This document is a Task Assignment Change Order (TACO #2) executed between the State of Florida Department of Environmental Protection (FDEP) and Aptim Environmental & Infrastructure, LLC (APTIM) under Contract HW689. The change order amends the original task assignment DC011B for environmental assessment and reporting services at the former Spot Busters Cleaners facility located at 6750 North State Road 7, Coconut Creek, Broward County, Florida (Site ID: ERIC_4244). The document was executed on September 28, 2023, with Aaron Cohen serving as the FDEP Project Manager and Eric Kramer as the contractor's project manager.

The change order reconciles outstanding Work Change Directives #4 and #5 and adjusts estimated costs to actual costs for completed work. The total task assignment value was decreased from $106,071.49 to $105,805.81, representing a cost reduction of $273.67. The change order extends the task assignment completion date by 120 days, from October 2, 2023, to January 30, 2024, to allow for submittal of outstanding deliverables including field work documentation, well installation confirmation, site assessment reports, and project management documentation. The scope encompasses seven subtasks including project management, site meeting and MAGS testing, soil and groundwater field activities, final well installations, reporting, and resolution of two work change directives for additional soil boring sampling and analytical costs. Payment is structured according to an invoice schedule tied to approval of specific deliverables, with the final total contract cost of $105,805.81 invoiced upon completion of all work items and FDEP approval.

View the file

Other files

File Type Posted
CN-370000-HW689-BF01A.pdf.crdownload CRDOWNLOAD file
CN-370000-HW689-BF01D.pdf PDF
CN-370000-HW689-BIL01G.pdf PDF
CN-370000-HW689-BIL1BCO1.pdf PDF
CN-370000-HW689-BIL1BCO3.pdf PDF
CN-370000-HW689-DC001A.pdf PDF
CN-370000-HW689-DC001B.pdf PDF
CN-370000-HW689-DC001C.pdf PDF
CN-370000-HW689-DC001D.pdf PDF
CN-370000-HW689-DC002A.pdf PDF
CN-370000-HW689-DC003B.pdf PDF
CN-370000-HW689-DC004A.pdf PDF
CN-370000-HW689-DC004B.pdf PDF
CN-370000-HW689-DC005C.pdf PDF
CN-370000-HW689-DC006A.pdf PDF
CN-370000-HW689-DC008B.pdf PDF
CN-370000-HW689-DC010B.pdf PDF
CN-370000-HW689-DC011B.pdf PDF
CN-370000-HW689-DC011D.pdf PDF
CN-370000-HW689-DC012A.pdf PDF
CN-370000-HW689-DC013B.pdf PDF
CN-370000-HW689-DC014B.pdf PDF
CN-370000-HW689-DC015E.pdf PDF
CN-370000-HW689-DC019A.pdf PDF
CN-370000-HW689-DC019B.pdf PDF
CN-370000-HW689-DC024A.pdf PDF
CN-370000-HW689-DC025A.pdf PDF
CN-370000-HW689-DC028A.pdf PDF
CN-370000-HW689-DC029A.pdf PDF
CN-370000-HW689-DC02ACO1.pdf PDF
CN-370000-HW689-DC031A.pdf PDF
CN-370000-HW689-DC034A.pdf PDF
CN-370000-HW689-DC035A.pdf PDF
CN-370000-HW689-DC037A.pdf PDF
CN-370000-HW689-DC03ACO1.pdf PDF
CN-370000-HW689-DC03ACO2.pdf PDF
CN-370000-HW689-DC03CC01.pdf PDF
CN-370000-HW689-DC03DCO1.pdf PDF
CN-370000-HW689-DC05CCO1.pdf PDF
CN-370000-HW689-DC05DCO1.pdf PDF
CN-370000-HW689-DC08CCO1.pdf PDF
CN-370000-HW689-DC08CCO2.pdf PDF
CN-370000-HW689-DC08CCO3.pdf PDF
CN-370000-HW689-DC11CCO5.pdf PDF
CN-370000-HW689-DC11CCO6.pdf PDF
CN-370000-HW689-DC12BCO4.pdf PDF
CN-370000-HW689-DC13BCO2.pdf PDF
CN-370000-HW689-DC13BCO4.pdf PDF
CN-370000-HW689-DC13BCO7.pdf PDF
CN-370000-HW689-DC16CCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

DC011B 2 HW689

This Change Order reconciles outstanding WCD #4 and WCD #5 and estimated costs with actual costs for work completed. This Change Order also extends deliverable due dates and the TA Completion Date to allow for submittal of outstanding deliverables, DEP review/comment/approval , and completion of invoicing.

Aaron Cohen 850-245-8974 Contractor Aptim Environmental & Infrastructure, LLC (APTIM) Contractor

Contractor Eric Kramer Contractor 407-287-3216

ERIC_4244

Spot Busters

$ 105,805.81 $ 106,071.49

$ 105,805.81 $ 106,071.49 Completion

✔ Completion 10/02/2023 01/30/2024 120

✔ 1 1 2

Contractor Eric Kramer

Eric Kramer Digitally signed by Eric Kramer Date: 2023.09.28 14:58:49 -04'00'

Teresa Booeshaghi

Teresa Booeshaghi Digitally signed by Teresa Booeshaghi Date: 2023.09.28 14:25:15 -04'00'

9/28/2023

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW689

DC011B

$ 105,805.81

Field work documentation including sampling logs, site photos, calibration and well logs for MAGS event (Subtask 2)

Field work documentation including sampling logs, site photos, calibration and well logs for soil and groundwater sampling event (Subtask 3)

Email confirmation of completion of Final Well Installation (Subtask 4), Site Assessment Report (Subtask 5) and Project Management (Subtask 1)

Approval of Field work documentation including sampling logs, site photos, calibration and well logs for MAGS event (Subtask 2)

Approval of Email confirmation of completion of Final Well Installation (Subtask 4), Site Assessment Report (Subtask 5) and Project Management (Subtask 1)

WCD #4 and WCD #5 (Subtask 6 and Subtask 7)

Approval of Field work documentation including sampling logs, site photos, calibration and well logs for soil and groundwater sampling event (Subtask 3)

01/27/2023

05/25/2023

11/03/2023

$ 46,637.88

$ 26,224.80

$ 30,261.21

$ 2,681.92

FFLORIDA DEPARTMENT OF

EEnvironmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette NNuñez

Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO: Negotiation File Spot Busters Facility ID: ERIC_4244 Coconut Creek, Broward County FROM: Aaron Cohen, Project Manager SUBJECT: Task Assignment Change Order DC011B-2 (HW689) DATE: September 28, 2023

This Change Order reconciles outstanding Work Change Directives #4 and #5 as well as estimated costs with actual costs for work completed. This Change Order also extends deliverable due dates and the TA Completion Date to allow for submittal of outstanding deliverables, DEP review/comments/approval, and Aptim to complete invoicing. Further information is found in the September 20, 2023, change order memo submitted by Eric Kramer of Aptim.

The previous cost total was $106,071.49. Total costs were decreased by $273.67 resulting in a new final cost total of $105,805.81. A 120-day time extension is added to the task assignment Completion Date. Aptim may invoice according to the attached schedule.

