CN-370000-HW687-DC048B.pdf

PDF 7 MB Posted

Attached to
Master Agreement FL|HW687|519929c0c8a00e44396dc1d8f5fa086b
Contract number
HW687
Issued by
Florida

About this file

Summary

This package of documents constitutes a Task Assignment (TA) under Contract HW687 between the State of Florida Department of Environmental Protection (FDEP) and Terracon Consultants, Inc. for environmental remediation services at the Crosstown Cleaners site located at 226 Center Street, Suite A1, Jupiter, Palm Beach County, Florida. The FDEP Project Manager is Gabriel Sostre, and Terracon's Project Manager is Donna Cline. The TA was executed on January 9, 2026, with a completion date of September 4, 2026.

The scope of work authorizes Terracon to conduct monitoring well installation, groundwater sampling, and a MAGS (Membrane And Geosorbent Survey) event at the Crosstown Cleaners site. The work is divided into six subtasks: Subtask 1 (Project Management), Subtask 2 (utility clearance, geophysical survey, installation of one 1-inch permanent shallow monitoring well at DP3 location), Subtask 3 (groundwater sampling and annual monitoring report), Subtask 4 (PFAS groundwater sampling), Subtask 5 (MAGS event at five existing interior wells), and Subtask 6 (Investigative Derived Waste Management). The total TA value is $23,503.97 on a fixed unit rate basis. Terracon may invoice according to an included schedule with deliverables due on specified dates through July 31, 2026, with FDEP approval required before payment authorization. The cost represents a $1,710.75 decrease (6.8%) from the previous total of $25,214.72, and the total labor hours dedicated to the TA are 121.91 hours. Supporting documentation includes cost estimates, level of effort worksheets, vendor bids for drilling, utility surveys, and investigative derived waste disposal, and proposals from subcontractors including JAEE Environmental, Geoview, GPRS, Erwin Remediation, and Clean Earth Environmental Solutions.

View the file

Other files

File Type Posted
CN-370000-HW687-BF01A.pdf PDF
CN-370000-HW687-BF01B.pdf PDF
CN-370000-HW687-BF02A.pdf PDF
CN-370000-HW687-BF04A.pdf PDF
CN-370000-HW687-BF04ACO3.pdf PDF
CN-370000-HW687-BIL01B.pdf PDF
CN-370000-HW687-BIL02B.pdf PDF
CN-370000-HW687-BIL03B.pdf PDF
CN-370000-HW687-BIL1BCO2.pdf PDF
CN-370000-HW687-BIL2CCO2.pdf PDF
CN-370000-HW687-CSS02.pdf PDF
CN-370000-HW687-CSS03.pdf PDF
CN-370000-HW687-DC002A.pdf PDF
CN-370000-HW687-DC002G.pdf PDF
CN-370000-HW687-DC006C.pdf PDF
CN-370000-HW687-DC008B.pdf PDF
CN-370000-HW687-DC008D.pdf PDF
CN-370000-HW687-DC009B.pdf PDF
CN-370000-HW687-DC010C.pdf PDF
CN-370000-HW687-DC012A.pdf PDF
CN-370000-HW687-DC014B.pdf PDF
CN-370000-HW687-DC014D.pdf PDF
CN-370000-HW687-DC014H.pdf PDF
CN-370000-HW687-DC015D.pdf PDF
CN-370000-HW687-DC016C.pdf PDF
CN-370000-HW687-DC01ACO9.pdf PDF
CN-370000-HW687-DC021A.pdf PDF
CN-370000-HW687-DC021C.pdf PDF
CN-370000-HW687-DC022A.pdf PDF
CN-370000-HW687-DC023B.pdf PDF
CN-370000-HW687-DC023D.pdf PDF
CN-370000-HW687-DC024B.pdf PDF
CN-370000-HW687-DC024E.pdf PDF
CN-370000-HW687-DC024F.pdf PDF
CN-370000-HW687-DC027A.pdf PDF
CN-370000-HW687-DC028A.pdf PDF
CN-370000-HW687-DC028D.pdf PDF
CN-370000-HW687-DC029C.pdf PDF
CN-370000-HW687-DC02ACO1.pdf PDF
CN-370000-HW687-DC02HCO2.pdf PDF
CN-370000-HW687-DC030A.pdf PDF
CN-370000-HW687-DC031A.pdf PDF
CN-370000-HW687-DC035A.pdf PDF
CN-370000-HW687-DC037A.pdf PDF
CN-370000-HW687-DC03CCO2.pdf PDF
CN-370000-HW687-DC044A.pdf PDF
CN-370000-HW687-DC045B.pdf PDF
CN-370000-HW687-DC049A.pdf PDF
CN-370000-HW687-DC054A.pdf PDF
CN-370000-HW687-DC056A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW687

DC048B Completion September 4, 2026

This TA authorizes Terracon to conduct Monitoring Well Installation, Groundwater Sampling, and a MAGS event at the Crosstown Cleaners site.

Gabriel Sostre 850-245-8749 Contractor Terracon Consultants, Inc. Contractor

Contractor Donna Cline Contractor 904-479-7415

ERIC_5086

226 Center Street, Suite A1, Jupiter, Palm Beach County

Crosstown Cleaners

Contractor Contractor

✔ $ 23,503.97

$ 23,503.97

Scope of Work

Terracon Consultants, Inc.

Contractor Donna Cline

Senior Associate / Engineer

01/09/2026

Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=Domain Users, email=Donna.Cline@terracon.com Date: 2026.01.09 11:12:49 -05'00'

Cline, Donna L

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2026.01.09 10:10:44 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

BWC TAFORM 01/18

HW687

DC048B

Subtask 3: Field task planning and preparation; mobilize to site, perform groundwater sampling of VOHs at 4 wells.

Subtask 4: PFAS groundwater sampling.

Subtask 5: MAGS event at six existing interior MAGS wells.

Subtasks 1 & 6: Project Management; IDW Management.

Subtask 2: Utility clearance, geophysical survey, updated HASP, coordinate with contractors and tenant/owner; Field task planning and preparation; mobilize to site, and oversee installation of a 1" permanent shallow monitoring well at DP3 location.

