This document is a Task Assignment Change Order (TACO #1) entered into between the State of Florida Department of Environmental Protection (FDEP) and Aptim Environmental & Infrastructure, LLC (APTIM). The change order amends Task Assignment DC010A under Contract HW689 for work at the Center West Plaza (formerly Touch of Class Dry Cleaners) located at 3215 US Highway 1 South, Fort Pierce, Saint Lucie County, Florida (ERIC_5417). The project managers are Skylar Schwed for FDEP and Eric Kramer for APTIM.
The change order authorizes a cost reduction of $430.00 to remove Investigative Derived Waste (IDW) pick-up and disposal fees from the original task assignment value. The amended total contract price is $18,504.57, reduced from the previous price of $18,934.57. The scope of work involves quarterly groundwater monitoring and post-active remediation monitoring (PARM) activities across four subtasks: Quarter 2 PARM with soil confirmation sampling, Quarter 3 PARM groundwater sampling, Quarter 4 PARM groundwater sampling, and annual groundwater reporting with Site Rehabilitation Completion Report (SRCR). The task assignment completion date was extended by 90 days from April 28, 2023, to July 27, 2023, to allow for PFAS sampling and analysis. Payment is structured on a fixed unit rate basis with invoicing triggered upon FDEP approval of deliverables, with subtask payments of $4,192.63, $2,964.03, and $11,347.91 for subtasks 2, 3, and 4&1, respectively.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Name:
4. ☐ There are no changes to the TA compensation.
☐ The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO ☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. ☐ There are no changes to the TA Expiration Date.
☐ The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. ☐ There are no changes to the Attachments.
☐ Attachment ___ is replaced with Attachment -____.
7. ☐ No Additional Changes.
☐ Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
DC010A 1 HW689
This Task Assignment Change Order authorizes a reduction in cost to remove IDW pick up and disposal fees in accordance with April 21, 2023, Scope of Work and Cost Estimate.
Skylar Schwed (850)245-8795 Contractor Contractor
Contractor Contractor
Contractor
Aptim Environmental & Infrastructure, LLC (APTIM) Eric Kramer 407-287-3216
ERIC_5417
Center West Plaza
✔ $ 18,504.57 $ 18,934.57
$ 18,504.57 $ 18,934.57 Completion
Completion✔ 04/28/2023 07/27/2023 90
✔ 1 1 1
Eric Kramer Digitally signed by Eric Kramer Date: 2023.04.27 12:57:11 -04'00' Kelly Crain Digitally signed by Kelly Crain
Date: 2023.04.27 11:47:49 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01_18
Contract Number:
Task Assignment #:
Change Order #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW689
DC010A
$ 18,504.57
Subtask 2: Quarter 2 PARM and Confirmation Soil Sampling
Subtask 3: Quarter 3 PARM
Subtask 1&4: Quarter 4 PARM and Annual Groundwater Reporting; PM
Upon submittal and FDEP approval of Quarterly PARM 2 Soil Tables and Laboratory Report: Subtask 2
Upon submittal and FDEP approval of Quarterly PARM 3 Soil Tables and Laboratory Report, Annual Ground Water Monitoring, SRCR, and Project Management : Subtask 4&1
Upon submittal and FDEP approval of Quarterly PARM 3 Soil Tables and Laboratory Report: Subtask 3.
07/29/2022
11/18/2022
02/24/2023
$ 2,964.03
$ 4,192.63
$ 11,347.91
Printed on recycled paper.
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Secretary
To:
From:
Date:
HW689 Contract Negotiation File Center West Plaza
ERIC_5417
Skylar Schwed, Project Manager April 25, 2023
Subject: Negotiation Summary
HW689 DC010A-1
This Task Assignment Change Order authorizes a reduction in cost to remove IDW pick up and disposal fees in accordance with April 21, 2023, Scope of Work and Cost Estimate.
The cost reduction related to this change order is $430.00
The FDEP project manager agrees to the scope of work and final cost associated with this Task Assignment Change Order. The final cost for this Task Assignment Change Order is $18,504.57
APTIM may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Change Order Notification Form.
