CN-370000-HW687-DC027A.pdf
PDF 9 MB Posted
- Contract number
- HW687
- Issued by
- Florida
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW687
DC027A Completion September 29, 2023
This TA authorizes $117,861.25 in costs associated with site assessment and all costs are fixed unit rate.
Dean Cox 850-245-8969 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Terracon Consultants, Inc.
Terracon Consultants, Inc.
Donna Cline 813-321-0340
ERIC_4799
3944 West Hillsborough Ave., Tampa (Hillsborough County)
Carriage Trade Dry Cleaners
✔ $ 117,861.25
$ 117,861.25
Scope of Work
Teresa Booeshaghi
Teresa Booeshaghi Digitally signed by Teresa Booeshaghi Date: 2023.01.11 14:46:43 -05'00'
1/11/2023
N/A
Cline, Donna L Typewriter Donna Cline
Senior Remediation Engineer
01/12/2023
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Soil assessment analytical results summary & certified lab report(s), MAGS well construction drawings and test results summary & certified lab reports (Subtask 2 Soil Sampling and MAGS)
04/15/2023
Monitoring well & piezometer logs and construction drawings, deep litho log, groundwater (GW) flow figure, direct push logs & GW analytical results summary, certified lab report(s) (Subtask 3 Well Installs, Litho Log, and GW Screening)
05/15/2023
Monitoring well logs and construction drawings, well sampling analytical results summary & certified laboratory report(s), survey report with well & piezometer elevations (Subtask 4 Monitoring Well [MW] Installation & Groundwater Sampling)
05/31/2023
Site Assessment Report (SAR); Investigation Derived Waste (IDW) manifests (Subtask 1 Project Management and Subtask 5 IDW Soil & GW Management and Subtask 6 Site Assessment Report)
06/30/2023
FDEP approval of soil assessment analytical results summary & certified lab reports, MAGS well construction drawings and test results summary & certified lab report(s) (Subtask 2 Soil Sampling and MAGS).
$ 31,030.48
FDEP approval of monitoring well & piezometer logs and construction drawings, deep log, groundwater (GW) flow figure, direct push logs & GW analytical results summary, and certified lab report(s) (Subtask 3 Well Installs, Litho Log, and GW Screening).
$ 43,327.47
FDEP approval of monitoring well logs & drawings, analytical results summary & cert.
lab report(s), and survey report (Subtask 1 Proj. Mgmt. and Subtask 4 MW Installs & GW Sampling); IDW manifests (Subtask 5 IDW Mgmt.); SAR (Subtask 6 SAR).
$ 43,503.30
$ 117,861.25
HW687
DC027A
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Interim Secretary
Memorandum
TO: HW687 Contract File FROM: Dean Cox, Contract Manager SUBJECT: DC027A Carriage Trade Dry Cleaners (ERIC_4799) Site Assessment
DATE: 1/6/2023
This TA authorizes costs associated with site assessment & reporting, based on the revised Terracon TA proposal dated 12/16/22 and cost estimate agreed upon 12/16/22.
The total cost of this TA is $117,861.25 and all costs are fixed unit rate. This TA was negotiated - the total cost is $4,106.17 or 3.4% less than originally proposed.
CEF task elements are accurately enumerated in each LOE subtask, with associated descriptions in the Deliverables & Invoicing Schedule. Deliverable due dates are farther out than usual to account for availability of subcontractors and a simultaneous assessment at another Tampa Bay area site (using the same office/personnel). Site access was recently acquired.
FDEP COST ESTIMATE
Contractor: Terracon
Date: 1/3/2023 Task #: SubTask 1 Project Management SubTask 6 Site Assessment Report
Site: Carriage Trade Dry Cleaners ERIC_4799 SubTask 2 Soil Sampling, MAGS SubTask 7 Activity/Phase: Site Assessment Workplan Investigation SubTask 3 Piezometers, Interior Well, Lithological Log and GW Screening SubTask 8
Project Manager: Dean Cox SubTask 4 Monitoring Well Installation and Groundwater Sampling SubTask 9 SubTask 5 IDW Soil and GW Management SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$64.50 Project Manager Donna Cline 26.08 26.08 $0.00 Administrative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Brownfield Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$31.25 CADD Specialist Chelsea Fugate 27.00 4.00 5.00 3.00 0.00 15.00 0.00 0.00 0.00 0.00 $0.00 Data Analyst & Visualization Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$17.50 Environmental Technician Corey Olson 25.00 23.00 0.00 0.00 2.00 0.00 0.00 0.00 0.00 0.00 $21.73 Field Geologist Jared Duncan 145.50 16.50 53.50 55.50 0.00 20.00 0.00 0.00 0.00 0.00 $31.73 Staff Engineer Ricker Lamphier 171.00 44.00 50.00 32.00 1.00 44.00 0.00 0.00 0.00 0.00 $0.00 Staff Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$64.50 Senior Engineer Donna Cline 3.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $57.69 Senior Geologist Dan Nedvidek 30.00 0.00 20.00 0.00 0.00 10.00 0.00 0.00 0.00 0.00 $0.00 Senior GIS Analyst 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$40.87 Senior Scientist/Engineer Michael Mui 28.00 28.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 455.58 26.08 118.50 128.50 90.50 3.00 89.00 0.00 0.00 0.00 0.00
Direct Labor $14,619.23 $1,681.86 $3,620.03 $4,059.11 $2,315.13 $66.73 $2,876.37 $0.00 $0.00 $0.00 $0.00
Overhead 116.00% $16,958.31 $1,950.96 $4,199.23 $4,708.57 $2,685.55 $77.41 $3,336.59 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.26% $8,224.78 $946.21 $2,036.63 $2,283.66 $1,302.49 $37.54 $1,618.25 $0.00 $0.00 $0.00 $0.00 Total Labor $39,802.32 $4,579.03 $9,855.89 $11,051.34 $6,303.17 $181.68 $7,831.21 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 1
FDEP COST ESTIMATEContractor: Terracon Date: 1/3/2023
Task #: SubTask 1 Project Management SubTask 6 Site Assessment Report Site: Carriage Trade Dry Cleaners ERIC_4799 SubTask 2 Soil Sampling, MAGS SubTask 7
Activity/Phase: Site Assessment Workplan Investigation SubTask 3 Piezometers, Interior Well, Lithological Log and GW Screening SubTask 8 Project Manager: Dean Cox SubTask 4 Monitoring Well Installation and Groundwater Sampling SubTask 9
