This document is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) under Contract Number HW687. The assignment authorizes Terracon Consultants, Inc. to conduct site assessment work at the Crosstown Cleaners waste site cleanup facility located at 226 Center Street, Jupiter, Palm Beach County, Florida. The project number is ERIC_5086, and the TA number is DC048A, with a completion date of December 12, 2025. Gabriel Sostre serves as the Department Project Manager, while Donna Cline is the Contractor's Project Manager.

Terracon will perform comprehensive site assessment services including utility clearance, geophysical surveys, health and safety planning, installation of MAGS wells and monitoring wells, soil sampling, drilling operations, groundwater sampling, PFAS screening, and preparation of a final Site Assessment Report. The work is divided into six subtasks with specific deliverables due at intervals between February and October 2025. The total task assignment value is $98,537.06, paid on a fixed unit rate basis. Deliverables include field reports documenting utility locations, boring logs, monitoring well construction details, laboratory analytical results, and a comprehensive Site Assessment Report. The contractor must submit the final report within 45 business days of receiving laboratory results. Payment is structured across multiple subtasks ranging from $2,190.66 to $43,129.08, with the work anticipated to commence in January 2025 following subcontractor availability.

View the file

Other files

File Type Posted
CN-370000-HW687-BF01ACO1.pdf PDF
CN-370000-HW687-BF03ACO1.pdf PDF
CN-370000-HW687-BIL01A.pdf PDF
CN-370000-HW687-BIL2ACO1.pdf PDF
CN-370000-HW687-BIL2BCO1.pdf PDF
CN-370000-HW687-BIL2CCO1.pdf PDF
CN-370000-HW687-BIL3ACO2.pdf PDF
CN-370000-HW687-BIO1ACO1.pdf PDF
CN-370000-HW687-DC001A.pdf PDF
CN-370000-HW687-DC003A.pdf PDF
CN-370000-HW687-DC003D.pdf PDF
CN-370000-HW687-DC005D.pdf PDF
CN-370000-HW687-DC006A.pdf PDF
CN-370000-HW687-DC006B.pdf PDF
CN-370000-HW687-DC008C.pdf PDF
CN-370000-HW687-DC010A.pdf PDF
CN-370000-HW687-DC010B.pdf PDF
CN-370000-HW687-DC011F.pdf PDF
CN-370000-HW687-DC011H.pdf PDF
CN-370000-HW687-DC012D.pdf PDF
CN-370000-HW687-DC013C.pdf PDF
CN-370000-HW687-DC015A.pdf PDF
CN-370000-HW687-DC015C.pdf PDF
CN-370000-HW687-DC019A.pdf PDF
CN-370000-HW687-DC01ACO2.pdf PDF
CN-370000-HW687-DC020A.pdf PDF
CN-370000-HW687-DC020B.pdf PDF
CN-370000-HW687-DC020C.pdf PDF
CN-370000-HW687-DC020D.pdf PDF
CN-370000-HW687-DC023C.pdf PDF
CN-370000-HW687-DC025B.pdf PDF
CN-370000-HW687-DC025C.pdf PDF
CN-370000-HW687-DC025F.pdf PDF
CN-370000-HW687-DC027B.pdf PDF
CN-370000-HW687-DC027C.pdf PDF
CN-370000-HW687-DC02BCO1.pdf PDF
CN-370000-HW687-DC02CCO2.pdf PDF
CN-370000-HW687-DC02DCO1.pdf PDF
CN-370000-HW687-DC02HCO1.pdf PDF
CN-370000-HW687-DC032A.pdf PDF
CN-370000-HW687-DC034A.pdf PDF
CN-370000-HW687-DC034C.pdf PDF
CN-370000-HW687-DC034D.pdf PDF
CN-370000-HW687-DC035F.pdf PDF
CN-370000-HW687-DC036A.pdf PDF
CN-370000-HW687-DC03CCO1.pdf PDF
CN-370000-HW687-DC041C.pdf PDF
CN-370000-HW687-DC041D.pdf PDF
CN-370000-HW687-DC048B.pdf PDF
CN-370000-HW687-DC04BCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

HW687

DC048A December 12, 2025

This Task Assignment authorizes Terracon to conduct site assessment at the Crosstown

Cleaners waste site cleanup site.

Gabriel Sostre 850-245-8749 Terracon Consultants, Inc.

Donna Cline 904-479-7415

ERIC_5086

226 Center Street, Jupiter, Palm Beach County, 33458

Crosstown Cleaners

$ 98,537.06

$ 98,537.06

Scope of Work

Terracon Consultants, Inc.

Donna Cline

Senior Associate / Remediation Engineer

12/13/24

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2024.12.12 12:08:54 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

BWC TAFORM 01/18

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Secretary

Memorandum

TO:

FROM:

Negotiation File

ERIC_5

, Project Manager

SUBJECT: Negotiation Summary

DATE:

Task Assignment (HW687)

November , 2024

This Task Assignment authorizes Terracon

F D

E P

C O

S T

E S

T

IM

A T E

C o nt ra ct o r:

T e rr a co n

D a te

/1

/2 a sk

C

A

S u bT as k

P ro je ct

M an ag em e nt

S u bT as k

S ite ro ss to w n

C le an e rs E

R

IC

S u bT as k

G eo ph ys ic a l S u rv ey , H ea lth a nd

S af e ty

P la n , m e et th e te n an t/o w nS u bT as k

A ct iv ity

/P ha se

S ite

A ss e ss m en t W o rk p la n

In ve st ig at io n S u bT as k

In st a ll O u ts id e

S oi l B or in g s/ M

A G

S W el ls

S oi l S am pl in g

, I ns ta ll

M S u bT as k

P ro je ct

M an ag er

P a tr ic k

M cG ra ne bT as k

M

A G

S a n d

G ro u nd w at e r

S a m pl in g a n d P ro fe ss io na l S u rv e y

S u bT as k

S u bT as k

P F

A S

S cr ee ni ng A nd

ID

W M a na ge m en t

S u bT as k

T o ta ls

L a b o r R a te

C a te g o ry

$5 1.

P ro je ct

M an a g e r

S h aw n

O ue lle tte

.5

.5

$0 .0

A d m in is tr at iv

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

B ro w nf ie ld C o ns ul ta n t

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$3 2.

G

IS

T e ch ni ci a n C h el se a

F u ga te

.0

0.

0.

0.

2.

.0

0.

0.

0.

0.

$0 .0

D a ta

A na ly st

V is ua liz at io n

S pe ci a lis t

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$3 4.

E n vi ro n m en ta l T ec h B ill y

P h ili ps

.0

0.

0.

.0

0.

0.

0.

0.

0.

0.

$0 .0

P ro je ct S ci e nt is t 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4 2.

S e ni o r S ta ff

S ci e nt is t

Je ss ic a

E nd ic ot t

1.

.5

.0

.2

.5

.0

0.

