This document is a Task Assignment Change Order (TACO) Number 2 issued by the State of Florida Department of Environmental Protection (FDEP) for contract HW687 with Terracon Consultants, Inc. The project involves supplemental site assessment and remediation activities at the Broward County School Board Property in Plantation, Florida (Site ID: ERIC_18360). The contract manager for FDEP is Megan Johnson, and the contractor's project manager is Shawn Ouellette. The TACO was executed in April 2026 and amends the original Task Assignment (BIL02C) to reconcile work authorized under three Work Change Directives (WCDs) issued between January and February 2026.
The TACO increases the total task assignment value from $15,189.75 to $48,896.49, representing a cost increase of $33,706.74. This increase encompasses: Subtask 5 (Supplemental Soil Assessment under WCD #1) with an increase of $13,566.62 for additional soil sampling, GPR locating, drilling, laboratory analysis, and updated excavation calculations; Subtask 6 (Voluntary Source Removal Plan under WCD #1) with an increase of $2,861.85 for plan development; Subtask 7 (TCLP Analysis under WCD #2) with an increase of $1,750.00 for specialized laboratory analysis of ten samples; and Subtask 8 (Additional Supplemental Soil Analysis under WCD #3) with an increase of $13,358.03 for further soil sampling, waste profile preparation, and updated remedial analysis. The task assignment completion date was extended from January 12, 2026 to June 26, 2026, a total of 57 additional days. Deliverables include field documentation, site assessment reports, remedial alternatives evaluations, and a voluntary source removal plan, with invoicing contingent upon FDEP approval of each deliverable component.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
BIL02C 2 HW687
This Task Assignment Change Order (TACO) reconciles Work Change Directives (WCD) #1, 2, and 3, authorizes time extensions for the task assignment completion date and final deliverable due date. This TACO adds a Voluntary Source
Megan Johnson 850.245.8994 Contractor Terracon Consultants, Inc. Contractor
Contractor Shawn Ouellette Contractor 561.689.4299
ERIC_18360
Broward County School Board Property - Plantation
✔ $ 48,896.49 $ 15,189.75
$ 48,896.49 $ 15,189.75
Completion ✔ Completion 04/30/2026 06/26/2026 57
✔ 1 1 1
Terracon Consultants, Inc.
Contractor Donna Cline, P.E.
Senior Remediation Engineer
04/14/2027
Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=Domain Users, email=Donna.Cline@terracon.com Date: 2026.04.14 17:16:38 -04'00'
Cline, Donna L
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2026.04.14 10:03:34 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW687
BIL02C
$ 48,896.49
Field notes, photographic log, chain of custody, and sampling logs from surface water and sediment sampling event (Subtask 2)
Revised Supplemental Site Assessment Report (Subtask 3)
Remedial Alternatives Evaluation (Subtask 4)
Field notes, photographic log, chain of custody, and sampling logs for all supplemental soil assessment events authorized in WCD #1, 2, and 3 (Subtasks 5, 7, and 8)
Voluntary Source Removal Plan; Project Management (Subtasks 1 and 6)
Department approval of field notes, photographic log, chain of custody, and sampling logs from surface water and sediment sampling event (Subtask 2)
Department approval of Remedial Alternatives Evaluation (Subtask 4)
Department approval of field notes, photographic log, chain of custody, and sampling logs for all supplemental soil assessment events authorized in WCD #1, 2, and 3 (Subtasks 5, 7, and 8)
Department approval of Voluntary Source Removal Plan and Project Management (Subtasks 1 and 6)
Department approval of revised Supplemental Site Assessment Report (Subtask 3)
10/24/2025
03/20/2026
03/20/2026
04/30/2026
04/30/2026
$ 2,896.09
$ 2,591.85
$ 8,069.59
$ 28,674.65
$ 6,664.31 www.FloridaDEP.gov
FFLLORIDAA DDEEPARTMENTT OOFF
EEnvironmentall Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jay Collins Lt. Governor
Alexis A. Lambert Secretary
Memorandum TO: Terracon Consultants, Inc., HW687 Contract File
FROM: Megan Johnson, Contract Manager
DATE: April 13, 2026
SUBJECT: Negotiation Summary – BIL22 Task Assignment (TA) Change Order #2 BIL02C C2 Broward County School Board Property – Site ID # ERIC_18360 Supplemental Site Assessment activities
This Task Assignment Change Order (TACO) reconciles work authorized under Work Change Directives (WCD) 1, 2, and 3, executed on January 8, 2026, January 30, 2026, and February 18, 2026, respectively. There are no scope or cost changes associated with Subtasks 2, 3, or 4.
Specific changes are detailed below:
Subtask 1: Project Management Under this subtask there was an increase in project management hours due to an increase in labor hours needed for the activities under Subtasks 5, 6, 7, and 8. This change resulted in a cost actual increase of $2,170.24.
Subtask 5: Supplemental Soil Assessment Following the submittal of the draft Remedial Alternatives Evaluation, Terracon, the Department, and Broward County held a meeting to discuss next steps. It was determined additional soil sampling was needed to better refine the future excavation boundaries. WCD #1 was approved for this additional sampling. This resulted in a cost actual increase of $13,566.62.
Subtask 6: Voluntary Source Removal Plan Additionally, under WCD #1, a Voluntary Source Removal Plan was requested by Broward County to define the scope and construction practices that will be employed. This resulted in a cost actual increase of $2,861.85.
Subtask 7: TCLP Analysis on Exceedances Following the receipt of preliminary laboratory results from the additional soil sampling done under Subtask 5, it was determined TCLP should be run on select samples for disposal evaluation. This was approved under WCD #2. This resulted in a cost actual increase of $1,750.00.