Specific negotiated subtasks are as follows:

Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor costs in accordance with Contract HW689.

Subtask 2: Site Meeting and MAGS Testing Subtask 2 adjusts the estimated costs of SVE and well installation materials for the MAGS testing to the actual costs.

Subtask 3: Soil and Groundwater Field Activities:

Subtask 3 adjusts the estimated soil analytical costs, encore sampler costs, and groundwater analytical costs to actuals based upon a reduction in the number of samples collected due to site conditions.

Subtask 4: Final Well Installations and Sampling Subtask 4 removes groundwater analytical costs for the interior well.

Subtask 5: Reporting No Changes

Subtask 6: WCD #4 Reconciliation Subtask 6 resolves WCD #4, approved for an additional site visit and soil samples. WCD #4 was approved for up to $2,740 and is being resolved for a total of $2,350.11.

Subtask 7: WCD #5 Reconciliation Subtask 7 resolves WCD #5, approved for analytical costs for three soil samples. WCD #5 was approved for up to $664.00 and is being resolved for a total of $498.00.

FD

EP

C O

ST

E

ST

IM

A

TE

C on tra ct or

A pt im E nv iro nm en ta l &

In fra st ru ct ur e, L

LC

D at e:

9/

/2

Ta sk

H W

- D C

1B

T A

C O

E R

IC

_4

S ub

Ta sk

P ro je ct M an ag em en t S ub Ta sk

W C

D

S ite

S po t B us te rs C le an er s

S ub

Ta sk

2-

S ite

M ee tin g, M A

G S

S ub

Ta sk

W

C D

A ct iv ity

/P ha se

S A

R S ub Ta sk

3- S oi l a nd G ro un dw at er F ie ld

A ct iv iti es S ub Ta sk

P ro je ct

M an ag er

A ar on

C oh en (F

D E

P )/E ric K ra m er (A

P

TI

M

S ub

Ta sk

4-

Fi na l W el l I ns ta lla tio ns

S ub

Ta sk

S ub

Ta sk

5-

R ep or tin g S ub Ta sk

T T ot al s

La bo r R at e

C at eg or y $6

5.

PP

ro je ct

M an ag er

E

. K ra m er

.9 $6

5.

En gi ne er

/S ci en tis t 5 E

. K ra m er

$3 7.

En gi ne er /S ci en tis t 4

J.

W ill ia m s

$6 1.

En gi ne er /S ci en tis t 5

G . R ob er ts

$3

4.

En gi ne er

/S ci en tis t 2 K

. H ow ar d

$2

9.

En gi ne er

/S ci en tis t 2 K

. M cD on al d

$2

6.

En gi ne er

/S ci en tis t 1 K

L uc ey

$2

6.

En gi ne er in g

Te ch ni ci an

J.

B el l

$3 2.

D es ig ne r 2

S . F er ia nc

$2

7.

Te ch ni ca l P ub lic at io ns

S pe ci al is t 3

H . V in in g

$0

.0

T ot al H ou rs

D ire ct L ab or

$1

6, 0.

$1 ,8

.9

$4

,2

.5

$4 ,3

.3

$2

,1

.4

$3 ,5

.8

$2

.1

$0

.0

$0 .0

$0

.0

$0 .0

O ve rh ea d

.5 8%

$1 4, 3.

$1

,6

.6

$3 ,6

.5

$3

,7

.9

$1 ,8

.3

$3

,0

.0

$1

.3

$0 .0

$0

.0

$0 .0

$0

.0

G en

A dm in

.3

8% $3

,1

.3

$3

.8

$8

.5

$8

.1

$4

.0

$6

.5

$4 0.

$0

.0

$0 .0

$0

.0

$0 .0

Fr in ge

.9

6% $5

,2

.7

$6

.3

$1 ,3

.8

$1

,3

.0

$6

.8

$1 ,1

.4

$6

6.

$0 .0

$0

.0

$0 .0

$0

.0

T ot al L

$3

8, 9.

$4 ,4

.8

$1

0, 6.

$1 0, 6.

$5

,0

.6

$8 ,4

.9

$4

.8

$0

.0

$0 .0

$0

.0

$0 .0

T ra ve l

V eh ic le

R en ta l

$2 ,4

.0

$8

.0

$9

.0

$4

.0

$0

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ile ag e

C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

A ir Fa re $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P er d ie m

H ot el

$1 ,7

.0

$5

.0

$8

.0

$3

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l T ra ve l $4

,1

.0

$1 ,3

.0

$1

,7

.0

$8

.0

$0 .0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

(E qu ip m en t P ro cu re m en t)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P ro cu re m en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (S er vi ce s

P ro cu re m ril lin g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

$1 6, 0.

$0

.0

$1 1, 7.

$4

,9

.0

$0 .0

$2

.0

$0

.0

$0 .0

$0

.0

$0 .0

M ob ile

L ab or at or y

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ur ve yi ng $5

,9

.0

$5 ,9

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

ID

W $9

.0

$0

.0

$0 .0

$9

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

U til iti es $7

.0

$7

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M

A G

S /W el l C on st ru ct io n

M at er ia ls $7

.4

$7

.4

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

S ub to ta l $2

4, 1.

$7 ,4

.4

$1

1, 7.

$5 ,9

.0

$0

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

H an dl in g Fe e $2

,4

.1

$7

.1

$1 ,1

.7

$5

.3

$0

.0

$2 3.

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $2

7, 8.

$8 ,1

.6

$1

2, 5.

$6 ,5

.3

$0

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

RE

V:

2/

CE

F

SH

AW

Pa ge

C O

ST

E

ST

IM

A

TE

C on tra ct or

A pt im E nv iro nm en ta l &

In fra st ru ct ur e, /2

H W

- D C

1B

T A

C O

E R

IC

_4

S ub

Ta sk

P ro je ct M an ag em en t S ub Ta sk

W C

D

S ite

S po t B us te rs C le an er s

S ub

Ta sk

2-

S ite

M ee tin g, M A

G S

S ub

Ta sk

W

C D

A ct iv ity

/P ha se

S A

R S ub Ta sk

3- S oi l a nd G ro un dw at er F ie ld

A ct iv iti es S ub Ta sk

P ro je ct

M an ag er

A ar on

C oh en (F

D E

P )/E ric K ra m er (A

P

TI

M

S ub

Ta sk

4-

Fi na l W el l I ns ta lla tio ns

S ub

Ta sk

S ub

Ta sk

5-

R ep or tin g S ub Ta sk

T T ot al s

LLa bo ra to ry

A na ly tic al C os ts

$2 4, 1.

$3

,9

.0

$1 7, 8.

$1

,5

.0

$0 .0

$9

.0

$4

.0

$0

.0

$0 .0

$0

.0

Fa st

T ur na ro un d

C ha rg es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S am pl e

S hi pp in g $1

.0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or at or y $$2

4, 1.

$4 ,0

.0

$1

7, 8.

