CN-370000-HW689-DC15DCO4.pdf

PDF 1 MB Posted

Attached to
Master Agreement FL|HW689|a751b87398beb5bfc7861f19a403533e
Contract number
HW689
Issued by
Florida

View the file

Other files

File Type Posted
CN-370000-HW689-BF01A.pdf.crdownload CRDOWNLOAD file
CN-370000-HW689-BF01D.pdf PDF
CN-370000-HW689-BIL01G.pdf PDF
CN-370000-HW689-BIL1BCO1.pdf PDF
CN-370000-HW689-BIL1BCO3.pdf PDF
CN-370000-HW689-DC001A.pdf PDF
CN-370000-HW689-DC001B.pdf PDF
CN-370000-HW689-DC001C.pdf PDF
CN-370000-HW689-DC001D.pdf PDF
CN-370000-HW689-DC002A.pdf PDF
CN-370000-HW689-DC003B.pdf PDF
CN-370000-HW689-DC004A.pdf PDF
CN-370000-HW689-DC004B.pdf PDF
CN-370000-HW689-DC005C.pdf PDF
CN-370000-HW689-DC006A.pdf PDF
CN-370000-HW689-DC008B.pdf PDF
CN-370000-HW689-DC010B.pdf PDF
CN-370000-HW689-DC011B.pdf PDF
CN-370000-HW689-DC011D.pdf PDF
CN-370000-HW689-DC012A.pdf PDF
CN-370000-HW689-DC013B.pdf PDF
CN-370000-HW689-DC014B.pdf PDF
CN-370000-HW689-DC015E.pdf PDF
CN-370000-HW689-DC019A.pdf PDF
CN-370000-HW689-DC019B.pdf PDF
CN-370000-HW689-DC024A.pdf PDF
CN-370000-HW689-DC025A.pdf PDF
CN-370000-HW689-DC028A.pdf PDF
CN-370000-HW689-DC029A.pdf PDF
CN-370000-HW689-DC02ACO1.pdf PDF
CN-370000-HW689-DC031A.pdf PDF
CN-370000-HW689-DC034A.pdf PDF
CN-370000-HW689-DC035A.pdf PDF
CN-370000-HW689-DC037A.pdf PDF
CN-370000-HW689-DC03ACO1.pdf PDF
CN-370000-HW689-DC03ACO2.pdf PDF
CN-370000-HW689-DC03CC01.pdf PDF
CN-370000-HW689-DC03DCO1.pdf PDF
CN-370000-HW689-DC05CCO1.pdf PDF
CN-370000-HW689-DC05DCO1.pdf PDF
CN-370000-HW689-DC08CCO1.pdf PDF
CN-370000-HW689-DC08CCO2.pdf PDF
CN-370000-HW689-DC08CCO3.pdf PDF
CN-370000-HW689-DC11CCO5.pdf PDF
CN-370000-HW689-DC11CCO6.pdf PDF
CN-370000-HW689-DC12BCO4.pdf PDF
CN-370000-HW689-DC13BCO2.pdf PDF
CN-370000-HW689-DC13BCO4.pdf PDF
CN-370000-HW689-DC13BCO7.pdf PDF
CN-370000-HW689-DC16CCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

DC015D 4 HW689

Benjamin Aoki 850-245-7527 Contractor APTIM Environmental & Infrastructure, LLC Contractor

Contractor Eric Kramer Contractor 813-205-4703

ERIC_4885

Oasis Cleaners

✔ $ 53,258.86 $ 55,769.25 ✔ $ 6,600.00 $ 6,600.00

$ 59,858.86 $ 62,369.25 Completion

✔ Completion 09/11/2026 09/11/2026 0

✔ 1 1 4

APTIM Environmental & Infrastructure, LLC Contractor

Aptim Contract Manager

Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2026.04.29 16:34:07 -04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2026.04.29 11:26:20 -04'00'

This Task Assignment Change Order reduces labor and subcontractor costs for ST3.

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number: HW689 Task Assignment #: DC015D

Change Order #: 4

Deliverables:

Deliverable Deliverable Due Date

Subtask 2: O&M (Quarter 1) 9/26/2025

Subtask 3: O&M (Quarter 2) 12/19/2025

Subtask 4: Utilities (First 6 Months) 12/19/2025

Subtask 5: Semi-Annual O&M Report 1/23/2026

Subtask 6: O&M (Quarter 3) 3/20/2026

Subtask 7: O&M (Quarter 4) 6/26/2026

Subtask 8: Utilities (Entire year) 6/26/2026

Subtask 1 & 9: Annual O&M Report; Project Management 7/17/2026

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

Subtask 2: FDEP receipt of Q1 O&M Report $7,444.55

Subtask 3: FDEP receipt of Q2 O&M Report $10,206.56

Subtask 4: FDEP receipt of paid utilities receipts: cost reimbursement = not to exceed $2,250.00 Handling Fee = $120 $0.00