SubTask 5 IDW Soil and GW Management SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle charge $3,280.00 1,040.00$ 1,280.00$ 840.00$ 120.00$ $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $3,280.00 $1,040.00 $1,280.00 $840.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) - Action $40,565.00 9,915.00$ 19,200.00$ 11,450.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying - SurvTech Solutions, Inc. $3,995.00 $0.00 $0.00 3,995.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 IDW - Erwin Remediation $1,000.00 $0.00 $0.00 $0.00 1,000.00$ $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Geoview $1,200.00 1,200.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $46,760.00 $11,115.00 $19,200.00 $15,445.00 $1,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $4,676.00 $1,111.50 $1,920.00 $1,544.50 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $51,436.00 $12,226.50 $21,120.00 $16,989.50 $1,100.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $13,856.00 4,758.00$ 7,210.00$ 1,888.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $220.00 $0.00 $0.00 220.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $14,076.00 $4,758.00 $7,210.00 $2,108.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $645.50 166.50$ 266.00$ 213.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $1,300.00 $0.00 650.00$ 650.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $2,941.20 1,823.00$ 420.00$ 698.20$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $400.00 175.00$ 225.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $5,286.70 $2,164.50 $1,561.00 $1,561.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $113,881.02 $4,579.03 $30,044.89 $42,222.34 $27,801.87 $1,401.68 $7,831.21 $0.00 $0.00 $0.00 $0.00 Completion Fee $3,980.23 $457.90 $985.59 $1,105.13 $630.32 $18.17 $783.12 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $117,861.25 $5,036.93 $31,030.48 $43,327.47 $28,432.19 $1,419.85 $8,614.33 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Carriage Trade Dry Cleaners ERIC_4799 SUBTASK 2: Soil Sampling, MAGS
PROPOSAL NO. PH4227412
DATE: 1/3/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning Staff Engineer RL 4.00 Staff Engineer RL 1.00 Senior Engineer DC 2.00 Staff Engineer RL 3.00
Environmental Tech CO 4.00 Staff Engineer RL 1.50
Staff Engineer RL 1.50 Soil Sampling / Oversee MAGS Well Installation Scope: 6 MAGS well (3 interior, 3 exterior) to a depth of 6 ft bgs with soil investigation.
Time Duration: 1 day Field Geologist JD Load/unload equipment (1 hour/day) 2.00 Staff Engineer RL Direct work, daily safety debrief, record lithological descriptions, oversee MAGS well install 13.00 Technician CO Collect one sample every 1 foot interval for OVA screening, record measurements 0.00 Field Geologist JD Collect one sample at 0.5, 2, 4, 6, 8 and 10 ft bgs for laboratory analysis (SPLP and VOCs) 13.00 Field Geologist JD Containerize IDW (0.5 hours/day) 0.50 Staff Engineer RL Finalize field notes at end of day for PM evaluation (1 hour/day) 1.00
CADD Specialist CF 2.00
MAGS Test Time Duration: 1.5 Days Senior Scientist/Engineer MM Attend Pre Task Planning meeting and review technical approach to MAGS 1.00 Environmental Tech CO Deliver and set up MAGS System 2.00 Senior Scientist/Engineer MM Perform and direct MAGS sampling test (6 points x 1.5 hr/point = 9, oversee set up / calibration) 15.00 Staff Engineer RL Collect vacuum/pressure and OVA screening measurements, collect samples for lab analysis 15.00 Environmental Tech CO Maintain system operation of the MAGS system, reduce vacuum / flows as directed by Engineer / 15.00
Maintain hoses / decon as appropriate between MAGS wells Senior Scientist/Engineer MM Finalize field notes at end of day (1 hour/day) 2.00 Senior Scientist/Engineer MM Interpret field data, perform calculations, and provide update to FDEP (8 hrs) 8.00 CADD Specialist CF Download MAGS summary data (vacuum and flow measurement) and soil vapor analytical 2.00 results to Compass (Terracon's software for FDEP access) (2 hrs) Mobilization / Demobilizations Senior Engineer DC 1.00 Senior Scientist/Engineer MM 2 Days, MAGS Test (1 hour/day) 2.00 Staff Engineer RL 4.00 Technician CO 2 Days, including Initial site visit (1 hour/day) CF 2.00 Field Geologist JD 1 Day, soil investigation (1 hour/day) 4.00 1.00
Personnel: RL MM JD CO DC Hours: 44.00 28.00 16.50 23.00 3.00 TOTAL LABOR 118.50
VEHICLE TYPE RATE UNIT USEAGE
Truck (Staff Engineer) 120.00$ day 4 480.00$ Truck (Field Technician/Field Geologis 120.00$ day 4 480.00$ Truck (Senior Scientist/Engineer) 120.00$ days 0 -$ Auto (Senior Engineer) 80.00$ day 1 80.00$
TOTAL VEHICLE 1,040.00$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
GeoView, Inc. Borehole utility clearance 1,200.00$ 1 1 1,200.00$ Action Environmental 9,915.00$ each 1 9,915.00$
TOTAL SUBCONTRACTOR 11,115.00$
LABORATORY COSTS
PARAMETER RATE # SAMPLES
Halocarbons EPA 8260 73.00$ 24 1,752.00$ Aromatics EPA 8260 60.00$ 24 1,440.00$ VOCs (soil-prep) 5035 prep 7.00$ 24 168.00$ SPLP Bottle Extraction Method 1312 -$ 0 VOCs Soil Vapor- Full Sc TO-15 200.00$ 6 1,200.00$
Summa Canister 33.00$ 6 198.00$
TOTAL LAB 4,758.00$
Pre Task Planning, develop soil installation SOW, develop subcontractor scopes of work Prepare Health and Safety Plan
Attend initial site visit and oversee geophysical survey for boring, groundwater screening locations (geophysical subcontractor estimated a full day of labor) Prepare soil logging materials and finalize day-of logistics for investigation Request laboratory sample kit (soil sampling, MAGS, groundwater screening, and sampling) and coordninate logistics with lab including project schedule - no. of samples daily and reporting
4 Days, including Initial site visit (1 hour/day)
1 Day, PreTask initial site visit (1 hour/day)
Attend initial site visit to meet with owner, review technical approach to soil / MAGS Investigation Contact owner and conduct pre-drilling site walk with property owner, current tenants, drilling contractor, and FDEP. Designate IDW staging areas, decon pad location, and truck staging areas.
