This document consists of Task Assignment Change Orders (TACO) issued by the State of Florida Department of Environmental Protection (FDEP) amending a contract with APTIM Environmental & Infrastructure, LLC for environmental services at the One Stop Cleaners site (Project Number ERIC_4123, Contract Number HW689). The primary parties involved are FDEP, represented by Project Managers Nicole Knutson and Skylar Schwed, and APTIM, represented by Eric Kramer. The task assignments address groundwater monitoring, operations and maintenance (O&M) activities, and utility cost management at the former contaminated site.

The contract encompasses multiple subtasks including semi-annual and annual O&M reports, project management, and quarterly utility cost reimbursement with a total task value of $42,726.10. Change Order #1, effective February 7, 2023, authorized a cost increase of $4,374.90 for additional groundwater monitoring, adjusting the completion date from May 26, 2023 to June 30, 2023. Change Order #2, effective June 21, 2023, extended the completion date an additional 60 days to August 29, 2023 for invoice processing and report review, with no change to the total cost. Utility reimbursement is structured as cost-plus-fixed-fee arrangements not to exceed $2,100 for quarters 1 and 2, and $1,800 for quarters 3 and 4, with handling fees of $140 and $120 respectively. Invoice milestones are tied to completion of deliverables and FDEP approval of reports.

View the file

Other files

File Type Posted
CN-370000-HW689-BF01B.pdf PDF
CN-370000-HW689-BF01E.pdf PDF
CN-370000-HW689-BF1ECO1.pdf PDF
CN-370000-HW689-BIL01B.pdf PDF
CN-370000-HW689-BIL01C.pdf PDF
CN-370000-HW689-BIL01F.pdf PDF
CN-370000-HW689-BIL1ECO1.pdf PDF
CN-370000-HW689-CSS1ACO1.pdf PDF
CN-370000-HW689-DC001E.pdf PDF
CN-370000-HW689-DC002B.pdf PDF
CN-370000-HW689-DC003C.pdf PDF
CN-370000-HW689-DC009B.pdf PDF
CN-370000-HW689-DC011A.pdf PDF
CN-370000-HW689-DC011C.pdf PDF
CN-370000-HW689-DC015A.pdf PDF
CN-370000-HW689-DC015C.pdf PDF
CN-370000-HW689-DC017A.pdf PDF
CN-370000-HW689-DC018A.pdf PDF
CN-370000-HW689-DC026B.pdf PDF
CN-370000-HW689-DC03A.pdf PDF
CN-370000-HW689-DC03BCO1.pdf PDF
CN-370000-HW689-DC04BCO1.pdf PDF
CN-370000-HW689-DC05CCO2.pdf PDF
CN-370000-HW689-DC08BCO1.pdf PDF
CN-370000-HW689-DC08CCO4.pdf PDF
CN-370000-HW689-DC09CCO1.pdf PDF
CN-370000-HW689-DC11BCO1.pdf PDF
CN-370000-HW689-DC11BCO2.pdf PDF
CN-370000-HW689-DC11CCO1.pdf PDF
CN-370000-HW689-DC12BCO3.pdf PDF
CN-370000-HW689-DC13BCO6.pdf PDF
CN-370000-HW689-DC14ACO1.pdf PDF
CN-370000-HW689-DC15ACO1.pdf PDF
CN-370000-HW689-DC15DCO3.pdf PDF
CN-370000-HW689-DC15DCO4.pdf PDF
CN-370000-HW689-DC15ECO1.pdf PDF
CN-370000-HW689-DC16CCO4.pdf PDF
CN-370000-HW689-DC17BCO2.pdf PDF
CN-370000-HW689-DC17BCO3.pdf PDF
CN-370000-HW689-DC19BCO1.pdf PDF
CN-370000-HW689-DC24BCO1.pdf PDF
CN-370000-HW689-DC28ACO1.pdf PDF
CN-370000-HW689-DC29ACO3.pdf PDF
CN-370000-HW689-DC29ACO4.pdf PDF
CN-370000-HW689-DC32ACO3.pdf PDF
CN-370000-HW689-FIL10.pdf PDF
CN-370000-HW689-FIL11.pdf PDF
CN-370000-HW689-FIL14.pdf PDF
CN-370000-HW689-FIL17.pdf PDF
CN-370000-HW689-FIL18.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. ☐ There are no changes to the TA compensation.

☐ The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO ☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. ☐ There are no changes to the TA Expiration Date.

☐ The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. ☐ There are no changes to the Attachments.

☐ Attachment ___ is replaced with Attachment -____.

7. ☐ No Additional Changes.

☐ Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

DC003A 2 HW689

This Change Order extends the TA completion date for invoice processing, as detailed in the June 21, 2023 time extension request from APTIM.

Nicole Knutson 850-245-8763 Contractor Contractor

Contractor Contractor

Contractor

APTIM Environmental & Infrastructure, LLC Eric Kramer 407-287-3216

ERIC_4123

One Stop Cleaners

$ 0.00 $ 0.00 Completion

Completion✔ 06/30/2023 08/29/2023 60

✔ 1 1 2

Eric Kramer Digitally signed by Eric Kramer Date: 2023.06.22 09:17:19 -04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2023.06.21 15:57:07 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 01_18

Contract Number:

Task Assignment #:

Change Order #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW689

DC003A

$ 42,726.10

Subtask 2: Semi-Annual O&M Report

Subtask 3: Utilities for Quarters 1 & 2

Subtasks 1 & 4: Annual O&M Report; Project Management

Subtask 5: Utilities for Quarters 3 & 4

Upon completion of all semi-annual O&M activities and FDEP approval of Semi-Annual O&M Report: Subtask 2

Upon completion of all annual O&M activities and FDEP approval of Annual O&M Report, and Project Management: Subtasks 1& 4

Upon receipt of Paid Utility Invoices: Subtask 5 Utilities (Cost Plus Fixed Fee): not to exceed $2100.00 Handling Fee: $140.00

Upon receipt of Paid Utility Invoices: Subtask 3 Utilities (Cost Plus Fixed Fee): not to exceed $1,800.00 Handling Fee: $: 120.00

09/16/2022

10/30/2022

05/01/2023

05/01/2023

$ 1,920.00

$ 12,852.25

$ 25,713.85

$ 2,240.00

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO: ERIC_4123

One Stop Cleaners

FROM: Nicole Knutson, Project Manager

SUBJECT: Negotiation Summary

HW689 DC003A

Change Order #2

DATE: June 21, 2023

This Change Order extends the TA completion date for invoice processing, as detailed in the June 21, 2023 time extension request from APTIM.