Subtask 8: Additional Supplemental Soil Analysis WCD #3 approved further supplemental soil sampling to refine excavation limits, update the Remedial Alternatives Evaluation, and to prepare and submit a waste profile to be utilized in the proposed Voluntary Source Removal Plan for identification of the disposal facility and costing. This resulted in a cost actual increase of $13,358.03.
Negotiation Summary – Task Assignment (TA) Change Order #2 BIL02C C2 Broward County School Board Property
ERIC_18360
April 13, 2026 www.FloridaDEP.gov
Summary The Department’s BIL Contract Manager and Terracon’s Contract Manager have both agreed to the above changes. All changes noted above represent a total overall cost increase of $33,706.74, as shown in the Final/Cost Actual LOE. Due to a rounding error in Excel, the Delta LOE states an overall cost increase of $33,706.72, however this was addressed in the Cost Actual LOE. The changes were noted in the TACO Request received from Terracon on April 8, 2026.
The final cost associated with this TA increased from $15,189.75 to $48,896.49. Documentation of the changes is included in the attached TACO Request, the Delta LOE spreadsheet and the Cost Actual LOE spreadsheet, and the TACO form for BIL02C C2 prepared by the Department.
FDEP COST ESTIMATE
Contractor: Terracon Final
Date: 4/7/2026 Task #: SubTask 1 Project Management SubTask 6 Voluntary Source Removal Plan WCD-1
Site: SBOBC PLANTATATION SITE SubTask 2 Surface Water and Sediment Sampling SubTask 7 TCLP Analysis on Exceedances WCD-2 Activity/Phase: SSA and Reporting SubTask 3 Revised SSAR SubTask 8 Additional Supplemental Soil Analysis WCD-3
Project Manager: Megan Johnson SubTask 4 Remedial Alternatives Analysis SubTask 9 SubTask 5 Supplemental Soil Assessment WCD-1 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$54.09 Project Manager Shawn Ouellette 23.47 23.47 $30.55 Administrative Danielle Adams 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.85 Brownfield Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $36.06 CADD Specialist Chelsea Fugate 25.00 0.00 5.00 8.00 4.00 4.00 0.00 4.00 0.00 0.00 $0.00 Data Analyst & Visualization Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$37.00 Environmental Technician Rob Siegel 8.50 8.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $54.09 Senior Geologist 10.00 0.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 0.00 $0.00 Field Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 GIS Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$72.79 Senior Engineer Donna Cline 22.00 0.00 0.00 12.00 4.00 0.00 0.00 6.00 0.00 0.00 $54.09 Senior Geologist Shawn Ouellette 58.00 4.00 8.00 0.00 21.00 5.00 0.00 20.00 0.00 0.00 $0.00 Senior GIS Analyst 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$44.25 Senior Scientist Jessica endicott 8.00 0.00 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $46.44 Senior Scientist Mike Mui 33.00 0.00 0.00 33.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Env Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$38.46 Senior Staff Scientist Jenna M 36.00 0.00 0.00 0.00 21.00 0.00 0.00 15.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 223.97 23.47 12.50 21.00 53.00 50.00 19.00 0.00 45.00 0.00 0.00
Direct Labor $11,036.24 $1,269.66 $530.86 $967.02 $2,694.48 $2,378.95 $955.59 $0.00 $2,239.68 $0.00 $0.00
Overhead 116.00% $12,802.04 $1,472.81 $615.80 $1,121.74 $3,125.60 $2,759.58 $1,108.48 $0.00 $2,598.03 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.260% $6,208.98 $714.31 $298.66 $544.05 $1,515.91 $1,338.40 $537.61 $0.00 $1,260.04 $0.00 $0.00 Total Labor $30,047.26 $3,456.78 $1,445.32 $2,632.81 $7,335.99 $6,476.93 $2,601.68 $0.00 $6,097.75 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 1
FDEP COST ESTIMATEContractor: Terracon Final
Date: 4/7/2026 Task #: SubTask 1 Project Management SubTask 6 Voluntary Source Removal Plan WCD-1
Site: SBOBC PLANTATATION SITE SubTask 2 Surface Water and Sediment Sampling SubTask 7 TCLP Analysis on Exceedances WCD-2 Activity/Phase: SSA and Reporting SubTask 3 Revised SSAR SubTask 8 Additional Supplemental Soil Analysis WCD-3
Project Manager: Megan Johnson SubTask 4 Remedial Alternatives Analysis SubTask 9 SubTask 5 Supplemental Soil Assessment WCD-1 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $600.00 $120.00 $0.00 $0.00 240.00$ $0.00 $0.00 240.00$ $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $600.00 $120.00 $0.00 $0.00 $240.00 $0.00 $0.00 $240.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) Jaee $3,550.00 $0.00 $0.00 $0.00 1,775.00$ $0.00 $0.00 $1,775.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities Geoview $900.00 $0.00 $0.00 $0.00 900.00$ $0.00 $0.00 $0.00 $0.00 $0.00 Erwin Remediation $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $4,450.00 $0.00 $0.00 $0.00 $2,675.00 $0.00 $0.00 $1,775.00 $0.00 $0.00 Handling Fee $355.00 $0.00 $0.00 $0.00 $177.50 $0.00 $0.00 $177.50 $0.00 $0.00 Total Subcontractor Cost $4,805.00 $0.00 $0.00 $0.00 $2,852.50 $0.00 $0.00 $1,952.50 $0.00 $0.00
