About this file

This document is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) Waste Cleanup Program to Terracon Consultants, Inc. for well abandonment services at the Concord Custom Cleaners #074 facility located at 4081 E. Olive Road in Pensacola, Escambia County, Florida. The task assignment is authorized under the underlying indefinite delivery contract HW687, executed January 5, 2022. The Department Project Manager is Gabriel Sostre (850-245-8749), and the Contractor's Project Manager is Donna Cline (904-479-7415). The project is identified as ERIC_4639 with a completion date of July 17, 2026.

The scope of work includes well abandonment activities consisting of three subtasks: Subtask 1 (Project Management), Subtask 2 (well abandonment of nine 2-inch diameter MAGS wells and four 2-inch diameter monitoring wells totaling 525 feet), and Subtask 3 (submittal of a Well Abandonment Report). The total task assignment value is $13,251.96, comprised of a fixed unit rate of $13,026.96 and cost reimbursement of $225.00. Payment is structured in two invoice milestones: $11,013.30 upon FDEP approval of well abandonment activities in the form of field notes (due by 04/24/2026), and $2,238.66 upon FDEP approval of the final Well Abandonment Report with updated tables, charts, appendices, and graphs (due by 05/29/2026). The cost estimate allocates 38.96 total labor hours, with subcontractor drilling services to Walker-Hill Environmental, Inc. at $7,740.00 as the lowest qualified bid. The task assignment was signed on February 10, 2026.

View the file

Other files

File Type Posted
CN-370000-HW687-BF01A.pdf PDF
CN-370000-HW687-BF01B.pdf PDF
CN-370000-HW687-BF02A.pdf PDF
CN-370000-HW687-BF04A.pdf PDF
CN-370000-HW687-BF04ACO3.pdf PDF
CN-370000-HW687-BIL01B.pdf PDF
CN-370000-HW687-BIL02B.pdf PDF
CN-370000-HW687-BIL03B.pdf PDF
CN-370000-HW687-BIL1BCO2.pdf PDF
CN-370000-HW687-BIL2CCO2.pdf PDF
CN-370000-HW687-CSS02.pdf PDF
CN-370000-HW687-CSS03.pdf PDF
CN-370000-HW687-DC002A.pdf PDF
CN-370000-HW687-DC002G.pdf PDF
CN-370000-HW687-DC006C.pdf PDF
CN-370000-HW687-DC008B.pdf PDF
CN-370000-HW687-DC008D.pdf PDF
CN-370000-HW687-DC009B.pdf PDF
CN-370000-HW687-DC010C.pdf PDF
CN-370000-HW687-DC012A.pdf PDF
CN-370000-HW687-DC014B.pdf PDF
CN-370000-HW687-DC014D.pdf PDF
CN-370000-HW687-DC014H.pdf PDF
CN-370000-HW687-DC015D.pdf PDF
CN-370000-HW687-DC016C.pdf PDF
CN-370000-HW687-DC01ACO9.pdf PDF
CN-370000-HW687-DC021A.pdf PDF
CN-370000-HW687-DC021C.pdf PDF
CN-370000-HW687-DC022A.pdf PDF
CN-370000-HW687-DC023B.pdf PDF
CN-370000-HW687-DC023D.pdf PDF
CN-370000-HW687-DC024B.pdf PDF
CN-370000-HW687-DC024E.pdf PDF
CN-370000-HW687-DC024F.pdf PDF
CN-370000-HW687-DC027A.pdf PDF
CN-370000-HW687-DC028A.pdf PDF
CN-370000-HW687-DC028D.pdf PDF
CN-370000-HW687-DC029C.pdf PDF
CN-370000-HW687-DC02ACO1.pdf PDF
CN-370000-HW687-DC02HCO2.pdf PDF
CN-370000-HW687-DC030A.pdf PDF
CN-370000-HW687-DC031A.pdf PDF
CN-370000-HW687-DC035A.pdf PDF
CN-370000-HW687-DC037A.pdf PDF
CN-370000-HW687-DC03CCO2.pdf PDF
CN-370000-HW687-DC044A.pdf PDF
CN-370000-HW687-DC049A.pdf PDF
CN-370000-HW687-DC054A.pdf PDF
CN-370000-HW687-DC056A.pdf PDF
CN-370000-HW687-DC057A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW687

DC045B Completion July 17, 2026

This TA authorizes Well Abandonment at the Concord Custom Cleaners #074 site as part of contract HW687.

