This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) under Contract Number HW689 to APTIM Environmental & Infrastructure, LLC. The task assignment, designated DC024D, authorizes well abandonment and reporting services at the Southgate Cleaners facility located at 53127 U.S. Highway 19 in New Port Richey, Pasco County, Florida. The FDEP Project Manager is Alyssa Lamb (850-245-8791), and the contractor's project manager is Eric Kramer (407-287-3216). The task is effective as of March 19, 2026, with a completion date of July 17, 2026.
The scope of work encompasses well abandonment activities for four monitoring wells (MW-1, PZ-1, PZ-2, and PZ-3) at the site, to be performed in accordance with Southwest Florida Water Management District (SWFWMD) rules in Chapter 40D-3 F.A.C. The work includes project management (Subtask 1), well abandonments and reporting (Subtask 2), and reporting deliverables (Subtask 3). The total task value is fixed at $7,183.38 based on a fixed unit rate, with payment contingent upon FDEP approval of the well abandonment documentation and photo log of field events. The final deliverable is due April 30, 2026. Cost elements include labor (50 total hours across multiple staff categories including project managers and engineers at $2,438.09), overhead (85.58%), general and administrative costs (19.38%), fringe benefits (31.96%), vehicle rental ($120.00), materials for concrete and Portland cement ($52.22), field equipment ($652.00), and a completion fee ($577.63).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW689
DC024D Completion July 17, 2026
This Task Assignment authorizes APTIM to complete well abandonments and reporting.
Alyssa Lamb 850-245-8791 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
APTIM Environmental & Infrastructure
APTIM Environmental & Infrastructure
Eric Kramer 407-287-3216
ERIC_5228
53127 U.S. Highway 19 New Port Richey, Pasco County, Florida 34625
Southgate Cleaners (former)
✔ $ 7,183.38
$ 7,183.38
Scope of Work
Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2026.03.19 17:04:05 -04'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2026.03.19 16:22:38 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW689
DC024D
Subtasks 1 & 2: PM and Well Abandonment and Reporting 04/30/2026
DEP approval of Subtasks1 & 2: PM and Well Abandonment Reporting including documentation of the well abandonments and photo log of the on-site field events $ 7,183.38
$ 7,183.38
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jay Collins Lt. Governor
Alexis Lambert Secretary
Memorandum
TO:
FROM:
SUBJECT:
DATE:
ERIC_5228
Southgate Cleaners
Alyssa Lamb, Project Manager
Negotiation Summary
HW689 DC024D
February 27, 2026
APTIM will perform well abandonment activities at Southgate Cleaners, as detailed in the February 13, 2026 proposal. Four wells require abandonment at the site.
APTIM will obtain a well abandonment permit from the Southwest Florida Water Management District (SWFWMD) for approval prior to the actual field activities.
Once the permit has been obtained, existing wells MW-1, PZ-1, PZ-2 and PZ-3 will be abandoned.
Total task amount is $7,183.38. Aptim's time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date is April 30, 2026. Task completion date is June 26, 2026.
FDEP COST ESTIMATE
Contractor: Aptim Environmental & Infrastructure, LLC
Date: 2/13/2026
Task #: HW689 DC024D SubTask 1 Project Management SubTask 6
Site: Southgate Cleaners ERIC_5228 SubTask 2 2-Well Abandonemnt & Reporting SubTask 7
Activity/Phase: Well Abandonments SubTask 3 3-Reporting SubTask 8
Project Manager: Alyssa Lamb (FDEP)/Eric Kramer (APTIM) SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$74.65 Project Manager E. Kramer 4 3.8 $74.65 Engineer/Scientist 5 E. Kramer 1 1 0 0 0 0 0 0 0 0 $70.34 Engineer/Scientist 5 G. Roberts 14 14 0 0 0 0 0 0 0 0 $66.99 Engineer/Scientist 5 S. Flynn 0 0 0 0 0 0 0 0 0 0 $61.04 Engineer/Scientist 4 J. Cheze 0 0 0 0 0 0 0 0 0 0 $30.34 Engineer/Scientist 1 B. Blount 0 0 0 0 0 0 0 0 0 0 $29.42 Engineer/Scientist 1 R. Green 15 15 0 0 0 0 0 0 0 0 $41.30 Construction Manager 1 A. Escobar 15 15 0 0 0 0 0 0 0 0 $37.39 Designer 2 S. Ferianc 1 1 0 0 0 0 0 0 0 0 $30.00 Technical Publications Specialist 3 H. Vining 0 0 0 0 0 0 0 0 0 0 $29.12 Technical Publications Specialist 3 L. Houser 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 Total Hours 50 4 46 0 0 0 0 0 0 0 0
Direct Labor $2,438.09 $280.49 $2,157.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 85.58% $2,086.51 $240.04 $1,846.47 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 19.38% $472.50 $54.36 $418.14 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 31.96% $779.21 $89.64 $689.57 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $5,776.31 $664.53 $5,111.78 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel Vehicle Rental $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Meals $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) Materials $52.22 $52.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $52.22 $52.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $5.22 $5.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $57.44 $57.44 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sanitary facility $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Electrician $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF SHAW Page 1
