This document is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) Waste Cleanup Program to Terracon Consultants, Inc. for well abandonment services at the Concord Custom Cleaners #074 facility located at 4081 E. Olive Road in Pensacola, Escambia County, Florida. The task assignment is authorized under the underlying indefinite delivery contract HW687, executed January 5, 2022. The Department Project Manager is Gabriel Sostre (850-245-8749), and the Contractor's Project Manager is Donna Cline (904-479-7415). The project is identified as ERIC_4639 with a completion date of July 17, 2026.
The scope of work includes well abandonment activities consisting of three subtasks: Subtask 1 (Project Management), Subtask 2 (well abandonment of nine 2-inch diameter MAGS wells and four 2-inch diameter monitoring wells totaling 525 feet), and Subtask 3 (submittal of a Well Abandonment Report). The total task assignment value is $13,251.96, comprised of a fixed unit rate of $13,026.96 and cost reimbursement of $225.00. Payment is structured in two invoice milestones: $11,013.30 upon FDEP approval of well abandonment activities in the form of field notes (due by 04/24/2026), and $2,238.66 upon FDEP approval of the final Well Abandonment Report with updated tables, charts, appendices, and graphs (due by 05/29/2026). The cost estimate allocates 38.96 total labor hours, with subcontractor drilling services to Walker-Hill Environmental, Inc. at $7,740.00 as the lowest qualified bid. The task assignment was signed on February 10, 2026.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW687
DC045B Completion July 17, 2026
This TA authorizes Well Abandonment at the Concord Custom Cleaners #074 site as part of contract HW687.
Gabriel Sostre 850-245-8749 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Terracon Consultants, Inc.
Terracon Consultants, Inc.
Donna Cline 904-479-7415
ERIC_4639
4081 E. Olive Road, Pensacola, Escambia County
Concord Custom Cleaners #074
✔ $ 13,026.96
$ 225.00 $ 13,251.96
Scope of Work
Donna Cline
Senior Associate
2/10/2026
Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=Domain Users, email=Donna.Cline@terracon.com Date: 2026.02.10 05:39:55 -05'00'
Cline, Donna L
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2026.02.09 11:58:24 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
BWC TAFORM 01/18
HW687
DC045B
Subtasks 1 & 3: Project Management. Well Abandonment Report.
Subtask 2: Well Abandonment activities including the abandonment of nine 2-inch diameter MAGS wells and four 2-inch diameter Monitoring Wells. 04/24/2026
05/29/2026
Subtask 2: FDEP approval of Well Abandonment activities in the form of field notes.
Subtasks 1 & 3: FDEP approval of Well Abandonment Report including updated tables, charts, appendices, and graphs.
$ 11,013.30
$ 2,238.66
$ 13,251.96
McGrane_P Rectangle
Memorandum
TO:
FROM:
SUBJECT:
DATE:
Negotiation File Concord Custom Cleaners #074 4081 E. Olive Road Pensacola, Escambia County
ERIC_4639
Gabriel Sostre, Project Manager
Negotiation Summary Task Assignment DC045B (HW687)
January 26th, 2026
This Task Assignment authorizes Terracon Consultants Inc. (Terracon) to conduct Well Abandonment at the Concord Custom Cleaners #074 site as part of contract HW687. Below is a summary of each subtasks relevant to this TA:
Subtask 1: Reserved for Project Managment.
Subtask 2: Terracon shall conduct Well Abandonment of nine 2-inch diameter MAGS Wells and four 2-inch diameter Monitoring Wells.
Subtask 3: Terracon shall submit a Well Abandonment Report including updated tables, charts, graphs, and appendices to the FDEP before receiving Approval to Invoice.
The total cost of this TA is $13,251.96. The total amount of labor hours dedicated to this TA is 38.96.
Terracon may invoice according to included schedule.