Total task amount is still $42,726.10. Task completion date has been extended to August 29, 2023.

From: Kramer, Eric To: Knutson, Nicole Cc: Roberts, Gregg; Crain, Kelly Subject: Request for Time Extension for Task Assignments DC003A & HW011A Date: Wednesday, June 21, 2023 9:53:02 AM Attachments: Executed HW689_DC003A-1.pdf

Executed_HW689_DC003A.pdf Executed HW689_HW011A.pdf

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Good morning Nicole, as discussed APTIM requests a time extension for the two referenced task assignments (TA). These TAs are for the One Stop Cleaners (former) site and involve groundwater sampling that was delayed due to the use of the State lab performing some of the analyses and flooding of the site area that restricted site access.

APTIM requests a 60 day extension to allow for report review and invoice processing. If you have any questions please contact Gregg or myself, thank you.

Eric K. Kramer, P.E.

Senior Environmental Engineer

APTIM l Environmental Services

O 407-287-3216 M 352-235-1789 E Eric.kramer@aptim.com

1228 Winter Garden Vineland Road Winter Garden, FL 34787 APTIM.com mailto:Eric.Kramer@aptim.com mailto:Nicole.Knutson@FloridaDEP.gov mailto:Gregg.Roberts@aptim.com mailto:Kelly.Crain@dep.state.fl.us mailto:Eric.kramer@aptim.com

Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. ☐ There are no changes to the TA compensation.

☐ The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO ☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. ☐ There are no changes to the TA Expiration Date.

☐ The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. ☐ There are no changes to the Attachments.

☐ Attachment ___ is replaced with Attachment -____.

7. ☐ No Additional Changes.

☐ Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

WCP TAFORM 01_18

Contract Number:

Task Assignment #:

Change Order #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Printed on recycled paper.

Tallahassee, FL 32399-2400

To: HW689 Contract Negotiation File One Stop Cleaners

ERIC_4123

From: Skylar Schwed, Project Manager Date: February 1, 2023 Subject: Negotiation Summary

HW689 DC003A-1

This Task Assignment Change Order authorizes an increase in cost for requested additional groundwater monitoring in accordance with January 24, 2023, Scope of Work and Cost Estimate.

The cost increase related to this change order is $4,374.92.

The FDEP project manager agrees to the scope of work and final cost associated with this Task Assignment Change Order. The final cost for this Task Assignment Change Order is $42,726.10

APTIM may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Change Order Notification Form.

FDEP COST ESTIMATE

Contractor: Aptim Environmental & Infrastructure, LLC Date: 1/24/2023

Task #: HW689 - DC003A TACO #1 ERIC_4123 SubTask 1 Project Management Site: One Stop Cleaners SubTask 2 O&M March-August 2022

Activity/Phase: O&M and Annual GW Sampling SubTask 3 Utilities Quarters 1 & 2 Project Manager: Skylar Schwed SubTask 4 O&M Sept. 2022 - Feb. 2023

SubTask 5 Utilites Quarters 3 & 4

Totals 1 2 3 4 5 Labor Rate Category

$65.22 Project Manager E. Kramer 18 17.5 $65.22 Engineer/Scientist 5 E. Kramer 19 9 0 10 0 $61.98 Engineer/Scientist 5 G. Roberts 12 0 0 12 0 $34.53 Engineer/Scientist 2 K. Howard 6 0 0 6 0 $29.38 Engineer/Scientist 2 K. McDonald 84 42 0 42 0 $26.24 Engineering Technician 2 J. Bell 142 52 0 90 0 $32.56 Designer 2 S. Ferianc 7 3 0 4 0 $27.64 Technical Publications Specialist 3 H. Vining 6 3 0 3 0

$0.00 0 0 0 0 0 Total Hours 294 18 109 0 167 0

Direct Labor $9,919.00 $1,141.12 $3,366.02 $0.00 $5,411.86 $0.00

Overhead 85.58% $8,488.68 $976.57 $2,880.64 $0.00 $4,631.47 $0.00 Gen & Admin 19.38% $1,922.30 $221.15 $652.33 $0.00 $1,048.82 $0.00 Fringe 31.96% $3,170.11 $364.70 $1,075.78 $0.00 $1,729.63 $0.00 Total Labor $23,500.09 $2,703.54 $7,974.77 $0.00 $12,821.78 $0.00

Travel Vehicle Rental $1,920.00 $720.00 $0.00 $1,200.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $1,920.00 $720.00 $0.00 $1,200.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00

IDW $200.00 $0.00 $0.00 $200.00 $0.00

Utilities $3,900.00 $0.00 $1,800.00 $0.00 $2,100.00 MAGS/Well Construction Materials $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF SHAW Page 1

Subcontractor Subtotal $4,100.00 $0.00 $1,800.00 $200.00 $2,100.00 Handling Fee $280.00 $0.00 $120.00 $20.00 $140.00 Total Subcontractor Cost $4,380.00 $0.00 $1,920.00 $220.00 $2,240.00

Laboratory Analytical Costs $3,246.00 $400.00 $0.00 $2,846.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $110.00 $110.00 $0.00 $0.00 $0.00 Total Laboratory $3,356.00 $510.00 $0.00 $2,846.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $640.00 $240.00 $0.00 $400.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $6,380.00 $2,610.00 $0.00 $3,770.00 $0.00 Equipment (IDW related) $200.00 $0.00 $0.00 $200.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $7,220.00 $2,850.00 $0.00 $4,370.00 $0.00

Subtotal $40,376.09 $2,703.54 $12,054.77 $1,920.00 $21,457.78 $2,240.00 Completion Fee $2,350.01 $270.35 $797.48 $0.00 $1,282.18 $0.00

Total Estimated Cost $42,726.10 $2,973.89 $12,852.25 $1,920.00 $22,739.96 $2,240.00

