This document is a Task Assignment Change Order (TACO) No. 4 executed between the State of Florida Department of Environmental Protection (FDEP) and APTIM Environmental & Infrastructure, LLC. The change order amends Task Assignment DC029A under Contract HW689 for site assessment and reporting services at Spring Lake Cleaners Inc. (Former), located at 1120 Havendale Boulevard NW, Winter Haven, Polk County, Florida. The project is identified as ERIC_5381 (Former Facility No. 539502466). FDEP's project manager is Alyssa Lamb, and the contractor's project manager is Eric Kramer. The change order was executed on March 13, 2026, with digital signatures from both parties.
TACO No. 4 provides additional funding of $961.08 to increase the total task assignment value from $106,551.26 to $107,512.34 for the collection of PFAS (per- and polyfluoroalkyl substances) groundwater samples that could not be collected during the January 2026 sampling event due to Federal Express shipping delays caused by winter storms. The scope includes purging and sampling from wells MW001, MW002, PZ002, and PZ003, plus collection of a PFAS IDW (investigation-derived waste) sample. The completion date was extended 60 days from April 17, 2026, to June 16, 2026. Deliverables include field notes packages, DPT field notes, a site assessment report, and a PFAS email deliverable with invoicing upon FDEP approval of each subtask. The cost breakdown allocates $455.00 for equipment and $120.00 for vehicle rental, with the remainder covering labor and compliance with FDEP methodology DEP SOP: LC-001-3 for PFAS analysis.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
DC029A 4 HW689
Alyssa Lamb 850-245-8791 Contractor APTIM Environmental & Infrastructure, LLC Contractor
Contractor Eric Kramer Contractor 813-205-4703
ERIC_5381
Spring Lake Cleaners (Former)
✔ $ 107,512.34 $ 106,551.26
$ 107,512.34 $ 106,551.26 Completion
✔ Completion 04/17/2026 06/16/2026 60
1 1
Contractor
Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2026.03.13 14:30:23 -04'00' Tim J. Bahr Digitally signed by Tim J. Bahr
Date: 2026.03.13 14:06:14 -04'00'
This Change Order to provides additional funding for the collection of the PFAS groundwater samples.
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW689
DC029A
$ 107,512.34
Subtask 2 - MAGS and Soil Sampling Field Notes Package, including vapor and soil sampling results
Subtask 3 - DPT Field Notes Package, including boring logs, DPT groundwater sampling results, and sampling results from existing monitoring wells
Subtasks 4, 5, & 1 - Site Assessment Report & PM
Subtask 6 - PFAS Email Deliverable
Upon DEP Approval of Subtask 2 - MAGS and Soil Sampling Field Notes Package, including vapor and soil sampling results
Upon DEP Approval of Subtasks 4, 5, & 1 - Site Assessment Report & PM
Upon DEP Approval of Subtask 6 - PFAS Email Deliverable
Upon DEP Approval of Subtask 3 - DPT Field Notes Package, including boring logs, DPT groundwater sampling results, and sampling results from existing monitoring wells
08/29/2025
09/26/2025
04/14/2026
04/14/2026
$ 34,947.68
$ 43,112.83
$ 27,120.36
$ 2,331.47
FFLORIDA DEPARTMENT OF
EEnvironmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jay Collins Lt. Governor
Alexis Lambert Secretary
Memorandum
TO:
FROM:
SUBJECT:
DATE
ERIC_
Cleaners
, Project Manager
Negotiation Summary
HW68 DC0
will perform activities at Cleaners, as detailed in the proposal.
Total task amount $ . time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date is . Task completion date is
FD
EP
C O
ST
E
ST
IM
A
TE
C on tra ct or
A pt im E nv iro nm en ta l &
In fra st ru ct ur e, L
LC
D at e:
3/ 2/
Ta sk
H W
D C
9A
T A
C O
S ub
Ta sk
P ro je ct M an ag em en t S ub Ta sk
6- A dd iti on al
P
FA
S S am pl in g
R ep or tin g
S ite
S pr in g La ke C le an er s
In c.
E R
IC
_5
S ub
Ta sk
2-
S ite
M ee tin g, M A
G S
/S oi l S ub Ta sk
A ct iv ity
/P ha se
S A
R S ub Ta sk
3- D
P T an d
G ro un dw at er
F ie ld A ct iv iti es
S ub
Ta sk
P ro je ct
M an ag er
A ly ss a La m b
(F D
E P
)/E ric
K ra m er
(A P
TI
M
S ub Ta sk
4- Fi na l W el l I ns ta lla tio ns S ub Ta sk
S ub
Ta sk
5-
R ep or tin g S ub Ta sk
TTo ta ls
La bo r
R at e C at eg or y
$7 3.
P P ro je ct M an ag er
E . K ra m er
.2
$7 3.
En gi ne er /S ci en tis t 5
E . K ra m er
$6
8.
En gi ne er
/S ci en tis t 5 G
. R ob er ts
$6 5.
En gi ne er /S ci en tis t 4
S . F ly nn
$3 7.
En gi ne er /S ci en tis t 3
K . H ow ar d
$3 7.
En gi ne er /S ci en tis t 2
K . M cD on al d
$2 6.
En gi ne er /S ci en tis t 1
B . B lo un t
$3
3.
En gi ne er
S ci en tis t 1 R
. L in ds ay
$3 5.
D es ig ne r 2
S . F er ia nc
$3
0.
Te ch ni ca l P ub lic at io ns
S pe ci al is t 3
H . V in in g
$2
8.
Te ch ni ca l P ub lic at io ns
S pe ci al is t 3
L.
H ou se r
$0
.0
To ta l H ou rs
D ire ct L ab or
$2
1, 1.
$2 ,4
.6
$6
,7
.1
$4 ,3
.4
$1
,3
.7
$5 ,5
.1
$6
.9
$0
.0
$0 .0
$0
.0
$0 .0
O ve rh ea d
.5 8%
$1 8, 8.