Establish Compass profile for project (1 hr). Download soil boring and MAGS well locations and soil analytical results to Compass (2 hrs) (Terracon's software for FDEP access)
Preconstruction meeting, mobe, concrete coring, advance hand auger, and MAGS well installation
SUBTASK 2: Soil Sampling, MAGS
PROPOSAL NO. PH4227412
DATE: 1/3/2023
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables Expendables 40.00$ day 4 160.00$
Ice (Sample Preservation) 6.50$ each 1 6.50$ Analytical related Encore Sampler 16.00$ each 24 (SPLP samples - hold) 384.00$
Terra Core Sampler 11.00$ each 24 (VOH samples) 264.00$ Soil Assessment Kit 175.00$ day 1 175.00$ MAGS Investigation Kit 500.00$ day 2 1,000.00$
IDW related (Drums provided by Diller) Other Global Positioning System 175.00$ day 1 175.00$
TOTAL EQUIPMENT 2,164.50$
SUBTASK 3: Piezometers, Interior Well, Lithological Log and GW Screening
PROPOSAL NO. PH4227412
DATE: 1/3/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning and Pre-Drilling Tasks (Primarily included in LOE 2) Senior Geologist DN 2.00
Staff Engineer RL 1.50 Piezometer Well Installation and Deep Lithological Boring Scope: 4 Piezometers to a depth of 15 ft bgs, Interior Monitoring Well (hand installed) to a depth of 10 ft bgs, survey top of casing, to assess gw flow direction, Advance deep lithological boring to 50 ft bgs (hydraulically upgradient location) Time Duration: 2 days Field Geologist JD Load/unload equipment (1 hour/day) 2.00 Staff Engineer RL Direct work, daily safety debrief, perform OVA screening of soil borings 15.00 Field Geologist JD Oversee well installation of piezometers, and interior well, and well development, record on MW Install Log 12.00 Field Geologist JD 7.00 boring in an upgradient location on-site.
Senior Geologist DN 4.00 Field Geologist JD Containerize IDW (0.5/hours per day) 0.50 Staff Engineer RL Prepare well construction and boring logs and field notes for PM evaluation (0.75 hr/day) 1.50 CADD Specialist CF Download boring logs, well construction logs, field notes, gw flow direction to Compass (2 hrs/day) 2.00
(Terracon's software for FDEP access) Direct Push Boring with Screen Point Sampling
Time Duration: 3 days Field Geologist JD Load/unload equipment (1 hour/day) 2.00 Staff Engineer RL Direct work, daily safety debrief, record lithology, assist with sample collection, coordinate lab pickup of 24.00 groundwater samples for rush TAT Field Geologist JD Collect field screened samples, record notes/observations in field book, oversee pressure grouting of 24.00 borehole, complete chain of custody Senior Geologist DN 6.00 Field Geologist JD Containerize IDW (0.5/hours per day) 1.00 Staff Engineer RL Prepare boring logs, groundwater screening data results from lab, and field notes for PM evaluation (1 hr/d 2.00 Senior Geologist DN Review gw screening data, communicate with FDEP (1 hr/day) 2.00 CADD Specialist CF Download groundwater screening location and groundwater results to Compass (1 hrs/day) 3.00
(Terracon's software for FDEP access) Mobilization / Demobilizations Senior Geologist DN 6.00 Staff Engineer RL 6.00 Field Geologist JD 5 Days (1 hour/day) 5.00
Personnel: RL JD DN CF Hours: 50.00 53.50 20.00 5.00 TOTAL LABOR 128.50
VEHICLE TYPE RATE UNIT USEAGE
Truck (Staff Engineer) 480.00$ week 1 480.00$ Truck (Field Geologist) 480.00$ week 1 480.00$ Car (Senior Geologist) 320.00$ week 1 320.00$
TOTAL VEHICLE 1,280.00$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
Action Environmental Piezometer, Lithology, GW Screen 19,200.00$ each 1 19,200.00$
TOTAL SUBCONTRACTOR 19,200.00$
LABORATORY COSTS
PARAMETER RATE # SAMPLES
Halocarbons EPA 8260 146.00$ 35 5,110.00$ Aromatics EPA 8260 60.00$ 35 2,100.00$ Emergency Turn-Around 8260 VOH (short list only screening) -$ 35 (included in rush Halocarbons) -$
TOTAL LAB 7,210.00$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables Expendables 40.00$ day 6 240.00$
Ice (Sample Preservation) 6.50$ each 4 26.00$ Drilling related Monitoring Well Installation Kit 325.00$ day 2 650.00$ Analytical related YSI 105.00$ day 4 420.00$ IDW related (Drums provided by Diller) Other Total Survey Station 50.00$ day 1 50.00$
Global Positioning System 175.00$ day 1 175.00$
TOTAL EQUIPMENT 1,561.00$
Attend initial site visit to meet with owner, review technical approach to groundwater Investigation Prepare soil logging, well construction materials, and coordninate logistics with lab including project schedule - no. of samples daily and reporting expectations
Senior geologist oversight of deep lithological boring, records lithological descriptions
(100% rush Emergeny turn-around)
Survey top of casing elevation of piezometers, assess gw flow direction, and install lithological
Senior geologist oversight / technical QA/QC of operations (2 hours/day)
6 Days, (1 hour/day) 6 Days (1 hour/day)
Scope: 7 Locations to a Depth of 50 feet, collect screen point samples @ 6-10, 16-20, 26-30, 36-40, 46-50 ft bgs, total of 35 screen point samples
