This is a Task Assignment Change Order (TACO #2) between the State of Florida Department of Environmental Protection (FDEP) and Terracon Consultants, Inc. regarding Contract HW687 for the Vicks Cleaners environmental remediation project (ERIC_4650) located in Escambia County, Florida. The contract is managed by FDEP Project Manager Gabriel Sostre and contractor Project Manager Donna Cline. This change order was executed on March 5, 2025, and supersedes the original task assignment and previous change orders by modifying specific terms and deliverables.

TACO #2 authorizes a decrease in the project price from $16,955.04 to $16,885.04, representing a net cost reduction of $70.00 (0.41 percent). The price reduction results from three adjustments: elimination of a $95.00 Walker-Hill drilling fee for a DOT 55-gallon drum, elimination of $110.00 in Erwin Remediation soil IDW disposal fees, and addition of $155.50 for two metal-brass circular plates to cover core-drilled holes per the property owner's request. The task completion date remains May 2, 2025, with deliverables including Subtask 2 (Field Notes) due January 10, 2025, and Subtasks 1 and 3 (SSAR and Project Management) due February 28, 2025. Invoice payment is conditioned upon FDEP approval of each deliverable, with Subtask 2 invoiced at $12,058.14 and Subtasks 1 and 3 invoiced at $4,826.90 for a total contract value of $16,885.04.

View the file

Other files

File Type Posted
CN-370000-HW687-BF01ACO1.pdf PDF
CN-370000-HW687-BF03ACO1.pdf PDF
CN-370000-HW687-BIL01A.pdf PDF
CN-370000-HW687-BIL2ACO1.pdf PDF
CN-370000-HW687-BIL2BCO1.pdf PDF
CN-370000-HW687-BIL2CCO1.pdf PDF
CN-370000-HW687-BIL3ACO2.pdf PDF
CN-370000-HW687-BIO1ACO1.pdf PDF
CN-370000-HW687-DC001A.pdf PDF
CN-370000-HW687-DC003A.pdf PDF
CN-370000-HW687-DC003D.pdf PDF
CN-370000-HW687-DC005D.pdf PDF
CN-370000-HW687-DC006A.pdf PDF
CN-370000-HW687-DC006B.pdf PDF
CN-370000-HW687-DC008C.pdf PDF
CN-370000-HW687-DC010A.pdf PDF
CN-370000-HW687-DC010B.pdf PDF
CN-370000-HW687-DC011F.pdf PDF
CN-370000-HW687-DC011H.pdf PDF
CN-370000-HW687-DC012D.pdf PDF
CN-370000-HW687-DC013C.pdf PDF
CN-370000-HW687-DC015A.pdf PDF
CN-370000-HW687-DC015C.pdf PDF
CN-370000-HW687-DC019A.pdf PDF
CN-370000-HW687-DC01ACO2.pdf PDF
CN-370000-HW687-DC020A.pdf PDF
CN-370000-HW687-DC020B.pdf PDF
CN-370000-HW687-DC020C.pdf PDF
CN-370000-HW687-DC020D.pdf PDF
CN-370000-HW687-DC023C.pdf PDF
CN-370000-HW687-DC025B.pdf PDF
CN-370000-HW687-DC025C.pdf PDF
CN-370000-HW687-DC025F.pdf PDF
CN-370000-HW687-DC027B.pdf PDF
CN-370000-HW687-DC027C.pdf PDF
CN-370000-HW687-DC02BCO1.pdf PDF
CN-370000-HW687-DC02CCO2.pdf PDF
CN-370000-HW687-DC02DCO1.pdf PDF
CN-370000-HW687-DC02HCO1.pdf PDF
CN-370000-HW687-DC032A.pdf PDF
CN-370000-HW687-DC034A.pdf PDF
CN-370000-HW687-DC034C.pdf PDF
CN-370000-HW687-DC034D.pdf PDF
CN-370000-HW687-DC035F.pdf PDF
CN-370000-HW687-DC036A.pdf PDF
CN-370000-HW687-DC03CCO1.pdf PDF
CN-370000-HW687-DC041C.pdf PDF
CN-370000-HW687-DC041D.pdf PDF
CN-370000-HW687-DC048A.pdf PDF
CN-370000-HW687-DC048B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department) Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