$2
,0
.4
$5 ,8
.1
$3
,7
.6
$1 ,1
.0
$4
,7
.2
$5
.7
$0 .0
$0
.0
$0 .0
$0
.0
G en
A dm in
.3
8% $4
,1
.9
$4
.0
$1 ,3
.0
$8
.1
$2
.4
$1
,0
.6
$1
.6
$0 .0
$0
.0
$0 .0
$0
.0
Fr in ge
.9 6%
$6 ,7
.2
$7
.4
$2
,1
.0
$1 ,4
.3
$4
.4
$1
,7
.6
$2
.4
$0 .0
$0
.0
$0 .0
$0
.0
To ta l L
$5 0, 8.
$5
,7
.4
$1 6, 1.
$1
0, 0.
$3 ,1
.6
$1
3, 5.
$1 ,5
.7
$0
.0
$0 .0
$0
.0
$0 .0
Tr av el V eh ic le R en ta l $2
,1
.0
$1 ,0
.0
$7
.0
$2
.0
$0
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ile ag e
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
A ir Fa re $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P er d ie m
H ot el
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l T ra ve l
$2 ,1
.0
$1
,0
.0
$7
.0
$2
.0
$0 .0
$1
.0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
(E qu ip m en t P ro cu re m en t)
W el l M at er ia ls
$9
.8
$9
.8
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$9
.8
$9
.8
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P ro cu re m en t F ee
$9 1.
$9
1.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l S ub co nt ra ct or C os t
$1 ,0
.8
$1
,0
.8
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (S er vi ce s
P ro cu re m ril lin g
(C on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
D ril lin g (N on -c on ve nt io na l)
$1 5, 0.
$0
.0
$1 5, 0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ob ile L ab or at or y $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ur ve yi ng
$9 ,9
.0
$9
,9
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
ID
W
$1 ,0
.0
$0
.0
$0 .0
$1
,0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til iti es
$7
.0
$7
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Pa ge
Pa ge
C O
ST
E
ST
IM
A
TE
C on tra ct or
A pt im E nv iro nm en ta l &
In fra st ru ct ur e, 3/
H W
D C
9A
T A
C O
S ub
Ta sk
P ro je ct M an ag em en t S ub Ta sk
6- A dd iti on al
P
FA
S S am pl in g
R ep or tin g
S ite
S pr in g La ke C le an er s
In c.
E R
IC
_5
S ub
Ta sk
2-
S ite
M ee tin g, M A
G S
/S oi l S ub Ta sk
A ct iv ity
/P ha se
S A
R S ub Ta sk
3- D
P T an d
G ro un dw at er
F ie ld A ct iv iti es
S ub
Ta sk
P ro je ct
M an ag er
A ly ss a La m b
(F D
E P
)/E ric
K ra m er
(A P
TI
M
S ub Ta sk
4- Fi na l W el l I ns ta lla tio ns S ub Ta sk
S ub
Ta sk
5-
R ep or tin g S ub Ta sk
TTo ta ls
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $2
7, 0.
$1 0, 5.
$1
5, 0.
$1 ,0
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
H an dl in g
Fe e
$2 ,7
.0
$1
,0
.5
$1 ,5
.0
$1
.5
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l S ub co nt ra ct or
C os t $ $3
0, 6.
$1 1, 8.
$1
7, 9.
$1 ,1
.5
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
La bo ra to ry
A na ly tic al
C os ts $1
2, 2.
$8 ,7
.0
$3
,1
.0
$9
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fa st
T ur na ro un d
C ha rg es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S am pl e
S hi pp in g $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l L ab or at or y $1
2, 2.
$8 ,7
.0
$3
,1
.0
$9
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fi el d E xp en se s
P so na l P ro te ct io n $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E xp en da bl es $7
.0
$3
.0
$2
.0
$4
0.
$0 .0
$4
0.
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
D ril lin g re la te d)
$7
.0
$0 .0
$7
.0
$5
0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
A na ly tic al re la te
d) $4
,1
.0
$2 ,2
.0
$1
,1
.0
$2
.0
$0 .0
$4
.0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t (
ID
W re la te
d) $2
.0
$1
.0
$0
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
O th er
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l F ie ld E xp en se s
$5 ,8
.0
$2
,7
.0
$2 ,1
.0
$4
.0
$0
.0
$4
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub to ta l $1
,4
.4
$5
,7
.4
$4 1, 2.
$3
3, 9.
$6 ,0
.1
$1
3, 5.
$2 ,1
.7
$0
.0
$0 .0
$0
.0
$0 .0
C om pl et io n Fe e $5
,0
.8
$5
.0
$1 ,6
.1
$1
,0
.0
$3
.3
$1 ,3
.5
$1
.6
$0
.0
$0 .0
$0
.0
$0 .0
To ta l E st im at ed C os t
$1
,5
.3
$6 ,3
.5
$4
3, 2.
$3 4, 7.
$6
,3
.5
$1 4, 8.
$2
,3
.4
$0 .0
$0
.0
$0 .0
$0
.0
C os t f ro m P rio r C
E F:
$1
,5
.2
M an ua l E nt ry
C os t f ro m D el ta
C E
F;
$9
.0
M an ua l E nt ry C os t (
P rio r + D el ta
$1
,5
.3
Au to -C al cu la te d R ou nd in g
E rr or
$0 .0
Au to -C al cu la te d Fi na l T ot al
C os t:
$1
,5
.3
Au to -C al cu la te d
Pa ge
Pa
LEVEL OF EFFORT / EXPENSE WORKSHEET
SITE : Spring Lake Cleaners Inc.