Laboratory Analytical Costs $9,372.00 $654.00 $0.00 $0.00 2,940.00$ $0.00 1,750.00$ 4,028.00$ $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $150.00 $150.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $9,522.00 $804.00 $0.00 $0.00 $2,940.00 $0.00 $1,750.00 $4,028.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $120.00 $40.00 $0.00 $0.00 40.00$ $0.00 $0.00 40.00$ $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $38.00 $38.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $759.50 $0.00 $0.00 $0.00 369.50$ $0.00 $0.00 390.00$ $0.00 $0.00 Total Field Expenses $917.50 $78.00 $0.00 $0.00 $409.50 $0.00 $0.00 $430.00 $0.00 $0.00
Subtotal $45,891.76 $3,456.78 $2,447.32 $2,632.81 $7,335.99 $12,918.93 $2,601.68 $1,750.00 $12,748.25 $0.00 $0.00 Completion Fee $3,004.73 $345.68 $144.53 $263.28 $733.60 $647.69 $260.17 $0.00 $609.78 $0.00 $0.00
Total Estimated Cost $48,896.49 $3,802.46 $2,591.85 $2,896.09 $8,069.59 $13,566.62 $2,861.85 $1,750.00 $13,358.03 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : SBOBC Plantation Site BFO3B SUBTASK 2: Surface Water and Sediment Sampling Final
PROPOSAL NO. PHB247047
DATE: 9/2/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning and Coordination Senior Geologist SO 2.00
SO Pretask planning, Field Event preperation 2.00 Surface Water / Additional GW Sampling Env Technician RS Load/Unload 1.50 Env Technician RS Mobilization/Demobilization (from PSL) @ 4 hours round trip 3.00 Env Technician RS Collect Surface water samples from the OPWCD canal, prepare COC for laboratory drop off 2.00 Env Technician RS Collect two additional sediment samples from OPWCD Canal, prepare for laboratory drop off 2.00
Personnel: SO RS JE Hours: 4.00 8.50 0.00
TOTAL LABOR 12.50
VEHICLE TYPE RATE UNIT USEAGE
RS Truck (Surface water/ Gwsampling and IDW pick up) $120.00 days 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC IDW
Surface Water Arsenic EPA 6020 14.00$ 2 1 0 $42.00 OCPs EPA 8081 105.00$ 2 0 0 $210.00
Sediment Arsenic EPA 6020 14.00$ 2 1 0 $42.00 OCPs EPA 8081 105.00$ 2 0 0 $210.00
Sample Shipping Large Cooler 150.00$ 1 $150.00
TOTAL $654.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables 40.00$ day 1 $40.00 Personal Protection 35.00$ day 0 $0.00 Shallow GW Sampling Kit 290.00$ day 0 $0.00 Core Sampler 25.00$ day 1 $25.00 Tubing, HDPE 0.30$ ft 0 $0.00 Tubing, silicon (3/16 x 3/8) 3.00$ ft 0 $0.00 Ice (for samples) 6.50$ EA 2 $13.00 55-gallon drum, new 110.00$ drum 0 $0.00
TOTAL EQUIPMENT $78.00
Site access verification, Kick-off meeting/planning
SUBTASK 3: Revised SSAR Final
PROPOSAL NO. PHB247047
DATE: 9/2/2025
LABOR CATEGORY
STAFF-TITLE WORK DESCRIPTION HOURS
Review of Field Data Senior Scientist JE 2.00
Preparation of Draft SSAR Report, Tables and Figures Senior Geologist JE 6.00 and summarize in a SSAR.
Preparation of Report Senior Geologist SO 2.00 Senior Geologist SO Finalize tables and figures 4.00 Senior Geologist SO Finalize report to address all review comments 2.00
Figures and Drafting Senior CADD Technician CF Finalize Figures/Exhibits (updated groundwater OCP int. wells, updated soil maps - remove ref. 5.00 to Kleinfelder data and include SPLP results, figures/exhibist for surface water
Personnel: SO JE CF DC Hours: 8.00 8.00 5.00 0.00
TOTAL LABOR 21.00
VEHICLE TYPE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNIT USEAGE
TOTAL $0.00
LABORATORY COSTS
PARAMETER # SAMPLES #QAQC IDW
TOTAL LAB $0.00
EQUIPMENT ITEM COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Review Surface water and Soil sample Field Data
Draft response to comments to Broward County review, include updated sample results, Finalize Surface Water and sediment results
SUBTASK 4: Remedial Alternatives Analysis Final
PROPOSAL NO. PHB247047
DATE: 9/2/2025
LABOR CATEGORY
STAFF-TITLE WORK DESCRIPTION HOURS
Preparation of Report
Senior Scientist MM 15.00 cleanup alternatives
Senior Scientist MM Evaluate cleanup alternative, the cost for each of the proposed cleanup alternative, 12.00 and evaluate the regulatory path to closure
Figures and Drafting Senior CADD Technician CF Prepare exhibits illustrating the area and volume calculations for proposed soil 8.00 remediation areas Senior Scientist MM Prepare associated area, volume and cost estimate tables associated with each 6.00 remedial alternative Senior Engineer DC QA/QC calculation, regulatory closure criteria, and cost estimate summary tables 8.00 and figures Senior Engineer DC Finalize Report 4.00
Personnel: SO CF DC MM Hours: 0.00 8.00 12.00 33.00
TOTAL LABOR 53.00
VEHICLE TYPE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNIT USEAGE
TOTAL $0.00
LABORATORY COSTS
PARAMETER # SAMPLES #QAQC IDW
TOTAL LAB $0.00
EQUIPMENT ITEM COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Prepare remedial alternatives analysis, remedial design / analysis of brownfield
SITE : SBOBC ERIC_18360
SUBTASK 5: Final
PROJECT NO. HD257004A