FDEP COST ESTIMATE
Contractor: Aptim Environmental & Infrastructure, LLC
Date: 2/13/2026
Task #: HW689 DC024D SubTask 1 Project Management SubTask 6
Site: Southgate Cleaners ERIC_5228 SubTask 2 2-Well Abandonemnt & Reporting SubTask 7
Activity/Phase: Well Abandonments SubTask 3 3-Reporting SubTask 8
Project Manager: Alyssa Lamb (FDEP)/Eric Kramer (APTIM) SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Equipment $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Dumpster rolloff $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $35.00 $35.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $577.00 $577.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $652.00 $652.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $6,605.75 $664.53 $5,941.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $577.63 $66.45 $511.18 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $7,183.38 $730.98 $6,452.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF SHAW Page 2
LEVEL OF EFFORT / EXPENSE WORKSHEET
SITE :
SUBTASK:
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 1
Engineer/Scientist 5 G. Roberts
Engineer/Scientist 5 S. Flynn Engineer/Scientist 4 J. Cheze Engineer/Scientist 1 B. Blount
Engineer/Scientist 1 R. Green
Construction Manager 1 A. Escobar
Designer 2 S. Ferianc 1 Technical Publications Specia H. Vining Technical Publications Specia L. Houser
TOTAL LABOR 46
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 1 $120.00 Van or Truck (2 trucks) $480.00 Week 0 $0.00
TOTAL VEHICLE $120.00
MEALS STAFF RATE UNIT USEAGE TOTALS
B. Skipper $36.00 Day 0 $0.00 B. Blount $36.00 Day 0 $0.00
$36.00 Week 0 $0.00
TOTAL VEHICLE $0.00
HOTEL STAFF RATE UNIT USEAGE TOTALS
B. Skipper $175.00 Day 0 $0.00 B. Blount $175.00 Day 0 $0.00
Week 0 $0.00
TOTAL VEHICLE $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE RATE UNIT USAGE TOTALS
SWFWMD Permit Well Abandonment Permit No Fee 1 $0.00 Home Depot 1-Portland (94 lb), 6-Concrete (80 lb) $52.22 Bags 1 $52.22
TOTAL $52.22
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method 8260 (VOHs) $73.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 1 $40.00 Portable generator $70.00 Day 1 $70.00 Jack hammer $87.00 Day 1 $87.00 Concrete /Asphalt saw $60.00 Day 1 $60.00 Construction Kit $360.00 Day 1 $360.00 PPE Level D 2 person crew $35.00 Day 1 $35.00 55 Gallon Drums $100.00 each 0 $0.00
TOTAL EQUIPMENT $652.00
Field Mobilization (1 hr), Purchase necessary materials, concrete and Portland grout (1 hr), Travel to site roundtrip (3 hrs), Collection of depth to groundwater and total depth measurements from all the monitoring wells (1 hr), abandonment of monitoriong wells in accordance with SWFWMD requirements (3 hrs), Removal of manholes and Well Pads (3 hrs), Restore areas with concrete (2 hrs), paint repaired concrete to match existing (1 hr.)
Field Mobilization (1 hr), Purchase necessary materials, concrete and Portland grout (1 hr), Travel to site roundtrip (3 hrs), Collection of depth to groundwater and total depth measurements from all the monitoring wells (1 hr), abandonment of monitoriong wells in accordance with SWFWMD requirements (3 hrs), Removal of manholes and Well Pads (3 hrs), Restore areas with concrete (2 hrs), paint repaired concrete to match existing (1 hr.)
Preparation of Well Closure Map (1 hr).
2-Well Abandonemnt & Reporting Southgate Cleaners
February 6, 2026
Preparation of Deliverable Email and Submittal of Report (1 hr) Contacting Property Owner and/or, Property Manager and Tenant of Proposed Scope of Work (1 hr), Preparation and Submittal of SWFWMD Well Abandonment Permit (4 hrs), Meeting with Field Techicians to review Scope of Work and provide advanced Notice of Abandonments to SWFWMD of Schedule (1 hr), Preparation and submittal of required Well Completion Reports for each well and submittal to SWFWMD to close the permit (3 hrs). Preparation of Letter Report documenting field events and Photo Log documenting the well abandonments (5 hrs) .
2-Well Abandonment & Rpt Page 1 of 1 DC024D est (Southgate)
Proposed Scope of Work
Southgate Cleaners (former)
53127 U.S. Highway 19
New Port Richey, Pasco County, Florida 34625
Site Closure (Well Abandonments)
Task Assignment DC024D
ERIC_5228 (Former Facility No. 519500354)
Aptim Environmental & Infrastructure, LLC
February 13, 2026, 2026
The following proposed scope of work under this task assignment is for well abandonment at the former
Southgate Cleaners facility. This scope of work was requested by the FDEP because results of the site assessment completed by APTIM indicated No Further Action was merited and a Site Rehabilitation
Completion Order (SRCO) was issued on December 11, 2025.