FDEP COST ESTI MATE
Contractor: Aptim Environmental & Infrastructure, LLC
Date: 3/8/2023
Task #: HW689 - HW010A TACO #1 ERIC_4903 SubTask 1 Project Management
Site: Center West Plaza Touch of Class SubTask 2 2-Q2 PARM & Soil Confirmation Sampling
Activity/Phase: Monitoring SubTask 3 3-Q3 PARM
Project Manager: Skylar Schwed (FDEP)/Eric Kramer (APTIM) SubTask 4 4-Q4 PARM and Annual Reporting/SRCR
SubTask 5 0
Totals 1 2 3 4 5 Labor Rate Category
$65.22 Project Manager E. Kramer 10 10.3 $65.22 Engineer/Scientist 5 E. Kramer 4 0 0 4 0 $61.98 Engineer/Scientist 5 G. Roberts 52 6 6 40 0 $34.53 Engineer/Scientist 2 K. Howard 35 11 12 12 0 $25.38 Engineer/Scientist 1 J. Harris 11 11 0 0 0 $32.56 Designer 2 S. Ferianc 4 0 0 4 0 $27.64 Technical Publications Specialist 3 H. Vining 3 0 0 3 0
$0.00 0 0 0 0 0 Total Hours 119 10 28 18 63 0
Direct Labor $5,858.74 $674.01 $1,030.89 $786.24 $3,367.60 $0.00
Overhead 85.58% $5,013.91 $576.82 $882.24 $672.86 $2,881.99 $0.00 Gen & Admin 19.38% $1,135.42 $130.62 $199.79 $152.37 $652.64 $0.00 Fringe 31.96% $1,872.44 $215.41 $329.47 $251.28 $1,076.28 $0.00 Total Labor $13,880.51 $1,596.86 $2,442.39 $1,862.75 $7,978.51 $0.00
Travel Vehicle Rental $360.00 $120.00 $120.00 $120.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $360.00 $120.00 $120.00 $120.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 MAGS/Well Construction Materials $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF SHAW Page 1
FDEP COST ESTI MATE
Date: 3/8/2023
Task #: HW689 - HW010A TACO #1 ERIC_4903 SubTask 1 Project Management
Site: Center West Plaza Touch of Class SubTask 2 2-Q2 PARM & Soil Confirmation Sampling
Activity/Phase: Monitoring SubTask 3 3-Q3 PARM
Project Manager: Skylar Schwed (FDEP)/Eric Kramer (APTIM) SubTask 4 4-Q4 PARM and Annual Reporting/SRCR
SubTask 5 0
Totals 1 2 3 4 5 Laboratory
Analytical Costs $1,387.00 $657.00 $365.00 $365.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,387.00 $657.00 $365.00 $365.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $120.00 $40.00 $40.00 $40.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,169.00 $589.00 $290.00 $290.00 $0.00 Equipment (IDW related) $200.00 $100.00 $100.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,489.00 $729.00 $430.00 $330.00 $0.00
Subtotal $17,116.51 $1,596.86 $3,948.39 $2,777.75 $8,793.51 $0.00 Completion Fee $1,388.06 $159.69 $244.24 $186.28 $797.85 $0.00
Total Estimated Cost $18,504.57 $1,756.55 $4,192.63 $2,964.03 $9,591.36 $0.00
TA $18,934.57 $1,756.55 $4,302.63 $3,074.03 $9,801.36 $0.00
Delta ($430.00) $0.00 ($110.00) ($110.00) ($210.00) $0.00
CEF Rounding Error $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $18,504.57 $1,756.55 $4,192.63 $2,964.03 $9,591.36 $0.00
REV: 02/03 CEF SHAW Page 2
LEVEL OF EFFORT / EXPENSE WORKSHEET
SITE : Center West Plaza Touch of Class SUBTASK: 2-Q2 PARM & Soil Confirmation Sampling DATE: June 06, 2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer
Engineer/Scientist 5 G. Roberts
Engineer/Scientist 2 K. Howard
Engineer/Scientist 1 J. Harris
Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining
TOTAL LABOR 28
