Task Assignment Summary
This document is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) Waste Cleanup Program under Master Contract HW687. The assignment authorizes Terracon Consultants, Inc. to perform supplementary assessment work at the Village Laundry site (ERIC_4743) located at 10325 Lake Carroll Way, Tampa, Hillsborough County, Florida. The contract was executed on July 27, 2022, with completion scheduled for November 30, 2022.
The scope of work encompasses site supplementary assessment well installation and groundwater sampling and analytical costs based on Terracon's proposals dated July 6, 2022, and July 25, 2022. The total task assignment value is $106,347.21 on a fixed unit rate basis. Work includes three subtasks: Project Management, Monitoring Well Installation (including eight sonic-drilled wells), and Groundwater Monitoring and Reporting. The primary deliverable is a Supplemental Site Assessment Report due September 30, 2022, for FDEP approval, with invoice authorization contingent upon report approval. The cost estimate breaks down as $3,883.01 for Project Management, $83,052.68 for Monitoring Well Installation (including $51,665.00 for drilling services), and $19,411.52 for Groundwater Monitoring and Reporting. Supporting cost includes labor totaling $30,684.05, travel at $2,160.00, subcontractor services totaling $61,806.05, laboratory analysis at $4,456.00, and field expenses of $4,172.70.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW687
DC021A Completion November 30, 2022
This task assignment (TA) authorizes costs for site supplementary assessment well installation and sampling & analytical costs (based on Terracon's proposal dated 7/6/22 and on their cost estimate dated 7/25/22).
Dean Cox 850-245-8969 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Terracon Consultants, Inc.
Terracon Consultants, Inc.
Donna Cline 813-321-0340
ERIC_4743
10235 Lake Carroll Way, Tampa (Hillsborough County)
Village Laundry & Dry Cleaners
✔ $ 106,347.21
$ 106,347.21
Scope of Work
Teresa Booeshaghi
Teresa Booeshaghi Digitally signed by Teresa Booeshaghi Date: 2022.07.27 13:09:44 -04'00'
07/27/2022
N/A dlcline Typewriter
DONNA CLINE
SENIOR REMEDIATION ENGINEER
dlcline Typewriter 07/28/2022
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Supplementary Assessment Report (Subtask 1 Project Management and Subtask 2 Monitoring Well Installation and Subtask 3 Groundwater Monitoring & Reporting). 09/30/2022
FDEP approval of Supplementary Assessment Report (Subtask 1 Project Management and Subtask 2 Monitoring Well Installation and Subtask 3 Groundwater Monitoring & Reporting).
$ 106,347.21
$ 106,347.21
HW687
DC021A
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Interim Secretary
Memorandum
TO: HW687 Contract File FROM: Dean Cox, Contract Manager SUBJECT: Supplementary Site Assessment for Village Laundry (ERIC_4743) HW687 DC021A
DATE: 7/25/2022
This task assignment (TA) authorizes costs for site supplementary assessment well installation and sampling & analytical costs (based on Terracon's proposal dated 7/6/22 and on their cost estimate dated 7/25/22). This TA serves to acquire data related to the extent and magnitude of site groundwater contamination, and to site lithology/geology, to determine a site remedy. Site access has been confirmed and necessary offsite notification efforts are tasked in this TA. Costs for this TA were reduced by $6,838.54 (6%) from the original contractor proposal via negotiation (and error correction). These reductions were from labor and equipment.
FDEP COST ESTIMATE
Contractor: Terracon
Date: 7/25/2022 Task #: SubTask 1 Project Management SubTask 6
Site: Village Laundry - ERIC_4743 SubTask 2 Monitoring Well Installation SubTask 7 Activity/Phase: Well Install, Groundwater Monitoring and Reporting SubTask 3 Groundwater Monitoring and Reporting SubTask 8
Project Manager: Dean Cox SubTask 4 SubTask 9 SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$64.50 Project Manager Donna Cline 20.10 20.10 $0.00 Administrative 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $0.00 Brownfield Consultant 0.00 0.00 0.00 0.00 0 0 0 0 0 0
$22.25 CADD Specialist Andy Schifano 8.00 0.00 8.00 0.00 0 0 0 0 0 0 $0.00 Data Analyst & Visualization Specialist 0.00 0.00 0.00 0.00 0 0 0 0 0 0
$17.50 Environmental Technician Corey Olson 144.00 98.50 45.50 0.00 0 0 0 0 0 0 $0.00 Field Geologist 0.00 0.00 0.00 0.00 0 0 0 0 0 0
$29.33 Staff Engineer Ricker Lamphier 164.00 95.00 69.00 0.00 0 0 0 0 0 0 $0.00 GIS Technician 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $0.00 Principal Consultant 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $0.00 Staff Engineer 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $0.00 Project Industrial Hygienist 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $0.00 Project Scientist 0.00 0.00 0.00 0.00 0 0 0 0 0 0
$64.50 Senior Engineer Donna Cline 2.00 0.00 2.00 0.00 0 0 0 0 0 0 $57.69 Senior Geologist Dan Nedvidek 40.50 26.50 14.00 0.00 0 0 0 0 0 0 $0.00 Senior GIS Analyst 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $0.00 Senior Industrial Hygienist 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $0.00 Senior Scientist 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $0.00 Senior Scientist 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $0.00 Staff Scientist 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0
Total Hours 378.60 20.10 220.00 138.50 0.00 0 0 0 0 0 0
Direct Labor $11,270.13 $1,296.56 $6,038.89 $3,934.68 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 116.00% $13,073.35 $1,504.01 $7,005.11 $4,564.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.26% $6,340.57 $729.44 $3,397.48 $2,213.65 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $30,684.05 $3,530.01 $16,441.48 $10,712.56 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 1
FDEP COST ESTIMATEContractor: Terracon Date: 7/25/2022
Task #: SubTask 1 Project Management SubTask 6 Site: Village Laundry - ERIC_4743 SubTask 2 Monitoring Well Installation SubTask 7
Activity/Phase: Well Install, Groundwater Monitoring and Reporting SubTask 3 Groundwater Monitoring and Reporting SubTask 8 Project Manager: Dean Cox SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle charge $2,160.00 1,440.00$ 720.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $2,160.00 $1,440.00 $720.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $51,665.00 51,665.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 IDW - Erwin Remediation $2,900.00 2,600.00$ 300.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utilities Markout $800.00 800.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 MOT - Road Safe $895.00 895.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $56,260.00 $55,960.00 $300.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $5,546.05 $5,516.05 $30.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $61,806.05 $61,476.05 $330.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $4,456.00 352.00$ 4,104.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $4,456.00 352.00$ $4,104.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $452.00 293.00$ 159.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $1,300.00 1,300.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $2,014.70 $0.00 2,014.70$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $300.00 $0.00 300.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $106.00 106.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $4,172.70 $1,699.00 $2,473.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $103,278.80 $3,530.01 $81,408.53 $18,340.26 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $3,068.41 $353.00 $1,644.15 $1,071.26 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $106,347.21 $3,883.01 $83,052.68 $19,411.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Village Laundry ERIC_4743 SUBTASK 2: Monitoring Well Installation