TA $38,351.18 $2,774.65 $12,852.25 $1,920.00 $18,564.28 $2,240.00

Delta $4,374.90 $199.24 $0.00 $0.00 $4,175.66 $0.00

CEF Rounding Error $0.02 $0.00 $0.00 $0.00 $0.02 $0.00 $42,726.10 $2,973.89 $12,852.25 $1,920.00 $22,739.96 $2,240.00

REV: 02/03 CEF SHAW Page 2

LEVEL OF EFFORT / EXPENSE WORKSHEET

SITE :

SUBTASK: O&M Sept. 2022 - Feb. 2023 DATE: March 16, 2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer 10

Engineer/Scientist 5 G. Roberts

Engineer/Scientist 2 K. Howard

Engineer/Scientist 1 K. McDonald 42

Engineering Technician 2 J. Bell 90

Designer 2 S. Ferianc 4 Technical Pub Specialist 3 H. Vining 3

TOTAL LABOR: 167

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 10 $1,200.00

TOTAL VEHICLE $1,200.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE USEAGE

Erwin Remediation Non-Haz Soil/Water T&D $100.00 Drum 2 $200.00

TOTAL $200.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method TO-15 (VOC Soil Vapor) $200.00 2 0 $400.00 EPA Method 8260 (Halos Only) $73.00 30 1 $2,263.00 EPA Method 8260 (Halos Only/IDW) $73.00 1 $73.00 Sample Shipping (Small cooler) $110.00 1 $110.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $2,846.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 10 $400.00 Construction/O&M Kit $360.00 Day 6 $2,160.00 Construction O&M Supplies $75.00 Day 6 $450.00 Tedlar Bags $20.00 Each 0 $0.00 Shallow GW Sampling Kit $290.00 Day 4 $1,160.00 55-gallon Drum $100.00 Each 2 $200.00

TOTAL EQUIPMENT $4,370.00

Proposed groundwater samples: multi-sampling well MS003 (from 11’, 23’, 38’, 50’ bls); from monitoring wells MW007, MW012, MW016, MW028, MW030. Water level gauging in 29 monitor wells. Quarterly VOC Vapor Samples by TO-15 Modified. Proposed groundwater samples: multi-sampling wells MS001 (from 11’, 23’, 35’, 50’ bls), MS002 (from 11’, 23’, 38’, 50’ bls), MS004 (from 11’, 23’, 39’, 50’ bls), MS005 (from 11’, 23’, 38’, 50’ bls), and MW006 (from 11’, 23’, 28', 35’, 50’ bls).

Daily telemetry checks to verify the SVE system is operating as scheduled (3 hrs per month x 6 months = 18 hrs). SVE performance evaluation and system optimization (6 hrs). Preparation of Annual O&M Report (18 hrs which includes preparation of SVE operational tables, calculations, figures, O&M site visit summary, SVE system operation & performance) Monthly Base Work - {Mob (1 hr), Travel Round Trip (2 hrs), SVE O&M (5 hrs) {total = 8 hrs x 6 mo = 48 hrs}. Additional work (each quarter) includes SVE Vacuum Readings and collection of VOC Vapor Sample (Total 4 hrs). Groundwater Sampling: Travel Preparation and Mobilization (1 hr), Round trip Travel (2 hrs). Locate and collect water levels and total depth measurements from 29 monitor wells (4 hrs). Preparation and Testing/Calibration of GW Sampling Field Equipment (1 hr).

Annual groundwater sampling from MS003 (from 11’, 23’, 38’, 50’ bls) and MW007, MW012, MW016, MW028, MW030 at 1 hr per sample (9 hrs), Purge Water Handling (1 hr), Sample Preparation, Chain of custody preparation, Sample Packaging, Delivery to Laboratory (1 hr). Site Restoration and Cleanup (1 hr). Roundtrip Travel for additional sampling during after school hours for two days (4 hrs), Preparation and Testing/Calibration of GW Sampling Field Equipment each day Annual Groundwater and O&M Reporting (Drafting) Annual Groundwater and O&M Report (Document Production)

PE Review of monthly data, direct staff engineer for system adjustments (6 hrs.). Review and PE seal of Annual O&M & groundwater report, data review, recommendations and conclusions (4 hrs.)

Review and assimilate field notes and laboratory report. Prepare GW Elevation and GW Analytical Data figures (4 hrs), Prepare Groundwater Related Data Summary Text (8 hrs).

Additonal Table Development for purging parameters and analytical results, development of additional scaled drawings of analytical results (6 hrs)

4-Total Page 1 of 1 Total DC003A TACO #1

$65.22 Project Manager E. Kramer 1 1.2 $65.22 Engineer/Scientist 5 E. Kramer 0 0 0 0 0 $61.98 Engineer/Scientist 5 G. Roberts -2 0 0 -2 0 $34.53 Engineer/Scientist 2 K. Howard 6 0 0 6 0 $29.38 Engineer/Scientist 2 K. McDonald 0 0 0 0 0 $26.24 Engineering Technician 2 J. Bell 18 0 0 18 0 $32.56 Designer 2 S. Ferianc 1 0 0 1 0 $27.64 Technical Publications Specialist 3 H. Vining 0 0 0 0 0

Total Hours 24 1 0 0 23 0

Direct Labor $664.55 $76.45 $0.00 $0.00 $588.10 $0.00

Overhead 85.58% $568.73 $65.43 $0.00 $0.00 $503.30 $0.00 Gen & Admin 19.38% $128.79 $14.82 $0.00 $0.00 $113.97 $0.00 Fringe 31.96% $212.39 $24.43 $0.00 $0.00 $187.96 $0.00 Total Labor $1,574.46 $181.13 $0.00 $0.00 $1,393.33 $0.00

Vehicle Rental $240.00 $0.00 $0.00 $240.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $240.00 $0.00 $0.00 $240.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00

IDW $100.00 $0.00 $0.00 $100.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $100.00 $0.00 $0.00 $100.00 $0.00 Handling Fee $10.00 $0.00 $0.00 $10.00 $0.00 Total Subcontractor Cost $110.00 $0.00 $0.00 $110.00 $0.00

Analytical Costs $1,533.00 $0.00 $0.00 $1,533.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,533.00 $0.00 $0.00 $1,533.00 $0.00

