This document constitutes a Task Assignment Change Order (TACO #1) entered into between the State of Florida Department of Environmental Protection (FDEP) and Aptim Environmental & Infrastructure, LLC (APTIM). The contract, designated HW689, pertains to site assessment and remediation activities at the Imperial Cleaners facility located at 1500 E. Commercial Boulevard in Oakland Park, Broward County, Florida (ERIC_4106). The change order was executed on April 17, 2023, with FDEP represented by Teresa Booeshaghi (Secretary or Designee) and APTIM represented by Eric Kramer (Project Manager).

This TACO authorizes a cost increase of $4,156.42 to reconcile Work Change Directives #1 through #4, bringing the total task assignment value from $104,545.32 to $108,701.74. The scope encompasses five subtasks: Project Management, Site Meeting and MAGS (Membrane Accumulation Gradient Sampling) event, Soil and Groundwater Field Activities, Final Well Installations, and Reporting. Deliverables include field work documentation with sampling logs, site photos, and well logs for the MAGS event and soil/groundwater sampling, along with email confirmation of final well installation completion and a Site Assessment Report. The task completion date was extended from May 31, 2023, to September 30, 2023 (122 days total). Invoice payments are structured in three phases based on deliverable approval: $33,696.99 for MAGS documentation, $43,698.94 for soil and groundwater sampling documentation, and $31,305.81 for final well installation and reporting completion.

View the file

Other files

File Type Posted
CN-370000-HW689-BF01A.pdf.crdownload CRDOWNLOAD file
CN-370000-HW689-BF01D.pdf PDF
CN-370000-HW689-BIL01G.pdf PDF
CN-370000-HW689-BIL1BCO1.pdf PDF
CN-370000-HW689-BIL1BCO3.pdf PDF
CN-370000-HW689-DC001A.pdf PDF
CN-370000-HW689-DC001B.pdf PDF
CN-370000-HW689-DC001C.pdf PDF
CN-370000-HW689-DC001D.pdf PDF
CN-370000-HW689-DC002A.pdf PDF
CN-370000-HW689-DC003B.pdf PDF
CN-370000-HW689-DC004A.pdf PDF
CN-370000-HW689-DC004B.pdf PDF
CN-370000-HW689-DC005C.pdf PDF
CN-370000-HW689-DC006A.pdf PDF
CN-370000-HW689-DC008B.pdf PDF
CN-370000-HW689-DC010B.pdf PDF
CN-370000-HW689-DC011B.pdf PDF
CN-370000-HW689-DC011D.pdf PDF
CN-370000-HW689-DC012A.pdf PDF
CN-370000-HW689-DC013B.pdf PDF
CN-370000-HW689-DC014B.pdf PDF
CN-370000-HW689-DC015E.pdf PDF
CN-370000-HW689-DC019A.pdf PDF
CN-370000-HW689-DC019B.pdf PDF
CN-370000-HW689-DC024A.pdf PDF
CN-370000-HW689-DC025A.pdf PDF
CN-370000-HW689-DC028A.pdf PDF
CN-370000-HW689-DC029A.pdf PDF
CN-370000-HW689-DC02ACO1.pdf PDF
CN-370000-HW689-DC031A.pdf PDF
CN-370000-HW689-DC034A.pdf PDF
CN-370000-HW689-DC035A.pdf PDF
CN-370000-HW689-DC037A.pdf PDF
CN-370000-HW689-DC03ACO1.pdf PDF
CN-370000-HW689-DC03ACO2.pdf PDF
CN-370000-HW689-DC03CC01.pdf PDF
CN-370000-HW689-DC03DCO1.pdf PDF
CN-370000-HW689-DC05CCO1.pdf PDF
CN-370000-HW689-DC05DCO1.pdf PDF
CN-370000-HW689-DC08CCO1.pdf PDF
CN-370000-HW689-DC08CCO2.pdf PDF
CN-370000-HW689-DC08CCO3.pdf PDF
CN-370000-HW689-DC11CCO5.pdf PDF
CN-370000-HW689-DC11CCO6.pdf PDF
CN-370000-HW689-DC12BCO4.pdf PDF
CN-370000-HW689-DC13BCO2.pdf PDF
CN-370000-HW689-DC13BCO4.pdf PDF
CN-370000-HW689-DC13BCO7.pdf PDF
CN-370000-HW689-DC16CCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. ☐ There are no changes to the TA compensation.

☐ The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO ☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. ☐ There are no changes to the TA Expiration Date.

☐ The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. ☐ There are no changes to the Attachments.

☐ Attachment ___ is replaced with Attachment -____.

7. ☐ No Additional Changes.

☐ Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

DC013B 1 HW689

This Task Assignment Change Order authorizes an increase in cost to reconcile Work Change Directives #1- 4 in accordance with March 6, 2023, Scope of Work and Cost Estimate.

The cost increase related to this change order is $4,156.42

Skylar Schwed (850)245-8795 Contractor Contractor

Contractor Contractor

Contractor

Aptim Environmental & Infrastructure, LLC (APTIM) Eric Kramer 407-287-3216

ERIC_4106

Imperial Cleaners

✔ $ 108,701.74 $ 104,545.32

$ 108,701.74 $ 104,545.32 Completion

Completion✔ 05/31/2023 09/30/2023 122

✔ 1 1 1

Eric Kramer Digitally signed by Eric Kramer Date: 2023.04.17 15:11:34 -04'00'

Teresa Booeshaghi

Teresa Booeshaghi Digitally signed by Teresa Booeshaghi Date: 2023.04.17 12:58:03 -04'00'

4/17/2023

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 01_18

Contract Number:

Task Assignment #:

Change Order #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW689

DC013B

$ 108,701.74

Field work documentation including sampling logs, site photos, calibration and well logs for MAGS event (Subtask 2).

Field work documentation including sampling logs, site photos, calibration and well logs for soil and groundwater sampling event (Subtask 3).

Email confirmation of completion of Final Well Installation (Subtask 4), Site Assessment Report (Subtask 5) and Project Management (Subtask 1)

Approval of Field work documentation including sampling logs, site photos, calibration and well logs for MAGS event (Subtask 2).