03/20/2026

05/01/2026

05/01/2026

06/19/2026

07/31/2026

Subtask 2: FDEP approval of Field Notes and Soil Boring Logs related to the Groundwater Sampling event and the Well Installation event.

Subtask 3: FDEP approval of Annual Groundwater Monitoring Report including lab reports, tables, maps, figures, and exhibits including groundwater flow and concentration maps.

Subtask 4: FDEP approval of PFAS deliverable including lab reports, tables, maps, figures, and exhibits.

Subtask 5: FDEP approval of MAGS report including lab analysis of soil samples from 6 MAGS points, radius of influence, intrinsic permeability calculations, and evaluation of soil gas data.

Subtasks 1 & 6: FDEP approval of signed IDW Manifests.

$ 5,080.22

$ 4,822.60

$ 1,026.18

$ 9,558.35

$ 3,016.62

$ 23,503.97

Memorandum

F D E P

C O S T

E S T I M A T E

C on tra ct or

Te rra co n

C on su lta nt s, In c at e:

1/ 5/

Ta sk

H W

Su bT as k

Pr oj ec t M an ag em en t Su bT as k

ID

W

M an ag em en t

Si te

Su bT as k

M W

In st al la tio ns

Su bT as k

Ac tiv ity

/P ha se

Su bT as k

An nu al

G ro un dw at er

S am pl in g

R ep or tin g Su bT as k

Pr oj ec t M an ag er

G ab rie l S os tre as k

PF

AS

S am pl in g

R ep or tin g Su bT as k

Su bT as k

M

AG

S

Ev en t & R ep or tin g

Su bT as k

To ta ls

La bo r R at e

C at eg or y $5

4.

Pr oj ec t M an ag er

Sh aw n O ue lle tte

.9

$3 0.

Ad m in is tra tiv e

D an ie lle

A da m s

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

Br ow nf ie ld

C on su lta nt 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$3

6.

C

AD

D S pe ci al is t C hl es ea F ug at e 8.

0.

4.

1.

3.

0.

0.

0.

0.

0.

$0

.0

D at a An al ys t & V is ua liz at io n

Sp ec ia lis t 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$3

7.

Fi el d Te ch ni ci an

R ob

S ie ge l

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

Fi el d

G eo lo gi st 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

Fi el d Sc ie nt is t

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

G

IS

T ec hn ic ia n 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

Pr in ci pa l C on su lta nt 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4

4.

Pr oj ec t G eo lo gi st

Je ss ic a

En di co tt

.0

0.

.0

4.

4.

0.

0.

0.

0.

0.

$0 .0

Pr oj ec t I nd us tri al H yg ie ni st

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$3 8.

Se ni or

S ta ff Sc ie nt is t

Je nn a M ar te n

.5

.0

.5

0.

.0

3.

0.

0.

0.

0.

$4

6.

Se ni or E ng in ee r

M ik e M ui

.0

0.

0.

0.

.0

0.

0.

0.

0.

0.

$5

4.

Se ni or G eo lo gi st

Sh aw n O ue lle tte

.5

1.

7.

2.

.5

1.

0.

0.

0.

0.

$0

.0

Se ni or G

IS

A na ly st 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

Se ni or In du st ria l H yg ie ni st

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

Se ni or

S ci en tis t 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$7

2.

Se ni or R em ed ia tio n En gi ne er D on na

C lin e 2.

0.

0.

0.

2.

0.

0.

0.

0.

0.

$0

.0

St af f G eo lo gi st 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

To ta l H ou rs

1.

.9

.5

.5

7.

.5

5.

0.

0.

0.

0.

D ire ct L ab or

$5

,6

.5

$6

.4

$5

.6

$1 ,3

.2

$3

.4

$2

,4

.0

$2

.7

$0 .0

$0

.0

$0 .0

$0

.0

O ve rh ea d

6.

$6

,4

.7

$7

.5

$6

.4

$1 ,5

.2

$3

.9

$2

,8

.2

$2

.2

$0 .0

$0

.0

$0 .0

$0

.0

G en

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge

.2

$3

,1

.5

$3

.5

$3

.3

$7

.3

$1

.5

$1 ,4

.4

$1

.3

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or

$1

5, 0.

$1 ,7

.5

$1

,4

.4

$3 ,7

.8

$9

.9

$6

,7

.6

$5

.4

$0 .0

$0

.0

$0 .0

$0

.0

C ro ss to w n

C le an er s

ER

IC

_5

M W

In st al la tio n, G W

M on ito rin g, M

AG

S Ev en t

R E V

C E F

W S P

P a g e

F

E P

C O S T

E S T I M A T E

C on tra ct or

Te rra co n

C on su lta nt s, In c e:

5/

Ta sk

H W as k

Pr oj ec t M an ag em en t Su bT as k

ID

W

M an ag em en t

Si te

Su bT as k

M W

In st al la tio ns

Su bT as k

Ac tiv ity

/P ha se

Su bT as k

An nu al

G ro un dw at er

S am pl in g

R ep or tin g Su bT as k

Pr oj ec t M an ag er

G ab rie l S os tre as k

PF

AS

S am pl in g

R ep or tin g Su bT as k

Su bT as k

M

AG

S

Ev en t & R ep or tin g

Su bT as k

To ta ls

C ro ss to w n

C le an er s

ER

IC

_5

M W

In st al la tio n, G W

M on ito rin g, M

AG

S Ev en t

Tr av el Ve hi cl e $6

.0

$1

.0

0.

$0 .0

0.

$0

.0

$0 .0

$0

.0

M ile ag e

C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Ai r F ar e $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ea ls

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

H ot el $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l T ra ve l $6

.0

$1

.0

$1

.0

$0

.0

$2

.0

$8 0.

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r

(E qu ip m en t P ro cu re m en t)

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tra ct or

S ub to ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Pr oc ur em en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tr ac to r (S er vi ce s

Pr oc ur em t) ril lin g (C on ve nt io na l)

$2 ,2

.0

$2

,2

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

D ril lin g

(N on

-c on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ob ile

L ab or at or y

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su rv ey in g $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

ID

W

Er w in $1

.0

$0

.0

$0 .0

$0

.0

$0 .0

5.