Gabriel Sostre 850-245-8749 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Terracon Consultants, Inc.

Terracon Consultants, Inc.

Donna Cline 904-479-7415

ERIC_4639

4081 E. Olive Road, Pensacola, Escambia County

Concord Custom Cleaners #074

✔ $ 13,026.96

$ 225.00 $ 13,251.96

Scope of Work

Donna Cline

Senior Associate

2/10/2026

Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=Domain Users, email=Donna.Cline@terracon.com Date: 2026.02.10 05:39:55 -05'00'

Cline, Donna L

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2026.02.09 11:58:24 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

BWC TAFORM 01/18

HW687

DC045B

Subtasks 1 & 3: Project Management. Well Abandonment Report.

Subtask 2: Well Abandonment activities including the abandonment of nine 2-inch diameter MAGS wells and four 2-inch diameter Monitoring Wells. 04/24/2026

05/29/2026

Subtask 2: FDEP approval of Well Abandonment activities in the form of field notes.

Subtasks 1 & 3: FDEP approval of Well Abandonment Report including updated tables, charts, appendices, and graphs.

$ 11,013.30

$ 2,238.66

$ 13,251.96

McGrane_P Rectangle

Memorandum

TO:

FROM:

SUBJECT:

DATE:

Negotiation File Concord Custom Cleaners #074 4081 E. Olive Road Pensacola, Escambia County

ERIC_4639

Gabriel Sostre, Project Manager

Negotiation Summary Task Assignment DC045B (HW687)

January 26th, 2026

This Task Assignment authorizes Terracon Consultants Inc. (Terracon) to conduct Well Abandonment at the Concord Custom Cleaners #074 site as part of contract HW687. Below is a summary of each subtasks relevant to this TA:

Subtask 1: Reserved for Project Managment.

Subtask 2: Terracon shall conduct Well Abandonment of nine 2-inch diameter MAGS Wells and four 2-inch diameter Monitoring Wells.

Subtask 3: Terracon shall submit a Well Abandonment Report including updated tables, charts, graphs, and appendices to the FDEP before receiving Approval to Invoice.

The total cost of this TA is $13,251.96. The total amount of labor hours dedicated to this TA is 38.96.

Terracon may invoice according to included schedule.

FDEP COST ESTIMATE

Contractor: Terracon

Date: 1/12/2026 Task #: SubTask 1 Project Management SubTask 6

Site: Concord Custom Cleaners No. 074 SubTask 2 Well Abandonment - Interim Deliverable SubTask 7 Activity/Phase: Well Abandonment SubTask 3 Well Abandonment Report SubTask 8

Project Manager: Gabriel Sostre SubTask 4 SubTask 9 SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$53.51 Project Manager Sid O'Neal 2.96 2.96 $25.22 Administrative Tanya Proietto 2.00 0.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Brownfield Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$36.06 CADD Specialist Chelsea Fugate 2.00 0.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Data Analyst & Visualization Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Environmental Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$25.00 Field Scientist Frankie Gilday 23.00 23.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 GIS Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$72.79 Senior Engineer Donna Cline 2.00 0.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior GIS Analyst 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$53.51 Senior Scientist Sid O'Neal 7.00 1.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Hours 38.96 2.96 24.00 12.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $1,376.01 $158.30 $628.51 $589.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 116.00% $1,596.17 $183.63 $729.07 $683.47 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.26% $774.14 $89.06 $353.60 $331.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,746.32 $430.99 $1,711.18 $1,604.15 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF TERRACON Page 1

FDEP COST ESTIMATEContractor: Terracon Date: 1/12/2026

Task #: SubTask 1 Project Management SubTask 6 Site: Concord Custom Cleaners No. 074 SubTask 2 Well Abandonment - Interim Deliverable SubTask 7

