This document is a Task Assignment (TA) under Contract Number HW687 between the State of Florida Department of Environmental Protection (FDEP) and Terracon Consultants, Inc. The task assignment, numbered BF01A, was executed on May 20, 2022, with an effective completion date of August 19, 2022. The work is being conducted at the Former Rose Printing Company site located at 2503 Jackson Bluff Road, Tallahassee, Leon County, Florida (Site ID ERIC_18047). Services are being funded through federal funds from the State & Tribal Response Program (SRP) cooperative agreement administered by FDEP on behalf of the U.S. Environmental Protection Agency (EPA). The Department Project Manager is Megan Johnson (850.245.8994), and the Contractor's Project Manager is Tom Lewis (850.692.7194).
The task assignment authorizes Terracon to conduct a Supplemental Site Assessment comprising four subtasks: (1) Project Management at a cost of $1,252.52; (2) Development of a Quality Assurance Project Plan (QAPP), Workplan, and Health and Safety Plan (HASP) at a cost of $2,652.73, with deliverable due June 1, 2022; (3) Groundwater sampling and analysis at fourteen locations using direct push technology (DPT), including deeper aquifer sampling to approximately 45 feet below ground surface, with laboratory analysis for BTEX, PAHs, lead, and TRPH at a cost of $14,235.49, with deliverable due June 24, 2022; and (4) Preparation of a Supplemental Site Assessment Report at a cost of $3,639.06, with final deliverable due July 18, 2022. The total Task Assignment value is $21,779.80 on a fixed unit rate basis. Invoicing is structured in three phases corresponding to departmental approval of each deliverable component.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW687
BF01A Completion August 19, 2022
The Department approves this Task Assignment (TA) based upon the Cost Proposal and Level of Effort (CP/LOE) for the completion of a Supplemental Site Assessment submitted to the Department on May 18, 2022, revised May 19, 2022 by Terracon Consultants, Inc., for the below referenced site. The final deliverable will be a Supplemental Site Assessment Report received by the Department no later than July 18, 2022.
Megan Johnson 850.245.8994 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Terracon Consultants, Inc.
Terracon Consultants, Inc.
Tom Lewis 850.692.7194
ERIC_18047
2503 Jackson Bluff Road, Tallahassee, Leon County
Former Rose Printing Company
✔ $ 21,779.80
$ 21,779.80
Scope of Work
Donna Cline, P.E.
Senior Remediation Engineer
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2022.05.20 14:43:05 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
QAPP/Work Plan and HASP 06/01/2022
Field notes, photographic log, chain of custody, groundwater sampling logs 06/24/2022
Project Management and Supplemental Site Assessment Report 07/18/2022
Department approval of QAPP/ Work Plan and HASP (Subtask 2) $ 2,652.73
Department approval of field notes, photographic log, chain of custody, and groundwater sampling logs (Subtask 3) $ 14,235.49
Department approval of Project Management and Supplemental Site Assessment Report (Subtasks 1 and 4) $ 4,891.58
$ 21,779.80
HW687
BF01A
www.FloridaDEP.gov
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Terracon Consultants, Inc., HW687 Contract File
FROM: Megan Johnson, Contract Manager
DATE: May 20, 2022
SUBJECT: Negotiation Summary – SRP18 Task Assignment (TA) BF01A
Former Rose Printing Company – Site ID # ERIC_18047 Supplemental Site Assessment Activities
This TA is intended for conducting Supplemental Site Assessment activities at the Former Rose Printing Company site, located at 2503 Jackson Bluff Road, Tallahassee, Leon County, Florida 32304. The services under this task are being conducted using federal funds from the State & Tribal Response Program (SRP) cooperative agreement that is administered by the Department on behalf of the U.S. Environmental Protection Agency (EPA).
Subtask 1: Project Management This subtask is a percentage of the overall project fees and has been negotiated as a contract rate. It includes project management, overhead, general and administrative, and fringe. The agreed upon cost of this subtask is $1,252.52.
Subtask 2: QAPP/Work Plan and Health and Safety Plan In accordance with an EPA directive, this subtask includes the completion of a Quality Assurance Project Plan (QAPP)/Work Plan and a Health and Safety Plan (HASP). The QAPP/Work Plan will provide a brief summary of the scope of work, tables and figures showing the proposed sampling locations, and laboratory and field quality assurance measures and procedures. The agreed upon cost of this subtask is $2,652.73.
