This document is a Task Assignment (TA) for environmental remediation services issued by the State of Florida Department of Environmental Protection (FDEP) to Terracon Consultants, Inc., a private environmental consulting firm based in Tampa, Florida. The TA is identified as DC014B under Master Contract HW687, dated January 23, 2023, with an effective completion date of November 30, 2023. The project involves operation and maintenance of a soil vapor extraction (SVE) system at the Village Laundry site (ERIC_4743) located at 10325 Lake Carroll Way in Tampa, Florida. The contract is managed by Dean Cox of FDEP and Donna Cline of Terracon Consultants, Inc.
The TA authorizes six months of operation and maintenance services for the existing SVE remediation system, including associated equipment operation, system sampling and analysis, reporting, and utility costs. The total contract value is $15,418.89, consisting of $12,418.89 in fixed unit rate labor costs (71.01 hours) and $3,000.00 in cost reimbursement for utilities plus a $120 handling fee. Deliverables include quarterly system email evaluations with O&M checklists and field notes due May 31, 2023 ($4,880.83), and a semi-annual system evaluation report with laboratory analysis and Remedial Action System Summary (RASS) due August 31, 2023 ($7,418.06). The contract was negotiated with proposed costs reduced by $1,686.06 (10% reduction). The funding source is listed as N/A in the budget entity documentation. Labor includes staff engineers, environmental technicians, project management, vehicle rental, laboratory analysis, and field equipment expenses.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW687
DC014B Completion November 30, 2023
This task assignment (TA) authorizes costs for operation & maintenance (O&M) of the soil vapor extraction system (SVE) for six months, with associated equipment, system sampling & analysis, reporting and utility costs. The total cost for this TA is $15418.89 with 71.01 hours labor. There is $3,000 in cost reimbursement (utilities).
Dean Cox 850-245-8969 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Terracon Consultants, Inc.
Terracon Consultants, Inc.
Donna Cline 813-321-0340
ERIC_4743
10325 Lake Carrol Way, Tampa
Village Laundry (former)
✔ $ 12,418.89 ✔ $ 3,000.00
$ 15,418.89
Scope of Work
1/24/2023
Kelly Crain
N/A
Kelly Crain Digitally signed by Kelly Crain Date: 2023.01.23 15:56:58 -05'00' dlcline Typewriter Donna Cline
Sr. Remediation Engineer
Cox_DL Underline
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Quarterly system email evaluation & recommendations, O&M checklists & field notes, certified laboratory analytical report, and O&M tables (Subtask 2). 05/31/2023
Semi-annual system evaluation report with recommendations, O&M checklists & field notes, certified laboratory analytical report, and O&M tables (Subtask 1 Project Management and Subtask 3).
08/31/2023
FDEP approval of quarterly system email evaluation & recommendations, O&M checklists & field notes, certified laboratory analytical report, and O&M tables (Subtask 2 Three Months O&M).
$ 4,880.83
FDEP approval of semi-annual system eval report, O&M checklists & field notes, certified lab report, and O&M tables (Subtask 1 Project Management and Subtask 3 Three Months O&M with Remedial Action System Summary [RASS] Report).
$ 7,418.06
FDEP receipt of utility invoices - Utilities Cost Reimbursement not to exceed $3000;
Utilities Handling Fee $120 - Subtask 4 $ 3,120.00
$ 15,418.89
HW687
DC014B
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Interim Secretary
Memorandum
TO: HW687 Contract File FROM: Dean Cox, Contract Manager SUBJECT: DC014B O&M (6-Months) – Village Laundry (ERIC_4743)
DATE: 1/23/23
This task assignment (TA) authorizes costs for operation & maintenance (O&M) of the soil vapor extraction system (SVE) for six months, with associated equipment, system sampling & analysis, reporting and utility costs. The total cost for this TA is $15,418.89 with 71.01 hours labor. There is $3,000 in cost reimbursement (utilities).