PROPOSAL NO. PH4227262
DATE: 7/25/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning and Pre-Drilling Tasks Senior Geologist DN 3.50
Senior Geologist RL 6.00
Senior Geologist DN 5.00
Field Task Planning and Installation of Eight Monitoring Wells Staff Engineer RL 2.00 Senior Geologist DN 10.00 Staff Engineer RL Load/unload. Daily safety meeting. 7 days of site work 7.00 Environmental Technician CO Load/unload. Daily safety meeting. 7 days of site work 7.00 Staff Engineer RL Mobilization/demobilization - 7 days of site work. 7.00 Environmental Technician CO Mobilization/demobilization - 7 days of site work. 7.00 Staff Engineer RL Install 8 monitoring wells via sonic rig. Log core samples and document lithology 70.00
Environmental Technician CO 70.00 Environmental Technician CO Containerize IDW, collect IDW sample from soil, water, and suspected hazardous IDW drums 3.00 Environmental Technician CO Deliver IDW characterization samples to laboratory 1.50 Environmental Technician CO 4.00 Staff Engineer RL Prepare draft well logs and field notes for PM evaluation 3.00
Coordinate IDW T&D Environmental Technician CO 2.00 Environmental Technician CO 4.00
Interim Deliverable / Daily Communiation
Senior Geologist DN 8.00
TOTAL LABOR 220.00
VEHICLE TYPE RATE UNIT USEAGE
120 day 1 120.00$
Truck (Well Installation, staff enginee 480 week 1 480.00$ Truck (Well Installation, staff enginee 120 day 0 -$ Truck (Well Installation, technician) 480 week 1 480.00$ Truck (Well Installation, technician) 120 day 1 120.00$ Truck (IDW management) 120 day 2 240.00$
TOTAL VEHICLE 1,440.00$
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM -$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
Erwin Remediation 100.00$ each 26 2,600.00$ GeoView Borehole utility clearance 800.00$ 1 1 800.00$
IDW Disposal (soil / groundwater excluding haz mat)
Truck (Pre-drill site meeting and borehole clearance)
Coordinate IDW T&D: Mobilize to site, meet transporter to sign manifests. Two events.
Contact off-site owners and coordinate off-site access.
Prepare soil logging materials and well installation kit.
Prepare waste characterization/Generator Profile (potential for hazardous waste)
Senior geologist oversight of drilling and logging
Develop MOT plan (sidewalk, shoulder and one lane closure) and prepare drawings for permit application. Apply for ROW permit.
Evaluate and interpret field data and communicate with FDEP (1 hr/day * 7 days), prepare Final Field Summary Interim Report with photo logs, soil logs, well construction details, and field notes, 2 hours/report)
Oversee borehole utility clearance and conduct pre-drilling site walk with property owner, current tenants, drilling contractor, and FDEP. Designate IDW staging areas, decon pad location, and truck staging.
Install 8 monitoring wells via sonic rig. Log core samples and document lithology. Assist with MOT oversight.
Survey top of casing elevation for eight new wells. Document finished well pad condition.
SUBTASK 2: Monitoring Well Installation
PROPOSAL NO. PH4227262
DATE: 7/25/2022
Groundwater Protection Install 8 monitoring wells 51,665.00$ each 1 51,665.00$ Road Safe MOT 895.00$ Day 1 895.00$
TOTAL SUBCONTRACTOR 55,960.00$
SUBTASK 2: Monitoring Well Installation
PROPOSAL NO. PH4227262
DATE: 7/25/2022
LABORATORY COSTS
PARAMETER RATE # SAMPLES
VOHs EPA 8260 63.00$ 4 252.00$ TCLP 1311 Zero Headspace 50.00$ 2 100.00$
TOTAL LAB 352.00$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Total Survey Station 50.00$ day 1 50.00$ PPE, Level D 35.00$ day 0 (2 people /7 days) -$ Monitor Well Installation Kit 1,300.00$ week 1 1,300.00$ Expendables 40.00$ day 7 (2 people /7 days) 280.00$ Expendables - Ice 6.50$ day 2 (2 bags/day/IDW) 13.00$ Lock, key operated 7.00$ ea 8 56.00$
TOTAL EQUIPMENT 1,699.00$
(Two soil & two GW/decon IDW samples)
SUBTASK 3: Groundwater Monitoring and Reporting
PROPOSAL NO. PH4227262
DATE: 7/25/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning and Pre-Sampling Tasks
Senior Geologist DN 2.00 Project Geologist DN 1.00
Field Task Planning and Groundwater Sample Collection Staff Engineer RL 1.00 Senior Geologist DN 1.00 Env. Technician CO Mobilization and load/unload. 4 days of site work 4.50 Staff Engineer RL Mobilization and Load/unload. 3 days of site work 3.00 Env. Technician CO Collect groundwater levels from 18 locations (10 minutes/well) 3.00 Staff Engineer RL Collect groundwater levels from 18 locations (10 minutes/well) 3.00 Env. Technician CO Collect groundwater samples from 15 deep wells (of total 31 wells, 2 hours/well) 30.00 Staff Engineer RL Collect groundwater samples from 16 of the total 31 wells (1.5 hours/well) 24.00 Env. Technician CO Deliver samples to laboratory. Two trips. 3.00 Env. Technician CO Containerize IDW, collect samples from non-haz and potential haz material 2.00 Env. Technician CO Decon and return rental equipment. Scan field notes and data to PM 3.00
Coordinate IDW T&D Senior Geologist DN 1.00 Env. Technician CO 0.00
Report Deliverable Staff Engineer RL Prepare report tables, trend graphs and draft maps 6.00 Staff Engineer RL 8.00 Staff Engineer RL QA/QC field and laboratory data 3.00
Staff Engineer RL 21.00 Senior Geologist DN Water Quality Parameters Summary Evaluation 2.00 Senior Engineer DC Remedial parameter summary evaluation 2.00 Senior Geologist DN Groundwater Analytical Results and Trend Graphs Summary Evaluation 3.00 Senior Geologist DN Conclusions/Recommendations 4.00
CADD Specialist AS Prepare base figures and Exhibits (groundwater flow and concentrations maps) 4.00 AS Generate lthological cross section maps with overlay of contaminant concentrations 4.00
TOTAL LABOR 138.50
VEHICLE TYPE RATE UNIT USEAGE
Truck (groundwater sampling, env. technician 120 day 4 480.00$ Truck (groundwater sampling, staff engineer) 120 day 1 120.00$ Truck (IDW pickup) 120 day 1 120.00$
TOTAL VEHICLE 720.00$
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM -$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
Prepare GINT boring logs (1.5 hours per well), well construction diagrams, lithological descriptions, and cross sections (1 hour per well)
Prepare draft report introduction, site history,recent activities summary, and discussion of results
Contact off-site owner and coordinate off-site access and/or obtain ROW access. Assess need for
MOT.