DATE: 4/8/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning and Soil Sampling Senior Geologist SO 2.00 Senior Staff Scientist JM Load/unload 1.00 Senior Geologist SO Mobilization/Demobilization (from PSL) 3.00 Senior Staff Scientist JM Mobilization/Demobilization (from WPB office)( 2 mobs) 6.00 Senior Staff Scientist JM Stake all soil boring locations and collect GPS points, supervise GPR utility locates 5.00 Senior Geologist SO Supervise DPT collection of 12 soil boring locations, collect samples from 0-0.5 and 0.5 8.00 Senior Staff Scientist JM Assist with collection of 12 soil sample points and sample collection 8.00 Senior Staff Scientist JM Finalize field notes, soil boring logs, and lab chain of custody 1.00
Update Remedial Alternatives Evaluation Senior Geolgoist SO Update RAE report, data and tables 8.00 Senior Engineer DC Update excavation calculations, conclusions and recommendations 4.00 CAD Specialist CF Update figures with new sample results, adjust excavation boundaries with new delinea 4.00
Personnel: JM SO DC CF Hours: 21.00 21.00 4.00 4.00 TOTAL LABOR 50.00
VEHICLE TYPE RATE UNIT USEAGE
Truck (Senior Geologist SO) $120.00 day 1 120.00$ Truck (Senior Staff Scientist JM) $120.00 day 1 120.00$
TOTAL VEHICLE 240.00$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
GPR Locate (Geoview) 900.00$ lump sum 1 900.00$ JAEE (Driller subcontractor) 1,775.00$ lump sum 1 1,775.00$ IDW Disposal -$ lump sum 1 -$
TOTAL SUBCONTRACTOR $2,675.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC #IDW
Arsenic EPA 6020 $26.00 0 0 -$ Toxaphene EPA 8081 $105.00 28 2,940.00$ Sample Shipping Small Cooler (Sample Drop off) 52.00$ 0 -$
TOTAL LAB 2,940.00$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE
Expendables Expendables 40.00$ day 1 40.00$
Ice (sample preservation) 6.50$ 1 3 19.50$ Analytical Related Terra Core Sampler 11.00$ each 0 -$
Encore Sampler 16.00$ each 0 -$ Soil Assessment Kit 175.00$ day 1 175.00$ GPS System 175.00$ day 1 175.00$
IDW related 55-gallon drum, new 100.00$ drum 0 -$
TOTAL EQUIPMENT 409.50$
Supplemental Soil Assessment WCD-1
PreTask Planning, prepare field sampling scope of work package, order sampling kits
SUBTASK 6: Final
PROJECT NO. HD257004A
DATE: 4/8/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Voluntary Source Removal Plan
Senior Geologist
SO 10.00
Senior Engineer DC 5.00 CAD Specialist CF Finalize VSR figures 4.00
Personnel: CF DC SO Hours: 4.00 5.00 10.00 TOTAL LABOR 19.00
Voluntay Source Removal Plan, WCD-1
Prepare VSR plan to include health and safty plan, construction details, waste characterization, Calculations, Required Permits and Design Analysis implementation and schedule, draft figures and appendicies
SUBTASK 7: Final
PROJECT NO. HD257004A
DATE: 4/8/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
TCLP Analysis on Exceedances
Personnel: JM SO DC CF Hours: 0.00 0.00 0.00 0.00 TOTAL LABOR 0.00
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE -$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
TOTAL SUBCONTRACTOR $1,775.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC #IDW
TCLP Extraction and analysis EPA 6020 $175.00 10 0 1,750.00$
Sample Shipping Small Cooler (Sample Drop off) 52.00$ 0 -$
TOTAL LAB 1,750.00$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE
Expendables Expendables 40.00$ day 0 -$
Ice (sample preservation) 6.50$ 1 0 -$ Analytical Related Terra Core Sampler 11.00$ each 0 -$
Encore Sampler 16.00$ each 0 -$ Soil Assessment Kit 175.00$ day 0 -$ GPS System 175.00$ day 0 -$
IDW related 55-gallon drum, new 100.00$ drum 0 -$
TOTAL EQUIPMENT -$
TCLP Analysis on Exceedances
SUBTASK 8: Final
PROJECT NO. HD257004A
DATE: 4/8/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning and Soil Sampling Senior Geologist SO 2.00 Senior Staff Scientist JM Load/unload 1.00 Senior Geologist SO Mobilization/Demobilization (from PSL) 3.00 Senior Staff Scientist JM Mobilization/Demobilization (from WPB office) 3.00 Senior Staff Scientist JM Stake all soil boring locations and collect GPS points, 2.00 Senior Geologist SO Supervise DPT collection of 10 soil boring locations, collect samples from 0-0.5 and 0.5-2 8.00 Senior Staff Scientist JM Assist with collection of 10 soil sample points and sample collection 8.00 Senior Staff Scientist JM Finalize field notes, soil boring logs, and lab chain of custody 1.00
Update Remedial Alternatives Evaluation Senior Geolgoist SO Update RAE report, data and tables 7.00 Senior Engineer DC Update excavation calculations, conclusions and recommendations 6.00 CAD Specialist CF Update figures with new sample results, adjust excavation boundaries with new delineatio 4.00
Personnel: JM SO DC CF Hours: 15.00 20.00 6.00 4.00 TOTAL LABOR 45.00
VEHICLE TYPE RATE UNIT USEAGE
Truck (Senior Geologist SO) $120.00 day 1 120.00$ Truck (Senior Staff Scientist JM) $120.00 day 1 120.00$
TOTAL VEHICLE 240.00$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
GPR Locate (Geoview) 900.00$ lump sum 0 -$ JAEE (Driller subcontractor) 1,775.00$ lump sum 1 1,775.00$ IDW Disposal 110.00$ lump sum 0 -$
TOTAL SUBCONTRACTOR $1,775.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC #IDW
