), SVE O&M (5 hrs) {total = 8 hrs x 3 mo = 24 hrs}. Additional work (each quarter) includes SVE Vacuum Readings and collection of VOC Vapor Sample (total 4 hrs).
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 4
Engineer/Scientist 5 G. Roberts 2
Engineer/Scientist 1 K. McDonald 25
Engineering Technician 2 J. Bell Designer 2 S. Ferianc 3 Technical Pub Specialist 3 H. Vining 3
TOTAL LABOR 37
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
$0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00 EPA Method 8260 (Halos Only) $73.00 0 0 $0.00 EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 0 $0.00 Construction/O&M Kit $360.00 Day 0 $0.00 Construction O&M Supplies $75.00 Day 0 $0.00
TOTAL EQUIPMENT $0.00
One Stop Cleaners
Semi-Annual Report 4/15/2024
Engineering evaluation of monthly data for first six months system operation, PE seal of Semi-Annual O&M report, evaluate data, develop recommendations and conclusions (4 hrs.)
Data quality evaluation and report documentation
Semi-Annual O&M Report (Document Production)
Preparation of Semi-Annual O&M Report includes preparation of SVE operational tables, calculations, figures, O&M site visit summary, SVE system operation & performance.
Semi-Annual O&M Report (Drafting)
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer Engineer/Scientist 5 G. Roberts Engineer/Scientist 1 K. McDonald Engineering Technician 2 J. Bell Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
FPL-Electrical Service April to September $300.00 Month 6 $1,800.00 Handling fee Electrical $20.00 Month 6 $120.00 EOS annula telemetry telemetry $309.00 each 1 $309.00 Handling fee telemetry telemetry $20.00 each 1 $20.00
TOTAL $2,249.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00 EPA Method 8260 (Halos Only) $73.00 0 0 $0.00 EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 0 $0.00 Construction/O&M Kit $360.00 Day 0 $0.00 Construction O&M Supplies $75.00 Day 0 $0.00
TOTAL EQUIPMENT $0.00
Utilites Quarters 1 & 2
One Stop Cleaners
4/15/2024
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 6
Engineer/Scientist 5 G. Roberts
Engineer/Scientist 2 K. McDonald 12
Engineering Technician 2 J. Bell 28
Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining
TOTAL LABOR 46
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 3 $360.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method TO-15 (VOC Soil Vapor) $200.00 1 0 $200.00 EPA Method 8260 (Halos Only) $73.00 0 0 $0.00 EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00 Sample Shipping (Small cooler) $110.00 1 $110.00 Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $310.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 3 $120.00 Construction/O&M Kit $360.00 Day 3 $1,080.00 Construction O&M Supplies $75.00 Day 3 $225.00
TOTAL EQUIPMENT $1,425.00
One Stop Cleaners
Qtr 3 Oct-Dec 2024 4/15/2024
Engineering evaluation of monthly data, direct staff engineer for system adjustments (3 hrs.).
Submittal of quarterly O&M data collections sheets (3 hrs.).
Daily telemetry checks to verify the SVE system is operating as scheduled (3 hrs per month x 3 months = 9 hrs). SVE performance evaluation and system optimization (3 hrs).
Monthly Base Work - {Mob (1 hr), Travel Round Trip (2 hrs), SVE O&M (5 hrs) {total = 8 hrs x 3 mo = 24 hrs}. Additional work (each quarter) includes SVE Vacuum Readings and collection of VOC Vapor Sample (Total 4 hrs).
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 8
Engineer/Scientist 5 G. Roberts
Engineer/Scientist 2 K. McDonald 27
Engineering Technician 2 J. Bell 55
Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining
TOTAL LABOR 90
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 6 $720.00
TOTAL VEHICLE $720.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
EnviroServe Non-Haz Soil/Water T&D $187.00 Drum 1 $187.00
TOTAL $187.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method TO-15 (VOC Soil Vapor) $200.00 1 0 $200.00 EPA Method 8260 (Halos Only) $73.00 9 0 $657.00 EPA Method 8260 (Halos Only/IDW) $73.00 1 $73.00 Sample Shipping (Small cooler) $110.00 2 $220.00 Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $1,150.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 6 $240.00 Construction/O&M Kit $360.00 Day 6 $2,160.00 Construction O&M Supplies $75.00 Day 6 $450.00 Shallow GW Sampling Kit $290.00 Day 2 $580.00 Drum $100.00 Each 1 $100.00
TOTAL EQUIPMENT $3,530.00
One Stop Cleaners
Qtr 4 Jan-Mar 2025 6/10/2025
Engineering evaluation of monthly data, direct staff engineer for system adjustments (3 hrs.).