$0

.0

$0 .0

$0

.0

U til iti es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til ity L oc at io n-

G eo vi ew

$4

.0

0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tra ct or S ub to ta l

$2 ,8

.0

$2

,7

.0

$0 .0

$0

.0

$0 .0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

H an dl in g

Fe e

$2

.5

$2

.0

$0 .0

$0

.0

$0 .0

$1

9.

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$3 ,1

.5

$2

,9

.0

$0 .0

$0

.0

$0 .0

$2

.5

$0

.0

$0 .0

$0

.0

$0 .0

La bo ra to ry

An al yt ic al

C os ts $1

,5

.0

$0 .0

0.

1, 5.

6.

$0 .0

$0

.0

$0 .0

Fa st T ur na ro un d C ha rg es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Sa m pl e Sh ip pi ng $1

.0

$0

.0

$0 .0

$0

.0

0.

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L ab or at or y

$1 ,6

.0

$0

.0

$2

.0

$0 .0

$1

,2

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fi el d Ex pe ns es

Pe rs on al

P ro te ct io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ex pe nd ab le s

$1

.0

.0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t ( D ril lin g R el at ed

$3

.0

5.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

An al yt ic al re la te

d) $8

.5

$0

.0

9.

6.

9.

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

ID

W re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t ( O th er

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l F ie ld

E xp en se s $1

,3

.5

$3

.0

$3

.0

$6 .5

$5

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bt ot al

$2 1, 8.

$1

,7

.5

$4 ,9

.4

$4

,4

.8

$9

.4

$8 ,8

.6

$1

,0

.9

$0 .0

$0

.0

$0 .0

$0

.0

C om pl et io n

Fe e

$1 ,5

.0

$1

.4

$1

.7

$3

.7

$9

2.

$6

.6

$5 8.

$0

.0

$0 .0

$0

.0

$0 .0

To ta l E st im at ed C os t

$2 3, 3.

$1

,9

.9

$5 ,0

.2

$4

,8

.6

$1 ,0

.1

$9

,5

.3

$1 ,0

.6

$0

.0

$0 .0

$0

.0

$0 .0

R E V

C E F

W S P

P a g

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Crosstown Cleaners ERIC_5086 SUBTASK 2: MW Installations

DATE: 1/5/2026

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning and MW Installation Senior Geologist SO 1.50 Senior Staff Scientist JM Load/unload 1.00 Senior Staff Scientist JM Mobilization/Demobilization (from WPB) 2.00 Senior Staff Scientist JM White line proposed MW locations for Utility Geopysical Survey 1.00 Senior Staff Scientist JM Supervise Drilling Contractor/Installation of 1 new MW well (MW-2) 6.50 Senior Staff Scientist JM Containerize IDW ( Move to Staging Area) 0.50 Senior Staff Scientist JM Survey TOC of newly installed well to tie into existing MW network 1.00

Personnel: CF JM SO Hours: 0.00 12.00 1.50 TOTAL LABOR 13.5

VEHICLE TYPE RATE UNIT USEAGE

Truck (Senior Staff Scientist) $120.00 day 1 120.00$

TOTAL VEHICLE 120.00$

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDW (GW replace soil back to borehole after soft dig) (See Subtask 6) $0.00 -$ JAEE MW Installation 2,250.00$ 2,250.00$ Geoview GPR Utility Survey $450.00 450.00$

TOTAL 2,700.00$

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 1 40.00$

Ice (sample preservation) 6.50$ 1 0 -$ Analytical Related Shallow groundwater sampling kit 290.00$ day 0 -$

Tubing, HDPE 0.30$ ft 0 -$ Tubing, silicon (3/16 x 3/8) 3.00$ ft 0 -$ Monitor Well Installation kit 325.00$ day 1 325.00$

IDW related 55-gallon drum, new 100.00$ drum 0 -$

TOTAL EQUIPMENT 365.00$

PreTask Planning, order sampling kits, prepare MW Installation field work package/Coordinate site access

FINAL --7/24/96

SUBTASK 3: Annual Groundwater Sampling & Reporting

DATE: 1/5/2026

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Geologist SO Request Laboratory Sample Kits 0.50

Senior Geologist SO 1.50 Senior Staff Scientist JM Load/unload 1.00 Senior Staff Scientist JM Mobilization/Demobilization (from West Palm Beach) 2.00 Senior Staff Scientist JM Collect groundwater level measurements (6 wells and 10 minutes per well) 1.00

Senior Staff Scientist JM 6.00

Senior Staff Scientist JM Containerize IDW 0.50

Report Deliverable Project Scientist JE Prepare report tables, and draft maps for Cadd Updates 4.00 Project Scientist JE Prepare report text body assemble appendices 6.00 Senior Geologist SO QA/QC field and laboratory data 1.00 Senior Geologist SO Summarize Water Quality Geochemical Parameters and Trends 1.00 Senior Geologist SO Summarize Groundwater Analytical Results 1.00 Senior Geologist SO Conclusions/Recommendations 2.00 CADD Specialist CF Prepare figures and Exhibits (groundwater flow and concentrations maps) (@1hr per figure) 4.00

Personnel: CF JE SO JM Hours: 4.00 10.00 7.00 10.50 TOTAL LABOR 31.50

VEHICLE TYPE RATE UNIT USEAGE

Truck (Project Geologist) $120.00 day 1 120.00$

TOTAL VEHICLE 120.00$

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL -$

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC #IDW

Halocarbons (VOH Shortlist) EPA 8260D 55.00$ 4 0 220.00$ Sample Shipping Large Cooler (2 day) 70.00$ 0 (lab drop off) -$

TOTAL LAB 220.00$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 1 40.00$

Ice (sample preservation) 6.50$ 1 2 13.00$ Analytical Related Shallow groundwater sampling kit 290.00$ day 1 290.00$

Tubing, HDPE 0.30$ ft 100 30.00$ Tubing, silicon (3/16 x 3/8) 3.00$ ft 3 9.00$

IDW related 55-gallon drum, new 100.00$ drum 0 (if necessary) -$

TOTAL EQUIPMENT 382.00$

Collect VOH groundwater samples from 3 existing wells (PZ-5/MW-1, PZ-3 & PZ-1) & 1 newly installed well (MW-2) (4 wells @ 1.5 hours each)