Arsenic EPA 6020 $26.00 0 0 -$ Toxaphene EPA 8081 $105.00 21 2,205.00$
TCLP EPA 8081 $175.00 1 175.00$
Waste Profile (8) Metals & 7471 Mercury $117.00 2 234.00$
EPA 8081 $105.00 4 420.00$
EPA 8082 $74.00 2 148.00$
EPA 8260 VOA/ VOH $73.00 2 146.00$
EPA 8270 $240.00 2 480.00$
FL PRO $110.00 2 220.00$
Sample Shipping Small Cooler (Sample Drop off) 52.00$ 0 -$
TOTAL LAB 4,028.00$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE
Expendables Expendables 40.00$ day 1 40.00$
Ice (sample preservation) 6.50$ each 2 13.00$ Analytical Related Terra Core Sampler 11.00$ each 1 11.00$
Encore Sampler 16.00$ each 1 16.00$ Soil Assessment Kit 175.00$ day 1 175.00$ GPS System 175.00$ day 1 175.00$
IDW related 55-gallon drum, new 100.00$ drum 0 -$
TOTAL EQUIPMENT 430.00$
PreTask Planning, prepare field sampling scope of work package, order sampling kits
Supplemental Soil Assessment
Contractor: Terracon Delta
Date: 4/7/2026 Task #: SubTask 1 Project Management SubTask 6 Voluntary Source Removal Plan WCD-1
Site: SBOBC PLANTATATION SITE SubTask 2 Surface Water and Sediment Sampling SubTask 7 TCLP Analysis on Exceedances WCD-2 Activity/Phase: SSA and Reporting SubTask 3 Revised SSAR SubTask 8 Additional Supplemental Soil Analysis WCD-3
Project Manager: Megan Johnson SubTask 4 Remedial Alternatives Analysis SubTask 9 SubTask 5 Supplemental Soil Assessment WCD-1 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$54.09 Project Manager Shawn Ouellette 13.40 13.40 $30.55 Administrative Danielle Adams 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.85 Brownfield Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $36.06 CADD Specialist Chelsea Fugate 12.00 0.00 0.00 0.00 4.00 4.00 0.00 4.00 0.00 0.00 $0.00 Data Analyst & Visualization Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$37.00 Environmental Technician Rob Siegel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $54.09 Senior Geologist 10.00 0.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 0.00 $0.00 Field Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 GIS Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$72.79 Senior Engineer Donna Cline 10.00 0.00 0.00 0.00 4.00 0.00 0.00 6.00 0.00 0.00 $54.09 Senior Geologist Shawn Ouellette 46.00 0.00 0.00 0.00 21.00 5.00 0.00 20.00 0.00 0.00 $0.00 Senior GIS Analyst 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$44.25 Senior Scientist Jessica endicott 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $46.44 Senior Scientist Mike Mui 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Env Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$38.46 Senior Staff Scientist Jenna M 36.00 0.00 0.00 0.00 21.00 0.00 0.00 15.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 127.40 13.40 0.00 0.00 0.00 50.00 19.00 0.00 45.00 0.00 0.00
Direct Labor $6,298.87 $724.65 $0.00 $0.00 $0.00 $2,378.95 $955.59 $0.00 $2,239.68 $0.00 $0.00
Overhead 116.00% $7,306.68 $840.59 $0.00 $0.00 $0.00 $2,759.58 $1,108.48 $0.00 $2,598.03 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.260% $3,543.74 $407.69 $0.00 $0.00 $0.00 $1,338.40 $537.61 $0.00 $1,260.04 $0.00 $0.00 Total Labor $17,149.29 $1,972.93 $0.00 $0.00 $0.00 $6,476.93 $2,601.68 $0.00 $6,097.75 $0.00 $0.00
FDEP COST ESTIMATEContractor: Terracon Delta
Date: 4/7/2026 Task #: SubTask 1 Project Management SubTask 6 Voluntary Source Removal Plan WCD-1
Site: SBOBC PLANTATATION SITE SubTask 2 Surface Water and Sediment Sampling SubTask 7 TCLP Analysis on Exceedances WCD-2 Activity/Phase: SSA and Reporting SubTask 3 Revised SSAR SubTask 8 Additional Supplemental Soil Analysis WCD-3
Project Manager: Megan Johnson SubTask 4 Remedial Alternatives Analysis SubTask 9 SubTask 5 Supplemental Soil Assessment WCD-1 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $480.00 $0.00 $0.00 $0.00 240.00$ $0.00 $0.00 240.00$ $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $480.00 $0.00 $0.00 $0.00 $240.00 $0.00 $0.00 $240.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) Jaee $3,550.00 $0.00 $0.00 $0.00 1,775.00$ $0.00 $0.00 $1,775.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities Geoview $900.00 $0.00 $0.00 $0.00 900.00$ $0.00 $0.00 $0.00 $0.00 $0.00 Erwin Remediation $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $4,450.00 $0.00 $0.00 $0.00 $2,675.00 $0.00 $0.00 $1,775.00 $0.00 $0.00 Handling Fee $355.00 $0.00 $0.00 $0.00 $177.50 $0.00 $0.00 $177.50 $0.00 $0.00 Total Subcontractor Cost $4,805.00 $0.00 $0.00 $0.00 $2,852.50 $0.00 $0.00 $1,952.50 $0.00 $0.00
Laboratory Analytical Costs $8,718.00 $0.00 $0.00 $0.00 2,940.00$ $0.00 1,750.00$ 4,028.00$ $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $8,718.00 $0.00 $0.00 $0.00 $2,940.00 $0.00 $1,750.00 $4,028.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $0.00 $0.00 $0.00 40.00$ $0.00 $0.00 40.00$ $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $759.50 $0.00 $0.00 $0.00 369.50$ $0.00 $0.00 390.00$ $0.00 $0.00 Total Field Expenses $839.50 $0.00 $0.00 $0.00 $409.50 $0.00 $0.00 $430.00 $0.00 $0.00
