CN-370000-HW687-DC03CCO2.pdf
PDF 2 MB Posted
- Contract number
- HW687
- Issued by
- Florida
About this file
This is a Task Assignment Change Order (TACO #2) between the State of Florida Department of Environmental Protection (FDEP) and Terracon Consultants, Inc. regarding Contract HW687 for the Vicks Cleaners environmental remediation project (ERIC_4650) located in Escambia County, Florida. The contract is managed by FDEP Project Manager Gabriel Sostre and contractor Project Manager Donna Cline. This change order was executed on March 5, 2025, and supersedes the original task assignment and previous change orders by modifying specific terms and deliverables.
TACO #2 authorizes a decrease in the project price from $16,955.04 to $16,885.04, representing a net cost reduction of $70.00 (0.41 percent). The price reduction results from three adjustments: elimination of a $95.00 Walker-Hill drilling fee for a DOT 55-gallon drum, elimination of $110.00 in Erwin Remediation soil IDW disposal fees, and addition of $155.50 for two metal-brass circular plates to cover core-drilled holes per the property owner's request. The task completion date remains May 2, 2025, with deliverables including Subtask 2 (Field Notes) due January 10, 2025, and Subtasks 1 and 3 (SSAR and Project Management) due February 28, 2025. Invoice payment is conditioned upon FDEP approval of each deliverable, with Subtask 2 invoiced at $12,058.14 and Subtasks 1 and 3 invoiced at $4,826.90 for a total contract value of $16,885.04.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department) Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
DC003C 2 HW687
Gabriel Sostre 850-245-8749 Contractor Terracon Consultants, Inc. Contractor
Contractor Donna Cline Contractor 904-479-7415
ERIC_4650
Vicks Cleaners
✔ $ 16,885.04 $ 16,955.04
$ 16,885.04 $ 16,955.04 ✔ Completion
Completion 05/02/2025 05/02/2025 0
✔ 1 1 2
Terracon Consultants, Inc.
Contractor Donna Cline
Senior Associate / Remediation Engineer
3/5/2025
Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=General Users, email=Donna.Cline@terracon.com Date: 2025.03.05 06:13:21 -05'00'
Cline, Donna L
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2025.03.04 15:31:53 -05'00'
N/A
This TACO authorizes a decrease in the DPT and Soil IDW disposal fees and the purchase of plates to cover core drilled holes.
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Change Order #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
BWC TAFORM 01/18
HW687
DC003C
Subtasks 3 & 1: SSAR & PM
Subtask 2: Field Notes Deliverable including field notes, boring logs, and groundwater sampling log 01/10/2025
02/28/2025
Subtask 2: Upon receipt and FDEP approval of Field Notes Deliverable including field notes, boring logs, and groundwater sampling log
Subtasks 3 & 1: Upon receipt and FDEP approval of SSAR & PM
$ 12,058.14
$ 4,826.90
$ 16,885.04
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette NNuñez Lt. Governor
Secretary
Memorandum
TO:
FROM:
Negotiation File
ERIC
, Project Manager
SUBJECT: Negotiation Summary Task Assignment (HW687)
DATE: ,
FDEP COST ESTIMATE
Contractor: Terracon FINAL
Date: 6/10/2024 Task #: SubTask 1 Project Management SubTask 6
Site: Vicks Cleaners, ERIC_4650 SubTask 2 Soil/Groundwater Sampling and Analysis SubTask 7 Activity/Phase: Soil/GW Sampling and Reporting SubTask 3 Supplemental Site Assessment Report / SRCO SubTask 8
Project Manager: Mubeen Darji SubTask 4 SubTask 9 SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$75.48 Project Manager Tom Lewis 4.52 4.52 $31.71 Administrative Julie Brown 4.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Brownfield Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$33.31 CADD Specialist Chelsea Fugate 5.00 0.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Data Analyst & Visualization Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Environmental Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$26.20 Field Scientist Renee Eddins 11.50 11.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 GIS Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$35.58 Project Scientist Kyle Parson 21.50 18.50 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$75.48 Senior Geologist Tom Lewis 3.00 0.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior GIS Analyst 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$49.52 Senior Scientist Sid O'Neal 21.00 8.00 13.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 70.52 4.52 38.00 28.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $2,967.40 $341.38 $1,355.69 $1,270.33 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 116.00% $3,442.18 $396.00 $1,572.60 $1,473.58 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.263% $1,669.55 $192.07 $762.75 $714.73 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $8,079.13 $929.45 $3,691.04 $3,458.64 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 1