Subtask 3: Supplemental Site Assessment Activities Under this subtask, Terracon will conduct direct push technology (DPT) groundwater profiling, sampling at fourteen select locations on site. One boring inside the building and one boring outside the building will additionally be advanced to approximately 45 feet below ground surface for collection of deeper aquifer sample for vertical profiling. Collected groundwater samples will be laboratory analyzed for benzene, toluene, ethylbenzene and xylene (BTEX) by EPA Method 8260, polycyclic aromatic hydrocarbons (PAHs) by EPA Method 8270, lead by EPA Method 6010, and total recoverable petroleum hydrocarbons (TRPH) by FL PRO. The agreed upon cost of this subtask is $14,235.49.
Subtask 4: Supplemental Site Assessment Report A Supplemental Site Assessment Report will be prepared detailing the field and laboratory results. This report will also include figures, maps, tables, and conclusions and recommendations for any future work. The agreed upon cost of this subtask is $3,639.06.
http://www.floridadep.gov/
Negotiation Summary – Task Assignment (TA) BF01A Former Rose Printing Company
ERIC_18047
May 20, 2022 www.FloridaDEP.gov
Summary The Department’s SRP Contract Manager and Terracon’s Contract Manager have both agreed to the scope of work and associated costs. The final cost associated with this TA is $21,779.80. Documentation of these costs is included in the Cost Proposal/Level of Effort (CP/LOE) Form and CP/LOE narrative provided by Terracon on May 18, 2022, revised May 19, 2022 and the Task Assignment Form for BF01A prepared by the Department. The final deliverable must be received by the Department no later than July 18, 2022.
http://www.floridadep.gov/
3559 Timberlane School Rd
Tallahassee, FL 32312
P (850) 692-7185
F (850) 692-7186
Terracon.com
May 19, 2022
Florida Department of Environmental Protection
Waste Cleanup Program-Waste Management Division
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Attn: Ms. Megan R. Johnson, Environmental Consultant
Brownfields and CERCLA Site Screening Section
E: Megan.R.Johnson@floridadep.gov
W: 850-245-8994
Re: Proposal for Supplemental Site Assessment
Former Rose Printing Company
2503 Jackson Bluff Road
Tallahassee, Leon County, Florida
Terracon Proposal No. PHF227047
Task # BF01A
Dear Ms. Johnson:
Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this proposal to the
Florida Department of Environmental Program (FDEP) Waste Cleanup Section to conduct a
Supplemental Site Assessment for the Former Rose Printing Company facility located at 2503 Jackson
Bluff Road in Tallahassee, Florida. These activities will be performed as approved by both FDEP and the U.S. Environmental Protection Agency (U.S. EPA) for utilizing Targeted Brownfield Assessment/Site
Specific Activities (TBA/SSA) federal funding administered by FDEP.
Scope of Services
(see Section 2.0 of attached
Proposal Detail)
◼ Develop a Workplan / Quality Assurance Project Plan (QAPP) and
Health and Safety Plan (HASP) and two (2) days of direct push groundwater profiling inside building and north of building at fourteen
(14) locations.
◼ Review data and prepare a Supplemental Site Assessment Report with tables and concentration exhibits sealed by a Professional
Geologist.
See attached LOE for details
Schedule
(see Section 4.0 of attached
Proposal Detail)
Deliverable of Workplan and QAPP within 5 business days of authorization;
Deliverable of field notes, photolog, and chain of custody within 2 business days of completion of field work;
Deliverable Supplemental Site Assessment within 20 business days following receipt of laboratory results.
Compensation
(see Section 4.0 of attached
Proposal Detail)
See attached CEF for details.
mailto:Megan.R.Johnson@floridadep.gov
Proposal for Supplemental Site Assessment and Preparation of Report
Former Rose Printing Company ■ Tallahassee, FL
May 19, 2022 ■ Terracon Proposal No. PHF227047
PROJECT INFORMATION
Prior to being redeveloped as a printing shop in the late 1950s, the site was occupied by the Dale
Mabry Army Airfield during the 1940s and 1950s to train pilots and air crews during World War II.