Subtask 5: FDEP receipt of Semi-Annual O&M Report $4,037.61

Subtask 6: FDEP receipt of Q3 O&M Report $10,681.85

Subtask 7: FDEP receipt of Q4 O&M Report $10,681.85

Subtask 8: FDEP receipt of paid utilities receipts: cost reimbursement = not to exceed $6,600.00 Handling Fee = $240 $6,840.00

Subtask 1 & 9: FDEP receipt of Annual O&M Report $9,966.44

TOTAL COST $59,858.86

BWC TAFORM 01_18

FFLORIDAA DEPARTMENTT OF

EEnvironmentall Protection

Ronn DeSantis

Alexiss A.. Lambert

Memorandum

TO:

FROM:

SUBJECT:

DATE:

FDEP COST ESTIMATE

Contractor: Aptim Environmental & Infrastructure, LLC

Date: 4/2/2026

Task #: HW689 - DC008C TACO #4 SubTask 1 Project Management SubTask 6 6-Qtr 3 O&M Dec-Feb

Site: Oasis Cleaners ERIC_4885 SubTask 2 2-Qtr 1 O&M Jun-Aug 2025 SubTask 7 7-Qtr 4 O&M Mar-May

Activity/Phase: Annual O&M Services SubTask 3 3- Qtr 2 O&M Sept-Nov SubTask 8 8-Utilities Qtr 3&4 (Dec-May)

Project Manager: Safa Shariat FDEP/Eric Kramer APTIM SubTask 4 4-Utilities Qtr 1&2 (Jun-Nov) SubTask 9 9-Annual O&M Report

SubTask 5 5-Semi-Annual Report SubTask 10

TTotals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$71.05 Project Manager E. Kramer 27 27.0 $71.05 Engineer/Scientist 5 E. Kramer 28 5 5 0 4 5 5 0 4 0 $66.63 Engineer/Scientist 5 G. Roberts 4 0 0 0 2 0 0 0 2 0 $36.08 Engineer/Scientist 3 K. Howard 0 0 0 0 0 0 0 0 0 0 $28.45 Engineer/Scientist 1 R. Lindsay 158 43 37 0 0 39 39 0 0 0 $24.50 Engineer/Scientist 1 B. Blount 0 0 0 0 0 0 0 0 0 0 $36.15 Engineer/Scientist 2 K. McDonald 108 12 12 0 25 12 12 0 35 0 $32.50 Engineering Technician 3 B. Skipper 111 0 37 0 0 37 37 0 0 0 $34.84 Designer 2 S. Ferianc 8 0 0 0 4 0 0 0 4 0 $29.57 Technical Publications Specialist 3 H. Vining 6 0 0 0 3 0 0 0 3 0

$0.00 0 0 0 0 0 0 0 0 0 0 TTotal Hours 450 27 60 91 0 38 93 93 0 48 0

Direct Labor $16,632.32 $1,913.46 $2,012.40 $3,044.20 $0.00 $1,549.28 $3,101.10 $3,101.10 $0.00 $1,910.78 $0.00

Overhead 85.58% $14,233.96 $1,637.54 $1,722.21 $2,605.23 $0.00 $1,325.87 $2,653.93 $2,653.93 $0.00 $1,635.25 $0.00 Gen & Admin 19.38% $3,223.36 $370.83 $390.00 $589.97 $0.00 $300.25 $601.00 $601.00 $0.00 $370.31 $0.00 Fringe 31.96% $5,315.69 $611.54 $643.16 $972.93 $0.00 $495.15 $991.11 $991.11 $0.00 $610.69 $0.00 Total Labor $39,405.33 $4,533.37 $4,767.77 $7,212.33 $0.00 $3,670.55 $7,347.14 $7,347.14 $0.00 $4,527.03 $0.00

Travel Vehicle Rental $1,440.00 $360.00 $360.00 $0.00 $0.00 $360.00 $360.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $1,440.00 $360.00 $360.00 $0.00 $0.00 $360.00 $360.00 $0.00 $0.00 $0.00

REV: 02/03 CEF SHAW Page 1

FDEP COST ESTIMATE

Date: 4/2/2026

Task #: HW689 - DC008C TACO #4 SubTask 1 Project Management SubTask 6 6-Qtr 3 O&M Dec-Feb

Site: Oasis Cleaners ERIC_4885 SubTask 2 2-Qtr 1 O&M Jun-Aug 2025 SubTask 7 7-Qtr 4 O&M Mar-May

Activity/Phase: Annual O&M Services SubTask 3 3- Qtr 2 O&M Sept-Nov SubTask 8 8-Utilities Qtr 3&4 (Dec-May)

Project Manager: Safa Shariat FDEP/Eric Kramer APTIM SubTask 4 4-Utilities Qtr 1&2 (Jun-Nov) SubTask 9 9-Annual O&M Report

SubTask 5 5-Semi-Annual Report SubTask 10

TTotals 1 2 3 4 5 6 7 8 9 10 SSubcontractor (Equipment Procurement)