Approval of Email confirmation of completion of Final Well Installation (Subtask 4), Site Assessment Report (Subtask 5) and Project Management (Subtask 1)

Approval of Field work documentation including sampling logs, site photos, calibration and well logs for soil and groundwater sampling event (Subtask 3).

01/27/2023

05/25/2023

06/29/2023

$ 43,698.94

$ 33,696.99

$ 31,305.81

Printed on recycled paper.

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

To: HW689 Contract Negotiation File Imperial Cleaners

ERIC_4106

From: Skylar Schwed, Project Manager Date: April 17, 2023 Subject: Negotiation Summary

HW689 DC013B-1

This Task Assignment Change Order authorizes an increase in cost to reconcile Work Change Directives #1- 4 in accordance with March 6, 2023, Scope of Work and Cost Estimate.

The cost increase related to this change order is $4,156.42

The FDEP project manager agrees to the scope of work and final cost associated with this Task Assignment Change Order. The final cost for this Task Assignment Change Order is $108,701.74

APTIM may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Change Order Notification Form.

FDEP COST ESTIMATE

Contractor: Aptim Environmental & Infrastructure, LLC

Date: 3/6/2023

Task #: HW689 - HW013B TACO #1 ERIC_4106 SubTask 1 Project Management

Site: Imperial Cleaners SubTask 2 2-SiteMeeting, MAGS

Activity/Phase: SAR SubTask 3 3-Soil and Groundwater Field Activities

Project Manager: Kelly Crain (FDEP)/Eric Kramer (APTIM) SubTask 4 4-Final Well Installations

SubTask 5 5-Reporting

Totals 1 2 3 4 5 Labor Rate Category

$65.22 Project Manager E. Kramer 32 32.1 $65.22 Engineer/Scientist 5 E. Kramer 8 2 2 0 4 $37.02 Engineer/Scientist 4 J. Williams 0 0 0 0 0 $61.98 Engineer/Scientist 5 G. Roberts 51.5 12 14.5 5 20 $34.53 Engineer/Scientist 2 K. Howard 203 73 90 40 0 $29.38 Engineer/Scientist 2 K. McDonald 39 33 0 0 6 $26.45 Engineer/Scientist 1 K. Lucey 29 29 0 0 0 $26.24 Engineering Technician 2 J. Bell 50 0 38 12 0 $32.56 Designer 2 S. Ferianc 8 0 0 0 8 $27.64 Technical Publications Specialist 3 H. Vining 6 0 0 0 6

$0.00 0 0 0 0 0 Total Hours 466.5 32 149 144.5 57 84

Direct Labor $18,208.49 $2,094.78 $5,131.48 $5,133.97 $2,005.98 $3,842.28

Overhead 85.58% $15,582.82 $1,792.71 $4,391.52 $4,393.65 $1,716.72 $3,288.22 Gen & Admin 19.38% $3,528.80 $405.97 $994.48 $994.96 $388.76 $744.63 Fringe 31.96% $5,819.43 $669.49 $1,640.02 $1,640.82 $641.11 $1,227.99 Total Labor $43,139.54 $4,962.95 $12,157.50 $12,163.40 $4,752.57 $9,103.12

Travel Vehicle Rental $2,520.00 $1,040.00 $1,000.00 $480.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $2,180.00 $984.00 $832.00 $364.00 $0.00 Total Travel $4,700.00 $2,024.00 $1,832.00 $844.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $13,905.00 $0.00 $8,832.00 $5,073.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $4,955.00 $4,955.00 $0.00 $0.00 $0.00

IDW $880.00 $0.00 $0.00 $880.00 $0.00

Utilities $750.00 $750.00 $0.00 $0.00 $0.00 MAGS/Well Construction Materials $1,167.49 $1,167.49 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF SHAW Page 1

Date: 3/6/2023

Task #: HW689 - HW013B TACO #1 ERIC_4106 SubTask 1 Project Management

Site: Imperial Cleaners SubTask 2 2-SiteMeeting, MAGS

Activity/Phase: SAR SubTask 3 3-Soil and Groundwater Field Activities

Project Manager: Kelly Crain (FDEP)/Eric Kramer (APTIM) SubTask 4 4-Final Well Installations

SubTask 5 5-Reporting

Totals 1 2 3 4 5 Subcontractor Subtotal $21,657.49 $6,872.49 $8,832.00 $5,953.00 $0.00 Handling Fee $2,165.75 $687.25 $883.20 $595.30 $0.00 Total Subcontractor Cost $23,823.24 $7,559.74 $9,715.20 $6,548.30 $0.00

Laboratory Analytical Costs $25,057.00 $8,000.00 $15,384.00 $1,673.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $150.00 $150.00 $0.00 $0.00 $0.00 Total Laboratory $25,207.00 $8,150.00 $15,384.00 $1,673.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $680.00 $240.00 $280.00 $160.00 $0.00 Equipment (Drilling related) $1,675.00 $0.00 $975.00 $700.00 $0.00 Equipment (Analytical related) $4,963.00 $2,250.00 $2,133.00 $580.00 $0.00 Equipment (IDW related) $200.00 $100.00 $0.00 $100.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $7,518.00 $2,590.00 $3,388.00 $1,540.00 $0.00

Subtotal $104,387.78 $4,962.95 $32,481.24 $42,482.60 $15,357.87 $9,103.12 Completion Fee $4,313.96 $496.30 $1,215.75 $1,216.34 $475.26 $910.31

Total Estimated Cost $108,701.74 $5,459.25 $33,696.99 $43,698.94 $15,833.13 $10,013.43

TA $104,545.32 $5,164.58 $33,696.99 $39,837.19 $15,833.13 $10,013.43

Delta $4,156.42 $294.67 $0.00 $3,861.75 $0.00 $0.00

CEF Rounding Error $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $108,701.74 $5,459.25 $33,696.99 $43,698.94 $15,833.13 $10,013.43

REV: 02/03 CEF SHAW Page 2

LEVEL OF EFFORT / EXPENSE WORKSHEET

SITE : Imperial Cleaners

SUBTASK:

DATE: October 25, 2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer 2

Engineer/Scientist 5 G. Roberts

Engineer/Scientist 4 J. Wilhoit

Engineer/Scientist 2 K. Howard

Engineer/Scientist 2 K. McDonald

Engineer/Scientist 1 K. Lucey

Engineering Technician 2 J. Bell Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining

TOTAL LABOR 149

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Day 1 $80.00 Van or Truck $120.00 Day 8 $960.00 Van or Truck $480.00 Week 0 $0.00

TOTAL VEHICLE $1,040.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel 3 $110.00 Day 6 $660.00 Day 1-leave before 6:00 AM 3 $36.00 Day 3 $108.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 3 $36.00 Day 6 $216.00

TOTAL PER DIEM $984.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Survtech Solutions Survey and Benchmark Placement $4,955.00 LS 1 $4,955.00 GeoTek Utility Locate Services $750.00 LS 1 $750.00 Atlantic Supply MAGS/Well Supplies (Casing, Screen, Sand) $1,167.49 LS 1 $1,167.49

TOTAL $6,872.49

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method TO-15 (VOC Soil Vapor) $200.00 10 0 $2,000.00 EPA Method 8260 (Full List) Soil $150.00 40 0 $6,000.00 EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $50.00 0 0 Contingency $0.00 EPA Method 8260 (VOHs) Leachate $73.00 0 0 Contingency $0.00 EPA Method 8260 (Full List) Well $150.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 1 $150.00

TOTAL LAB $8,150.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 6 $240.00 Soil Sampling Kit (concrete) $235.00 Day 2 $470.00 MAGS Investigation Kit $500.00 Day 2 $1,000.00 Tedlar Bags $20.00 bag 7 $140.00 Shallow GW Sampling Kit $260.00 Day 0 $0.00 Encore Sampler $16.00 each 40 $640.00 55 Gallon Drums $100.00 each 1 $100.00

TOTAL EQUIPMENT $2,590.00

2-SiteMeeting, MAGS

MAGS Analytical Data Summary Reporting to FDEP (2 hrs) Preparation of MAGS, Survey, Utility Markout Soil Sampling Field Events (3 hrs), Investigate Adjacent Property (east) and ROWs (west and south) and Pursue Access/Agreements for Offsite Locations (2 hrs), Prepare Access Request Letters/Forms, Prepare Permission to Enter Property Agreement and Submit Requests to Adjacent Owner (3 hrs), Sunshine One Markout Requests (1 hr), Reporting of Preliminary Soil Sample Data to FDEP (3 hrs).

Note: Air Analysis by TO-15, Soil Samples by VOCs by EPA Method 8260 (Full List)

Onsite Meeting with Property Manager and Utility White-lines for Markouts including travel (12 hrs), Perform Municipal Sampling, Sample Handling and Shipping to FDEP Laboratory (3 hrs), Oversight of GPR Utility Subcontract Survey (10 hrs), Oversight of Professional Site Survey (12 hrs), MAGS Location Soil Sampling Mobilization and Field Event Preparation (2 hrs), Travel (6 hrs), Advancement of 10 MAGS Soil Borings, including coring for the collection of 40 soil samples at depths of 6", 2', 4, and 6' (20 hrs), Installation of Interior Monitoring Well, including Coring (2 hrs), Surface and Site Restoration (3 hrs), Preparation of Soil Boring Logs (3 hrs).

MAGS Mobilization and Field Event Preparation for MAGS Well and Interior Well Installation and Vapor Sampling (3 hrs), Travel Round Trip (6 hrs), Installation and Construction of 10 MAGS Testing Wells (8 hrs), Installation of 5 Vapor Monitoring Point Locations, including coring (5 hrs), Perform MAGS Tests at 10 locations and collection of 10 Vapor Samples (10 hrs), Assistance with Installation of Interior Monitoring Well (1 hr).

Travel Round Trip (6 hrs), Installation and Construction of 10 MAGS Testing Wells (8 hrs), Installation of 5 Vapor Monitoring Point Locations, including coring (5 hrs), Perform MAGS Tests at 10 locations and collection of 10 Vapor Samples (10 hrs).

2-Meeting & MAGs Page 1 of 4 OG CEF

SUBTASK:

DATE: March 06, 2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer 2

Engineer/Scientist 5 G. Roberts

14.5

Engineer/Scientist 4 J. Wilhoit

Engineer/Scientist 2 K. Howard

Engineer/Scientist 2 K. McDonald Engineer/Scientist 1 K. Lucey

Engineering Technician 2 J. Bell

Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining

TOTAL LABOR 144.5

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Day 2 $160.00 Van or Truck $120.00 Day 3 $360.00 Van or Truck $480.00 Week 1 $480.00

TOTAL VEHICLE $1,000.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel 3 $110.00 Day 5 $550.00 Day 1-leave before 6:00 AM 2 $36.00 Day 2 $72.00 Day 1-Leave between 6 - Noon 1 $30.00 Day 1 $30.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 3 $36.00 Day 5 $180.00

TOTAL PER DIEM $832.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

GW Protection DPT Drilling $8,832.00 Lump 1 $8,832.00

TOTAL $8,832.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00 EPA Method 8260 (Full List) Soil $150.00 68 0 $10,200.00 EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $50.00 8 0 Contingency $400.00 EPA Method 8260 (VOHs) Leachate $73.00 8 0 Contingency $584.00 EPA Method 8260 (Full List) DPT Groundwater $150.00 24 0 $3,600.00 EPA Method 8260 (Full List) Well/Piezometers $150.00 4 0 $600.00 EPA Method 8260 (Full List) IDW $150.00 0 0 $0.00 EPA Method 6010 (As, Cd, Cr and Pb) IDW $39.00 0 0 $0.00 EPA Method 1311 TCLP Extraction (Zero Headspace Method/VOCs)-Solid $50.00 0 0 $0.00 EPA Method 1311 TCLP Extraction (Bottle Extraction for Metals)-Solid $45.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $15,384.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 7 $280.00 Soil Sampling Kit (concrete) $235.00 Day 3 $705.00 Monitor Well Installation Kit $325.00 Day 3 $975.00 Total Survey Station $50.00 Day 1 $50.00 Shallow GW Sampling Kit $290.00 Day 1 $290.00 Encore Sampler $16.00 each 68 $1,088.00 55 Gallon Drums $100.00 each 0 $0.00