During site operations as Dale Mabry Army Airfield, the area of the site served as location for bunkered underground storage tanks (USTs) that transported fuel in an underground pipeline to a fuel depot adjacent to a runway northwest of the site.
According to the Final Site Assessment Report - Site Assessment and Pipeline Abandonment Former
Dale Mabry Army Airfield Tallahassee, Leon County, Project No. I04FL0117-01, dated May 2016, prepared by Aerostar SES, LLC (Aerostar), this specific area of the fueling operations was identified as
“Site B”. Site B consisted of thirteen (13) 25,000-gallon USTs. It is believed that the north portion of this former tank area is north of the former Rose Printing Building and under the northwest corner of the former Rose Printing Building. Prior assessments performed at the site confirmed exceedances above the FDEP Cleanup Target Levels for soil and groundwater have been identified in this area. The reports reviewed suggest that the USTs and the pipeline were abandoned sometime prior to the site being occupied by Rose Printing. Only benzene, toluene, ethylbenzene, xylenes (BTEX) and lead were analyzed for in this prior groundwater assessment.
In a May 19, 2017 letter from FDEP to the U.S. Army Corp of Engineers (USACE), FDEP did not concur with the USACE recommendation for Site B and indicated the USACE “needs to conduct additional assessment activities at the site, and fully characterize and define the site’s groundwater plume, before the Department can determine if Site B qualifies for non-eligibility status”. This investigation was not performed.
In the fall of 2019, utilizing funds available from their US EPA Community Brownfield Assessment grant, the City of Tallahassee (City) contracted Terracon to perform Phase I and II Environmental Site
Assessment (ESA) activities prior to acquiring the site for redevelopment. Direct push sampling inside the building indicated significant groundwater impacts extended south of the former tank area under the building.
On March 3, 2022, FDEP approved the City’s application for further assessment and cleanup of this former airfield site. This following scope has been prepared to provide both an update to current onsite monitoring well data as well as perform additional horizontal and vertical extent profiling of the impacts to groundwater underneath the building and on the north portion of the site. The goal of this study is to provide an update to the original May 19, 2017 request by FDEP to the USACE and serve as an initial remedial planning tool for additional assessment and cleanup approaches to be implemented after the building’s demolition later in 2022.
SCOPE OF SERVICES
Based on prior discussions on phone and email, the proposed scope of services consists of four subtasks involving Project Management, developing a Workplan / QAPP and HASP, two-days of direct push technology (DPT) groundwater profiling, and producing a Supplemental Site Assessment Report:
Subtask Description
Subtask 1: Project Management This scope is provided for in the template worksheets
Subtask 2:
Workplan/QAPP/HASP
Develop a Workplan and Quality Assurance Project Plan and Health and
Safety Plan prior to field work for approval by FDEP
Subtask 3. Groundwater
Sampling and Analysis
▪ Mobilization to the site for two consecutive days.
▪ Supervise DPT groundwater sampling at eight (8) locations north of the building and six (6) locations within the building (estimated water is 20 feet below ground surface). One (1) boring inside the building and one (1) boring outside the building will be advanced to approximately 45 feet below ground surface for collection of deeper aquifer sample for vertical profiling.
▪ Collected groundwater samples will be laboratory analyzed for benzene, toluene, ethylbenzene and xylene (BTEX) by EPA Method
8260, polycyclic aromatic hydrocarbons (PAHs) by EPA Method
8270, lead by EPA Method 6010 and Total Recoverable Petroleum
Hydrocarbons (TRPH) by FL PRO. The analysis will be performed using a National Environmental Laboratory Accreditation Conference
(NELAC) approved laboratory.
Subtask 4. Supplemental Site
Assessment Report
▪ Prepare a Supplemental Site Assessment Report with site history, methodology, conclusions, recommendations, tables, sample locations and concentration exhibits, sealed by a Professional
Geologist
SCHEDULE
It is estimated that the workplan, QAPP, and HSP can be submitted within five days of authorization and the DPT groundwater profiling can be implemented by mid-June 2022. A Supplemental Site
Assessment Report can be issued within 20 business days of receipt of laboratory analytical results.