Submittal of quarterly O&M data collections sheets (3 hrs.) Engineering evaluation of flow meter installation (2 hrs.)
Proposed groundwater samples: multi-sampling well MS003 (from 11’, 23’, 38’, 50’ bls); from monitoring wells MW007, MW012, MW016, MW028, MW030. Water level gauging in 29 monitor wells. Quarterly VOC Vapor Samples by TO-15 Modified.
Daily telemetry checks to verify the SVE system is operating as scheduled (3 hrs per month x3 months = 9 hrs). SVE performance evaluation and system optimization (6 hrs). Travel to site and return (8 hrs.), Install new direct read flow meters (4 hrs.)
Monthly Base Work - {Mob (1 hr), Travel Round Trip (2 hrs), SVE O&M (5 hrs) {total = 8 hrs x 3 mo = 24 hrs}. Additional work (each quarter) includes SVE Vacuum Readings and collection of VOC Vapor Sample (Total 4 hrs). Groundwater Sampling: Travel Preparation and Mobilization (1 hr), Round trip Travel (2 hrs). Locate and collect water levels and total depth measurements from 29 monitor wells (4 hrs). Preparation and Testing/Calibration of GW Sampling Field Equipment (1 hr/day- 2 total). Annual groundwater sampling from MS003 (from 11’, 23’, 38’, 50’ bls) and MW007, MW012, MW016, MW028, MW030 at 1 hr per sample (9 hrs), Purge Water Handling (1 hr), Sample Preparation, Chain of custody preparation, Sample Packaging, Delivery to Laboratory (1 hr). Site Restoration and Cleanup (1 hr). Travel to site and return (2 hrs.), Assist install of direct read flow meters (4 hrs.)
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer Engineer/Scientist 5 G. Roberts Engineer/Scientist 1 K. McDonald Engineering Technician 2 J. Bell Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
FPL-Electrical Service March to August $300.00 Month 6 $1,800.00 Handling fee Electrical $20.00 Month 6 $120.00
TOTAL $1,920.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 0 $0.00 Construction/O&M Kit $360.00 Day 0 $0.00 Construction O&M Supplies $75.00 Day 0 $0.00
TOTAL EQUIPMENT $0.00
One Stop Cleaners
Utilities Qtr 3 & 4 4/15/2024
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 4
Engineer/Scientist 5 G. Roberts
Engineer/Scientist 2 K. McDonald 24
Designer 2 S. Ferianc 3 Technical Pub Specialist 3 H. Vining 3
TOTAL LABOR 54
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
One Stop Cleaners
Annual Report 4/15/2024
Engineering evaluation of monthly data, PE seal of Annual O&M report, evaluate data, develop recommendations and conclusions (4 hrs.)
Assimilate field notes and laboratory report. Prepare GW Elevation and GW Analytical Data figures (4 hrs), Prepare Groundwater Related Data Summary Text (16 hrs).
Annual Groundwater and O&M Report (Document Production)
Preparation of Annual O&M Report (24 hrs which includes preparation of SVE operational tables, calculations, figures, O&M site visit summary, SVE system operation & performance)
Annual Groundwater and O&M Reporting (Drafting)
C
OS
T
ES
TI
MA
TE
C on tra ct or
Ap tim E nv iro nm en ta l &
In fra st ru ct ur e, /2
H W
- D C
3C
T
AC
O
Su bT as k
Pr oj ec t M an ag em en t Su bT as k
Q tr
O ct -D ec
Si te
O ne S to p
C le an er s
ER
IC
_4
Su bT as k
Q tr
O &M
A pr
-J un e
Su bT as k
Q tr
Ja n- M ar
Ac tiv ity /P ha se
O
&M a nd A nn ua l G W
S am pl in g Su bT as k
Q tr
Ju l-S ep t 2
Su bT as k
U til iti es
Q tr
Pr oj ec t M an ag er
N ik ki
K nu ts on
/E ric
K ra m er
Su bT as k
Se m i-A nn ua l R ep or t
Su bT as k
An nu al
R ep or t
Su bT as k
U til ite s Q ua rte rs
Su bT as k
TTo ta ls
La bo r
R at e C at eg or y
$7 1.
