This document is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) to Terracon Consultants, Inc. for supplemental site assessment activities at the Broward County School Board Property in Plantation, Broward County, Florida. The work is being conducted under the auspices of Contract Number HW687, executed under the State & Tribal Response Program Bipartisan Infrastructure Law (BIL) funding cooperative agreement administered by FDEP on behalf of the U.S. Environmental Protection Agency (EPA). The Department Project Manager is Megan Johnson, and the Contractor's Project Manager is Shawn Ouellette.

The scope of work comprises five subtasks: (1) Project Management at $2,549.02; (2) Groundwater and Right-of-Way Soil Sampling at $12,254.37, including utility survey preparation, three soil borings to six feet below ground surface, and five groundwater samples for arsenic analysis; (3) Soil Boring and Monitoring Well Installations at $17,315.39, including installation of two monitoring wells (one to 21 feet and one to 50 feet below ground surface), confirmation soil borings, and groundwater sampling; (4) Investigation Derived Waste (IDW) Management at $1,578.05 for coordination and disposal of up to six drums of investigation derived waste; and (5) Supplemental Site Assessment Report preparation at $6,748.02. The total Task Assignment value is $40,444.85, to be paid on a fixed unit rate basis. Field deliverables are due by March 14, 2025, with the final Supplemental Site Assessment Report due by May 9, 2025. Invoicing is structured in three milestones based on departmental approval of respective deliverables.

View the file

Other files

File Type Posted
CN-370000-HW687-BF01A.pdf PDF
CN-370000-HW687-BF01B.pdf PDF
CN-370000-HW687-BF02A.pdf PDF
CN-370000-HW687-BF04A.pdf PDF
CN-370000-HW687-BF04ACO3.pdf PDF
CN-370000-HW687-BIL01B.pdf PDF
CN-370000-HW687-BIL03B.pdf PDF
CN-370000-HW687-BIL1BCO2.pdf PDF
CN-370000-HW687-BIL2CCO2.pdf PDF
CN-370000-HW687-CSS02.pdf PDF
CN-370000-HW687-CSS03.pdf PDF
CN-370000-HW687-DC002A.pdf PDF
CN-370000-HW687-DC002G.pdf PDF
CN-370000-HW687-DC006C.pdf PDF
CN-370000-HW687-DC008B.pdf PDF
CN-370000-HW687-DC008D.pdf PDF
CN-370000-HW687-DC009B.pdf PDF
CN-370000-HW687-DC010C.pdf PDF
CN-370000-HW687-DC012A.pdf PDF
CN-370000-HW687-DC014B.pdf PDF
CN-370000-HW687-DC014D.pdf PDF
CN-370000-HW687-DC014H.pdf PDF
CN-370000-HW687-DC015D.pdf PDF
CN-370000-HW687-DC016C.pdf PDF
CN-370000-HW687-DC01ACO9.pdf PDF
CN-370000-HW687-DC021A.pdf PDF
CN-370000-HW687-DC021C.pdf PDF
CN-370000-HW687-DC022A.pdf PDF
CN-370000-HW687-DC023B.pdf PDF
CN-370000-HW687-DC023D.pdf PDF
CN-370000-HW687-DC024B.pdf PDF
CN-370000-HW687-DC024E.pdf PDF
CN-370000-HW687-DC024F.pdf PDF
CN-370000-HW687-DC027A.pdf PDF
CN-370000-HW687-DC028A.pdf PDF
CN-370000-HW687-DC028D.pdf PDF
CN-370000-HW687-DC029C.pdf PDF
CN-370000-HW687-DC02ACO1.pdf PDF
CN-370000-HW687-DC02HCO2.pdf PDF
CN-370000-HW687-DC030A.pdf PDF
CN-370000-HW687-DC031A.pdf PDF
CN-370000-HW687-DC035A.pdf PDF
CN-370000-HW687-DC037A.pdf PDF
CN-370000-HW687-DC03CCO2.pdf PDF
CN-370000-HW687-DC044A.pdf PDF
CN-370000-HW687-DC045B.pdf PDF
CN-370000-HW687-DC049A.pdf PDF
CN-370000-HW687-DC054A.pdf PDF
CN-370000-HW687-DC056A.pdf PDF
CN-370000-HW687-DC057A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW687

BIL02B Completion June 13, 2025

The Department approves this Task Assignment (TA) based upon the Cost Proposal and Level of Effort (CP/LOE) for supplemental site assessment (SSA) submitted to the Department on December 10, 2024, revised January 15, 2025, by Terracon Consultants, Inc., for the below referenced site. The final deliverable will be a SSA Report received by the Department no later than May 9, 2025.

Megan Johnson 850.245.8994 Contractor Terracon Consultants, Inc. Contractor

Contractor Shawn Ouellette Contractor 561.689.4299

ERIC_18360

SE Corner of Broward Blvd. and South Hiatus Road, Plantation, Broward County

Broward County School Board Property - Plantation

Contractor Contractor

✔ $ 40,444.85

$ 40,444.85

Scope of Work

Terracon Consultants, Inc.

Contractor Donna Cline, P.E.

Senior Remediation Engineer

1/17/2025

Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=General Users, email=Donna.Cline@terracon.com Date: 2025.01.17 11:18:59 -05'00'

Cline, Donna L

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2025.01.16 15:02:43 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Field notes, photographic log, chain of custody, and sampling logs for Subtask 2 activities. 03/14/2025

Field notes, photographic log, chain of custody, and sampling logs for Subtask 3 activities. 03/14/2025

Confirmation of IDW disposal; Supplemental Site Assessment Report; Project Management. 05/09/2025

Department approval of field notes, photographic log, chain of custody, and sampling logs (Subtask 2). $ 12,254.37

Department approval of field notes, photographic log, chain of custody, and sampling logs (Subtask 3). $ 17,315.39

Department approval of Project Management, confirmation of IDW disposal, and Supplemental Site Assessment Report (Subtasks 1, 4, and 5). $ 10,875.09

$ 40,444.85

HW687

BIL02B

www.FloridaDEP.gov

FFLLORIDA DDEEPARTMENTT OOFF

EEnvironmentall Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ronn DDeSantiss Governor

Jeanette Nuñez Lt. Governor

Alexis A. Lambert Secretary

Memorandum TO: Terracon Consultants, Inc., HW687 Contract File

FROM: Megan Johnson, Contract Manager

DATE: January 15, 2025

SUBJECT: Negotiation Summary – BIL22 Task Assignment (TA) BIL02B Broward County School Board Property – Site ID # ERIC_18360 Supplemental Site Assessment activities

This TA is intended for conducting Supplemental Site Assessment activities at the Broward County School Board Property site, located at the southeast corner of Broward Boulevard and South Hiatus Road, Plantation, Broward County, Florida. The services under this task are being conducted using federal funds from the State & Tribal Response Program Bipartisan Infrastructure Law (BIL) funding cooperative agreement that is administered by the Department on behalf of the U.S. Environmental Protection Agency (EPA).