Field Task Planning and Groundwater Sampling

PreTask Safety Planning, Prepare field sampling SOW, re-verify site ownership/tenants, Coordinate site access

SUBTASK 4: PFAS Sampling & Reporting

DATE: 1/5/2026

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Geologist SO Request Sample Kit 0.50 Senior Geologist SO 0.00 Senior Staff Scientist JM Load/unload 0.00 Senior Staff Scientist JM Mobilization/Demobilization (from Port Saint Lucie) 0.00 Senior Staff Scientist JM Collect groundwater levels (6 wells and 10 minutes per well) 0.00 Senior Staff Scientist JM Collect 2 PFAS groundwater samples (PZ-5/MW-1 and newly installed MW-2) 0.00 Senior Staff Scientist JM (1 well, @ 1.5 hours each, plus 0.5 hrs for one IDW sample) Bolded indicates included in VOH sampling) Senior Staff Scientist JM Containerize IDW 0.50

Report Deliverable Senior Staff Scientist JE Prepare report tables, and draft maps 2.00 Senior Geologist JE Prepare report Deliverable & include in VOHs report 2.00 Senior Geologist SO QA/QC field and laboratory data 0.00 Senior Geologist SO Summarize Water Quality Geochemical Parameters and Trends 0.00 Senior Geologist SO Summarize Groundwater Analytical Results (PFAS) 0.50 Senior Geologist SO Conclusions/Recommendations 1.00 CADD Specialist CF Prepare figures and Exhibits (groundwater flow and concentrations maps)(@1hr per figure) 1.00

Personnel: CF JE SO JM Hours: 1.00 4.00 2.00 0.50 TOTAL LABOR 7.50

VEHICLE TYPE RATE UNIT USEAGE

Truck (Project Geologist) $120.00 day 0 -$

TOTAL VEHICLE -$

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL -$

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC #DUP

PFAS FDEP Laboratories -$ 2 1 1 -$ Sample Shipping Small Cooler (2 day) -$ 1 -$

TOTAL LAB -$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 0 -$

Ice (sample preservation) 6.50$ each 1 6.50$ Analytical Related Shallow groundwater sampling kit 290.00$ day 0 -$

Tubing, HDPE 0.30$ ft 0 -$ Tubing, silicon (3/16 x 3/8) 3.00$ ft 0 -$

IDW related 55-gallon drum, new 100.00$ drum 0 -$

TOTAL EQUIPMENT 6.50$

Field Task Planning and PFAS Sampling

PreTask Planning, prepare field sampling SOW/coordinate site access, verify ownership

SUBTASK 5: MAGS Event & Reporting

DATE: 1/5/2026

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Geologist SO Request Summa Canisters 0.50 Senior Geologist SO 0.50 Senior Scientist/Engineer MM 2.00

MAGS Test Time Duration: 1 Day - 5 MAGS points @ 60 minutes per test, including 5 locations @ 15 min each for move and set up at each point Senior Geologist SO Setup/Prep system at site 1 hr, Access old well heads and remove concrete and repatch after test (3hr) 4.00 Senior Staff Scientist JM Load/Unload addditional MAGS testing equiptment and hand tools 1.50 Senior Staff Scientist JM Mobilize to site to conduct MAGS testing/Demobilization (1 hour each way) 2.00 Senior Geologist SO Mobilize to site to conduct MAGS testing/Demobilization (1 hour each way) 2.00 Senior Geologist SO 8.50

Senior Staff Geologist JM Assist with breaking through old MAGS locations, Maintain system operation of the MAGS system, reduce vacuum 8.50 flows as directed by Engineer, Maintain hoses / decon as approriate between MAGS wells, grout /patch MAGS well locations

Senior Geologist SO Finalize field notes at end of day (1 hour/day) 1.00 Senior Scientist/Engineer MM Interpret field data, perform calculations, and provide update to FDEP (2 hrs) 2.00

Report Deliverable Project Geologist JE Prepare report draft and tables 4.00 Senior Scientist MM Prepare radius of influence presentations, calculate intrinsic permeability, evaluate soil gas data, 10.00 make comparisons and charts Senior Scientist SO Reiew field and laboratory data 1.00 Senior Engineer DC Conclusions/Recommendations 2.00 CADD Specialist CF Prepare base figures and Exhibits 3.00

DC

2.00

Personnel: CF JE SO MM JM RS Total

Hours: 3.00 4.00 17.50 14.00 12.00 0.00 52.50

VEHICLE TYPE RATE UNIT USEAGE

Truck (Senior Staff Geologist) $120.00 day 1 120.00$ Car (Senior Geologist) $80.00 day 2 160.00$

TOTAL VEHICLE 280.00$

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL -$

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC #DUP

VOCs Soil Vapor- Full Scan TO-15 200.00$ 5 0 0 1,000.00$

Summa Canister 33.00$ 5 165.00$ Sample Shipping 110.00$ 1 110.00$

TOTAL LAB 1,275.00$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 1 40.00$

Ice (sample preservation) 6.50$ each 0 -$ Analytical Related Shallow groundwater sampling kit 290.00$ day 0 -$

Tubing, HDPE 0.30$ ft 10 3.00$ Tubing, silicon (3/16 x 3/8) 3.00$ ft 2 6.00$ MAGS Investigation Kit 500.00$ day 1 500.00$

IDW related 55-gallon drum, new 100.00$ drum 0 -$

TOTAL EQUIPMENT 549.00$

Field Task Planning and PFAS Sampling

PreTask Planning, prepare field sampling SOW/coordinate site access, verify ownership Review technical approach to soil / MAGS Investigation

Break through grout to access old MAGS locations, Perform and direct MAGS test and sampling procedures, grout/patch MAGS well locations

SUBTASK 6: IDW Management

DATE: 1/5/2026

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Coordinate IDW T&D Senior Geologist SO 1.50 Senior Staff Scientist JM 3.50

Personnel: CF RS SO JM Hours: 0.00 0.00 1.50 3.50 TOTAL LABOR 5.00

VEHICLE TYPE RATE UNIT USEAGE

Car (Senior Staff Scientist) (IDW) $80.00 day 1 80.00$

TOTAL VEHICLE 80.00$

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDW (Soil and GW drum disposal) 195.00$ 195.00$