FDEP COST ESTIMATE
Contractor: Terracon
Date: 1/12/2026 Task #: SubTask 1 Project Management SubTask 6
Site: Concord Custom Cleaners No. 074 SubTask 2 Well Abandonment - Interim Deliverable SubTask 7 Activity/Phase: Well Abandonment SubTask 3 Well Abandonment Report SubTask 8
Project Manager: Gabriel Sostre SubTask 4 SubTask 9 SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$53.51 Project Manager Sid O'Neal 2.96 2.96 $25.22 Administrative Tanya Proietto 2.00 0.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Brownfield Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$36.06 CADD Specialist Chelsea Fugate 2.00 0.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Data Analyst & Visualization Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Environmental Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$25.00 Field Scientist Frankie Gilday 23.00 23.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 GIS Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$72.79 Senior Engineer Donna Cline 2.00 0.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior GIS Analyst 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$53.51 Senior Scientist Sid O'Neal 7.00 1.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 38.96 2.96 24.00 12.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $1,376.01 $158.30 $628.51 $589.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 116.00% $1,596.17 $183.63 $729.07 $683.47 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.26% $774.14 $89.06 $353.60 $331.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,746.32 $430.99 $1,711.18 $1,604.15 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 1
FDEP COST ESTIMATEContractor: Terracon Date: 1/12/2026
Task #: SubTask 1 Project Management SubTask 6 Site: Concord Custom Cleaners No. 074 SubTask 2 Well Abandonment - Interim Deliverable SubTask 7
Activity/Phase: Well Abandonment SubTask 3 Well Abandonment Report SubTask 8 Project Manager: Gabriel Sostre SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $240.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Meal $72.00 $72.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Hotel $225.00 $225.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $537.00 $537.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Walker-Hill) $7,740.00 $7,740.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 IDW (Erwin Remediation) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $7,740.00 $7,740.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $774.00 $774.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $8,514.00 $8,514.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $80.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $12,877.32 $430.99 $10,842.18 $1,604.15 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $374.64 $43.10 $171.12 $160.42 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $13,251.96 $474.09 $11,013.30 $1,764.57 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Concord Custom Cleaners No. 074 SUBTASK 2: Well Abandonment - Interim Deliverable
PROPOSAL NO. PHF267001
DATE: 1/12/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning for Well Abandonment
Senior Scientist SO 1.00
Field Scientist FG Load/unload equipment 1.00 Field Scientist FG Mobilization/Demobilization (from Tallahassee), 1 days 6.00 Field Scientist FG 16.00
Staff Total hours
SO 1.00
FG 23.00
Total: 24.00 TOTAL LABOR 24.00
VEHICLE TYPE RATE UNIT USEAGE
Truck (Well abandonment) 120 day 2 $240.00 day $0.00
TOTAL VEHICLE $240.00
MEALS STAFF RATE UNIT USEAGE
FG $36.00 day 2 $72.00
TOTAL MEALS $72.00
HOTEL STAFF RATE UNIT USEAGE
FG $225.00 night 1 $225.00
TOTAL HOTEL $225.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
Walker-Hill Well Abandonment 7,740.00$ each 1 $7,740.00
TOTAL $7,740.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables Expendables 40.00$ day 2 $80.00
TOTAL EQUIPMENT $80.00
PreTask Coordination: Coordinate field work with selected drilling company and property owner and inform FDEP of field activity schedule
Oversee Well Abandonment
Oversee Abandonment of thirteen (13) monitoring/MAGs wells - Nine (9) 2-inch diameter MAGs wells ) and four (4) – 2-inch diameter monitoring wells totaling 525-feet.