UltraSonic Water Level $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $6,600.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $6,600.00 $0.00 $0.00 Pump Alarm Telementry $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 PRM Filteration $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $6,600.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $6,600.00 $0.00 $0.00 Handling Fee $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $240.00 $0.00 $0.00 Total Subcontractor Cost $6,840.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $6,840.00 $0.00 $0.00

Laboratory Analytical Costs $1,673.00 $200.00 $273.00 $0.00 $0.00 $600.00 $600.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $440.00 $110.00 $110.00 $0.00 $0.00 $110.00 $110.00 $0.00 $0.00 $0.00 Total Laboratory $2,113.00 $310.00 $383.00 $0.00 $0.00 $710.00 $710.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $420.00 $105.00 $105.00 $0.00 $0.00 $105.00 $105.00 $0.00 $0.00 $0.00 Expendables $480.00 $120.00 $120.00 $0.00 $0.00 $120.00 $120.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $5,220.00 $1,305.00 $1,305.00 $0.00 $0.00 $1,305.00 $1,305.00 $0.00 $0.00 $0.00 Total Field Expenses $6,120.00 $1,530.00 $1,530.00 $0.00 $0.00 $1,530.00 $1,530.00 $0.00 $0.00 $0.00

Subtotal $55,918.33 $4,533.37 $6,967.77 $9,485.33 $0.00 $3,670.55 $9,947.14 $9,947.14 $6,840.00 $4,527.03 $0.00 Completion Fee $3,940.53 $453.34 $476.78 $721.23 $0.00 $367.06 $734.71 $734.71 $0.00 $452.70 $0.00

Total Estimated Cost $59,858.86 $4,986.71 $7,444.55 $10,206.56 $0.00 $4,037.61 $10,681.85 $10,681.85 $6,840.00 $4,979.73 $0.00

Cost from Prior CEF: $62,369.25 Manual Entry Cost from Delta CEF; ($2,510.41) Manual Entry

Cost (Prior + Delta): $59,858.84 Auto-Calculated Rounding Error: $0.02 Auto-Calculated

Final Total Cost: $59,858.86 Auto-Calculated

REV: 02/03 CEF SHAW Page 2

SITE :

SUBTASK:

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer 5

Engineer/Scientist 5 G. Roberts Engineer/Scientist 2 K. Howard

Engineer/Scientist 1 R. Lindsay 43

Engineer/Scientist 1 B. Blount

Engineer/Scientist 1 K. McDonald 12

Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining

TOTAL LABOR 60

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 3 $360.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE TOTALS

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method TO-15 (VOC Soil Vapor) $200.00 1 0 $200.00 EPA Method 8260 (Halos Only) $73.00 0 0 $0.00 EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00 Sample Shipping (Small cooler) $110.00 1 $110.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $310.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 3 $120.00 PPE Level D $35.00 Day 3 $105.00 Construction/O&M Kit $360.00 Day 3 $1,080.00 Construction O&M Supplies $75.00 Day 3 $225.00

TOTAL EQUIPMENT $1,530.00

Oasis Cleaners

11/5/2024

Engineering evaluation of monthly data, direct staff engineer for system adjustments (3 hrs.). Submital of the Quarterly monthly reports O&M data collection sheets. (2 hrs.)

2-Qtr 1 O&M Jan-Mar 2025

Monthly Base Work - Loadout prep. (1 hr), Travel Round Trip (6 hrs), SVE O&M (6 hrs) {total = 13 hrs x 3 mo = 39 hrs. Additional work (each quarter) includes SVE Vacuum Readings and collection of VOC Vapor Sample (total 4 hrs).

Daily telemetry checks to verify the SVE system is operating as scheduled (3 hrs per month x 3 months = 9 hrs). SVE performance evaluation and system optimization (3 hrs).

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer 5

Engineer/Scientist 5 G. Roberts Engineer/Scientist 2 K. Howard

Engineer/Scientist 1 R. Lindsay 37

Engineer/Scientist 1 B. Blount

Engineer/Scientist 1 K. McDonald 12

Engineering Technician 3 B. Skipper 37

Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining

TOTAL LABOR 91

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 3 $360.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE TOTALS

PRM Filtration panel modification $966.00 each 0 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method TO-15 (VOC Soil Vapor) $200.00 1 0 $200.00 EPA Method 8260 (Halos Only) $73.00 0 0 $0.00 EPA Method 8260 (Halos Only/IDW) $73.00 1 $73.00 Sample Shipping (Small cooler) $110.00 1 $110.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $383.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 3 $120.00 PPE Level D $35.00 Day 3 $105.00 Construction/O&M Kit $360.00 Day 3 $1,080.00 Construction O&M Supplies $75.00 Day 3 $225.00 Ultrasonic Water Level $663.50 each 0 $0.00

TOTAL EQUIPMENT $1,530.00

Oasis Cleaners

3- Qtr 2 O&M Sept-Nov 4/2/2026

Engineering evaluation of monthly data, direct staff engineer for system adjustments (3 hrs.). Submital of the Quarterly monthly reports O&M data collection sheets. (2 hrs.)