SUBTASK 4: Monitoring Well Installation and Groundwater Sampling
PROPOSAL NO. PH4227412
DATE: 1/3/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning and Pre-Drilling Tasks (Primarily included in LOE 2) Staff Engineer RL 1.00
Monitoring Well Installation Scope: 6 Intermediate Wells to a proposed depth of 30 ft bgs, 1 Deep Monitoring Well to a depth of 50 feet Time Duration: 3 days Field Geologist JD Load/unload equipment (1 hour/day) 1.50 Staff Engineer RL Direct work, daily safety debrief, oversee subcontracted surveyor, coordinate sample pickup by lab 25.00 Field Geologist JD Oversee well installation, well development, record on MW Install Log 25.00 Field Geologist JD Containerize IDW (0.5 hrs/day) 0.00 Staff Engineer RL Prepare draft well and boring logs and field notes for PM evaluation (1 hr/day) 3.00 Groundwater Sampling Scope: 12 New Monitoring Wells (includes 1 interior monitoring well, 6 intermediate wells, 1 deep monitoring well, and 4-shallow piezometer wells) Time Duration: 2 days Field Geologist JD Load/unload equipment (1 hour/day) 1.50 Field Geologist JD Collect water levels (7 wells, 1 interior well, 4 piezometers, 10 minutes/well) 2.00 Field Geologist JD Containerize IDW (0.5 hrs/day) 0.50 Field Geologist JD Collect groundwater samples for PFAS and VOHs (12 wells, 1.5 hours each) 18.00 Field Geologist JD Collect soil and groundwater IDW samples from the 55-gallon drums 1.00 Field Geologist JD Prepare gw sampling and calibration logs and field notes for PM evaluation (1 hr/day) 1.00 Cadd Specialist CF Download monitoring well locations and groundwater results to Compass (1.5 hrs/day) 3.00
(Terracon's software for FDEP access) Mobilization / Demobilizations Staff Engineer RL 3.00 Field Geologist JD 5 Days (1 hour/day) 5.00
Personnel: RL JD DN CF Hours: 32.00 55.50 0.00 3.00 TOTAL LABOR 90.50
VEHICLE TYPE RATE UNIT USEAGE
Truck (Staff Engineer) 120 day 3 360.00$ Truck (Field Geologist) 480 week 1 480.00$ Truck (Senior Geologist) 120 day 0 -$
TOTAL VEHICLE 840.00$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
Action Environmental MW Installation 11,450.00$ lump sum 1 11,450.00$ SurvTech Survey, Location and Elevation 3,995.00$ lump sum 1 3,995.00$
TOTAL SUBCONTRACTOR 15,445.00$
LABORATORY COSTS
PARAMETER RATE # SAMPLES IDW
Halocarbons EPA 8260 73.00$ 12 1,168.00$ Aromatics EPA 8260 60.00$ 12 720.00$ PFAS FDEP laboratory performs analysis -- -- -$ Sample Shipping Small Cooler (overnight) 110.00$ 2 220.00$
TOTAL LAB 2,108.00$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables Expendables 40.00$ day 5 200.00$
Ice (Sample Preservation) 6.50$ each 2 13.00$ Drilling related Monitoring Well Installation Kit 325.00$ day 2 650.00$ Analytical related Groundwater Sampling Kit 290.00$ day 2 580.00$
Tubing, HDPE 0.30$ ft 334 100.20$ Tubing, silicon (3/16 x 3/8) 3.00$ ft 6 18.00$
IDW related (Drums provided by Diller)
TOTAL EQUIPMENT 1,561.20$
3 Days (1 hour/day)
Prepare monitoring well installation materials and well installation kit.
SUBTASK 5: IDW Soil and GW Management
PROPOSAL NO. PH4227412
DATE: 1/3/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Coordinate IDW T&D Staff RL 1.00 Environmental Technician CO 2.00
TOTAL LABOR 3.00
VEHICLE TYPE RATE UNIT USEAGE
Truck (IDW management) 120 day 1 120.00$
TOTAL VEHICLE 120.00$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
Erwin Remediation 100.00$ each 10 1,000.00$
TOTAL SUBCONTRACTOR 1,000.00$
IDW Disposal (soil / groundwater excluding haz mat)
Coordinate IDW T&D: Mobilize to site, meet transporter to sign manifests Prepare waste characterization/Generator Profile (potential for hazardous waste)
SUBTASK 6: Site Assessment Report
PROPOSAL NO. PH4227412
DATE: 1/3/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Report Deliverable Staff Engineer RL 18.00 Senior Geologist DN QA/QC field and laboratory data 3.00 Staff Engineer RL
20.00 Staff Engineer RL
6.00 Senior Geologist DN Water Quality Parameters Summary Evaluation 2.00 Senior Geologist DN Groundwater Analytical Results and Summary Evaluation 2.00 Senior Geologist DN Conclusions/Recommendations 3.00
Field Geologist JD 20.00
CADD Specialist CF Prepare base figures and Exhibits (site setting, potable wells, groundwater flow, cross sections, 11.00 and concentrations maps)
CADD Specialist CF Provide simplistic 2-D models that CSM supporting exhibits 4.00 Personnel: RL JD DN CF
Hours: 44.00 20.00 10.00 15.00 TOTAL LABOR 89.00
Prepare GINT boring logs (7 DPT Screen points, 6 soil locations, 1 lithological), to include well construction diagrams, lithological descriptions, and prepare cross sections (1.5 hrs/point)
Prepare GINT boring logs (1.5 hours per well), well construction diagrams, lithological descriptions, and cross sections (1 hour per well)
Prepare draft report introduction, site history, recent activities summary, and discussion of results
Forensic chemistry and analysis of reported COCs. Develop CSM based on potential fate and transport of COCs.