SUBTASK:
DATE: July 30, 2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 2
Engineer/Scientist 5 G. Roberts 14
Engineer/Scientist 4 S. Flynn
Engineer/Scientist 2 K. Howard 67
Engineer/Scientist 2 K. McDonald 28
Engineer/Scientist 1 B. Blount 54
Engineer Scientist 1 R. Lindsay 18
Designer 2 S. Ferianc Technical Publications SpecialisH. Vining Technical Publications SpecialisL. Houser 3
TOTAL LABOR 186
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 1 $80.00 Van or Truck $120.00 Day 4 $480.00 Van or Truck $480.00 Week 1 $480.00
TOTAL VEHICLE $1,040.00
PER DIEM STAFF DESCRIPTION RATE UNIT USEAGE TOTALS
Hotel 0 $150.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE ACTUAL TOTALS
Survtech Solutions Survey and Benchmark Placement $9,985.00 LS 1 $9,985.00 $9,985.00 GeoTek Utility Locate Services $750.00 LS 1 $750.00 $750.00 Atlantic Supply MAGS Well Supplies (Casing, Screen, Sand) $1,097.43 LS 1 $919.84 $919.84
TOTAL $11,654.84
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method TO-15 (VOC Soil Vapor) $200.00 7 0 $1,400.00 EPA Method 8260 (Full List) Soil $110.00 66 0 $7,260.00 EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $55.00 1 0 Contingency $55.00 EPA Method 8260 (VOHs) Leachate $73.00 1 0 Contingency $73.00 EPA Method 8260 (Full List) Well $110.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $8,788.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 9 $360.00 Soil Sampling Kit (concrete) $235.00 Day 3 $705.00 MAGS Investigation Kit $500.00 Day 1 $500.00 Tedlar Bags $20.00 bag 4 (3 Included w/Kit) $80.00 Shallow GW Sampling Kit $290.00 Day 0 $0.00 Encore Sampler $16.00 each 63 $1,008.00 55 Gallon Drums $100.00 each 1 $100.00
TOTAL EQUIPMENT $2,753.00
2-SiteMeeting, MAGS/Soil
MAGS Analytical Data and Graph Reviews for Reporting to FDEP (2 hrs) Onsite Meeting with Property Owner/Property Manager/Maintenance Technician and/or tenant and perform Utility White-lines for Markouts including travel (4 hrs), Research and Prepare Site Access Agreement for Adjacent Properties (1 property) south of Shopping Center (1 hr), Site Work Notifications (1 hr), Submit Sunshine One Markout Requests (2 hrs), Summarize MAGS and MAGS Soil Data for Preliminary Reporting to FDEP (3 hrs). Compilation of Field Soil Analytical Data, Preparation of Soil Summary Maps for FDEP (3 hrs), MAGS Testing Mobilization and Equipment Preparation (2 hrs), Round Trip Travel for MAGS Testing (3 hrs), Perform MAGS Tests at 7 locations and collection of 7 Vapor Samples (10 hrs), Surface and Site Restoration, Equipment Demobilization (3 hrs).
Onsite Meeting with Property Owner/Property Manager/Maintenance Technician and/or tenant and perform Utility White-lines for Markouts including travel (6 hrs), Oversight of GPR Utility Subcontract Survey including travel (8 hrs), MAGS Testing and Soil Sampling Mobilization and Field Event Preparation (2 hrs), Round Trip Travel for two days to site for MAGS Soil Sampling and MAGS well Installations (6 hrs), Perform Onsite H&S and Scoping meetings (1 hr), Advancement of 7 MAGS Soil Borings for the collection of 63 soil samples at depths of 6", 2', 4', 6', 8', 10', 15', 20' and 25' (16 hrs), Assistance with Installation and Construction of 7 MAGS Testing Wells (4 hrs), Assistance with Installation of one Vapor Monitoring Point Location, including coring (1 hr), Preparation of Soil Boring Logs and MAGS Well Constuction Logs (3 hrs). Remaining Soil Sampling Field Event Preparation and Mobilization (2 hrs), Round Trip Travel to site (2 hrs), Collect Remaining Soil Samples at 4 locations including, Coring, Collection of 36 Soil Samples (10 hrs). Site visit to redeveop and repair existing monitring wells MW-1 and MW-2 (6 hrs).
MAGS Testing Mobilization and Equipment Preparation (2 hrs), Travel Round Trip for MAGS Well Installations (3 hrs), Perform Onsite H&S and Scoping meetings (1 hr), Installation and Construction of 7 MAGS Testing Wells, including coring (7 hrs), Installation of 1 Vapor Monitoring Point Locations, including coring (1 hr), Perform MAGS Tests at 7 locations and collection of 7 Vapor Samples (10 hrs), Surface and Site Restoration (2 hrs). Delivery of Vapor Samples to Laboratory (2 hrs)
MAGS Testing and Soil Sampling Mobilization and Field Event Preparation (2 hrs), Round Trip Travel for two days to site for MAGS Soil Sampling and MAGS well Installations (6 hrs), Attend Onsite H&S and Scoping meeting (1 hr), Assist with collection of 7 MAGS Soil Borings for the collection of 63 soil samples at depths of 6", 2', 4', 6', 8', 10', 15', 20' and 25' (16 hrs), Assistance with Installation and Construction of 7 MAGS Testing Wells (4 hrs), Assistance with Installation of one Vapor Monitoring Point Location (1 hr), Daily MAGS Soil Sample Deliveries to Laboratory (2 hrs). Collect Remaining Soil Samples at 4 locations including Travel, Coring, Collection of Soil Samples (10 hrs), Site Restoration (2 hrs), Drum Handling and Demobilization (3 hrs), Delivery of Remaining Soil Samples to Laboratory (1 hr). Site visit to redeveop and repair existing monitring wells MW-1 and MW-2 (6 hrs).