$1 ,5

.0

$0

.0

$9

.0

$4

.0

$0 .0

$0

.0

$0 .0

Fi el d

E xp en se s

P so na l P ro te ct io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E xp en da bl es

$6

.0

$2

.0

$2

.0

$1

.0

$0 .0

$4

0.

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

D ril lin g re la te d)

$2 ,0

.0

$0

.0

$1 ,3

.0

$7

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( A na ly tic al re la te d)

$3 ,8

.0

$1

,3

.0

$1 ,6

.0

$5

.0

$0

.0

$3

.0

$4 8.

$0

.0

$0 .0

$0

.0

E qu ip m en t (

ID

W re la te d)

$2

.0

$1

.0

$0 .0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( O th er

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l F ie ld

E xp en se s $6

,7

.0

$1 ,6

.0

$3

,1

.0

$1 ,5

.0

$0

.0

$3

.0

$4 8.

$0

.0

$0 .0

$0

.0

S ub to ta l $1

,9

.9

$4

,4

.8

$2 5, 4.

$4

5, 2.

$1 5, 4.

$8

,4

.9

$2 ,1

.8

$4

.0

$0

.0

$0 .0

$0

.0

C om pl et io n

Fe e

$3 ,8

.9

$4

.2

$1

,0

.6

$1 ,0

.6

$5

.1

$8

.0

$4

9.

$0 .0

$0

.0

$0 .0

$0

.0

T ot al E st im at ed

C os t $1

,8

.8

$4

,9

.1

$2 6, 4.

$4

6, 7.

$1 6, 1.

$9

,3

.0

$2 ,1

.9

$4

.0

$0

.0

$0 .0

$0

.0

C os t f ro m P rio r C

E F:

$1

,0

.4

M an ua l E nt ry

C os t f ro m D el ta

C E

F;

3.

M an ua l E nt ry

C os t ( P rio r +

D el ta

$1

,7

.8

Au to

-C al cu la te d

R ou nd in g E rr or

$7

.9

Au to

-C al cu la te d

Fi na l T ot al C os t:

$1

,8

.8

Au to

-C al cu la te d

RE

V:

2/

CE

F

SH

AW

Pa

LEVEL OF EFFORT / EXPENSE WORKSHEET

SITE : Spot Busters Cleaners

SUBTASK:

DATE: September 20, 2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer 2 Engineer/Scientist 4 J. Williams

Engineer/Scientist 5 G. Roberts

Engineer/Scientist 2 K. Howard

Engineer/Scientist 2 K. McDonald

Engineer/Scientist 1 K. Lucey

Engineering Technician 2 J. Bell Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining

TOTAL LABOR 124

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 7 $840.00 Van or Truck $480.00 Week 0 $0.00

TOTAL VEHICLE $840.00

PER DIEM STAFF RATE UNIT USEAGE ACTUAL

Hotel 3 $110.00 Day 3 $366.21 $330.00 Day 1-leave before 6:00 AM 3 $36.00 Day 3 $108.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 3 $36.00 Day 3 $108.00

TOTAL PER DIEM $546.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST ACTUAL

Survtech Solutions Survey and Benchmark Placement $5,905.00 LS 1 $5,905.00 $5,905.00 GeoTek Utility Locate Services $750.00 LS 1 $750.00 $750.00 Hole Products MAGS/Well Supplies (Casing, Screen, Sand) $822.64 LS 1 $766.48 $766.48

TOTAL $7,421.48

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method TO-15 (VOC Soil Vapor) $200.00 6 0 $1,200.00 EPA Method 8260 (Full List) Soil $150.00 18 0 $2,700.00 EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $50.00 0 0 Contingency $0.00 EPA Method 8260 (VOHs) Leachate $73.00 0 0 Contingency $0.00 EPA Method 8260 (Full List) Well $150.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 1 $150.00

TOTAL LAB $4,050.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 5 $200.00 Soil Sampling Kit (concrete) $235.00 Day 2 $470.00 MAGS Investigation Kit $500.00 Day 1 $500.00 Tedlar Bags $20.00 bag 3 $60.00 Shallow GW Sampling Kit $260.00 Day 0 $0.00 Encore Sampler $16.00 each 18 $288.00 55 Gallon Drums $100.00 each 1 $100.00

TOTAL EQUIPMENT $1,618.00

2-SiteMeeting, MAGS

MAGS Analytical Data Summary Reporting to FDEP (2 hrs)

Preparation of MAGS, Survey, Utility Markout Soil Sampling Field Events (3 hrs), Sunshine One Markout Requests (1 hr), Reporting of Preliminary Soil Sample Data to FDEP (3 hrs).

Note: Air Analysis by TO-15, Soil Samples by VOCs by EPA Method 8260 (Full List)

Onsite Meeting with Property Manager and Utility White-lines for Markouts including travel (12 hrs), Field Event Preparation for Site Municipal Water Sampling for VOCs and PFAS (2 hrs), Perform Municipal Sampling, Sample Handling and Shipping to FDEP Laboratory (3 hrs), Oversight of GPR Utility Subcontract Survey (10 hrs), Oversight of Professional Site Survey (12 hrs), MAGS Soil Sampling Mobilization and Field Event Preparation (2 hrs), Travel (6 hrs), Advancement of 6 MAGS Soil Borings, including coring for the collection of 24 soil samples at depths of 6", 2', 4, and 6' (14 hrs), Installation of Interior Monitoring Well, including Coring (2 hrs), Preparation of Soil Boring Logs (2 hrs), Surface and Site Restoration (2 hrs).

MAGS Mobilization and Field Event Preparation for MAGS Well and Interior Well Installations and Vapor Sampling (3 hrs), Travel Round Trip (6 hrs), Installation and Construction of 6 MAGS Testing Wells (6 hrs), Installation of 4 Vapor Monitoring Point Locations, including coring (4 hrs), Perform MAGS Tests at 6 locations and collection of 6 Vapor Samples (6 hrs), Assistance with Installation of Interior Monitoring Well (1 hr).

Travel Round Trip (6 hrs), Assistance with Installation and Construction of 6 MAGS Testing Wells (6 hrs), Installation of 4 Vapor Monitoring Point Locations, including coring (4 hrs), Perform MAGS Tests at 6 locations and collection of 6 Vapor Samples (6 hrs).