Order sampling kits for 31 wells.
PreTask Planning, prepare field sampling SOW/coordinate site access
Prepare waste characterization/Generator Profile Coordinate IDW T&D: Mobilize to site, meet transporter for pickup.
PreTask Planning, prepare well sampling SOW and health and safety plan.
SUBTASK 3: Groundwater Monitoring and Reporting
PROPOSAL NO. PH4227262
DATE: 7/25/2022
Erwin Remediation IDW Disposal (soil / groundwater) 100.00$ each 3 300.00$
TOTAL SUBCONTRACTOR 300.00$
SUBTASK 3: Groundwater Monitoring and Reporting
PROPOSAL NO. PH4227262
DATE: 7/25/2022
LABORATORY COSTS
PARAMETER METHOD RATE # SAMPLES #QAQC IDW
VOHs (short list) 8260 63.00$ 31 0 2 2,079.00$ Total iron 6010 13.50$ 6 81.00$ Dissolved iron 6010 13.50$ 6 81.00$ manganese 6010 13.50$ 6 81.00$ sulfate 375.2 21.00$ 6 126.00$ sulfide 9030/SM4500 30.00$ 6 180.00$ total organic carbon 9060/SM5310B 30.00$ 6 180.00$ methane, ethane, eth RSK175 180.00$ 6 1,080.00$ alkalinity SM2320 B / 310.2 15.00$ 6 90.00$ In-line filter 0.45 micron 21.00$ 6 126.00$
TOTAL LAB 4,104.00$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
PPE, Level D 35.00$ day 0 (2 people / 3 days) -$ Shallow Groundwater Sampling Kit $ 290.00 day 3 (1 person / 3 days) $ 870.00 Deep Groundwater Sampling Kit $ 415.00 day 2 (1 person / 3 days) $ 830.00 Tubing, HDPE 0.30$ ft 889 266.70$ Tubing, silicon (3/16 x 3/8) 3.00$ ft 16 48.00$ Expendables 40.00$ day 3 (2 people / 3 days) 120.00$ Expendables - Ice 6.50$ day 6 (2 bags/3 days) 39.00$ 55-gallon drum, new 100.00$ drum 3 300.00$
TOTAL EQUIPMENT 2,473.70$
5463 West Waters Avenue, Suite 830
Tampa, FL 33584
P (813) 221-0050
F (813) 221-0051
Terracon.com
July 6, 2022
Florida Department of Environmental Protection
Waste Cleanup Program
Waste Management Division
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Attn: Mr. Dean Cox, Environmental Consultant
E: Dean.Cox@FloridaDep.gov
W: 850-245-8969
M: 727-686-6502
Re: Proposal for Monitoring Well Installation, Groundwater Sampling, and Supplemental
Site Assessment Report
Village Laundry
10325 Lake Carrol Way
Tampa, Florida 33618
ERIC_4743
Contract No. HW687
Terracon Proposal No PH4227262
Dear Mr. Cox:
Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this proposal to the
Florida Department of Environmental Program (FDEP) Waste Cleanup Program to perform monitoring well installation, groundwater sampling, and preparation of a supplemental site assessment report.
This scope of work reflects conclusions reached during communications with your office regarding the extent and location of the additions to the existing well network and the need for a full set of groundwater analytical data.
Scope of Services
◼ On Site Construction meeting with drillers, Terracon, FDEP, and the property owner(s), tenants, to discuss project timing, access limitations, well locations, and staging areas.
◼ Field preparation, mobilize to site, oversee continuous borings and monitoring well installation at 8 locations.
◼ Field preparation, mobilize to site, perform groundwater sampling and laboratory analysis of 21 existing wells, 2 on-site wells associated with Imperial Cleaners, and 8 new wells (total of 31and analyze for volatile organic halocarbon (VOH) short list.
◼ Include laboratory analysis for the biostimulation remedial design parameters: total iron, dissolved iron, manganese, sulfate, sulfide, total organic carbon, methane, ethane, ethene, and alkalinity to monitoring wells MW007D-2, MW003D-2, MW003S, MW003I, MW013D and MW011D.
◼ Collect water levels from 21 existing wells, 3 existing piezometers, 8 newly installed wells, and 2 from Former Imperial Cleaners.
Proposal for MW Install, GW Sampling and SSA Report
Village Laundry, ERIC_4743 ■ Tampa, FL
July 6, 2022 ■ Terracon Proposal No. PH4227262
◼ Review data and prepare a Supplemental Site Assessment Report including updated tables and groundwater flow and concentration exhibits.
See attached LOE for details
Schedule
Based on driller availability, Terracon is proposing to install the new wells from August 1-7, 2022. Groundwater sampling is proposed for August 10-
12, 2022. The Supplemental Site Assessment report will be submitted within 20 business days of receipt of analytical results.
Compensation See attached CEF for details.
SITE RECOMMENDATIONS
Recent site assessment activities are summarized in a Tetra Tech Groundwater Monitoring
Report dated April 4, 2022. The report documented the third sampling event for the site and the first event to occur following the installation and startup of an SVE system in April 2021.