DC003C 2 HW687

Gabriel Sostre 850-245-8749 Contractor Terracon Consultants, Inc. Contractor

Contractor Donna Cline Contractor 904-479-7415

ERIC_4650

Vicks Cleaners

✔ $ 16,885.04 $ 16,955.04

$ 16,885.04 $ 16,955.04 ✔ Completion

Completion 05/02/2025 05/02/2025 0

✔ 1 1 2

Terracon Consultants, Inc.

Contractor Donna Cline

Senior Associate / Remediation Engineer

3/5/2025

Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=General Users, email=Donna.Cline@terracon.com Date: 2025.03.05 06:13:21 -05'00'

Cline, Donna L

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2025.03.04 15:31:53 -05'00'

N/A

This TACO authorizes a decrease in the DPT and Soil IDW disposal fees and the purchase of plates to cover core drilled holes.

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Change Order #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

BWC TAFORM 01/18

HW687

DC003C

Subtasks 3 & 1: SSAR & PM

Subtask 2: Field Notes Deliverable including field notes, boring logs, and groundwater sampling log 01/10/2025

02/28/2025

Subtask 2: Upon receipt and FDEP approval of Field Notes Deliverable including field notes, boring logs, and groundwater sampling log

Subtasks 3 & 1: Upon receipt and FDEP approval of SSAR & PM

$ 12,058.14

$ 4,826.90

$ 16,885.04

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette NNuñez Lt. Governor

Secretary

Memorandum

TO:

FROM:

Negotiation File

ERIC

, Project Manager

SUBJECT: Negotiation Summary Task Assignment (HW687)

DATE: ,

FDEP COST ESTIMATE

Contractor: Terracon FINAL

Date: 6/10/2024 Task #: SubTask 1 Project Management SubTask 6

Site: Vicks Cleaners, ERIC_4650 SubTask 2 Soil/Groundwater Sampling and Analysis SubTask 7 Activity/Phase: Soil/GW Sampling and Reporting SubTask 3 Supplemental Site Assessment Report / SRCO SubTask 8

Project Manager: Mubeen Darji SubTask 4 SubTask 9 SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$75.48 Project Manager Tom Lewis 4.52 4.52 $31.71 Administrative Julie Brown 4.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Brownfield Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$33.31 CADD Specialist Chelsea Fugate 5.00 0.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Data Analyst & Visualization Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Environmental Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$26.20 Field Scientist Renee Eddins 11.50 11.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 GIS Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$35.58 Project Scientist Kyle Parson 21.50 18.50 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$75.48 Senior Geologist Tom Lewis 3.00 0.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior GIS Analyst 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$49.52 Senior Scientist Sid O'Neal 21.00 8.00 13.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Hours 70.52 4.52 38.00 28.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $2,967.40 $341.38 $1,355.69 $1,270.33 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 116.00% $3,442.18 $396.00 $1,572.60 $1,473.58 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.263% $1,669.55 $192.07 $762.75 $714.73 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $8,079.13 $929.45 $3,691.04 $3,458.64 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF TERRACON Page 1

FDEP COST ESTIMATEContractor: Terracon FINAL

Date: 6/10/2024 Task #: SubTask 1 Project Management SubTask 6

Site: Vicks Cleaners, ERIC_4650 SubTask 2 Soil/Groundwater Sampling and Analysis SubTask 7 Activity/Phase: Soil/GW Sampling and Reporting SubTask 3 Supplemental Site Assessment Report / SRCO SubTask 8