FDEP COST ESTIMATEContractor: Terracon FINAL
Date: 6/10/2024 Task #: SubTask 1 Project Management SubTask 6
Site: Vicks Cleaners, ERIC_4650 SubTask 2 Soil/Groundwater Sampling and Analysis SubTask 7 Activity/Phase: Soil/GW Sampling and Reporting SubTask 3 Supplemental Site Assessment Report / SRCO SubTask 8
Project Manager: Mubeen Darji SubTask 4 SubTask 9 SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Walker-Hill) $2,300.00 $2,300.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 IDW (Erwin Remediation) $125.00 $125.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $2,425.00 $2,425.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $242.50 $242.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $2,667.50 $2,667.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $3,113.00 $3,113.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $220.00 $220.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $3,333.00 $3,333.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $66.00 $66.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,328.00 $1,328.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $243.50 $243.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,637.50 $1,637.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $16,077.13 $929.45 $11,689.04 $3,458.64 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $807.91 $92.95 $369.10 $345.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $16,885.04 $1,022.40 $12,058.14 $3,804.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Vicks Cleaners, ERIC_4650 FINAL SUBTASK 2: Soil/Groundwater Sampling and Analysis
PROPOSAL NO. PHF247051
DATE: 6/10/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning for Soil and Groundwater Sampling Senior Scientist SO 0.50 Senior Scientist SO 0.50 Senior Scientist SO 3.00
Senior Scientist SO 3.00
Project Scientist KP Load/unload and calibrate equipment 1.00 Project Scientist KP Mobilization/Demobilization (from Pensacola), 2 days (soil and gw sampling) 1.50 Project Scientist RE Mobilization/Demobilization (from Pensacola), 1 days (soil sampling) 1.50 Project Scientist KP 10.00
Project Scientist RE 10.00
Project Scientist KP Collect depth to water samples (6 well, 10 minutes) 1.00 Project Scientist KP Collect groundwater sample (1 well, 1.5 hours each) 1.50 Project Scientist KP Containerize IDW, collect drum sample, secure drum with chains / lock 1.00 Coordinate IDW T&D Senior Scientist SO 1.00 Project Scientist KP Mobilization/Demobilization (from Pensacola) 1.50 Project Scientist KP 1.00 Staff Total hours
TL 0.00
KP 18.50
SO 8.00
RE 11.50
Total: 38.00 TOTAL LABOR 38.00
VEHICLE TYPE RATE UNIT USEAGE
Truck (groundwater/soil samp 120 day 2 $240.00 Truck (IDW pickup) 120 day 1 $120.00
TOTAL VEHICLE $360.00
Daily safety debrief, collect soil samples from hand auger soil borings and collect 7 samples per boring for laboratory analysis (Halocarbons and SPLP prep sample).
Prepare waste characterization/Generator Profile
Coordinate IDW T&D: Meet transporter to unlock secure area for pickup
Request sample kit Update Health and Safety Plan PreTask Coordination: Verify property owner is the same as on the access agreement, contact property owner and FDEP of field activity schedule (building interior core drilling), designate IDW staging area (drum stolen in the past) Review preliminary soil VOC data to determine if SPLP tests need to be completed, contact the FDEP with suggested samples for SPLP analysis, prepare WCD as necessary
Soil and Groundwater Sampling: 2 soil borings interior of building, sample collection from SB002 at 5 and 6.5 ft bgs, and SB003 at 1
ft. 5 soil borings on the perimeter of the former excavation area, with soil sample collection at 0.5, 2,4,6,8,10 ft bgs and 1 ft above water table. Measure depth to groundwater in 6 MW's, and collect 1 GW sample from MW039R for 8260 Halocarbons.