Subtotal $31,991.79 $1,972.93 $0.00 $0.00 $0.00 $12,918.93 $2,601.68 $1,750.00 $12,748.25 $0.00 $0.00 Completion Fee $1,714.93 $197.29 $0.00 $0.00 $0.00 $647.69 $260.17 $0.00 $609.78 $0.00 $0.00
Total Estimated Cost $33,706.72 $2,170.22 $0.00 $0.00 $0.00 $13,566.62 $2,861.85 $1,750.00 $13,358.03 $0.00 $0.00
SUBTASK 2: Surface Water and Sediment Sampling Delta
PROPOSAL NO. PHB247047
DATE: 9/2/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning and Coordination Senior Geologist SO 0.00
SO Pretask planning, Field Event preperation 0.00 Surface Water / Additional GW Sampling 0.00 Env Technician RS Load/Unload 0.00 Env Technician RS Mobilization/Demobilization (from PSL) @ 4 hours round trip 0.00 Env Technician RS Collect Surface water samples from the OPWCD canal, prepare COC for laboratory drop off 0.00 Env Technician RS Collect two additional sediment samples from OPWCD Canal, prepare for laboratory drop off 0.00
Personnel: SO RS JE Hours: 0.00 0.00 0.00
TOTAL LABOR 0.00
VEHICLE TYPE RATE UNIT USEAGE
RS Truck (Surface water/ Gwsampling and IDW pick up) $120.00 days 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC IDW
Surface Water Arsenic EPA 6020 14.00$ 0 0 0 $0.00 OCPs EPA 8081 105.00$ 0 0 0 $0.00
Sediment Arsenic EPA 6020 14.00$ 0 0 0 $0.00 OCPs EPA 8081 105.00$ 0 0 0 $0.00
Sample Shipping Large Cooler 150.00$ 0 $0.00
TOTAL $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables 40.00$ day 0 $0.00 Personal Protection 35.00$ day 0 $0.00 Shallow GW Sampling Kit 290.00$ day 0 $0.00 Core Sampler 25.00$ day 0 $0.00 Tubing, HDPE 0.30$ ft 0 $0.00 Tubing, silicon (3/16 x 3/8) 3.00$ ft 0 $0.00 Ice (for samples) 6.50$ EA 0 $0.00 55-gallon drum, new 110.00$ drum 0 $0.00
TOTAL EQUIPMENT $0.00
SUBTASK 3: Revised SSAR Delta
PROPOSAL NO. PHB247047
DATE: 9/2/2025
LABOR CATEGORY
STAFF-TITLE WORK DESCRIPTION HOURS
Review of Field Data Senior Scientist JE 0.00
Preparation of Draft SSAR Report, Tables and Figures Senior Geologist JE 0.00 and summarize in a SSAR.
Preparation of Report Senior Geologist SO 0.00 Senior Geologist SO Finalize tables and figures 0.00 Senior Geologist SO Finalize report to address all review comments 0.00
Senior CADD Technician CF Finalize Figures/Exhibits (updated groundwater OCP int. wells, updated soil maps - remove ref. 0.00 to Kleinfelder data and include SPLP results, figures/exhibist for surface water
Personnel: SO JE CF DC Hours: 0.00 0.00 0.00 0.00
TOTAL LABOR 0.00
VEHICLE TYPE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNIT USEAGE
TOTAL $0.00
LABORATORY COSTS
PARAMETER # SAMPLES #QAQC IDW
TOTAL LAB $0.00
EQUIPMENT ITEM COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Review Surface water and Soil sample Field Data
Draft response to comments to Broward County review, include updated sample results, SUBTASK 4: Remedial Alternatives Analysis Delta
PROPOSAL NO. PHB247047
DATE: 9/2/2025
LABOR CATEGORY
STAFF-TITLE WORK DESCRIPTION HOURS
Preparation of Report
Senior Scientist MM 0.00 cleanup alternatives
Senior Scientist MM Evaluate cleanup alternative, the cost for each of the proposed cleanup alternative, 0.00 and evaluate the regulatory path to closure
Figures and Drafting Senior CADD Technician CF Prepare exhibits illustrating the area and volume calculations for proposed soil 0.00 remediation areas Senior Scientist MM Prepare associated area, volume and cost estimate tables associated with each 0.00 remedial alternative Senior Engineer DC QA/QC calculation, regulatory closure criteria, and cost estimate summary tables 0.00 and figures Senior Engineer DC Finalize Report 0.00
Personnel: SO CF DC MM Hours: 0.00 0.00 0.00 0.00
TOTAL LABOR 0.00
VEHICLE TYPE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNIT USEAGE
TOTAL $0.00
LABORATORY COSTS
PARAMETER # SAMPLES #QAQC IDW
TOTAL LAB $0.00
EQUIPMENT ITEM COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
SUBTASK 5: Delta
PROJECT NO. HD257004A
DATE: 4/8/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning and Soil Sampling Senior Geologist SO 2.00 Senior Staff Scientist JM Load/unload 1.00 Senior Geologist SO Mobilization/Demobilization (from PSL) 3.00 Senior Staff Scientist JM Mobilization/Demobilization (from WPB office)( 2 mobs) 6.00 Senior Staff Scientist JM Stake all soil boring locations and collect GPS points, supervise GPR utility locates 5.00 Senior Geologist SO Supervise DPT collection of 12 soil boring locations, collect samples from 0-0.5 and 0.5 8.00 Senior Staff Scientist JM Assist with collection of 12 soil sample points and sample collection 8.00 Senior Staff Scientist JM Finalize field notes, soil boring logs, and lab chain of custody 1.00
Update Remedial Alternatives Evaluation Senior Geolgoist SO Update RAE report, data and tables 8.00 Senior Engineer DC Update excavation calculations, conclusions and recommendations 4.00 CAD Specialist CF Update figures with new sample results, adjust excavation boundaries with new delinea 4.00
Personnel: JM SO DC CF Hours: 21.00 21.00 4.00 4.00 TOTAL LABOR 50.00
VEHICLE TYPE RATE UNIT USEAGE
Truck (Senior Geologist SO) $120.00 day 1 120.00$ Truck (Senior Staff Scientist JM) $120.00 day 1 120.00$