Project Manager: Mubeen Darji SubTask 4 SubTask 9 SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Walker-Hill) $2,300.00 $2,300.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 IDW (Erwin Remediation) $125.00 $125.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $2,425.00 $2,425.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $242.50 $242.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $2,667.50 $2,667.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $3,113.00 $3,113.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $220.00 $220.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $3,333.00 $3,333.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $66.00 $66.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,328.00 $1,328.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $243.50 $243.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,637.50 $1,637.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $16,077.13 $929.45 $11,689.04 $3,458.64 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $807.91 $92.95 $369.10 $345.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $16,885.04 $1,022.40 $12,058.14 $3,804.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF TERRACON Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Vicks Cleaners, ERIC_4650 FINAL SUBTASK 2: Soil/Groundwater Sampling and Analysis

PROPOSAL NO. PHF247051

DATE: 6/10/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning for Soil and Groundwater Sampling Senior Scientist SO 0.50 Senior Scientist SO 0.50 Senior Scientist SO 3.00

Senior Scientist SO 3.00

Project Scientist KP Load/unload and calibrate equipment 1.00 Project Scientist KP Mobilization/Demobilization (from Pensacola), 2 days (soil and gw sampling) 1.50 Project Scientist RE Mobilization/Demobilization (from Pensacola), 1 days (soil sampling) 1.50 Project Scientist KP 10.00

Project Scientist RE 10.00

Project Scientist KP Collect depth to water samples (6 well, 10 minutes) 1.00 Project Scientist KP Collect groundwater sample (1 well, 1.5 hours each) 1.50 Project Scientist KP Containerize IDW, collect drum sample, secure drum with chains / lock 1.00 Coordinate IDW T&D Senior Scientist SO 1.00 Project Scientist KP Mobilization/Demobilization (from Pensacola) 1.50 Project Scientist KP 1.00 Staff Total hours

TL 0.00

KP 18.50

SO 8.00

RE 11.50

Total: 38.00 TOTAL LABOR 38.00

VEHICLE TYPE RATE UNIT USEAGE

Truck (groundwater/soil samp 120 day 2 $240.00 Truck (IDW pickup) 120 day 1 $120.00

TOTAL VEHICLE $360.00

Daily safety debrief, collect soil samples from hand auger soil borings and collect 7 samples per boring for laboratory analysis (Halocarbons and SPLP prep sample).

Prepare waste characterization/Generator Profile

Coordinate IDW T&D: Meet transporter to unlock secure area for pickup

Request sample kit Update Health and Safety Plan PreTask Coordination: Verify property owner is the same as on the access agreement, contact property owner and FDEP of field activity schedule (building interior core drilling), designate IDW staging area (drum stolen in the past) Review preliminary soil VOC data to determine if SPLP tests need to be completed, contact the FDEP with suggested samples for SPLP analysis, prepare WCD as necessary

Soil and Groundwater Sampling: 2 soil borings interior of building, sample collection from SB002 at 5 and 6.5 ft bgs, and SB003 at 1

ft. 5 soil borings on the perimeter of the former excavation area, with soil sample collection at 0.5, 2,4,6,8,10 ft bgs and 1 ft above water table. Measure depth to groundwater in 6 MW's, and collect 1 GW sample from MW039R for 8260 Halocarbons.

Direct work, daily safety debrief, record lithological descriptions, perform OVA-PID screening on soil samples, assist with core drilling and hand augering of 7 soil borings

SITE : Vicks Cleaners, ERIC_4650 FINAL SUBTASK 2: Soil/Groundwater Sampling and Analysis

PROPOSAL NO. PHF247051

DATE: 6/10/2024

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Erwin Remediation Soil IDW Disposal 110.00$ each 1 $110.00 Erwin Remediation Soil IDW Disposal 110.00$ each -1 ($110.00) Erwin Remediation Groundwater IDW Disposal 125.00$ each 1 $125.00 Walker-Hill DPT/Hand Augering 2,395.00$ each 1 $2,395.00 Walker-Hill DPT/Hand Augering 95.00$ each -1 ($95.00)