Direct work, daily safety debrief, record lithological descriptions, perform OVA-PID screening on soil samples, assist with core drilling and hand augering of 7 soil borings
SITE : Vicks Cleaners, ERIC_4650 FINAL SUBTASK 2: Soil/Groundwater Sampling and Analysis
PROPOSAL NO. PHF247051
DATE: 6/10/2024
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
Erwin Remediation Soil IDW Disposal 110.00$ each 1 $110.00 Erwin Remediation Soil IDW Disposal 110.00$ each -1 ($110.00) Erwin Remediation Groundwater IDW Disposal 125.00$ each 1 $125.00 Walker-Hill DPT/Hand Augering 2,395.00$ each 1 $2,395.00 Walker-Hill DPT/Hand Augering 95.00$ each -1 ($95.00)
TOTAL $2,425.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Halocarbons (GW) EPA 8260 73.00$ 1 $73.00 Halocarbons Soil EPA 8260 73.00$ 38 $2,774.00 Halocabons 5035 Prep 7.00$ 38 $266.00 SPLP Bottle Extraction EPA 1312 (Zero headspace) 55.00$ to be prepared as WCD -- VOHs SPLP EPA 8260 73.00$ to be prepared as WCD -- Sample Shipping Small Cooler (overnight) 110.00$ 2 (water and soil) $220.00
Soil analysis has a short hold time TOTAL LAB $3,333.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables Expendables 40.00$ day 1 $40.00
Ice (sample shipping) 6.50$ each 4 $26.00 Analytical Related Shallow groundwater samplin 290.00$ day 1 $290.00
Tubing, HDPE 0.30$ ft 30 $9.00 Tubing, silicon (3/16 x 3/8) 3.00$ ft 1 $3.00
235.00$ day 0 (supplied by driller) $0.00 Encore Sampler 16.00$ each 38 $608.00 Terra Core Sampler 11.00$ each 38 $418.00
Other Photoionization Meter 88.00$ day 1 $88.00 Other Circular Plates 77.75$ each 2 WCD #1 $155.50 IDW 55-gallon drum, new 100.00$ drum 0 (supplied by driller) $0.00
TOTAL EQUIPMENT $1,637.50
Soil sampling kit (through concrete)
SITE : Vicks Cleaners, ERIC_4650 SUBTASK 3: Supplemental Site Assessment / SRCO Report FINAL
PROPOSAL NO. PHF247051
DATE: 6/10/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Report Deliverable Senior Scientist SO 9.00
Project Scientist KP 3.00
Project Scientist SO 1.50 Senior Scientist/Geologist SO Review and Summarize Water Quality Parameters 0.50 Senior Scientist/Geologist SO Review and Summarize Soil/Groundwater Analytical Results 2.00 Senior Geologist TL Conclusions/Recommendations 2.00 Senior Geologist TL Sign and Seal the Supplemental Assessment Report 1.00 GIS Technician CF Prepare soil base map, create updated exhibits (soil and groundwater) 5.00 Admin JB 4.00
Staff Total hours
TL 3.00
JB 4.00
SO 13.00
CF 5.00
KP 3.00
Total: 28.00 TOTAL LABOR 28.00
Prepare draft report introduction, site history, recent activities summary, and discussion of historical and current soil and groundwater results (SRCO) Summary data into the existing historical soil and groundwater tables, prepare draft exhibits QA/QC field and laboratory data
Formating report and tables, assembling of exhibits and appendicies to be assembled in a pdf format
FDEP COST ESTIMATE
Contractor: Terracon DELTA
Date: 6/10/2024 Task #: SubTask 1 Project Management SubTask 6
Site: Vicks Cleaners, ERIC_4650 SubTask 2 Soil/Groundwater Sampling and Analysis SubTask 7 Activity/Phase: Soil/GW Sampling and Reporting SubTask 3 Supplemental Site Assessment Report / SRCO SubTask 8
Project Manager: Mubeen Darji SubTask 4 SubTask 9 SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$75.48 Project Manager Tom Lewis 0.00 0.00 $31.71 Administrative Julie Brown 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Brownfield Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$33.31 CADD Specialist Chelsea Fugate 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Data Analyst & Visualization Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Environmental Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$26.20 Field Scientist Renee Eddins 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 GIS Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$35.58 Project Scientist Kyle Parson 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$75.48 Senior Geologist Tom Lewis 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior GIS Analyst 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$49.52 Senior Scientist Sid O'Neal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 116.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.263% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