Activity/Phase: Well Abandonment SubTask 3 Well Abandonment Report SubTask 8 Project Manager: Gabriel Sostre SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $240.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Meal $72.00 $72.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Hotel $225.00 $225.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $537.00 $537.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Walker-Hill) $7,740.00 $7,740.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 IDW (Erwin Remediation) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $7,740.00 $7,740.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $774.00 $774.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $8,514.00 $8,514.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $80.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $12,877.32 $430.99 $10,842.18 $1,604.15 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $374.64 $43.10 $171.12 $160.42 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $13,251.96 $474.09 $11,013.30 $1,764.57 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF TERRACON Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Concord Custom Cleaners No. 074 SUBTASK 2: Well Abandonment - Interim Deliverable

PROPOSAL NO. PHF267001

DATE: 1/12/2026

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning for Well Abandonment

Senior Scientist SO 1.00

Field Scientist FG Load/unload equipment 1.00 Field Scientist FG Mobilization/Demobilization (from Tallahassee), 1 days 6.00 Field Scientist FG 16.00

Staff Total hours

SO 1.00

FG 23.00

Total: 24.00 TOTAL LABOR 24.00

VEHICLE TYPE RATE UNIT USEAGE

Truck (Well abandonment) 120 day 2 $240.00 day $0.00

TOTAL VEHICLE $240.00

MEALS STAFF RATE UNIT USEAGE

FG $36.00 day 2 $72.00

TOTAL MEALS $72.00

HOTEL STAFF RATE UNIT USEAGE

FG $225.00 night 1 $225.00

TOTAL HOTEL $225.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Walker-Hill Well Abandonment 7,740.00$ each 1 $7,740.00

TOTAL $7,740.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 2 $80.00

TOTAL EQUIPMENT $80.00

PreTask Coordination: Coordinate field work with selected drilling company and property owner and inform FDEP of field activity schedule

Oversee Well Abandonment

Oversee Abandonment of thirteen (13) monitoring/MAGs wells - Nine (9) 2-inch diameter MAGs wells ) and four (4) – 2-inch diameter monitoring wells totaling 525-feet.

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Vicks Cleaners, ERIC_4650 SUBTASK 3: Well Abandonment Report

PROPOSAL NO. PHF267001

DATE: 1/12/2026

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Report Deliverable Senior Scientist SO 6.00

Senior Engineer DC QA/QC Well Abandonment Report 2.00 GIS Technician CF Prepare updated base map (abandoned monitroing wells) 2.00 Admin TP 2.00

Personnel Total hours 0.00

SO 6.00

DC 2.00

CF 2.00

TP 2.00

Total: 12.00 TOTAL LABOR 12.00

Prepare Well Abandonment Report, summarizing well abandonment activites field event including NFWMD approved Well Completion Reports

Formating report, assembling of exhibits and appendicies to be assembled in a pdf format

3559 Timberlane School Rd

Tallahassee, FL 32312

P (850) 692-7185

F (813) 692-7186

Terracon.com

January 12, 2026

Florida Department of Environmental Protection

Waste Cleanup Program

Waste Management Division

2600 Blair Stone Road

Tallahassee, Florida 32399-2400

Attn: Attn: Mr. Gabriel Sostre, Project Manager

E: Gabriel.Sostre@FloridaDep.gov

W: 850-245-8749

Re: Proposal for Well Abandonment

Concord Custom Cleaners No. 074

4081 E. Olive Road

Pensacola, Escambia County, Florida

ERIC_4639

Terracon Proposal No. PHF267001

Dear Mr. Sostre:

Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this proposal to the Florida Department of Environmental Program (FDEP) Waste Cleanup Section to conduct well abandonment activities for the Concord Custom Cleaners No. 074 (ERIC_4639) facility located at 4081 E. Olive Road in Pensacola, Escambia County, Florida.

Scope of Services

◼ Field preparation, mobilize to site

◼ Oversee the abandonment of four 2-inch diameter wells totaling 370-feet total depth

◼ Oversee the abandonment of Nine 2-inch diameter wells totaling 155-feet total depth

◼ Total abandonment footage equals 525 feet by a Florida

Licensed Well Driller in accordance with the Northwest

Florida Water Management District (NFWMD) requirements.