5463 West Waters Avenue
Tampa, FL 33684
P (813) 221-0050
F (813) 221-0051
Terracon.com
October 31, 2022, revised December 16, 2022
Florida Department of Environmental Protection
Waste Cleanup Program
Waste Management Division
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Attn: Mr. Dean Cox, Environmental Consultant
E: Dean.Cox@FloridaDep.gov
W: 850-245-8969
M: 727-686-6502
Re: Proposal for Site Assessment Work Plan Implementation
Carriage Trade Dry Cleaners
3920, 3924, and 3944 West Hillsborough Ave.
Tampa, Hillsborough County, Florida 33614
ERIC_4799
Task Assignment HW687
Terracon Proposal No. PH4227412
Dear Mr. Cox:
Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this proposal to the
Florida Department of Environmental Program (FDEP) Waste Cleanup Program (WCP) to implement the FDEP approved Site Assessment Workplan (SAWP), Revision 1.0, dated August 22, 2022 for
Carriage Trade Dry Cleaners (ERIC_4799) located at 3920 West Hillsborough Avenue Tampa, Hillsborough County, Florida. The objective of this site assessment is to assess for the horizontal and vertical extent of on-site chlorinated solvent contamination.
Scope of Services
◼ Subtask 1. Project Management
◼ Subtask 2. Soil Sampling and Modified Active Gas Survey
(MAGS)
◼ Subtask 3. Installation of Piezometer and Interior Well, Advance
Lithological Profile Boring, and Groundwater Profile Assessment, ◼ Subtask 4. Monitoring Well Installation and Groundwater
Sampling
◼ Subtask 5. Investigative Derived Waste Management
◼ Subtask 6. Preparation of Site Assessment Report
See attached LOE for details
Schedule
Submit Site Assessment Report of on-site activities within 30 business days following receipt of laboratory results.
Compensation
See attached CEF for details.
mailto:Dean.Cox@FloridaDep.gov
Proposal for Site Assessment Workplan Investigation
Carriage Trade Dry Cleaners, ERIC_4799 ■ Tampa, FL
October 31, 2022, Revised December 16, 2022 ■ Terracon Proposal No. PH4227412
SCOPE OF SERVICES
Subtask 1 – Project Management
Ricker Lamphier, E.I. will serve as the Project Manager during the field investigation. Donna Cline, P.E., and Dan Nedvidek, P.G., will be involved throughout the project, serving as Authorized Project
Reviewers.
Subtask 2 - Soil Sampling and Modified Active Gas Sampling (MAGS)
Pre-Task Planning will also be performed to prepare for field investigations. Terracon will prepare a site specific health and safety plan.
Utility Locate
Prior to conducting the soil sampling, monitoring well installations, and DPT groundwater profile assessment, Terracon will subcontract the services of a subsurface geophysical survey company to identify potential subsurface utilities or obstructions. GeoView was the low bid and estimates that the work will take one day to complete. The geophysical survey bids are attached. As a cost saving measure, no additional mobilization costs will be incurred as the subsurface utility survey will begin the same day as soil sampling activities.
Soil Investigation
Terracon will collect soil samples via hand-auger from 6 MAGS locations as described in SAWP
(Terracon 2022). Terracon will collect soil samples from 0.5, 2, 4, and 6, feet (ft) below ground surface (BGS), or to the top of the water table, via hand auger at each soil boring location. Terracon has contracted with Action Environmental to perform the concrete coring and complete the soil borings. Terracon personnel will also field screen the soils with an OVA-PID, document the lithology observed at each of these soil boring locations, and will record the Global Positioning System (GPS) coordinates of completed borings. Based on the number of proposed boring locations and depth intervals, Terracon will collect up to 24 soil samples for “full list” Volatile Organic Compounds via EPA
Method 8260 and Synthetic Precipitation Leaching Procedure (SPLP) via EPA 1311. The SPLP samples will remain on hold until the results from the full list VOC results are received. SPLP extraction and
VOC analysis will be performed with FDEPs discretion on those samples that report concentrations exceeding the respective Soil Cleanup Target Level. This additional analysis will be considered a Work
Change Directive/Task Assignment Change Order. The approximate sampling locations, depth intervals, matrices, analytes and laboratory methods, rationale, and screening criteria are summarized in the SAWP (Terracon, 2022). As detailed in the SAWP, all (6) soil borings will be completed as
MAGS wells. The MAGS wells are proposed to a depth of 6 ft BGS, with 5-ft of 2-inch diameter 10 slot screen. Each well will be completed flush to ground surface. The interior MAGS wells will be temporarily covered with a neat cement grout at surface to allow for their later use in a Soil Vapor
Extraction system. The exterior MAGS wells will be completed within an 8-inch manhole set within a
2x2 ft pad.
Modified Active Gas Survey (MAGS)
The MAGS test will be performed over a period of 2 days.
Subtask 3 - Piezometer and Interior Well Installation, Lithological Profiling, Groundwater
Profile Assessment
Piezometer and Interior Well Installation, Lithological Profile
Four piezometers will be installed at the site, screened 4 to 14 ft BGS (based on an estimated depth to water of 6-7 ft BGS), the piezometers will be surveyed to assess groundwater flow direction, and the lithological boring will be installed within an upgradient hydraulic location. The lithological profile boring will be advanced to an estimated depth of 50 ft BGS, and Terracon’s geologist will be on-site to describe the lithology.
The interior monitoring well will be hand-installed with a 5 ft screen to a depth of 10 ft bgs.
DPT Groundwater Profile Assessment
The objective of the DPT groundwater profile assessment is to evaluate the extent and magnitude of drycleaning contaminants of interest within the on-site property boundary. Terracon anticipates advancing up to 7 DPT groundwater borings and collecting groundwater samples from the following intervals: 6 to10, 16 to 20, 26 to 30, 36 to 40, 46 to 50, or until refusal at each location. The groundwater samples will be submitted to the laboratory for analysis of full list VOCs. As detailed in the SAWP, the VOH (short list) will be requested for 24-hour turnaround time, for screening purposes, to allow for the horizontal and vertical assessment of groundwater. This assessment data will be used to evaluate the location and the screen interval of the proposed monitoring wells. Daily updates of activities will be uploaded within 24 hours on the Terracon website Compass, to allow FDEP access to the site activities, and groundwater analytical results.