Subtask 1: Project Management This subtask is a percentage of the overall project fees and has been negotiated as a contract rate.

It includes project management, overhead, general and administrative, and fringe. The agreed upon cost of this subtask is $2,549.02.

Subtask 2: Groundwater and ROW Soil Sampling Under this subtask, Terracon will prepare Right of Way permits and oversee the utility survey.

Terracon will also install three soil borings and collect soil samples in the Right of Way to be analyzed for OCP and collect five groundwater samples for laboratory analysis for arsenic and/or OCP. The agreed upon cost of this subtask is $12,254.37.

Subtask 3: Soil Boring and Monitoring Well Installations Under this subtask, Terracon will supervise the installation of one intermediate monitoring well to 21 feet below ground surface and one deeper surficial zone monitoring well to 50 feet below ground surface. Groundwater samples will be analyzed for arsenic and OCP. Terracon will also install new confirmation soil borings to confirm OCP exceedances with potential SPLP analysis at specific locations, and new soil borings to determine the vertical extent of arsenic. The agreed upon cost of this subtask is $17,315.39.

Subtask 4: IDW Management Under this subtask, Terracon will coordinate the collection and disposal of up to six drums of investigation derived waste (IDW). The agreed upon cost of this subtask is $1,578.0 .

www.FloridaDEP.gov

Negotiation Summary – Task Assignment (TA) BIL02B Broward County School Board Property

ERIC_18360

January 15, 2025

Subtask 5: Supplemental Site Assessment Report A Supplemental Site Assessment Report will be prepared detailing the field and laboratory results.

This report will also include figures, maps, tables, and conclusions and recommendations for any future work. The agreed upon cost of this subtask is $6,748.02.

Summary The Department’s BIL Contract Manager and Terracon’s Contract Manager have both agreed to the scope of work and associated costs. The final cost associated with this TA is $40,444.85.

Documentation of these costs is included in the Cost Proposal/Level of Effort (CP/LOE) Form and CP/LOE narrative provided by Terracon on December 10, 2024, revised January 15, 2025, and the Task Assignment Form for BIL02B prepared by the Department.

The final deliverable must be received by the Department no later than May 9, 2025.

FDEP COST ESTIMATE

Contractor: Terracon

Date: 12/10/2024 Task #: BIL02B SubTask 1 Project Management SubTask 6

Site: SBOBC PLANTATATION SITE SubTask 2 Groundwater and ROW Soil Sampling SubTask 7 Activity/Phase: SSA and Reporting SubTask 3 Soil Boring and Monitoring Well Installations SubTask 8

Project Manager: Megan Johnson SubTask 4 IDW Management SubTask 9 SubTask 5 Report Preparation SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$51.92 Project Manager Shawn Ouellette 16.39 16.39 $29.25 Administrative Danielle Adams 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78.85 Brownfield Consultant Tom Lewis 4.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 $33.31 CADD Specialist Chelsea Fugate 6.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00 $0.00 Data Analyst & Visualization Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$34.10 Environmental Technician Billy Phillips 59.00 33.50 21.00 4.50 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 GIS Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$27.50 Project Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$51.92 Senior Geologist Shawn Ouellette 53.25 25.25 4.00 2.00 22.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior GIS Analyst 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$42.55 Senior Scientist Jessica Endicott 29.50 0.00 15.50 0.00 14.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Env Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Hours 168.14 16.39 58.75 40.50 6.50 46.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $7,398.26 $851.13 $2,453.33 $1,583.31 $257.29 $2,253.20 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 116.00% $8,581.98 $987.31 $2,845.86 $1,836.64 $298.46 $2,613.71 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.26% $4,162.26 $478.85 $1,380.24 $890.77 $144.75 $1,267.65 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $20,142.50 $2,317.29 $6,679.43 $4,310.72 $700.50 $6,134.56 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $920.00 $480.00 $360.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $261.00 $0.00 $261.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $1,181.00 $480.00 $621.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional Earth Tech $9,651.00 $0.00 $9,651.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 IDW US Ecology $625.00 $0.00 $0.00 $625.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 GEO View $1,300.00 $1,300.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $11,576.00 $1,300.00 $9,651.00 $625.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $1,157.60 $130.00 $965.10 $62.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $12,733.60 $1,430.00 $10,616.10 $687.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00REV: 02/03 CEF TERRACON Page 1

FDEP COST ESTIMATEContractor: Terracon Date: 12/10/2024

Task #: BIL02B SubTask 1 Project Management SubTask 6 Site: SBOBC PLANTATATION SITE SubTask 2 Groundwater and ROW Soil Sampling SubTask 7

Activity/Phase: SSA and Reporting SubTask 3 Soil Boring and Monitoring Well Installations SubTask 8 Project Manager: Megan Johnson SubTask 4 IDW Management SubTask 9

SubTask 5 Report Preparation SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Laboratory

Analytical Costs $2,032.00 $1,759.00 $273.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $520.00 $300.00 $220.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $2,552.00 $2,059.00 $493.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $175.00 $105.00 $70.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $240.00 $120.00 $80.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $1,406.50 $713.00 $693.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,821.50 $938.00 $843.50 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $38,430.60 $2,317.29 $11,586.43 $16,884.32 $1,508.00 $6,134.56 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $2,014.25 $231.73 $667.94 $431.07 $70.05 $613.46 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $40,444.85 $2,549.02 $12,254.37 $17,315.39 $1,578.05 $6,748.02 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF TERRACON Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : SBOBC Plantation Site BFO3B SUBTASK 2: Groundwater and ROW Soil Sampling