TOTAL VEHICLE 240.00$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
GPR Locate (Geoview) 900.00$ lump sum 1 900.00$ JAEE (Driller subcontractor) 1,775.00$ lump sum 1 1,775.00$ IDW Disposal -$ lump sum 1 -$
TOTAL SUBCONTRACTOR $2,675.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC #IDW
Arsenic EPA 6020 $26.00 0 0 -$ Toxaphene EPA 8081 $105.00 28 2,940.00$ Sample Shipping Small Cooler (Sample Drop off) 52.00$ 0 -$
TOTAL LAB 2,940.00$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE
Expendables Expendables 40.00$ day 1 40.00$
Ice (sample preservation) 6.50$ 1 3 19.50$ Analytical Related Terra Core Sampler 11.00$ each 0 -$
Encore Sampler 16.00$ each 0 -$ Soil Assessment Kit 175.00$ day 1 175.00$ GPS System 175.00$ day 1 175.00$
IDW related 55-gallon drum, new 100.00$ drum 0 -$
TOTAL EQUIPMENT 409.50$
Supplemental Soil Assessment WCD-1
SUBTASK 6: Delta
PROJECT NO. HD257004A
DATE: 4/8/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Voluntary Source Removal Plan
Senior Geologist
SO 10.00
Senior Engineer DC 5.00 CAD Specialist CF Finalize VSR figures 4.00
Personnel: CF DC SO Hours: 4.00 5.00 10.00 TOTAL LABOR 19.00
Voluntay Source Removal Plan, WCD-1
Prepare VSR plan to include health and safty plan, construction details, waste characterization, implementation and schedule, draft figures and appendicies Calculations, Required Permits and Design Analysis
SUBTASK 7: Delta
PROJECT NO. HD257004A
DATE: 4/8/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
TCLP Analysis on Exceedances
Personnel: JM SO DC CF Hours: 0.00 0.00 0.00 0.00 TOTAL LABOR 0.00
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE -$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
TOTAL SUBCONTRACTOR $1,775.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC #IDW
TCLP Extraction and analysis EPA 6020 $175.00 10 0 1,750.00$
Sample Shipping Small Cooler (Sample Drop off) 52.00$ 0 -$
TOTAL LAB 1,750.00$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE
Expendables Expendables 40.00$ day 0 -$
Ice (sample preservation) 6.50$ 1 0 -$ Analytical Related Terra Core Sampler 11.00$ each 0 -$
Encore Sampler 16.00$ each 0 -$ Soil Assessment Kit 175.00$ day 0 -$ GPS System 175.00$ day 0 -$
IDW related 55-gallon drum, new 100.00$ drum 0 -$
TOTAL EQUIPMENT -$
TCLP Analysis on Exceedances
SUBTASK 8: Delta
PROJECT NO. HD257004A
DATE: 4/8/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning and Soil Sampling Senior Geologist SO 2.00 Senior Staff Scientist JM Load/unload 1.00 Senior Geologist SO Mobilization/Demobilization (from PSL) 3.00 Senior Staff Scientist JM Mobilization/Demobilization (from WPB office) 3.00 Senior Staff Scientist JM Stake all soil boring locations and collect GPS points, 2.00 Senior Geologist SO Supervise DPT collection of 10 soil boring locations, collect samples from 0-0.5 and 0.5-2 8.00 Senior Staff Scientist JM Assist with collection of 10 soil sample points and sample collection 8.00 Senior Staff Scientist JM Finalize field notes, soil boring logs, and lab chain of custody 1.00
Update Remedial Alternatives Evaluation Senior Geolgoist SO Update RAE report, data and tables 7.00 Senior Engineer DC Update excavation calculations, conclusions and recommendations 6.00 CAD Specialist CF Update figures with new sample results, adjust excavation boundaries with new delineatio 4.00
Personnel: JM SO DC CF Hours: 15.00 20.00 6.00 4.00 TOTAL LABOR 45.00
VEHICLE TYPE RATE UNIT USEAGE
Truck (Senior Geologist SO) $120.00 day 1 120.00$ Truck (Senior Staff Scientist JM) $120.00 day 1 120.00$
TOTAL VEHICLE 240.00$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
GPR Locate (Geoview) 900.00$ lump sum 0 -$ JAEE (Driller subcontractor) 1,775.00$ lump sum 1 1,775.00$ IDW Disposal 110.00$ lump sum 0 -$
TOTAL SUBCONTRACTOR $1,775.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC #IDW
Arsenic EPA 6020 $26.00 0 0 -$ Toxaphene EPA 8081 $105.00 21 2,205.00$
TCLP EPA 8081 $175.00 1 175.00$
Waste Profile (8) Metals & 7471 Mercury $117.00 2 234.00$
EPA 8081 $105.00 4 420.00$
EPA 8082 $74.00 2 148.00$
EPA 8260 VOA/ VOH $73.00 2 146.00$
EPA 8270 $240.00 2 480.00$
FL PRO $110.00 2 220.00$
Sample Shipping Small Cooler (Sample Drop off) 52.00$ 0 -$
TOTAL LAB 4,028.00$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE
Expendables Expendables 40.00$ day 1 40.00$
Ice (sample preservation) 6.50$ each 2 13.00$ Analytical Related Terra Core Sampler 11.00$ each 1 11.00$
Encore Sampler 16.00$ each 1 16.00$ Soil Assessment Kit 175.00$ day 1 175.00$ GPS System 175.00$ day 1 175.00$
IDW related 55-gallon drum, new 100.00$ drum 0 -$
TOTAL EQUIPMENT 430.00$
Supplemental Soil Assessment
Contractor: Terracon
Date: 4/7/2026 Original
Task #: SubTask 1 Project Management SubTask 6 Site: SBOBC PLANTATATION SITE SubTask 2 Surface Water and Sediment Sampling SubTask 7