Based on the number of proposed boring locations and depth intervals, Terracon will collect up to 35 groundwater samples. Additional details are summarized in the SAWP (Terracon, 2022).
Subtask 4 -Monitoring Well Installation and Monitoring Well Sampling
Monitoring Well Installation
Terracon will oversee the installation of six intermediate and one deep monitoring wells. The proposed locations for the monitoring wells are shown in the SAWP (Terracon, 2022). Terracon will advise with
FDEP on the proposed locations, and the monitoring wells will not be installed unless the locations are agreed on by FDEP.
It is anticipated that the proposed intermediate monitoring wells will be installed to a depth of approximately 30 ft BGS, with 10 ft pre-packed screen. The deep monitoring well is proposed to a depth of 50 ft BGS, with 5-ft of pre-packed screen. Each well will be completed flush to ground surface in an 8-inch diameter manhole set within a 2-ft by 2-ft by 4-inch concrete pad. Monitoring wells will be developed until the water is visibly free of sediment.
Monitoring Well Sampling
Groundwater samples will be collected from the 4 piezometers, and the 6 intermediate, 1 deep, and 1 shallow interior newly installed monitoring wells, in accordance with the FDEP SOPs. Prior to monitoring well sampling, Terracon will collect depth-to-water measurements. The analytes and laboratory methods are summarized in the SAWP (Terracon, 2022), and will include full list VOCs and
PFAS analysis.
As a cost saving measure, no additional mobilization costs will be incurred as the specific purpose survey by SurvTech Solutions, Inc. will begin the same day as groundwater sampling activities.
Subtask 5 –Investigation Derived Waste
Decontamination activities will take place at a designated staging and laydown area. The soil and water IDW will be containerized in 55-gallon drums and staged on-Site at a designated location. It is estimated that 10 drums of IDW will be generated in Subtasks 2, 3 and 4, and the transportation and disposal costs for the drums are included under Subtask 5.
Terracon recommends subcontracting Erwin Remediation, Inc. (Erwin) for IDW transportation and disposal. Terracon will provide oversight of the IDW pickup, and sign waste manifests as an agent of
FDEP.
Subtask 6 –Site Assessment Report
Terracon will prepare a Site Assessment Report that will detail and summarize the groundwater sampling activities, field observations, and results of soil and groundwater analysis and will include data tables and exhibits of groundwater flow and soil and groundwater concentrations. Conclusions and recommendations will include a summary of results and recommendations for future sampling or remedial activities.
SCHEDULE
It is estimated that the drilling activities may be completed within a 10-day period. Due to the expedited schedule while performing work at an active commercial drycleaning facility, Terracon recommends having three Terracon personnel on-site. Daily updates of activities will be uploaded within 24 hours on the Terracon website Compass, to allow FDEP access to the site activities, and groundwater and soil analytical and investigative results. Terracon anticipates the deliverable of site assessment activities within 30 business days of receipt of analytical results.
CLOSING REMARKS
Terracon services will be conducted in accordance with the terms and conditions, contained within DEP
Waste Cleanup Program (WCP) Contract No. HW687, executed January 5, 2022. It is understood that a Task Assignment will be issued to authorize us to perform this work.
We appreciate the opportunity to provide this proposal and look forward to working with you on this project. If you should have any questions or comments regarding this proposal, please contact either of the undersigned at 813-221-0050.
Sincerely, Terracon Consultants, Inc.
Ricker Lamphier, E.I. Donna Cline, P.E.
Staff Engineer Senior Remediation Engineer
Attachments: Cost Spreadsheet
Level of Effort
Action
Environmental
Environmental
Drilling Service
Preferred Drilling
Solutions, Inc.
Drilling Specifications 40,565.00$ 43,475.00$ 44,325.00$
Total 40,565.00$ 43,475.00$ 44,325.00$
Selected FL Licensed Driller: Groundwater Protection
3-Bid Summary SAWP Implementation
Carriage Trade Dry Cleaners ERIC_4799
Page 1 of 1 Terracon Proposal No. PH4227412
Carriade Trade Dry Cleaners, ERIC_4799
DRILLING SPECIFICATIONS
Site and Address: Carriage Trade Dry Cleaners, 3910 W Hillsborough Ave. Tampa, Hillsborough County, Florida
Item
No.
Estimate
Time to
Complete
(days)
Unit of
Measure
Estimated
Quantity
Total Linear
Feet
Unit
Price/Quant ity
Extended
Price
0 -- Lump Sum 1 -- 400.00$ 400.00$
1 -- Lump Sum 1 -- 5,065.00$ 5,065.00$
2 -- Lump Sum 1 -- 250.00$ 250.00$
3 -- Lump Sum 1 -- -$ -$
4 1 Lump Sum 6 36 650.00$ 3,900.00$
5 0 Lump Sum 0 0 -$ -$
6 0.5 Lump Sum 1 10 1,500.00$ 1,500.00$
7 0.5 Lump Sum 4 60 600.00$ 2,400.00$
8 1 Boring 1 50 1,300.00$ 1,300.00$
9A 3 ** Boring 7 350 1,000.00$ 7,000.00$
9B 3 ** Boring 7 350 1,000.00$ 7,000.00$
10 2 Well 6 180 1,200.00$ 7,200.00$
11 1 Well 1 50 1,500.00$ 1,500.00$
12 -- Drum 10 Drum 55.00$ 550.00$
13 -- Lump Sum 1 Lump Sum 2,500.00$ 2,500.00$
14 -$
TOTAL NO. DAYS 9 TOTAL 40,565.00$
** Task 9A and 9B to be completed concurrently expected to take a total of 3 days Subtask 2 9,915.00$
Subtask 3 19,200.00$
Subtask 4 11,450.00$
Company Address:
Phone:
Mobilization and Per Diem
Permitting
Action Environmental
Item Description
Intermediate Monitoring Well Installation
Direct push boring adjacent to screen point sampling location
Line items 8-12 will be invoiced based upon actual quantities/depths completed in the field.