CLOSING REMARKS
Terracon services will be conducted in accordance with the terms and conditions, contained within DEP
Waste Cleanup Program (WCP) Contract No. HW687, executed January 5, 2022. It is understood that a Task Assignment will be issued to authorize us to perform this work.
We appreciate the opportunity to provide this proposal and look forward to working with you on this project. If you should have any questions or comments regarding this proposal, please contact either of the undersigned at 850-692-7185.
Sincerely, Terracon Consultants, Inc.
for Donna Cline, P.E. Tom Lewis, P.G.
Senior Remediation Engineer Principal
Attachments: Exhibit 1
Cost Spreadsheet
Level of Effort
Drill Bids
EXHIBIT 1 – WELLS AND PROPOSED SAMPLING LOCATIONS
FDEP COST ESTIMATE
Contractor: Terracon
Date: 5/19/2022 Task #: BF01A SubTask 1 Project Management SubTask 6
Site: Former Rose Printing Company TBA SubTask 2 QAPP and HASP SubTask 7 Activity/Phase: TBA and Reporting SubTask 3 Groundwater Sampling and Analysis SubTask 8
Project Manager: Megan Johnson SubTask 4 Site Assessment Report SubTask 9 SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$70.19 Project Manager Tom Lewis 6 6.0 $20.50 Administrative Ashley Miller 1 1 0 0 0 0 0 0 0 0 $69.71 Brownfield Consultant Belinda Richard 4 3 0 1 0 0 0 0 0 0 $20.50 CADD Specialist Oscar Encalada 4 0 0 4 0 0 0 0 0 0 $0.00 Data Analyst & Visualization Specialist 0 0 0 0 0 0 0 0 0 0 $0.00 Environmental Technician 0 0 0 0 0 0 0 0 0 0 $0.00 Field Geologist 0 0 0 0 0 0 0 0 0 0 $0.00 Field Scientist 0 0 0 0 0 0 0 0 0 0 $0.00 GIS Technician 0 0 0 0 0 0 0 0 0 0 $0.00 Principal Consultant 0 0 0 0 0 0 0 0 0 0 $0.00 Project Geologist 0 0 0 0 0 0 0 0 0 0 $0.00 Project Industrial Hygienist 0 0 0 0 0 0 0 0 0 0
$26.92 Project Scientist 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Engineer 0 0 0 0 0 0 0 0 0 0
$70.19 Senior Geologist Tom Lewis 4 1 0 3 0 0 0 0 0 0 $0.00 Senior GIS Analyst 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Industrial Hygienist 0 0 0 0 0 0 0 0 0 0
$45.19 Senior Scientist Sid O'Neal 35 1 18 16 0 0 0 0 0 0 $0.00 Staff Engineer 0 0 0 0 0 0 0 0 0 0
$21.63 Staff Scientist Tommy Grey 45 25 14 6 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 99 6 31 32 30 0 0 0 0 0 0
Direct Labor $3,635.32 $418.22 $885.76 $1,116.24 $1,215.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 116.00% $4,216.98 $485.14 $1,027.48 $1,294.84 $1,409.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.26% $2,045.24 $235.29 $498.33 $628.00 $683.62 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $9,897.54 $1,138.65 $2,411.57 $3,039.08 $3,308.24 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 1
FDEP COST ESTIMATEContractor: Terracon Date: 5/19/2022
Task #: BF01A SubTask 1 Project Management SubTask 6 Site: Former Rose Printing Company TBA SubTask 2 QAPP and HASP SubTask 7
Activity/Phase: TBA and Reporting SubTask 3 Groundwater Sampling and Analysis SubTask 8 Project Manager: Megan Johnson SubTask 4 Site Assessment Report SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $300.00 $0.00 $300.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $300.00 $0.00 $300.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $4,335.00 $0.00 $4,335.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $200.00 $0.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $4,535.00 $0.00 $4,535.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $453.50 $0.00 $453.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $4,988.50 $0.00 $4,988.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $4,336.00 $0.00 $4,336.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $140.00 $0.00 140.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $4,476.00 $0.00 $4,476.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $70.00 $0.00 $70.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $0.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $978.00 $0.00 $978.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,128.00 $0.00 $1,128.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $20,790.04 $1,138.65 $2,411.57 $13,931.58 $3,308.24 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $989.76 $113.87 $241.16 $303.91 $330.82 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $21,779.80 $1,252.52 $2,652.73 $14,235.49 $3,639.06 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Former Rose Printing SUBTASK 2: QAPP and HASP