PROPOSAL NO. PHB247044

DATE: 12/10/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning and Coordination Background Soil Sampling Senior Geologist SO 10.00 Env Technician BP 10.00 Env Technician BP 1 day loading/unload, mobilization (PB) 3.50 Senior Geologist SO 1 day loading/unload, mobilization (PSL) 4.50 Env Technician BP 1 day of Soil Boring Installation 9.00 Senior Geologist SO 1 day Soil sampling 9.00

Monitoring Well Groundwater Sampling Senior Geologist SO 1.75

Env Technician BP 1 day loading/unload mobilization (1 Mob Demob) 5.00 Env Technician BP 1 day of monitoring well sampling at 4 locations 6.00

Personnel: SO BP JE Hours: 25.25 33.50 0.00

TOTAL LABOR 58.75

VEHICLE TYPE RATE UNIT USEAGE

SO Truck (Soil sampling) 120 day 1 $120.00 BP Truck (Utilities soil sampling, Groundwater Sampling) 120 Day 3 $360.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Geo View Utility Clearance (Geo View) 1,300.00$ day 1 $1,300.00

TOTAL $1,300.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC EQB

Arsenic EPA 6020 (soil) 14.00$ 0 0 0 $0.00 OCP EPA 8081 (SoiL) Right Of Way Borings and SB-117, SB-118 105.00$ 11 1 1 $1,365.00

SPLP Extraction $50.00 2 $100.00 Arsenic EPA 6020 (water) ( MW-100, DMW-1, MW-300D, MW-203I) 14.00$ 4 1 1 $84.00 OCP EPA 8081 Water SPLP Extraction $105 2 $210.00

TOTAL LAB $1,759.00

Sample Shipping Large Cooler 150.00$ 2 $300.00

TOTAL $2,059.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables 40.00$ day 3 $120.00 Personal Protection 35.00$ day 3 $105.00 Groundwater sampling kit 290.00$ day 1 $290.00 Soil sample kit 235.00$ day 1 $235.00 Hand Auger 12.00$ Day 1 $12.00 Ice 6.50$ EA 4 $26.00 Total Survey Station (GEODE, GPS) 50.00$ day 1 $50.00 55-gallon drum, new 100.00$ drum 1 $100.00

$0.00

TOTAL EQUIPMENT $713.00

PreTask Planning, prepare field sampling SOW/coordinate offsite access,Laboratory kit, ROW Permit Utilities Markout and coordination ( Includes Mobilzation)

PreTask Planning, prepare field sampling SOW/coordinate site access, kit

SITE : SBOBC Plantation Site SUBTASK 3: Soil Boring and Monitoring Well Installations

PROPOSAL NO. PHD237064

DATE: 12/10/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning and Coordination Soil Boring and Monitoring Well Installation and Sampling Senior Geologist SO 3.00 Env Technician BP 1 day loading/unload mobilization 1.75 Hrs Travel Each way 3.50 Senior Staff Scientist JE 1 day loading/unload mobilization (2.25 Hr mob 2.25 hr Demob each day) 4.50 Senior Staff Scientist JE 1 day of soil boring Installation and monitoring well installation. 10.00 Env Technician BP 1 days of soil boring Installation and monitoring well installation. 10.00

Survey Monitoring Well Top of Casing Senior Staff Scientist JE 1.00 Env Technician BP 1.00

Monitoring Well Groundwater Sampling Senior Geologist SO 1.00 Env Technician BP 1 day loading/unload mobilization (1 Mob Demob) 3.50 Env Technician BP 1/2 Day Groundwater sampling 3.00

Personnel: SO JE BP Hours: 4.00 15.50 21.00

TOTAL LABOR 40.50

VEHICLE TYPE RATE UNIT USEAGE

BP Truck (Soil Boring/Well Installation/ sampling) 120 Day 2 $240.00 JE Truck (SoilBoring/Well Installation/ sampling) 120 Day 1 $120.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

Senior Staff Scientist Lodging $225.00 Night 1 $225.00

Meals $36.00 Each 1 $36.00

TOTAL PER DIEM $261.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Earth Tech Drilling Soil Borings and MW Installation $9,651.00 LS 1 $9,651.00

TOTAL $9,651.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

SOIL

Arsenic EPA 6020 (soil) Deeper Intervals 14.00$ 9 1 1 $154.00 Digestion 7.00$ 9 $63.00

OCP EPA 8081 105.00$ 0 0 $0.00

Sample Shipping Small Cooler 110.00$ 1 $110.00 Groundwater Arsenic EPA 6020 New Wells 14.00$ 2 1 1 $56.00 Digestion 7.00$ 2 $14.00

OCP EPA 8081 105.00$ 0 0 0 $0.00

Sample Shipping Small Cooler 110.00$ 1 $110.00

TOTAL LAB $273.00

TOTAL SHIPPING $220.00

TOTAL $507.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables 40.00$ day 2 $80.00 Personal Protection 35.00$ day 2 $70.00 Shallow groundwater sampling kit 290.00$ day 1 $290.00 Monitor well installation Kit 325.00$ day 1 $325.00 Tubing, HDPE 0.30$ ft 75 $22.50 Tubing, silicon (3/16 x 3/8) 3.00$ ft 2 $6.00 Total Survey Station (Geode, GPS) 50.00$ day 1 $50.00

TOTAL EQUIPMENT $693.50

PreTask Planning, prepare field sampling SOW/coordinate site access, kit

Measure TOC new wells Measure TOC new wells

PreTask Planning, prepare field sampling SOW/coordinate site access, kit

SUBTASK 4: IDW Management

PROPOSAL NO. PHD237064

DATE: 12/10/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

IDW Managemet Senior Geologist SO 2.00 Env Tech BP 1 Hour Onsite 1.75 Hour Mobilize and 1.75 hr Demobilize 4.50

Personnel: SO JE BP Hours: 2.00 0.00 4.50

TOTAL LABOR 6.50

VEHICLE TYPE RATE UNIT USEAGE

CAR 80 day 1 $80.00

TOTAL VEHICLE $80.00

PER DIEM STAFF RATE UNIT USEAGE

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

US Ecology Dispose of 5 drums of waste 625.00$ LS 1 $625.00

TOTAL $625.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables 40.00$ day 1 $40.00