Note: Air Analysis by TO-15, Soil Samples by VOCs by EPA Method 8260 (Full List) Preparation of Site Specific Health and Safety Plan (3 hrs)
2-Total Page 3 of 12 HW689 DC029A TACO #1 est (002)
SUBTASK:
DATE: October 16, 2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 2
Engineer/Scientist 5 G. Roberts 7
Engineer/Scientist 4 S. Flynn
Engineer/Scientist 2 K. Howard 88
Engineer/Scientist 2 K. McDonald
Engineer/Scientist 1 B. Blount 16
Engineer Scientist 1 R. Lindsay Designer 2 S. Ferianc Technical Publications SpecialisH. Vining Technical Publications SpecialisL. Houser
TOTAL LABOR 113
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 2 $240.00 Van or Truck $480.00 Week 1 $480.00
TOTAL VEHICLE $720.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel 0 $150.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE TOTALS
GW Protection DPT Drilling $15,890.00 Lump 1 $15,890.00
TOTAL $15,890.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method 8260 (Full List) DPT Groundwater $110.00 24 0 $2,640.00 EPA Method 8260 (Full List) Wells/Piezometers $110.00 5 0 $550.00 EPA Method 8260 (Full List) IDW $110.00 0 0 $0.00 EPA Method 6010 (As, Cd, Cr and Pb) IDW $52.00 0 0 $0.00 EPA Method 1311 TCLP Extraction (Zero Headspace Method/VOCs)-Solid $55.00 0 0 $0.00 EPA Method 1311 TCLP Extraction (Bottle Extraction for Metals)-Solid $45.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $3,190.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 7 $280.00 Monitor Well Installation Kit $325.00 Day 2 $650.00 Total Survey Station $50.00 Day 1 $50.00 Shallow GW Sampling Kit $290.00 Day 4 $1,160.00 55 Gallon Drums $100.00 each 0 $0.00
TOTAL EQUIPMENT $2,140.00
Groundwater Samples by VOCs by EPA Method 8260 (Full List)
Groundwater Sampling and Survey of Piezometers and Existing Wells (5 total) with Travel (9 hrs), delivery of samples to laboratory (1 hr). Daily delivery of DPT Groundwater Samples to Laboratory (6 hrs), Finalize Proposed DPT Locations (1 hr), Finalize Proposed Piezometer Locations (1 hr).
Contacting Property Owner, Property Manager, Maintenance Technician, Tenant of Proposed Sampling Schedule and Confirming Access (1 hr), Preparation and Review of Cross Section from DPT Cores for Recommendations of Proposed GW Sampling Depths with FDEP (3 hrs), Calculation of Well and Watertable Elevations for Flow Direction and Preparartion of Map (2 hrs.), Prepare Map of Final Proposed DPT Locations (1 hr).
DPT Drilling Field Event Preparation and Mobilization (2 hrs), Travel to Site over 3 days (9 hrs), Installation of two DPT Macrocore to 75 ft bls, installation of 3 Piezometers, DPT Groundwater Sampling at 8 locations (40 hrs), Assist with Survey Piezometers and Existing Wells (2 hrs), Daily DPT Groundwater Sample Chain of Custody preparation, Sample Packaging (3 hrs), Preparation of Soil Boring and Well Construction Logs (4 hrs), Preparation of Summary Tables and Figures of Groundwater Sampling Results for Preliminary Reporting to FDEP (6 hrs). Additional hours for DPT Drilling and Groundwater Sampling for two additional days, Additional Travel to Site for 2 days (6 hrs), Additional DPT Drilling for installation of Piezometers and DPT Groundwater Sampling (16 hrs).
3-DPT and Groundwater Field Activities
3-Total Page 1 of 1 HW689 DC029A TACO #2 est
SUBTASK:
DATE: November 21, 2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 2
Engineer/Scientist 5 G. Roberts 7
Engineer/Scientist 4 S. Flynn
Engineer/Scientist 2 K. Howard 12
Engineer/Scientist 2 K. McDonald
Engineer/Scientist 1 B. Blount 10
Engineer Scientist 1 R. Lindsay Designer 2 S. Ferianc Technical Publications SpecialisH. Vining Technical Publications SpecialisL. Houser
TOTAL LABOR 31
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 2 $240.00 Van or Truck $480.00 Week 0 $0.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel 0 $150.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE TOTALS
GW Protection Well Installations $13,932.00 LS 0 $0.00 Erwin Remediation IDW T&D Soil IDW Drums $110.00 LS 6 $660.00 Erwin Remediation IDW T&D Liquid IDW Drums $125.00 LS 3 $375.00
TOTAL $1,035.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method 8260 (Full List) Wells $110.00 5 0 $550.00 EPA Method 8260 (Full List) IDW $110.00 2 0 $220.00 EPA Method 6010 (As, Cd, Cr and Pb) IDW $52.00 2 0 $104.00 EPA 1311 TCLP Extraction (Zero Headspace Method/VOCs)-Soil IDW $55.00 1 0 $55.00 EPA 1311 TCLP Extraction (Bottle Extraction/Metals)-Soil IDW $45.00 1 0 $45.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $974.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 1 $40.00 Soil Sampling Kit (concrete) $235.00 Day 0 $0.00 Monitor Well Installation Kit $325.00 Day 0 $0.00 Total Survey Station $50.00 Day 1 $50.00 Shallow GW Sampling Kit $290.00 Day 1 $290.00 Encore Sampler $16.00 each 0 $0.00 55 Gallon Drums $100.00 each 1 $100.00
TOTAL EQUIPMENT $480.00
Groundwater Samples by VOCs by EPA Method 8260 (Full List), PFAS Samples by FDEP Laboratory Method DEP SOP: LC-001-3
Prepare Recommendations (2 hrs)
Property Owner, Property Manager, Tenant Site Work Notifications (2 hrs), Prepare Proposed Recommendations (3 hrs), Characterization and Waste Profile for Transportation and Disposal of IDW Drums (2 hours).
Collection of Final Groundwater Samples from 5 wells with Travel and Survey Wells (10 hrs), Deliver final samples to laboratory (2 hrs), Preparation of Well Construction Logs (2 hrs).