Pr oj ec t M an ra m er
1.
$7
1.
En gi ne er
/S ci en tis t 5 E.
K ra m er
$6 6.
En gi ne er /S ci en tis t 5
G . R ob er ts
$3
6.
En gi ne er
/S ci en tis t 2 K.
M cD on al d
$2
7.
En gi ne er in g
Te ch ni ci an
J.
B el l
$3 4.
D es ig ne r 2
S.
F er ia nc
$2
9.
Te ch ni ca l P ub lic at io ns
S pe ci al is t 3
H . V in in g
$0
.0
T To ta l H ou rs
D ire ct L
$8
.1
$9
6.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$7
.4
$0
.0
$0 .0
$0
.0
O ve rh ea d
.5 8%
$7
.9
$8 2.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$6
.2
$0 .0
$0
.0
$0 .0
G en
A dm in
.3 8%
$1
.8
$1 8.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$1
.0
$0 .0
$0
.0
$0 .0
Fr in ge
.9
6% $2
.5
$3
0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$2
.6
$0
.0
$0 .0
$0
.0
To ta l L
,9
.4
$2
.9
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$1 ,7
.4
$0
.0
$0 .0
$0
.0
Tr av el V eh ic le R en ta l $1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$1
.0
$0 .0
$0
.0
$0 .0
M ile ag e C os ts
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
A ir
Fa re
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P er d ie m
H ot el $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l T ra ve l $1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$1
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
(E qu ip m en t P ro cu re m
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P ro cu re m en t F ee
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l S ub co nt ra ct or C os t
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (S er vi ce s
P ro cu re m lin g
(C on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
D ril lin g (N on -c on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ob ile L ab or at or y $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ur ve yi ng
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
ID
W
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til iti es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
H an dl in g Fe e $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Pa
C
OS
T
ES
TI
MA
TE
C on tra ct or
Ap tim E nv iro nm en ta l &
In fra st ru ct ur e, /2
H W
- D C
3C
T
AC
O
Su bT as k
Pr oj ec t M an ag em en t Su bT as k
Q tr
O ct -D ec
Si te
O ne S to p
C le an er s
ER
IC
_4
Su bT as k
Q tr
O &M
A pr
-J un e
Su bT as k
Q tr
Ja n- M ar
Ac tiv ity /P ha se
O
&M a nd A nn ua l G W
S am pl in g Su bT as k
Q tr
Ju l-S ep t 2
Su bT as k
U til iti es
Q tr
Pr oj ec t M an ag er
N ik ki
K nu ts on
/E ric
K ra m er
Su bT as k
Se m i-A nn ua l R ep or t
Su bT as k
An nu al
R ep or t
Su bT as k
U til ite s Q ua rte rs
Su bT as k
TTo ta ls
To ta l S ub co nt ra ct or
C os t $ $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
L La bo ra ly tic al
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fa st T ur na ro un d C ha rg es $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S am pl e S hi pp in g
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l L ab or at or y
$ $0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fi el d E xp en so na l P ro te ct io n $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E xp en da bl es $4
0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$4
0.