The report concluded that additional horizontal and vertical delineation was required. Based on this report, a review of historical data, and discussions with FDEP, Terracon recommends installing three (3) vertical delineation wells along a northwest to southeast axis through the site. The proposed vertical delineation wells will be installed using a sonic drill rig with temporary override casings set at various depths based on previous assessment data.
Continuous coring and lithological logging data will be collected to address data gaps identified in previous reports. These wells will be terminated at 70 feet below ground surface
(bgs) with a screen interval from 65-70 bgs. Two wells will be installed to provide additional source zone data. One well will be located adjacent to the existing MW007 cluster and one near the existing MW003 cluster. Both will be terminated at a maximum depth of approximately 55’ bgs (for driller quote purposes). Conversations with Breck Dalton suggested a screen interval of 45-50 ft for MW007D2 and 40-45 ft for MW003D2. Final depths and screen intervals will be determined on-site using lithological data collected during drilling operations. Three additional wells will be installed off-site to the northeast, southwest, and northwest to provide confirmation of delineation assumptions. These wells will be terminated at 40’ bgs with a screen interval of 30-40’ bgs.
Terracon will collect site-wide groundwater samples following the installation of the new monitoring wells. Groundwater samples will be collected from twenty-one (21) existing wells, 8 newly installed wells. At the recommendation of FDEP samples will be collected from 2 wells in the MW006 cluster associated with the Imperial Cleaners site during this monitoring event. Additionally, the monitoring wells MW007D-2, MW003D-2, MW003S, MW003I, MW013D and MW011D will be analyzed for the biostimulation remedial design parameters:
total iron, dissolved iron, manganese, sulfate, sulfide, total organic carbon, methane, ethane, ethene, and alkalinity.
DELIVERABLES
Terracon will prepare a Supplemental Site Assessment Report encompassing both the monitoring well installation and sampling event at the conclusion of field activities. The report will re-evaluate the conceptual site model with regards to horizontal and vertical delineation
Proposal for MW Install, GW Sampling and SSA Report
Village Laundry, ERIC_4743 ■ Tampa, FL
July 6, 2022 ■ Terracon Proposal No. PH4227262 and provide recommendations for additional services. Field notes, monitoring well construction diagrams, soil boring logs, lithologic and contaminant cross sections, and updated analytical tables and exhibits will be included in this report.
SCHEDULE
It is estimated that installation of the new monitoring wells will take seven (7) business days to complete with an additional three (3) days required for groundwater sampling. Terracon proposes to submit the Supplemental Site Assessment Report within 20 days from the receipt of laboratory analytical data. Based on driller availability, Terracon is proposing to install the new wells from August
1-7, 2022. Groundwater sampling is proposed for August 10-12, 2022.
CLOSING REMARKS
Terracon services will be conducted in accordance with the terms and conditions, contained within DEP
Waste Cleanup Program (WCP) Contract No. HW687, executed January 5, 2022. It is understood that a Task Assignment will be issued to authorize us to perform this work.
We appreciate the opportunity to provide this proposal and look forward to working with you on this project. If you should have any questions or comments, please contact either of the undersigned at
813-221-0050.
Sincerely, Terracon Consultants, Inc.
Donna Cline, P.E. Dan Nedvidek, P.G.
Senior Remediation Engineer Senior Geologist
Attachments: Cost Spreadsheet
Level of Effort
AutoCAD SHX Text
APPROXIMATE GRAPHIC SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
IMAGE SOURCE: LABINS.ORG, 2017
AutoCAD SHX Text
APPROVED:
AutoCAD SHX Text
PREPARED: SO
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
CAD FILE NO.
AutoCAD SHX Text FIGURE No.
AutoCAD SHX Text
AutoCAD SHX Text
ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
FLORIDA DEPARTMENT OF
AutoCAD SHX Text
TETRA TECH, INC.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text LEGEND: PZ001 PIEZOMETER LOCATION MW 004 SID MONITORING WELL APPROXIMATE LOCATION OF CONTAMINANT EXCEEDANCES
AutoCAD SHX Text
TRICHLOROETHENE
AutoCAD SHX Text
TETRACHLOROETHENE
AutoCAD SHX Text
TCE
AutoCAD SHX Text
PCE
AutoCAD SHX Text
1,1-DICHLOROETHENE
AutoCAD SHX Text
1,1-DCE
AutoCAD SHX Text Trans-1,2-DICHLOROETHENE
AutoCAD SHX Text Trans
AutoCAD SHX Text cis-1,2-DICHLOROETHENE
AutoCAD SHX Text Cis
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text RESULTS SHOWN ARE IN ug/L (MICROGRAMS/LITER). ALL DEPTH MEASUREMENTS ARE IN FEET SAMPLE DATE: 01/31/22 AND 02/01/22 BOLD INDICATES A LABORATORY DETECTION BOLD AND SHADED INDICATES AN EXCEEDANCE OF THE MCLs or GCTLs
AutoCAD SHX Text
ANALYZED, BUT NOT DETECTED
AutoCAD SHX Text U
AutoCAD SHX Text