This TA was negotiated. Proposed costs were reduced by $1,686.06 or 10%. This TA continues O&M for the SVE system that has been and continues to operate at the site.
Contaminant concentrations are moderate, so the system will be needed for at least the term of this TA. The site access agreement has been verified accurate and current.
FDEP COST ESTIMATE
Contractor: Terracon
Date: 3/10/2022 Task #: HW687 DC014B SubTask 1 Project Management SubTask 6
Site: Village Laundry ERIC_4743 SubTask 2 3 Months of O&M SubTask 7 Activity/Phase: 6 Months of O&M, Semiannual RASS SubTask 3 3 Months of O&M and Remedial Summary Report SubTask 8
Project Manager: Dean Cox SubTask 4 Utilities SubTask 9 SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$64.50 Project Manager Donna Cline 4.01 4.01 $0.00 Administrative 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Brownfield Consultant 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0
$31.25 CADD Specialist Chelsea Fugate 3.00 0.00 3.00 0.00 0.00 0 0 0 0 0 $0.00 Data Analyst & Visualization Specialist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0
$17.50 Environmental Technician Corey Olson 24.00 13.00 11.00 0.00 0.00 0 0 0 0 0 $0.00 Field Geologist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Field Scientist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 GIS Technician 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Principal Consultant 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Project Geologist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Project Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Project Scientist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0
$64.50 Senior Engineer Donna Cline 4.00 0.00 4.00 0.00 0.00 0 0 0 0 0 $0.00 Senior Geologist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Senior GIS Analyst 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Senior Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0
$40.87 Senior Scientist Michael Mui 8.00 3.00 5.00 0.00 0.00 0 0 0 0 0 $31.73 Staff Engineer Ricker Lamphier 28.00 11.00 17.00 0.00 0.00 0 0 0 0 0 $0.00 Staff Scientist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0
Total Hours 71.01 4.01 27.00 40.00 0.00 0.00 0 0 0 0 0
Direct Labor $2,245.48 $258.33 $699.14 $1,288.01 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 116.00% $2,604.75 $299.66 $811.00 $1,494.09 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.26% $1,263.31 $145.34 $393.34 $724.63 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $6,113.54 $703.33 $1,903.48 $3,506.73 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 1
FDEP COST ESTIMATEContractor: Terracon Date: 3/10/2022
Task #: HW687 DC014B SubTask 1 Project Management SubTask 6 Site: Village Laundry ERIC_4743 SubTask 2 3 Months of O&M SubTask 7
Activity/Phase: 6 Months of O&M, Semiannual RASS SubTask 3 3 Months of O&M and Remedial Summary Report SubTask 8 Project Manager: Dean Cox SubTask 4 Utilities SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $720.00 360.00$ 360.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $720.00 $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $3,000.00 $0.00 $0.00 3,000.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Initiation Fee $0.00 $0.00 $0.00 -$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $3,000.00 $0.00 $0.00 $3,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $120.00 $0.00 $0.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $3,120.00 $0.00 $0.00 $3,120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $1,864.00 932.00$ 932.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $140.00 70.00$ 70.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $2,004.00 $1,002.00 $1,002.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $240.00 120.00$ 120.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $2,610.00 1,305.00$ 1,305.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $2,850.00 $1,425.00 $1,425.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $14,807.54 $703.33 $4,690.48 $6,293.73 $3,120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $611.35 $70.33 $190.35 $350.67 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $15,418.89 $773.66 $4,880.83 $6,644.40 $3,120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Village Laundry ERIC_4743 SUBTASK 2: 3 Months of O&M