$0 .0
$0
.0
$0 .0
E qu ip m en t ( D ril lin g re la te
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( A na ly tic al re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
ID
W re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
O th er
$4
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$4
.0
$0
.0
$0 .0
$0
.0
To ta l F ie ld E xp en se s
$4
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$4
.0
$0
.0
$0 .0
$0
.0
S ub to ta l $2
,5
.4
$2
.9
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$2
,3
.4
$0 .0
$0
.0
$0 .0
C om pl et io n Fe e $1
.0
$2
2.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$1
.1
$0
.0
$0 .0
$0
.0
To ta l E st im at ed C os t
$2 ,7
.4
$2
.8
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$2 ,5
.6
$0
.0
$0 .0
$0
.0
Pa
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 2 Engineer/Scientist 5 G. Roberts Engineer/Scientist 1 K. McDonald 12 Engineering Technician 2 J. Bell 6 Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining
TOTAL LABOR 20
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
FPL-Electrical Service March to August $300.00 Month 0 $0.00 Handling fee Electrical $20.00 Month 0 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 1 $40.00 Construction/O&M Kit $360.00 Day 1 $360.00 Construction O&M Supplies $75.00 Day 1 $75.00
TOTAL EQUIPMENT $475.00
One Stop Cleaners
Qtr 4 Jan-Mar 2025 6/10/2025
Engineering evaluation of flow meter installation (2 hrs.)
Travel to site and return (2 hrs.), Assist install of direct read flow meters (4 hrs.)
Travel to site and return (8 hrs.), Install new direct read flow meters (4 hrs.)
C
OS
T
ES
TI
MA
TE
C on tra ct or
Ap tim E nv iro nm en ta l &
In fra st ru ct ur e, 4/
/2
H W
- D C
3C
Su bT as k
Pr oj ec t M an ag em en t
Su bT as k
Q tr
O ct
-D ec
Si te
O ne
S to p C le an er s
ER
IC
_4
Su bT as k
Q tr
O
&M A pr -J un e
Su bT as k
Q tr
Ja n-
M ar
Ac tiv ity
/P ha se
O &M a nd
A nn ua l G
W S am pl in g
Su bT as k
Q tr
Ju l-S ep t 2
Su bT as k
U til iti es Q tr
Pr oj ec t M an ag er
N ik ki K nu ts on /E ric K ra m er Su bT as k
Se m i-A nn ua l R ep or t Su bT as k
An nu al R ep or t Su bT as k
U til ite s
Q ua rte rs
Su bT as k
TTo ta ls
La bo r
R at e C at eg or y
$7 1.
Pr oj ec t M an ra m er
.0 $7
1.
En gi ne er
/S ci en tis t 5 E.
K ra m er
En gi ne er
/S ci en tis t 5 D
. R od ge rs
$6 6.
En gi ne er /S ci en tis t 5
G . R ob er ts
$3
6.
En gi ne er
/S ci en tis t 2 K.
M cD on al d
$2 7.
En gi ne er in g Te ch ni ci an
J.
B el l
$3 4.
D es ig ne r 2
S.
F er ia nc
$2
9.
Te ch ni ca l P ub lic at io ns
S pe ci al is t 3
H . V in in g
$0
.0
T To ta l H ou rs
D ire ct L
2, 4.
$1 ,4
.2
$1
,6
.1
$1 ,6
.1
$1
,5
.4
$0 .0
$1
,6
.1
$2 ,3
.1
$0
.0
$2 ,6
.6
$0
.0
O ve rh ea d
.5 8%
$1 1, 8.
$1
,2
.4
$1 ,4
.3
$1
,4
.3
$1 ,2
.0
$0
.0
$1 ,4
.3
$2
,0
.1
$0 .0
$2
,2
.5
$0 .0
G en
A dm in
.3 8%
$2 ,5
.7
$2
.6
$3
.2
$3
.2
$2
.5
$0
.0
$3
.2
$4
.9
$0 .0
$5
.9
$0
.0
Fr in ge
.9 6%
$4 ,1
.1
$4
.9
$5
.8
$5
.8
$4
.0
$0
.0
$5
.8
$7
.9
$0 .0
$8
.7
$0
.0
To ta l L
$3 0, 8.