FDEP COST ESTIMATEContractor: Terracon DELTA
Task #: SubTask 1 Project Management SubTask 6 Site: Vicks Cleaners, ERIC_4650 SubTask 2 Soil/Groundwater Sampling and Analysis SubTask 7
Activity/Phase: Soil/GW Sampling and Reporting SubTask 3 Supplemental Site Assessment Report / SRCO SubTask 8 Project Manager: Mubeen Darji SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Walker-Hill) ($95.00) ($95.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 IDW (Erwin Remediation) ($110.00) ($110.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal ($205.00) ($205.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee ($20.50) ($20.50) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost ($225.50) ($225.50) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $155.50 $155.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $155.50 $155.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal ($70.00) $0.00 ($70.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost ($70.00) $0.00 ($70.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
SITE : Vicks Cleaners, ERIC_4650 DELTA SUBTASK 2: Soil/Groundwater Sampling and Analysis
PROPOSAL NO. PHF247051
DATE: 6/10/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning for Soil and Groundwater Sampling Senior Scientist SO 0.00 Senior Scientist SO 0.00 Senior Scientist SO 0.00
Senior Scientist SO 0.00
Project Scientist KP Load/unload and calibrate equipment 0.00 Project Scientist KP Mobilization/Demobilization (from Pensacola), 2 days (soil and gw sampling) 0.00 Project Scientist RE Mobilization/Demobilization (from Pensacola), 1 days (soil sampling) 0.00 Project Scientist KP 0.00
Project Scientist RE 0.00
Project Scientist KP Collect depth to water samples (6 well, 10 minutes) 0.00 Project Scientist KP Collect groundwater sample (1 well, 1.5 hours each) 0.00 Project Scientist KP Containerize IDW, collect drum sample, secure drum with chains / lock 0.00 Coordinate IDW T&D Senior Scientist SO 0.00 Project Scientist KP Mobilization/Demobilization (from Pensacola) 0.00 Project Scientist KP 0.00 Staff Total hours
TL 0.00
KP 0.00
SO 0.00
RE 0.00
Total: 0.00 TOTAL LABOR 0.00
VEHICLE TYPE RATE UNIT USEAGE
Truck (groundwater/soil samp 120 day 0 $0.00 Truck (IDW pickup) 120 day 0 $0.00
TOTAL VEHICLE $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
Erwin Remediation Soil IDW Disposal 110.00$ each 0 $0.00 Erwin Remediation Soil IDW Disposal 110.00$ each -1 ($110.00) Erwin Remediation Groundwater IDW Disposal 125.00$ each 0 $0.00 Walker-Hill DPT/Hand Augering 2,395.00$ each 0 $0.00 Walker-Hill DPT/Hand Augering 95.00$ each -1 ($95.00)
TOTAL ($205.00)
Daily safety debrief, collect soil samples from hand auger soil borings and collect 7 samples per boring for laboratory analysis (Halocarbons and SPLP prep sample).
Prepare waste characterization/Generator Profile
Coordinate IDW T&D: Meet transporter to unlock secure area for pickup
Request sample kit Update Health and Safety Plan PreTask Coordination: Verify property owner is the same as on the access agreement, contact property owner and FDEP of field activity schedule (building interior core drilling), designate IDW staging area (drum stolen in the past) Review preliminary soil VOC data to determine if SPLP tests need to be completed, contact the FDEP with suggested samples for SPLP analysis, prepare WCD as necessary
Soil and Groundwater Sampling: 2 soil borings interior of building, sample collection from SB002 at 5 and 6.5 ft bgs, and SB003 at 1
ft. 5 soil borings on the perimeter of the former excavation area, with soil sample collection at 0.5, 2,4,6,8,10 ft bgs and 1 ft above water table. Measure depth to groundwater in 6 MW's, and collect 1 GW sample from MW039R for 8260 Halocarbons.