Assist with Collection of Final Groundwater Samples from 5 wells, with Travel, Assist with Survey Wells, Site Restoration and Collection IDW Samples, Drum Handling (10 hrs)
4-Final Well Installations
4-Total Page 1 of 1 HW689 DC029A TACO #3 est
SITE :
SUBTASK:
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 10
Engineer/Scientist 5 G. Roberts 24
Engineer/Scientist 4 S. Flynn 40
Engineer/Scientist 2 K. Howard
Engineer/Scientist 2 K. McDonald 6
Engineer/Scientist 1 B. Blount Engineer Scientist 1 R. Lindsay
Designer 2 S. Ferianc 6
Technical Publications SpeciaH. Vining
Technical Publications SpeciaL. Houser
TOTAL LABOR 90
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE TOTALS
Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE TOTALS
$0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method 8270 (PAHs) Soil $110.00 0 0 $0.00 EPA Method 8290 (Dioxins&Furans) Soil $950.00 0 0 $0.00 EPA Method 6010 (Total Arsenic) Soil $13.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 0 $0.00 Global Positioning System (Handheld G $175.00 Day 0 $0.00 55-gallon Drum $100.00 each 0 $0.00
TOTAL EQUIPMENT $0.00
Vapor Data Tabulation (3 hrs), Step Test and Radius of Influence calculations and graphs (3 hrs)
Report Drafting, including Site Location Map, Local Land Use Map, Site Layout Map, Utility Location Map, MAGS Location Map. Soil Boring Location Map, DPT Push Groundwater Sample Location Map, Piezometer and Monitoring Well Location Map, Lithologic Cross Section, MAGS Analtyical Summary Map, Soil Analytical Summary Map for several depth intervals, Groundwater Elevation Contour Maps, DPT Analytical Summary Map (3 depths), Monitoring Well and Piezometer Groundwater Analytical Map (6 hrs)
Report Document Production, Formating Tables and Text, Compilation into Adobe Format for Submittal
Compilation of Logs and Prepartion of SAR Cross Sections, Preparation of Physiography, Regional Geology and Regional Hydrogeology Sections, Preparation of Conceptual Model based on Findings, Preparation of Laboratory QA/QC Summary and Data Recommendations, Preparation of Site Assessment Conclusions, Recommendations for Assessment (24 hrs).
Spring Lake Cleaners Inc.
Preparation of MAGS Assessment Findings text (4 hrs), Revise and Provide Edits to Site Assessment Report (5 hrs), Preparation of Deliverable Email and Submittal of Report (1 hr)
Preparation of SAR text including, Operational History, Previous Investigations, Site Specific Soil and Groundwater Site Characterization, Preparation of Tables, Preparation of Draft Soil and Analytical Summary Figures, Preparation of Assessment Findings (lithologic borings, soil borings, DPT Sampling, Piezometer and Monitoring Well Installations, Groundwater Sampling) (40 hrs).
5-Reporting 3/18/2025
SUBTASK:
DATE: March 02, 2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer
Engineer/Scientist 5 G. Roberts 6
Engineer/Scientist 4 S. Flynn Engineer/Scientist 2 K. Howard Engineer/Scientist 2 K. McDonald Engineer/Scientist 1
Engineer/Scientist 1 B. Blount 10
Engineer Scientist 1 R. Lindsay Designer 2 S. Ferianc Technical Publications SpecialisH. Vining Technical Publications SpecialisL. Houser
TOTAL LABOR 16
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 1 $120.00 Van or Truck $480.00 Week 0 $0.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel 0 $150.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE TOTALS
GW Protection Well Installations $4,766.00 LS 0 $0.00 Erwin Remediation IDW T&D Soil IDW Drums $110.00 LS 0 $0.00 Erwin Remediation IDW T&D Liquid IDW Drums $125.00 LS 0 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method 8260 (Full List) Wells $110.00 0 0 $0.00 EPA Method 8260 (Full List) IDW $110.00 0 0 $0.00 State Laboratory DEP SOP: LC-001-3 (PFAS) GWTallahassee $0.00 4 1 Fld Regent Blk $0.00 State Laboratory DEP SOP: LC-001-3 (PFAS) IDWTallahassee $0.00 1 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 1 $40.00 Soil Sampling Kit (concrete) $235.00 Day 0 $0.00 Monitor Well Installation Kit $325.00 Day 0 $0.00 Total Survey Station $50.00 Day 0 $0.00 Deep GW Sampling Kit $415.00 Day 1 $415.00 Encore Sampler $16.00 each 0 $0.00 55 Gallon Drums $100.00 each 0 $0.00
TOTAL EQUIPMENT $455.00
6-Additional PFAS Sampling & Reporting
Develop PFAS Well Recommendations for Sampling and Order Kit from FDEP Laboratory (2 hrs), Develop PFAS Table and Map, Compile Field Notes, Sample Logs and Analytical for Reporting (3 hrs), Preparation of Findings email with Recommendations (1 hr)
Additional Purging and Collection of PFAS Groundwater Samples (4-5 wells), Collection and document PFAS Field Regent Blank and Collection of PFAS Drum purge Water IDW Sample (3 hrs), Chain of Custody Completion and Packaging for FDEP Lab samples (1 hr) and Delivery of FDEP PFAS Samples to Shipper (2 hrs), Travel Round Trip (2 hrs), Additional Purging and Collection of PFAS Groundwater Samples from 4 wells (3 hrs).
PFAS Samples by FDEP Laboratory Method DEP SOP: LC-001-3, Wells MW001, MW002, PZ002 and PZ003, also Includes IDW and Field Regent Blank Samples.
6-Total Page 3 of 6 HW689 DC029A TACO #4 est (002)
C
OS
T
ES
TI
MA
TE
C on tra ct or
A pt im
E nv iro nm en ta l & In fra st ru ct ur e, /2
H W
D C
9A
T A
C O
S ub
Ta sk
P ro je ct M an ag em en t S ub Ta sk
6- A dd iti on al
P
FA
S S am pl in g
R ep or tin g
S ite
S pr in g La ke C le an er s
In c.
E R
IC
_5
S ub
Ta sk
2-
S ite
M ee tin g, M A
G S
/S oi l S ub Ta sk
A ct iv ity
/P ha se
S A
R S ub Ta sk
3- D
P T an d
G ro un dw at er
F ie ld A ct iv iti es
S ub
Ta sk
P ro je ct
M an ag er
A ly ss a La m b
(F D
E P
)/E ric
K ra m er
(A P
TI
M
S ub Ta sk
4- Fi na l W el l I ns ta lla tio ns S ub Ta sk
S ub
Ta sk
5-
R ep or tin g S ub Ta sk
TTo ta ls
La bo r
R at e C at eg or y
$7 3.
P P ro je ct M an
E . K ra m er
0.
$7 3.
En gi ne er /S ci en tis t 5
E . K ra m er
$6
8.
En gi ne er
/S ci en tis t 5 G
. R ob er ts
$6 5.
En gi ne er /S ci en tis t 4
S . F ly nn
$3 7.
En gi ne er /S ci en tis t 3
K . H ow ar d
$3
7.
En gi ne er
/S ci en tis t 2 K
. M cD on al d
$2
6.
En gi ne er
/S ci en tis t 1 B
. B lo un t
$3 3.