TOTAL EQUIPMENT $0.00

Create Waste Generator Profile and Coordinate IDW removal

SUBTASK 5: Report Preparation

PROPOSAL NO. PHD237064

DATE: 12/10/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Review of Field Data Interim Deliverable Preparation Senior Geologist SO 2.00 Senior Staff Scientist JE Prepare Summary for Interim Deliverable 6.00

Preparation of Draft Tables and Figures

Senior Staff Scientist JE 8.00

Preparation of Report Senior Geologist SO 4.00 Senior Geologist SO Review and Summarize Water Quality Data 4.00 Senior Geologist SO Preparation of Report 12.00

Figures and Drafting Senior CADD Technician CF Draft Figures Compile Data 6.00

QA QC TL Senior Brownfields Coordinator 4.00

Personnel: SO JE JW CF TL Hours: 22.00 14.00 0.00 6.00 4.00

TOTAL LABOR 46.00

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

Review Field Data Interim Deliverable Review

Draft Tables and Figures

Review and Summarize Soil Data

645 NW Enterprise Drive #107 Port St Lucie, FL 34986

P (772) 343-9787 Terracon.com

December 5, 2024

Florida Department of Environmental Protection Waste Cleanup Program-Waste Management Division 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Attn: Ms. Megan R. Johnson, Environmental Consultant Brownfields and CERCLA Site Screening Section E: Megan.R.Johnson@floridadep.gov W: 850-245-8994

Re: Task Assignment Request Supplemental Site Assessment

School Board of Broward County Plantation Site S Hiatus Road and W Broward Blvd Plantation, Broward County, Florida Terracon Proposal No. PHB247047

Dear Ms. Johnson:

Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this Task Assignment request to the Florida Department of Environmental (FDEP) Waste Cleanup Section Program to conduct a Supplemental Site Assessment (SSA) for the School Board of Broward County (SBOBC), Plantation Site, located at the SE corner of south Hiatus Road and West Broward Blvd in Plantation, Florida. These activities will be performed as approved by both FDEP and the U.S. Environmental Protection Agency (U.S. EPA) for utilizing Targeted Brownfield Assessment/Site Specific Activities (TBA/SSA) federal funding administered by FDEP.

Scope of Services (see Section 2.0 of attached Proposal Detail)

Subtask 1 - The changes in costs associated with this subtask are calculated automatically at 13% of the change in the direct labor costs of the remaining subtasks.

Subtask 2 – Permit preparation, soil and groundwater sampling, Terracon proposes to install eight additional soil borings and collect laboratory samples. The proposed samples are outlined in the scope of services section. Terracon proposes collecting groundwater samples from four existing monitoring wells as outlined in the scope of services section for subtask 2.

Subtask 3 – Monitoring Well Installations, Terracon proposes to install one vertical extent monitor well and one intermediate monitor well. This subtask will include the sampling of the newly installed monitor wells for total arsenic as described in the scope of services section for subtask 3.

Subtask 4 – IDW Management, Terracon will subcontract the proper disposal of all soil and groundwater generated, associated with the proposed soil and groundwater sampling and well installations.

Proposal for Supplemental Site Assessment and Preparation of Report SBOBC Plantation Site Plantation, FL December 10, 2024 Terracon Proposal No. PHB247047

Subtask 5– Reporting a Supplemental Site Assessment Report will be submitted that incorporates the newly installed soil borings and monitoring wells.

See attached LOEs for details

Schedule Deliverable of field notes, photolog, and chain of custody within 10 business days of completion of field work;

Deliverable of Supplemental Site Assessment Report within 30 business days following receipt of laboratory results.

1.0 PROJECT INFORMATION

The School Board of Broward County - Plantation site is an approximate 13.06-acre parcel of land located at the SE Corner of south Hiatus Rd and west Broward Blvd, Plantation, Broward County, Florida (hereinafter, referred to as the site). The site is comprised of two land parcels identified as Broward County Property Appraiser’s office (BCPAO) parcel identification numbers 5041-07-15-0020 (11.87 acres southern portion) and 5041-10-70-0140, (1.19-acre northern portion) The site is located in Section 7, Township 50 South, and Range 41 East. The approximate latitude/longitude coordinates of the site are N: 26° 7' 10.68" / W: -80° 17' 43.61".

The site is currently vacant land and is present as a cleared maintained grassed field with 2-to-3-foot undulations observed in certain areas.

Historically, the site was part of a larger agricultural area that was utilized to cultivate row crops from approximately 1968 to 1999. The site also contained a maintenance/equipment storage/staging area in its northwestern portion and a drainage canal previously transected the entire northern parcel along its frontage with west Broward Blvd.

The review of historical reports and analytical data indicate the presence of arsenic and toxaphene at concentrations in soil above the SCTLs and arsenic concentrations in groundwater above the GCTL.

The extents of soil and groundwater impacts have yet to be satisfactorily delineated. The identified areas are believed to be related to the former row crop agricultural operations and an associated maintenance structure formerly located in the northwest portion of the site. This proposal is based on the EPA and FDEP signed and approved QAPP for the project site received September 13, 2023.

2.0 SCOPE OF SERVICES

Based on prior discussions via phone and email, the proposed scope of services consists of five subtasks involving Project Management, background soil sampling, soil boring and monitoring well installation, groundwater sampling, IDW management and producing a Supplemental Site Assessment Report:

Subtask Description

Subtask 1: Project Management This scope is provided for in the template worksheets

December 10, 2024 Terracon Proposal No. PHB247047

Subtask Description

Subtask 2. Soil and Groundwater Sampling and Analysis, Utility Survey

Prepare Right Of Way permit and oversee utility survey.

Install (3) soil borings to a depth of 6 feet bgs and collect soil samples at 0-0.5-, 0.5-2- and 2–4-foot depth bgs in the Right Of Way of Broward Blvd. A single location will require concrete coring and a utility survey will be necessary. In addition we will utilize the Utility survey contractor to look for the potential anomalies and former irrigation well. Analyze the 0 to 0.5, 0.5-2 and 2 to 4 ft bgs depth intervals for Organochlorine pesticides (OCP) by EPA Method 8081.