TOTAL $2,425.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Halocarbons (GW) EPA 8260 73.00$ 1 $73.00 Halocarbons Soil EPA 8260 73.00$ 38 $2,774.00 Halocabons 5035 Prep 7.00$ 38 $266.00 SPLP Bottle Extraction EPA 1312 (Zero headspace) 55.00$ to be prepared as WCD -- VOHs SPLP EPA 8260 73.00$ to be prepared as WCD -- Sample Shipping Small Cooler (overnight) 110.00$ 2 (water and soil) $220.00

Soil analysis has a short hold time TOTAL LAB $3,333.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 1 $40.00

Ice (sample shipping) 6.50$ each 4 $26.00 Analytical Related Shallow groundwater samplin 290.00$ day 1 $290.00

Tubing, HDPE 0.30$ ft 30 $9.00 Tubing, silicon (3/16 x 3/8) 3.00$ ft 1 $3.00

235.00$ day 0 (supplied by driller) $0.00 Encore Sampler 16.00$ each 38 $608.00 Terra Core Sampler 11.00$ each 38 $418.00

Other Photoionization Meter 88.00$ day 1 $88.00 Other Circular Plates 77.75$ each 2 WCD #1 $155.50 IDW 55-gallon drum, new 100.00$ drum 0 (supplied by driller) $0.00

TOTAL EQUIPMENT $1,637.50

Soil sampling kit (through concrete)

SITE : Vicks Cleaners, ERIC_4650 SUBTASK 3: Supplemental Site Assessment / SRCO Report FINAL

PROPOSAL NO. PHF247051

DATE: 6/10/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Report Deliverable Senior Scientist SO 9.00

Project Scientist KP 3.00

Project Scientist SO 1.50 Senior Scientist/Geologist SO Review and Summarize Water Quality Parameters 0.50 Senior Scientist/Geologist SO Review and Summarize Soil/Groundwater Analytical Results 2.00 Senior Geologist TL Conclusions/Recommendations 2.00 Senior Geologist TL Sign and Seal the Supplemental Assessment Report 1.00 GIS Technician CF Prepare soil base map, create updated exhibits (soil and groundwater) 5.00 Admin JB 4.00

Staff Total hours

TL 3.00

JB 4.00

SO 13.00

CF 5.00

KP 3.00

Total: 28.00 TOTAL LABOR 28.00

Prepare draft report introduction, site history, recent activities summary, and discussion of historical and current soil and groundwater results (SRCO) Summary data into the existing historical soil and groundwater tables, prepare draft exhibits QA/QC field and laboratory data

Formating report and tables, assembling of exhibits and appendicies to be assembled in a pdf format

FDEP COST ESTIMATE

Contractor: Terracon DELTA

Date: 6/10/2024 Task #: SubTask 1 Project Management SubTask 6

Site: Vicks Cleaners, ERIC_4650 SubTask 2 Soil/Groundwater Sampling and Analysis SubTask 7 Activity/Phase: Soil/GW Sampling and Reporting SubTask 3 Supplemental Site Assessment Report / SRCO SubTask 8

Project Manager: Mubeen Darji SubTask 4 SubTask 9 SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$75.48 Project Manager Tom Lewis 0.00 0.00 $31.71 Administrative Julie Brown 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Brownfield Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$33.31 CADD Specialist Chelsea Fugate 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Data Analyst & Visualization Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Environmental Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$26.20 Field Scientist Renee Eddins 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 GIS Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$35.58 Project Scientist Kyle Parson 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$75.48 Senior Geologist Tom Lewis 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior GIS Analyst 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$49.52 Senior Scientist Sid O'Neal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Hours 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 116.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.263% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

FDEP COST ESTIMATEContractor: Terracon DELTA

Task #: SubTask 1 Project Management SubTask 6 Site: Vicks Cleaners, ERIC_4650 SubTask 2 Soil/Groundwater Sampling and Analysis SubTask 7