Monthly Base Work - Loadout prep. (1 hr), Travel Round Trip (6 hrs), SVE O&M (6 hrs) {total = 11 hrs x 3 mo = 33 hrs. Additional work (each quarter) includes SVE Vacuum Readings and collection of VOC Vapor Sample (total 4 hrs).

Daily telemetry checks to verify the SVE system is operating as scheduled (3 hrs per month x 3 months = 9 hrs). SVE performance evaluation and system optimization (3 hrs).

Monthly Base Work - Loadout prep. (1 hr), Travel Round Trip (6 hrs), SVE O&M (4 hrs) {total = 11 hrs x 3 mo = 33 hrs. Additional work once per quarter includes SVE Vacuum Readings and collection of VOC Vapor Sample (total 4 hrs).

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer Engineer/Scientist 5 G. Roberts Engineer/Scientist 2 K. Howard Engineer/Scientist 1 R. Lindsay Engineer/Scientist 1 B. Blount Engineer/Scientist 1 K. McDonald Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE TOTALS

Electrical Service Sept-Oct $0.00 Month 0 0 $0.00 Handling fee Electrical $0.00 Month 0 0 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00 EPA Method 8260 (Halos Only) $73.00 0 0 $0.00 EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00 Construction/O&M Kit $360.00 Day 0 $0.00 Construction O&M Supplies $75.00 Day 0 $0.00

TOTAL EQUIPMENT $0.00

Oasis Cleaners

4-Utilities Qtr 1&2 (Jun-Nov) 1/30/2026

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer 4

Engineer/Scientist 5 G. Roberts 2 Engineer/Scientist 2 K. Howard Engineer/Scientist 1 R. Lindsay Engineer/Scientist 1 B. Blount

Engineer/Scientist 1 K. McDonald 25

Designer 2 S. Ferianc 4 Technical Pub Specialist 3 H. Vining 3

TOTAL LABOR 38

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE TOTALS

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00 EPA Method 8260 (Halos Only) $73.00 0 0 $0.00 EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00 Construction/O&M Kit $360.00 Day 0 $0.00 Construction O&M Supplies $75.00 Day 0 $0.00

TOTAL EQUIPMENT $0.00

Oasis Cleaners

5-Semi-Annual Report 11/5/2024

Engineering evaluation of monthly data for first six months system operation, PE seal of Semi-Annual O&M report, evaluate data, develop recommendations and conclusions (4 hrs.)

Data quality evaluation and report documentation

Semi-Annual O&M Report (Document Production)

Preparation of Semi-Annual O&M Report includes preparation of SVE operational tables, calculations, figures, O&M site visit summary, SVE system operation & performance.

Semi-Annual O&M Report (Drafting)

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer 5

Engineer/Scientist 5 G. Roberts Engineer/Scientist 2 K. Howard

Engineer/Scientist 1 R. Lindsay 39

Engineer/Scientist 1 B. Blount

Engineer/Scientist 1 K. McDonald 12

Engineering Technician 3 B. Skipper 37

Designer 2 S. Ferianc Designer 1 Technical Pub Specialist 3 H. Vining

TOTAL LABOR 93

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 3 $360.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE TOTALS

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method TO-15 (VOC Soil Vapor) $200.00 3 0 $600.00 EPA Method 8260 (Halos Only) $73.00 0 0 $0.00 EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00 Sample Shipping (Small cooler) $110.00 1 $110.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $710.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 3 $120.00 PPE Level D $35.00 Day 3 $105.00 Construction/O&M Kit $360.00 Day 3 $1,080.00 Construction O&M Supplies $75.00 Day 3 $225.00

TOTAL EQUIPMENT $1,530.00

Monthly Base Work - Loadout prep. (1 hr), Travel Round Trip (6 hrs), SVE O&M (4 hrs) {total = 11 hrs x 3 mo = 33 hrs. Additional work once per quarter includes SVE Vacuum Readings and collection of VOC Vapor Sample (total 4 hrs).

Monthly Base Work - Loadout prep. (1 hr), Travel Round Trip (6 hrs), SVE O&M (4 hrs) {total = 11 hrs x 3 mo = 33 hrs. Additional work once per quarter includes SVE Vacuum Readings and collection of VOC Vapor Sample (total 4 hrs). Add -cycle zones to collect vapor samples form two zones

Daily telemetry checks to verify the SVE system is operating as scheduled (3 hrs per month x 3 months = 9 hrs). SVE performance evaluation and system optimization (3 hrs).

Oasis Cleaners

6-Qtr 3 O&M Dec-Feb 1/30/2026

Engineering evaluation of monthly data, direct staff engineer for system adjustments (3 hrs.). Submital of the Quarterly monthly reports O&M data collection sheets. (2 hrs.)