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Remediation Non-Haz Soil/Water T&D $100.00 Drum 0 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method 8260 (VOHs Only) Soil $73.00 4 0 $292.00 EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $50.00 0 0 Contingency $0.00 EPA Method 8260 (VOHs Only) Leachate $73.00 0 0 Contingency $0.00 EPA Method 8260 (VOHs Only) GW $73.00 3 1 $292.00 EPA Method 8260 (Halos Only/IDW) $73.00 1 $73.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $657.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 1 $40.00 Soil Sampling Kit (concrete) $235.00 Day 1 $235.00 Shallow GW Sampling Kit $290.00 Day 1 $290.00 Encore Sampler $16.00 each 4 $64.00 55-gallon Drum $100.00 Each 1 $100.00
TOTAL EQUIPMENT $729.00
Soil Sampling Travel Preparation and Mobilization (1 hr), Travel Round Trip (4 hrs), Relocation and Replacement of Stage for Sampling, Collect Confirmation Soil Samples at SB006 (0.5', 2', 4, and 5') including, Coring, Collection of Samples (4 hrs), Collect IDW Sample and Purgewater Handling (1 hr), Site Restoration (1 hr)
Monitoring Wells Proposed for Sampling include MW009, MW013 and MW016 by EPA Method 8260 (VOHs only), Soil Samples at SB006 (0.5 ft bls, 2 ft bls, 4 ft bls and 5 ft bls) by EPA Method 8260 (VOHs only) and Contingency Encore Sampler for SPLP Extraction by EPA Method 1312 with Leachate Analysis by EPA Method 8260 (VOHs only).
Noticing and Coordination of Access with Tenant (1 hr), Order Sampling Laboratory Kits and Supplies (1 hr), Update of GW Elevation, Analytical Summary Tables and Electronic Submittal of Tables and Laboratory Data (3 hrs), Preparation of IDW manifest and profile (1 hr)
GW Sampling Travel Preparation and Mobilization (1 hr), Round trip travel to site (4 hrs). Collect Depth to Groundwater Measurements from all wells (2 hrs). Sample three monitoring wells MW009, MW013 and MW016 (3 hrs). Prepare chain of custody preparation, sample packaging and delivery (1 hr).
2-Total Page 3 of 5 final
SUBTASK:
DATE: June 06, 2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer
Engineer/Scientist 5 G. Roberts
Engineer/Scientist 2 K. Howard
Engineer/Scientist 1 J. Harris Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining
TOTAL LABOR 18
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Remediation Non-Haz Soil/Water T&D $100.00 Drum 0 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method 8260 (VOHs Only) Soil $73.00 0 0 $0.00 EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $48.00 0 0 Contingency $0.00 EPA Method 8260 (VOHs Only) Leachate $73.00 0 0 Contingency $0.00 EPA Method 8260 (VOHs Only) GW $73.00 3 1 $292.00 EPA Method 8260 (Halos Only/IDW) $73.00 1 $73.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $365.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 1 $40.00 Soil Sampling Kit (concrete) $235.00 Day 0 $0.00 Shallow GW Sampling Kit $290.00 Day 1 $290.00 Encore Sampler $16.00 each 0 $0.00 55-gallon Drum $100.00 Each 1 $100.00
TOTAL EQUIPMENT $430.00
Monitoring Wells Proposed for Sampling include MW009, MW013 and MW016 by EPA Method 8260 (VOHs only)
3-Q3 PARM
Noticing and Coordination of Access with Tenant (1 hr), Order Sampling Laboratory Kits and Supplies (1 hr), Update of GW Elevation, Analytical Summary Tables and Electronic Submittal of Tables and Laboratory Data (3 hrs), Preparation of IDW manifest and profile (1 hr) GW Sampling Travel Preparation and Mobilization (1 hr), Round trip travel to site (4 hrs). Collect Depth to Groundwater Measurements from all wells (2 hrs). Sample three monitoring wells MW009, MW013 and MW016 (3 hrs). Collect IDW Sample and Purgewater Handling (1 hr), Prepare chain of custody preparation, sample packaging and delivery (1 hr).