En gi ne er S ci en tis t 1
R . L in ds ay
$3
5.
D es ig ne r 2 S
. F er ia nc
$3 0.
Te ch ni ca l P ub lic at io ns S pe ci al is t 3 H
. V in in g
$2 8.
Te ch ni ca l P ub lic at io ns S pe ci al is t 3 L.
H ou se r
$0 .0
To ta l H ou rs
D ire ct L
$1
.1
$1
7.
$0 .0
$0
.0
$0 .0
$0
.0
$1
.1
$0 .0
$0
.0
$0 .0
$0
.0
O ve rh ea d
.5 8%
$1
.7
$1 4.
$0
.0
$0 .0
$0
.0
$0 .0
$1
.2
$0
.0
$0 .0
$0
.0
$0 .0
G en
A dm in
.3 8%
$2 8.
$3
.3
$0 .0
$0
.0
$0 .0
$0
.0
$2 5.
$0
.0
$0 .0
$0
.0
$0 .0
Fr in ge
.9
6% $4
7.
$5 .4
$0
.0
$0 .0
$0
.0
$0 .0
$4
1.
$0 .0
$0
.0
$0 .0
$0
.0
To ta l L
$3
.9
$4 0.
$0
.0
$0 .0
$0
.0
$0 .0
$3
.6
$0
.0
$0 .0
$0
.0
$0 .0
Tr av el V eh ic le R en ta l $1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$1
.0
$0
.0
$0 .0
$0
.0
$0 .0
M ile ag e C os ts
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
A ir
Fa re
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P er d ie m
H ot el $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l T ra ve l $1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$1
.0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
(E qu ip m en t P ro cu re m l M at er ia ls
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P ro cu re m en t F ee
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l S ub co nt ra ct or C os t
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (S er vi ce s
P ro cu re m lin g
(C on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
D ril lin g (N on -c on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ob ile L ab or at or y $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ur ve yi ng
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
ID
W
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til iti es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Pa
C
OS
T
ES
TI
MA
TE
C on tra ct or
A pt im
E nv iro nm en ta l & In fra st ru ct ur e, /2
H W
D C
9A
T A
C O
S ub
Ta sk
P ro je ct M an ag em en t S ub Ta sk
6- A dd iti on al
P
FA
S S am pl in g
R ep or tin g
S ite
S pr in g La ke C le an er s
In c.
E R
IC
_5
S ub
Ta sk
2-
S ite
M ee tin g, M A
G S
/S oi l S ub Ta sk
A ct iv ity
/P ha se
S A
R S ub Ta sk
3- D
P T an d
G ro un dw at er
F ie ld A ct iv iti es
S ub
Ta sk
P ro je ct
M an ag er
A ly ss a La m b
(F D
E P
)/E ric
K ra m er
(A P
TI
M
S ub Ta sk
4- Fi na l W el l I ns ta lla tio ns S ub Ta sk
S ub
Ta sk
5-
R ep or tin g S ub Ta sk
TTo ta ls
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
H an dl in g
Fe e
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l S ub co nt ra ct or C os t
$ $0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
La bo ra
A na ly tic al C os ts
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fa st
T ur na ro un d
C ha rg es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S am pl e
S hi pp in g $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l L ab or at or y $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fi el d
E xp en se s
P so na l P ro te ct io n
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E xp en da bl es
$4 0.
$0
.0
$0 .0
$0
.0
$0 .0
$4
0.
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
D ril lin g re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
A na ly tic al re la te
d) $4
.0
$0
.0
$0 .0
$0
.0
$0 .0
$4
.0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t (
ID
W re la te
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( O th er
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l F ie ld
E xp en se s $4
.0
$0
.0
$0 .0
$0
.0
$0 .0
$4
.0
$0
.0
$0 .0
$0
.0
$0 .0
S ub to ta l $9
.9
$4
0.
$0 .0
$0
.0
$0 .0
$0
.0
$8
.6
$0 .0
$0
.0
$0 .0
$0
.0
C om pl et io n
Fe e
$3 5.
$4
.0
$0 .0
$0
.0
$0 .0
$0
.0
$3 1.
$0
.0
$0 .0
$0
.0
$0 .0
To ta l E st im at ed C os t
$9
.0
$4 4.
$0
.0
$0 .0
$0
.0
$0 .0
$9
.6
$0
.0
$0 .0
$0
.0
$0 .0
Pa
SUBTASK:
DATE: February 25, 2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer Engineer/Scientist 5 G. Roberts Engineer/Scientist 4 S. Flynn Engineer/Scientist 2 K. Howard Engineer/Scientist 2 K. McDonald Engineer/Scientist 1
Engineer/Scientist 1 B. Blount 5
Engineer Scientist 1 R. Lindsay Designer 2 S. Ferianc Technical Publications SpecialisH. Vining Technical Publications SpecialisL. Houser
TOTAL LABOR 5
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 1 $120.00 Van or Truck $480.00 Week 0 $0.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel 0 $150.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE TOTALS
GW Protection Well Installations $4,766.00 LS 0 $0.00 Erwin Remediation IDW T&D Soil IDW Drums $110.00 LS 0 $0.00 Erwin Remediation IDW T&D Liquid IDW Drums $125.00 LS 0 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method 8260 (Full List) Wells $110.00 0 0 $0.00 EPA Method 8260 (Full List) IDW $110.00 0 0 $0.00 State Laboratory DEP SOP: LC-001-3 (PFAS) GWTallahassee $0.00 4 1 Fld Regent Blk $0.00 State Laboratory DEP SOP: LC-001-3 (PFAS) IDWTallahassee $0.00 1 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 1 $40.00 Soil Sampling Kit (concrete) $235.00 Day 0 $0.00 Monitor Well Installation Kit $325.00 Day 0 $0.00 Total Survey Station $50.00 Day 0 $0.00 Deep GW Sampling Kit $415.00 Day 1 $415.00 Encore Sampler $16.00 each 0 $0.00 55 Gallon Drums $100.00 each 0 $0.00
TOTAL EQUIPMENT $455.00
6-Additional PFAS Sampling & Reporting
Travel Round Trip (2 hrs), Additional Purging and Collection of PFAS Groundwater Samples from 4 wells (3 hrs)
PFAS Samples by FDEP Laboratory Method DEP SOP: LC-001-3, Wells MW001, MW002, PZ002 and PZ003, also Includes IDW and Field Regent Blank Samples.