TOTAL EQUIPMENT $3,388.00

Collect Remaining Soil Samples at 17 locations including Travel, Coring, Collection of Soil Samples (20 hrs), Site Restoration, Drum Labeling (2 hrs), Soil Sample Packaging, Chain of Custody and Sample Delivery to Laboratory (2 hrs), Survey Piezometers and Wells with Travel (4 hrs). Round Trip (2 hrs), Additional Hours for the collection of Soil Borings (8 hrs)

Soil and Groundwater Samples by VOCs by EPA Method 8260 (Full List)

Remaining Soil Sampling Field Event Preparation and Mobilization (2 hrs), Collect Remaining Soil Samples at 17 locations including, Coring, Collection of 68 Soil Samples (20 hrs), DPT Drilling Field Event Preparation and Mobilization (2 hrs), Travel to Site (6 hrs), Installation of two DPT Macrocores to 60 ft bls and installation of 3 Piezometers, DPT Groundwater Sampling at 8 locations (36 hrs), Collection of Groundwater Samples from 3 Piezometers and Interior well (3 hrs), and Survey Wells (1 hr), DPT and Well Groundwater Chain of Custody preparation, Sample Packaging and Sample Delivery (2 hrs), Preparation of Soil Boring and Well Construction Logs (4 hrs). Round Trip (6 hrs), 3-Soil and Groundwater Field Activities

Conference with FDEP for Final Proposed DPT Locations (1 hr), Conference with FDEP for Final Proposed Well Locations (1 hr).

Contacting Property Owners and City of Oakland Park of Proposed Sampling Schedule and Confirming Access (1.5 hrs), Compilation of Field Soil Analytical Data, Preparation of Soil Summary Maps for FDEP (3 hrs), Preparation of Cross Section from DPT Cores to Review Proposed GW Sampling Depths with FDEP (3 hrs), Calculation of TOC and Watertable Elevations, Preparation of Groundwater Flow Map for FDEP (2 hrs), Conference with FDEP for Final Proposed DPT Locations (1 hr), Preparation of DPT Data Maps and Conference with FDEP for Final Proposed Well Locations (2 hrs). Preparation of Source Area Access Agreement for New Site Owner (2 hrs)

3-Total Page 3 of 3 Fianl

SITE :

SUBTASK:

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer

Engineer/Scientist 5 G. Roberts

Engineer/Scientist 4 J. Wilhoit

Engineer/Scientist 2 K. Howard

Engineer/Scientist 2 K. McDonald Engineer/Scientist 1 K. Lucey

Engineering Technician 2 J. Bell

Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining

TOTAL LABOR 57

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 4 $480.00 Van or Truck $480.00 Week 0 $0.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel 2 $110.00 Day 2 $220.00 Day 1-leave before 6:00 AM 2 $36.00 Day 2 $72.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 2 $36.00 Day 2 $72.00

TOTAL PER DIEM $364.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

GW Protection Well Installations $5,073.00 LS 1 $5,073.00 Erwin Remediation IDW T&D $110.00 LS 8 $880.00

TOTAL $5,953.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00 EPA Method 8260 (Full List) Soil $150.00 0 0 $0.00 EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $50.00 0 0 Contingency $0.00 EPA Method 8260 (VOHs) Leachate $73.00 0 0 Contingency $0.00 EPA Method 8260 (Full List) Wells $150.00 8 0 $1,200.00 EPA Method 8260 (Full List) IDW $150.00 2 0 $300.00 EPA Method 6010 (As, Cd, Cr and Pb) IDW $39.00 2 0 $78.00 EPA 1311 TCLP Extraction (Zero Headspace Method/VOCs)-Soil IDW $50.00 1 0 $50.00 EPA 1311 TCLP Extraction (Bottle Extraction/Metals)-Soil IDW $45.00 1 0 $45.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $1,673.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 4 $160.00 Soil Sampling Kit (concrete) $235.00 Day 0 $0.00 Monitor Well Installation Kit $325.00 Day 2 $650.00 Total Survey Station $50.00 Day 1 $50.00 Shallow GW Sampling Kit $290.00 Day 2 $580.00 Encore Sampler $16.00 each 0 $0.00 55 Gallon Drums $100.00 each 1 $100.00

TOTAL EQUIPMENT $1,540.00

Collection of Final Groundwater Samples and IDW Samples, with travel, Survey Wells, Site Restoration (12 hrs)

Installation of final well network of 3 shallow/1 deep, including travel (20 hrs). Collection of Final Groundwater Samples (8 wells) with travel and Survey Wells (16 hrs), Deliver final samples to laboratory (2 hrs), Preparation of Well Construction Logs (2 hrs).

Imperial Cleaners

10/25/2022

Prepare Proposed Location Maps and Recommendations (3 hrs), Characterization and Waste Profile for Transportation and Disposal of IDW Drums (2 hours)

4-Final Well Installations

4-Final Well Installations Page 3 of 4 OG CEF

SITE :

SUBTASK: 5-Reporting DATE: October 25, 2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer 4

Engineer/Scientist 5 G. Roberts

Engineer/Scientist 4 J. Wilhoit

Engineer/Scientist 2 K. Howard Engineer/Scientist 2 K. McDonald 6 Engineer/Scientist 1 K. Lucey Engineering Technician 2 J. Bell Designer 2 S. Ferianc 8 Technical Pub Specialist 3 H. Vining 6

TOTAL LABOR: 84

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00 Van or Truck $480.00 Week 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

Document Production and Formatting Tables and Text (6 hrs).

Site Assessment Report Map Preparations and Drafting

Imperial Cleaners

Vapor Data Tabulation (3 hrs), Step Test and Radius of Influence calculations and graphs (3 hrs)

Preparation of MAGS Assessment Findings text (2 hrs), finalization of tables, figures and graphs (2 hrs).