◼ Final Deliverable - submit a Well Abandonment Report including well completion reports.

mailto:Gabriel.Sostre@FloridaDep.gov

Proposal for Well Abanondment

Concord Custom Cleaners #074, ERIC_4639 ■ Pensacola, FL

January 12, 2026 ■ Terracon Proposal No. PHF267001

See attached Exhibits for Well Locations.

See attached Table 1 for Well Specifications and Wells to be abandoned.

See attached LOE for details.

Schedule

Final Deliverable (Well Abandonment Report) within 10 business days following receipt of NFWMD approved Well

Completion Reports.

Compensation

See attached CEF for details.

DELIVERABLES

The Final Deliverable will detail the field activities and summarize field observations, including the NFWMD approved well completion reports. Recommendations will include issuance of a Site Rehabilitation Completion Order with No Further Action.

SCHEDULE

It is estimated that the well abandonment activities could be completed within two weeks from TA authorization and Final Deliverable (Well Abandonment Report) issued within 10 business days of receipt of NFWMD approved Well Completion Reports.

CLOSING REMARKS

Terracon services will be conducted in accordance with the terms and conditions, contained within DEP Waste Cleanup Program Contract No. HW687, executed January 5, 2022. It is understood that a Task Assignment will be issued to authorize us to perform this work.

We appreciate the opportunity to provide this proposal and look forward to working with you on this project. If you should have any questions or comments regarding this proposal, please contact either of the undersigned at 850-692-7186.

Sincerely, Terracon Consultants, Inc.

Sid O’Neal Donna Cline, P.E.

Project Manager Senior Remediation Engineer

Attachments: Exhibits – Well locations, Table 1 – Well Specifications

Cost Spreadsheet, Level of Effort

Facility Name: Concord Custom Cleaners #074 Facility ID#: ERIC_4639

WELL NO.

DIAMETER (inches)

WELL DEPTH (feet)

SCREEN INTERVAL

DATE CONSTRUCTED

TOC ELEVATION

DATE ELEV DTW ELEV DTW ELEV DTW ELEV DTW

2/19/2025 20.02 77.00 20.17 73.52 19.84 77.35 19.94 77.30

WELL NO.

DIAMETER (inches)

WELL DEPTH (feet)

SCREEN INTERVAL

DATE CONSTRUCTED

TOC ELEVATION

DATE ELEV DTW ELEV DTW ELEV DTW ELEV DTW

2/19/2025 -77.00 77.00 -73.52 73.52 -77.35 77.35 -77.30 77.30

WELL NO.

DIAMETER (inches)

WELL DEPTH (feet)

SCREEN INTERVAL

DATE CONSTRUCTED

TOC ELEVATION

DATE ELEV DTW ELEV DTW ELEV DTW ELEV DTW

2/19/2025 NM Dry NM Dry NM Dry NM Dry

WELL NO.

DIAMETER (inches)

WELL DEPTH (feet)

SCREEN INTERVAL

DATE CONSTRUCTED

TOC ELEVATION

DATE ELEV DTW

2/19/2025 NM Dry

NOTES

Elev - Elevation TOC - Top of Casing DTW - Depth to Water

NM

60-75

12/3/2024

MAGS-9

12/5/2024 12/6/2024 12/6/2024 12/6/2024

2 2 2 2

MAGS-5 MAGS-6 MAGS-7 MAGS-8

12/4/2024 12/4/2024 12/5/2024 12/5/2024 nm - not measured

MAGS-1 MAGS-2 MAGS-3 MAGS-4

2 2 2 2

97.02 93.69 97.19 97.24

All Measurements in feet wnf - well not found

85-100 75-90 75-90 75-90

1/15/2025 1/16/2025 1/20/2025 2/10/2025

2 2 2 2

100 90 90 90

TABLE 1: WELL CONSTRUCTION DETAIL

MW001 MW002 MW003 MW004

Page 1 of 1 Terracon Project No. HF227090

MW-2

MW-1

MW-3

MW-4

MAGS-2

MAGS-9

MAGS-5

MAGS-4

MAGS-3

MAGS-1

MAGS-6

MAGS-8

MAGS-7

N

Drawn By:

Checked By:

Approved By:

Project Mngr:

File No.