TOTAL 195.00$

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

Halocarbons (Soil) EPA 8260D 73.00$ 0 1 73.00$ Halocarbons (water) EPA 8260D 73.00$ 1 73.00$ Sample Shipping Large Cooler (2 day) 70.00$ 0 -$

TOTAL LAB 146.00$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 0 -$

Ice (sample preservation) 6.50$ each 0 -$ Analytical Related Shallow groundwater sampling kit 290.00$ day 0 -$

Tubing, HDPE 0.30$ ft 0 -$ Tubing, silicon (3/16 x 3/8) 3.00$ ft 0 -$

IDW related 55-gallon drum, new 100.00$ drum 0 -$

TOTAL EQUIPMENT -$

Prepare waste characterization/Generator Profile and schedule pickup Coordinate IDW T&D: Meet transporter for pickup (Includes roundtrip Mobilization 2.5 hr and 1 hr onsite)

645 NW Enterprise Drive, 107 Port St. Lucie, FL 34987

P (772) 343-9787

F (772) 343-9404

Terracon.com

December 11, 2025

Florida Department of Environmental Protection Waste Cleanup Program Waste Management Division 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Attn: Mr. Gabriel Sostre, FCCM, Environmental Specialist II W: (850) 245-8749 E: Gabriel.Sostre@floridadep.gov

Re: Proposal for Monitoring Well Installation, Groundwater Sampling, and Re- Testing MAGS Event and Reporting Crosstown Cleaners 226 Center Street, Suite A1 Jupiter, Palm Beach County, Florida 33458 FDEP Facility ID ERIC_5086 Task Assignment HW687 TBD Terracon Proposal No. PHB257047

Dear Mr. Sostre:

Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this proposal to Florida Department of Environmental Program (FDEP) Waste Cleanup Program to conduct Monitoring Well Installation, Groundwater Sampling, retesting MAGS Event and Reporting at Crosstown Cleaners (ERIC_5086), located at 226 Center Street, Suite A1, in Jupiter, Palm Beach County, Florida.

Scope of Services

Subtask 1 - The costs associated with this subtask are calculated automatically at 13% of the direct labor costs of the remaining subtasks;

Subtask 2 – Utility Clearance, geophysical survey, updated health and safety plan, coordinate with contractors and tenant/owner; Field task planning and preparation; Mobilize to site, and oversea the installation of a 1” permanent shallow monitoring well at DP3 location (MW-2) to confirm SAR VC exceedances.

Subtask 3 - Field task planning and preparation; Mobilize to site, perform groundwater sampling and reporting of

Proposal for Well Installation, Annual GW Monitoring & MAGS Re-Test Event Crosstown Cleaners ERIC_5085 Jupiter, FL December 11, 2025 Terracon Proposal No. PHB257047 the newly installed monitoring well (MW-2), and existing wells PZ-5/MW-1 (interior), PZ-3 (downgradient) and PZ- 1 (upgradient) for VOHs analysis by EPA method 8260;

Collect depth to water level measurements from the newly installed MW-2 and five (5) existing onsite piezometers (PZ-1 through PZ-5/MW-1). Review data and prepare an Annual GW Monitoring Report that will detail and summarize the well installation and GW sampling field activities and include tables, exhibits, field notes, and conclusions and recommendations.

Subtask 4 – Combined PFAS groundwater sampling to include the newly installed MW-2, and existing onsite monitoring well PZ-5/MW-1 (prior detections).

Subtask 5 - Field task planning and preparation; Mobilize to the site to conduct a MAGS event at five existing interior MAGS wells (MAGS-1, MAGS-2, MAGS-3, MAGS-4, and MAGS-6). Review data and prepare a Letter Report that will detail and summarize the field activities and include tables, exhibits, field notes, and conclusions and recommendations on a path forward with respect to the soil gas detections measured above 1 mg/m3 in the SAR.

Subtask 6 – Investigative Derived Waste Management;

It is estimated that 1 drum of IDW (1 liquid) will be generated in Subtasks 3, 4 & 5. The transportation and disposal costs for the drums are included under Subtask 6.

See attached LOE for details.

Schedule Terracon anticipates the deliverables to be submitted within 30 business days following receipt of laboratory results.

Compensation See attached CEF for details.

SITE HISTORY

Recent site assessment activities were reported in a Site Assessment Report, dated August 29, 2025, prepared by Terracon. A summary of the findings is provided below:

Crosstown Cleaners ERIC_5085 Jupiter, FL December 11, 2025 Terracon Proposal No. PHB257047

Eight shallow MAGS wells (4 feet bgs) were installed March 4, 2025 (Interior: MAGS-1 through MAGS-6; Exterior: MAGS-7 and MAGS-8). Soil samples were collected during the installation of the MAGS wells at the 0.5’, 2’, and 3’ intervals bgs, for analysis of VOCs (full list) by EPA Method 8260D. VOC contaminants of concern (COCs) were not detected above their respective SCTLs outlined in Chapter 62-777, F.A.C.

A MAGS event was performed on March 6, 2025. Soil gas analytical samples were submitted for analysis of VOHs by EPA Method TO-15. Moderate PCE concentrations (above 1.0 mg/m³ but below 10 mg/m³) were observed in five of the six interior wells (all except MAGS-5), ranging from 1.10 to 2.00 mg/m³. The highest concentration was in the sample from MAGS-3 located in the spotting area. MAGS-7 and MAGS-8 reported low PCE concentrations, below 1.0 mg/m3.

Four exterior 1” piezometer wells (PZ-1 through PZ-4) and one interior 1” monitoring well (PZ-5/MW-1) were installed March 3, 2025, to total depths of 12 feet bgs. Groundwater sampling was conducted from the five recently installed piezometer/monitoring wells on March 11, 2025, for analysis of VOCs (full list) by EPA Method 8260D and PFAS via FDEP SOP: LC-001-03. The VOC parameters were reported below the respective laboratory MDLs and GCTLs for the groundwater samples collected from PZ-1 through PZ-5/MW-1, with the exception of cis-DCE and trans-DCE reported in PZ-5/MW-1 at concentrations above the MDL but below the GCTLs.