Collect 5 groundwater samples for laboratory analysis by EPA method 6020 for arsenic (GP-2, MW-100, MW-300D, DMW-1, MW- 203I). The analysis will be performed using a NELAC approved laboratory.

Subtask 3. Soil Boring Installation, Monitoring Well Installation, Groundwater Sampling and Analysis

Supervise installation of one intermediate monitoring well to 21 ft bgs constructed of 1-inch dia. PVC riser with 5 ft of 0.006-inch slotted screen and 30/65 grade sand filter pack. Additionally, install one deeper surficial zone monitoring well to 50 ft bgs constructed of 2-inch dia. PVC riser with 5 ft of 0.006-inch slotted screen with a 30/65 grade sand filter pack. Aboveground stickups. Complete newly installed wells with a 2’x2’ pad and a 4”x5’ aluminum stickup.

Install (2) confirmation soil borings (1) at SB-117 and (1) at SB- 118 and confirm the OCP exceedances within the 2-4 ft bgs interval and potentially collect additional samples and hold for SPLP analysis. Install (4) soil borings at SB-106, SB-107, and SS-19 collect soil samples from the 4-6, 6-8 and 8-10 ft bgs depth interval (or to the top of the groundwater table) and analyze for arsenic by EPA Method 6020 to determine the vertical extent of arsenic in this area and to evaluate the remedial options of soil blending.

Collect 2 groundwater samples from the newly installed wells for laboratory analysis by EPA method 6020 for arsenic and EPA Method 8081 for OCP. The analysis will be performed using a NELAC approved laboratory.

Subtask 4. IDW Management Coordinate the collection and disposal of up to 6 drums investigation derived waste (IDW)

Subtask 5. Supplemental Site Assessment Report

Prepare a Supplemental Site Assessment Report with site history, methodology, conclusions, recommendations, tables, sample locations and concentration exhibits, sealed by a Professional Geologist. Extra time is allotted to for three one hour stake holder meetings

3.0 SCHEDULE

It is estimated that the supplemental site assessment can be implemented by January 2025, or earlier based on the subcontract drilling schedule. A Supplemental Site Assessment Report can be issued within 30 business days of receipt of laboratory analytical results.

December 10, 2024 Terracon Proposal No. PHB247047

CLOSING REMARKS

Terracon services will be conducted in accordance with the terms and conditions, contained within DEP Waste Cleanup Program (WCP) Contract No. HW687, executed January 5, 2022. It is understood that a Task Assignment will be issued to authorize Terracon to perform this work.

We appreciate the opportunity to provide this proposal and look forward to working with you on this project. If you should have any questions or comments regarding this proposal, please contact either of the undersigned at 772-343-9787.

Sincerely, Terracon Consultants, Inc.

Donna Cline, P.E. Shawn Ouellette, P.G.

Senior Remediation Engineer Senior Geologist

Attachments: Exhibit A Exhibit B Cost Spreadsheet Level of Effort Drill Bids IDW Bids GPR Bids

W BROWARD

TMW-1

MW10

MW301S

MW100

MW207

MW7

MW5

GP 2

MW202I

MW300D

MW204I

MW301I

DMW1

MW203I

MW302S

E:

\P ro je ct s

- o th er o ffi ce s\

F t L au de rd al e\

S ch oo l B oa rd o f B ro w ar d

C ou nt y\

C

AD

\2

4-

Drawn By:

Checked By:

Approved By:

Project Mngr:

File No.

Date:

Scale:

Project No.

CF AS SHOWN

SO

09/11/24SO

SO 34237223

34237223 5371 NW 33rd Avenue Fort Lauderdale, Florida

FAX. (954) 741-8282PH. (954) 703-1831

EXHIBITPROPOSED SOIL BORING LOCATIONS MAP

A

BROWARD COUNTY SCHOOL BOARD PROPERTY

SOUTHEAST CORNER OF BROWARD BOULEVARD AND

SOUTH HIATUS ROAD

PLANTATION, BROWARD COUNTY, FLORIDA

ERIC_18360

LEGEND

APPROXIMATE BROWARD COUNTY SCHOOL

BOARD PROPERTY BOUNDARY

SHALLOW MONITORING WELL LOCATION

APPROXIMATE OLD PLANTATION WATER

CONTROL DISTRICT PROPERTY BOUNDARY

INTERMEDIATE MONITORING WELL LOCATION

DEEP MONITORING WELL LOCATION

N

PROPOSED SOIL BORING LOCATIONS

MW-303I

7/12/24

15-20

5.1 I

DMW-1

11/8/23 2/26/24 4/17/24

16-21 16-21 16-21 50 48 49

MW-202I

4/18/24

16-21

2.8 I

MW-206I

4/17/24

16-21

2.7 I

MW-203I

4/18/24

16-21

MW-204I

4/18/24

16-21 9.8

MW-301I

7/11/24

16-21

4.2 I

MW-300D

7/11/24 7/29/24

27-32 27-32 25 23

SB111

SB201

SB122

SB120

SB116

SB117

SB118

SB100

SB102

SB105

SB110

SB109

SB108

SB106

SB207

SB113

SB114

SB121

SB107

SB115

SB112

SB103

SB119

SB104

W BROWARD BLVD

N H

IA

TU

S R

D

MW12

MW13

MW11

MW109

MW108

MW106 MW201

MW-104

MW8

TMW-1

MW10

TMW-2

MW301S

MW100

MW207

MW7

MW5

GP 2

MW202I

MW300D

MW204I

MW206I

MW301I

DMW1

MW203I

MW303S

MW302S

MW303I

MW-103

Proposed

Proposed

E:

\P ro je ct s

- o th er o ffi ce s\

F t L au de rd al e\

S ch oo l B oa rd o f B ro w ar d

C ou nt y\

C

AD

\2

4-

N

Drawn By:

Checked By:

Approved By:

Project Mngr:

File No.