2-Total Page 3 of 17 DC011B TACO #2 (Spot Busters)

SUBTASK:

DATE: September 20, 2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer

Engineer/Scientist 4 J. Williams

Engineer/Scientist 5 G. Roberts

Engineer/Scientist 2 K. Howard

Engineer/Scientist 2 K. McDonald Engineer/Scientist 1 K. Lucey

Engineering Technician 2 J. Bell

Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining

TOTAL LABOR 122

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 4 $480.00 Van or Truck $480.00 Week 1 $480.00

TOTAL VEHICLE $960.00

PER DIEM STAFF RATE UNIT USEAGE ACTUAL

Hotel 2 $110.00 Day 5 $639.13 $550.00 Day 1-leave before 6:00 AM 2 $36.00 Day 2 $72.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 2 $36.00 Day 5 $180.00

TOTAL PER DIEM $802.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST ACTUAL

GW Protection DPT Drilling $11,387.00 Lump 1 $11,445.00 $11,387.00

TOTAL $11,387.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00 EPA Method 8260 (Full List) Soil $150.00 50 0 $7,500.00 EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $55.00 31 0 Contingency $1,705.00 EPA Method 8260 (VOHs) Leachate $73.00 31 0 Contingency $2,263.00 EPA Method 8260 (Full List) DPT Groundwater $150.00 39 0 $5,850.00 EPA Method 8260 (Full List) Well/Piezometers $150.00 3 0 $450.00 EPA Method 8260 (Full List) IDW $150.00 0 0 $0.00 EPA Method 6010 (As, Cd, Cr and Pb) IDW $39.00 0 0 $0.00 EPA Method 1311 TCLP Extraction (Zero Headspace Method/VOCs)-Solid $50.00 0 0 $0.00 EPA Method 1311 TCLP Extraction (Bottle Extraction for Metals)-Solid $45.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $17,768.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 7 $280.00 Soil Sampling Kit (concrete) $235.00 Day 2 $470.00 Monitor Well Installation Kit $325.00 Day 4 $1,300.00 Total Survey Station $50.00 Day 1 $50.00 Shallow GW Sampling Kit $290.00 Day 1 $290.00 Encore Sampler $16.00 each 50 $800.00 55 Gallon Drums $100.00 each 0 $0.00

TOTAL EQUIPMENT $3,190.00

3-Soil and Groundwater Field Activities

Conference with FDEP for Final Proposed DPT Locations (1 hr), Conference with FDEP for Final Proposed Well Locations (1 hr).

Contacting Property Owners of Proposed Sampling Schedule and Confirming Access (1 hr), Compilation of Field Soil Analytical Data, Preparation of Soil Summary Maps for FDEP (3 hrs), Preparation of Cross Section from DPT Cores to Review Proposed GW Sampling Depths with FDEP (3 hrs), Calculation of TOC and Watertable Elevations, Preparation of Groundwater Flow Map for FDEP (2 hrs), Conference with FDEP for Final Proposed DPT Locations (1 hr), Preparation of DPT Data Maps and Conference with FDEP for Final Proposed Well Locations (2 hrs).

Collect Remaining Soil Samples at 15 locations including Travel, Coring, Collection of Soil Samples (20 hrs), Site Restoration, Drum Labeling (2 hrs), Soil Sample Packaging, Chain of Custody and Sample Delivery to Laboratory (2 hrs), Survey Piezometers and Wells with Travel (4 hrs).

Soil and Groundwater Samples by VOCs by EPA Method 8260 (Full List)

Remaining Soil Sampling Field Event Preparation and Mobilization (2 hrs), Collect Remaining Soil Samples at 15 locations including, Coring, Collection of 60 Soil Samples (20 hrs), DPT Drilling Field Event Preparation and Mobilization (2 hrs), Travel to Site (6 hrs), Installation of two DPT Macrocores to 60 ft bls and installation of 3 Piezometers, DPT Groundwater Sampling at 13 locations (40 hrs), Collection of Groundwater Samples from 3 Piezometers and Interior well (3 hrs), and Survey Wells (1 hr), DPT and Well Groundwater Chain of Custody preparation, Sample Packaging and Sample Delivery (2 hrs), Preparation of Soil Boring and Well Construction Logs (4 hrs).

3-Total Page 4 of 17 DC011B TACO #2 (Spot Busters)

SITE :

SUBTASK:

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer 2 Engineer/Scientist 4 J. Williams

Engineer/Scientist 5 G. Roberts

Engineer/Scientist 2 K. Howard

Engineer/Scientist 2 K. McDonald Engineer/Scientist 1 K. Lucey

Engineering Technician 2 J. Bell

Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining

TOTAL LABOR 59

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 4 $480.00 Van or Truck $480.00 Week 0 $0.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE ACTUAL

Hotel 2 $110.00 Day 2 $246.54 $220.00 Day 1-leave before 6:00 AM 2 $36.00 Day 2 $72.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 2 $36.00 Day 2 $72.00

TOTAL PER DIEM $364.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST ACTUAL

GW Protection Well Installations $4,943.00 LS 1 $5,173.00 $4,943.00 Erwin Remediation IDW T&D $110.00 LS 9 $990.00 $990.00

TOTAL $5,933.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00 EPA Method 8260 (Full List) Soil $150.00 0 0 $0.00 EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $50.00 0 0 Contingency $0.00 EPA Method 8260 (VOHs) Leachate $73.00 0 0 Contingency $0.00 EPA Method 8260 (Full List) Wells $150.00 7 0 $1,050.00 EPA Method 8260 (Full List) IDW $150.00 2 0 $300.00 EPA Method 6010 (As, Cd, Cr and Pb) IDW $39.00 2 0 $78.00 EPA 1311 TCLP Extraction (Zero Headspace Method/VOCs)-Soil IDW $50.00 1 0 $50.00 EPA 1311 TCLP Extraction (Bottle Extraction/Metals)-Soil IDW $45.00 1 0 $45.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $1,523.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 4 $160.00 Soil Sampling Kit (concrete) $235.00 Day 0 $0.00 Monitor Well Installation Kit $325.00 Day 2 $650.00 Total Survey Station $50.00 Day 1 $50.00 Shallow GW Sampling Kit $290.00 Day 2 $580.00 Encore Sampler $16.00 each 0 $0.00 55 Gallon Drums $100.00 each 1 $100.00

TOTAL EQUIPMENT $1,540.00

Collection of Final Groundwater Samples and IDW Samples, with travel, Survey Wells, Site Restoration (12 hrs)

Spot Busters Cleaners 4-Final Well Installations

September 20, 2023

Conference with FDEP for Final Well Locations (2 hrs)

Prepare Proposed Location Maps and Recommendations (3 hrs), Characterization and Waste Profile for Transportation and Disposal of IDW Drums (2 hours)

Installation of final well network of 3 shallow/1 deep, including travel (20 hrs). Collection of Final Groundwater Samples (8 wells) with travel and Survey Wells (16 hrs), Deliver final samples to laboratory (2 hrs), Preparation of Well Construction Logs (2 hrs).

4-Total Page 5 of 17 DC011B TACO #2 (Spot Busters)

SUBTASK: 5-Reporting DATE: March 07, 2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer 4

Engineer/Scientist 4 J. Williams

Engineer/Scientist 5 G. Roberts

Engineer/Scientist 2 K. Howard Engineer/Scientist 2 K. McDonald 6 Engineer/Scientist 1 K. Lucey Engineering Technician 2 J. Bell Designer 2 S. Ferianc 8 Technical Pub Specialist 3 H. Vining 6

TOTAL LABOR: 84

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00 Van or Truck $480.00 Week 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

Spot Busters Cleaners

Vapor Data Tabulation (3 hrs), Step Test and Radius of Influence calculations and graphs (3 hrs)

Preparation of MAGS Assessment Findings text (2 hrs), finalization of tables, figures and graphs (2 hrs).