3-Total Page 4 of 5 final
SUBTASK: 4-Q4 PARM and Annual Reporting/SRCR
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 4
Engineer/Scientist 5 G. Roberts
Engineer/Scientist 2 K. Howard
Engineer/Scientist 1 J. Harris Designer 2 S. Ferianc 4 Technical Pub Specialist 3 H. Vining 3
TOTAL LABOR 63
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Remediation Non-Haz Soil/Water T&D $100.00 Drum 0 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method 8260 (VOHs Only) Soil $73.00 0 0 $0.00 EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $48.00 0 0 Contingency $0.00 EPA Method 8260 (VOHs Only) Leachate $73.00 0 0 Contingency $0.00 EPA Method 8260 (VOHs Only) GW $73.00 3 1 $292.00 EPA Method 8260 (Halos Only/IDW) $73.00 1 $73.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $365.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 1 $40.00 Soil Sampling Kit (concrete) $235.00 Day 0 $0.00 Shallow GW Sampling Kit $290.00 Day 1 $290.00 Encore Sampler $16.00 each 0 $0.00 55-gallon Drum $100.00 Each 0 $0.00
TOTAL EQUIPMENT $330.00
Monitoring Wells Proposed for Sampling include MW009, MW013 and MW016 by EPA Method 8260 (VOHs only)
Drafting Final Soil Analytical, GW Flow and GW Analytical Results Maps Report Document Production
6/6/2022
Technical Review of Annual Groundwater Sampling Report/SRCR (3 hrs) Noticing and Coordination of Access with Tenant (1 hr), Order Sampling Laboratory Kits and Supplies (1 hr), Preparation of Shallow GW Flow Maps, Soil Analytical Confirmation Maps, and GW Analytical Summary Results Maps for Three PARM Events (6 hrs). Update of GW Elevation, Groundwater Analytical Summary Tables (3 hrs), Preparation of Annual Groundwater and Soil Sampling Report Text and Preparation of Recommendations and Conclusions (20 hrs), Incorporation of SRCR Data inaccordance with FDEP Guidance dated July 10, 2019, if qualified for NFA Recommendation (8 hrs), Preparation of IDW manifest and profile (1 hr) GW Sampling Travel Preparation and Mobilization (1 hr), Round trip travel to site (4 hrs).
Collect Depth to Groundwater Measurements from all wells (2 hrs). Sample three monitoring wells MW009, MW013 and MW016 (3 hrs).Collect IDW Sample and Purgewater Handling (1 hr), Prepare chain of custody preparation, sample packaging and delivery (1 hr).
4-Total Page 5 of 5 final
FDEP COST ESTIMATE
Date: 4/21/2023
Task #: HW689 - HW010A TACO #1 ERIC_4903 SubTask 1 Project Management
Site: Center West Plaza Touch of Class SubTask 2 2-Q2 PARM & Soil Confirmation Sampling
Activity/Phase: Monitoring SubTask 3 3-Q3 PARM
Project Manager: Skylar Schwed (FDEP)/Eric Kramer (APTIM) SubTask 4 4-Q4 PARM and Annual Reporting/SRCR
SubTask 5 0
Totals 1 2 3 4 5 Labor Rate Category
$65.22 Project Manager E. Kramer 0 0.0 $65.22 Engineer/Scientist 5 E. Kramer 0 0 0 0 0 $61.98 Engineer/Scientist 5 G. Roberts 0 0 0 0 0 $34.53 Engineer/Scientist 2 K. Howard 0 0 0 0 0 $25.38 Engineer/Scientist 1 J. Harris 0 0 0 0 0 $32.56 Designer 2 S. Ferianc 0 0 0 0 0 $27.64 Technical Publications Specialist 3 H. Vining 0 0 0 0 0
$0.00 0 0 0 0 0 Total Hours 0 0 0 0 0 0
Direct Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 85.58% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 19.38% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 31.96% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW ($300.00) ($100.00) ($100.00) ($100.00) $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 MAGS/Well Construction Materials $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal ($300.00) ($100.00) ($100.00) ($100.00) $0.00
Date: 4/21/2023
Task #: HW689 - HW010A TACO #1 ERIC_4903 SubTask 1 Project Management
Site: Center West Plaza Touch of Class SubTask 2 2-Q2 PARM & Soil Confirmation Sampling
Activity/Phase: Monitoring SubTask 3 3-Q3 PARM
Project Manager: Skylar Schwed (FDEP)/Eric Kramer (APTIM) SubTask 4 4-Q4 PARM and Annual Reporting/SRCR