PROPOSAL NO. PH4227493
DATE: 1/23/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Terracon Month 7 O&M Staff Engineer RL 1.00 Staff Engineer RL Load/unload 1.00 Staff Engineer RL Mobilization (from Tampa) 1.00 Staff Engineer RL System O&M, optimize system 3.00 Staff Engineer RL Monthly recording of system data into the operational tables 1.00
Month 8 O&M Environmental Tech CO PreTask planning, Load/unload 1.00 Environmental Tech CO Mobilization (from Tampa) 1.00 Environmental Tech CO System O&M, optimize system 3.00 Staff Engineer RL Monthly recording of system data into the operational tables 1.00
Month 9 O&M Staff Engineer RL 0.50 Environmental Tech CO PreTask planning, Load/unload 1.00 Environmental Tech CO Mobilization (from Tampa) 1.00 Environmental Tech CO System O&M, optimize system 3.00 Environmental Tech CO Collect soil vapor samples for laboratory analysis 3.00 Staff Engineer RL Quarterly recording of lab data into operational tables and calculate mass recover 1.50 Staff Engineer RL Monthly recording of system data into the operational tables 1.00 Senior PM/Engineer MM 3.00
Personnel: RL MM CO CF Hours: 11.00 3.00 13.00 0.00 TOTAL LABOR 27.00
VEHICLE TYPE RATE UNIT USEAGE
Truck (Staff Engineer) 120 day 1 120.00$ Truck (Env Tech) 120 day 2 240.00$
TOTAL VEHICLE 360.00$
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC* #IDW TOTALS
VOCs 200.00$ 4 800.00$
Summa Canister 33.00$ 4 132.00$ Sample Shipping Large (2 day) 70.00$ 1 70.00$
TOTAL LAB 1,002.00$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Construction / O&M / Pilot Test Kit 360.00$ day 3 1,080.00$ Construction / O&M Supplies 75.00$ day 3 225.00$ Expendables 40.00$ day 3 120.00$
TOTAL EQUIPMENT 1,425.00$
TO-15 (VEW-1, -2, -3, Influent)
Request sample kit
PreTask Planning, prepare field sampling SOW/coordinate site access
Quarterly system evaluation and recommendations (sent in an email)
SUBTASK 3: 3 Months of O&M and RASS
PROPOSAL NO. PH4227493
DATE: 1/23/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Terracon Month 10 O&M Staff Engineer RL PreTask planning, Load/unload 1.00 Staff Engineer RL Mobilization (from Tampa) 1.00 Staff Engineer RL Perform System O&M, optimize system 3.00 Staff Engineer RL Monthly recording of system data into the operational tables 1.00
Terracon Month 11 O&M Environmental Tech CO PreTask planning, Load/unload 1.00 Environmental Tech CO Mobilization (from Tampa) 1.00 Environmental Tech CO O&M, optimize performance 3.00 Staff Engineer RL Monthly recording of system data into the operational tables 1.00
Terracon Month 12 O&M Staff Engineer RL 0.50 Environmental Tech CO PreTask planning, Load/unload 1.00 Environmental Tech CO Mobilization (from Tampa) 1.00 Environmental Tech CO Conduct O&M, optimize performance 3.00 Environmental Tech CO Collect soil vapor samples for laboratory analysis 1.00 Staff Engineer RL Monthly recording of system data into the operational tables 1.00 Reporting (6 Months of O&M, Semiannual RASS) Senior PM/Engineer MM Data reduction/evaluation 5.00 Staff Engineer RL Preparation of report 5.00 Staff Engineer RL Report - prepare final tables and exhibits 3.50 CADD Specialist CF Create unpdated Exhibits 3.00 Senior Engineer DC 3.00 Senior Engineer DC 1.00
Personnel: RL MM DC CF CO Hours: 17.00 5.00 4.00 3.00 11.00 OTAL LABOR 40.00
VEHICLE TYPE RATE UNIT USEAGE
Truck (Staff Engineer) 120 day 1 120.00$ Truck (Env Tech) 120 day 2 240.00$
TOTAL VEHICLE 360.00$
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC* #IDW TOTALS
VOCs 200.00$ 4 800.00$