Preparation of SAR text including Site Description, Topography and Drainage, Potable Well Survey tables and figures, Operational History, Summarize Previous Investigations, Site Specific Soil and Groundwater Site Characterization Procedures Text, Tabulate and Report Preparation of Assessment Findings (lithologic borings, soil borings, DPT Sampling, Piezometer and Monitoring Well Installations, Groundwater Sampling) Review and summarize boring logs, Preparation of GW Flow and Analytical Figures (40 hrs).

Review Logs and Prepartion of SAR Cross Sections, Preparation of Physiography, Regional Geology and Regional Hydrogeology Sections, Preparation of Conceptual Model based on Findings, Preparation of Laboratory QA/QC Summary and Data Recommendations, Preparation of Site Assessment Conclusions and Recommendations (20 hrs).

Document Production and Formatting Tables and Text (6 hrs).

Site Assessment Report Map Preparations and Drafting

5-SAR Rept Page 6 of 17 DC011B TACO #2 (Spot Busters)

SUBTASK:

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer Engineer/Scientist 4 J. Williams Engineer/Scientist 5 G. Roberts

Engineer/Scientist 2 K. Howard

Engineer/Scientist 2 K. McDonald Engineer/Scientist 1 K. Lucey Engineering Technician 2 J. Bell Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining

TOTAL LABOR 6

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 1 $120.00 Van or Truck $480.00 Week 0 $0.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

GW Protection Additional Well Installations $230.00 LS 0 $230.00

TOTAL $230.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00 EPA Method 8260 (Full List) Soil $150.00 6 0 $900.00 EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $50.00 0 0 $0.00 EPA Method 8260 (VOHs) Leachate $73.00 0 0 $0.00 EPA Method 8260 (Full List) Wells $150.00 0 0 $0.00 EPA Method 8260 (Full List) IDW $150.00 0 0 $0.00 EPA Method 6010 (As, Cd, Cr and Pb) IDW $39.00 0 0 $0.00 EPA 1311 TCLP Extraction (Zero Headspace Method/VOCs)-Soil IDW $50.00 0 0 $0.00 EPA 1311 TCLP Extraction (Bottle Extraction/Metals)-Soil IDW $45.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $900.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 1 $40.00 Soil Sampling Kit (concrete) $235.00 Day 1 $235.00 Monitor Well Installation Kit $325.00 Day 0 $0.00 Total Survey Station $50.00 Day 0 $0.00 Shallow GW Sampling Kit $290.00 Day 0 $0.00 Encore Sampler $16.00 each 6 $96.00 55 Gallon Drums $100.00 each 0 $0.00

TOTAL EQUIPMENT $371.00

Spot Busters Cleaners

WCD #4

September 20, 2023

Installation and sampling of three additional soil borings for the collection of nine additional delineation samples

6-Total Page 7 of 17 DC011B TACO #2 (Spot Busters)

SUBTASK:

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer Engineer/Scientist 4 J. Williams Engineer/Scientist 5 G. Roberts Engineer/Scientist 2 K. Howard Engineer/Scientist 2 K. McDonald Engineer/Scientist 1 K. Lucey Engineering Technician 2 J. Bell Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00 Van or Truck $480.00 Week 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST ACTUAL

GW Protection Well Installations $4,943.00 LS 0 $5,173.00 $0.00 Erwin Remediation IDW T&D $110.00 LS 0 $990.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00 EPA Method 8260 (Full List) Soil $150.00 3 0 $450.00 EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $50.00 0 0 $0.00 EPA Method 8260 (VOHs) Leachate $73.00 0 0 $0.00 EPA Method 8260 (Full List) Wells $150.00 0 0 $0.00 EPA Method 8260 (Full List) IDW $150.00 0 0 $0.00 EPA Method 6010 (As, Cd, Cr and Pb) IDW $39.00 0 0 $0.00 EPA 1311 TCLP Extraction (Zero Headspace Method/VOCs)-Soil IDW $50.00 0 0 $0.00 EPA 1311 TCLP Extraction (Bottle Extraction/Metals)-Soil IDW $45.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $450.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00 Soil Sampling Kit (concrete) $235.00 Day 0 $0.00 Monitor Well Installation Kit $325.00 Day 0 $0.00 Total Survey Station $50.00 Day 0 $0.00 Shallow GW Sampling Kit $290.00 Day 0 $0.00 Encore Sampler $16.00 each 3 $48.00 55 Gallon Drums $100.00 each 0 $0.00

TOTAL EQUIPMENT $48.00

Spot Busters Cleaners

WCD #5

September 20, 2023

7-Total Page 8 of 17 DC011B TACO #2 (Spot Busters)

C

OS

T

ES

TI

MA

TE

C on tra ct or

A pt im

E nv iro nm en ta l & In fra st ru ct ur e, /2

H W

- D C

1B

T A

C O

E R

IC

_4

S ub

Ta sk

P ro je ct M an ag em en t S ub Ta sk

W C

D

S ite

S po t B us te rs C le an er s

S ub

Ta sk

2-

S ite

M ee tin g, M A

G S

S ub

Ta sk

W

C D

A ct iv ity

/P ha se

S A

R S ub Ta sk

3- S oi l a nd G ro un dw at er F ie ld

A ct iv iti es S ub Ta sk

P ro je ct

M an ag er

A ar on

C oh en (F

D E

P )/E ric K ra m er (A

P

TI

M

S ub

Ta sk

4-

Fi na l W el l I ns ta lla tio ns

S ub

Ta sk

S ub

Ta sk

5-

R ep or tin g S ub Ta sk

T To ta ls

La bo r

R at e C at eg or y

$6 5.

PP

ro je ct M an ra m er

0.

$6 5.

En gi ne er /S ci en tis t 5

E . K ra m er

$3

7.

En gi ne er

/S ci en tis t 4 J.

W ill ia m s

$6

1.

En gi ne er

/S ci en tis t 5 G

. R ob er ts

$3 4.

En gi ne er /S ci en tis t 2

K . H ow ar d

$2

9.

En gi ne er

/S ci en tis t 2 K

. M cD on al d

$2

6.

En gi ne er

/S ci en tis t 1 K

L uc ey

$2

6.

En gi ne er in g

Te ch ni ci an

J.

B el l

$3 2.

D es ig ne r 2

S . F er ia nc

$2

7.

Te ch ni ca l P ub lic at io ns

S pe ci al is t 3

H . V in in g

$0

.0

To ta l H ou rs

D ire ct L

$2

.1

$2

6.

$0 .0

$0

.0

$0 .0

$0

.0

$2

.1

$0 .0

$0

.0

$0 .0

$0

.0

O ve rh ea d

.5 8%

$2

.3

$2 3.

$0

.0

$0 .0

$0

.0

$0 .0

$1

.3

$0

.0

$0 .0

$0

.0

$0 .0

G en

A dm in

.3 8%

$4 5.

$5

.2

$0 .0

$0

.0

$0 .0

$0

.0

$4 0.

$0

.0

$0 .0

$0

.0

$0 .0

Fr in ge

.9

6% $7

4.

$8 .6

$0

.0

$0 .0

$0

.0

$0 .0

$6

6.