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer 5

Engineer/Scientist 5 G. Roberts Engineer/Scientist 2 K. Howard

Engineer/Scientist 1 R. Lindsay 37

Engineer/Scientist 1 B. Blount

Engineer/Scientist 1 K. McDonald 12

Engineering Technician 3 B. Skipper 37

Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining

TOTAL LABOR 91

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 3 $360.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE TOTALS

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method TO-15 (VOC Soil Vapor) $200.00 3 0 $600.00 EPA Method 8260 (Halos Only) $73.00 0 0 $0.00 EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00 Sample Shipping (Small cooler) $110.00 1 $110.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $710.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 3 $120.00 PPE Level D $35.00 Day 3 $105.00 Construction/O&M Kit $360.00 Day 3 $1,080.00 Construction O&M Supplies $75.00 Day 3 $225.00

TOTAL EQUIPMENT $1,530.00

Oasis Cleaners

7-Qtr 4 O&M Mar-May 1/30/2026

Engineering evaluation of monthly data, direct staff engineer for system adjustments (3 hrs.). Submital of the Quarterly monthly reports O&M data collection sheets. (2 hrs.)

Monthly Base Work - Loadout prep. (1 hr), Travel Round Trip (6 hrs), SVE O&M (4 hrs) {total = 11 hrs x 3 mo = 33 hrs. Additional work once per quarter includes SVE Vacuum Readings and collection of VOC Vapor Sample (total 4 hrs). Add -cycle zones to collect vapor samples form two zones

Daily telemetry checks to verify the SVE system is operating as scheduled (3 hrs per month x 3 months = 9 hrs). SVE performance evaluation and system optimization (3 hrs).

Monthly Base Work - Loadout prep. (1 hr), Travel Round Trip (6 hrs), SVE O&M (4 hrs) {total = 11 hrs x 3 mo = 33 hrs. Additional work once per quarter includes SVE Vacuum Readings and collection of VOC Vapor Sample (total 4 hrs).

SUBTASK: 8-Utilities

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer Engineer/Scientist 5 G. Roberts Engineer/Scientist 2 K. Howard Engineer/Scientist 1 R. Lindsay Engineer/Scientist 1 B. Blount Engineer/Scientist 1 K. McDonald Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE TOTALS

FPL-Electrical Service $550.00 Month 12 $6,600.00 Handling fee Electrical $20.00 Month 12 $240.00

TOTAL $6,840.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00 Construction/O&M Kit $360.00 Day 0 $0.00 Construction O&M Supplies $75.00 Day 0 $0.00

TOTAL EQUIPMENT $0.00

Oasis Cleaners

1/30/2026

LEVEL OF EFFORT / EXPENSE WORKSHEET

SUBTASK:

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer 4

Engineer/Scientist 5 G. Roberts 2

Engineer/Scientist 2 K. Howard Engineer/Scientist 1 R. Lindsay Engineer/Scientist 1 B. Blount

Engineer/Scientist 1 K. McDonald 35

Designer 2 S. Ferianc 4 Technical Pub Specialist 3 H. Vining 3

TOTAL LABOR 48

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE TOTALS

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00 EPA Method 8260 (Halos Only) $73.00 0 0 $0.00 EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day $0.00 Shallow GW Sampling Kit $290.00 Day $0.00 Deep Groundwater Sampling Kit $415.00 Day $0.00 Diffusion Sampler (2" well) $36.00 Day $0.00 55-gallon Drum $100.00 each $0.00

TOTAL EQUIPMENT $0.00

Oasis Cleaners

Preparation of Annual O&M Report that includes SVE operational tables, calculations, figures, O&M site visit summary, SVE system operation & performance (35 hrs.)

Annual Groundwater and O&M Reporting (Drafting) Annual Groundwater and O&M Report (Document Production)

9-Annual O&M Report 11/5/2024

Engineering evaluation of monthly data, PE seal of Annual O&M report, evaluate data, develop recommendations and conclusions (4 hrs.)

Technical evaluation of air analytical data (2 hr)

9-Annual O&M Reporting Page 10 of 10 Oasis Cleaners DC015D est

FDEP COST ESTI MATE

Date: 4/2/2026

Task #: HW689 - DC008C TACO #4 SubTask 1 Project Management SubTask 6 6-Qtr 3 O&M Dec-Feb

Site: Oasis Cleaners ERIC_4885 SubTask 2 2-Qtr 1 O&M Jun-Aug 2025 SubTask 7 7-Qtr 4 O&M Mar-May

Activity/Phase: Annual O&M Services SubTask 3 3- Qtr 2 O&M Sept-Nov SubTask 8 8-Utilities Qtr 3&4 (Dec-May)

Project Manager: Safa Shariat FDEP/Eric Kramer APTIM SubTask 4 4-Utilities Qtr 1&2 (Jun-Nov) SubTask 9 9-Annual O&M Report