Activity/Phase: Soil/GW Sampling and Reporting SubTask 3 Supplemental Site Assessment Report / SRCO SubTask 8 Project Manager: Mubeen Darji SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Walker-Hill) ($95.00) ($95.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 IDW (Erwin Remediation) ($110.00) ($110.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal ($205.00) ($205.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee ($20.50) ($20.50) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost ($225.50) ($225.50) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $155.50 $155.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $155.50 $155.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal ($70.00) $0.00 ($70.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost ($70.00) $0.00 ($70.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

SITE : Vicks Cleaners, ERIC_4650 DELTA SUBTASK 2: Soil/Groundwater Sampling and Analysis

PROPOSAL NO. PHF247051

DATE: 6/10/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning for Soil and Groundwater Sampling Senior Scientist SO 0.00 Senior Scientist SO 0.00 Senior Scientist SO 0.00

Senior Scientist SO 0.00

Project Scientist KP Load/unload and calibrate equipment 0.00 Project Scientist KP Mobilization/Demobilization (from Pensacola), 2 days (soil and gw sampling) 0.00 Project Scientist RE Mobilization/Demobilization (from Pensacola), 1 days (soil sampling) 0.00 Project Scientist KP 0.00

Project Scientist RE 0.00

Project Scientist KP Collect depth to water samples (6 well, 10 minutes) 0.00 Project Scientist KP Collect groundwater sample (1 well, 1.5 hours each) 0.00 Project Scientist KP Containerize IDW, collect drum sample, secure drum with chains / lock 0.00 Coordinate IDW T&D Senior Scientist SO 0.00 Project Scientist KP Mobilization/Demobilization (from Pensacola) 0.00 Project Scientist KP 0.00 Staff Total hours

TL 0.00

KP 0.00

SO 0.00

RE 0.00

Total: 0.00 TOTAL LABOR 0.00

VEHICLE TYPE RATE UNIT USEAGE

Truck (groundwater/soil samp 120 day 0 $0.00 Truck (IDW pickup) 120 day 0 $0.00

TOTAL VEHICLE $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Erwin Remediation Soil IDW Disposal 110.00$ each 0 $0.00 Erwin Remediation Soil IDW Disposal 110.00$ each -1 ($110.00) Erwin Remediation Groundwater IDW Disposal 125.00$ each 0 $0.00 Walker-Hill DPT/Hand Augering 2,395.00$ each 0 $0.00 Walker-Hill DPT/Hand Augering 95.00$ each -1 ($95.00)

TOTAL ($205.00)

Daily safety debrief, collect soil samples from hand auger soil borings and collect 7 samples per boring for laboratory analysis (Halocarbons and SPLP prep sample).

Prepare waste characterization/Generator Profile

Coordinate IDW T&D: Meet transporter to unlock secure area for pickup

Request sample kit Update Health and Safety Plan PreTask Coordination: Verify property owner is the same as on the access agreement, contact property owner and FDEP of field activity schedule (building interior core drilling), designate IDW staging area (drum stolen in the past) Review preliminary soil VOC data to determine if SPLP tests need to be completed, contact the FDEP with suggested samples for SPLP analysis, prepare WCD as necessary

Soil and Groundwater Sampling: 2 soil borings interior of building, sample collection from SB002 at 5 and 6.5 ft bgs, and SB003 at 1

ft. 5 soil borings on the perimeter of the former excavation area, with soil sample collection at 0.5, 2,4,6,8,10 ft bgs and 1 ft above water table. Measure depth to groundwater in 6 MW's, and collect 1 GW sample from MW039R for 8260 Halocarbons.