0.

0.

0.

$0 .0

S ta ff

E n gi ne er 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

P ri nc ip al

C o ns ul ta n t 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

S e ni o r

E n gi er

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

P ro je ct In du st ria l H yg ie ni st

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

P ro je ct S ci e nt is t 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$7 0.

S e ni o r E n gi ne er

D o nn a

C lin e

.0

0.

0.

0.

1.

.0

0.

0.

0.

0.

$5 1.

S e ni o r G e ol og is t S h aw n O ue lle tte

9.

.0

.5

.0

0.

.0

0.

0.

0.

0.

$3 2.

G

IS

T e ch ni ci a n C h el se a

F u ga te

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

S e ni o r

In d us tr ia l H yg ie n is t 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4 5.

S e ni o r E n gi ne er

M ik e M ui 9.

3.

0.

5.

0.

0.

0.

0.

0.

0.

$4 0.

S e ni o r S ta ff

S ci e nt is t

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

S ta ff

S ci e nt is t

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

T o ta l H o u rs

8.

.5

.0

2.

.7

.5

.0

0.

0.

0.

0.

D ir ec t L ab or

$1

8, .2

$2

,1

7.

$3 ,1

.2

$5

,2

.9

$3 ,3

.5

$6

.0

$3

,8

.9

$0 .0

$0

.0

$0 .0

$0

.0

O ve rh e ad

6.

0% $2

1, .2

$2

,4

.7

$3 ,5

.6

$6

,0

.0

$3 ,9

.7

$7

.7

$4

,4

.4

$0 .0

$0

.0

$0 .0

$0

.0

G e n

A d m in

0.

0% $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

F ri ng e

.2

3%

$1 0, .9

$1 ,1

.7

$1

,7

.4

$2 ,9

.6

$1

,9

.1

$3

.2

$2 ,1

.7

$0

.0

$0 .0

$0

.0

$0 .0

T o ta l L ab o r

,8

.4

$5

,7

7.

$8 ,4

6.

$1

4, .6

$9

,2

.3

$1 ,8

.0

$1

0, 2.

$0

.0

$0 .0

$0

.0

$0 .0

S ite

A ss e ss m en t R ep or t

R E

V

C

E F T

E R

R A

C O

N P a g

F

E P

C O

S T

E S

T

IM

A T E

C o nt ra ct o r:

rr a co n te

/1

/2 sk bT as k

P ro je ct

M an ag em e nt

S u bT as k

S ite ro ss to w n

C le an e rs E

R

IC

S u bT as k

G eo ph ys ic a l S u rv ey , H ea lth a nd

S af e ty

P la n , m e et th e te n an t/o w nS u bT as k

A ct iv ity

/P ha se

S ite

A ss e ss m en t W o rk p la n

In ve st ig at io n S u bT as k

In st a ll O u ts id e

S oi l B or in g s/ M

A G

S W el ls

S oi l S am pl in g

, I ns ta ll

M S u bT as k

P ro je ct

M an ag er

P a tr ic k

M cG ra bT as k

M

A G

S a n d

G ro u nd w at e r

S a m pl in g a n d P ro fe ss io na l S u rv e y

S u bT as k

S u bT as k

P F

A S

S cr ee ni ng A nd

ID

W M a na ge m en t

S u bT as k

T o ta ls

S ite

A ss e ss m en t R ep or t

T ra v el

V e hi cl e c ha rg e $2

,3

0.

0.

.0

.0

0.

0.

0.

$0 .0

M ile a ge

C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

A ir

F ar e $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P e r d ie m

H ot el

$0 .0

0.

0.

0.

0.

$0 .0

T o ta l T ra ve l $2

,3

0.

$6

.0

$9

.0

$7

.0

$8 0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S u b c o n tr ac to r

(S er v ic es P ro cu re m en t) ri lli ng

C on ve n tio na l)

G

W P

$1 6, .0

$0 .0

,6

1.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

D ri lli ng

N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M o bi le

L a bo ra to ry

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S u rv ey in g

R e se rv e

G e os pa tia l

$2 ,4

0.

$0

.0

$0 .0

2, .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

C o m m o n G ro u nd $1

,4

3.

$0 .0

1, .5

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

G e ov ie w $9

.0

0.

0.

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S u bc on tr a ct or

S ub to ta l $2

1, .5

$9

.0

$1

8, 4.

$2

,4

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

H a nd lin g F e e

$2 ,1

1.

$9

0.

$1

,8

.4

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T o ta l S u b c o n tr ac to r C o st

$2 3, .9

$9

.0

$1 9, .9

$2 ,6

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

L a b o ra to ry n al yt ic al

C os ts $1

1, .0

4, .0

,6

.0

,1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

F a st T u rn ar ou nd C ha rg es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S a m pl e S hi pp in g

$1 ,0

0.

0.

.0

.0

0.

0.

$0

.0

$0 .0

$0

.0

T o ta l L ab o ra to ry $1

3, .0

$4

,5

2.

$5 ,0

0.

$3

,4

9.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

F ie ld E xp en s es

P rs on al P ro te ct io n $0

.0

$0 .0

$0

.0

$0 .0

0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E xp e nd ab le s $4

.5

6.

.0

.5

3.

0.

0.

0.

$0

.0

E q ui p m en t ( D ril lin g r el a te d)

$6

.0

0.

.0

0.

0.

$0

.0

$0 .0

$0

.0

$0 .0

E q ui p m en t ( A n al yt ic a l r el a te d)

$3 ,1

3.

1, .0

.0

,5

.5

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E q ui p m en t (

ID

W r e la te d

$1

.0

0.

.0

0.

$0 .0

$0

.0

$0 .0

$0

.0

E q ui p m en t ( O th e

r) $4

.0

.0

.0

0.

$0

.0

$0 .0

$0

.0

$0 .0

T o ta l F ie ld

E x p en se s

4, 6.

$1

,4

2.

$1 ,5

4.

$1

,6

7.

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S u b to ta l

$9 3, .4

$5 ,7

7.

$1

6, .3

$4

1, 4.

$1

7, 5.

$2

,0

.0

$1 0, 2.

$0

.0

$0 .0

$0

.0

$0 .0

C o m p le ti o n

F ee

$4 ,9

7.

$5

.8

$8

.6

$1

,4

.4

$9

.9

$1

.6

$1 ,0

.2

$0

.0

$0 .0

$0

.0

$0 .0

T o ta l E st im at ed

C o st $9

8, .0

$6

,3

1.

$1 6, .0

$4 3, 9.

$1 8, 6.

$2 ,1

.6

$1

1, 4.