Date:

Scale:

Project No. EXHIBITSAMPLING LOCATIONS

CF AS SHOWN

SO

06/10/25SO

SO HF247075

HF247075

CONCORD CUSTOM CLEANERS #074

4081 EAST OLIVE ROAD

PENSACOLA, ESCAMBIA COUNTY, FLORIDA

ERIC_4639

MAGS WELL LOCATION

LEGEND

MONITORING WELL LOCATION

CONCORD CUSTOM CLEANERS #074

3559 Timberlane School Road Tallahassee, Florida

FAX. (850) 692-7186PH. (850) 692-7185

FORMER DRY CLEANING MACHINE OR FORMER

BOILING ROOM LOCATION

FORMER STORAGE TANK

APPROXIMATE SUBJECT PROPERTY BOUNDARY

FORMER SOIL SAMPLING LOCATION SS-1

AutoCAD SHX Text

9TH AVENUE

AutoCAD SHX Text

(RIGHT OF WAY VARIES)

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text

FLAT GRATE INLET

AutoCAD SHX Text

VENT 5

AutoCAD SHX Text

GT

AutoCAD SHX Text

GREASE TRAPS

AutoCAD SHX Text

RETENTION POND

AutoCAD SHX Text

FLAT GRATE INLET

AutoCAD SHX Text

SANITARY SEWER MANHOLE

AutoCAD SHX Text

LEXINGTON SQUARE SHOPPING CENTER

AutoCAD SHX Text

VENT 1

AutoCAD SHX Text

POND VENT 2

AutoCAD SHX Text

GT

AutoCAD SHX Text

SS-1

AutoCAD SHX Text

FORMER DRY CLEAN MACHINE

AutoCAD SHX Text

FORMER BOILER ROOM

AutoCAD SHX Text

FORMER STORAGE TANK

AutoCAD SHX Text

VENT 3 & 44

AutoCAD SHX Text

REAR ENTRANCE (SINGLE DOOR)

AutoCAD SHX Text

REAR ENTRANCE (DOUBLE DOORS)

AutoCAD SHX Text

FORMER DRY CLEAN MACHINE

AutoCAD SHX Text

FORMER BOILER ROOMS

AutoCAD SHX Text

FRONT ENTRANCE

AutoCAD SHX Text

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

APPROXIMATE

AutoCAD SHX Text

1 INCH = 20 FEET

FDEP Waste Cleanup Program

COMPETITIVE BID WORKSHEET

Project Name/Address: Concord Custom Cleaners, ERIC_4639 Date: 1/12/26

Detailed description of goods or services required (including total quantity, size, delivery requirements, and all other specifications): Subtask 2

1. Four, 2-inch diameter Monitoring wells totaling 370-feet depth

2. Nine, 2-inch diameter Monitoring wells:

a. MAGS-1 thru MAGS-8 totaling 80-feet depth (MAGS-6, MAGS-7, and MAGS-8 located inside building)

b. MAGS-9 totaling 75-feet depth

TOTAL ABANDONMENT FOOTAGE = 525-FEET

Vendor Name: Quantity / Description Singley Environmental PDS Walker-Hill

Contact Name: Pattie Eckerle Rose Hood Frank Harrington

Contact Number: 850-944-7799 727-561-7477 601-441-0180

Written Quote (yes/no): Yes No Yes

Telephone Quote (yes/no): No No No

Estimated Days Day to Completion 2-3 2 2.00$

Scope of work see detailed description above 11,105.00$ 8,625.00$ 7,740.00$

Service/Good Cost:

Taxes (7.5%):

Shipping:

Handling/Drop Fees:

TOTAL COST: 11,105.00$ 8,625.00$ 7,740.00$

VENDOR SELECTED: Walker-Hill

Basis of Selection: Lowest bid

Note: All items costing $1,000 or more will be 3-bid. More than three bids will be necessary if any vendor no-bids a request.

If adequate bids cannot be obtained, a full explanation must be included with this bid form.

4081 E. Olive Street, Pensacola, FL

Cost Proposal Date

12/4/2025

Proposal #

21614

Name / Address

TERRACON CONSULTANTS, INC.