Expendables $80.00 $0.00 $0.00 $80.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $580.00 $0.00 $0.00 $580.00 $0.00 Equipment (IDW related) $100.00 $0.00 $0.00 $100.00 $0.00

Total Field Expenses $760.00 $0.00 $0.00 $760.00 $0.00

Subtotal $4,217.46 $181.13 $0.00 $0.00 $4,036.33 $0.00 Completion Fee $157.44 $18.11 $0.00 $0.00 $139.33 $0.00

Total Estimated Cost $4,374.90 $199.24 $0.00 $0.00 $4,175.66 $0.00

SUBTASK: O&M Sept. 2022 - Feb. 2023 DATE: January 24, 2023

Engineer/Scientist 5 E. Kramer Engineer/Scientist 5 G. Roberts -2

Engineer/Scientist 1 K. McDonald

Engineering Technician 2 J. Bell 18

Designer 2 S. Ferianc 1 Technical Pub Specialist 3 H. Vining

TOTAL LABOR: 23

Van or Truck $120.00 Day 2 $240.00

TOTAL VEHICLE $240.00

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00

Erwin Remediation Non-Haz Soil/Water T&D $100.00 Drum 1 $100.00

TOTAL $100.00

EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00 EPA Method 8260 (Halos Only) $73.00 21 0 $1,533.00 EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00

TOTAL LAB $1,533.00

Expendables $40.00 Day 2 $80.00 Construction/O&M Kit $360.00 Day 0 $0.00 Construction O&M Supplies $75.00 Day 0 $0.00 Tedlar Bags $20.00 Each 0 $0.00 Shallow GW Sampling Kit $290.00 Day 2 $580.00 55-gallon Drum $100.00 Each 1 $100.00

TOTAL EQUIPMENT $760.00

Remove:Update CD/Database Tables Update, ADaPT Upload (2 hrs).

Additonal Table Development for purging parameters and analytical results, development of additional scaled drawings of analytical results (6 hrs)

Proposed groundwater samples: multi-sampling wells MS001 (from 11’, 23’, 35’, 50’ bls), MS002 (from 11’, 23’, 38’, 50’ bls), MS004 (from 11’, 23’, 39’, 50’ bls), MS005 (from 11’, 23’, 38’, 50’ bls), and MW006 (from 11’, 23’, 28', 35’, 50’ bls).

Roundtrip Travel for additional sampling during after school hours for two days (4 hrs), Preparation and Testing/Calibration of GW Sampling Field Equipment each day (2 hrs). Purging and sampling 5 additional mulitport samplers, collection of 21 additional samples (12 hrs). (Note: interior sampling must be performed during after school hours) Additional Drafting

4-Delta Page 3 of 3 Delta DC003A TACO #1

Date: 3/16/2022

Task #: HW689 - DC003A ERIC_4123 SubTask 1 Project Management SubTask 6

Site: One Stop Cleaners SubTask 2 O&M March-August 2022 SubTask 7

Activity/Phase: O&M and Annual GW Sampling SubTask 3 Utilities Quarters 1 & 2 SubTask 8

Project Manager: Skylar Schwed SubTask 4 O&M Sept. 2022 - Feb. 2023 SubTask 9

SubTask 5 Utilites Quarters 3 & 4 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

$65.22 Project Manager E. Kramer 16 16.3 $65.22 Engineer/Scientist 5 E. Kramer 19 9 0 10 0 0 0 0 0 0 $61.98 Engineer/Scientist 5 G. Roberts 14 0 0 14 0 0 0 0 0 0 $34.53 Engineer/Scientist 2 K. Howard 0 0 0 0 0 0 0 0 0 0 $29.38 Engineer/Scientist 2 K. McDonald 84 42 0 42 0 0 0 0 0 0 $26.24 Engineering Technician 2 J. Bell 124 52 0 72 0 0 0 0 0 0 $32.56 Designer 2 S. Ferianc 6 3 0 3 0 0 0 0 0 0 $27.64 Technical Publications Specialist 3 H. Vining 6 3 0 3 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0 Total Hours 269 16 109 0 144 0 0 0 0 0 0

Direct Labor $9,254.45 $1,064.67 $3,366.02 $0.00 $4,823.76 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 85.58% $7,919.95 $911.14 $2,880.64 $0.00 $4,128.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 19.38% $1,793.50 $206.33 $652.33 $0.00 $934.84 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 31.96% $2,957.72 $340.27 $1,075.78 $0.00 $1,541.67 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $21,925.62 $2,522.41 $7,974.77 $0.00 $11,428.44 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Vehicle Rental $1,680.00 $720.00 $0.00 $960.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $1,680.00 $720.00 $0.00 $960.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $100.00 $0.00 $0.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $3,900.00 $0.00 $1,800.00 $0.00 $2,100.00 $0.00 $0.00 $0.00 $0.00 $0.00

Task #: HW689 - DC003A ERIC_4123 SubTask 1 Project Management SubTask 6

Site: One Stop Cleaners SubTask 2 O&M March-August 2022 SubTask 7

Activity/Phase: O&M and Annual GW Sampling SubTask 3 Utilities Quarters 1 & 2 SubTask 8

Project Manager: Skylar Schwed SubTask 4 O&M Sept. 2022 - Feb. 2023 SubTask 9

SubTask 5 Utilites Quarters 3 & 4 SubTask 10

Subcontractor Subtotal $4,000.00 $0.00 $1,800.00 $100.00 $2,100.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $270.00 $0.00 $120.00 $10.00 $140.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $4,270.00 $0.00 $1,920.00 $110.00 $2,240.00 $0.00 $0.00 $0.00 $0.00 $0.00

Analytical Costs $1,713.00 $400.00 $0.00 $1,313.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,823.00 $510.00 $0.00 $1,313.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $560.00 $240.00 $0.00 $320.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $5,800.00 $2,610.00 $0.00 $3,190.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $0.00 $0.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $6,460.00 $2,850.00 $0.00 $3,610.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $36,158.62 $2,522.41 $12,054.77 $1,920.00 $17,421.44 $2,240.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $2,192.56 $252.24 $797.48 $0.00 $1,142.84 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $38,351.18 $2,774.65 $12,852.25 $1,920.00 $18,564.28 $2,240.00 $0.00 $0.00 $0.00 $0.00 $0.00

Proposed Scope of Work

Task Assignment DC003A TACO #1 FAC ID No. 069501160 (ERIC_4123) Aptim Environmental & Infrastructure, Inc. (APTIM) 1/24/23

Attached are the CEF and LOE for the former One Stop Cleaners located in Coral Springs, Task Assignment (TA) request DC003A TA Change Order (TACO) #1. This LOE workbook has been prepared for additional source area groundwater sampling activities at the One Stop Cleaners site during the annual groundwater sampling event.