BETWEEN MDL & PQL
AutoCAD SHX Text I
AutoCAD SHX Text
VINYL CHLORIDE
AutoCAD SHX Text
VC
AutoCAD SHX Text
MAXIMUM CONTAMINANT LEVEL
AutoCAD SHX Text
MCL
AutoCAD SHX Text
NON-DETECT
AutoCAD SHX Text
ND
AutoCAD SHX Text
SHALLOW ZONE
AutoCAD SHX Text
MW... S
AutoCAD SHX Text
INTERMEDIATE ZONE
AutoCAD SHX Text
MW... I
AutoCAD SHX Text
DEEPER ZONE
AutoCAD SHX Text
MW... D
AutoCAD SHX Text
PZ001
AutoCAD SHX Text
PZ002
AutoCAD SHX Text
PZ004
AutoCAD SHX Text
PZ003
AutoCAD SHX Text
MW003SID
AutoCAD SHX Text
MW002ID
AutoCAD SHX Text
MW001-VIL
AutoCAD SHX Text
MW008ID
AutoCAD SHX Text
MW005ID
AutoCAD SHX Text
MW004SID
AutoCAD SHX Text
MW007SID
AutoCAD SHX Text
MW009 SID
AutoCAD SHX Text 03/31/22
AutoCAD SHX Text VLT_SAR_03-28.22.dwg
AutoCAD SHX Text
MONITOR WELL GROUNDWATER ANALYTICAL RESULTS
AutoCAD SHX Text
VILLAGE LAUNDRY
AutoCAD SHX Text
TAMPA, FL
AutoCAD SHX Text
FAC ID, ERIC_ 4743
AutoCAD SHX Text
MAP - JANUARY 2022
AutoCAD SHX Text
NS
AutoCAD SHX Text
NOT SAMPLED
AutoCAD SHX Text
NS
AutoCAD SHX Text
NS
AutoCAD SHX Text
NS
AutoCAD SHX Text
NS
dlcline Rectangle dlcline Rectangle dlcline Rectangle dlcline Rectangle dlcline Rectangle dlcline Rectangle dlcline Typewriter
PROPOSED SONIC MONITORING WELL
(6/24/22 Email Breck Dalton) dlcline Polygon Line dlcline Polygon Line dlcline Polygon Line dlcline Polygon Line dlcline Polygon Line dlcline Polygon Line dlcline Typewriter 3-10 ft bgs dlcline Typewriter 14-20 ft bgs dlcline Typewriter 30-40 ft bgs
Dalton_JB Oval
Dalton_JB Oval
Dalton_JB Oval
Dalton_JB Oval
Dalton_JB Oval
Dalton_JB Oval
Dalton_JB Oval
Dalton_JB Text Box Brecks Proposed MWs
Dalton_JB Text Box 30-40'
Dalton_JB Text Box 65-70'
Dalton_JB Text Box 65-70'
Dalton_JB Text Box 65-70'
Dalton_JB Text Box 30-40'
Dalton_JB Text Box 30-40'
Dalton_JB Oval
Dalton_JB Oval
Dalton_JB Oval
Dalton_JB Oval
Dalton_JB Text Box 45-50' Lithology dependent
Dalton_JB Text Box 40-45' Lithology dependent dlcline Typewriter
MW011D
dlcline Typewriter
MW004V
dlcline Typewriter
MW007D2
dlcline Typewriter dlcline Typewriter
MW003V
dlcline Typewriter
MW003D2
dlcline Typewriter
MW012D
dlcline Typewriter
MW009V
dlcline Typewriter
MW013D
Project Name/Address: Village Laundry, Tampa Date:
Detailed description of goods or services required (including total quantity, size, delivery requirements, and all other specifications):
Install 8 flush mount monitoring wells via sonic drilling with continuous core logging. Three (3) 2" PVC vertical extent wells with a TD of 70' bgs and a screen interval of 65-70' bgs.
Two (2) 2" PVC wells with a TD of 50' bgs screened 45-50'. Three (3) 2' PVC wells with a TD of 30' bgs screened 20-30'.
Construct decon pad and steam pressure washer. Provide equipment for pump out and of decon pad and containment of IDW Assume setting two override casings for the 65-70' wells and one for each of the other wells.
Vendor Name: Description Price Quantity Cascade Price Quantity Preferred Drilling Price Quantity Groundwater Protection Contact Name: Oliver Pederson Kevin Bonacum Todd Hodgson Contact Number: 715-225-8663 727-561-7477 407-325-4234
Written Quote (yes/no): Yes Yes Yes Telephone Quote (yes/no): No No No
Mobilization Roundtrip 3,500.00$ 1 3,500.00$ 975.00$ 1 975.00$ 2,000.00$ 1 2,000.00$ Per Diem 600.00$ 10 6,000.00$ -$ 375.00$ 6 2,250.00$ Sonic Rig daily rate Day -$ 4,000.00$ 7 28,000.00$ 4,250.00$ 7 29,750.00$ Sonic rig completion rate Foot 45.00$ 440 19,800.00$ -$ -$ Tooling/support vehicle Day -$ -$ -$ 7 and 8" override casing Foot 38.00$ 365 13,870.00$ -$ 20.00$ 210 4,200.00$ 10" override casing Foot -$ 48.00$ 120 5,760.00$ 30.00$ 90 2,700.00$ Well development - extended -$ 150.00$ 3 450.00$ Well development hour 275.00$ 10 2,750.00$ -$ 75.00$ 5 375.00$ Decon pad LS 1,500.00$ 1 1,500.00$ 400.00$ 1 400.00$ 500.00$ 1 500.00$ 2" PVC Well (all materials) Foot 20.00$ 440 8,800.00$ 20.00$ 400 8,000.00$ 10.00$ 400 4,000.00$ PVC well screen 11 each 2" x 5' length (55 ft) -$ -$ -$ Well Riser 55 each 2" x 5' length (75 ft) -$ -$ -$
Well Completion (development, 8-inch manhole, locking well cap) 275.00$ 8 2,200.00$ 150.00$ 8 1,200.00$ 125.00$ 8 1,000.00$
DOT 55-gallon drum 100.00$ 25 2,500.00$ 75.00$ 45 3,375.00$ 65.00$ 26 1,690.00$ Permits 8 50.00$ 4 200.00$ 100.00$ 6 600.00$ 60.00$ 4 240.00$ Steam Cleaner Day -$ 75.00$ 7 525.00$ -$ Night work surcharge 2,250.00$ 2 4,500.00$ 1,200.00$ 2 2,400.00$ 1,000.00$ 2 2,000.00$ Hydrant Meter and Water Use 1,500.00$ 1 1,500.00$ 1.00$ 500.00$ 500.00$ 1 500.00$ Challeging location surcharge LS 2,000.00$ 1 2,000.00$ -$ -$ Decon equipment hours 225.00$ 10 2,250.00$ -$ -$
Service/Good Cost: 71,370.00$ 51,735.00$ $51,655.00 Taxes (7.5%):
Shipping:
Handling/Drop Fees:
TOTAL COST: 71,370.00$ 51,735.00$ $51,655.00
VENDOR SELECTED: Groundwater Protection Basis of Selection: Lowest price
7/6/2022
FDEP Waste Cleanup Program
COMPETITIVE BID WORKSHEET
From: Oliver Pederson To: Nedvidek, Dan Cc: Mark Herndon; Will Burdette; Ricky Davis; Michael Hansen Subject: RE: Cascade Drilling - Quote Dry Cleaners Tampa, FL Date: Thursday, June 23, 2022 4:35:33 PM
Dan, I put the answers to you questions in red below.