$0 .0

$0

.0

$0 .0

$0

.0

R E

V

C

E F T

E R

R A

C O

N P a g

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Crosstown Cleaners ERIC_5086

SUBTASK 2:

PROPOSAL NO. HB247034

DATE: 11/15/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning and Pre-Drilling Tasks Senior Staff Scientist JE 2.00 Senior Geologist SO 1.00

Senior Geologist SO 6.00

Senior Geologist SO 6.00

Senior Staff Scientist JE 1.00 Soil Sampling / Oversee MAGS Well and Interior Monitoring Well Installation

Time Duration: 1.5 days Senior Staff Scientist JE Load/unload and calibrate equipment (0.5 hour/day) 1.00 Senior Staff Scientist JE 16.00

Senior Geologist SO 16.00

Senior Engineer MM 3.50

Senior Staff Scientist JE Daily IDW management (0.5 hrs. a day) 1.00 Senior Staff Scientist JE Finalize field notes at end of day for PM evaluation (1 hour/day) 1.50

Mobilization / Demobilizations Senior Geologist SO 6.00 Senior Staff Scientist JE 4.00

Personnel: SO JE MM Hours: 35.00 26.50 3.50 TOTAL LABOR 65.00

VEHICLE TYPE RATE UNIT USEAGE

Car 80.00$ Day 0 -$ Truck 480.00$ week 0 -$ Truck (SO) 120.00$ day 3 360.00$ Truck (JE) 120.00$ Day 2 240.00$

TOTAL VEHICLE 600.00$

Geophysical Survey, Health and Safety Plan, meet the tenant/owner, Installation of Interior Soil Borings MAGS wells, and monitoring Well, and soil sampling

Verify property owner is the same as on the access agreement, contact property owner and FDEP of field activity schedule.

Prepare Health and Safety Plan

Contact owner/tenant and conduct pre-drilling site walk with property owner, current tenants, drilling contractor. Designate IDW staging areas. Attend initial site visit and oversee geophysical survey for boring, groundwater screening locations (geophysical subcontractor estimated a full day of labor)

2 hours per Mobe/Demobe from Port Saint Lucie, 3 events

Request laboratory sample kit (soil sampling)

Review preliminary soil VOC data to determine if SPLP tests need to be completed (3 Hrs.) and prepare the Subtask 2 Deliverable Submittal to the FDEP to include field notes, sampling forms, and laboratory reports (3 Hrs.).

Scope: 8 MAGS wells to a depth of 6 ft bgs and interior well to a depth of 10 ft with soil sampling, Collect 36 Soil Samples.

Direct work, daily safety debrief, record lithological descriptions, oversee the install of 8 MAGS and 1 monitoring well and well development, record on MW install log, and coordinate lab pickup of soil samples. Day-1 12 hours Day-2 4 hours Daily safety debrief, collect one sample at 0.5, 2, 4, & 6 ft bgs for laboratory analysis (VOCs and SPLP prep sample) Day-1 12 hours Day-2 4 hours

Senior Engineer oversight / technical QA/QC of operations (2 hours/day)

2 hours per Mobe/Demobe from Port Saint Lucie, 2 events

SUBTASK 2:

PROPOSAL NO. HB247034

DATE: 11/15/2024

Geophysical Survey, Health and Safety Plan, meet the tenant/owner, Installation of Interior Soil Borings MAGS wells, and monitoring Well, and soil sampling

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Geoview GPR and EM Survey (Geo View) 900.00$ day 1 900.00$ GWP See Subtask 3 each 0 -$

TOTAL SUBCONTRACTOR 900.00$

LABORATORY COSTS

PARAMETER RATE # SAMPLES

VOCs Full List (Soil) EPA 8260 110.00$ 36 3,960.00$ VOCs (soil-prep) 5035 prep 7.00$ 36 252.00$ SPLP Extraction EPA Method 1311/1312 55.00$ -$ Halocarbons EPA 8260 73.00$ -$

Sample Shipping Large Cooler (overnight) 150.00$ 2 300.00$

TOTAL LAB 4,512.00$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 2 80.00$ Ice (Sample Preservation) 6.50$ each 4 26.00$

Analytical related Soil Assessment Kit 175.00$ day 2 Soil Sampling 350.00$ Encore Sampler (25 gram) 16.00$ each 38 (SPLP samples - hold) 608.00$ Terra Core Sampler 11.00$ each 38 (VOH samples) 418.00$

IDW related (Drums provided by Driller) Other

TOTAL EQUIPMENT 1,482.00$

Concrete coring, inside/outside soil boring for sampling/MAGS well/GW well installations.

To be submitted as a WCD To be submitted as a WCD

SUBTASK 3:

PROPOSAL NO. HB247034

DATE: 11/15/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning Senior Geologist SO 1.50

Senior Geologist SO 4.50

Senior Staff Scientist JE 1.00 Senior Staff Scientist JE 1.00

Exterior Well Installations

Time Duration: 1.0 days Senior Staff Scientist JE Load/unload and calibrate equipment (1 hour) 1.00 Senior Staff Scientist JE 4.00

Senior Staff Scientist JE Oversee well installation of five (5) shallow wells and record on MW install logs 10.00 Senior Geologist SO Oversee well installation of five (5) shallow wells and record on MW install logs. Assist in GW flow evalua 10.00 Senior Staff Scientist SO Containerize IDW (0.5/hours per day) 0.50 Senior Staff Scientist SO Prepare well construction and boring logs and field notes for PM evaluation (1 hr./day) 1.00 Direct Push Boring with Screen Point Sampling

Time Duration: 2.0 days Senior Staff Scientist JE Load/unload and calibrate equipment (1 hour) 1.00 Senior Staff Scientist JE 24.00

Senior Staff Scientist SO Oversee Groundwater Profile sample collection 24.00

Senior Geologist JE Containerize IDW (0.5/hours per day) 1.00

Exterior Lithological Boring

Time Duration: 1.0 days Senior Staff Scientist JE Load/unload and calibrate equipment (1.0 hour/day) 1.00

Senior Staff Scientist JE 1.00

Senior Staff Scientist JE 8.00 Senior Staff Scientist JE Prepare draft boring logs and field notes for PM evaluation (1 hr./day) 1.00

IDW coordination/pickup, time duration: 0.5 day Senior Staff Scientist JE 3.00 Mobilization / Demobilizations Senior Geologist SO 6.00 Senior Staff Scientist JE 8.00

Personnel: SO JE Hours: 47.50 65.00 0.00 TOTAL LABOR 112.50

VEHICLE TYPE RATE UNIT USEAGE

Truck (JE) 480.00$ week 1 480.00$ Car (IDW) 80.00$ Day 1 80.00$ Truck (SO) 120.00$ days 3 360.00$

TOTAL VEHICLE 920.00$

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Common Ground 1,423.50$ Lump Sum 1 three soil drums four liquid drums

1,423.50$

GWP 16,691.00$ each 1 16,691.00$

TOTAL SUBCONTRACTOR 18,114.50$

LABORATORY COSTS

PARAMETER RATE # SAMPLES IDW

VOCs Full List (GW) EPA 8260 110.00$ 40 5 Day TAT 4,400.00$ VOCs Full List (IDW GW) 110.00$ 2 5 day TAT 220.00$