Date:

Scale:

Project No. EXHIBITProposed Soil Borings and Monitor Wells

B

CF AS SHOWN

SO

09/11/24SO

SO 34237223

34237223 5371 NW 33rd Avenue Fort Lauderdale, Florida

FAX. (954) 741-8282PH. (954) 703-1831

BROWARD COUNTY SCHOOL BOARD PROPERTY

SOUTHEAST CORNER OF BROWARD BOULEVARD AND

SOUTH HIATUS ROAD

PLANTATION, BROWARD COUNTY, FLORIDA

ERIC_18360

LEGEND

APPROXIMATE BROWARD COUNTY SCHOOL

BOARD PROPERTY BOUNDARY

APPROXIMATE OLD PLANTATION WATER

CONTROL DISTRICT PROPERTY BOUNDARY

ANALYTE DETECTED BETWEEN THE LAB

METHOD DETECTION LIMIT & THE PRACTICAL

QUANTITATION LIMIT

ANALYTE NOT DETECTED ABOVE LAB

METHOD DETECTION LIMIT

RESULTS REPORTED IN MICROGRAMS PER

LITER

μg/L =

RESULT EXCEEDS NADC

RESULT EXCEEDS GCTL=

I =

U =

BLUE

RED

ESTIMATED VALUE; VALUE MAY NOT BE

ACCURATE

J =

DEPTH IN FEET BELOW GROUND SURFACEFT BGS =

SHALLOW MONITORING WELL LOCATION

INTERMEDIATE MONITORING WELL LOCATION

DEEP MONITORING WELL LOCATION

Well ID GCTL NADCDate

Screened Interval (FT BGS) Arsenic (μg/L) 10 100

RESULT EXCEEDS GCTL

Proposed Right of Way Borings

2703 NW 19th Street, Pompano Beach, FL 33069

Monitoring Wells Sparge Wells Direct Push Geotechnical Drilling SONIC Drilling

DATE

CLIENT: PHONE

SITE:

PROPOSED SCOPE OF WORK:

Drum ALL Soil & Water

Unit Number Rate of Units

Sonic Daily Rate per day $3,900.00 1 per day

8" Temp Sonic Casing per foot $25.00 51 10" Temp Sonic Casing per foot Compact Loader for Tooling & Water Support per day $575.00 1

1" PVC Well Material (includes all annular backfill) per foot 2" PVC Well Material (includes all annular backfill) per foot $16.00 71 6" PVC Well Material (includes all annular backfill) per foot

4" x 4" Protective Riser completion per well $325.00 2 8" Bolt-down completion per well $225.00 each per well

Mobilization (Sonic Drill with all associated equipment) roundtrip $1,200.00 1 Daily Mobilization (to and from site per day) per day

Per Diem per night Permits (1st Well) each $85.00 1 Permits Additional wells each $60.00 1 Decontamination Pad (incl. setup & breakdown) lump sum $500.00 0 Site Visit (If Needed) each $500.00 0 DOT Approved 55-gal Drum each $80.00 4 Development Time per hour $75.00 2 Borehole Abandonment per foot $10.00 30 Hydrant and /or water truck lump sum $1,500.00 0 Standby / Difficult Moving Time per hour $575.00 0 Days to Complete Scope of Work 1 Submitted By: Charles Bucher TOTAL QUOTE PRICE

$650.00

(IF NEEDED)

$60.00

$0.00

11/27/2024

Plantation, FL (Broward Blvd & Hiatus) Client to provide approved WATER SOURCE

(561) 494-7013Terracon Jessica Endicott

(3) Sonic Soil Borings to 10' - Abandon & Patch

(1) MW 2" x 50' w/ 5' .006" Screen (30/65 Sand) & 4" AGP Completion - 8" x 40' Temp Casing - Sonic Soil Cores

Sonic Daily Rate (Compact Track) Price Includes a ten hour work day ( 7 to 5 ) Unless otherwise stated in this quote.

(1) MW 1" x 21' w/ 5' .006" Screen (30/65 Sand) & 4" AGP Completion - 8" x 11' Temp Casing - Sonic Soil Cores

$0.00

WELL MATERIALS

$0.00

$0.00

$0.00

No water onsite

SONIC DRILL Unit Extended Price

$3,900.00

MISCELLANEOUS

$575.00

$0.00

$0.00 $1,136.00

$9,651.00

$1,200.00

$0.00 $85.00

$320.00

$0.00

$1,275.00

$150.00 $300.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Well Completion (includes 8" bolt-down manhole, concrete pad & lockable well cap

Preferred Drilling Solutions, Inc.

8820 66th St, Pinellas Park, FL 33782

Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com

SONIC DRILLING TECHNOLOGY QUOTE FORM

Date: 12/4/24 FAC ID#:

*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner

Unit Unit Rate Number of Units Extended Price per day $4,500.00 1 4,500.00$ per day $3,500.00 1 3,500.00$ per foot $18.00 -$ per foot $25.00 71 1,775.00$ per foot $35.00 -$ each $150.00 -$ per well $225.00 2 450.00$ roundtrip $1,275.00 1 1,275.00$ per crew / per night $600.00 1 600.00$ each $75.00 6 450.00$ each $140.00 1 140.00$

TOTAL QUOTE PRICE $12,690.00

Notes: 1. Includes caps, plugs, tubing, saw cuts, development, standby time, and decon.

Project No.:

Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477

Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782

Signature and Title of Person Submitting Quote: ___________________________________ Austin Bonacum, Estimator

MISCELLANEOUS

(3) Soil borings to 10', drum cuttings, grout and restore grade

(1) 2" x 21' MW with 5' .006 screen, 8" x 11' temp override casing, continuous soil sampling, drum soil & water, pad and AGP

(1) 2" x 50' MW with 5' .006 screen, 8" x 40' temp override casing, continuous soil sampling, drum soil & water, pad and AGP

Sonic Daily Rate & Crew (up to 10 hours on site)

Sonic Half Day Rate & Crew (up to 5 hours on site)

1" PVC Well Installation (includes all materials)

2" PVC Well Installation (includes all materials) 4" PVC Well Installation (includes all materials)

Pre-Packed Well Screen (includes all materials) ID 2" 5' Length

Above Grade Well Completion (includes AGP, concrete pad, and locking well cap)

Consultant Name: Terracon

Site Name and Location: W Broward Blvd & S Hiatus Rd, Plantation, Broward County, FL

PROPOSED SCOPE OF WORK:

Equipment Type: Geoprobe 8150LS, Terrasonic 150CC

SONIC DRILLING TECHNOLOGY

Other (specify)

Other (specify)

Days to Complete Scope of Work: 1.5

Mobilization Per Diem (4 Men)

DOT Approved 55-gal Drum

Permits

Other (specify) as Park, FL 33782

A Geophysical Services Company

5709 First Avenue South Tel.: (727) 209-2334 St. Petersburg, FL 33707 Fax: (727) 328-2477

March 31, 2023

Ms. Rachael Greller Terracon 1675 Lee Road Winter Park, FL 32789

Subject: Proposal to Perform a Utility Designation Study

Waste Cleanup Program , Florida GeoView Proposal Number: 10467p

Ms. Greller, The purpose of this letter is to transmit a proposal to complete a geophysical investigation at the subject site. This proposal is in response to your request for proposal made during your recent conversations with our office. GeoView, Inc.

appreciates the opportunity to provide our services on this project. We look forward to hearing from you soon.

Sincerely, GEOVIEW, INC.

Christopher Taylor, P.G.

Vice President Florida Professional Geologist Number 2256 Enclosure

Proposal This document shall serve as a proposal for work to be performed by

GeoView, Inc. for Terracon.

Description of Site

The project is referred to as the Waste Cleanup Program and will be located at various sites throughout Florida. The purpose of the geophysical survey will be to determine the location of underground within designated areas of the project sites.

Scope of Work The geophysical survey will be conducted using ground penetrating radar

(GPR) and conventional electromagnetic (EM) pipe and cable locators. The GPR survey will be conducted using either a Mala and/or a GSSI GPR system. The appropriate GPR antenna configuration and time range and processing parameters will be determined in the field by the project manager.

The EM survey will be performed using a Radiodetection RD (8000, 8100 or 8200) system. As appropriate, the EM survey will be conducted using both passive and active modes. The passive mode is used to find cables and conduits carrying live power (50-60 Hz) and communication (29-33Hz) signals. For the active mode survey, a current is transmitted directly or broadcast into using electromagnetic induction a metal pipe or conduit and the path of the pipe/conduit is identified by following the signal with a portable receiver. The active mode is used to trace out cast iron pipes, metal water and sewer lines, utilities that have trace wires, and inactive power and communication lines.

Based on information provided by Terracon, it does not appear that the work at any of the sites will require MOT (traffic calming efforts). This proposal does not include the costs for the design or implementation of an MOT program.

If requested GeoView can provide vacuum excavation services to determine the exact horizontal location, depth, outside diameters and material type of specific underground utilities of any utilities identified at the project site. The vacuum excavation will be performed using the Vermeer CV573GT vacuum excavation system. It is noted that the vacuum excavation equipment used by GeoView can only identify utilities above the water table or to a maximum depth of 7 to 8 ft in unconsolidated soils. It will not be possible to confirm (using vacuum excavation) the presence, location or depth of utilities that are located below these depths or in consolidated soil/rock. This proposal does not include the vacuum exaction services.

Presentation of Results The location and estimated depths of underground utilities or any other identified structures shall be indicated on the ground surface using spray paint or other methods as specified by Terracon. No report shall be prepared.

Compensation Cost to complete the survey will be be based on a ½ and full day rates with additional mobilization charges to certain regions of the state.

½ day rate: $900 Full day rate: $1300 Additional Mobilization charges o Near Tampa, Orlando, Ocala, Jacksonville and Miami: $0 o Tallahassee Area: $500 o Pensacola Area: $1000 o Naples Area: $400 o Florida Keys: $500

If a scaled AutoCAD site map is required to document the study results, an additional fee of $200 will be added. This price is inclusive of all charges associated with the project. Unless otherwise agreed upon, GeoView shall be compensated for all services within 30 days of invoice date. GeoView shall be paid in full regardless of whether the results of the geophysical survey are what Terracon anticipated. If it is determined during the survey that the geophysical survey will not achieve the objectives of the project, Terracon will immediately be notified. If a decision is made to discontinue the survey, only charges for time and materials costs to that point will be submitted.

These prices are based upon GeoView being able to access the site during normal business hours, Monday through Friday. It is also based upon the assumption that no site-specific training or drug testing will be required. If there are any such requirements, additional costs will be incurred.

Requirements of Client Terracon will provide a scaled map and digital file, if available, of the project site showing the boundaries of the project site, areas of specific concern and pertinent landmarks. Terracon will also supply all available information regarding the presence and history of underground utilities at the project site (see limitations for further discussion). Unless otherwise requested, Terracon will be responsible for the coordination of site access, traffic control, clearing of onsite obstructions or any other logistical consideration necessary to conduct the survey.

If any test drilling, monitor well installation or other excavation activities are planned it will be the responsibility of Terracon to submit a notification (dig ticket) to the appropriate 811 One-Call agency. It is recommended that such notification be filed sufficiently in advance so that GeoView will have the opportunity incorporate the 811 findings into their results.

Limitations The objective of the geophysical survey is to determine the presence and configuration of underground utilities. However, the geophysical response of these features may be highly complex depending upon on the physical characteristics of the underground utilities, the electrical properties of the surrounding soils, the depth of burial of the utilities, and the proximity of the utilities to each other.

GeoView shall conduct the geophysical survey using the most “up-to-date” geophysical equipment in a manner consistent with the level of care and skill ordinarily exercised by members of the geophysical profession practicing in the same locality under similar conditions. GeoView’s utility locating personnel are all certified GPR and conventional pipe and cable locator operators with extensive in-house training.

It is acknowledged that GeoView is not an 811 Sunshine One-Call or equivalent utility mark-out service. GeoView does not have access to any utility-related records for either public or private properties. It is the responsibility of Terracon to obtain such records and provide to GeoView prior to the site investigation. GeoView will use these records during the site investigation and report to Terracon any utilities that are shown on the site records but cannot be confirmed by GeoView. GeoView will not mark on the ground surface any utilities which it cannot confirm.

GeoView shall only be liable for the successful locating of underground utilities or any other underground structures whose presence is both known and indicated on site maps to be provided prior to the performance of the geophysical survey. Every attempt will be made to locate both known and unknown utilities within the survey area. However, GeoView will only be liable for utilities whose presence is known prior to the survey. Terracon accepts that due to the inherent limitations of non-intrusive geophysical technologies GeoView cannot be held liable for damages to utilities that cannot identified using non-intrusive technologies.