Deep Monitoring Well Installation
Drums (contractor to estimate IDW based on specs)
Demobilization
Contactor Specific / Other (include description below)
Decontamination: All downhole tools will be decontaminated prior to and between each sample interval location (i.e. every foot during hand auger advancement and every five feet during macrocore advancement). Specific decontamination procedures include alconox scrub and steam wash and apply for all drilling equipment and downhole tools (e.g., tremie pipe, hoses). Decontamination fluids and solids will be containerized separetly. Offeror’s equipment shall arrive clean and free of soil or dirt from its previous work location.
Investigation Derived Waste (IDW) and Trash: Soil cuttings, decontamination water and solids, and development water (IDW) generated during well installation will be drummed.
The Driller will supply a sufficient number of FDOT-approved 55-gallon steel drums to contain all IDW generated during site activities. The Offeror will be required to consolidate the IDW drums into one central location.
Drilling Conditions: The site is an active facility, operating as a nail salon and shopping plaza. The site has limited space. It should be assumed that potable water and electricity are not available. The depth to water is estimated at 7 feet bgs.
Health and Safety: Work is expected to be perfomed in Level D personal protective equipment. The primary contaminats of concern at the site are chlorinated solvents, tetrachloroethene. Proper safey procedures to minimize contact with contaminated site media is required. Site personnel are required to be 40-hour OSHA trained.
3007 N 50th Street Tampa FL 33619
Hand Augered/DPT Soil Borings to Water Table (Est. @ 10')
Shallow Piezometer Installation
Subcontractor Deliverables
Soil Gas (MAGS) Well Installation and Soil Sampling
Deep Lithological Boring
Direct Push Boring with Screenpoint Sampling
Shallow Monitoring Well Installation (interior)
Company Name:
"PFAS-Free" water source: Samples of the driller's shop water will be required to be analyzed for PFAS by the FDEP Laboratory prior to use on-site. If water has been previously tested and approved for use please provide letter or copy of lab data with this solicitation.
General Information: Terracon is soliciting quotes from three (3) Florida licensed well contractors, on behalf of the FDEP Waste Cleanup Program, for the following scope of services.
The driller will be responsible for all necessary permits, public utility locates, equipment and personnel to complete this scope of work. The driller should be aware that increases in scope may occur once the work has begun.
Preconstruction Meeting
Drillers Signature: Jonathan Abbott
License No.: 9539
727.637.9956
Page 1 of3 Terracon Project No. H4227286
Install
Method
Well
Material Total Depth
Screen
Interval
4 Hand Auger
2” SCH 40
PVC
One foot above the seasonal high water table
(approx. 7')
1-6'
Hand Auger /
DPT
N/A 10' N/A
Hand
Auger/Dolly
Rig
1" SCH 40
PVC
prepacked well
10'
5' screen based on total depth
eg. 5-10'
Hand Auger to 5'
DPT to 40-50' max
N/A 50' N/A
8 DPT
1" SCH 40
PVC
prepacked well
15' 10' screen
5-15'
Advancement of 0 soil borings for soil sampling at the locations shown on Exhibit 3. Soil
Samples will be collected continuously for OVA screening and for lab analysis to the terminal depth of each location, the hand auger is expected to be decontaminated every foot, soil samples will be collected every foot.
Surface: concrete (core drill), asphalt/pavement (core drill), and grass
Completion logs, permits, sunshine utility locate number, 40-hour OSHA certificates
(0-2'): neat cement
(2-3'): 30/65 fine sand
(3-15'): 20/30 sand
Construction Details
ITEM
NO
Installation of 6 MAGS wells and soil sample collection at the locations shown on Exhibit
3. Soil Samples will be collected continuously for OVA screening and for lab analysis to the terminal depth of each location, the hand auger is expected to be decontaminated every foot, soil samples will be collected every 2-feet. Indoor wells to be completed with sand to 2-3" below ground surface. Outside wells to be finished in a 8" well manhole and
2x2-ft concrete well pad.
Inside Building Surface (3 MAGS/Soil Gas Wells): Concrete floor (core drill)
Outside Surface (3 MAGS/Soil Gas Wells): Asphalt
Item Specifications
Deep lithological boring to include DPT sample collection continuous core every 5 feet.
Surface: asphalt
Shallow Interior Monitoring Well installation to include: installation by hand or dolly rig
(preffered method) at the location shown on Exhibit 4, soil sampling continuously for
OVA screening, installation of 1" prepacked monitoring well to approximately 10', well to be completed with 6 or 8" well locking manhole
Surface: concrete (core drill)
4 shallow Piezometer installation to include: soil sampling continuously for OVA screening, installation of 1" prepacked monitoring well. Wells to be completed with 6 or
8" DOT Locking manhole cover completed flush to grade with 2x2' concrete pad, The investigative derived waste will be containerized into a FDOT 55-gallon drum for offsite disposal.