SubTask 5 0
Totals 1 2 3 4 5 Handling Fee ($30.00) ($10.00) ($10.00) ($10.00) $0.00 Total Subcontractor Cost ($330.00) ($110.00) ($110.00) ($110.00) $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) ($100.00) $0.00 $0.00 ($100.00) $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses ($100.00) $0.00 $0.00 ($100.00) $0.00
Subtotal ($430.00) $0.00 ($110.00) ($110.00) ($210.00) $0.00 Completion Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost ($430.00) $0.00 ($110.00) ($110.00) ($210.00) $0.00
SUBTASK: 2-Q2 PARM & Soil Confirmation Sampling DATE: April 21, 2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer Engineer/Scientist 5 G. Roberts Engineer/Scientist 2 K. Howard Engineer/Scientist 1 J. Harris Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Remediation Non-Haz Soil/Water T&D $100.00 Drum -1 ($100.00)
TOTAL ($100.00)
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method 8260 (VOHs Only) Soil $73.00 0 0 $0.00 EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $50.00 0 0 Contingency $0.00 EPA Method 8260 (VOHs Only) Leachate $73.00 0 0 Contingency $0.00 EPA Method 8260 (VOHs Only) GW $73.00 0 0 $0.00 EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 0 $0.00 Soil Sampling Kit (concrete) $235.00 Day 0 $0.00 Shallow GW Sampling Kit $290.00 Day 0 $0.00 Encore Sampler $16.00 each 0 $0.00 55-gallon Drum $100.00 Each 0 $0.00
TOTAL EQUIPMENT $0.00
2-Delta Page 3 of 5 DC010A TACO #1 (Delta)
SUBTASK:
DATE: April 21, 2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer Engineer/Scientist 5 G. Roberts Engineer/Scientist 2 K. Howard Engineer/Scientist 1 J. Harris Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Remediation Non-Haz Soil/Water T&D $100.00 Drum -1 ($100.00)
TOTAL ($100.00)
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method 8260 (VOHs Only) Soil $73.00 0 0 $0.00 EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $48.00 0 0 Contingency $0.00 EPA Method 8260 (VOHs Only) Leachate $73.00 0 0 Contingency $0.00 EPA Method 8260 (VOHs Only) GW $73.00 0 0 $0.00 EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 0 $0.00 Soil Sampling Kit (concrete) $235.00 Day 0 $0.00 Shallow GW Sampling Kit $290.00 Day 0 $0.00 Encore Sampler $16.00 each 0 $0.00 55-gallon Drum $100.00 Each 0 $0.00
TOTAL EQUIPMENT $0.00
3-Q3 PARM
3-Delta Page 4 of 5 DC010A TACO #1 (Delta)
SUBTASK: 4-Q4 PARM and Annual Reporting/SRCR
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer Engineer/Scientist 5 G. Roberts Engineer/Scientist 2 K. Howard Engineer/Scientist 1 J. Harris Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Remediation Non-Haz Soil/Water T&D $100.00 Drum -1 ($100.00)
TOTAL ($100.00)
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method 8260 (VOHs Only) Soil $73.00 0 0 $0.00 EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $48.00 0 0 Contingency $0.00 EPA Method 8260 (VOHs Only) Leachate $73.00 0 0 Contingency $0.00 EPA Method 8260 (VOHs Only) GW $73.00 0 0 $0.00 EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 0 $0.00 Soil Sampling Kit (concrete) $235.00 Day 0 $0.00 Shallow GW Sampling Kit $290.00 Day 0 $0.00 Encore Sampler $16.00 each 0 $0.00 55-gallon Drum $100.00 Each -1 ($100.00)
TOTAL EQUIPMENT ($100.00)
4/21/2023
4-Delta Page 5 of 5 DC010A TACO #1 (Delta)
Date: 6/6/2022
Task #: HW689 DC010A ERIC_4903 SubTask 1 Project Management SubTask 6
Site: Center West Plaza Touch of Class SubTask 2 2-Q2 PARM & Soil Confirmation Sampling SubTask 7
Activity/Phase: Monitoring SubTask 3 3-Q3 PARM SubTask 8