Summa Canister 33.00$ 4 132.00$ Sample Shipping Large (2 day) 70.00$ 1 70.00$
TOTAL LAB 1,002.00$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Construction / O&M / Pilot Test Kit 360.00$ day 3 1,080.00$ Construction / O&M Supplies 75.00$ day 3 225.00$ Expendables 40.00$ day 3 120.00$
TOTAL EQUIPMENT 1,425.00$
Request sample kit
TO-15 (VEW-1, -2, -3, Influent)
Semiannual system evaluation and recommendations Sign and Seal RASS
SUBTASK 4: Utilities
PROPOSAL NO. PH4227493
DATE: 1/23/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
TOTAL LABOR 0.0
TOTAL PER DIEM -$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
FPL Electric 500.00$ Month 6 3,000.00$ Subcontractor Handling Fee 20.00$ Month 6 120.00$
TOTAL SUBCONTRATOR 3,120.00$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT -$
5463 West Waters Avenue, Suite 830
Tampa, FL 33584
P (813) 221-0050
F (813) 221-0051
Terracon.com
December 27, 2022
Florida Department of Environmental Protection
Waste Cleanup Program
Waste Management Division
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Attn: Mr. Dean Cox, Environmental Consultant
E: Dean.Cox@FloridaDep.gov
W: 850-245-8969
M: 727-686-6502
Re: Proposal for 6 Months of O&M and Preparation of a Semiannual RASS
Village Laundry
10325 Lake Carroll Way
Tampa, Florida 33618
ERIC_4743
Task Assignment HW687 DC014B
Terracon Proposal No PH4227493
Dear Mr. Cox:
Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this proposal to the
Florida Department of Environmental Program (FDEP) Waste Cleanup Program to perform six months
(2 quarters) of system operation and maintenance on an existing soil vapor extraction system. The proposal also includes the quarterly submittal of an email report and the submittal of a Semiannual
Remedial Action System Summary (RASS).
Scope of Services
◼ Perform first 6 months of system Operation and Maintenance
(O&M); quarterly sampling with laboratory analysis;
◼ Submit a quarterly email summary, to include O&M checklists, field notes, operational tables, lab data, remedial system evaluations and recommendations.
◼ Submit a Semiannual RASS Report, to include O&M checklists, field notes, operational tables, lab data, remedial system evaluations and recommendations.
See attached LOE for details
Schedule
The quarterly email summary will be submitted within 20 business days of receipt of analytical results (April 30, 2022).
The Semiannual RASS report will be submitted within 20 business days of receipt of analytical results (July 30, 2022).
Compensation See attached CEF for details.
Proposal for 6 Months of O&M and RASS
Village Laundry, ERIC_4743 ■ Tampa, FL
December 27, 2022 ■ Terracon Proposal No. PH4227493
SCOPE OF SERVICES SUMMARY
Terracon has operated this SVE system the past 6 months, and TetraTech operated this system for a period of 1 year. Due to the presence of significant mass recovery, and the moderate to high groundwater concentrations, the system is required to operate an additional six months.
CLOSING REMARKS
Terracon services will be conducted in accordance with the terms and conditions, contained within DEP
Waste Cleanup Program (WCP) Contract No. HW687, executed January 5, 2022. It is understood that a Task Assignment will be issued to authorize us to perform this work.
We appreciate the opportunity to provide this proposal and look forward to working with you on this project. If you should have any questions or comments, please contact either of the undersigned at
813-221-0050.
Sincerely, Terracon Consultants, Inc.
Donna Cline, P.E. Michael Mui, L.E.P.
Senior Remediation Engineer Remediation Engineer
Attachments: Cost Estimate Form
Level of Effort
Cline, Donna L Stamp
Cline, Donna L Stamp
Cline, Donna L Verdana for
| DC014B.pdf |
| DC014B memo.pdf |
| CEF-LOEs 230123.pdf |
| Cost Estimate |
| LOE Subtask 2 O&M |
| LOE Subtask 3 O&M |
| LOE Subtask 4 |
Pages from Proposal221227.pdf
File details come from the government source that posted it. Updated .