(0-2'): neat cement
(2-3'): 30/65 fine sand
(3-10'): 20/30 sand borehole properly sealed with bentonite chips or neat cement grout, asphalt surface patch
Backfill Interval
Permitting for wells
(0.125-0.25'): sand
(0.25-0.75'): grout
(0.5-6'): sand
Neat cement grout to surface, concrete patch in asphalt/pavement
Mobilization to include: all equipment necessary to complete the identified scope of work, including drill rig, tooling, trucks, restoration or repair of damaged surfaces (e.g.
repair of concrete, if damaged by drill rig)
Page 2 of3
Install
Method
Well
Material Total Depth
Screen
Interval
9A
Hand Auger to 5'
DPT to 50'
N/A 50'
0-5'
5-10'
10-15'
15-20'
20-25'
25-30'
30-35'
35-40'
40-45'
45-50'
9B
Hand Auger to 5'
DPT to 50'
N/A
DPT 4'
retractable screenpoint for sample collection
50'
5-intervals
6-10'
16-20'
26-30'
36-40'
46-50'
10 DPT
1” SCH 40
PVC
30'
10' pre-packed screen based on total depth
eg. 25-30'
11 DPT
1” SCH 40
PVC
50'
5' pre-packed screen based on total depth
eg. 35-50'
ITEM
NO
Item Specifications
Construction Details
Backfill Interval borehole properly sealed with bentonite chips or neat cement grout, asphalt surface patch
Intermediate monitoring wells to be completed with 6 or 8" DOT Locking manhole cover completed flush to grade with 2x2' concrete pad. Location to be determined. If lithology prevents DPT, wells may be installed with solid stem or hallow stem auger.
ground surface: dirt/asphalt
Demobilization to include staging of drums, restoration of property, and cleanup required from exploration activities
Deep monitoring wells to be completed with 6 or 8" DOT Locking manhole cover completed flush to grade with 2x2' concrete pad. Location to be determined. If lithology prevents DPT, wells may be installed with solid stem or hallow stem auger.
ground surface: dirt/asphalt
Drums for IDW:
All soil will be drummed
All water will be drummed separately from soil
Direct push groundwater sample screenpoint collection (7 locations) to include:
Groundwater samples to be collected from 4' DPT screenpoint every 10 feet. (6-10', 16-
20', 26-30', 36-40', 46-50')
Terracon to perform groundwater sample collection (anticipated time to collect samples:
30 min)
DPT screen point sampling locations shown on Exhibit 5.
Direct push soil boring adjacent to screenpoint sampling location collection (7 locations) to include: Hand auger 0-5 feet and continuous macrocore collection every 5 feet to terminal depth of boring (5-10, 10-15, …)
DPT screen point sampling locations shown on Exhibit 4.
borehole properly sealed with bentonite chips or neat cement grout, asphalt surface patch
(0-23'): neat cement
(23-24'): 30/65 fine sand
(24-30'): 20/30 sand
(0-41'): neat cement
(41-43'): 30/65 fine sand
(43-50'): 20/30 sand
Page 3 of3
Site and Address: Carriage Trade Dry Cleaners, 3910 W Hillsborough Ave. Tampa, Hillsborough County, Florida
Item
No.
Estimate
Time to
Complete
(days)
Unit of
Measure
Estimated
Quantity Linear Feet
Unit
Price/Quant ity Extended Price
0 -- Lump Sum 1 -- $750.00 750.00$
1 -- Lump Sum 1 -- $1,000.00 1,000.00$
2 -- Lump Sum 1 -- $150.00 150.00$
3 -- Lump Sum 1 -- $200.00 200.00$
4 1 Lump Sum 6 36 $500.00 3,000.00$
5 -- Lump Sum 0 0 -$ -$
6 1 Lump Sum 1 13 $2,500.00 2,500.00$
7 1 Lump Sum 4 54 $500.00 2,000.00$
8 1 Boring 1 50 $1,500.00 1,500.00$
9A 7 Boring 7 350 $2,200.00 15,400.00$
9B 5 Boring 7 350 $1,425.00 9,975.00$
10 2 Well 6 180 $650.00 3,900.00$
11 1 Well 1 50 $2,000.00 2,000.00$
12 -- Drum 10 Drum $60.00 600.00$
13 -- Lump Sum 1 Lump Sum $500.00 500.00$
14 -$
TOTAL NO. DAYS 19 TOTAL 43,475.00$
"PFAS-Free" water source: Samples of the driller's shop water will be required to be analyzed for PFAS by the FDEP Laboratory prior to use on-site. If water has been previously tested and approved for use please provide letter or copy of lab data with this solicitation.
General Information: Terracon is soliciting quotes from three (3) Florida licensed well contractors, on behalf of the FDEP Waste Cleanup Program, for the following scope of services. The driller will be responsible for all necessary permits, public utility locates, equipment and personnel to complete this scope of work. The driller should be aware that increases in scope may occur once the work has begun.
Preconstruction Meeting
Drillers Signature: Carl Leonhardt
License No.: 9521
4072953532
Decontamination: All downhole tools will be decontaminated prior to and between each sample interval location (i.e. every foot during hand auger advancement and every five feet during macrocore advancement). Specific decontamination procedures include alconox scrub and steam wash and apply for all drilling equipment and downhole tools (e.g., tremie pipe, hoses).
Decontamination fluids and solids will be containerized separetly. Offeror’s equipment shall arrive clean and free of soil or dirt from its previous work location.
Investigation Derived Waste (IDW) and Trash: Soil cuttings, decontamination water and solids, and development water (IDW) generated during well installation will be drummed. The
Driller will supply a sufficient number of FDOT-approved 55-gallon steel drums to contain all IDW generated during site activities. The Offeror will be required to consolidate the IDW drums into one central location.
Drilling Conditions: The site is an active facility, operating as a nail salon and shopping plaza. The site has limited space. It should be assumed that potable water and electricity are not available. The depth to water is estimated at 7 feet bgs.
Health and Safety: Work is expected to be perfomed in Level D personal protective equipment. The primary contaminats of concern at the site are chlorinated solvents, tetrachloroethene. Proper safey procedures to minimize contact with contaminated site media is required. Site personnel are required to be 40-hour OSHA trained.
4712 Old Winter Garden Rd. Orlando, FL
Hand Augered/DPT Soil Borings to Water Table (Est. @ 10')
Shallow Piezometer Installation
Subcontractor Deliverables
Soil Gas (MAGS) Well Installation and Soil Sampling
Deep Lithological Boring
Direct Push Boring with Screenpoint Sampling
Shallow Monitoring Well Installation (interior)
Company Name:
Direct push boring adjacent to screen point sampling location
Line items 8-12 will be invoiced based upon actual quantities/depths completed in the field.
Deep Monitoring Well Installation
Drums (contractor to estimate IDW based on specs)
Demobilization
Contactor Specific / Other (include description below)