SubTask 5 5-Semi-Annual Report SubTask 10

TTotals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$71.05 Project Manager E. Kramer 0 -0.4 $71.05 Engineer/Scientist 5 E. Kramer 0 0 0 0 0 0 0 0 0 0 $66.63 Engineer/Scientist 5 G. Roberts 0 0 0 0 0 0 0 0 0 0 $36.08 Engineer/Scientist 3 K. Howard 0 0 0 0 0 0 0 0 0 0 $28.45 Engineer/Scientist 1 R. Lindsay -4 0 -4 0 0 0 0 0 0 0 $24.50 Engineer/Scientist 1 B. Blount 0 0 0 0 0 0 0 0 0 0 $36.15 Engineer/Scientist 2 K. McDonald 0 0 0 0 0 0 0 0 0 0 $32.50 Engineering Technician 3 B. Skipper -4 0 -4 0 0 0 0 0 0 0 $34.84 Designer 2 S. Ferianc 0 0 0 0 0 0 0 0 0 0 $29.57 Technical Publications Specialist 3 H. Vining 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0 TTotal Hours -8 0 0 -8 0 0 0 0 0 0 0

Direct Labor ($275.49) ($31.69) $0.00 ($243.80) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 85.58% ($235.76) ($27.12) $0.00 ($208.64) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 19.38% ($53.39) ($6.14) $0.00 ($47.25) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 31.96% ($88.05) ($10.13) $0.00 ($77.92) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor ($652.69) ($75.08) $0.00 ($577.61) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF SHAW Page 4

Date: 4/2/2026

Task #: HW689 - DC008C TACO #4 SubTask 1 Project Management SubTask 6 6-Qtr 3 O&M Dec-Feb

Site: Oasis Cleaners ERIC_4885 SubTask 2 2-Qtr 1 O&M Jun-Aug 2025 SubTask 7 7-Qtr 4 O&M Mar-May

Activity/Phase: Annual O&M Services SubTask 3 3- Qtr 2 O&M Sept-Nov SubTask 8 8-Utilities Qtr 3&4 (Dec-May)

Project Manager: Safa Shariat FDEP/Eric Kramer APTIM SubTask 4 4-Utilities Qtr 1&2 (Jun-Nov) SubTask 9 9-Annual O&M Report

SubTask 5 5-Semi-Annual Report SubTask 10

TTotals 1 2 3 4 5 6 7 8 9 10 SSubcontractor (Equipment Procurement)

UltraSonic Water Level ($663.50) $0.00 ($663.50) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal ($663.50) $0.00 ($663.50) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee ($66.35) $0.00 ($66.35) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost (($729.85) $0.00 ($729.85) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Pump Alarm Telementry $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 PRM Filteration ($966.00) $0.00 ($966.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal ($966.00) $0.00 ($966.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee ($96.60) $0.00 ($96.60) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost ($1,062.60) $0.00 ($1,062.60) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal ($2,445.14) ($75.08) $0.00 ($2,370.06) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee ($65.27) ($7.51) $0.00 ($57.76) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost ($2,510.41) ($82.59) $0.00 ($2,427.82) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF SHAW Page 5

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer Engineer/Scientist 5 G. Roberts Engineer/Scientist 2 K. Howard

Engineer/Scientist 1 R. Lindsay -4

Engineer/Scientist 1 B. Blount Engineer/Scientist 1 K. McDonald

Engineering Technician 3 B. Skipper -4

Geospatial Analyst 3 H. Vollmer Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining

TOTAL LABOR -8

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE TOTALS

PRM Filtration panel modification $966.00 each -1 ($966.00)

TOTAL ($966.00)

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00 EPA Method 8260 (Halos Only) $73.00 0 0 $0.00 EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00 PPE Level D $35.00 Day 0 $0.00 Construction/O&M Kit $360.00 Day 0 $0.00 Construction O&M Supplies $75.00 Day 0 $0.00 Ultrasonic Water Level $663.50 each -1 ($663.50)

TOTAL EQUIPMENT ($663.50)

Oasis Cleaners

3- Qtr 2 O&M Sept-Nov 4/2/2026

Remove: Installation of ultrasonic levl meter and pull control wire 4 hrs. (Ultasonic meter not installed due to difficulty coordinating with contractor and below grade fit issues)

Remove: Installation of ultrasonic levl meter and pull control wire 4 hrs. (Ultasonic meter not installed due to difficulty coordinating with contractor and below grade fit issues)

Date: 1/30/2026 Task #: HW689 - DC015D TACO #3 SubTask 1 Project Management SubTask 6 6-Qtr 3 O&M Dec-Feb

Site: Oasis Cleaners ERIC_4885 SubTask 2 2-Qtr 1 O&M Jun-Aug 2025 SubTask 7 7-Qtr 4 O&M Mar-May Activity/Phase: Annual O&M Services SubTask 3 3- Qtr 2 O&M Sept-Nov SubTask 8 8-Utilities Qtr 3&4 (Dec-May)

Project Manager: Safa Shariat FDEP/Eric Kramer APTIM SubTask 4 4-Utilities Qtr 1&2 (Jun-Nov) SubTask 9 9-Annual O&M Report SubTask 5 5-Semi-Annual Report SubTask 10