Sample Shipping Large Cooler (overnight) soil and GW 150.00$ 3 450.00$

TOTAL LAB 5,070.00$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 5 4 field days and IDW 200.00$ Ice (Sample Preservation) 6.50$ each 6 39.00$

Drilling related Monitoring Well Installation Kit 325.00$ day 1 Well Install 325.00$ Analytical related Shallow Groundwater Screening Kit 290.00$ day 2 DPT Screening 580.00$ IDW related (Drums provided by Driller) Other Total Survey Station 50.00$ day 1 50.00$

Global Positioning System 175.00$ day 2 350.00$

TOTAL EQUIPMENT 1,544.00$

IDW Drum T&D (soil / groundwater excluding haz mat)

Scope: 8 Locations to 50 feet, collect screen point samples @ 6-10, 16-20, 26-30, 36-40, 46-50 ft bgs and boring abandonment (total of 40 screen point samples)

Scope: Four Exterior wells/piezometers to a depth of 15 ft bgs

2 hours per Mobe/Demobe from Port Saint Lucie, 4 events

MAGS, litho boring, Inside/outside soil sampling, groundwater screening sampling, well installation, and boring abandonment

2 hours per Mobe/Demobe from Port Saint Lucie, 3 event

Coordinate IDW T&D: Mobilize to site, meet transporter to sign manifests

Direct work, safety debriefs, well development, survey top of casing elevation of wells to assess gw flow direction, and elevation survey of well top of casings.

Scope: Lithological Boring to 50 feet bgs

Daily safety debrief, Collect one sample at 0.5, 2, 4, 6, 8, 10, &15 20 25 30 35 40 45 50 ft bgs for PID analysis

Review preliminary soil VOC data to determine if SPLP tests need to be completed (1.5 Hrs.) and prepare the Subtask 3 Deliverable Submittal to the FDEP to include field notes, sampling forms, and laboratory reports (3 Hrs.).

Geologist oversight of lithological boring and abandonment, records lithological descriptions

Direct work, safety debriefs set up breakdown,exclusion zone. Oversee groundwater profile sample collection

Install Outside Soil Borings/ MAGS Wells, Soil Sampling, Install Monitoring Wells, Lithologic Boring, DPT Groundwater Screening, and IDW Disposal

IDW waste profile and manifesting

Prepare soil logging materials and finalize day-of logistics for investigation Request laboratory sample kit (soil sampling, groundwater screening, and IDW Sampling)

SUBTASK 4: MAGS and Groundwater Sampling and Professional Survey

PROPOSAL NO. HB247034

DATE: 11/18/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning and Pre-GW and MAGS Tasks Senior Geologist SO 2.00

Senior Geologist SO 4.00

Groundwater Sampling

Time Duration: 1 day Senior Staff Geologist JE Load/unload equipment (1 hour/day) 1.00 Senior Staff Geologist JE Collect water levels (5 new wells, 10 minutes/well) 1.25 Senior Staff Geologist JE Containerize IDW (0.5 hrs./day) 0.50 Senior Staff Geologist JE Safety meeting, calibrate instruments, collect groundwater samples for VOCs (5 wells) 7.50 Senior Staff Geologist JE 1.50

Senior Staff Geologist JE Collect VOC groundwater IDW sample from the 55-gallon drum 0.50 MAGS Testing Time Duration: 2.0 Days Senior Geologist SO Attend Pre Task Planning meeting and review technical approach to MAGS 1.00 Environmental Technician BP Pickup, Deliver and set up Trailer MAGS System 10.00 Senior Geologist SO 16.00

Environmental Technician BP 16.00

Senior Geologist SO Finalize field notes at end of day (1 hour/day) 2.00

Senior Engineer MM Interpret field data, perform calculations, and provide update to FDEP (5.5 hrs.) 5.50

Mobilization / Demobilizations Senior Geologist SO 4.00 Environmental Technician BP 4.00 Senior Staff Geologist JE 2.00

Personnel: SO JE DC MM BP Hours: 29.00 14.25 0.00 5.50 30.00 TOTAL LABOR 78.75

VEHICLE TYPE RATE UNIT USEAGE

Truck (BP) MAGS/ Delivery 120 day 3 360.00$ Truck (SO) MAGS 120 day 2 240.00$

Truck (JE) GW Sampling 120 day 1 120.00$

TOTAL VEHICLE 720.00$

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Reserve Geospatial Survey, Location and Elevation 2,400.00$ lump sum 1 2,400.00$

TOTAL SUBCONTRACTOR 2,400.00$

LABORATORY COSTS

PARAMETER RATE # SAMPLES IDW

VOCs Full List (GW) PID/HALLEPA 8260 (EMERGENCY 24 HR TA) 121.00$ 5 (110%) 605.00$ VOCs Full List (GW) PID/HALLEPA 8260 110.00$ 5 550.00$ VOCs Full List (IDW GW) 110.00$ 1 110.00$ VOCs Soil Vapor- Full Scan TO-15 200.00$ 8 1,600.00$

Summa Canister 33.00$ 8 264.00$

Sample Shipping Large Cooler (overnight) 150.00$ 2 300.00$ PFAS Samples to be analyzed at the FDEP Laboratory in Tallahassee, FL TOTAL LAB 3,429.00$

2 hours per mobe/demobe from Port St Lucie (GW Sampling)

Prepare GW sampling/calibration logs/field notes for PM evaluation (1 hr./day) and meet with surveyor (0.5 hr./day)

Safety meeting, calibrate instruments, collect vacuum/pressure and OVA screening measurements, collect samples for lab analysis(12 Hours-Day 1, 4 Hours-Day 2)

Request laboratory sample kit (MAGS and groundwater sampling), verify property owner is the same as on the access agreement, contact property owner and FDEP of field activity schedule

Scope: 4 New Monitoring Wells (includes 1 interior well, 4 Exterior shallow wells)

2 hours per mobe/demobe from Port Saint Lucie (MAGS), 2 events

Prepare the Subtask 4 Deliverable submittal for groundwater sampling and MAGS Testing to the FDEP to include field notes, sampling forms, laboratory reports, and calculations (4 Hrs.).