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Vicks Cleaners, ERIC_4650 SUBTASK 3: Well Abandonment Report
PROPOSAL NO. PHF267001
DATE: 1/12/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Report Deliverable Senior Scientist SO 6.00
Senior Engineer DC QA/QC Well Abandonment Report 2.00 GIS Technician CF Prepare updated base map (abandoned monitroing wells) 2.00 Admin TP 2.00
Personnel Total hours 0.00
SO 6.00
DC 2.00
CF 2.00
TP 2.00
Total: 12.00 TOTAL LABOR 12.00
Prepare Well Abandonment Report, summarizing well abandonment activites field event including NFWMD approved Well Completion Reports
Formating report, assembling of exhibits and appendicies to be assembled in a pdf format
3559 Timberlane School Rd
Tallahassee, FL 32312
P (850) 692-7185
F (813) 692-7186
Terracon.com
January 12, 2026
Florida Department of Environmental Protection
Waste Cleanup Program
Waste Management Division
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Attn: Attn: Mr. Gabriel Sostre, Project Manager
E: Gabriel.Sostre@FloridaDep.gov
W: 850-245-8749
Re: Proposal for Well Abandonment
Concord Custom Cleaners No. 074
4081 E. Olive Road
Pensacola, Escambia County, Florida
ERIC_4639
Terracon Proposal No. PHF267001
Dear Mr. Sostre:
Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this proposal to the Florida Department of Environmental Program (FDEP) Waste Cleanup Section to conduct well abandonment activities for the Concord Custom Cleaners No. 074 (ERIC_4639) facility located at 4081 E. Olive Road in Pensacola, Escambia County, Florida.
Scope of Services
◼ Field preparation, mobilize to site
◼ Oversee the abandonment of four 2-inch diameter wells totaling 370-feet total depth
◼ Oversee the abandonment of Nine 2-inch diameter wells totaling 155-feet total depth
◼ Total abandonment footage equals 525 feet by a Florida
Licensed Well Driller in accordance with the Northwest
Florida Water Management District (NFWMD) requirements.
◼ Final Deliverable - submit a Well Abandonment Report including well completion reports.
mailto:Gabriel.Sostre@FloridaDep.gov
Proposal for Well Abanondment
Concord Custom Cleaners #074, ERIC_4639 ■ Pensacola, FL
January 12, 2026 ■ Terracon Proposal No. PHF267001
See attached Exhibits for Well Locations.
See attached Table 1 for Well Specifications and Wells to be abandoned.
See attached LOE for details.
Schedule
Final Deliverable (Well Abandonment Report) within 10 business days following receipt of NFWMD approved Well
Completion Reports.
Compensation
See attached CEF for details.
DELIVERABLES
The Final Deliverable will detail the field activities and summarize field observations, including the NFWMD approved well completion reports. Recommendations will include issuance of a Site Rehabilitation Completion Order with No Further Action.
SCHEDULE
It is estimated that the well abandonment activities could be completed within two weeks from TA authorization and Final Deliverable (Well Abandonment Report) issued within 10 business days of receipt of NFWMD approved Well Completion Reports.
CLOSING REMARKS
Terracon services will be conducted in accordance with the terms and conditions, contained within DEP Waste Cleanup Program Contract No. HW687, executed January 5, 2022. It is understood that a Task Assignment will be issued to authorize us to perform this work.
We appreciate the opportunity to provide this proposal and look forward to working with you on this project. If you should have any questions or comments regarding this proposal, please contact either of the undersigned at 850-692-7186.
Sincerely, Terracon Consultants, Inc.
Sid O’Neal Donna Cline, P.E.
Project Manager Senior Remediation Engineer
Attachments: Exhibits – Well locations, Table 1 – Well Specifications
Cost Spreadsheet, Level of Effort
Facility Name: Concord Custom Cleaners #074 Facility ID#: ERIC_4639
WELL NO.
DIAMETER (inches)
WELL DEPTH (feet)
SCREEN INTERVAL
DATE CONSTRUCTED
TOC ELEVATION
DATE ELEV DTW ELEV DTW ELEV DTW ELEV DTW
2/19/2025 20.02 77.00 20.17 73.52 19.84 77.35 19.94 77.30
WELL NO.
DIAMETER (inches)
WELL DEPTH (feet)
SCREEN INTERVAL
DATE CONSTRUCTED
TOC ELEVATION
DATE ELEV DTW ELEV DTW ELEV DTW ELEV DTW
2/19/2025 -77.00 77.00 -73.52 73.52 -77.35 77.35 -77.30 77.30
WELL NO.
DIAMETER (inches)
WELL DEPTH (feet)
SCREEN INTERVAL
DATE CONSTRUCTED
TOC ELEVATION
DATE ELEV DTW ELEV DTW ELEV DTW ELEV DTW
2/19/2025 NM Dry NM Dry NM Dry NM Dry
WELL NO.