Subtask 2: No Changes

Subtask 3: No Changes

Subtask 4: TACO #1 includes the collection of 21 additional groundwater samples from multi-samplers located in the vicinity of the source area inside the building of the Coral Springs Charter School. Specifically, the additional samples to be collected during the annual groundwater sampling event includes multi-sampling wells MS001 (from 11’, 23’, 35’, 50’ bls), MS002 (from 11’, 23’, 38’, 50’ bls), MS004 (from 11’, 23’, 39’, 50’ bls), MS005 (from 11’, 23’, 38’, 50’ bls), and MW006 (from 11’, 23’, 28', 35’, 50’ bls). The samples will be analyzed for the presence of volatile organic halocarbons (VOHs) by EPA Method 8260. Please see the attached FDEP approval email requesting the additional sampling activities at the One Stop facility. Please note that all the multi-samplers are located within hallways and classrooms inside the Charter School.

Sampling activities inside the school must occur after regular school hours, therefore, the work will be scheduled to allow for two visits for completion of the work.

Due to the number of additional samples proposed, one additional IDW drum and the associated transportation and disposal costs have been incorporated into the TACO.

Subtask 5: No Changes

Due to the time discussing site issues with the FDEP, including well access issues and alternate options for sampling within the source area of the site, a 30-day deliverable extension for the reporting, final utilities and the task completion is requested. The extension would allow for scheduling, collection of the samples, laboratory analysis, and reporting. Recommended due dates are provided as follows:

Subtasks 1&4: Annual O&M Report w/GW Due Date 5/1/23

Subtask 5: Utilities for Quarters 3 and 4 Due Date 5/1/23

Task Completion 6/30/23

APTIM proposes to perform this scope of work in accordance with the terms and conditions of the contract No. HW689 executed December 21, 2021, between APTIM Environmental & Infrastructure, LLC and Florida Department of Environmental Protection. APTIM will begin the proposed scope of work upon written authorization.

If you have any questions, please do not hesitate to call.

Roberts, Gregg

From: Huckaby, Robert <Robert.Huckaby@FloridaDEP.gov> Sent: Tuesday, December 20, 2022 2:56 PM To: Roberts, Gregg; Dalton, James B; Crain, Kelly; Schwed, Skylar L Cc: Kramer, Eric Subject: RE: One Stop Proposed Wells to be Sampled Review (ERIC_4123)

EXTERNAL SENDER

Hey Greg, After discussing this with Breck, we suggest collecting groundwater samples for VOHs from the multi‐level samplers at all the intervals, not just shallow and deep. Also, do we know the intervals for MS006? And if not, is there anyway to collect water level measurements?

As far as PFAs sampling, MW007, MW012, MS003 Shallow, and MS003 Deep should be sampled.

Thanks Robert

Robert Huckaby, P.E.

Florida Department of Environmental Protection Waste Management/Waste Site Cleanup Section Professional Engineer I Robert.Huckaby@FloridaDEP.gov Office: 850‐245‐8956

From: Roberts, Gregg <Gregg.Roberts@aptim.com> Sent: Wednesday, December 14, 2022 10:59 AM To: Huckaby, Robert <Robert.Huckaby@FloridaDEP.gov>; Dalton, James B <James.B.Dalton@FloridaDEP.gov>; Crain, Kelly <Kelly.Crain@dep.state.fl.us>; Schwed, Skylar L <Skylar.Schwed@FloridaDEP.gov> Cc: Kramer, Eric <Eric.Kramer@aptim.com>

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Hello Robert, Breck, Kelly and Skylar:

The search for additional wells within the source area to sample inside the current Coral Springs Charter School has played out a little differently than we originally anticipated. The recovery wells within the building are currently not accessible. The school maintenance director assisted Aptim in our search and in discussing our options, and unfortunately, attempting access to the numerous recovery wells within the building will cause disruption and fairly extensive flooring damage in several rooms. With his assistance, however, we were able to locate and access multi samplers MS001 through MW006 (MS003 is included in the annual groundwater sampling well set and sampled at all depth intervals). As you can see below, although these multi samplers are not located within the former footprint of the cleaners, they do provide a good cross‐section of the source area with MS003 included in the sampling set. If the FDEP would like to incorporate additional groundwater samples within the One Stop source area, I would recommend sampling the shallow and deep zones of each of these wells (11 ft bls and 50 ft bls), as these depths are consistently display elevated PCE and VOH concentrations in MS003 (see attached Analytical Summary Map). With the FDEPs approval, I will incorporate 10 additional VOH samples into the annual groundwater sampling event.

In addition to the collection of source area VOHs, Kelly has requested that PFAS samples be incorporated into the groundwater sampling event. I would recommend that PFAS samples be collected from the two monitoring wells located within the source area, including shallow well MW007 and deeper well MW012. Both of these wells are already incorporated into the proposed annual groundwater sampling. See the attached Analytical Summary Map for the location of these two wells.

Should you have any questions or additional comments, please do not hesitate to call, Gregg

GREGG ROBERTS, PG

Project Manager

APTIM | ENVIRONMENT & SUSTAINABILITY

O 813 612 3687 M 863 670 0215 E gregg.roberts@aptim.com

Sent: Thursday, October 6, 2022 4:01 PM To: Roberts, Gregg <Gregg.Roberts@aptim.com> Cc: Kramer, Eric <Eric.Kramer@aptim.com> Subject: RE: One Stop Proposed Wells to be Sampled Review (ERIC_4123)

EXTERNAL SENDER

Greg, Have you gotten any information from the field technician on whether the multi‐samplers are accessible? If the are accessible, I am inclined to not attempt to access RW001, RW002, RW003, and RW004 with these RW’s being in such close proximity to the multi‐samplers (just a thought).