2 hours per mobe/demobe from Port Saint Lucie (MAGS), 2 events

Safety meeting, calibrate instruments, perform and direct MAGS sampling test (8 points x 1.5 hr./point = 12.0, oversee set up / calibration, system Breakdown) (12 Hours Day 1, 4 Hours Day 2)

SUBTASK 4: MAGS and Groundwater Sampling and Professional Survey

PROPOSAL NO. HB247034

DATE: 11/18/2024

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 3 120.00$ Ice (Sample Preservation) 6.50$ each 3 19.50$

Analytical related Groundwater Sampling Kit 290.00$ day 1 290.00$ Tubing, HDPE 0.30$ ft 175 52.50$ Tubing, silicon (3/16 x 3/8) 3.00$ ft 5 15.00$ MAGS Investigation Kit 500.00$ day 2 1,000.00$ Construction O&M Supplies 75.00$ day 2 150.00$

IDW related Drum See Subtask 5

TOTAL EQUIPMENT 1,647.00$

SUBTASK 5: PFAS Screening And IDW Management

PROPOSAL NO. HB247034

DATE: 11/15/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Groundwater screenign and reporting for PFAS Senior Staff Geologist JE 1.00

Senior Staff Geologist JE Collect PFAS groundwater IDW sample from the 55-gallon drum 0.50

Senior Staff Geologist JE 1.00

Senior Staff Geologist JE 4.00

GIS Technician CF 2.00

Senior Engineer DC Review package and add text to the email summarizing results and recommendations 1.00

Coordinate IDW T&D Senior Staff Geologist JE 2.00

Senior Staff Geologist JE 2.00

Mobilization / Demobilizations Senior Staff Geologist JE 2.00

Personnel: DC SO JE CF Hours 1 0 12.5 2 0 TOTAL LABOR 15.50

VEHICLE TYPE RATE UNIT USEAGE

Car (IDW) for Subtasks 4 and 5 80.00$ Day 1 80.00$

TOTAL VEHICLE 80.00$

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

WCD at the time is collected each 1 1 liquid Drum -$

TOTAL SUBCONTRACTOR -$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 0 -$

Ice (Sample Preservation) 6.50$ each 2 13.00$

IDW related Drum 100.00$ drum 1 100.00$

PFAS Samples to be analyzed at the FDEP Laboratory in Tallahassee, FL TOTAL EQUIPMENT 113.00$

PFAS IDW Disposal (groundwater excluding haz mat)

Prepare the Subtask 5 electronic mail deliverable submittal (within 48-hours of receiving analytical data from the FDEP laboratory) to include the figure with PFAS data, analytical report, field notes, PFAS sampling forms and checklists and recommend next action (3 Hrs).

Prepare waste characterization/generator profile and manifest (potential for hazardous substance)

Complete PFAS form from FDEP laboratory and schedule bottle order delivery for sample kit (groundwater sampling)

Coordinate IDW T&D for Subtasks 4 and 5: Mobilize to site, meet transporter to sign manifests

2 hours per Mobe/Demobe from Port Saint Lucie

Prepare base PFAS figure with analytical results for constituents of concern

Package samples for overnight delivery to the FDEP Laboratory and contact the lab the following day to verify sample arrival.

SUBTASK 7: Site Assessment Report

PROPOSAL NO. HB247034

DATE: 11/15/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Report Deliverable Senior Geologist SO 20.00

Senior Geologist SO 8.00

Senior Engineer DC Develop MAGS results, charts, calculations, and summary tables, and recommendations 6.00 Senior Staff Geologist JE 3.00

Senior Geologist SO Evaluate data in report text, raw soil and groundwater data, tables and exhibits 10.00 Senior Engineer DC Water Quality Parameters Summary Evaluation 1.00 Senior Engineer DC Soil Analytical Results for and Summary Evaluation 1.00 Senior Engineer DC Groundwater Analytical Results and Summary Evaluation 1.00 Senior Engineer DC Conclusions/Recommendations 3.00 Senior Engineer DC Sign and Seal the Site Assessment Report 1.00

Senior Staff Geologist JE 8.00

GIS Technician CF 12.00

Senior Staff Geologist JE 2.00

Personnel: DC SO JE CF Hours: 13.00 38.00 13.00 12.00 0.00 TOTAL LABOR 76.00

Prepare Appendicies including boring logs (10 soil locations and 1 lithological), to include well construction diagrams (6 wells), and prepare cross section with detected GW COCs

Prepare draft report introduction, site history, recent activities summary, and discussion of soil, groundwater, and soil vapor results

Forensic chemistry and analysis of reported COCs. Develop CSM based on potential fate and transport of COCs.

Formating report and tables, assembling of exhibits and appendicies to be assembled in a pdf format

QA/QC field and laboratory data (46 soil, 35 groundwater screening, 6 groundwater, and 8 soil vapor samples)

Prepare base figures and Exhibits (site setting, potable wells, groundwater flow, soil detection maps for 0.5, 2.0, 4.0 & 6.0 ft bgs samples for VOCs, cross section, and groundwater concentrations maps for screening samples (5 depths) and monitoring wells (VOCs shallow zone).

645 NW Enterprise Dr Port Saint Lucie, FL 34986

P (772) 343-9787 F (772) 343-9404

Terracon.com

November 12, 2024

Florida Department of Environmental Protection Waste Cleanup Program Waste Site Cleanup Section Drycleaning Solvent Cleanup Program 2600 Blair Stone Road MS 4520 Tallahassee, Florida 32399-4520

Attn: Mr. Gabriel Sostre E: Gabriel.sostre@floridadep.gov P: 850-245-8745

Re: Proposal for Site Assessment Work Plan Implementation Crosstown Cleaners 226 Center Street Jupiter, Palm Beach County, Florida 33458

ERIC_5086

FDEP Contract No. HW687 Terracon Proposal No. PHB247034

Dear Mr. Sostre:

Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this proposal to the Florida Department of Environmental Program (FDEP) Waste Cleanup Program (WCP) to implement the work scope of the FDEP approved Site Assessment Workplan (SAWP), and FDEP approval in an electronic mail correspondence from Patrick McGrane, dated July 11, 2024, for Crosstown Cleaners (ERIC_5086) located at 226 Center Street, Jupiter, Palm Beach County, Florida. Terracon submitted an electronic mail correspondence, dated July 14, 2024, and discussed this particular site assessment details, and discussed clarification of some proposed sample locations, which Terracon provided revised sample locations and responses to the FDEP. The objective of this site assessment is to confirm the presence or absence of the constituents of interest (COI) onsite and preliminarily assess the horizontal and vertical extent of on-site chlorinated solvent contamination (if applicable).

Scope of Services

Subtask 1. Project Management Subtask 2. Utility Clearance and Geophysical(utility) Survey to scan Borehole Locations, Health and Safety Plan, Coordinate with the Tenant/Owner, Installation of Interior Soil Borings MAGS Wells, and interior Monitoring Well, and Soil Sampling.

Subtask 3. Monitoring Well Installation, Lithologic Profile Boring, DPT Groundwater Screening, and IDW Management for Subtasks 2 & 3.

Subtask 4. MAGS and Groundwater Sampling and Professional Survey.

Proposal for Site Assessment Work Plan Implementation Crosstown Cleaners ERIC_5086 Jupiter, Palm Beach County, FL November 12, 2024 Terracon Proposal No. HB247034

Subtask 5. Per-and polyfluoroalkyl substances (PFAS) Groundwater Screening and IDW Management

Subtask 6. Site Assessment Report (SAR)

See attached LOE for details

Schedule Submit Site Assessment Report of on-site activities within 45 business days following receipt of laboratory results.