$3
,5
.2
$3 ,8
.5
$3
,8
.5
$3 ,5
.0
$0
.0
$3 ,8
.5
$5
,5
.1
$0 .0
$6
,3
.8
$0 .0
Tr av el V eh ic le R en ta l $1
,6
.0
$3
.0
$3
.0
$0 .0
$0
.0
$3
.0
$6
.0
$0 .0
$0
.0
$0 .0
M ile ag e C os ts
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
A ir
Fa re
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P er d ie m
H ot el $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l T ra ve l $1
,6
.0
$3
.0
$3
.0
$0 .0
$0
.0
$3
.0
$6
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
(E qu ip m en t P ro cu re m
W el l M at er ia ls
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P ro cu re m en t F ee
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l S ub co nt ra ct or C os t
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (S er vi ce s
P ro cu re m lin g
(C on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
D ril lin g (N on -c on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ob ile L ab or at or y $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ur ve yi ng
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
ID
W
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$1
.0
$0
.0
$0 .0
$0
.0
U til iti es
$3 ,9
.0
$0
.0
$0 .0
$0
.0
$2 ,1
.0
$0
.0
$0 .0
$1
,8
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$4 ,0
.0
$0
.0
$0 .0
$0
.0
$2 ,1
.0
$0
.0
$1
.0
$1 ,8
.0
$0
.0
$0 .0
Pa
C
OS
T
ES
TI
MA
TE
C on tra ct or
Ap tim E nv iro nm en ta l &
In fra st ru ct ur e, 4/
/2
H W
- D C
3C
Su bT as k
Pr oj ec t M an ag em en t
Su bT as k
Q tr
O ct
-D ec
Si te
O ne
S to p C le an er s
ER
IC
_4
Su bT as k
Q tr
O
&M A pr -J un e
Su bT as k
Q tr
Ja n-
M ar
Ac tiv ity
/P ha se
O &M a nd
A nn ua l G
W S am pl in g
Su bT as k
Q tr
Ju l-S ep t 2
Su bT as k
U til iti es Q tr
Pr oj ec t M an ag er
N ik ki K nu ts on /E ric K ra m er Su bT as k
Se m i-A nn ua l R ep or t Su bT as k
An nu al R ep or t Su bT as k
U til ite s
Q ua rte rs
Su bT as k
TTo ta ls
H an dl in g
Fe e
$2
.7
$0 .0
$0
.0
$0 .0
$1
.0
$0
.0
$1 8.
$1
.0
$0
.0
$0 .0
To ta l S ub co nt ra ct or
C os t $ $4
,3
.7
$0 .0
$0
.0
$0 .0
$2
,2
.0
$0 .0
$2
.7
$1
,9
.0
$0 .0
$0
.0
La bo ra ly tic al C os ts
$1 ,5
.0
$2
.0
$2
.0
$0
.0
$0 .0
$2
.0
$9
.0
$0
.0
$0 .0
$0
.0
Fa st
T ur na ro un d
C ha rg es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S am pl e
S hi pp in g $5
.0
$1
.0
$1
.0
$0
.0
$0 .0
$1
.0
$2
.0
$0
.0
$0 .0
$0
.0
To ta l L ab or at or y
$2 ,0
.0
$3
.0
$3
.0
$0
.0
$0 .0
$3
.0
$1
,1
.0
$0 .0
$0
.0
$0 .0
Fi el d
E xp en so na l P ro te ct io n
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E xp en da bl es
$5
.0
$1
.0
$1
.0
$0 .0
$0
.0
$1
.0
$2
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( D ril lin g re la te
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( A na ly tic al re la te d)
$6 ,6
.0
$1
,3
.0
$1 ,3
.0
$0
.0
$0 .0
$1
,3
.0
$2 ,7
.0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
ID
W re la te d)
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$1
.0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
O th er
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l F ie ld E xp en se s
$7 ,3
.0
$1
,4
.0
$1 ,4
.0
$0
.0
$0 .0
$1
,4
.0
$3 ,0
.0
$0
.0
$0 .0
$0
.0
S ub to ta l $4
6, 3.
$3 ,5
.2
$5
,9
.5
$5 ,9
.5
$3
,5
.0
$2 ,2
.0
$5
,9
.5
$1 0, 7.
$1
,9
.0
$6 ,3
.8
$0
.0
C om pl et io n
Fe e
$3 ,0
.9
$3
.8
$3
.0
$3
.0
$3
.8
$0
.0
$3
.0
$5
.7
$0 .0
$6
.3
$0
.0
To ta l E st im at ed C os t
$4 9, 0.