Direct work, daily safety debrief, record lithological descriptions, perform OVA-PID screening on soil samples, assist with core drilling and hand augering of 7 soil borings
SITE : Vicks Cleaners, ERIC_4650 DELTA SUBTASK 2: Soil/Groundwater Sampling and Analysis
PROPOSAL NO. PHF247051
DATE: 6/10/2024
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Halocarbons (GW) EPA 8260 73.00$ 0 $0.00 Halocarbons Soil EPA 8260 73.00$ 0 $0.00 Halocabons 5035 Prep 7.00$ 0 $0.00 SPLP Bottle Extraction EPA 1312 (Zero headspace) 55.00$ to be prepared as WCD -- VOHs SPLP EPA 8260 73.00$ to be prepared as WCD -- Sample Shipping Small Cooler (overnight) 110.00$ 0 (water and soil) $0.00
Soil analysis has a short hold time TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables Expendables 40.00$ day 0 $0.00
Ice (sample shipping) 6.50$ each 0 $0.00 Analytical Related Shallow groundwater samplin 290.00$ day 0 $0.00
Tubing, HDPE 0.30$ ft 0 $0.00 Tubing, silicon (3/16 x 3/8) 3.00$ ft 0 $0.00
235.00$ day 0 (supplied by driller) $0.00 Encore Sampler 16.00$ each 0 $0.00 Terra Core Sampler 11.00$ each 0 $0.00
Other Photoionization Meter 88.00$ day 0 $0.00 Other Circular Plates 77.75$ each 2 $155.50 IDW 55-gallon drum, new 100.00$ drum 0 (supplied by driller) $0.00
TOTAL EQUIPMENT $155.50
Soil sampling kit (through concrete)
FDEP COST ESTIMATE ORIGINAL
Contractor: Terracon
Date: 6/10/2024 Task #: SubTask 1 Project Management SubTask 6
Site: Vicks Cleaners, ERIC_4650 SubTask 2 Soil/Groundwater Sampling and Analysis SubTask 7 Activity/Phase: Soil/GW Sampling and Reporting SubTask 3 Supplemental Site Assessment Report / SRCO SubTask 8
Project Manager: Mubeen Darji SubTask 4 SubTask 9 SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$75.48 Project Manager Tom Lewis 4.52 4.52 $31.71 Administrative Julie Brown 4.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Brownfield Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$33.31 CADD Specialist Chelsea Fugate 5.00 0.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Data Analyst & Visualization Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Environmental Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$26.20 Field Scientist Renee Eddins 11.50 11.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 GIS Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$35.58 Project Scientist Kyle Parson 21.50 18.50 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$75.48 Senior Geologist Tom Lewis 3.00 0.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior GIS Analyst 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$49.52 Senior Scientist Sid O'Neal 21.00 8.00 13.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 70.52 4.52 38.00 28.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $2,967.40 $341.38 $1,355.69 $1,270.33 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 116.00% $3,442.18 $396.00 $1,572.60 $1,473.58 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.263% $1,669.55 $192.07 $762.75 $714.73 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $8,079.13 $929.45 $3,691.04 $3,458.64 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
FDEP COST ESTIMATEContractor: Terracon
Task #: SubTask 1 Project Management SubTask 6 Site: Vicks Cleaners, ERIC_4650 SubTask 2 Soil/Groundwater Sampling and Analysis SubTask 7
Activity/Phase: Soil/GW Sampling and Reporting SubTask 3 Supplemental Site Assessment Report / SRCO SubTask 8 Project Manager: Mubeen Darji SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Walker-Hill) $2,395.00 $2,395.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 IDW (Erwin Remediation) $235.00 $235.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $2,630.00 $2,630.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $263.00 $263.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $2,893.00 $2,893.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $3,113.00 $3,113.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $220.00 $220.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $3,333.00 $3,333.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $66.00 $66.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,328.00 $1,328.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $88.00 $88.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,482.00 $1,482.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $16,147.13 $929.45 $11,759.04 $3,458.64 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $807.91 $92.95 $369.10 $345.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $16,955.04 $1,022.40 $12,128.14 $3,804.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Site Name: Site ID #:
Contract #: Contractor:
• Reason for Work Change Directive :
• Description of Work Change Directive :
• Attachments (if applicable, list documents supporting change):
• Costs (if negotiated unit costs, provide information below):
Authorized Contractor Signature:
Authorized FDEP Signature:
FDEP Supervisor Approval:
(if applicable)
Additional work is not authorized without prior FDEP approval as indicated by an approved Work Change Directive Form or Task Assignment Change Order Form. It is the Contractor's responsibility to ensure that additional costs associated with this WCD are resolved by a Task Assignment Change Order (TACO) prior to the completion date of the original Task Assignment or subsequent TACOs completed prior to the execution date of this WCD. Failure to do so will result in a loss of reimbursement for work associated with this WCD.