Compensation See attached CEF for details.

SCOPE OF SERVICES

Subtask 1 – Project Management

Shawn Ouellette, P.G., will serve as the Project Manager during the field investigation and reporting.

Donna Cline, P.E., will be involved throughout the project, serving as Authorized Project Reviewer.

Subtask 2 – Health and Safety Plan Preparation, Utility Clearance and Geophysical Survey to Clear Borehole Locations, Coordination with Owner/Tenant, Soil Boring and Soil Sampling/MAGS Well Installations, and Interior Monitoring Well Installation

Pre-Task Planning will be performed to prepare for field investigations. Terracon will prepare a site-specific health and safety plan. A meeting with the property owner/tenant will be completed to inform them of our field activities and discuss the best way to conduct our work with minimal interruptions to the business. The tenant space is occupied by Crosstown Cleaners and currently remains an active drycleaner utilizing a K2 solvent.

Utility Locate Prior to conducting the soil sampling, MAGS and monitoring well installations, Terracon will perform a geophysical survey of the proposed locations, to clear subsurface private/ public utilities or obstructions. A public utility locate will also be conducted through Sunshine 811.

Soil Investigation The former 1998 Site Screening soil boring location was identified during the May 2024 site reconnaissance visit and is located on the rear of the facility within the area of the existing drycleaning machine. Terracon will install eight (8) soil borings (6 inside and 2 outside) to a depth of approximately 6 feet below ground surface (bgs) and one interior monitoring well to approximately 10 feet bgs or 2-3 feet into the water table based on anticipated borehole collapse when installing the well by hand into saturated sandy soils. The eight soil boring locations will be converted to Modified Active Gas Sampling (MAGS) wells, as described in the sections below. The proposed locations are presented on Exhibit 5 of the SAWP (Terracon, 2024). The soil borings inside the building, near the back door and in the rear alleyway will be hand-installed with a core drill and hand auger and will be screened with an OVA-PID during the installation process. Grab soil sample depths will include 0.5 feet bgs, 2 feet bgs, 4 feet bgs, and 6 feet bgs (depending on the depth to groundwater interface) (36 total soil samples which includes the interior monitoring well). Sample depths for laboratory analysis will be terminated at the water table. Soil samples will be analyzed for full list volatile organic compounds (VOCs) by EPA Method 8260. In addition, a 25-gram Encore Sampler will be used to collect a sample at each location

November 12, 2024 Terracon Proposal No. HB247034

(left on hold) for possible synthetic precipitation leaching procedure (SPLP) analysis by EPA Method 1311 in the samples where VOC parameter(s) exceed the SCTLs. Terracon will select samples for SPLP VOC analysis and contact the FDEP project manager with the selected samples and complete a Work Change Directive (WCD)/Task Assignment Change Order (TACO).

MAGS Well Installation As detailed in the SAWP, eight MAGS wells will be installed. Six MAGS locations will be installed inside the six interior soil borings, and two will be installed within the paved alley way behind the building. For budgeting purposes, it is assumed that the MAGS wells will be installed to 6 feet bgs (however actual depths will depend on depth to groundwater). The MAGS wells will be constructed with a 2-inch diameter, 5-foot length of 0.020-inch slotted screen, 1 foot of casing, and 6/20 silica sand filter pack around the screen. It is anticipated the screen length and total depths will be adjusted in the field based on the measured depth to water. The interior MAGS wells will be completed at the surface with 0.5 foot of Portland grout seal and capped to access in the future if needed. The exterior MAGS wells will also be patched and matched flush to grade to be accessed at a later date. MAGS well surface completions can be added if it is deemed necessary to convert these to a permanent soil vapor extraction wells. The MAGS wells will be installed as permanent for later use as SVE wells, if necessary.

Interior Monitoring Well Installation A one-inch diameter pre-packed shallow monitoring well will be hand installed at the location of the 1998 Site Screening Soil Boring Location next to the NE corner of the existing drycleaning machine.

The well will be installed to approximately 10-12 feet bgs or 2-3 feet into the water table based on difficulty installing the well by hand into saturated soils. The well construction will consist of 5 feet of 1-inch diameter, 0.010-inch slotted pre-packed PVC screen and 1- inch diameter PVC casing.

Terracon will complete an email deliverable for Subtask 2 documenting the field event is completed by providing field notes, utility locate documents, soil sampling forms, MAGS and monitoring well construction logs, and laboratory reports.

Subtask 3 –Monitoring Well Installation, Lithological Profile Boring, DPT Groundwater Screening Profile and IDW Management for Subtasks 2 and 3

Lithological Profile The lithological profile boring will be advanced to an estimated depth of 50 feet bgs by collecting continuous samples using a Geoprobe DPT drilling rig. Terracon’s geologist will be on-site to describe the lithology. We anticipate the lithologic boring to be installed as one of the earlier field tasks once groundwater flow is established.

Monitoring Well Installation Terracon will oversee the installation of four shallow piezometers/monitoring wells to verify and evaluate the groundwater flow conditions. As these wells with be constructed as shallow monitoring wells, a groundwater sample will be collected for full list of VOCs via EPA Method 8260 and analyzed on an expedited turnaround. Soil lithology will also be collected from each of the piezometer locations. The proposed piezometer locations are presented on Exhibit 4. It is anticipated that the proposed shallow zone piezometers will be installed to a depth of approximately 15 feet bgs, with 10 feet pre-packed screen. Each piezometer will be converted to a shallow monitoring well and completed flush to ground surface in an 8-inch diameter manhole set within a 2-foot by 2-foot by 4-inch concrete pad. The monitoring wells will be developed until the water is visibly free of sediment. The monitoring wells will

November 12, 2024 Terracon Proposal No. HB247034 be surveyed using a temporary benchmark (TBM) to assess groundwater flow direction. Presumed groundwater flow is believed to be towards the east.

DPT Groundwater Screening Profile The objective of the DPT groundwater profile assessment is to evaluate the extent and magnitude of drycleaning contaminants of interest within the on-site property boundary. Terracon anticipates advancing up to eight DPT groundwater screening borings and collecting groundwater samples from four-foot vertical intervals and the following six depths: 6-10, 16-20, 26-30, 36-40, 46-50, or until refusal at each location (40 groundwater samples). The proposed groundwater screening locations are presented on Exhibit 4. The groundwater screening samples will be collected by evacuating approximately one to two screen volumes of water to remove the initial fines from uncovering the screen at the desired depth. The groundwater samples will be submitted to the laboratory for analysis of full list VOCs. Additional details are summarized in the SAWP (Terracon, 2024).