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L

$5

.6

$6 3.

$0

.0

$0 .0

$0

.0

$0 .0

$4

.8

$0

.0

$0 .0

$0

.0

$0 .0

Tr av el V eh ic le R en ta l $1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

M ile ag e C os ts

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

A ir

Fa re

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P er d ie m

H ot el $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l T ra ve l $1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

(E qu ip m en t P ro cu re m

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P ro cu re m en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (S er vi ce s

P ro cu re m lin g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ur ve yi ng

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til iti es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M A

G S

/W el l C on st ru ct io n M at er ia ls

.1 6)

.1 6)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$1

.8

.1 6)

$0 .0

$0

.0

$0 .0

$2

.0

$0

.0

$0 .0

$0

.0

$0 .0

RE

V:

2/

CE

F

SH

AW

Pa

C

OS

T

ES

TI

MA

TE

C on tra ct or

A pt im

E nv iro nm en ta l & In fra st ru ct ur e, /2

H W

- D C

1B

T A

C O

E R

IC

_4

S ub

Ta sk

P ro je ct M an ag em en t S ub Ta sk

W C

D

S ite

S po t B us te rs C le an er s

S ub

Ta sk

2-

S ite

M ee tin g, M A

G S

S ub

Ta sk

W

C D

A ct iv ity

/P ha se

S A

R S ub Ta sk

3- S oi l a nd G ro un dw at er F ie ld

A ct iv iti es S ub Ta sk

P ro je ct

M an ag er

A ar on

C oh en (F

D E

P )/E ric K ra m er (A

P

TI

M

S ub

Ta sk

4-

Fi na l W el l I ns ta lla tio ns

S ub

Ta sk

S ub

Ta sk

5-

R ep or tin g S ub Ta sk

T To ta ls

H an dl in g

Fe e

$1 7.

5.

$0

.0

$0 .0

$0

.0

$2 3.

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $ $1

.2

.7

8) $0

.0

$0 .0

$0

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

La bo ra ly tic al C os ts

1, 0.

0.

1, 0.

0.

$0 .0

$9

.0

$4

.0

$0

.0

$0 .0

$0

.0

Fa st

T ur na ro un d

C ha rg es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S am pl e

S hi pp in g $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or at or y

1, 0.

0.

1, 0.

0.

$0

.0

$9

.0

$4

.0

$0 .0

$0

.0

$0 .0

Fi el d

E xp en so na l P ro te ct io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E xp en da bl es

$4 0.

$0

.0

$0 .0

$0

.0

$0 .0

$4

0.

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

D ril lin g re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

A na ly tic al re la te

d) $1

.0

.0

0)

0.

$0 .0

$0

.0

$3

.0

$4 8.

$0

.0

$0 .0

$0

.0

E qu ip m en t (

ID

W re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

O th er

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l F ie ld E xp en se s

$1

.0

.0 0)

0.

$0

.0

$0 .0

$3

.0

$4

8.

$0 .0

$0

.0

$0 .0

S ub to ta l

1.

$6 3.

1, 7.

1, 0.

0.

$0 .0

$2

,1

.8

$4

.0

$0 .0

$0

.0

$0 .0

C om pl et io n Fe e $5

5.

$6 .3

$0

.0

$0 .0

$0

.0

$0 .0

$4

9.

$0 .0

$0

.0

$0 .0

$0

.0

To ta l E st im at ed C os t

5.

$7

0.

1, 7.

1, 0.

0.

$0

.0

$2 ,1

.9

$4

.0

$0

.0

$0 .0

$0

.0

RE

V:

2/

CE

F

SH

AW

Pa ge

SUBTASK:

DATE: September 20, 2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer Engineer/Scientist 4 J. Williams Engineer/Scientist 5 G. Roberts Engineer/Scientist 2 K. Howard Engineer/Scientist 2 K. McDonald Engineer/Scientist 1 K. Lucey Engineering Technician 2 J. Bell Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00 Van or Truck $480.00 Week 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE ACTUAL

Hotel 3 $110.00 Day 0 $366.21 $0.00 Day 1-leave before 6:00 AM 3 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 3 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST ACTUAL

Survtech Solutions Survey and Benchmark Placement $5,905.00 LS 0 $5,905.00 $0.00 GeoTek Utility Locate Services $750.00 LS 0 $750.00 $0.00 Hole Products MAGS/Well Supplies (Casing, Screen, Sand) $822.64 LS 1 $766.48 ($56.16)

TOTAL ($56.16)

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00 EPA Method 8260 (Full List) Soil $150.00 -6 0 ($900.00) EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $50.00 0 0 Contingency $0.00 EPA Method 8260 (VOHs) Leachate $73.00 0 0 Contingency $0.00 EPA Method 8260 (Full List) Well $150.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB ($900.00)

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00 Soil Sampling Kit (concrete) $235.00 Day 0 $0.00 MAGS Investigation Kit $500.00 Day 0 $0.00 Tedlar Bags $20.00 bag 0 $0.00 Shallow GW Sampling Kit $260.00 Day 0 $0.00 Encore Sampler $16.00 each -6 ($96.00) 55 Gallon Drums $100.00 each 0 $0.00

TOTAL EQUIPMENT ($96.00)

2-SiteMeeting, MAGS

2-Delta Page 11 of 17 DC011B TACO #2 (Spot Busters)

SUBTASK:

DATE: September 20, 2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer Engineer/Scientist 4 J. Williams Engineer/Scientist 5 G. Roberts Engineer/Scientist 2 K. Howard Engineer/Scientist 2 K. McDonald Engineer/Scientist 1 K. Lucey Engineering Technician 2 J. Bell Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00 Van or Truck $480.00 Week 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE ACTUAL

Hotel 2 $110.00 Day 0 $639.13 $0.00 Day 1-leave before 6:00 AM 2 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 2 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST ACTUAL

GW Protection DPT Drilling $11,387.00 Lump 0 $11,445.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00 EPA Method 8260 (Full List) Soil $150.00 -10 0 ($1,500.00) EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $55.00 0 0 Contingency $0.00 EPA Method 8260 (VOHs) Leachate $73.00 0 0 Contingency $0.00 EPA Method 8260 (Full List) DPT Groundwater $150.00 0 0 $0.00 EPA Method 8260 (Full List) Well/Piezometers $150.00 -1 0 ($150.00) EPA Method 8260 (Full List) IDW $150.00 0 0 $0.00 EPA Method 6010 (As, Cd, Cr and Pb) IDW $39.00 0 0 $0.00 EPA Method 1311 TCLP Extraction (Zero Headspace Method/VOCs)-Solid $50.00 0 0 $0.00 EPA Method 1311 TCLP Extraction (Bottle Extraction for Metals)-Solid $45.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB ($1,650.00)

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00 Soil Sampling Kit (concrete) $235.00 Day 0 $0.00 Monitor Well Installation Kit $325.00 Day 0 $0.00 Total Survey Station $50.00 Day 0 $0.00 Shallow GW Sampling Kit $290.00 Day 0 $0.00 Encore Sampler $16.00 each -10 ($160.00) 55 Gallon Drums $100.00 each 0 $0.00