Robert Huckaby, P.E., BCEE Florida Department of Environmental Protection Waste Management/Waste Site Cleanup Section Professional Engineer I Robert.Huckaby@FloridaDEP.gov Office: 850‐245‐8956

Sent: Monday, August 1, 2022 4:54 PM To: Huckaby, Robert <Robert.Huckaby@FloridaDEP.gov> Cc: Kramer, Eric <Eric.Kramer@aptim.com>; Dalton, James B <James.B.Dalton@FloridaDEP.gov>; Walsh, Melissa <Melissa.Walsh@FloridaDEP.gov>

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this

Hello Robert:

I apologize for the delayed response. You are correct, we simply do not have numerous options to sample within the relatively small source area within the school. Honestly, I believe we could access the recovery wells, but I do not think we could accomplish this without significant damage to the floors surrounding the recovery well vaults. At this time, the maintenance team at the school is telling me the floors have been cleaned and waxed in preparation for the start of the school year, which is next week. I have provided my field technician with the classroom numbers for the additional multi‐samplers we could sample, and upon the next visit to the site, he will advise whether he thinks we can access those multi‐samplers without causing damage to the flooring. I believe the multi‐samplers may be accessible, unless they have been tiled over, which is the issue with the recovery well vaults (see below pictures, even the handle pulls have been tiled over).

Based on that assessment, we will decide if we should move forward with the additional scope, or remain on the current approved path for annual sampling. Based on the current Task Assignment, the groundwater sampling event was moved to a due date of March, 2023, so the actual sampling will likely be scheduled during the winter break. That means we should have some time to make the decision and add the additional multi‐samplers, if they can be located and accessed.

I will let you know what our field technician recommends.

GREGG ROBERTS, PG

Project Manager

APTIM | ENVIRONMENT & SUSTAINABILITY

O 813 612 3687

Sent: Wednesday, July 27, 2022 11:33 AM To: Roberts, Gregg <Gregg.Roberts@aptim.com> Cc: Kramer, Eric <Eric.Kramer@aptim.com>; Dalton, James B <James.B.Dalton@FloridaDEP.gov>; Walsh, Melissa <Melissa.Walsh@FloridaDEP.gov> Subject: RE: One Stop Proposed Wells to be Sampled Review (ERIC_4123)

EXTERNAL SENDER

Greg, Thanks for the information and looking into this. I am inclined to sample all wells possible during the next scheduled groundwater monitoring event. Even though the multi‐level samplers may not be ideal, it does not sound like we have many options for obtaining GW samples in the source area. The question I have is, is it even worth while attempting to access the Recovery Wells? There were two previous attempts in 2015 and 2018 to no avail (except for RW002). Do we give one more “college try”, just try to access RW002,….? Having not seen the area of the recovery wells myself, would the data obtained from accessing these recovery wells be worth the level of effort needed to gain access? If we do attempt to gain access and are successful, is this something would need to happen each time they are to be sampled?

Sent: Thursday, July 14, 2022 3:10 PM To: Dalton, James B <James.B.Dalton@FloridaDEP.gov>; Huckaby, Robert <Robert.Huckaby@FloridaDEP.gov>; Walsh, Melissa <Melissa.Walsh@FloridaDEP.gov>

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this

Hello All:

I pulled that Zebra project summary from our project files after an exhaustive search. I checked and the document is actually in OCULUS. I went ahead and attached the original document which also includes a cover that appears to be misdated (wrong year) and references redline drawings prepared after the multi‐level samplers were installed in May 1999. The document in OCULUS was entered under the incorrect date (May 21, 1998).

I was only able to find one reference to the installation of the multi‐level samplers (MLS) dated 4/12/99, where an onsite engineer installing the initial remediation system noted that during the installation of MS005, “MLS do not have grout seals between intervals”, but there is no reference to the use of bentonite or any other construction specifics. However, since the samplers will be sampled at a low flow and previous analytical results from MS003 consistently provide dissimilar concentrations from the various depths, I believe the data would be fairly representative of the groundwater at each interval and area.

So the below snip‐picture is from the attached well review map. The collection of additional samples within the source area was simply raised due to the time that has passed since a more comprehensive sampling has been performed. Let me know if you would prefer to move forward with just the currently sampled wells (highlighted yellow), the nearby proposed recovery wells (highlighted green), the multi‐samplers (highlighted orange) or all the wells. There are no monitoring wells located within the source area that could be incorporated into this sampling event without moving some distance from the source area. My recommendation would be the recovery wells, however, I have no confidence that we will be able to access these wells based on our previous attempts.

Just so we are all on the same page, below is a picture of the actual MLS casing type installed at the One Stop Cleaners in 1999.

If you have any questions, please do not hesitate to call, Gregg

GREGG ROBERTS, PG

Project Manager

APTIM | ENVIRONMENT & SUSTAINABILITY

O 813 612 3687

From: Dalton, James B <James.B.Dalton@FloridaDEP.gov> Sent: Wednesday, July 6, 2022 2:56 PM To: Huckaby, Robert <Robert.Huckaby@FloridaDEP.gov>; Walsh, Melissa <Melissa.Walsh@FloridaDEP.gov>; Roberts, Gregg <Gregg.Roberts@aptim.com>; Kramer, Eric <Eric.Kramer@aptim.com> Subject: FW: One Stop Proposed Wells to be Sampled Review (ERIC_4123)

EXTERNAL SENDER

All – I’ve looked at this some and looked at the most recent groundwater monitoring report. I don’t really remember the discussion during our site review meeting, but noticed that Aptim is recommending groundwater remediation in the GMR. It may be more appropriate for Robert to consider the recommendations in the GMR and the additional monitoring that is being proposed in this email….that will presumably support development of a RAE/RAP.

Gregg – Where did you find the Multilevel Sampler Install Report? I didn’t see it in ERIC.