IDW Management and Disposal Soil and liquid IDW derived from soil cuttings, well development, decontamination, and purge water during the Subtask 2 and 3 investigations will be contained in DOT approved 55-gallon drums and temporarily stored onsite until the waste characterization sample results are completed. The liquid IDW will be analyzed for the full list VOCs and the soil IDW will be analyzed for toxicity characteristic leaching procedure (TCLP) extraction for the full list VOCs and TCLP RCRA 8 metals. Assuming the waste is non-hazardous, the drums will be transported to an approved facility for disposal or treatment. Estimated two drums of soil and two drums of liquid. Terracon recommends subcontracting Common Ground Environmental, LLC for IDW transportation and disposal. Terracon will provide oversight of the IDW pickup, and sign waste manifests as an agent of FDEP.

Groundwater Protection (GWP) Drillpro was the low bid and estimates that the work to complete Subtasks 2 and 3 will take five (5) days to complete.

Subtask 4 - MAGS and Groundwater Sampling and IDW Management

Modified Active Gas Sampling (MAGS) Eight (8) MAGS wells will be installed throughout the interior of the footprint of the former dry cleaner operation and outside of the back door. The proposed MAGS well locations are presented on Exhibit 5.

The assessment will use MAGS testing procedures to assist in identifying areas at the site requiring additional assessment. A portable blower and generator mounted on a utility trailer will be utilized to conduct the MAGS test. A well head assembly will be connected to each MAGS well to allow for vacuum, flow, temperature, and OVA measurements. Vacuum influence will be measured from other MAGS wells and shallow monitor wells during the test.

A vacuum step test will be conducted at the first MAGS point (adjacent to the active drycleaning machine and former site screening sample location), beginning with a lower applied vacuum, then increasing vacuum to reach an optimal vacuum to flow rate. This will assess the Radius of Influence (ROI) and provide maximum vacuum levels at well heads without excessive water entrainment. It is anticipated that the initial MAGS test location (adjacent to the active machine) and one additional location will be evaluated for optimum radius of influence. Based on the site anticipated lithology, depth to water and data from local nearby sites we are anticipating steps be conducted with well head vacuums set at 6, 13, 18 and 25 inches of water. The optimum range is most likely between 6 to 13 inches of water of vacuum.

November 12, 2024 Terracon Proposal No. HB247034

Eurofins Environmental Testing (Eurofins) will be used for TO-15 Method analytical testing for the full list of VOCs. The soil vapor samples will be collected in Summa canisters from the eight (8) MAGS wells for analysis by TO-15.

Monitoring Well Sampling Groundwater samples will be collected from the newly installed four shallow piezometers and interior monitoring well, in accordance with the FDEP SOPs, dated January 2017 (effective April 16, 2018) for chlorinated solvents. Prior to monitoring well sampling, Terracon will collect depth-to-water measurements. The analytes and laboratory methods are summarized in the SAWP (Terracon, 2024), and will include full list VOCs and PFAS analysis at FDEP approved well locations.

As a cost saving measure, no additional mobilization costs will be incurred as the specific purpose survey by Reserve Geospatial will begin the same day as groundwater sampling activities.

Terracon will complete an email deliverable for Proposal Subtask 4 documenting the field event is completed by providing field notes, MAGS preliminary data, groundwater sampling forms, laboratory reports, and management of IDW associated with Subtask 4.

Subtask 5 –PFAS Screening and IDW Management

Terracon will propose to sample groundwater in up to four of the onsite monitoring wells for PFAS. Once the selected monitoring wells are approved by the FDEP, Terracon will complete the PFAS sampling in general accordance with the Terracon State of Florida Sampling Standard Operating Procedure PFAS Version 2.0, dated January 30, 2024. The groundwater samples will be submitted overnight delivery to the FDEP Central Laboratory (DEP SOP LC-001-3).

IDW Management and Disposal Liquid IDW derived from purge water during the Subtask 4 and 5 investigations will be contained in DOT approved 55-gallon drums and temporarily stored onsite until the waste characterization sample results for the full list VOCs and PFAS can be evaluated. Assuming the waste is non-hazardous, the drum(s) will be transported to an approved facility for disposal or treatment.

This includes the electronic mail deliverable due to the FDEP in 48-hours after Terracon receives the PFAS analytical results. This will include preparation of a figure with the well locations and PFAS results, photograph documentation, laboratory data, PFAS checklist, chain-of custody, and signed waste manifest for VOC and PFAS IDW associated with Subtasks 4 and 5.

Subtask 6 –Site Assessment Report

Terracon will prepare a Site Assessment Report that will detail and summarize the soil, groundwater, and soil vapor sampling activities, field observations, and results of soil and groundwater analysis and will include data tables and exhibits of groundwater flow and soil and groundwater concentrations.

Conclusions and recommendations will include a summary of results and recommendations for future sampling or remedial activities.

November 12, 2024 Terracon Proposal No. HB247034

SCHEDULE

The availability of the low bid drilling subcontractor will determine when Terracon can schedule the work after receiving the signed Task Assignment. Terracon anticipates the assessment work to begin in January 2025. Terracon anticipates the field deliverable of the interior site assessment activities within 45 business days of receipt of analytical results.

CLOSING REMARKS

Terracon services will be conducted in accordance with the terms and conditions, contained within DEP Waste Cleanup Program (WCP) Contract No. HW687, executed January 5, 2022. It is understood that a Task Assignment will be issued which authorize us to perform this work.

We appreciate the opportunity to provide this proposal and look forward to collaborating with you on this project. If you should have any questions or comments regarding this proposal, please contact either of the undersigned at 772-408-2959.

Sincerely, Terracon Consultants, Inc.

Jessica Endicott, G.I.T. Shawn Ouellette, P.G.

Senior Staff Geologist Environmental Department Manager

Attachments: Cost Spreadsheet Level of Effort July 14, 2024 email to Patrick McGrane Exhibit 4 (revised from original SAWP) Exhibit 5 (revised from original SAWP) Subcontractor Cost Estimates

No. of MAGS: 8

DTW: Estimated at 4 to 6 ft bgs

Total Depth/Screen Interval of MAGS wells: 1-5 ft bgs

Test Duration: 30-45 minutes each test

Vacuum Setting for Step Test: Proposed at interior MAGS well (at current machine location) to allow for ROI measurement at approximately 5, 10, 15, 20, and 30 ft

ROI.

Vacuum step test to be performed at current machine location noted on map at 6,13,18 and 25 IW

Estimated ROI: 20-25 feet

No. of Vapor Samples: One vapor sample collected at the end of each MAGS test.

Common Ground Environmental Inc.

(Common Sense Approach to Environmental Issues)

P.O. Box 1044, Lakeland, Florida 33802 Phone: (863) 647-3888

September 10, 2024

Jessica Endicott Terracon 645 NW Enterprise Drive Suite 107 Port Saint Lucie, FL 34986

RE: Cleaners with Seven (7) Drums of Non-Hazardous Waste for Disposal

Dear Jessica, Thank you for the opportunity to present Common Ground Environmental Inc. (CGE) to you.