Direct work, daily safety debrief, record lithological descriptions, perform OVA-PID screening on soil samples, assist with core drilling and hand augering of 7 soil borings

SITE : Vicks Cleaners, ERIC_4650 DELTA SUBTASK 2: Soil/Groundwater Sampling and Analysis

PROPOSAL NO. PHF247051

DATE: 6/10/2024

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Halocarbons (GW) EPA 8260 73.00$ 0 $0.00 Halocarbons Soil EPA 8260 73.00$ 0 $0.00 Halocabons 5035 Prep 7.00$ 0 $0.00 SPLP Bottle Extraction EPA 1312 (Zero headspace) 55.00$ to be prepared as WCD -- VOHs SPLP EPA 8260 73.00$ to be prepared as WCD -- Sample Shipping Small Cooler (overnight) 110.00$ 0 (water and soil) $0.00

Soil analysis has a short hold time TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 0 $0.00

Ice (sample shipping) 6.50$ each 0 $0.00 Analytical Related Shallow groundwater samplin 290.00$ day 0 $0.00

Tubing, HDPE 0.30$ ft 0 $0.00 Tubing, silicon (3/16 x 3/8) 3.00$ ft 0 $0.00

235.00$ day 0 (supplied by driller) $0.00 Encore Sampler 16.00$ each 0 $0.00 Terra Core Sampler 11.00$ each 0 $0.00

Other Photoionization Meter 88.00$ day 0 $0.00 Other Circular Plates 77.75$ each 2 $155.50 IDW 55-gallon drum, new 100.00$ drum 0 (supplied by driller) $0.00

TOTAL EQUIPMENT $155.50

Soil sampling kit (through concrete)

FDEP COST ESTIMATE ORIGINAL

Contractor: Terracon

Date: 6/10/2024 Task #: SubTask 1 Project Management SubTask 6

Site: Vicks Cleaners, ERIC_4650 SubTask 2 Soil/Groundwater Sampling and Analysis SubTask 7 Activity/Phase: Soil/GW Sampling and Reporting SubTask 3 Supplemental Site Assessment Report / SRCO SubTask 8

Project Manager: Mubeen Darji SubTask 4 SubTask 9 SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$75.48 Project Manager Tom Lewis 4.52 4.52 $31.71 Administrative Julie Brown 4.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Brownfield Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$33.31 CADD Specialist Chelsea Fugate 5.00 0.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Data Analyst & Visualization Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Environmental Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$26.20 Field Scientist Renee Eddins 11.50 11.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 GIS Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$35.58 Project Scientist Kyle Parson 21.50 18.50 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$75.48 Senior Geologist Tom Lewis 3.00 0.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior GIS Analyst 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$49.52 Senior Scientist Sid O'Neal 21.00 8.00 13.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Hours 70.52 4.52 38.00 28.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $2,967.40 $341.38 $1,355.69 $1,270.33 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 116.00% $3,442.18 $396.00 $1,572.60 $1,473.58 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.263% $1,669.55 $192.07 $762.75 $714.73 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $8,079.13 $929.45 $3,691.04 $3,458.64 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

FDEP COST ESTIMATEContractor: Terracon

Task #: SubTask 1 Project Management SubTask 6 Site: Vicks Cleaners, ERIC_4650 SubTask 2 Soil/Groundwater Sampling and Analysis SubTask 7

Activity/Phase: Soil/GW Sampling and Reporting SubTask 3 Supplemental Site Assessment Report / SRCO SubTask 8 Project Manager: Mubeen Darji SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Walker-Hill) $2,395.00 $2,395.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 IDW (Erwin Remediation) $235.00 $235.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $2,630.00 $2,630.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $263.00 $263.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $2,893.00 $2,893.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $3,113.00 $3,113.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $220.00 $220.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $3,333.00 $3,333.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $66.00 $66.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,328.00 $1,328.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $88.00 $88.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,482.00 $1,482.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $16,147.13 $929.45 $11,759.04 $3,458.64 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $807.91 $92.95 $369.10 $345.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $16,955.04 $1,022.40 $12,128.14 $3,804.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Site Name: Site ID #:

Contract #: Contractor:

• Reason for Work Change Directive :

• Description of Work Change Directive :

• Attachments (if applicable, list documents supporting change):