PROPOSAL NO. PHF227047
DATE: 5/19/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
HASP
Senior Scientist SO 1.00 Staff Scientist TG 3.00
QAPP
Staff Scientist TG 22.00 Senior Geologist TL 1.00
Brownfields Consultant BR QA/QC and Review 3.00
Admin Admin AM Project files set-up 1
TOTAL LABOR 31
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Review Prepare Health and Safety Plan
Prepare QUAPP Review
SUBTASK 3: GW Sampling
PROPOSAL NO. PHF227047
DATE: 5/19/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning and Groundwater Sampling Senior Scientist SO 3.00
Staff Scientist TG 2 days loading/unload mobilization 2.00 Senior Scientist SO 2 days loading/unload mobilization 2.00 Staff Scientist TG Two days of DPT groundwater sampling oversite 14 locations 11.00 Senior Scientist SO Two days of DPT groundwater sampling oversite 14 locations 11.00
Coordinate IDW T&D Senior Scientist SO 2.00 Field Scientist TG 1.00
TOTAL LABOR 32
VEHICLE TYPE RATE UNIT USEAGE
Truck (sampling) 120 day 2 $240.00 Truck (IDW pickup) 120 day 0.5 $60.00
TOTAL VEHICLE $300.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
Erwin Remediation IDW Disposal 100.00$ each 2 $200.00 JSA DPT 4,335.00$ each 1 $4,335.00
TOTAL $4,535.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Aromatic VOCs EPA 8260D 60.00$ 16 0 0 $960.00
PAHS EPA 8270 110.00$ 16 $1,760.00
TRPH FL PRO 88.00$ 16 $1,408.00
Lead EPA 6010 13.00$ 16 $208.00 Sample Shipping Large Cooler (2 day) 70.00$ 2 $140.00
PreTask Planning, prepare field sampling SOW/coordinate site access, kit
Prepare waste characterization/Generator Profile Coordinate IDW T&D: Meet transporter to unlock secure area for pickup
SUBTASK 2: GW Sampling
PROPOSAL NO. PHF227047
DATE: 5/19/2022
Sample Shipping -$ 0 $0.00
TOTAL LAB $4,476.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Shallow groundwater sampling kit290.00$ day 2 $580.00 Tubing, HDPE 0.30$ ft 430 $129.00 Tubing, silicon (3/16 x 3/8) 3.00$ ft 23 $69.00 PPE 35.00$ day 2 $70.00 Expendables 40.00$ day 2 $80.00 Multimeter (YSI ProPlus) 105.00$ day 0 $0.00 Turbidimeter (Hach) 27.00$ day 0 $0.00 water level indicator 25.00$ day 0 $0.00 Pump, peristaltic 30.00$ day 0 $0.00 Lock, key operated 7.00$ ea 0 $0.00 55-gallon drum, new 100.00$ drum 2 $200.00
$0.00
TOTAL EQUIPMENT $1,128.00
SUBTASK 3: GW Sampling
PROPOSAL NO. PHF227047
DATE: 5/19/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning Senior Scientist SO 1.00 Senior Geologist TL 1.00
Deliverable Field Scientist TG 6.00 Senior Scientist/Geologist SO Review and Summarize Water Quality Parameters 3.00 Senior Scientist/Geologist SO Review and Summarize Groundwater Analytical Results 2.00 Senior Scientist SO 10.00
QA/QC and Review Brownfields Consultant BR QA/QC 1.00 Senior Scientist/Geologist TL Review and Seal Report 2.00
CADD
Project Scientist OE Create updated exhibits 4.00
TOTAL LABOR 30.00
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE -$
PER DIEM STAFF RATE UNIT USEAGE
$0.00 -$
TOTAL PER DIEM -$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
TOTAL -$
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC* #IDW TOTALS
TOTAL LAB -$
* No charge for trip blanks, only one duplicate
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT -$
Review data Review data
Data reduction/evaluation/Tables
Prep of Report
File details come from the government source that posted it. Updated .