Review Logs and Prepartion of SAR Cross Sections, Preparation of Physiography, Regional Geology and Regional Hydrogeology Sections, Preparation of Conceptual Model based on Findings, Preparation of Laboratory QA/QC Summary and Data Recommendations, Preparation of Site Assessment Conclusions and Recommendations (20 hrs).

Preparation of SAR text including Site Description, Topography and Drainage, Potable Well Survey tables and figures, Operational History, Summarize Previous Investigations, Site Specific Soil and Groundwater Site Characterization Procedures Text, Tabulate and Report Preparation of Assessment Findings (lithologic borings, soil borings, DPT Sampling, Piezometer and Monitoring Well Installations, Groundwater Sampling) Review and summarize boring logs, Preparation of GW Flow and Analytical Figures (40 hrs).

5-SAR Rept Page 4 of 4 OG CEF

Date: 3/6/2023

Task #: HW689 - HW013B TACO #1 ERIC_4106 SubTask 1 Project Management

Site: Imperial Cleaners SubTask 2 2-SiteMeeting, MAGS

Activity/Phase: SAR SubTask 3 3-Soil and Groundwater Field Activities

Project Manager: Kelly Crain (FDEP)/Eric Kramer (APTIM) SubTask 4 4-Final Well Installations

SubTask 5 5-Reporting

Totals 1 2 3 4 5 Labor Rate Category

$65.22 Project Manager E. Kramer 2 1.7 $65.22 Engineer/Scientist 5 E. Kramer 0 0 0 0 0 $37.02 Engineer/Scientist 4 J. Williams 0 0 0 0 0 $61.98 Engineer/Scientist 5 G. Roberts 2 0 2 0 0 $34.53 Engineer/Scientist 2 K. Howard 14 0 14 0 0 $29.38 Engineer/Scientist 2 K. McDonald 0 0 0 0 0 $26.45 Engineer/Scientist 1 K. Lucey 0 0 0 0 0 $26.24 Engineering Technician 2 J. Bell 10 0 10 0 0 $32.56 Designer 2 S. Ferianc 0 0 0 0 0 $27.64 Technical Publications Specialist 3 H. Vining 0 0 0 0 0

$0.00 0 0 0 0 0 Total Hours 28 2 0 26 0 0

Direct Labor $982.85 $113.07 $0.00 $869.78 $0.00 $0.00

Overhead 85.58% $841.13 $96.77 $0.00 $744.36 $0.00 $0.00 Gen & Admin 19.38% $190.47 $21.91 $0.00 $168.56 $0.00 $0.00 Fringe 31.96% $314.12 $36.14 $0.00 $277.98 $0.00 $0.00 Total Labor $2,328.57 $267.89 $0.00 $2,060.68 $0.00 $0.00

Travel Vehicle Rental $160.00 $0.00 $160.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $176.00 $0.00 $176.00 $0.00 $0.00 Total Travel $336.00 $0.00 $336.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 MAGS/Well Construction Materials $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Date: 3/6/2023

Task #: HW689 - HW013B TACO #1 ERIC_4106 SubTask 1 Project Management

Site: Imperial Cleaners SubTask 2 2-SiteMeeting, MAGS

Activity/Phase: SAR SubTask 3 3-Soil and Groundwater Field Activities

Project Manager: Kelly Crain (FDEP)/Eric Kramer (APTIM) SubTask 4 4-Final Well Installations

SubTask 5 5-Reporting

Totals 1 2 3 4 5 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $984.00 $0.00 $984.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $984.00 $0.00 $984.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $0.00 $40.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $235.00 $0.00 $235.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $275.00 $0.00 $275.00 $0.00 $0.00

Subtotal $3,923.57 $267.89 $0.00 $3,655.68 $0.00 $0.00 Completion Fee $232.85 $26.78 $0.00 $206.07 $0.00 $0.00

Total Estimated Cost $4,156.42 $294.67 $0.00 $3,861.75 $0.00 $0.00

SUBTASK:

DATE: March 06, 2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer Engineer/Scientist 4 J. Williams Engineer/Scientist 5 G. Roberts 2 Engineer/Scientist 2 K. Howard 14 Engineer/Scientist 2 K. McDonald Engineer/Scientist 1 K. Lucey Engineering Technician 2 J. Bell 10 Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining

TOTAL LABOR 26

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Day 2 $160.00 Van or Truck $120.00 Day 0 $0.00 Van or Truck $480.00 Week 0 $0.00

TOTAL VEHICLE $160.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel 2 $110.00 Day 1 $110.00 Day 1-leave before 6:00 AM 2 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 1 $30.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 2 $36.00 Day 1 $36.00

TOTAL PER DIEM $176.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

GW Protection DPT Drilling $8,832.00 Lump 0 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00 EPA Method 8260 (Full List) Soil $150.00 0 0 $0.00 EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $50.00 8 0 Contingency $400.00 EPA Method 8260 (VOHs) Leachate $73.00 8 0 Contingency $584.00 EPA Method 8260 (Full List) DPT Groundwater $150.00 0 0 $0.00 EPA Method 8260 (Full List) Well/Piezometers $150.00 0 0 $0.00 EPA Method 8260 (Full List) IDW $150.00 0 0 $0.00 EPA Method 6010 (As, Cd, Cr and Pb) IDW $39.00 0 0 $0.00 EPA Method 1311 TCLP Extraction (Zero Headspace Method/VOCs)-Solid $50.00 0 0 $0.00 EPA Method 1311 TCLP Extraction (Bottle Extraction for Metals)-Solid $45.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $984.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 1 $40.00 Soil Sampling Kit (concrete) $235.00 Day 1 $235.00 Monitor Well Installation Kit $325.00 Day 0 $0.00 Total Survey Station $50.00 Day 0 $0.00 Shallow GW Sampling Kit $290.00 Day 0 $0.00 Encore Sampler $16.00 each 0 $0.00 55 Gallon Drums $100.00 each 0 $0.00

TOTAL EQUIPMENT $275.00

3-Soil and Groundwater Field Activities

Preparation of Source Area Access Agreement for New Site Owner (2 hrs)

Round Trip (2 hrs), Additional Hours for the collection of Soil Borings (8 hrs)

WCD #1 Total $256.00, WCD #2 Total $512.00, WCD #3 Total $3175.42, WCD #4 $256.00.