Project Manager: Skylar Schwed (FDEP)/Eric Kramer (APTIM) SubTask 4 4-Q4 PARM and Annual Reporting/SRCR SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$65.22 Project Manager E. Kramer 10 10.3 $65.22 Engineer/Scientist 5 E. Kramer 4 0 0 4 0 0 0 0 0 0 $61.98 Engineer/Scientist 5 G. Roberts 52 6 6 40 0 0 0 0 0 0 $34.53 Engineer/Scientist 2 K. Howard 35 11 12 12 0 0 0 0 0 0 $25.38 Engineer/Scientist 1 J. Harris 11 11 0 0 0 0 0 0 0 0 $32.56 Designer 2 S. Ferianc 4 0 0 4 0 0 0 0 0 0 $27.64 Technical Publications Specialist 3 H. Vining 3 0 0 3 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0 Total Hours 119 10 28 18.0 63 0 0 0 0 0 0
Direct Labor $5,858.74 $674.01 $1,030.89 $786.24 $3,367.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 85.58% $5,013.91 $576.82 $882.24 $672.86 $2,881.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 19.38% $1,135.42 $130.62 $199.79 $152.37 $652.64 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 31.96% $1,872.44 $215.41 $329.47 $251.28 $1,076.28 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $13,880.51 $1,596.86 $2,442.39 $1,862.75 $7,978.51 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel Vehicle Rental $360.00 $120.00 $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $360.00 $120.00 $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $300.00 $100.00 $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 MAGS/Well Construction Materials $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Date: 6/6/2022
Task #: HW689 DC010A ERIC_4903 SubTask 1 Project Management SubTask 6
Site: Center West Plaza Touch of Class SubTask 2 2-Q2 PARM & Soil Confirmation Sampling SubTask 7
Activity/Phase: Monitoring SubTask 3 3-Q3 PARM SubTask 8
Project Manager: Skylar Schwed (FDEP)/Eric Kramer (APTIM) SubTask 4 4-Q4 PARM and Annual Reporting/SRCR SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Subcontractor Subtotal $300.00 $100.00 $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $30.00 $10.00 $10.00 $10.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $330.00 $110.00 $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $1,387.00 $657.00 $365.00 $365.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,387.00 $657.00 $365.00 $365.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $120.00 $40.00 $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,169.00 $589.00 $290.00 $290.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $300.00 $100.00 $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,589.00 $729.00 $430.00 $430.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $17,546.51 $1,596.86 $4,058.39 $2,887.75 $9,003.51 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,388.06 $159.69 $244.24 $186.28 $797.85 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $18,934.57 $1,756.55 $4,302.63 $3,074.03 $9,801.36 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Proposed Scope of Work Center West Plaza (Former Touch of Class Dry Cleaners) Quarterly Groundwater Monitoring Task Assignment DC010A TACO #1 3215 US Highway 1 South, Fort Pierce, Saint Lucie County, FL ERIC_5414 (Former Facility No. 569800113) Aptim Environmental & Infrastructure, LLC April 21, 2023
The following is the proposed scope of work for DC010A Task Assignment Change Order (TACO) #1 for the former Touch of Class Dry Cleaners located in Fort Pierce, Saint Lucie County, Florida. The proposed scope of work under Task Assignment DC010A TACO #1 is to adjust costs associated with the pickup and disposal of IDW, which was removed from the site (stolen) prior to the scheduled pickup for disposal.
Subtask 2: Quarter 2 Post Active Remediation Monitoring (PARM) and Soil Confirmation Sampling
Subtask 2 was reduced to remove costs associated with the pickup and disposal of the groundwater sampling purge water by the subcontractor (Erwin Remediation), due to the drum being removed (stolen) from the property prior to the scheduled drum pickup. The TACO removed the pickup and disposal, which was not charged. Analytical results of the IDW purge water did not exceed the GCTLs for any of the target compounds, and demonstrate the waste was non-hazardous.