$3
,8
.1
$6 ,3
.6
$6
,3
.6
$3 ,9
.8
$2
,2
.0
$6 ,3
.6
$1
1, 1.
$1 ,9
.0
$6
,9
.2
$0 .0
Pa
Proposed Scope of Work O&M Services & Groundwater Monitoring Former One Stop Cleaners
HW689 DC003C TACO #1
3303 University Drive, Coral Springs, Broward County, FL 33065 ERIC_4123 (Former FAC ID No. 069501160) Aptim Environmental & Infrastructure, LLC (APTIM) 6/10/25
The following proposed Task Assignment Change Order (TACO) #1 has been prepared to resolved Work Change Directive (WCD) #1 for Task Assignment (TA) DC003C.
Subtask 2: No changes in scope or funding are proposed for this subtask
Subtask 3: No changes in scope or funding are proposed for this subtask
Subtask 4: No changes in scope or funding are proposed for this subtask
Subtask 5: No changes in scope or funding are proposed for this subtask
Subtask 6: No changes in scope or funding are proposed for this subtask
Subtask 7: WCD#1 was authorized for $2,800.00 to provide engineering support to modify vapor flow measuring by incorporating a rotometer flow meter for each of the two vacuum extraction wells. Work was completed and WCD#1 is resolved for $2,784.49.
Subtask 8: No changes in scope or funding are proposed for this subtask
Subtask 9: No changes in scope or funding are proposed for this subtask
APTIM proposes to perform this scope of work in accordance with the terms and conditions of the contract executed December 21, 2021, between APTIM Environmental & Infrastructure, LLC and Florida Department of Environmental Protection No. HW689.
APTIM will begin the proposed scope of work upon written authorization.
If you have any questions, please contact us for clarification.
Site Name: Site ID #:
Contract #: Contractor:
• Reason for Work Change Directive :
• Description of Work Change Directive :
• Attachments (if applicable, list documents supporting change):
• Costs (if negotiated unit costs, provide information below):
WCP WCD 07-2018
Authorized Contractor Signature:
Authorized FDEP Signature:
WORK CHANGE DIRECTIVE FORM
FDEP Supervisor Approval:
(if applicable)
Additional work is not authorized without prior FDEP approval as indicated by an approved Work Change Directive Form or Task Assignment Change Order Form. It is the Contractor's responsibility to ensure that additional costs associated with this WCD are resolved by a Task Assignment Change Order (TACO) prior to the completion date of the original Task Assignment or subsequent TACOs completed prior to the execution date of this WCD. Failure to do so will result in a loss of reimbursement for work associated with this WCD.
Task Assignment #: Work Change Directive #:
Maximum Estimated Increase in Task Amount:
One Stop Cleaners ERIC_4123
HW689 Aptim Environmental & Infrastructure, Inc.
DC003C WCD #1
Existing method for determining vapor flow is difficult for technician to read accurately. APTIM has two new direct rotometer flow meters available for installation in the remedial system.
Junior engineer will travel to site and meet with local technician to replace existing flow measuring devices with two new direct read flow meters.
None
Labor $1,800, Field Expenses $800, Travel expenses $200. Total Estimated Costs $2,800.00.
$ 1.#R
Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2025.02.18 08:23:21 -05'00'
Nicole Knutson Digitally signed by Nicole Knutson Date: 2025.02.18 09:14:51 -05'00'
Mubeen Darji, P.E.
Digitally signed by Mubeen Darji, P.E.
Date: 2025.02.18 09:20:50 -05'00'
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW689
DC003C July 26, 2025
This TA authorizes APTIM to perform O&M services for 12 months and groundwater sampling at the former One Stop Cleaners site.
Nicole Knutson 850-245-8763
APTIM
Eric Kramer 407-287-3216
ERIC_4123
3303 University Dr E, Coral Springs, Broward County
One Stop Cleaners
$ 45,600.52
$ 3,600.00
$ 49,200.52
Scope of Work
APTIM
Eric Kramer Digitally signed by Eric Kramer Date: 2024.04.26 13:27:28 -04'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2024.04.26 13:15:17 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
File details come from the government source that posted it. Updated .