Round Trip (6 hrs), Additional Hours for the collection of Soil Borings (8 hrs)

3-Delta Page 3 of 3 Delta

Date: 10/25/2022

Task #: HW689 DC013B ERIC_4106 SubTask 1 Project Management SubTask 6

Site: Imperial Cleaners SubTask 2 2-SiteMeeting, MAGS SubTask 7

Activity/Phase: SAR SubTask 3 3-Soil and Groundwater Field Activities SubTask 8

Project Manager: Kelly Crain (FDEP)/Eric Kramer (APTIM) SubTask 4 4-Final Well Installations SubTask 9

SubTask 5 5-Reporting SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$65.22 Project Manager E. Kramer 30 30.4 $65.22 Engineer/Scientist 5 E. Kramer 8 2 2 0 4 0 0 0 0 0 $37.02 Engineer/Scientist 4 J. Williams 0 0 0 0 0 0 0 0 0 0 $61.98 Engineer/Scientist 5 G. Roberts 49.5 12 12.5 5 20 0 0 0 0 0 $34.53 Engineer/Scientist 2 K. Howard 189 73 76 40 0 0 0 0 0 0 $29.38 Engineer/Scientist 2 K. McDonald 39 33 0 0 6 0 0 0 0 0 $26.45 Engineer/Scientist 1 K. Lucey 29 29 0 0 0 0 0 0 0 0 $26.24 Engineering Technician 2 J. Bell 40 0 28 12 0 0 0 0 0 0 $32.56 Designer 2 S. Ferianc 8 0 0 0 8 0 0 0 0 0 $27.64 Technical Publications Specialist 3 H. Vining 6 0 0 0 6 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0 Total Hours 438.5 30 149 118.5 57 84 0 0 0 0 0

Direct Labor $17,225.64 $1,981.71 $5,131.48 $4,264.19 $2,005.98 $3,842.28 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 85.58% $14,741.70 $1,695.95 $4,391.52 $3,649.29 $1,716.72 $3,288.22 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 19.38% $3,338.33 $384.06 $994.48 $826.40 $388.76 $744.63 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 31.96% $5,505.31 $633.35 $1,640.02 $1,362.84 $641.11 $1,227.99 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $40,810.98 $4,695.07 $12,157.50 $10,102.72 $4,752.57 $9,103.12 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $2,360.00 $1,040.00 $840.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $2,004.00 $984.00 $656.00 $364.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $4,364.00 $2,024.00 $1,496.00 $844.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $13,905.00 $0.00 $8,832.00 $5,073.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $4,955.00 $4,955.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $880.00 $0.00 $0.00 $880.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $750.00 $750.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 MAGS/Well Construction Materials $1,167.49 $1,167.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Date: 10/25/2022

Task #: HW689 DC013B ERIC_4106 SubTask 1 Project Management SubTask 6

Site: Imperial Cleaners SubTask 2 2-SiteMeeting, MAGS SubTask 7

Activity/Phase: SAR SubTask 3 3-Soil and Groundwater Field Activities SubTask 8

Project Manager: Kelly Crain (FDEP)/Eric Kramer (APTIM) SubTask 4 4-Final Well Installations SubTask 9

SubTask 5 5-Reporting SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $21,657.49 $6,872.49 $8,832.00 $5,953.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $2,165.75 $687.25 $883.20 $595.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $23,823.24 $7,559.74 $9,715.20 $6,548.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $24,073.00 $8,000.00 $14,400.00 $1,673.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $150.00 $150.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $24,223.00 $8,150.00 $14,400.00 $1,673.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $640.00 $240.00 $240.00 $160.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $1,675.00 $0.00 $975.00 $700.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $4,728.00 $2,250.00 $1,898.00 $580.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $200.00 $100.00 $0.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $7,243.00 $2,590.00 $3,113.00 $1,540.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $100,464.22 $4,695.07 $32,481.24 $38,826.92 $15,357.87 $9,103.12 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $4,081.10 $469.51 $1,215.75 $1,010.27 $475.26 $910.31 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $104,545.32 $5,164.58 $33,696.99 $39,837.19 $15,833.13 $10,013.43 $0.00 $0.00 $0.00 $0.00 $0.00

Site Name: Site ID #:

Contract #: Contractor:

• Reason for Work Change Directive :

• Description of Work Change Directive :

• Attachments (if applicable, list documents supporting change):

• Costs (if negotiated unit costs, provide information below):

WCP WCD 07-2018

Authorized Contractor Signature:

Authorized FDEP Signature:

WORK CHANGE DIRECTIVE FORM

FDEP Supervisor Approval:

(if applicable)

Additional work is not authorized without prior FDEP approval as indicated by an approved Work Change Directive Form or Task Assignment Change Order Form. It is the Contractor's responsibility to ensure that additional costs associated with this WCD are resolved by a Task Assignment Change Order (TACO) prior to the completion date of the original Task Assignment or subsequent TACOs completed prior to the execution date of this WCD. Failure to do so will result in a loss of reimbursement for work associated with this WCD.

Task Assignment #: Work Change Directive #:

Maximum Estimated Increase in Task Amount:

Imperial Cleaners ERIC_4106

HW689 Aptim Environmental & Infrastructure, Inc.

DC013B WCD #1

Additional Analytical Costs Requested for the Analysis of SPLP Extraction (EPA Method 1312) and analysis of the leachate for EPA Method 8260 (VOHs only) for three (3) Encore Samplers currently on Hold with the Laboratory.

Analytical for SPLP Extraction and Volatiles Analysis (VOHs) for the following Soil Samples: MAG-5 @ 0.5 ft bls (120 μg/kg PCE), MAG-6 @ 2 ft bls (62 μg/kg PCE), and MAG-9 @ 0.5 ft bls (170 μg/kg PCE).