Subtask 3: Quarter 3 PARM Groundwater Sampling
Subtask 3 was also reduced to remove costs associated with the pickup and disposal of the groundwater sampling purge water by the subcontractor (Erwin Remediation), due to the drum being removed (stolen) from the property prior to the scheduled drum pickup. The TACO removed the pickup and disposal, which was not charged. Analytical results of the IDW purge water did not detect the presence of target compounds above the GCTLs or laboratory method detection limits (MDLs), demonstrating the waste was non-hazardous.
Subtask 4: Quarter 4 PARM Groundwater Sampling
Subtask 4 was reduced to remove costs associated with the IDW, including the drum and disposal of the by the subcontractor. The purge water was stored temporarily onsite, based on previous characterization of the waste. Upon receipt of the IDW analytical results, which did not detect the presence of volatile organic hydrocarbons above the laboratory method detection limits (MDLs), the purge water was disposed onsite.
Currently the PARM groundwater sampling events have been completed and the report was submitted on February 14, 2023. However, at the direction of the FDEP, the report, a Site Rehabilitation Completion Report cannot be reviewed, until the site is sampled for PFAS constituents, which has not been performed, to date. Currently, the Task Assignment (DC010A) Completion date is April 28, 2023. An extension of 90 days is requested to allow for tasking, the collection and reporting of PFAS samples and review of the previously submitted report, based on the analytical results. The request will extend the Task Assignment Completion date to July 27, 2023.
APTIM proposes to perform this scope of work in accordance with the terms and conditions of the contract executed between APTIM Environmental & Infrastructure, LLC and Florida Department of Environmental Protection No. HW689. APTIM will begin the proposed scope of work upon issuance of the Task Assignment Notification.
If you have any questions, please do not hesitate to call.
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW689
DC010A Completion April 28, 2023
Under this task assignment, APTIM will commence PARM sampling.
Work will be done according to the attached scope of work dated May 2, 2022.
Melissa Walsh 407-287-3216 Contractor APTIM Contractor
Contractor Eric Kramer Contractor 407-287-3216
ERIC_5417
3215 S US Highway 1, Fort Pierce, St. Lucie
Center W Plaza
Contractor Contractor
✔ $ 18,934.57
$ 18,934.57
Scope of Work
APTIM
Contractor Eric Kramer
APTIM Contract Manager
Eric Kramer Digitally signed by Eric Kramer Date: 2022.06.08 18:21:21 -04'00'
William E. Burns, Jr.
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.06.07 13:25:31 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 2: Quarter 2 PARM and Confirmation Soil Sampling 07/29/2022
Subtask 3: Quarter 3 PARM 11/18/2022
Subtask 1&4: Quarter 4 PARM and Annual Groundwater Reporting 02/24/2023
Upon submittal and FDEP approval of Quarterly PARM 2 Soil Tables and Laboratory Report: Subtask 2 $ 4,302.63
Upon submittal and FDEP approval of Quarterly PARM 3 Soil Tables and Laboratory Report: Subtask 3 $ 3,074.03
Upon submittal and FDEP approval of Quarterly PARM 3 Soil Tables and Laboratory Report, Annual Ground Water Monitoring, SRCR, and Project Management : Subtask 4&1
$ 11,557.91
$ 18,934.57
HW689
DC010A
| HW689 DC010A-1 TACO.pdf |
| HW689 DC010A-1 TACO.pdf |
| TACO HW689.pdf |
| NS.pdf |
| final cef loe.pdf |
| Total |
| 2-Total |
| 3-Total |
| 4-Total |
| Delta Corrected.pdf |
| Delta |
| 2-Delta |
| 3-Delta |
| 4-Delta |
| HW689 DC010A-1 TACO |
| HW689 DC010A-1 TACO |
| OG CEF.pdf |
| Cost Estimate |
| DC010A TACO #1 Scope of Work.pdf |
| HW689 DC010A-1 TACO |
| HW689 DC010A-1 TACO |
| OG TA.pdf |
File details come from the government source that posted it. Updated .