Oliver
OLIVER PEDERSON, MBA
CASCADE | 5785 SW 6th Place, Suite 101A, Ocala FL 34474 P 352-237-1995 Ext 3103 M 715-225-8663 | OPEDERSON@CASCADE-ENV.COM
EXCELLENCE ON EVERY LEVEL™ WWW.CASCADE-ENV.COM
Please consider the environment before printing this e-mail
From: Nedvidek, Dan <Dan.Nedvidek@terracon.com> Sent: Thursday, June 23, 2022 3:29 PM To: Oliver Pederson <opederson@cascade-env.com> Cc: Mark Herndon <mherndon@cascade-env.com>; Will Burdette <wburdette@cascade-env.com>;
Ricky Davis <rdavis@Cascade-env.com>; Michael Hansen <mhansen@cascade-env.com> Subject: RE: Cascade Drilling - Quote Dry Cleaners Tampa, FL
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. If in doubt, contact the Help Desk...
Oliver, Thanks for the quick turn around on this. I have a few questions that I’m sending to each respondent as we start comparing bids since there was a lot of variation in the responses and we don’t want to mess around with trying to get a change order approved during the site work. Please take a look at your quote and make sure you’re good to go on the following:
Confirm your number of days on site. Make sure it’s adequate to complete the scope without a change order.
Cascade believes the scope of work can be completed in 10 days on site Confirm worst case number of drums.
Worst case number of drums would be 50 Drum staging. Please include costs for a skidsteer if you haven’t already. Space for drums is limited and we’re going to have trouble controlling a large area of the parking lot for staging.
Cascade has included a BOBCAT skid steer in our original quote.
mailto:opederson@cascade-env.com mailto:Dan.Nedvidek@terracon.com mailto:mherndon@cascade-env.com mailto:wburdette@cascade-env.com mailto:rdavis@Cascade-env.com mailto:mhansen@cascade-env.com mailto:OPederson@cascade-env.com https://urldefense.com/v3/__http://www.cascade-env.com__;!!JrcuqBw_IQ!hGRXZ4HdDdYS8MaHC2vPOVDing9R_r29zfQhn1467bG8dLVF7w0CqRgAuCMR4_3FGi9W9wUCwxAUO5ZSL-A96Cnea8s$
Please indicate if (if you haven’t already) if you’re planning on tapping a hydrant or bringing a full tank with you. Do not rely on site water being available.
Cascade will contact the local utilities and arrange a water source close to the site if awarded Confirm the number of well permit applications. Everyone came back with a different number.
From looking at the map, it looks like (4) addresses would need to be used for pulling permits. 4 permits in total would be needed.
Please note (if not already detailed in a line item) if decon equipment – steam cleaner, etc.
are built into your daily rates. Please add costs if not.
Cascade has included a steam cleaner in our original quote.
Thanks, Dan
From: Oliver Pederson <opederson@cascade-env.com> Sent: Tuesday, June 21, 2022 3:04 PM To: Nedvidek, Dan <Dan.Nedvidek@terracon.com> Cc: Mark Herndon <mherndon@cascade-env.com>; Will Burdette <wburdette@cascade-env.com>;
Ricky Davis <rdavis@Cascade-env.com>; Michael Hansen <mhansen@cascade-env.com> Subject: Cascade Drilling - Quote Dry Cleaners Tampa, FL
Dan, Attached is the proposal for the 8 wells at the laundromat in Tampa. I noticed the depths of the wells in the email were just a few feet different than the depths on the map provided. I went with the deeper info. If they go shallower, you will be billed only what we drill. If you have any questions about the bid, feel free to call me anytime.
Thank you for allowing Cascade to bid on your project.
Oliver Pederson
OLIVER PEDERSON, MBA
CASCADE | 5785 SW 6th Place, Suite 101A, Ocala FL 34474 P 352-237-1995 Ext 3103 M 715-225-8663 | OPEDERSON@CASCADE-ENV.COM
EXCELLENCE ON EVERY LEVEL™ WWW.CASCADE-ENV.COM
Please consider the environment before printing this e-mail mailto:opederson@cascade-env.com mailto:Dan.Nedvidek@terracon.com mailto:mherndon@cascade-env.com mailto:wburdette@cascade-env.com mailto:rdavis@Cascade-env.com mailto:mhansen@cascade-env.com mailto:OPederson@cascade-env.com https://urldefense.com/v3/__https://nam04.safelinks.protection.outlook.com/?url=https*3A*2F*2Furldefense.com*2Fv3*2F__http*3A*2Fwww.cascade-env.com__*3B!!JrcuqBw_IQ!j2eP5Z7Aia7IWddNqlvuFckE_FIN6ezbIY8wvjFHr8ZgeWRsx0IcIAi23WKzoidyVG7FGHvHNEvEnSQfILPX5axDBaI*24&data=05*7C01*7Copederson*40cascade-env.com*7Cbdf14fa5b84c41ae780608da554e982d*7C1b5ac9f0748045089372af6cbf2f8476*7C0*7C0*7C637916093291215229*7CUnknown*7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0*3D*7C3000*7C*7C*7C&sdata=*2BhAI7QdF4ML0*2FC50qOfFMt*2FMeqp*2Fp8Rv4VdV7aH*2FCvg*3D&reserved=0__;JSUlJSUlJSUlJSUlJSUlJSUlJSUlJSUlJSUlJSUl!!JrcuqBw_IQ!hGRXZ4HdDdYS8MaHC2vPOVDing9R_r29zfQhn1467bG8dLVF7w0CqRgAuCMR4_3FGi9W9wUCwxAUO5ZSL-A93GSYvIg$
Terracon provides environmental, facilities, geotechnical, and materials consulting engineering services delivered with responsiveness, resourcefulness, and reliability.
Private and confidential as detailed here (www.terracon.com/disclaimer). If you cannot access the hyperlink, please e-mail sender.
http://www.terracon.com/disclaimer
Preferred Drilling Solutions, Inc.
8820 66th St, Pinellas Park, FL 33782
Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com
SONIC DRILLING TECHNOLOGY QUOTE FORM
Date: 6/24/22 FAC ID#: ERIC_4743
*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner
Unit Unit Rate Number of Units Extended Price per day $4,000.00 7 $28,000.00 per day $3,000.00 $0.00 per foot $12.00 $0.00 per foot $20.00 400 $8,000.00 per foot $26.00 $0.00 per foot $48.00 120 $5,760.00 each $125.00 $0.00 per well $150.00 8 $1,200.00 roundtrip $975.00 1 $975.00 per crew / per night $0.00 $0.00 each $75.00 45 $3,375.00 each $100.00 6 $600.00 lump sum $400.00 1 $400.00 per day $75.00 7 $525.00 per night $1,200.00 2 $2,400.00
TOTAL QUOTE PRICE $51,235.00
Notes: 1. Includes expendables, tubing, points, liners, caps, plugs, saw cuts, development, standby time.