WCD #1 Summary Table of Results and Analytical Results (Laboratory Work Order M2206601).

Analytical costs for SPLP Extraction EPA Method 1312 of Soil ($55.00 per Sample) and Analysis of Leachate for VOHs by EPA Method 8260 ($73.00 per Sample) for total of three Samples $384.00.

$ 384.00

Eric Kramer Digitally signed by Eric Kramer Date: 2022.12.09 17:04:23 -05'00'

Kelly Crain Digitally signed by Kelly Crain Date: 2022.12.12 08:39:02 -05'00'

• Reason for Work Change Directive :

• Description of Work Change Directive :

• Attachments (if applicable, list documents supporting change):

• Costs (if negotiated unit costs, provide information below):

WCP WCD 07-2018

Authorized Contractor Signature:

Authorized FDEP Signature:

WORK CHANGE DIRECTIVE FORM

FDEP Supervisor Approval:

(if applicable)

Additional work is not authorized without prior FDEP approval as indicated by an approved Work Change Directive Form or Task Assignment Change Order Form. It is the Contractor's responsibility to ensure that additional costs associated with this WCD are resolved by a Task Assignment Change Order (TACO) prior to the completion date of the original Task Assignment or subsequent TACOs completed prior to the execution date of this WCD. Failure to do so will result in a loss of reimbursement for work associated with this WCD.

Task Assignment #: Work Change Directive #:

Maximum Estimated Increase in Task Amount:

Imperial Cleaners ERIC_4106

HW689 Aptim Environmental & Infrastructure, Inc.

DC013B WCD #2

Additional Analytical Costs Requested for the Analysis of SPLP Extraction (EPA Method 1312) and analysis of the leachate for EPA Method 8260 (VOHs only) for four (4) Encore Samplers currently on Hold with the Laboratory.

Analytical for SPLP Extraction and Volatiles Analysis (VOHs) for the following Soil Samples: SB-1 @ 0.5 ft bls (560 μg/kg PCE), SB-1 @ 4 ft bls (53 μg/kg PCE), SB-2 @ 2 ft bls (230 μg/kg PCE), and SB-2 @ 4 ft bls 42 μg/kg PCE).

WCD #2 Summary Table of Results and Analytical Results (Laboratory Work Order M2206648).

Analytical costs for SPLP Extraction EPA Method 1312 of Soil ($55.00 per Sample) and Analysis of Leachate for VOHs by EPA Method 8260 ($73.00 per Sample) for total of four Samples $512.00.

$ 512.00

Eric Kramer Digitally signed by Eric Kramer Date: 2022.12.14 16:47:58 -05'00'

Kelly Crain Digitally signed by Kelly Crain Date: 2022.12.14 16:53:57

• Reason for Work Change Directive :

• Description of Work Change Directive :

• Attachments (if applicable, list documents supporting change):

• Costs (if negotiated unit costs, provide information below):

WCP WCD 07-2018

Authorized Contractor Signature:

Authorized FDEP Signature:

WORK CHANGE DIRECTIVE FORM

FDEP Supervisor Approval:

(if applicable)

Additional work is not authorized without prior FDEP approval as indicated by an approved Work Change Directive Form or Task Assignment Change Order Form. It is the Contractor's responsibility to ensure that additional costs associated with this WCD are resolved by a Task Assignment Change Order (TACO) prior to the completion date of the original Task Assignment or subsequent TACOs completed prior to the execution date of this WCD. Failure to do so will result in a loss of reimbursement for work associated with this WCD.

Task Assignment #: Work Change Directive #:

Maximum Estimated Increase in Task Amount:

Imperial Cleaners ERIC_4106

HW689 Aptim Environmental & Infrastructure, Inc.

DC013B WCD #3

Additional Labor, Equipment and Travel Costs Requested to complete the Soil Sampling for the Imperial Cleaners site in Oakland Park. Upon Arrival for the MAGS testing, the site was found to be built on construction debris and some areas have two levels of concrete slabs requiring additional time to sample.

WCD #3 to allow for additional day of soil sampling to complete the interior coring, and soil sampling scope of work. The WCD also includes labor to prepare new access agreements for the site, which changed ownership yesterday.

WCD #3 Estimate Showing Spreadsheet Estimate for Labor, Vehicles, Per Diem, Hotel, Expendables and Equipment.

Additional Labor estimated to be $2565 (including PM and Markups), Equipment and Expendables $275, Vehicles and Per Diem $336 for a total estimated costs of $3,176.00

$ 3,176.00

Eric Kramer Digitally signed by Eric Kramer Date: 2022.12.16 10:47:33 -05'00'

Kelly Crain Digitally signed by Kelly Crain Date: 2022.12.16 11:42:53

• Reason for Work Change Directive :

• Description of Work Change Directive :

• Attachments (if applicable, list documents supporting change):

• Costs (if negotiated unit costs, provide information below):

WCP WCD 07-2018

Authorized Contractor Signature:

Authorized FDEP Signature:

WORK CHANGE DIRECTIVE FORM

FDEP Supervisor Approval:

(if applicable)

Additional work is not authorized without prior FDEP approval as indicated by an approved Work Change Directive Form or Task Assignment Change Order Form. It is the Contractor's responsibility to ensure that additional costs associated with this WCD are resolved by a Task Assignment Change Order (TACO) prior to the completion date of the original Task Assignment or subsequent TACOs completed prior to the execution date of this WCD. Failure to do so will result in a loss of reimbursement for work associated with this WCD.

Task Assignment #: Work Change Directive #:

Maximum Estimated Increase in Task Amount:

Imperial Cleaners ERIC_4106

HW689 Aptim Environmental & Infrastructure, Inc.

DC013B WCD #4

Additional Analytical Costs Requested for the Analysis of SPLP Extraction (EPA Method 1312) and analysis of the leachate for EPA Method 8260 (VOHs only) for two (2) Encore Samplers currently on Hold with the Laboratory.

Analytical for SPLP Extraction and Volatiles Analysis (VOHs) for the following Soil Samples: SB-3 @ 2 ft bls (320 μg/kg PCE), and SB-3 @ 4 ft bls (37 μg/kg PCE).