10841 S Ridgeview Road Olathe, KS 66061

Re:

Environmental Services 4081 E. Olive Road Pensacola, FL

PO Box 1147 Foxworth, MS 39483

Total

Subtotal

Tax (0.0%)

Customer Acceptance of Cost Proposal

Authorized Signature Date

*Payment Terms NTE 30 days upon project completion.

*1.5% Interest will be charged monthly to all overdue invoices.

Walker-Hill Environmental, Inc.

Milton, FL Office

Phone: (601) 441-0180 Email: frank@whenv.com

Description Unit Qty Rate Total

Mobilize/Demobilize each 1 250.00 250.00T Plug & Abandon (13) 2" Monitor Wells per foot 525 12.00 6,300.00T Permits for Abandonment each 2 20.00 40.00T Remove Surface Completion up 2'x2'x4" Concrete Pad and Resurfaced to Existing Surrounding Surface each 10 100.00 1,000.00T

Patch Inside Building each 3 50.00 150.00T

$7,740.00

$7,740.00

$0.00

Preferred Drilling Solutions, Inc.

8820 66th St, Pinellas Park, FL 33782

Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com

Date: 12/4/25 FAC ID#:

*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner

Unit Unit Rate Number of Units Extended Price

Rig Type: Auger/Mud Rotary_____

HSA Drilling & Split Spoon Collection (continuous or 5' intervals) (can be used in conjunction with well installation)

<50 foot boring depth per foot $0.00

50 foot to 100 foot boring depth per foot $0.00

>100 foot boring depth per foot $0.00

Borehole Grouting

4 - inch borehole diameter per foot $0.00

6 - inch borehole diameter per foot $0.00

8 - inch borehole diameter per foot $0.00

1" - 2" Well Installation (includes screen, riser, sand pack, seal and grout)

<50 foot boring depth per foot $0.00

50 foot to 100 foot boring depth per foot $0.00

>100 foot boring depth per foot $0.00

4" Well Installation (includes screen, riser, sand pack, seal and grout)

<50 foot boring depth per foot $0.00

50 foot to 100 foot boring depth per foot $0.00

>100 foot boring depth per foot $0.00

Double Cased Well $0.00

6" Surface Casing per foot $0.00 per well $0.00

1"- 2" Well Abandonment (includes grouting) per foot $14.00 525.0 $7,350.00

3"- 4" Well Abandonment (includes grouting) per foot $0.00

5"- 6" Well Abandonment (includes grouting) per foot $0.00

2' x 2' Well Pad Removal and Patch each $0.00

Mobilization roundtrip $675.00 1 $675.00

Per Diem per crew / per night $0.00

DOT Approved 55-gal Drum each $0.00 lump sum $100.00 6 $600.00

$0.00

$0.00

$0.00

Standby/Delay/Difficult Access Time per hour $0.00

Additional Development Time per hour $0.00

Additional Decontamination Time per hour $0.00

TOTAL QUOTE PRICE $8,625.00

Project No.:

Signature and Title of Person Submitting Quote: _____________________________________ Rose Hood, Estimating & Scheduling Mgr Date: 12/4/25

Days to Complete Scope of Work: 2

4081 E Olive Rd, Pensacola, Escambia County, FL

Well Completion (includes MH w/ cover, concrete pad, locking well cap, DRILLING

MISCELLANEOUS

Permits/Well Completion or Abandonment Reports

Consultant Name: Terracon

Site Name & Location: Concord Custom Cleaners

PROPOSED SCOPE OF WORK:

Abandon (13) 2" wells, depths 10' - 90' , total footage: 525' remove pads and manholes, restore grade

Some work indoors, pads and manholes to remain in place

Terracon, Concord Custom Cleaners, Pensacola, FL.xlsx

Date: December 4, 2025

Quote # : SERS6747

FDEP Facility ID No.: ERIC_4639

Project No.:

Purchase Order No.:

To: Sid O'Neal

Terracon Consultants, Inc.