DIAMETER (inches)
WELL DEPTH (feet)
SCREEN INTERVAL
DATE CONSTRUCTED
TOC ELEVATION
DATE ELEV DTW
2/19/2025 NM Dry
NOTES
Elev - Elevation TOC - Top of Casing DTW - Depth to Water
NM
60-75
12/3/2024
MAGS-9
12/5/2024 12/6/2024 12/6/2024 12/6/2024
2 2 2 2
MAGS-5 MAGS-6 MAGS-7 MAGS-8
12/4/2024 12/4/2024 12/5/2024 12/5/2024 nm - not measured
MAGS-1 MAGS-2 MAGS-3 MAGS-4
2 2 2 2
97.02 93.69 97.19 97.24
All Measurements in feet wnf - well not found
85-100 75-90 75-90 75-90
1/15/2025 1/16/2025 1/20/2025 2/10/2025
2 2 2 2
100 90 90 90
TABLE 1: WELL CONSTRUCTION DETAIL
MW001 MW002 MW003 MW004
Page 1 of 1 Terracon Project No. HF227090
MW-2
MW-1
MW-3
MW-4
MAGS-2
MAGS-9
MAGS-5
MAGS-4
MAGS-3
MAGS-1
MAGS-6
MAGS-8
MAGS-7
N
Drawn By:
Checked By:
Approved By:
Project Mngr:
File No.
Date:
Scale:
Project No. EXHIBITSAMPLING LOCATIONS
CF AS SHOWN
SO
06/10/25SO
SO HF247075
HF247075
CONCORD CUSTOM CLEANERS #074
4081 EAST OLIVE ROAD
PENSACOLA, ESCAMBIA COUNTY, FLORIDA
ERIC_4639
MAGS WELL LOCATION
LEGEND
MONITORING WELL LOCATION
CONCORD CUSTOM CLEANERS #074
3559 Timberlane School Road Tallahassee, Florida
FAX. (850) 692-7186PH. (850) 692-7185
FORMER DRY CLEANING MACHINE OR FORMER
BOILING ROOM LOCATION
FORMER STORAGE TANK
APPROXIMATE SUBJECT PROPERTY BOUNDARY
FORMER SOIL SAMPLING LOCATION SS-1
AutoCAD SHX Text
9TH AVENUE
AutoCAD SHX Text
(RIGHT OF WAY VARIES)
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text S
AutoCAD SHX Text
FLAT GRATE INLET
AutoCAD SHX Text
VENT 5
AutoCAD SHX Text
GT
AutoCAD SHX Text
GREASE TRAPS
AutoCAD SHX Text
RETENTION POND
AutoCAD SHX Text
FLAT GRATE INLET
AutoCAD SHX Text
SANITARY SEWER MANHOLE
AutoCAD SHX Text
LEXINGTON SQUARE SHOPPING CENTER
AutoCAD SHX Text
VENT 1
AutoCAD SHX Text
POND VENT 2
AutoCAD SHX Text
GT
AutoCAD SHX Text
SS-1
AutoCAD SHX Text
FORMER DRY CLEAN MACHINE
AutoCAD SHX Text
FORMER BOILER ROOM
AutoCAD SHX Text
FORMER STORAGE TANK
AutoCAD SHX Text
VENT 3 & 44
AutoCAD SHX Text
REAR ENTRANCE (SINGLE DOOR)
AutoCAD SHX Text
REAR ENTRANCE (DOUBLE DOORS)
AutoCAD SHX Text
FORMER DRY CLEAN MACHINE
AutoCAD SHX Text
FORMER BOILER ROOMS
AutoCAD SHX Text
FRONT ENTRANCE
AutoCAD SHX Text
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
APPROXIMATE
AutoCAD SHX Text
1 INCH = 20 FEET
FDEP Waste Cleanup Program
COMPETITIVE BID WORKSHEET
Project Name/Address: Concord Custom Cleaners, ERIC_4639 Date: 1/12/26
Detailed description of goods or services required (including total quantity, size, delivery requirements, and all other specifications): Subtask 2
1. Four, 2-inch diameter Monitoring wells totaling 370-feet depth
2. Nine, 2-inch diameter Monitoring wells:
a. MAGS-1 thru MAGS-8 totaling 80-feet depth (MAGS-6, MAGS-7, and MAGS-8 located inside building)
b. MAGS-9 totaling 75-feet depth
TOTAL ABANDONMENT FOOTAGE = 525-FEET
Vendor Name: Quantity / Description Singley Environmental PDS Walker-Hill
Contact Name: Pattie Eckerle Rose Hood Frank Harrington
Contact Number: 850-944-7799 727-561-7477 601-441-0180
Written Quote (yes/no): Yes No Yes
Telephone Quote (yes/no): No No No
Estimated Days Day to Completion 2-3 2 2.00$
Scope of work see detailed description above 11,105.00$ 8,625.00$ 7,740.00$
Service/Good Cost:
Taxes (7.5%):
Shipping:
Handling/Drop Fees:
TOTAL COST: 11,105.00$ 8,625.00$ 7,740.00$
VENDOR SELECTED: Walker-Hill
Basis of Selection: Lowest bid
Note: All items costing $1,000 or more will be 3-bid. More than three bids will be necessary if any vendor no-bids a request.