PFAS-impacted groundwater was identified above the Provisional Groundwater Cleanup Target Levels (PGCTL) for constituents of concern PFOA, and PFOA + PFOS in PZ-5/MW-1 adjacent to the dry-clean machine. PFOA and PFOA+PFOS were reported for the groundwater sample collected from the shallow zone monitoring well PZ-5/MW-1 (screened 5-10 feet bgs) with a reported PFOA concentration of 150 nanograms per liter (ng/L) and PFOA+PFOS concentration of 181 ng/L which is above the PGCTL of 70 ng/L.

PFOA, PFOS, and PFOA+PFOS concentrations for the remaining four piezometers were not reported above the PGCTL.

Terracon collected screen point groundwater samples from seven locations (DP-1 through DP-8) from March 5 through March 7, 2025. Eight screening sampling intervals were selected for groundwater sample collection (6 to 10, 16 to 20, 26 to 30, 36 to 40, and 46 to 50 feet bgs. COCs were reported below the respective GCTLs per Table I, Chapter 62- 777, F.A.C, with the exception of DP-3 at 6-10 feet bgs which had a reported vinyl chloride concentration of 27 μg/L, which is above the GCTL of 1 μg/L but below the Natural Attenuation Default Concentration (NADC) of 100 μg/L per Table I, Chapter 62- 777, F.A.C. DP-3 is located outside the back door area of the cleaner.

Terracon Recommended installing a permanent well at the DP-3 location to confirm the vinyl chloride exceedance reported within the 6-foot to 10-foot depth interval. If this sample result is reported below GCTLS no additional sampling will need to be completed. The soil and groundwater results would then support a No Further Action (NFA) without Institutional and Engineering Controls using Risk Management Option Level I (RMO I) criteria for Chapter 62-

780.680 (1) of the F.A.C for chlorinated solvents.

Crosstown Cleaners ERIC_5085 Jupiter, FL December 11, 2025 Terracon Proposal No. PHB257047

Elevated PCE concentrations above the default action level of 1 mg/m³ in five of the eight MAGS wells, may warrant the design of an SVE system as part of an Interim Source Removal Plan (ISRP) or consideration of a short-term episodic Soil Vapor Extraction Event.

Terracon recommended additional groundwater sampling for chlorinated solvents at the 1-year anniversary of the initial sampling event (March 2025) or as a baseline for implementing an ISRP should the FDEP choose this route.

Terracon also recommended continued Monitoring for PFAS at the site since the initial analytical sampling results exceeded the PGCTL in one source well PZ-5/MW-1.

DELVIVERABLES

The Groundwater Monitoring Report will detail and summarize the field activities for the MW installations, sampling activities from the sampling event, field and laboratory data, tables and updated exhibits of groundwater flow and well concentrations. Conclusions and recommendations will include a summary of results and recommendations for future sampling or remedial activities or potential closure pathways. The PFAS evaluation will be provided in an additional section within this report.

Terracon will also prepare a separate Letter Report that will detail and summarize the MAGS activities, field observations and laboratory analytical results for the soil gas samples. The Letter Report will include exhibits with analytical concentrations, summary data tables, intrinsic permeabilities ROI estimates, conclusions and recommendations.

SCHEDULE

It is estimated that the well could be installed and sampling activities could be conducted within two weeks from TA authorization and reports issued within 30 business days of receipt of analytical data.

CLOSING REMARKS

Terracon services will be conducted in accordance with the terms and conditions, contained within the DEP Waste Cleanup Program (WCP) Contract No. HW687, executed January 5, 2022. It is understood that the Task Assignment will be issued to authorize us to perform this work.

We appreciate the opportunity to provide this proposal and look forward to working with you on this project. If you should have any questions or comments regarding this proposal, please contact either of the undersigned at 772-343-9787.

Crosstown Cleaners ERIC_5085 Jupiter, FL December 11, 2025 Terracon Proposal No. PHB257047

Sincerely, Terracon Consultants, Inc.

Jessica Endicott, P.G. Shawn Ouellette, P.G.

Project Geologist Environmental Group Manager

Attachments: Cost Spreadsheet Level of Effort Exhibit 3 (Revised from SAR) Drilling, IDW and Utility Survey Bids

JJJJessica Endicott P

IT

E

M

ES

C R

IP

TI

O N

U N

IT

O

F M

EA

S

U R

E

ES

TI

M

A

TE

U N

IT

P

R

IC

E

EX

TE

N

ED

P

R

IC

E

EM

O

D

ES

C

R

IP

TI

O

N U

N

IT

O F

M

EA

S U

R E

ES

TI

M A

IC

E

EX

TE

N

IC

E

D

ES

C

R

IP

TI

O

N U

N

IT

O F

M

EA

S U

R E

ES

TI

M A

Q

A

N

TI

TY

U

IC

E

EX

TE

N

IC

E

D ir ec t Pu sh D ai l y e 1/ da y

$1 ,1

.0

$1

,1

.0

D ir ec t Pu sh

/2 da y

R at e

EA

$1

,4

.0

$1 ,4

.0

G eo pr ob e

PT

D ay

R at e

EA

$1

,4

.0

$1 ,4

.0

M on ito r W el l ( al l m at er ia ls in cl ud ed

EA

$4

.0

$4

.0

Pr ep ac k

S cr ee n

1" x

EA

$1

.0

$2

.0

S lo tt ed

P V C w el l ( fo ot

EA

$5

0.

$1

.0

W el l R is er

"x 5'

EA

$4 0.

$4

0.

W el l R is er

1"

EA

$3

5.

$3 5.

W el l C om pl et io n

EA

$2

.0

$2

.0

W el l c om pl et io n

EA

$1

.0

$1

.0

M ob ili za tio n

EA

$6

.0

$6

.0

M ob ili za tio n

R ou nd tr ip

$5

.0

$5

.0

M ob ili za tio n

EA

$1

,1

.0

$1 ,1

.0

-g al lo n dr um

(i f ne ce ss ar y)

EA

$7 5.

$7

5.