Project No.:
Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477
Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782
Signature and Title of Person Submitting Quote: ___________________________________Kevin Bonacum, Estimator
MISCELLANEOUS
(3) 2" x 30' MW's with 10' .010 screen, continuous soil sampling, drum soil & water, pad and 8" bolt down manhole
(2) 2" x 50' MW's with 5' .010 screen, 8" x 40' temp override casing, continuous soil sampling, drum soil & water, pad and 8" bolt down manhole
(3) 2" x 70' MW's with 5' .010 screen, (2) zone temp override casing: 10" x 40' temp override casing, 8" x 60' temp override casing, continuous soil sampling, drum soil & water, pad and 8" bolt down manhole
Decon pad, decon tooling and equipment prior to and between borings with steam cleaner, brushes and saw horses, drum decon fluids
Sonic Daily Rate & Crew (up to 10 hours on site)
Sonic Half Day Rate & Crew (up to 5 hours on site)
1" PVC Well Installation (includes all materials)
2" PVC Well Installation (includes all materials) 4" PVC Well Installation (includes all materials)
Pre-Packed Well Screen (includes all materials) ID 2" 5' Length
Well Completion (includes MH w/ cover, concrete pad, and locking well cap)
10" Temporary Override Casing (8" Override Casing Included in Daily Rate)
Consultant Name: Terracon
Site Name and Location: Village Laundry 10049 N. Dale Mabry Highway, Tampa, Hillsborough County, FL
PROPOSED SCOPE OF WORK:
Equipment Type: Geoprobe 8140LC, Geoprobe 8150LS, Terrasonic 150CC
SONIC DRILLING TECHNOLOGY
Develop each well for a minimum 0.75 hours, assume 1.5 hours of development for deep wells
Some wells may need to be complete during night work hours due to traffic flow/parking lot access
Some wells are in ROW, client responsible for ROW permitting and MOT as needed
Skid steer to assist with moving tooling and equipment, drums and decon
Steam Cleaner
Night Work Surcharge
Days to Complete Scope of Work: 7
Mobilization Per Diem
DOT Approved 55-gal Drum
Permits
Decon Pad
Sonic Auger DPT Injection Well Abandonment
DATE: 6/23/2022
ESTIMATE #: 622069
Terracon
ID QTY Unit Rate TOTAL
1 1 ls 2,000.00$ 2,000.00$
2 Per Diem 6 night 375.00$ 2,250.00$
3 Sonic Rig and Crew 7 day 4,250.00$ 29,750.00$
4 10" Sonic Override Casing to 30' 90 foot 30.00$ 2,700.00$
5 8" Sonic Override Casing (30' and 50') 210 foot 20.00$ 4,200.00$
7 Materials: 2" Sch 40 PVC Well Installation 400 foot 10.00$ 4,000.00$
9 2' x 2' Concrete Pad w/8" BD Completion 8 each 125.00$ 1,000.00$
11 Well Development (Up to 45 Min with pump) 5 each 75.00$ 375.00$
11a Well Development (Deep Wells up to 1.5 Hours with pump) 3 each 150.00$ 450.00$
12 Drums (Soil Cores) Estimated 8 each 65.00$ 520.00$
13 Drums (Drilli Mud) Estimated 8 each 65.00$ 520.00$
13 Drums (Development Water) Estimated 10 each 65.00$ 650.00$
13 Night Work Allowance (If Needed) night 1,000.00$ -$
14 Light Tower night 500.00$ -$
14 Water Meter and Use 1 ls 500.00$ 500.00$
15 Bobcat for IDW and Tooling Management 1 ls 1,000.00$ Included
16 Decon Pad (If Needed) ls 500.00$ -$
17 Permits (SWFLWMD/Not Applicable for FDEP Projects) -$
Subtotal 48,915.00$
Todd Hodgson
Todd Hodgson TOTAL 48,915.00$ Partner
Tampa, Florida 33634 Tampa, Florida 331685463 W. Waters Avenue, Suite 830
(813) 321-0313 Sonic Well Installation
Project Description:
(2) 2" x 50' PVC Well w/5' of .010 Slot Screen, 8" Override Casing to 30', 8" BD Completion. Sonic Soil Sampling
(3) 2" x 30' PVC Well w/10' of .010 Slot Screen, 8" BD Completion. Sonic Soil Sampling
PROJECT
Village Laundry 10049 N. Dale Mabry Highway
Dan Nedvidek, P.G.
CUSTOMER
THANK YOU FOR YOUR BUSINESS!
DESCRIPTION
If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 at Todd@drillprollc.com.
"Actual quantities used and days onsite will be invoiced"
Completion: 6-7 Days - Due to wells scattered over multiple parcels.
(3) 2" x 70' PVC Well w/5' of .010 Slot Screen, 10" Override Casing to 30', 8" Override Casing to 50', 8" BD Completion. Sonic Soil Sampling
Mobilization (Includes Shift Change)
Locations must be accessible with track mounted Sonic Rig
Damage to utilities on private property during borehole clearance are the responsibility of the client Utility Locates on Private Property are the responsibility of the client
ROW Permits and MOT Responsibility of the Client Borehole Clearance to 5’ bgs beyond 20 minutes may require a change order for additional time and costs.
2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586
Project Name/Address: Village Laundry, Tampa Date: 7/6/2022
Detailed description of goods or services required (including total quantity, size, delivery requirements, and all other specifications):
Vendor Name: Description Price Quantity GPRS Price Quantity GeoView Price Quantity SurvTech Contact Name: Megan Meyers Chris Taylor David O'Brien Contact Number: 419-767-2456 813-494-1664 813-621-4929
Written Quote (yes/no): Yes No Yes Telephone Quote (yes/no): No Yes No
Utility clearance scanning, marking, map $ 975.00 1 $ 975.00 $ 800.00 1 $ 800.00 $ - 1 $ 2,795.00
Service/Good Cost: $ 975.00 $ 800.00 $ 2,795.00 Taxes (7.5%):
Shipping:
Handling/Drop Fees:
TOTAL COST: $ 975.00 $ 800.00 $ 2,795.00
VENDOR SELECTED: Geoview Basis of Selection: Lowest bid
Scan and mark utilities within a 10'x10' box around eight (8) proposed boring locations.