WCD #4 Summary Table of Results and Analytical Results (Laboratory Work Order A2302489010).

Analytical costs for SPLP Extraction EPA Method 1312 of Soil ($55.00 per Sample) and Analysis of Leachate for VOHs by EPA Method 8260 ($73.00 per Sample) for total of three Samples $256.00.

$ 256.00

Eric Kramer Digitally signed by Eric Kramer Date: 2023.03.03 09:49:37 -05'00'

Skylar Schwed Digitally signed by Skylar Schwed Date: 2023.03.03 11:12:58 -05'00'

Kelly Crain Digitally signed by Kelly Crain Date: 2023.03.03 11:15:31

Proposed Scope of Work Imperial Cleaners Site Assessment and Reporting Task Assignment DC013B TACO #1 1500 E. Commercial Blvd, Oakland Park, Broward County, FL ERIC_4106 (Former Facility No. 069500959) Aptim Environmental & Infrastructure, LLC March 6, 2023

The following is the proposed scope of work for DC013B Task Assignment Change Order (TACO) #1 for the former Imperial Cleaners site located in Oakland Park, Broward County, Florida. The proposed scope of work under Task Assignment DC013B TACO #1 is to resolve Work Change Directives 1 through 4, previously approved for the site.

Subtask 3 Soil & GW Field Activities

WCD #1 was approved for the analysis of three (3) additional soil samples for SPLP extraction by EPA Method 1312 and analysis of the leachate for VOHs by EPA Method 8260. WCD #1 was approved for a total of $384.00, but is being resolved for a total of $256.00, as a laboratory error resulted in one sample not being extracted and analyzed.

WCD #2 was approved for the analysis of four (4) additional soil samples for SPLP extraction by EPA Method 1312 and analysis of the leachate for VOHs by EPA Method 8260. WCD #2 was approved for a total of $512.00 and is being resolved for that amount.

WCD #3 was approved to allow for additional time for the collection of the proposed soil samples. One additional day of sampling was required due to the thickness of the building slab and required extensive time to core and the subsurface sample collection which was problematic due to rocks and debris encountered below the slab. The WCD included mobilization, labor, hotel, vehicles, and equipment required for the additional day of soil assessment activities. WCD #3 was approved for a total of $3,172.43 and is being resolved for a total of $3,172.42, due to rounding on the spreadsheet.

WCD #4 was approved for the analysis of four (4) additional soil samples for SPLP extraction by EPA Method 1312 and analysis of the leachate for VOHs by EPA Method 8260. WCD #2 was approved for a total of $256.00 and is being resolved for that amount.

As previously discussed, the Imperial Cleaners property changed ownership while our field personnel were onsite performing the soil assessment and the work was required to be rescheduled upon execution of an updated agreement. The remaining soil samples were only recently collected.

Currently the Direct Push groundwater sampling event is scheduled for March 20 through 22, 2023. The installation sampling of the subsequent monitoring wells, based on the direct push data should be performed in April. For that reason, a 90-day extension is requested to allow for time to access the adjacent property and complete the proposed scope of work. The 90-day extension would shift the remaining two deliverables to May 25, 2023 (Subtask 3) and June 29, 2023 (Subtasks 1, 4 and 5), respectively.

APTIM proposes to perform this scope of work in accordance with the terms and conditions of the contract executed between APTIM Environmental & Infrastructure, LLC and Florida Department of

Environmental Protection No. HW689. APTIM will begin the proposed scope of work upon issuance of the Task Assignment Notification.

If you have any questions, please do not hesitate to call.

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW689

DC013B Completion May 31, 2023

This Task Assignment authorizes APTIM to conduct site assessment activities at the Imperial Cleaners site located in Oakland Park, Florida. All work will be conducted in accordance with the scope of work and cost proposal submitted on October 26, 2022.

Kelly Crain 8502458953 Contractor APTIM Contractor

Contractor Eric Kramer Contractor 407-287-3216

ERIC_4106

1500 E COMMERCIAL BLV, FT. LAUDERDALE, Broward County

IMPERIAL CLEANERS

Contractor Contractor

✔ $ 104,545.32

$ 0.00

$ 104,545.32

Scope of Work

APTIM

Contractor Eric Kramer

APTIM Contract Manager

Eric Kramer Digitally signed by Eric Kramer Date: 2022.11.04 11:08:05 -04'00'

Teresa Booeshaghi

Teresa Booeshaghi Digitally signed by Teresa Booeshaghi Date: 2022.11.04 10:31:40 -04'00'

11/4/2022

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Re�uirements �or Invoice Submittal �mount to be Invoiced

TOTAL COST

Field work documentation including sampling logs, site photos, calibration and well logs for MAGS event (Subtask 2). 01/27/2023

Field work documentation including sampling logs, site photos, calibration and well logs for soil and groundwater sampling event (Subtask 3). 02/24/2023

Email confirmation of completion of Final Well Installation (Subtask 4), Site Assessment Report (Subtask 5) and Project Management (Subtask 1) 03/31/2023

Approval of Field work documentation including sampling logs, site photos, calibration and well logs for MAGS event (Subtask 2). $ 33,696.99

Approval of Field work documentation including sampling logs, site photos, calibration and well logs for soil and groundwater sampling event (Subtask 3). $ 39,837.19

Approval of Email confirmation of completion of Final Well Installation (Subtask 4), Site Assessment Report (Subtask 5) and Project Management (Subtask 1) $ 31,011.14

$ 104,545.32

HW689

DC013B

HW689 DC013B.pdf
NS.pdf
Final CEF.pdf
Total
LOE 2 4 5.pdf
2-Meeting & MAGs
Final LOE 3.pdf
3-Total
LOE 2 4 5
4-Final Well Installations
5-SAR Rept
Delta.pdf
Delta
3-Delta
OG CEF.pdf
Cost Estimate
WCD #1.pdf
WCD #2.pdf
WCD #3.pdf
WCD#4.pdf
SOW.pdf
OG TA.pdf

File details come from the government source that posted it. Updated .