If adequate bids cannot be obtained, a full explanation must be included with this bid form.
4081 E. Olive Street, Pensacola, FL
Cost Proposal Date
12/4/2025
Proposal #
21614
Name / Address
TERRACON CONSULTANTS, INC.
10841 S Ridgeview Road Olathe, KS 66061
Re:
Environmental Services 4081 E. Olive Road Pensacola, FL
PO Box 1147 Foxworth, MS 39483
Total
Subtotal
Tax (0.0%)
Customer Acceptance of Cost Proposal
Authorized Signature Date
*Payment Terms NTE 30 days upon project completion.
*1.5% Interest will be charged monthly to all overdue invoices.
Walker-Hill Environmental, Inc.
Milton, FL Office
Phone: (601) 441-0180 Email: frank@whenv.com
Description Unit Qty Rate Total
Mobilize/Demobilize each 1 250.00 250.00T Plug & Abandon (13) 2" Monitor Wells per foot 525 12.00 6,300.00T Permits for Abandonment each 2 20.00 40.00T Remove Surface Completion up 2'x2'x4" Concrete Pad and Resurfaced to Existing Surrounding Surface each 10 100.00 1,000.00T
Patch Inside Building each 3 50.00 150.00T
$7,740.00
$7,740.00
$0.00
Preferred Drilling Solutions, Inc.
8820 66th St, Pinellas Park, FL 33782
Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com
Date: 12/4/25 FAC ID#:
*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner
Unit Unit Rate Number of Units Extended Price
Rig Type: Auger/Mud Rotary_____
HSA Drilling & Split Spoon Collection (continuous or 5' intervals) (can be used in conjunction with well installation)
<50 foot boring depth per foot $0.00
50 foot to 100 foot boring depth per foot $0.00
>100 foot boring depth per foot $0.00
Borehole Grouting
4 - inch borehole diameter per foot $0.00
6 - inch borehole diameter per foot $0.00
8 - inch borehole diameter per foot $0.00
1" - 2" Well Installation (includes screen, riser, sand pack, seal and grout)
<50 foot boring depth per foot $0.00
50 foot to 100 foot boring depth per foot $0.00
>100 foot boring depth per foot $0.00
4" Well Installation (includes screen, riser, sand pack, seal and grout)
<50 foot boring depth per foot $0.00
50 foot to 100 foot boring depth per foot $0.00
>100 foot boring depth per foot $0.00
Double Cased Well $0.00
6" Surface Casing per foot $0.00 per well $0.00
1"- 2" Well Abandonment (includes grouting) per foot $14.00 525.0 $7,350.00
3"- 4" Well Abandonment (includes grouting) per foot $0.00
5"- 6" Well Abandonment (includes grouting) per foot $0.00
2' x 2' Well Pad Removal and Patch each $0.00
Mobilization roundtrip $675.00 1 $675.00
Per Diem per crew / per night $0.00
DOT Approved 55-gal Drum each $0.00 lump sum $100.00 6 $600.00
$0.00
$0.00
$0.00
Standby/Delay/Difficult Access Time per hour $0.00
Additional Development Time per hour $0.00
Additional Decontamination Time per hour $0.00
TOTAL QUOTE PRICE $8,625.00
Project No.:
Signature and Title of Person Submitting Quote: _____________________________________ Rose Hood, Estimating & Scheduling Mgr Date: 12/4/25
Days to Complete Scope of Work: 2
4081 E Olive Rd, Pensacola, Escambia County, FL
Well Completion (includes MH w/ cover, concrete pad, locking well cap, DRILLING
MISCELLANEOUS