-g al lo n

D ru m

(i ne ce ss ar y)

EA

$8

0.

$8 0.

D O

T g al lo n dr um

EA

$7 5.

$7

5.

Pe rm its

EA

$7 5.

$7

5.

pe rm its st w el l in st al l

EA

$6

0.

$6 0.

W el l P er m its

EA

$1

.0

$1

.0

A d j us te d pr ic in g to re fe ct

G

W dr um o nl y

9 10 11 12

TO

TA

L

,2

.0

TO

TA

L

,6

.0

TO

TA

L

,1

.0

Lo w

B id

JA

EE

D ri lli n g

M W

I n st al la ti on

TH

EE

B

ID

S

U M

M A

R Y

E V

A

LU

A

TI

O N

JA

EE

E n vi ro n m en ta l Ea rt h

T ec h re fe rr ed D ri lln g S ol u ti on s (P

D S

Pl ea se s ee s pe ci fic V en do r bi ds f or d et ai ls a nd e qu ip m t

Preferred Drilling Solutions, Inc.

8820 66th St. North, Pinellas Park, FL 33782

Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com

DIRECT PUSH TECHNOLOGY QUOTE FORM

Date: 11/13/25 FAC ID#:

Unit Unit Rate Number of Units Extended Price whole day $2,125.00 -$ half day $1,475.00 1 1,475.00$ per foot $25.00 -$ each $110.00 -$ each $50.00 2 100.00$ each $35.00 1 35.00$ per well $150.00 1 150.00$ roundtrip $1,175.00 1 1,175.00$ per crew / per night $575.00 -$ each $75.00 2 150.00$ per day $150.00 -$ each $100.00 1 100.00$ lump sum $350.00 -$ per day $50.00 -$

TOTAL QUOTE PRICE $3,185.00

Notes: 1. Includes saw cuts, development, standby time, and decon.

Project No.:

Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477

Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782

Signature and Title of Person Submitting Quote: , Rose Hood Estimating & Scheduling Manager Date: 11/13/25

Days to Complete Scope of Work: 0.5

Direct Push Daily Rate 1 - on-site day

Equipment Type: Geoprobe 8040DT, 3230DT, 7822DT, 6620DT, 6712DT

*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner

Other (specify)

Steam Cleaner

Decon Pad

GeoProbe Consumables (includes tubing, points, liners, concrete patch, asphalt patch, and grouting)

DOT Approved 55-gal Drum

Per Diem Mobilization

DIRECT PUSH TECHNOLOGY

MISCELLANEOUS

Permits

Site Name and Location: Crosstown Cleaners

Consultant Name: Terracon

PROPOSED SCOPE OF WORK:

(1) 1" x 12' MW with 10' .010 screen, soil sampling, as needed, drum cuttings, pad and 8" manhole

Drum all IDW

226 Center St, Jupiter, Brevard County, FL

Well Completion (includes 8" MH w/ cover, concrete pad, and locking well cap)

Well Riser (includes all materials) ID 1" 5' Length

Slotted PVC Well Screen (includes all materials) 5' Length Pack OD 3.5"

Pre-Packed Well Screen (includes all materials) ID 1" 5' Length Pack OD 3.5"

Auger Attachment, 2" Well Install

Direct Push Half-Day Rate 1 - on-site half day

EARTH TECH DRILLING

2703 NW 19TH STREET, POMPANO BEACH, FL 33069

954.974.2424 FAX:954.974.2423

Date: 11/12/2025

FAC ID#:

PROPOSED SCOPE OF WORK:

Unit Unit Rate Number of Units Extended Price

Equipment Type: DPT Track Rig

Direct Push Daily Rate 1 - on-site day whole day $1,700.00 $0.00

Direct Push Half-Day Rate 1 - on-site half day 1/2 day $1,450.00 1 $1,450.00 Auger Attachment, 1" Well Install with 4.25" ID Augers per foot $0.00 each $0.00 Pre-Packed PVC Well Screen (includes all materials) 1" x 5' Length each $100.00 2 $200.00 Well Riser (includes all materials) 1" x 5' Length each $40.00 1 $40.00 per well $225.00 1 $225.00 per well $0.00

Mobilization daily roundtrip $575.00 1 $575.00 Per Diem per crew / per night $0.00 DOT Approved 55-gal Drum each $80.00 2 $160.00 Permits 2 (Drilling or abandonment only; cost according to WMD & Local Municipalities) each $60.00 1 $60.00 each $55.00 0 $0.00 Decon Pit - Steam Cleaner lump sum $650.00 0 $0.00 Concrete Cores each $75.00 0 $0.00

TOTAL QUOTE PRICE $2,710.00

Notes:

Project No.: ___________________________

Subcontract Company Name: EARTH TECH DRILLING. Inc.

Subcontract Mailing Address: 2703 NW 19th Street, Pompano Beach, FL 33069

Date: 11/12/2025

Drum ALL Soil & Water

Well Completion (includes 30 Min Dev. 8" BD Mnahole & locking well cap)

Well Completion (includes 30 Min Dev. 3.5" Brass Cap & locking well cap)

MAG Well Installation - Patch Surface

Signature and Title of Person Submitting Quote:

DIRECT PUSH TECHNOLOGY

MISCELLANEOUS

Water Sample

ETD Policy: If pea gravel is encountered, borehole advancement is terminated. If client would like to continue borehole advancement, it is at the risk of the consultant, FDEP or property owner.