Task Assignment #: Work Change Directive #:
Maximum Estimated Increase in Task Amount:
Vicks Cleaners ERIC_4650
HW687 Terracon
DC003C 1
We are tasked to advance two soil borings within the interior building which is currently being used as a beauty shop, modernized with new vinyl flooring.
Coordinated with owner to install a metal/brass circular plates over the core drilled hole.
Purchase two metal/brass circular plates to cover the core drilled holes.
$77.75 x 2 = $155.50
$ 200.00
Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=General Users, email=Donna.Cline@terracon.com Date: 2024.12.11 02:24:31 -05'00'
Cline, Donna L
Gabriel M Sostre Digitally signed by Gabriel M Sostre Date: 2024.12.11 13:58:43 -05'00'
Digitally signed by Jennifer Farrell Date: 2024.12.12 08:21:30 -05'00'
Sostre, Gabriel
From: Brown, Julie A. <Julie.Brown@terracon.com> Sent: Friday, February 21, 2025 8:08 AM To: Sostre, Gabriel Cc: Cline, Donna L; O'Neal, Sid L Subject: RE: Request for HW687 TACO-02 DC003C Vicks Cleaners ERIC_4650 Attachments: HW687 TACO-02 DC003C Vicks Cleaners ERIC_4650 final.pdf; HW687 TACO-02 DC003C Vicks
Cleaners ERIC_4650.xlsx
Follow Up Flag: Follow up Flag Status: Flagged
EXTERNAL MESSAGE
This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.
Good morning Gabriel – my apologies, attached please nd corrected TACO #2 for above. . It includes the following for Subtask 2;
• Reduction in Erwin Remediation and Walker-Hill invoices; and
• Addition for circular plates in accordance with WCD #1.
Let me know if you need anything else. Thank you for your help. Julie
From: Sostre, Gabriel <Gabriel.Sostre@floridadep.gov> Sent: Wednesday, February 19, 2025 3:14 PM To: Brown, Julie A. <Julie.Brown@terracon.com> Cc: Cline, Donna L <Donna.Cline@terracon.com>; O'Neal, Sid L <Sid.O'neal@terracon.com> Subject: RE: Request for HW687 TACO-01 DC003C Vicks Cleaners ERIC_4650
Hi all, I think this one is supposed to be TACO #2. If I recall correctly, TACO #1 was for a time extension that was approved sometime in December of last year. Can Terracon amend the sent TACO to re ect this and include the relevant pages from TACO #1?
Thanks, Gabriel Sostre Environmental Specialist II Waste Management/Waste Site Cleanup Section Florida Department of Environmental Protection Gabriel.Sostre@FloridaDEP.gov Office: 850-245-8749
Contractor Contractor Contractor Contractor
Completion Completion
Contractor
Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=General Users, email=Donna.Cline@terracon.com Date: 2024.12.10 09:44:35 -05'00'
Cline, Donna L
HW687
DC003C
Subtasks 3 & 1: SSAR & PM
Subtask 2: Field Notes Deliverable including field notes, boring logs, and groundwater sampling log 01/10/2025
02/28/2025
Subtask 2: Upon receipt and FDEP approval of Field Notes Deliverable including field notes, boring logs, and groundwater sampling log
Subtasks 3 & 1: Upon receipt and FDEP approval of SSAR & PM
$ 12,128.14
$ 4,826.90
$ 16,955.04
File details come from the government source that posted it. Updated .