6-Delta Page 6 of 6 HW689 DC029A TACO #4 est (002)
F
E P
C O S T
E S T I M A T E
C on tra ct or
Ap tim
E nv iro nm en ta l & In fra st ru ct ur e, /2
1/
H
W
D
C
9A T
AC
O
Su bT as k
Pr oj ec t M an ag em en t
Su bT as k
6-
Ad di tio na l P
FA
S Sa m pl in g
R ep or tin g
Si te
Sp rin g
La ke
C le an er s In c.
ER
IC
_5
Su bT as k
2-
Si te
M ee tin g, M
AG
S/ So il Su bT as k
Ac tiv ity /P ha se
SA
R Su bT as k
3- D
PT
a nd G ro un dw at er F ie ld
A ct iv iti es Su bT as k
Pr oj ec t M an ag er
N ik ki K nu ts on (F
D
EP
)/E ric
K ra m er
(A
PT
IM
Su bT as k
4-
Fi na l W el l I ns ta lla tio ns
Su bT as k
Su bT as k
5- R ep or tin g
Su bT as k
To ta ls
La bo r R at e
C at eg or y $7
3.
Pr oj ec t M an
E.
K ra m er
.0
$7 3.
En gi ne er /S ci en tis t 5
E.
K ra m er
$6
8.
En gi ne er
/S ci en tis t 5 G
. R ob er ts
$6 5.
En gi ne er /S ci en tis t 4
S.
F ly nn
$3 7.
En gi ne er /S ci en tis t 3
K.
H ow ar d
$3 7.
En gi ne er /S ci en tis t 2
K.
M cD on al d
$2 6.
En gi ne er /S ci en tis t 1
B.
B lo un t
$3
3.
En gi ne er
S ci en tis t 1 R
. L in ds ay
$3 5.
D es ig ne r 2
S.
F er ia nc
$3
0.
Te ch ni ca l P ub lic at io ns
S pe ci al is t 3
H . V in in g
$2
8.
Te ch ni ca l P ub lic at io ns
S pe ci al is t 3
L.
H ou se r
$0
.0
To ta l H ou rs
D ire ct L
$2
1, 2.
$2 ,4
.5
$6
,7
.1
$4 ,3
.4
$1
,3
.7
$5 ,5
.1
$5
.8
$0
.0
$0 .0
$0
.0
$0 .0
O ve rh ea d
.5 8%
$1 7, 1.
$2
,0
.8
$5 ,8
.1
$3
,7
.6
$1 ,1
.0
$4
,7
.2
$4
.6
$0 .0
$0
.0
$0 .0
$0
.0
G en
A dm in
.3
8% $4
,0
.2
$4
.7
$1 ,3
.0
$8
.1
$2
.4
$1
,0
.6
$1
.2
$0 .0
$0
.0
$0 .0
$0
.0
Fr in ge
.9 6%
$6 ,7
.9
$7
.9
$2
,1
.0
$1 ,4
.3
$4
.4
$1
,7
.6
$1
.5
$0 .0
$0
.0
$0 .0
$0
.0
To ta l L
$4 9, 7.
$5
,7
.0
$1 6, 1.
$1
0, 0.
$3 ,1
.6
$1
3, 5.
$1 ,2
.1
$0
.0
$0 .0
$0
.0
$0 .0
P a g e
P a g e
F
E P
C O S T
E S T I M A T E
C on tra ct or
Ap tim
E nv iro nm en ta l & In fra st ru ct ur e, /2
1/
H
W
D
C
9A T
AC
O
Su bT as k
Pr oj ec t M an ag em en t
Su bT as k
6-
Ad di tio na l P
FA
S Sa m pl in g
R ep or tin g
Si te
Sp rin g
La ke
C le an er s In c.
ER
IC
_5
Su bT as k
2-
Si te
M ee tin g, M
AG
S/ So il Su bT as k
Ac tiv ity /P ha se
SA
R Su bT as k
3- D
PT
a nd G ro un dw at er F ie ld
A ct iv iti es Su bT as k
Pr oj ec t M an ag er
N ik ki K nu ts on (F
D
EP
)/E ric
K ra m er
(A
PT
IM
Su bT as k
4-
Fi na l W el l I ns ta lla tio ns
Su bT as k
Su bT as k
5- R ep or tin g
Su bT as k
To ta ls
Tr av el
Ve hi cl e
R en ta l
$2 ,0
.0
$1
,0
.0
$7
.0
$2
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ile ag e
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Ai r F ar e $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Pe r d ie m
H ot el $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l T ra ve l $2
,0
.0
$1 ,0
.0
$7
.0
$2
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Su bc on tr ac to r
(E qu ip m en t P ro cu re m l M at er ia ls
$9
.8
$9
.8
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Su bc on tra ct or
S ub to ta l $9
.8
$9
.8
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Pr oc ur em en t F ee
$9 1.
$9
1.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l S ub co nt ra ct or C os t
$1 ,0
.8
$1
,0
.8
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Su bc on tr ac to r (S er vi ce s
Pr oc ur em lin g (C on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
D ril lin g
(N on
-c on ve nt io na
l) $1
5, 0.
$0 .0
$1
5, 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ob ile
L ab or at or y
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Su rv ey in g $9
,9
.0
$9 ,9
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
ID
W $1
,0
.0
$0 .0
$0
.0
$1 ,0
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
U til iti es $7
.0
$7
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Su bc on tra ct or S ub to ta l
$2 7, 0.
$1
0, 5.
$1 5, 0.
$1
,0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
H an dl in g Fe e $2
,7
.0
$1 ,0
.5
$1
,5
.0
$1
.5
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l S ub co nt ra ct or C os t
$3 0, 6.
$1
1, 8.
$1 7, 9.
$1
,1
.5
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
La bo ra
An al yt ic al C os ts
$1 2, 2.