3559 Timberlane School Rd.

Tallahassee, FL

(850) 692-7189 M (229) 400-5108

Sid.O'Neal@terracon.com

Job Payment Terms

Net 60 Days

L

Qty Unit Price Line Total

575.00 $14 8,050.00$

2.00 $15 30.00$

21.00 $125 2,625.00$

1.00 $400 400.00$

Subtotal 11,105.00$

Sales Tax

Total 11,105.00$

QUOTE

Singley Environmental & Remediation Services Singley Construction Company

Pensacola, Florida

Abandon 13) 2" diameter monitor wells

Salesperson

Pattie Eckerle Concord Custom Cleaners #074, ERIC_4639 4081

E. Olive Road, Pensacola, FL

Remove 10 Well Completions 2'x2' well pads w/ 8" manhole in pavement / concrete (leave interior well completions)

Description

Four, 2-inch diameter Monitoring wells totaling 370-feet depth Nine, 2-inch diameter Monitoring wells:

MAGS-1 thru MAGS-8 totaling 80-feet depth (MAGS-6, MAGS-7, and MAGS-8 located inside building) MAGS-9 totaling 75-feet depth

Note: Cost Estimate is valid for 30 days

Mobilization and demobilization- equipment and crew

Well Abandonment Permits

Estimated days to complete scope of work 2 -3 days

Pensacola, Florida 32526 Office:850-944-7799 Email: pensacola@singleycc.com

Thank you for your business!

due to the ever changing cost of materials and fuel

COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_v2.pdf
Subtask 1 – Project Management
Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling
Subtask 3 –Monitoring Well Installation
Right-of-Way Permitting
Utility Locate and Drilling Subcontractors
Monitoring Well Installation
Subtask 4 – Monitoring Well Sampling and Surveying
Laboratory Analysis
Trip Report
Subtask 5 – Investigation Derived Waste
Trip Report
Subtask 6 – Supplemental Site Assessment Report
Invoice and Deliverable Schedule:
ATTACHMENT A
ATTACHMENT B
ATTACHMENT C
ATTACHMENT D
ATTACHMENT E
ATTACHMENT F
Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v1.pdf
Cost Estimate
Subtask 2
Subtask 3
Subtask 4
Subtask 5
Subtask 6
2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev1_12-12-22.pdf
Table 1 for SAWP
Monitoring Well Locations
Utility Locate Bids_Compiled.pdf
Geosyntec Utility-272_Geotek_1500
Geoview Utility Quote_2000_COT FTF SIS
Tallahassee Fire Training Division_V1_Bloodhound_3700
Drilling Bids_Compiled.pdf
PDS_Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (sonic)
Direct Push
City of Tallahassee Fire Training Site_GW Protection PFAS Free Water Estimate Email
Cascade_Geosyntec Consultants, Inc. - City of Tallahassee Fire Training Facility - PN221026-118844
GW Protection_Geosyntec (T) 1022060 S.pdf
Invoice
Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (MOT).xlsx.pdf
Sheet1
COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v1.pdf
Subtask 1 – Project Management
Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling
Subtask 3 –Monitoring Well Installation
Right-of-Way Permitting
Utility Locate and Drilling Subcontractors
Monitoring Well Installation
Subtask 4 – Monitoring Well Sampling and Surveying
Laboratory Analysis
Trip Report
Subtask 5 – Investigation Derived Waste
Trip Report
Subtask 6 – Supplemental Site Assessment Report
Invoice and Deliverable Schedule:
ATTACHMENT A
ATTACHMENT B
ATTACHMENT C
ATTACHMENT D
ATTACHMENT E
ATTACHMENT F
COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v2.pdf
Subtask 1 – Project Management
Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling
Subtask 3 –Monitoring Well Installation
Right-of-Way Permitting
Utility Locate and Drilling Subcontractors
Monitoring Well Installation
Subtask 4 – Monitoring Well Sampling and Surveying
Laboratory Analysis
Trip Report
Subtask 5 – Investigation Derived Waste
Trip Report
Subtask 6 – Supplemental Site Assessment Report
Invoice and Deliverable Schedule:
ATTACHMENT A
ATTACHMENT B
ATTACHMENT C
ATTACHMENT D
ATTACHMENT E
ATTACHMENT F
Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v2.pdf
Cost Estimate
Subtask 2
Subtask 3
Subtask 4
Subtask 5
Subtask 6
2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev2.pdf
Table 1 for SAWP
Monitoring Well Locations

File details come from the government source that posted it. Updated .