CGE is committed to providing the best service in the waste management industry at competitive pricing. When you choose CGE, you choose to have a partner with the experience and the capabilities to handle all your environmental needs, from proper paperwork to site audits to remediation and analytical testing. CGE will be on site at time of pick up to correctly complete all paperwork and to tackle any unexpected problems. CGE makes it easy for you by handling all profiles, paperwork, and scheduling; all you do is sign the shipping documents!

Common Ground Environmental, Inc. is pleased to submit this quote for the following services.

Waste Stream Qty. Price per Unit Total Disposal Only of Non-Hazardous Non-Regulated Material in 55 Gallon Drums

7 $110.00.00 per 55 Gallon Drum

$770.00

Transportation Only of Drums 7 $60.00 per Drum Minimum $300

$420.00

Stop Charge 1 $125.00 per Trip $125.00 Fuel Surcharge as of 9/10/24 7 $15.50 per Drum $108.50 Estimated Total $1423.50

NOTES:

The above pricing will be valid for 10 days from date of this quote. _____ Int.

The first hour of loading is included in the above price. For each additional hour, customer will be billed $225.00 per hour. _____ Int.

The above quote is only an estimated total. Final invoice can be higher or it can be lower due to number of drums for disposal, number of surcharges and/or waste conditions. _____ Int.

Quote is based on final profile approval from waste facility. _____ Int.

A monthly fee of 1 ½ % interest will be charged on the balance of every past due invoice that is over 30 days past due and will incur every 30 days until invoice and late fees are paid in full. _____ Int.

Our terms are 30 Days Net. _____ Int.

Terracon Page 2

The pricing above includes transportation and disposal to an EPA permitted facility. Pricing is based on approved waste profiles and non-conforming waste will be assessed surcharges that are billed separately. A $125.00 stop fee will be passed on to the customer. Please note, due to the high cost of Diesel, the fuel surcharge rate will now be managed separately on a month-to-month basis.

Thank you for considering Common Ground Environmental, Inc. as your waste management provider. Please review the above pricing and if it meets with your approval, please confirm your order by signing and returning this quote to my attention. Do not hesitate calling me at (863) 860- 0827 or (863) 647-3888 with questions or concerns.

Sincerely, Mike Propst Common Ground Environmental, Inc.

Acceptance of Proposal

The above prices, specifications and conditions are satisfactory to generator/client and are hereby accepted. Common Ground Environmental, Inc. is hereby granted to do the work as specified.

Payment terms are net 30 days unless specified otherwise. A 1.5% per month finance charge will be applied on all past due invoices. The generator/client will be responsible for all cost, expenses and reasonable counsel fees incurred by or on behalf of Common Ground Environmental, Inc. as a result of failure to remit payment as specified above.

Date of Acceptance _______________________________________________________

Signature: __________________________________________Title: ________________

Printed Name: ___________________________________________________________

CE (Quote) Addendum_v17_01.13.2023_unlocked

2024 08-22 Proposal Project No. 24109.01

August 22, 2024 Jessica Endicott, G.I.T Senior Staff Geologist Terracon 645 NW Enterprise Drive., Suite 107 Port St. Lucie, Fl 34986 (Via email: Jessica.Endicott@terracon.com)

Re: Professional Surveying Services Crosstown Cleaners Jupiter, Florida Engenuity Group Project No. 24109.01

Dear Ms. Endicott:

We are pleased to offer this proposal to render professional surveying services in connection with Monitoring Wells in connection with the abovementioned project

Engenuity Group, Inc. will horizontally locate twenty (20) monitoring wells, soil borings and mags well locations as depicted on the attached graphics, which were provided by your office on August 21, 2024. Engenuity Group, Inc will measure the top of casing at each well with an adjacent ground elevation and the soil boring locations with an adjacent ground elevation. All elevations will be obtained in National American Vertical Datum of 1988 (NAVD 88).

Survey Fee: $3,060.00

The final deliverable will be an electronically signed and sealed copy of the Surveyors Report, which can be provided within twenty (20) business days of receiving authorization to proceed and the meeting on site to identify the locations with your staff. The Surveyors Report will have the x, y and z of all monitoring wells.

Permit Fees, Reproduction Charges and Reimbursable Expenses The Total Contract Price does not include the payment of any governmental agency submittal fees. The cost of these fees and any costs incurred by the office for printing, reproduction and other reimbursable expenses such as long-distance telephone calls, facsimile, postage, travel, and document copy charges will be billed to the client monthly.

Invoicing and Payment Work will be invoiced on a monthly basis for work completed to date. Invoice shall be paid in full by the Client within thirty (30) days of the invoice date, unless within such thirty (30) day period, Client notifies Engenuity Group, Inc. in writing of its objection to the amount of said invoice. Such notice shall be accompanied by payment of any undisputed portion of said invoice. If written objection is not received within thirty (30) days it shall constitute approval of invoice by Client. If the payment is not received within thirty (30) days of billing date, a late charge will be added to the invoice in the amount of 1½ percent per month on the outstanding balance. If payment is not received within sixty (60) days of the invoice date, work may be suspended on the project until the outstanding invoice(s) are paid in full.

This proposal represents the entire understanding between you and us with respect to the Project. If this satisfactorily sets forth your understanding of our agreement, please execute the attached Authorization and return it to us. If you have any questions, please do not hesitate to contact us.

PURSUANT TO SECTION 558.0035 FLORIDA STATUTES, THE CONSULTANT IS THE

RESPONSIBLE PARTY FOR THE PROFESSIONAL SERVICES IT AGREES TO PROVIDE

UNDER THIS CONTRACT. NO INDIVIDUAL PROFESSIONAL EMPLOYEE, AGENT,

DIRECTOR, OFFICER OR PRINCIPAL MAY BE INDIVIDUALLY LIABLE FOR

NEGLIGENCE ARISING OUT OF THIS CONTRACT, AS LONG AS THE

CONSULTANT MAINTAINS THE PROFESSIONAL LIABILITY INSURANCE REQUIRED

UNDER THIS CONTRACT AND AS LONG AS ANY DAMAGES ARE SOLELY

ECONOMIC IN NATURE AND THE DAMAGES DO NOT EXTEND TO PERSONAL

INJURIES OR PROPERTY NOT SUBJECT TO THIS CONTRACT.

Sincerely, Approved by, Jennifer Malin, P.S.M. Andre Rayman, P.S.M.

Director of Surveying President

Authorization: Professional Surveying Services Crosstown Cleaners

Jupiter, Florida Engenuity Group Project No. 24109.01

By: Date:

(Name & Title)

For:

(Name of Company)

Contract Amount: $3,060.00

I am ____ I am not _____ The Owner of the Property

The Property Owner Is:

Address:

Telephone:

Fax:

Graphic

File details come from the government source that posted it. Updated .