Subtask 1-Project Management
Project management hours are calculated based on the labor hours anticipated in the scope of work.
Subtask 2-Well Abandonments and Reporting
Four wells require abandonment at the site. APTIM will obtain a well abandonment permit from the
Southwest Florida Water Management District (SWFWMD) for approval prior to the actual field activities.
Upon approval of the permits, the District will be notified of the schedule and the existing wells MW-1, PZ-
1, PZ-2 and PZ-3 will be abandoned in accordance with SWFWMD rules in Chapter 40D-3 F.A.C.
Following the well abandonments, Well Completion Reports will be prepared for each well abandoned for submittal to the SWFWMD to close the permit. A letter report documenting the well abandonments and including a photo log of the onsite field events will be submitted to the FDEP as a deliverable.
Field activities will commence upon approval of the Task Assignment and SWFWMD permits.
Abandonment of the wells should be completed by March 31, 2026, and reporting should be completed by April 30, 2026. A proposed Task Completion date can be estimated at June 26, 2026.
APTIM proposes to perform this scope of work in accordance with the terms and conditions of the contract executed between APTIM Environmental & Infrastructure, LLC and Florida Department of
Environmental Protection No. HW689. APTIM will begin the proposed scope of work upon issuance of the
Task Assignment Notification.
If you have any questions, please contact us for clarification.
Florida Department of Environmental Protection -- Waste Cleanup Program -- Waste Site Cleanup Section
TABLE 3: WELL SPECIFICATION
AND GROUNDWATER ELEVATION DATA
WELL ID
DIAMETER
WELL DEPTH
SCREEN INTERVAL
TOC ELEVATION
DATE DTW ELEV DTW ELEV DTW ELEV DTW ELEV DTW ELEV DTW ELEV
12/09/24 3.38 2.85 3.86 2.92 5.53 2.21 -- --
12/11/24 3.27 2.96 3.91 2.87 4.98 2.76 -- --
03/21/25 -- -- -- -- -- -- 5.29 2.31
04/22/25 4.01 2.22 4.05 2.73 5.27 2.47 5.41 2.19
Notes: Blank cell = no data
ELEV = surveyed elevation in feet relative to NAVD-88.
DTW = depth to water in feet below top of casing (TOC)
Screen Interval = approximate measurement in feet below land surface
Well depth in feet below land surface
Shaded dates pertain to the most recent gauging event
6.23 6.78 7.74 7.60
Blank
1" 1" 1" 1"
Facility Name: Southgate Cleaners Facility ID ERIC_5228
PZ-1 PZ-2 PZ-3 MW-1
Blank 2'-12' 2'-12' 2'-12' 3'-13'
12 12 12
PIEZOMETER and MONITORING
WELL LOCATION MAP
725 U.S. HIGHWAY 301 SOUTH
TAMPA, FLORIDA 33619
APTIM ENVIRONMENTAL & INFRASTRUCTURE, LLC
(813) 612-3600 office
Portland Cement Type I/II or IL
Portland (94 lb bag) 1 bag $12.92
Concrete (80 lb bag) 6 bags $35.88
Subtotal $48.80
Tax (7%) $3.42
Total $52.22
Portland (94 lb bag) 1 bag $12.98
Concrete (80 lb bag) 6 bags $35.88
Subtotal $48.86
Tax (7%) $3.42
Total $52.28
Portland (47 lb bag) 2 bags $29.98
Concrete (80 lb bag) 6 bags $59.94
Subtotal $89.92
Tax (7%) $6.29
Total $96.21
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_v2.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v1.pdf |
| Cost Estimate |
| Subtask 2 |
| Subtask 3 |
| Subtask 4 |
| Subtask 5 |
| Subtask 6 |
| 2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev1_12-12-22.pdf |
| Table 1 for SAWP |
| Monitoring Well Locations |
| Utility Locate Bids_Compiled.pdf |
| Geosyntec Utility-272_Geotek_1500 |
| Geoview Utility Quote_2000_COT FTF SIS |
| Tallahassee Fire Training Division_V1_Bloodhound_3700 |
| Drilling Bids_Compiled.pdf |
| PDS_Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (sonic) |
| Direct Push |
| City of Tallahassee Fire Training Site_GW Protection PFAS Free Water Estimate Email |
| Cascade_Geosyntec Consultants, Inc. - City of Tallahassee Fire Training Facility - PN221026-118844 |
| GW Protection_Geosyntec (T) 1022060 S.pdf |
| Invoice |
| Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (MOT).xlsx.pdf |
| Sheet1 |
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v1.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v2.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v2.pdf |
| Cost Estimate |
| Subtask 2 |
| Subtask 3 |
| Subtask 4 |
| Subtask 5 |
| Subtask 6 |
| 2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev2.pdf |
| Table 1 for SAWP |
| Monitoring Well Locations |
File details come from the government source that posted it. Updated .