Activity/Phase: SSA and Reporting SubTask 3 Revised SSAR SubTask 8 Project Manager: Megan Johnson SubTask 4 Remedial Alternatives Analysis SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$54.09 Project Manager Shawn Ouellette 10.08 10.08 $30.55 Administrative Danielle Adams 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.85 Brownfield Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $36.06 CADD Specialist Chelsea Fugate 13.00 0.00 5.00 8.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Data Analyst & Visualization Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$37.00 Environmental Technician Rob Siegel 8.50 8.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 GIS Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$72.79 Senior Engineer Donna Cline 12.00 0.00 0.00 12.00 0.00 0.00 0.00 0.00 0.00 0.00 $54.09 Senior Geologist Shawn Ouellette 12.00 4.00 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior GIS Analyst 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$44.25 Senior Scientist Jessica endicott 8.00 0.00 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $46.44 Senior Scientist Mike Mui 33.00 0.00 0.00 33.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Env Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 96.58 10.08 12.50 21.00 53.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $4,737.37 $545.01 $530.86 $967.02 $2,694.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 116.00% $5,495.35 $632.21 $615.80 $1,121.74 $3,125.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.26% $2,665.24 $306.62 $298.66 $544.05 $1,515.91 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $12,897.96 $1,483.84 $1,445.32 $2,632.81 $7,335.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
FDEP COST ESTIMATEContractor: Terracon Date: 4/7/2026 Original
Task #: SubTask 1 Project Management SubTask 6 Site: SBOBC PLANTATATION SITE SubTask 2 Surface Water and Sediment Sampling SubTask 7
Activity/Phase: SSA and Reporting SubTask 3 Revised SSAR SubTask 8 Project Manager: Megan Johnson SubTask 4 Remedial Alternatives Analysis SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) Earth Nurse $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 IDW US Ecology $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Erwin Remediation $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $654.00 $654.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $150.00 $150.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $804.00 $804.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $38.00 $38.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $78.00 $78.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $13,899.96 $1,483.84 $2,447.32 $2,632.81 $7,335.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,289.79 $148.38 $144.53 $263.28 $733.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $15,189.75 $1,632.22 $2,591.85 $2,896.09 $8,069.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
SUBTASK 2: Surface Water and Sediment Sampling Original
PROPOSAL NO. PHB247047
DATE: 9/2/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning and Coordination Senior Geologist SO 2.00
SO Pretask planning, Field Event preperation 2.00 Surface Water / Additional GW Sampling Env Technician RS Load/Unload 1.50 Env Technician RS Mobilization/Demobilization (from PSL) @ 4 hours round trip 3.00 Env Technician RS Collect Surface water samples from the OPWCD canal, prepare COC for laboratory drop off 2.00 Env Technician RS Collect two additional sediment samples from OPWCD Canal, prepare for laboratory drop off 2.00
Personnel: SO RS JE Hours: 4.00 8.50 0.00
TOTAL LABOR 12.50
VEHICLE TYPE RATE UNIT USEAGE
RS Truck (Surface water/ Gwsampling and IDW pick up) $120.00 days 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC IDW
Surface Water Arsenic EPA 6020 14.00$ 2 1 0 $42.00 OCPs EPA 8081 105.00$ 2 0 0 $210.00
Sediment Arsenic EPA 6020 14.00$ 2 1 0 $42.00 OCPs EPA 8081 105.00$ 2 0 0 $210.00
Sample Shipping Large Cooler 150.00$ 1 $150.00
TOTAL $654.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables 40.00$ day 1 $40.00 Personal Protection 35.00$ day 0 $0.00 Shallow GW Sampling Kit 290.00$ day 0 $0.00 Core Sampler 25.00$ day 1 $25.00 Tubing, HDPE 0.30$ ft 0 $0.00 Tubing, silicon (3/16 x 3/8) 3.00$ ft 0 $0.00 Ice (for samples) 6.50$ EA 2 $13.00 55-gallon drum, new 110.00$ drum 0 $0.00
TOTAL EQUIPMENT $78.00
SUBTASK 3: Revised SSAR Original
PROPOSAL NO. PHB247047
DATE: 9/2/2025
LABOR CATEGORY
STAFF-TITLE WORK DESCRIPTION HOURS
Review of Field Data Senior Scientist JE 2.00
Preparation of Draft SSAR Report, Tables and Figures Senior Geologist JE 6.00 and summarize in a SSAR.
Preparation of Report Senior Geologist SO 2.00 Senior Geologist SO Finalize tables and figures 4.00 Senior Geologist SO Finalize report to address all review comments 2.00
Senior CADD Technician CF Finalize Figures/Exhibits (updated groundwater OCP int. wells, updated soil maps - remove ref. 5.00 to Kleinfelder data and include SPLP results, figures/exhibist for surface water
Personnel: SO JE CF DC Hours: 8.00 8.00 5.00 0.00
TOTAL LABOR 21.00
VEHICLE TYPE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNIT USEAGE
TOTAL $0.00
LABORATORY COSTS
PARAMETER # SAMPLES #QAQC IDW
TO…