Days to Complete Scope of Work: 1/2 Day

Contractor Name: Terracon / Jessica Endicott / 561 494-7013

Site Name : Crosstown Cleaners - 226 Center Street - Jupiter, FL

Hand Clear ALL Locations to 5' or REFUSAL

(1) MW 1" x 12' w/ 10' .010" Pre-Pack Screen - 8" BD Completion - Wells Installed w/ 3.25" DPT Rods - DPT Soil Sampling

Monitoring Wells Sparge Wells Horizontal and Vertical Extraction Wells Geotechnical Drilling Direct Push

D

ES

C R

IP

TI

O N

U N

IT

O

F M

EA

S

U R

E

ES

TI

M

A

IC

E

EX

TE

N D

E D

P R

IC

E

D

ES

C R

IP

TI

O N

U N

IT

O

F M

EA

S

U R

E

ES

TI

M

A

IC

E

EX

TE

N

IC

E

D

ES

C R

IP

TI

O N

U N

IT

O

F M

EA

S

U R

ES

TI

M A

IC

E

EX

TE

N

IC

E

U til ity D es ig na tio n S tu dy Lu m p

S um

0.

til ity M ar k ou t lu m p su m

$2 ,0

.0

,0

G P

R S u rv ey Lu m p

S um

$5

.0

TO

TA

L

.0

TO

TA

L

,0

.0

TO

TA

L

.0

Lo w

B id

G eo vi ew

G

EE

B

ID

S

U M

M A

R Y

E V

A

LU

A

TI

O N

G eo vi ew

Tr in it y

S u b su rf ac e G

P R

S I n c

Pl ea se s ee s pe ci fic V en do r bi ds f or d et ai ls a nd e qu ip m

E

ES

C R

IP

TI

O N

U N

IT

O

F M

EA

S

U R

E

ES

TI

M

A

A N

TI

TY

U

IC

E

EX

TE

N

IC

E

D

ES

C R

IP

TI

O N

U N

IT

O

F M

EA

S

U R

E

ES

TI

M

A

A N

TI

TY

U

IC

E

EX

TE

N

IC

E

D

ES

C R

IP

TI

O N

U N

IT

O

F M

EA

S

U R

E

ES

TI

M

A

A N

TI

TY

U

IC

E

EX

TE

N

IC

E

ID

W

P ic ku p, an ife st

Tr an sp or ta tio n (l iq ui ds

EA

$1

.0

$1

.0

D is po sa l (

PF

A S

Im pa ct ed er

W as te s)

EA

$4

.0

$4

.0

D is po sa l

EA

$1

.0

$1

.0

ID

W P ic k p, an ife st

Tr an sp or ta tio n (S oi ls

EA

$1

.0

$0 .0

Tr an sp or ta tio n (5 m i or la nd o)

$2 m

EA

$2

.0

$2

.0

Tr an sp or ta tio n

$3

.0

$3

.0

Pr of ili ng ee

(P

FA

S im pa ct ed

EA

$3

.0

$0 .0

M an ife st

A dm

Fe

EA

$2

.0

$2

.0

S to p C ha rg e

$1

.0

$1

.0

Fu el S ur ch ar ge

$1 5.

$1

5.

TO

TA

L

.0

TO

TA

L

.0

TO

TA

L

.5

Lo w

B id

Er w in

R em ed ia ti on

ID

EE

B

ID

S U

M M

A R

Y E

V A

LU

A

TI

O

N

Er w in R em ed ia ti on C le an

E ar th C om m on G ro u n d

E n vi ro n m en ta l

Pl ea se s ee s pe ci fic V en do r bi ds f or d et ai ls a nd e qu ip m

V

Common Ground Environmental Inc.

(Common Sense Approach to Environmental Issues)

P.O. Box 1044, Lakeland, Florida 33802 Phone: (863) 647-3888

May 8, 2025

Jessica Endicott Terracon 645 NW Enterprise Drive Suite 107 Port Saint Lucie, FL 34986

RE: One (1) Drum of Non-Hazardous Waste for Disposal

Dear Jessica, Thank you for the opportunity to present Common Ground Environmental Inc. (CGE) to you.

CGE is committed to providing the best service in the waste management industry at competitive pricing. When you choose CGE, you choose to have a partner with the experience and the capabilities to handle all your environmental needs, from proper paperwork to site audits to remediation and analytical testing. CGE will be on site at time of pick up to correctly complete all paperwork and to tackle any unexpected problems. CGE makes it easy for you by handling all profiles, paperwork, and scheduling; all you do is sign the shipping documents!

Common Ground Environmental, Inc. is pleased to submit this quote for the following services.

Waste Stream Qty. Price per Unit Total Disposal Only of Non-Hazardous Non-Regulated Material in 55 Gallon Drums

1 $125.00.00 per 55 Gallon Drum

$125.00

Transportation Only of Drums 1 0B$60.00 per Drum Minimum $300

$300.00

Stop Charge 1 $125.00 per Trip $125.00 Fuel Surcharge as of 5/8/25 1 $15.50 per Drum $15.50 Estimated Total $565.50

NOTES:

The above pricing will be valid for 10 days from date of this quote. _____ Int.

The first hour of loading is included in the above price. For each additional hour, customer will be billed $225.00 per hour. _____ Int.

The above quote is only an estimated total. Final invoice can be higher, or it can be lower due to number of drums for disposal, number of surcharges and/or waste conditions. _____ Int.

Quote is based on final profile approval from waste facility. _____ Int.

A monthly fee of 1 ½ % interest will be charged on the balance of every past due invoice that is over 30 days past due and will incur every 30 days until invoice and late fees are paid in full. _____ Int.

Our terms are 30 Days Net. _____ Int.

Terracon Page 2

The pricing above includes transportation and disposal to an EPA permitted facility. Pricing is based on approved waste profiles and non-conforming waste will be assessed surcharges that are billed separately. A $125.00 stop fee will be passed on to the customer. Please note, due to the high cost of Diesel, the fuel surcharge rate will now be managed separately on a month-to-month basis.

Thank you for considering Common Ground Environmental, Inc. as your waste management provider. Please review the above pricing and if it meets with your approval, please confirm your order by signing and returning this quote to my attention. Do not hesitate to call me at (863) 860- 0827 or (863) 647-3888 with questions or concerns.

Sincerely, Michael Propst Mike Propst Common Ground Environmental, Inc.

Acceptance of Proposal

The above prices, specifications and conditions are satisfactory to generator/client and are hereby accepted. Common Ground Environmental, Inc. is hereby granted to do the work as specified.

Payment terms are net 30 days unless specified otherwise. A 1.5% per month finance charge will be applied on all past due invoices. The generator/client will be responsible for all cost, expenses and reasonable counsel fees incurred by or on behalf of Common Ground Environmental, Inc. as a result of failure to remit payment as specified above.

Date of Acceptance _______________________________________________________

Signature: __________________________________________Title: ________________

Printed Name: ___________________________________________________________