TOTAL EQUIPMENT ($160.00)

3-Soil and Groundwater Field Activities

3-Delta Page 12 of 17 DC011B TACO #2 (Spot Busters)

SUBTASK:

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer Engineer/Scientist 4 J. Williams Engineer/Scientist 5 G. Roberts Engineer/Scientist 2 K. Howard Engineer/Scientist 2 K. McDonald Engineer/Scientist 1 K. Lucey Engineering Technician 2 J. Bell Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00 Van or Truck $480.00 Week 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE ACTUAL

Hotel 2 $110.00 Day 0 $246.54 $0.00 Day 1-leave before 6:00 AM 2 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 2 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST ACTUAL

GW Protection Well Installations $4,943.00 LS 0 $5,173.00 $0.00 Erwin Remediation IDW T&D $110.00 LS 0 $990.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00 EPA Method 8260 (Full List) Soil $150.00 0 0 $0.00 EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $50.00 0 0 $0.00 EPA Method 8260 (VOHs) Leachate $73.00 0 0 $0.00 EPA Method 8260 (Full List) Wells $150.00 -1 0 ($150.00) EPA Method 8260 (Full List) IDW $150.00 0 0 $0.00 EPA Method 6010 (As, Cd, Cr and Pb) IDW $39.00 0 0 $0.00 EPA 1311 TCLP Extraction (Zero Headspace Method/VOCs)-Soil IDW $50.00 0 0 $0.00 EPA 1311 TCLP Extraction (Bottle Extraction/Metals)-Soil IDW $45.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB ($150.00)

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00 Soil Sampling Kit (concrete) $235.00 Day 0 $0.00 Monitor Well Installation Kit $325.00 Day 0 $0.00 Total Survey Station $50.00 Day 0 $0.00 Shallow GW Sampling Kit $290.00 Day 0 $0.00 Encore Sampler $16.00 each 0 $0.00 55 Gallon Drums $100.00 each 0 $0.00

TOTAL EQUIPMENT $0.00

Spot Busters Cleaners 4-Final Well Installations

4-Delta Page 13 of 17 DC011B TACO #2 (Spot Busters)

SUBTASK:

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer Engineer/Scientist 4 J. Williams Engineer/Scientist 5 G. Roberts

Engineer/Scientist 2 K. Howard

Engineer/Scientist 2 K. McDonald Engineer/Scientist 1 K. Lucey Engineering Technician 2 J. Bell Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining

TOTAL LABOR 6

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 1 $120.00 Van or Truck $480.00 Week 0 $0.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

GW Protection Additional Well Installations $230.00 LS 0 $230.00

TOTAL $230.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00 EPA Method 8260 (Full List) Soil $150.00 6 0 $900.00 EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $50.00 0 0 $0.00 EPA Method 8260 (VOHs) Leachate $73.00 0 0 $0.00 EPA Method 8260 (Full List) Wells $150.00 0 0 $0.00 EPA Method 8260 (Full List) IDW $150.00 0 0 $0.00 EPA Method 6010 (As, Cd, Cr and Pb) IDW $39.00 0 0 $0.00 EPA 1311 TCLP Extraction (Zero Headspace Method/VOCs)-Soil IDW $50.00 0 0 $0.00 EPA 1311 TCLP Extraction (Bottle Extraction/Metals)-Soil IDW $45.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $900.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 1 $40.00 Soil Sampling Kit (concrete) $235.00 Day 1 $235.00 Monitor Well Installation Kit $325.00 Day 0 $0.00 Total Survey Station $50.00 Day 0 $0.00 Shallow GW Sampling Kit $290.00 Day 0 $0.00 Encore Sampler $16.00 each 6 $96.00 55 Gallon Drums $100.00 each 0 $0.00

TOTAL EQUIPMENT $371.00

Spot Busters Cleaners

WCD #4

September 20, 2023

Installation and sampling of three additional soil borings for the collection of nine additional delineation samples

6-Delta Page 14 of 17 DC011B TACO #2 (Spot Busters)

SUBTASK:

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer Engineer/Scientist 4 J. Williams Engineer/Scientist 5 G. Roberts Engineer/Scientist 2 K. Howard Engineer/Scientist 2 K. McDonald Engineer/Scientist 1 K. Lucey Engineering Technician 2 J. Bell Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00 Van or Truck $480.00 Week 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST ACTUAL

GW Protection Well Installations $4,943.00 LS 0 $5,173.00 $0.00 Erwin Remediation IDW T&D $110.00 LS 0 $990.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00 EPA Method 8260 (Full List) Soil $150.00 3 0 $450.00 EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $50.00 0 0 $0.00 EPA Method 8260 (VOHs) Leachate $73.00 0 0 $0.00 EPA Method 8260 (Full List) Wells $150.00 0 0 $0.00 EPA Method 8260 (Full List) IDW $150.00 0 0 $0.00 EPA Method 6010 (As, Cd, Cr and Pb) IDW $39.00 0 0 $0.00 EPA 1311 TCLP Extraction (Zero Headspace Method/VOCs)-Soil IDW $50.00 0 0 $0.00 EPA 1311 TCLP Extraction (Bottle Extraction/Metals)-Soil IDW $45.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $450.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00 Soil Sampling Kit (concrete) $235.00 Day 0 $0.00 Monitor Well Installation Kit $325.00 Day 0 $0.00 Total Survey Station $50.00 Day 0 $0.00 Shallow GW Sampling Kit $290.00 Day 0 $0.00 Encore Sampler $16.00 each 3 $48.00 55 Gallon Drums $100.00 each 0 $0.00

TOTAL EQUIPMENT $48.00

Spot Busters Cleaners

WCD #5

7-Delta Page 15 of 17 DC011B TACO #2 (Spot Busters)

C

OS

T

ES

TI

MA

TE

C on tra ct or

A pt im

E nv iro nm en ta l & In fra st ru ct ur e, 3/ 7/

H W

D C

1B

T A

C O

E R

IC

_4

S ub

Ta sk

P ro je ct M an ag em en t S ub Ta sk

W C

D

S ite

S po t B us te rs C le an er s

S ub

Ta sk

2-

S ite

M ee tin g, M A

G S

S ub

Ta sk

W

C D

A ct iv ity

/P ha se

S A

R S ub Ta sk

3- S oi l a nd G ro un dw at er F ie ld

A ct iv iti es S ub Ta sk

P ro je ct

M an ag er

A ar on

C oh en (F

D E

P )/E ric K ra m er (A

P

TI

M

S ub

Ta sk

4-

Fi na l W el l I ns ta lla tio ns

S ub

Ta sk

S ub

Ta sk

5-

R ep or tin g S ub Ta sk

T To ta ls

La bo r

R at e C at eg or y

$6 5.

PP

ro je ct M an ra m er

.5

$6 5.

En gi ne er /S ci en tis t 5

E . K ra m er

$3

7.

En gi ne er

/S ci en tis t 4 J.

W ill ia m s

$6

1.

En gi ne er

/S ci en tis t 5 G

. R ob er ts

$3 4.