TTotals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$71.05 Project Manager E. Kramer 27 27.4 $71.05 Engineer/Scientist 5 E. Kramer 28 5 5 0 4 5 5 0 4 0 $66.63 Engineer/Scientist 5 G. Roberts 4 0 0 0 2 0 0 0 2 0 $36.08 Engineer/Scientist 3 K. Howard 0 0 0 0 0 0 0 0 0 0 $28.45 Engineer/Scientist 1 R. Lindsay 162 43 41 0 0 39 39 0 0 0 $24.50 Engineer/Scientist 1 B. Blount 0 0 0 0 0 0 0 0 0 0 $36.15 Engineer/Scientist 2 K. McDonald 108 12 12 0 25 12 12 0 35 0 $32.50 Engineering Technician 3 B. Skipper 115 0 41 0 0 37 37 0 0 0 $34.84 Designer 2 S. Ferianc 8 0 0 0 4 0 0 0 4 0 $29.57 Technical Publications Specialist 3 H. Vining 6 0 0 0 3 0 0 0 3 0

$0.00 0 0 0 0 0 0 0 0 0 0 TTotal Hours 458 27 60 99 0 38 93 93 0 48 0

Direct Labor $16,907.81 $1,945.15 $2,012.40 $3,288.00 $0.00 $1,549.28 $3,101.10 $3,101.10 $0.00 $1,910.78 $0.00

Overhead 85.58% $14,469.72 $1,664.66 $1,722.21 $2,813.87 $0.00 $1,325.87 $2,653.93 $2,653.93 $0.00 $1,635.25 $0.00 Gen & Admin 19.38% $3,276.74 $376.97 $390.00 $637.21 $0.00 $300.25 $601.00 $601.00 $0.00 $370.31 $0.00 Fringe 31.96% $5,403.73 $621.67 $643.16 $1,050.84 $0.00 $495.15 $991.11 $991.11 $0.00 $610.69 $0.00 Total Labor $40,058.00 $4,608.45 $4,767.77 $7,789.92 $0.00 $3,670.55 $7,347.14 $7,347.14 $0.00 $4,527.03 $0.00

Travel Vehicle Rental $1,440.00 $360.00 $360.00 $0.00 $0.00 $360.00 $360.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $1,440.00 $360.00 $360.00 $0.00 $0.00 $360.00 $360.00 $0.00 $0.00 $0.00

REV: 02/03 CEF SHAW Page 7

Date: 1/30/2026 Task #: HW689 - DC015D TACO #3 SubTask 1 Project Management SubTask 6 6-Qtr 3 O&M Dec-Feb

Site: Oasis Cleaners ERIC_4885 SubTask 2 2-Qtr 1 O&M Jun-Aug 2025 SubTask 7 7-Qtr 4 O&M Mar-May Activity/Phase: Annual O&M Services SubTask 3 3- Qtr 2 O&M Sept-Nov SubTask 8 8-Utilities Qtr 3&4 (Dec-May)

Project Manager: Safa Shariat FDEP/Eric Kramer APTIM SubTask 4 4-Utilities Qtr 1&2 (Jun-Nov) SubTask 9 9-Annual O&M Report SubTask 5 5-Semi-Annual Report SubTask 10

TTotals 1 2 3 4 5 6 7 8 9 10 SSubcontractor (Equipment Procurement)

UltraSonic Water Level $663.50 $0.00 $663.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $663.50 $0.00 $663.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $66.35 $0.00 $66.35 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $$729.85 $0.00 $729.85 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $6,600.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $6,600.00 $0.00 $0.00 Pump Alarm Telementry $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 PRM Filteration $966.00 $0.00 $966.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $7,566.00 $0.00 $966.00 $0.00 $0.00 $0.00 $0.00 $6,600.00 $0.00 $0.00 Handling Fee $336.60 $0.00 $96.60 $0.00 $0.00 $0.00 $0.00 $240.00 $0.00 $0.00 Total Subcontractor Cost $7,902.60 $0.00 $1,062.60 $0.00 $0.00 $0.00 $0.00 $6,840.00 $0.00 $0.00

Laboratory Analytical Costs $1,673.00 $200.00 $273.00 $0.00 $0.00 $600.00 $600.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $440.00 $110.00 $110.00 $0.00 $0.00 $110.00 $110.00 $0.00 $0.00 $0.00 Total Laboratory $2,113.00 $310.00 $383.00 $0.00 $0.00 $710.00 $710.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $420.00 $105.00 $105.00 $0.00 $0.00 $105.00 $105.00 $0.00 $0.00 $0.00 Expendables $480.00 $120.00 $120.00 $0.00 $0.00 $120.00 $120.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $5,220.00 $1,305.00 $1,305.00 $0.00 $0.00 $1,305.00 $1,305.00 $0.00 $0.00 $0.00 Total Field Expenses $6,120.00 $1,530.00 $1,530.00 $0.00 $0.00 $1,530.00 $1,530.00 $0.00 $0.00 $0.00