Permits/Well Completion or Abandonment Reports
Consultant Name: Terracon
Site Name & Location: Concord Custom Cleaners
PROPOSED SCOPE OF WORK:
Abandon (13) 2" wells, depths 10' - 90' , total footage: 525' remove pads and manholes, restore grade
Some work indoors, pads and manholes to remain in place
Terracon, Concord Custom Cleaners, Pensacola, FL.xlsx
Date: December 4, 2025
Quote # : SERS6747
FDEP Facility ID No.: ERIC_4639
Project No.:
Purchase Order No.:
To: Sid O'Neal
Terracon Consultants, Inc.
3559 Timberlane School Rd.
Tallahassee, FL
(850) 692-7189 M (229) 400-5108
Sid.O'Neal@terracon.com
Job Payment Terms
Net 60 Days
L
Qty Unit Price Line Total
575.00 $14 8,050.00$
2.00 $15 30.00$
21.00 $125 2,625.00$
1.00 $400 400.00$
Subtotal 11,105.00$
Sales Tax
Total 11,105.00$
QUOTE
Singley Environmental & Remediation Services Singley Construction Company
Pensacola, Florida
Abandon 13) 2" diameter monitor wells
Salesperson
Pattie Eckerle Concord Custom Cleaners #074, ERIC_4639 4081
E. Olive Road, Pensacola, FL
Remove 10 Well Completions 2'x2' well pads w/ 8" manhole in pavement / concrete (leave interior well completions)
Description
Four, 2-inch diameter Monitoring wells totaling 370-feet depth Nine, 2-inch diameter Monitoring wells:
MAGS-1 thru MAGS-8 totaling 80-feet depth (MAGS-6, MAGS-7, and MAGS-8 located inside building) MAGS-9 totaling 75-feet depth
Note: Cost Estimate is valid for 30 days
Mobilization and demobilization- equipment and crew
Well Abandonment Permits
Estimated days to complete scope of work 2 -3 days
Pensacola, Florida 32526 Office:850-944-7799 Email: pensacola@singleycc.com
Thank you for your business!
due to the ever changing cost of materials and fuel
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_v2.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v1.pdf |
| Cost Estimate |
| Subtask 2 |
| Subtask 3 |
| Subtask 4 |
| Subtask 5 |
| Subtask 6 |
| 2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev1_12-12-22.pdf |
| Table 1 for SAWP |
| Monitoring Well Locations |
| Utility Locate Bids_Compiled.pdf |
| Geosyntec Utility-272_Geotek_1500 |
| Geoview Utility Quote_2000_COT FTF SIS |
| Tallahassee Fire Training Division_V1_Bloodhound_3700 |
| Drilling Bids_Compiled.pdf |
| PDS_Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (sonic) |
| Direct Push |
| City of Tallahassee Fire Training Site_GW Protection PFAS Free Water Estimate Email |
| Cascade_Geosyntec Consultants, Inc. - City of Tallahassee Fire Training Facility - PN221026-118844 |
| GW Protection_Geosyntec (T) 1022060 S.pdf |
| Invoice |
| Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (MOT).xlsx.pdf |
| Sheet1 |
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v1.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v2.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v2.pdf |
| Cost Estimate |
| Subtask 2 |
| Subtask 3 |
| Subtask 4 |
| Subtask 5 |
| Subtask 6 |
| 2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev2.pdf |
| Table 1 for SAWP |
| Monitoring Well Locations |
File details come from the government source that posted it. Updated .