A Geophysical Services Company
4610 Central Avenue Tel.: (727) 209-2334
St. Petersburg, FL 33711 Fax: (727) 328-2477
July 20, 2022
Mr. Dan Nedvidek, P.G.
Terracon
5463 W. Waters Avenue, Suite 830
Tampa, FL 33634
Subject: Proposal to Perform a Utility Designation Study
10049 N. Dale Mabry
Tampa, Florida
GeoView Proposal Number: 10088p
Mr. Nedvidek, The purpose of this letter is to transmit a proposal to complete a geophysical investigation at the subject site. This proposal is in response to your request for proposal made during your recent conversations with our office. GeoView, Inc.
appreciates the opportunity to provide our services on this project. We look forward to hearing from you soon.
GEOVIEW, INC.
Chris Taylor, P.G.
Vice President
Florida Professional Geologist Number 2256
Enclosure
Proposal
This document shall serve as a proposal for work to be performed by
GeoView, Inc. (GeoView) for Terracon.
Description of Site
The project site is located at 10049 North Dale Mabry Highway in Tampa, Florida. The purpose of the geophysical survey will be to determine the location of underground utilities within a 10 feet radius of 8 proposed borings.
Scope of Work
The geophysical survey will be conducted using ground penetrating radar
(GPR) and conventional electromagnetic (EM) pipe and cable locators. The GPR survey will be conducted using either a Mala and/or a GSSI GPR system. The appropriate GPR antenna configuration and time range and processing parameters will be determined in the field by the project manager.
The EM survey will be performed using a Subsite 95R and/or a
Radiodetection RD (8000, 8100 or 8200) system. As appropriate, the EM survey will be conducted using both passive and active modes. The passive mode is used to find cables and conduits carrying live power (50-60 Hz) and communication
(29-33Hz) signals. For the active mode survey, a current is transmitted directly or broadcast into using electromagnetic induction a metal pipe or conduit and the path of the pipe/conduit is identified by following the signal with a portable receiver.
The active mode is used to trace out cast iron pipes, metal water and sewer lines, utilities that have trace wires, and inactive power and communication lines.
Presentation of Results
The location and estimated depths of underground utilities or any other identified structures shall be indicated on the ground surface using spray paint or other methods as specified by Terracon. No report shall be prepared.
Compensation
Cost to complete the survey will be $800. If an scaled AutoCAD site map is required to document the study results, an additional fee of $200 will be added.
This price is inclusive of all charges associated with the project. Unless otherwise agreed upon, GeoView shall be compensated for all services within 30 days of invoice date. GeoView shall be paid in full regardless of whether the results of the geophysical survey are what Terracon anticipated. If it is determined during the survey that the geophysical survey will not achieve the objectives of the project, Terracon will immediately be notified. If a decision is made to discontinue the survey, only charges for time and materials costs to that point will be submitted.
Requirements of Client
Terracon will provide a scaled map and digital file, if available, of the project site showing the boundaries of the project site, areas of specific concern and pertinent landmarks. Terracon will also supply all available information regarding the presence and history of underground utilities at the project site (see limitations for further discussion). Unless otherwise requested, Terracon will be responsible for the coordination of site access, traffic control, clearing of onsite obstructions or any other logistical consideration necessary to conduct the survey.
General Description of Each of The Geophysical Methods
Ground Penetrating Radar (GPR)
The GPR survey will be conducted using a Mala or GSSI GPR system. The survey will be conducted with either a 500, 400 or 250 mega-Hertz antenna. The appropriate antenna will be determined in the field by the project manager. GPR will be able to provide both the position and estimated depth of both metallic and non-metallic underground utilities.
The ability of GPR to resolve a particular utility will be controlled by the following factors: 1) Depth of penetration of the GPR signal, 2) Depth of burial and diameter of the underground utility and 3) Electrical contract between the underground utility and the surrounding soils and 4) The complexity of the utility layout at the site. Due to one or a combination of these factors the GPR may not be able to identify all the utilities at the site. The diameter or composition of utilities cannot be accurately determined using GPR, though can be estimated. Estimates of burial depth are typically accurate to within +/- 20 percent, more accurate depths are possible if invert elevations for some on-site utilities are known.
Conventional Electromagnetic Pipe and Cable Locators
A Radiodetection System is used to locate underground utilities using conventional means. The system consists of a dual-function receiver and transmitter. The receiver can be operated in two modes: active and passive. In the passive mode the receiver detects the presence of underground utilities that are energized by a 60-Hertz or other known frequency. These utilities can either be those actually carrying electrical power or those utilities that are both metallic and sufficiently close to the electrical lines to have an electrical field induced within them.
In the active mode, the transmitter deliberately induces an electrical current into the utility. The frequency of this field can be varied from 512 Hertz to 200 kilohertz. The electrical field is induced using a transmitter which is either directly attached to the utility, placed on or above the utility or attached to an induction coil which is placed around the utility. Depths of underground utilities can be determined when the EM equipment is being used in the active mode. Depths are typically accurate to within 10-15 percent of the total utility depth.
Limitations
GeoView shall only be liable for the successful locating of underground utilities or any other under ground structures whose presence is both known and indicated on site maps to be provided prior to the performance of the geophysical survey. Every attempt will be made to locate both known and unknown utilities within the survey area. However, GeoView will only be liable for utilities whose presence is known prior to the survey.
The objective of the geophysical survey is to determine the presence and configuration of underground utilities. However, the geophysical response of these features may be highly complex depending upon on the physical characteristics of the underground utilities, the electrical properties of the surrounding soils, the depth of burial of the utilities, and the proximity of the utilities to each other.
GeoView shall conduct the geophysical survey using the most “up-to-date” geophysical equipment in a manner consistent with the level of care and skill ordinarily exercised by members of the geophysical profession practicing in the same locality under similar conditions. GeoView’s utility locating personnel are all certified GPR and conventional pipe and cable locator operators with extensive in-house training.
When Terracon is working around indicated utilities, a minimum of 2 feet clearance from either side of the marked utility will be maintained.