Regarding the use of the multi‐level samplers, I don’t have a lot of experience with them, but don’t really have any objection to their use to support path forward decisions. As Gregg mentioned, multi‐level samplers are still being used and I suspect the existing ones at this site are acceptable as long as they were installed properly. I was a little disappointed to see in the attached multilevel sampler install report that there didn’t appear to be any mention of how they isolated the zones to be monitored. I doubt they used packers, but did they use bentonite or did they just allow the formation to collapse? I think the preferred method back in the day was to use bentonite socks/sleeves between the screened sections. Hopefully, that’s what was done. It’s probably worth trying to sample them, but we should also try to sample wells that are as close as possible to the multi‐level samplers (if they exist) so that we might be able to compare results to an actual MW. I’m not sure what the access or lithology might be like, but should we be considering some Membrane Interface Probe work if it’s feasible?

Breck

James Breck Dalton, P.G.

Professional Geologist II Waste Site Cleanup Section Florida Department of Environmental Protection James.b.dalton@FloridaDEP.gov Office: 850-245-8892

Sent: Friday, July 1, 2022 6:10 PM To: Walsh, Melissa <Melissa.Walsh@FloridaDEP.gov>; Dalton, James B <James.B.Dalton@FloridaDEP.gov>

Subject: One Stop Proposed Wells to be Sampled Review (ERIC_4123)

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this

Hello Melissa (and Breck):

During our project review meeting, I was asked to take a look at the proposed wells to be sampled this year at the One Stop Cleaners facility and evaluate if we should include some additional wells during the annual sampling event this summer. The addition wells could provide some insight into the current distribution of the plume near the source area. The PCE source at the former One Stop Cleaners is thought to be the location of a drain which was previously located at the rear of the facility. This drain was reported to be located near the location of multi-sampler MS003, which is sampled on an annual basis, and consistently displays elevated PCE concentrations at several depths.

Please note, as we discussed, a multi-sampler is not a well, but rather a 1.5-inch tube containing six separate chambers (tubes) which run vertically within the pipe. The “screened intervals” are constructed above ground by drilling openings into the tube, which are wrapped with prepacked sand packs. I have located the installation report from the drillers from 1999, which provide additional information for some of the samplers. Specifically, the wells are referenced as Waterloo Multi-level Wells, which are still utilized today, although the construction and design has changed somewhat over the past 20 years.

Please see the attached figure which shows the locations of the wells in the vicinity of the source area. The wells that are currently sampled are highlighted. Unfortunately, there are no adjacent monitoring wells that would be useful in providing additional information near this source area.

However, there are several recovery wells in the area that could be used, including RW001 (screened from 5 to 15 ft bls), RW002 (screened from 18.5 to 28.5 ft bls), RW003 (screened from 33 to 43 ft bls), RW004 (screened from 44 to 54 ft bls). Although these recovery wells have been previously sampled, attempts to access to these wells has not been successful in past years, as the well vaults have been tiled over and multiple heavy wax applications have apparently sealed the vault lids shut. The last time access to these recovery wells was attempted was 2018, and only RW002 was opened. Access to the remaining recovery wells was unsuccessful, primarily due to the amount of damage the necessary actions would have caused to the tile and flooring in the school hallways and classrooms (an angle grinder was used to remove the layers of wax and free the manhole lid for RW002). The previous attempts to access these wells in 2015 were also unsuccessful. Therefore, RW001, RW003 and RW004 have not been accessed since 2014.

As an alternative to the recovery wells, several multi-samplers also are present in the source area, including MS001, MS002, MS004 and MS006. These samplers are constructed similar to MS003, therefore, if selected for sampling, multiple samples would be collected from each well. These multi-samplers have also not been located or accessed in some time. However, if accessed, they may provide additional insight into the current distribution of the dissolved source area plume. The sample depths for the selected multi-samplers are as follows:

MS001 - 11 ft bls, 23 ft bls, 39 ft bls, 50 ft bls MS002 - 11 ft bls, 23 ft bls, 39 ft bls, 50 ft bls MS004 - 11 ft bls, 23 ft bls, 39 ft bls, 50 ft bls MS006 - 11 ft bls, 23 ft bls, 28 ft bls, 35 ft bls, 50 ft bls

If the FDEP would like to incorporate additional wells into the groundwater sampling event scheduled for the end of this summer, either the recovery wells or the additional multi-samplers, please let us know, and a Task Assignment Change Order for the additional cost will be prepared prior to visiting the site to locate and access the wells for sampling.

If you have any question, please do not hesitate to call, Gregg

GREGG ROBERTS, PG

Project Manager

APTIM | ENVIRONMENT & SUSTAINABILITY

O 813 612 3687

725 US Highway 301 South Tampa, FL 33619

APTIM.com

Additional Funding Information attached on separate page.

Rev. 8/26/2020

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

Department Project Manager: Department Project Manager Phone:

Project Location(s):

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

Additional signatures attached on separate page.

HW689

DC003A Completion May 26, 2023

Under this task assignment, APTIM will conduct 1 year of O&M of the soil vapor extraction system.The payment of utilities is the only part of this Task Assignment that is Cost Reimbursement.

Work will be done according to the attached scope of work dated March 17, 2022.

Melissa Walsh 850-245-8960 Contractor APTIM Contractor

Contractor Eric Kramer Contractor 407-287-3216

ERIC_4123

3303 University Dr E, Coral Springs, Broward

Contractor Contractor

✔ $ 34,541.18 ✔ $ 3,900.00

$ 38,351.18

Scope of Work

APTIM

Contractor Eric Kramer

APTIM Contract Manager

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2022.04.06 12:17:39 -04'00'

N/A

Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2022.04.06 13:50:41 -04'00'

WC TAFORM

Subtask 2: Semi-Annual O&M Report 09/16/2022

Subtask 3: Utilities for Quarters 1 & 2 10/30/2022

Subtasks 1 & 4: Annual O&M Report; Project Management 03/31/2023

Subtask 5: Utilities for Quarters 3 & 4 03/31/2023

Upon completion of all semi-annual O&M activities and FDEP approval of Semi-Annual O&M Report: Subtask 2 $ 12,852.25

Upon receipt of Paid Utility Invoices: Subtask 3 Utilities (Cost Plus Fixed Fee): not to exceed $1,800.00 Handling Fee: $: 120.00

$ 1,920.00

Upon completion of all annual O&M activities and FDEP approval of Annual O&M Report, and Project Management: Subtasks 1& 4 $ 21,338.93

Upon receipt of Paid Utility Invoices: Subtask 5 Utilities (Cost Plus Fixed Fee): not to exceed $2100.00 Handling Fee: $140.00

$ 2,240.00

$ 38,351.18

HW689

DC003A

HW689 DC003A-1 TACO.pdf

NS.pdf final CEF.pdf

Final LOE.pdf

4-Total

Delta CEF LOE.pdf

Delta

4-Delta

OG CEF.pdf

Cost Estimate

Scope of Work.pdf

Sample Request Email from FDEP 1222.pdf

OG TA.pdf

TA Number: DC003A

TACO Number: 1

Contract Number: HW689

TACO Description: This Task Assignment Change Order authorizes an increase in cost of 4,374.90 for requested additional groundwater monitoring.