Terracon accepts that a non-intrusive utility designation study does not replace the need to employ widely accepted industry safety standards for subsurface work. Concerning the installation of well or test borings this standard of care includes post-holing or hand auguring at the planned test locations to the minimum depth at which underground utilities are anticipated at the project site. If absolute confirmation is needed to a specified depth that underground utilities are not present at a planned work location GeoView can provide vacuum excavation services. Pricing for such services is available upon request.

When Terracon is working around indicated utilities, a minimum of 2 ft clearance from either side of the marked utility will be maintained. Unless otherwise indicated, a minimum vertical clearance of +/- 20 percent of the indicated depth shall also be maintained. Terracon maintains the responsibility for manually exposing any indicated underground utility for absolute confirmation.

Authorization and scheduling of the project is considered acceptance of these terms and conditions.

Other Terms and Conditions Per Master Services Agreement with Terracon.

GEOVIEW ASSOCIATES, INC.

PROPOSAL ACCEPTANCE SHEET

Project Name: Waste Cleanup Program Project Location Florida GeoView Proposal #: 10467p Proposal Date: March 31, 2023 Description of Services Provide Utility Designating Services Project Cost: $1,300 plus mobilization – see compensation page 3 Payment Terms: Per MSA

CHARGE INVOICE TO THE ACCOUNT OF:

Client: Terracon Address: 1675 Lee Road

Winter Park, FL 32789 Attention: Rachael Greller Phone (Office): (321) 347-3196 Phone (Cell): (407) 572-7095 Email: rachael.greller@terracon.com

FOR APPROVAL OF CHARGES:

Firm:

Address:

Phone No.: Fax No:

Attention:

Special Instructions and/or Mutually Agreed Upon Changes to the Proposal:

In witness thereof, the parties hereto have made and executed this Agreement

Client: GeoView, Inc.

Signature

By: By: Chris Taylor, P.G.

Title: Title: Vice President

Date Signed: Date Signed: March 31, 2023

General Description of Geophysical Methods Ground Penetrating Radar (GPR)

The GPR survey will be conducted using a Mala or GSSI GPR system. The survey will be conducted with either a 500, 400 or 250 mega-Hertz antenna. The appropriate antenna will be determined in the field by the project manager. GPR will be able to provide both the position and estimated depth of both metallic and non-metallic underground utilities.

The ability of GPR to resolve a particular utility will be controlled by the following factors: 1) Depth of penetration of the GPR signal, 2) Depth of burial and diameter of the underground utility and 3) Electrical contract between the underground utility and the surrounding soils and 4) The complexity of the utility layout at the site. Due to one or a combination of these factors the GPR may not be able to identify all the utilities at the site. The diameter or composition of utilities cannot be accurately determined using GPR, though can be estimated. Estimates of burial depth are typically accurate to within +/- 20 percent, more accurate depths are possible if invert elevations for some on-site utilities are known.

Conventional Electromagnetic Pipe and Cable Locators

A Radiodetection System is used to locate underground utilities using conventional means. The system consists of a dual-function receiver and transmitter. The receiver can be operated in two modes: active and passive. In the passive mode the receiver detects the presence of underground utilities that are energized by a 60-Hertz or other known frequency. These utilities can either be those actually carrying electrical power or those utilities that are both metallic and sufficiently close to the electrical lines to have an electrical field induced within them.

In the active mode, the transmitter deliberately induces an electrical current into the utility. The frequency of this field can be varied from 512 Hertz to 200 kilohertz. The electrical field is induced using a transmitter which is either directly attached to the utility, placed on or above the utility or attached to an induction coil which is placed around the utility. Depths of underground utilities can be determined when the EM equipment is being used in the active mode. Depths are typically accurate to within 10-15 percent of the total utility depth.

From: Ray Hicks To: Matt Brooks; Greller, Rachael Cc: David O"Brien Subject: RE: Quote for GPR services for Private Utility Locates Date: Friday, March 31, 2023 11:02:51 AM Attachments: image001.png image002.png image003.png image006.png image007.png image008.png image009.png

Good morning Rachael, Each project is different depending on location and the size of the scope that we need to preform our work. We do not have a standard pricing for our services. However, you are more than welcome to send us your scope of work for each project and we can send you a proposal.

I have some additional answers to your questions below in red.

Best regards and I hope you have a great weekend.

Raymondjames U. Hicks SUE Division Leader

813-621-4929 | 813-333-5030 rhicks@survtechsolutions.com survtechsolutions.com

From: Matt Brooks <mbrooks@survtechsolutions.com> Sent: Friday, March 31, 2023 10:43 AM To: Greller, Rachael <Rachael.Greller@terracon.com> Cc: David O'Brien <dobrien@survtechsolutions.com>; Ray Hicks <rhicks@survtechsolutions.com> Subject: RE: Quote for GPR services for Private Utility Locates

Rachael, This has been received.

I have copied Ray Hicks, our subsurface utility department lead, on this email. We’ll get you an estimate as soon as possible and follow up with any questions.

Thanks, Matthew S. Brooks, P.S.M, L.S., P.L.S.

Vice President Contracts Manager, Project Manager Licensed: FL, NY, ME

813-621-4929 | 813-333-2370 mbrooks@survtechsolutions.com survtechsolutions.com 10220 U.S. Highway 92 E. Tampa, Florida 33610

From: Greller, Rachael <Rachael.Greller@terracon.com> Sent: Friday, March 31, 2023 10:41 AM To: Sales SurvTech <sales@survtechsolutions.com> Cc: Matt Brooks <mbrooks@survtechsolutions.com> Subject: RE: Quote for GPR services for Private Utility Locates

Good morning, Lydia Wing shared your contact with me. I haven’t heard anything back about my original email attached below.

If you could help point me in the right direction I would greatly appreciate it.

Best regards, Rachael Greller Staff Scientist Environmental Services

1675 Lee Road I Winter Park, FL 32789 D (321) 347-3196 I M (407) 572-7095 rachael.greller@terracon.com I…