$8
,7
.0
$3 ,1
.0
$9
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fa st T ur na ro un d C ha rg es $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Sa m pl e Sh ip pi ng $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l L ab or at or y $1
2, 2.
$8 ,7
.0
$3
,1
.0
$9
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fi el d Ex pe ns es
Pe rs on al
P ro te ct io n
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Ex pe nd ab le s
$6
.0
$3
.0
$2
.0
$4 0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Eq ui pm en t (
D ril lin g re la te d)
$7
.0
$0 .0
$7
.0
$5
0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Eq ui pm en t ( An al yt ic al re la te d)
$3 ,7
.0
$2
,2
.0
$1 ,1
.0
$2
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Eq ui pm en t (
ID
W re la te d)
$2
.0
$1
.0
$0 .0
$1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Eq ui pm en t (
O th er
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l F ie ld E xp en se s
$5 ,3
.0
$2
,7
.0
$2 ,1
.0
$4
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Su bt ot al
$1
,5
.4
$5 ,7
.0
$4
1, 2.
$3 3, 9.
$6
,0
.1
$1 3, 5.
$1
,2
.1
$0 .0
$0
.0
$0 .0
$0
.0
C om pl et io n
Fe e
$4 ,9
.7
$5
.0
$1
,6
.1
$1 ,0
.0
$3
.3
$1
,3
.5
$1
.6
$0 .0
$0
.0
$0 .0
$0
.0
To ta l E st im at ed C os t
$1
,5
.2
$6 ,3
.0
$4
3, 2.
$3 4, 7.
$6
,3
.5
$1 4, 8.
$1
,4
.8
$0 .0
$0
.0
$0 .0
$0
.0
C os t f ro m P rio r C
EF
$1
,5
.1
M an ua l E nt ry
C os t f ro m D el ta
C
EF
,0
.9
3) M an ua l E nt ry C os t (
Pr io r + D el ta
$1
,5
.2
A ut o-
C al cu la te d
R ou nd in g Er ro r:
$0 .0
A ut o-
C al cu la te d
Fi na l T ot al C os t:
$1
,5
.2
A ut o- C al cu la te d
P a g e
P a g e
Proposed Scope of Work Spring Lake Cleaners Inc. (Former) Spring Lake Plaza 1120 Havendale Boulevard NW Winter Haven, Polk County, FL 33881 Site Assessment and Reporting Task Assignment DC029A TACO #4 ERIC_5381 (Former Facility No. 539502466) Aptim Environmental & Infrastructure, LLC March 2, 2026
The following Task Assignment Change Order (TACO) #4 has been prepared to provide additional funding for the collection of the PFAS groundwater samples, which could not be collected during the January scheduled groundwater sampling event due to Federal Express shipping delays caused by the winter storms across much of the United States at the time.
Subtask 1-Project Management Project management hours are calculated based on the labor hours in the scope of work.
Subtask 2-Meeting & MAGS/Soil Sampling: No Changes Subtask 3-DPT & GW Sampling Field Activities: No Changes Subtask 4-Well Installations: No Changes Subtask 5-SAR Reporting: No Changes
Subtask 6-Additional PFAS Sampling:
As noted above, the final site assessment groundwater sampling event was scheduled and performed on January 26, 2026. At that time, PFAS samples were also scheduled for collection, however, winter weather caused shipping delays and the sampling kit from the FDEP Laboratory in Tallahassee was not delivered by Federal Express in time to allow for the collection of the samples. Therefore, the site will need to be revisited for the collection of PFAS samples. The TACO includes the necessary additional labor, equipment and travel to revisit the site and purge wells MW001, MW002, PZ002 and PZ003 for the collection of the PFAS samples, which will also include the collection of a PFAS IDW sample for characterization of the waste.
At this time, to allow time for processing of the TACO #4 request, rescheduling the PFAS sampling, analysis of the samples at the FDEP Laboratory, scheduling the IDW pickup and reporting, a 60-day extension is requested for the submittal of the Subtask 5 and 6 deliverables. The extension will extend the due date for both Subtasks to April 14, 2026. The Task Assignment Completion Date would be extended to June 16, 2026.
APTIM proposes to perform this scope of work in accordance with the terms and conditions of the contract executed between APTIM Environmental & Infrastructure, LLC and Florida Department of Environmental Protection No. HW689. APTIM will begin the proposed scope of work upon issuance of the Task Assignment Notification.
If you have any questions, please contact us for clarification.
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department) Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
DC029A 3 HW689
Gabriel Sostre 850-245-8749 Contractor APTIM Environmental & INfrastructure, LLC Contractor
Contractor Eric Kramer Contractor 407-287-3216
ERIC_5381
Spring Lake Cleaners, Inc. (Former)
✔ $ 106,551.26 $ 128,577.17
$ 106,551.26 $ 128,577.17 ✔ Completion
Completion 04/17/2026 04/17/2026 0
✔ 1 1 3
APTIM Environmental & INfrastructure, LLC Contractor
Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2025.12.12 17:36:47 -05'00' Tim Bahr Digitally signed by Tim Bahr
Date: 2025.12.12 13:25:16 -05'00'
N/A
This TACO adjusts the Scope of Work associated with this Task Assignment.
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Change Order #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
BWC TAFORM 01/18
HW689
DC029A
Subtask 3 - DPT Field Notes Package, including boring logs, DPT groundwater sampling results, and sampling results from existing monitoring wells
Subtasks 4, 5, & 1 - Site Assessment Report & PM
Subtask 6 - PFAS Email Deliverable
Subtask 2 - MAGS and Soil Sampling Field Notes Package, including vapor and soil sampling results 08/29/2025
09/26/2025
02/13/2026
02/13/2026
Upon DEP Approval of Subtask 2 - MAGS and Soil Sampling Field Notes Package, including vapor and soil sampling results
Upon DEP Approval of Subtask 3 - DPT Field Notes Package, including boring logs, DPT groundwater sampling results, and sampling results from existing monitoring wells
Upon DEP Approval of Subtasks 4, 5, & 1 - Site Assessment Report & PM
Upon DEP Approval of Subtask 6 - PFAS Email Deliverable
$ 43,112.83
$ 34,947.68
$ 27,075.94
$ 1,414.81
$ 106,551.26