Department's Contract Manager: Skylar Schwed

DPM's Phone: (850)245-8795

Contractor Name: Aptim Environmental & Infrastructure, LLC (APTIM)

Contractor/Consultant: [Contractor]

Contractor's Project Manager: Eric Kramer

CPM's Phone: 407-287-3216

Project Number: ERIC_4123

Project Name: One Stop Cleaners

4 No changes Checkbox: Off

4 changes Checkbox: Off

Fixed Price: Off

Amended Fixed Price Amount:

Fixed Price Prior Price Amount:

Fixed Unit Rate: On

Amended Fixed Unit Rate Amount: 38826.1

Fixed Unit Price Prior Price Amount: 34541.18

Cost Reimbursement: On

Amended Cost Reimbursement Amount: 3900

Cost Reimbursement Prior Price Amount: 3900

Amended Total TA Value: 42726.1

Total TA Value Prior Amount: 38441.18

5 no changes Checkbox: Off

5 changes Checkbox: On

Expiration/Completion: [Completion]

Original Date: May 26, 2023

New Date: 06/30/2023 days: 35

6 no changes Checkbox: Off

6 changes Checkbox: On

Attachment Reference: 1

Revised Reference: 1

No Additional Changes: On

Additional Changes: Off

All other terms and conditions of the TA remain in effect If and to the extent that any inconsistencies may appear between the:

Contractor's Name:

Contractor's Authority Name:

Contractor Title:

Contractor Date:

2023-02-07T14:59:13-0500

Eric Kramer

Department Name: Jennifer Farrell

2023-02-07T08:45:18-0500

Jennifer Farrell

Department Date:

Additional signatures attached on separate page: Off

Org CodeRow1: N/A

EORow1:

Object CodeRow1:

Budget EntityRow1:

Appropriation CategoryRow1:

Grant Row1:

Project Row1:

YearRow1:

AmountRow1:

Org CodeRow2:

EORow2:

Object CodeRow2:

Budget EntityRow2:

Appropriation CategoryRow2:

Grant Row2:

Project Row2:

YearRow2:

AmountRow2:

Additional Funding Information attached on separate page: Off

Contract #: HW689

Task Assignment #: DC003A

TOTAL COST: 42726.1

Deliverable Description 1: Subtask 2: Semi-Annual O&M Report

Deliverable Description 2: Subtask 3: Utilities for Quarters 1 & 2

Deliverable Description 3: Subtasks 1 & 4: Annual O&M Report; Project Management

Deliverable Description 4: Subtask 5: Utilities for Quarters 3 & 4

Deliverable Description 5:

Deliverable Description 6:

Invoice Submittal Requirement 1: Upon completion of all semi-annual O&M activities and FDEP approval of Semi-Annual O&M Report: Subtask 2

Invoice Submittal Requirement 3: Upon completion of all annual O&M activities and FDEP approval of Annual O&M Report, and Project Management: Subtasks 1& 4

Invoice Submittal Requirement 4: Upon receipt of Paid Utility Invoices: Subtask 5 Utilities (Cost Plus Fixed Fee): not to exceed $2100.00 Handling Fee: $140.00

Invoice Submittal Requirement 6:

Invoice Submittal Requirement 5:

Invoice Submittal Requirement 2: Upon receipt of Paid Utility Invoices: Subtask 3 Utilities (Cost Plus Fixed Fee): not to exceed $1,800.00 Handling Fee: $: 120.00

Deliverable Due Date 1: 09/16/2022

Deliverable Due Date 2: 10/30/2022

Deliverable Due Date 3: 05/01/2023

Deliverable Due Date 4: 05/01/2023

Deliverable Due Date 6:

Deliverable Due Date 5:

Invoice Amount 2: 1920.00

Invoice Amount 1: 12852.25

Invoice Amount 3: 25713.85

Invoice Amount 4: 2240.00

Invoice Amount 5:

Invoice Amount 6:

Change Order #: 1

This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which

☐ Additional Attachments (if necessary):

WCP TAFORM 04-2017

Memorandum TO: Contract File

Contract No. HW689

FROM: Melissa A Walsh, Project Manager

SUBJECT: One Stop Cleaners

FAC # ERIC_4123

Task Assignment #DC003A O&M

DATE: 4/4/2022

Under this Task Assignment, APTIM will conduct 6 months of O&M. Work will be done according to the attached scope of work dated March 17,2022

Subtask 1: Project Management This subtask is a percentage of the overall project and has been negotiated as a contract rate.

Subtask 2: Semi-Annual O&M Activities APTIM and DEP agreed to the proposed scope of work and level of effort. Subtask 2 includes six months of O&M.

Subtask 3: Utilities APTIM and DEP agreed to the proposed scope of work and level of effort. Subtask 3 includes six months of utility service. The utility invoices will be submitted to the Department for reimbursement.

Subtask 4: Annual O&M Activities APTIM and DEP agreed to the proposed scope of work and level of effort. Subtask 4 includes six months of O&M and second six months of SVE operation and maintenance, and annual groundwater sampling.

Subtask 5: Utilities APTIM and DEP agreed to the proposed scope of work and level of effort. Subtask 5 includes six months of utility service. The utility invoices will be submitted to the Department for reimbursement.

Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and the APTM proposal. The final deliverable due date is March 25, 2023, and the completion date for the Task Assignment is May 26, 2023.

The final cost total for DC003A is $38,351.18