Subtotal $58,363.45 $4,608.45 $6,967.77 $11,855.37 $0.00 $3,670.55 $9,947.14 $9,947.14 $6,840.00 $4,527.03 $0.00 Completion Fee $4,005.80 $460.85 $476.78 $778.99 $0.00 $367.06 $734.71 $734.71 $0.00 $452.70 $0.00

Total Estimated Cost $62,369.25 $5,069.30 $7,444.55 $12,634.36 $0.00 $4,037.61 $10,681.85 $10,681.85 $6,840.00 $4,979.73 $0.00

REV: 02/03 CEF SHAW Page 8

Proposed Scope of Work Oasis Cleaners (former) DC015D 3210 1st Street West, Bradenton, FL Task Assignment DC015C TACO #4 ERIC_4885 (Former FAC ID No. 419500357) Aptim Environmental & Infrastructure, LLC (APTIM) April 1, 2026

The following proposed Task Assignment Change Order (TACO) #4 for the former Oasis Cleaners facility reconciles the costs associated with the authorized scope of work.

Subtask - 1: Project Management This task includes project management activities associated with the completion of Subtasks 2 through 9, as calculated in accordance with Contract HW689.

Subtask 2: Qtr. 1 O&M Reporting: No Changes

Subtask 3: Qtr. 2 O&M Reporting

TACO #2 which is in Subtask 3, authorized the purchase and installation of an optical water level detector that would be placed at the top of the well casing. Operation of this device required modifications to the control panel to receive a 4-20 milliamp analog signal or other digital response to changing groundwater elevation changes. Unfortunately, a cost-effective unit that could fit within the well casing and manhole could not readily be found so the modification was not performed. The high groundwater elevation condition that would allow water entrainment into the remedial system is now managed by adjusting the vacuum extraction pressure, isolating specific vertical SVE wells and adjusting zone operation. The cost reconciliation for this system modification removes 8 personnel hours from ST 3, removal of $966 fee from subcontractor PRM and removal of the optical sensor for $663.50. Total cost reduction for Subtask 3 is $2,510.41.

Subtask 4: Utilities One Month: No Changes

Subtask 5: Semi-Annual Reporting: No Changes

Subtask 6: Qtr. 3 O&M Reporting: No Changes

Subtask 7: Qtr. 4 O&M Reporting: No Changes

Subtask 8: Utilities One Month: No Changes

Subtask 9: Annual O&M Reporting: No Changes

APTIM proposes to perform this scope of work in accordance with the terms and conditions of the DEP Contract No. HW689, dated December 21, 2021, that was executed between the Florida Department of Environmental Protection and APTIM. APTIM will begin the proposed scope of work upon issuance of the Task Assignment Notification.

If you have any questions, please contact us for clarification.

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

DC015D 3 HW689

Alyssa Lamb 850-245-8791 Contractor APTIM Environmental & Infrastructure, LLC Contractor

Contractor Eric Kramer Contractor 813-205-4703

ERIC_4885

Oasis Cleaners

✔ $ 55,769.25 $ 54,643.11 ✔ $ 6,600.00 $ 4,500.00

$ 62,369.25 $ 59,143.11 ✔ Completion

Completion 09/11/2026 09/11/2026 0

1 1

Contractor

Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2026.02.09 08:14:18 -05'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2026.02.06 12:59:00 -05'00'

This Change Order adjusts the utility subtasks for invoicing purposes as well as the addition of vapor sample analysis.

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number: HW689 Task Assignment #: DC015D

Deliverables:

Deliverable Deliverable Due Date Subtask 2- O&M (Quarter 1) 9/26/2025

Subtask 3- O&M (Quarter 2) 12/19/2025 Subtask 4- Utilities (First 6 Months) 12/19/2025 Subtak 5- Semi-Annual O&M Report 1/23/2026 Subtask 6- O&M (Quarter 3) 3/20/2026 Subtask 7- O&M (Quarter 4) 6/26/2026 Subtask 8- Utilities (Entire Year) 6/26/2026 Subtask 1 & 9- Project Management; Annual O&M Report 7/17/2026

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced Subtask 2- Submittal and FDEP approval of the first quarter O&M Report 7,444.55

Subtask 3- Submittal and FDEP approval of the second quarter O&M Report 12,634.36

Subtask 4- Submittal and FDEP approval of paid utility receipts:

Cost Reimbursement = not to exceed $2,250.00 Handling Fee= $120

0.00

Subtask 5- Submittal and FDEP approval of Semi- Annual O&M Report 4,037.61

Subtask 6- Submittal and FDEP approval of the third quarter O&M Report 10,681.85

Subtask 7- Submittal and FDEP approval of the fourth quarter O&M Report 10,681.85

Subtask 8- Submittal and FDEP approval of paid utility receipts:

Cost Reimbursement = not to exceed $6,600.00 Handling Fee= $240

6,840.00

Subtasks 1 & 9- Submittal and FDEP approval of Annual O&M Report 10,049.03

TOTAL COST $62,369.25

BWC TAFORM 01/18