En gi ne er /S ci en tis t 2

K . H ow ar d

$2 9.

En gi ne er /S ci en tis t 2

K . M cD on al d

$2 6.

En gi ne er /S ci en tis t 1

K L uc ey

$2 6.

En gi ne er in g Te ch ni ci an

J.

B el l

$3

2.

D es ig ne r 2 S

. F er ia nc

$2 7.

Te ch ni ca l P ub lic at io ns S pe ci al is t 3 H

. V in in g

$0 .0

To ta l H ou rs

D ire ct L

$1

6, 6.

$1 ,8

.9

$4

,2

.5

$4 ,3

.3

$2

,1

.4

$3 ,5

.8

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

O ve rh ea d

.5 8%

$1 3, 3.

$1

,5

.6

$3 ,6

.5

$3

,7

.9

$1 ,8

.3

$3

,0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

G en

A dm in

.3 8%

$3 ,1

.9

$3

.6

$8

.5

$8

.1

$4

.0

$6

.5

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge

.9 6%

$5 ,1

.9

$5

.7

$1

,3

.8

$1 ,3

.0

$6

.8

$1

,1

.4

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L

$3

8, 4.

$4 ,4

.0

$1

0, 6.

$1 0, 6.

$5

,0

.6

$8 ,4

.9

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Tr av el V eh ic le R en ta l $2

,2

.0

$8

.0

$9

.0

$4

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ile ag e

C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

A ir Fa re $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P er d ie m

H ot el

$1 ,7

.0

$5

.0

$8

.0

$3

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l T ra ve l $3

,9

.0

$1 ,3

.0

$1

,7

.0

$8

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (E qu ip m en t P ro cu re m

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

S ub to ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P ro cu re m en t F ee $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

(S er vi ce s P ro cu re m lin g (C on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

D ril lin g

(N on

-c on ve nt io na

l) $1

6, 0.

$0 .0

$1

1, 7.

$4 ,9

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ob ile

L ab or at or y

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ur ve yi ng $5

,9

.0

$5 ,9

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

ID

W $9

.0

$0

.0

$0 .0

$9

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

U til iti es $7

.0

$7

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

RE

V:

2/

CE

F

SH

AW

Pa ge

C

OS

T

ES

TI

MA

TE

C on tra ct or

A pt im

E nv iro nm en ta l & In fra st ru ct ur e, 3/ 7/

H W

D C

1B

T A

C O

E R

IC

_4

S ub

Ta sk

P ro je ct M an ag em en t S ub Ta sk

W C

D

S ite

S po t B us te rs C le an er s

S ub

Ta sk

2-

S ite

M ee tin g, M A

G S

S ub

Ta sk

W

C D

A ct iv ity

/P ha se

S A

R S ub Ta sk

3- S oi l a nd G ro un dw at er F ie ld

A ct iv iti es S ub Ta sk

P ro je ct

M an ag er

A ar on

C oh en (F

D E

P )/E ric K ra m er (A

P

TI

M

S ub

Ta sk

4-

Fi na l W el l I ns ta lla tio ns

S ub

Ta sk

S ub

Ta sk

5-

R ep or tin g S ub Ta sk

T To ta ls

M

A G

S /W el l C on st ru ct io n

M at er ia ls $8

.6

$8

.6

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

S ub to ta l $2

4, 7.

$7 ,4

.6

$1

1, 7.

$5 ,9

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

H an dl in g

Fe e

$2 ,4

.7

$7

.7

$1

,1

.7

$5

.3

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$ $2 7, 7.

$8

,2

.4

$1 2, 5.

$6

,5

.3

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

La bo ra ly tic al C os ts

$2 5, 1.

$4

,8

.0

$1 9, 8.

$1

,6

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fa st

T ur na ro un d

C ha rg es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S am pl e

S hi pp in g $1

.0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or at or y $2

6, 1.

$4 ,9

.0

$1

9, 8.

$1 ,6

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fi el d

E xp en so na l P ro te ct io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E xp en da bl es

$6

.0

$2

.0

$2

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

D ril lin g re la te d)

$2 ,0

.0

$0

.0

$1 ,3

.0

$7

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( A na ly tic al re la te d)

$3 ,7

.0

$1

,4

.0

$1 ,7

.0

$5

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t (

ID

W re la te

d) $2

.0

$1

.0

$0

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

O th er

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l F ie ld E xp en se s

$6 ,6

.0

$1

,7

.0

$3 ,3

.0

$1

,5

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub to ta l $1

,2

.0

$4

,4

.0

$2 6, 1.

$4

7, 2.

$1 5, 4.

$8

,4

.9

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

C om pl et io n Fe e $3

,8

.4

$4

.9

$1 ,0

.6

$1

,0

.6

$5

.1

$8

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l E st im at ed C os t

$1

,0

.4

$4 ,8

.9

$2

7, 2.

$4 8, 7.

$1

6, 1.

$9 ,3

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

RE

V:

2/

CE

F

SH

AW

Pa ge

Site Name: Site ID #:

Contract #: Contractor:

• Reason for Work Change Directive :

• Description of Work Change Directive :

• Attachments (if applicable, list documents supporting change):

• Costs (if negotiated unit costs, provide information below):

WCP WCD 07-2018

Authorized Contractor Signature:

Authorized FDEP Signature:

WORK CHANGE DIRECTIVE FORM

FDEP Supervisor Approval:

(if applicable)

Additional work is not authorized without prior FDEP approval as indicated by an approved Work Change Directive Form or Task Assignment Change Order Form. It is the Contractor's responsibility to ensure that additional costs associated with this WCD are resolved by a Task Assignment Change Order (TACO) prior to the completion date of the original Task Assignment or subsequent TACOs completed prior to the execution date of this WCD. Failure to do so will result in a loss of reimbursement for work associated with this WCD.

Task Assignment #: Work Change Directive #:

Maximum Estimated Increase in Task Amount:

Site Name: Site ID #:

Contract #: Contractor:

• Reason for Work Change Directive :

• Description of Work Change Directive :

• Attachments (if applicable, list documents supporting change):

• Costs (if negotiated unit costs, provide information below):

WCP WCD 07-2018

Authorized Contractor Signature:

Authorized FDEP Signature:

WORK CHANGE DIRECTIVE FORM

FDEP Supervisor Approval:

(if applicable)

Additional work is not authorized without prior FDEP approval as indicated by an approved Work Change Directive Form or Task Assignment Change Order Form. It is the Contractor's responsibility to ensure that additional costs associated with this WCD are resolved by a Task Assignment Change Order (TACO) prior to the completion date of the original Task Assignment or subsequent TACOs completed prior to the execution date of this WCD. Failure to do so will result in a loss of reimbursement for work associated with this WCD.

Task Assignment #: Work Change Directive #:

Maximum Estimated Increase in Task Amount:

Proposed Scope of Work Spot Busters Cleaners Site Assessment and Reporting Task Assignment DC011B TACO #2 6750 North State Road 7, Coconut Creek, Broward County, FL ERIC_4244 (Former Facility No.

This is the start of the file's text. The full file is on GovTribe.