• Costs (if negotiated unit costs, provide information below):

Authorized Contractor Signature:

Authorized FDEP Signature:

FDEP Supervisor Approval:

(if applicable)

Additional work is not authorized without prior FDEP approval as indicated by an approved Work Change Directive Form or Task Assignment Change Order Form. It is the Contractor's responsibility to ensure that additional costs associated with this WCD are resolved by a Task Assignment Change Order (TACO) prior to the completion date of the original Task Assignment or subsequent TACOs completed prior to the execution date of this WCD. Failure to do so will result in a loss of reimbursement for work associated with this WCD.

Task Assignment #: Work Change Directive #:

Maximum Estimated Increase in Task Amount:

Vicks Cleaners ERIC_4650

HW687 Terracon

DC003C 1

We are tasked to advance two soil borings within the interior building which is currently being used as a beauty shop, modernized with new vinyl flooring.

Coordinated with owner to install a metal/brass circular plates over the core drilled hole.

Purchase two metal/brass circular plates to cover the core drilled holes.

$77.75 x 2 = $155.50

$ 200.00

Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=General Users, email=Donna.Cline@terracon.com Date: 2024.12.11 02:24:31 -05'00'

Cline, Donna L

Gabriel M Sostre Digitally signed by Gabriel M Sostre Date: 2024.12.11 13:58:43 -05'00'

Digitally signed by Jennifer Farrell Date: 2024.12.12 08:21:30 -05'00'

Sostre, Gabriel

From: Brown, Julie A. <Julie.Brown@terracon.com> Sent: Friday, February 21, 2025 8:08 AM To: Sostre, Gabriel Cc: Cline, Donna L; O'Neal, Sid L Subject: RE: Request for HW687 TACO-02 DC003C Vicks Cleaners ERIC_4650 Attachments: HW687 TACO-02 DC003C Vicks Cleaners ERIC_4650 final.pdf; HW687 TACO-02 DC003C Vicks

Cleaners ERIC_4650.xlsx

Follow Up Flag: Follow up Flag Status: Flagged

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Good morning Gabriel – my apologies, attached please nd corrected TACO #2 for above. . It includes the following for Subtask 2;

• Reduction in Erwin Remediation and Walker-Hill invoices; and

• Addition for circular plates in accordance with WCD #1.

Let me know if you need anything else. Thank you for your help. Julie

From: Sostre, Gabriel <Gabriel.Sostre@floridadep.gov> Sent: Wednesday, February 19, 2025 3:14 PM To: Brown, Julie A. <Julie.Brown@terracon.com> Cc: Cline, Donna L <Donna.Cline@terracon.com>; O'Neal, Sid L <Sid.O'neal@terracon.com> Subject: RE: Request for HW687 TACO-01 DC003C Vicks Cleaners ERIC_4650

Hi all, I think this one is supposed to be TACO #2. If I recall correctly, TACO #1 was for a time extension that was approved sometime in December of last year. Can Terracon amend the sent TACO to re ect this and include the relevant pages from TACO #1?

Thanks, Gabriel Sostre Environmental Specialist II Waste Management/Waste Site Cleanup Section Florida Department of Environmental Protection Gabriel.Sostre@FloridaDEP.gov Office: 850-245-8749

Contractor Contractor Contractor Contractor

Completion Completion

Contractor

Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=General Users, email=Donna.Cline@terracon.com Date: 2024.12.10 09:44:35 -05'00'

Cline, Donna L

HW687

DC003C

Subtasks 3 & 1: SSAR & PM

Subtask 2: Field Notes Deliverable including field notes, boring logs, and groundwater sampling log 01/10/2025

02/28/2025

Subtask 2: Upon receipt and FDEP approval of Field Notes Deliverable including field notes, boring logs, and groundwater sampling log

Subtasks 3 & 1: Upon receipt and FDEP approval of SSAR & PM

$ 12,128.14

$ 4,826.90

$ 16,955.04