This document consists of a Task Assignment Change Order (TACO) and related attachments between the State of Florida Department of Environmental Protection (FDEP) and Terracon Consultants, Inc., executed on February 13, 2024. The change order modifies an existing task assignment (BIL02A) under Contract Number HW687, dated January 5, 2022. The project involves supplemental site assessment activities at the Broward County School Board Property in Plantation, Florida (Site ID: ERIC_18360).

The TACO authorizes a cost increase from $62,696.59 to $130,045.09—a total change of $67,348.50—to remove background soil sampling from the original scope and add extensive additional field work including installation of 20 additional soil borings, 8 shallow monitoring wells, and 4 deeper monitoring wells, along with comprehensive laboratory analytical testing for arsenic and organochlorine pesticides, IDW management for up to 4 drums of investigation-derived waste, and completion of a specific purpose survey and topographic study. The task assignment completion date was extended from March 1, 2024, to June 28, 2024 (119 days). Deliverables include field notes, photographic logs, chain of custody documentation, sampling logs, confirmation of IDW disposal, and a comprehensive Supplemental Site Assessment Report, with invoicing structured in four phases tied to departmental approvals. The work is being conducted in accordance with EPA and FDEP-approved protocols and will be performed by Terracon under the supervision of Donna Cline, P.E. (Senior Remediation Engineer) and Shawn Ouellette, P.G. (Senior Geologist).

View the file

Other files

File Type Posted
CN-370000-HW687-BF01A.pdf PDF
CN-370000-HW687-BF01B.pdf PDF
CN-370000-HW687-BF02A.pdf PDF
CN-370000-HW687-BF04A.pdf PDF
CN-370000-HW687-BF04ACO3.pdf PDF
CN-370000-HW687-BIL01B.pdf PDF
CN-370000-HW687-BIL02B.pdf PDF
CN-370000-HW687-BIL03B.pdf PDF
CN-370000-HW687-BIL1BCO2.pdf PDF
CN-370000-HW687-BIL2CCO2.pdf PDF
CN-370000-HW687-CSS02.pdf PDF
CN-370000-HW687-CSS03.pdf PDF
CN-370000-HW687-DC002A.pdf PDF
CN-370000-HW687-DC002G.pdf PDF
CN-370000-HW687-DC006C.pdf PDF
CN-370000-HW687-DC008B.pdf PDF
CN-370000-HW687-DC008D.pdf PDF
CN-370000-HW687-DC009B.pdf PDF
CN-370000-HW687-DC010C.pdf PDF
CN-370000-HW687-DC012A.pdf PDF
CN-370000-HW687-DC014B.pdf PDF
CN-370000-HW687-DC014D.pdf PDF
CN-370000-HW687-DC014H.pdf PDF
CN-370000-HW687-DC015D.pdf PDF
CN-370000-HW687-DC016C.pdf PDF
CN-370000-HW687-DC01ACO9.pdf PDF
CN-370000-HW687-DC021A.pdf PDF
CN-370000-HW687-DC021C.pdf PDF
CN-370000-HW687-DC022A.pdf PDF
CN-370000-HW687-DC023B.pdf PDF
CN-370000-HW687-DC023D.pdf PDF
CN-370000-HW687-DC024B.pdf PDF
CN-370000-HW687-DC024E.pdf PDF
CN-370000-HW687-DC024F.pdf PDF
CN-370000-HW687-DC027A.pdf PDF
CN-370000-HW687-DC028A.pdf PDF
CN-370000-HW687-DC028D.pdf PDF
CN-370000-HW687-DC029C.pdf PDF
CN-370000-HW687-DC02ACO1.pdf PDF
CN-370000-HW687-DC02HCO2.pdf PDF
CN-370000-HW687-DC030A.pdf PDF
CN-370000-HW687-DC031A.pdf PDF
CN-370000-HW687-DC035A.pdf PDF
CN-370000-HW687-DC037A.pdf PDF
CN-370000-HW687-DC03CCO2.pdf PDF
CN-370000-HW687-DC044A.pdf PDF
CN-370000-HW687-DC045B.pdf PDF
CN-370000-HW687-DC049A.pdf PDF
CN-370000-HW687-DC054A.pdf PDF
CN-370000-HW687-DC056A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

BIL02A 1 HW687

This Task Assignment Change Order is for the removal of a background study from the original proposal and to authorize additional soil borings and monitoring wells, conduct laboratory analytical testing, and complete a specific purpose survey and topographic survey per the TACO request received by Terracon on January 26, 2024.

Megan Johnson 850.245.8994 Contractor Terracon Consultants, Inc. Contractor

Contractor Shawn Ouellette Contractor 561.689.4299

ERIC_18360

Broward County School Board Property - Plantation

✔ $ 130,045.09 $ 62,696.59

$ 130,045.09 $ 62,696.59 Completion

✔ Completion 03/01/2024 06/28/2024 119

✔ 1 1 1

Terracon Consultants, Inc.

Contractor Donna Cline, P.E.

Senior Remediation Engineer Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=General Users, email=Donna.Cline@terracon.com Date: 2024.02.13 15:23:48 -05'00'

Cline, Donna L

Teresa Booeshaghi

Teresa Booeshaghi Digitally signed by Teresa Booeshaghi Date: 2024.02.13 11:38:15 -05'00'

2/13/2024

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW687

BIL02A

$ 130,045.09

Initial sampling field notes, photographic log, chain of custody, and sampling logs

Additional sampling field notes, photographic log, chain of custody, and sampling logs

Confirmation of IDW disposal for both sampling events; combined Supplemental Site Assessment Report; Project Management

Department approval of initial sampling field notes, photographic log, chain of custody, and sampling logs (Subtask 3)

Department approval of additional sampling field notes, photographic log, chain of custody, and sampling logs (Subtask 6)

Department approval of confirmation of IDW disposal for additional sampling event;

combined Supplemental Site Assessment Report; Project Management (Subtasks 1, 5, and 7)

Department approval of confirmation of IDW disposal for initial sampling event (Subtask 4)

12/22/2023

04/19/2024

05/31/2024

$ 1,216.56

$ 35,011.26

$ 63,187.72

$ 30,629.55 www.FloridaDEP.gov

FFLLORIDA DDEEPARTMENTT OOFF

EEnvironmentall Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ronn DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawnn Hamilton Secretary

Memorandum TO: Terracon Consultants, Inc., HW687 Contract File

FROM: Megan Johnson, Contract Manager

DATE: February 8, 2024

SUBJECT: Negotiation Summary – BIL22 Task Assignment (TA) Change Order #1 – TA BIL02AC1 Broward County School Board Property – Site ID # ERIC_18360 Supplemental Site Assessment Activities

This Task Assignment Change Order (TACO) is for the removal of a background study from the original proposal and to authorize the installation of additional soil borings and monitoring wells, conduct laboratory analytical testing, and complete a specific purpose survey and topographic survey. Specific changes are detailed below:

Subtask 1: Project Management The changes in cost for this Subtask is calculated automatically due to the change in the direct labor costs of the remaining subtasks. This resulted in a cost increase of $3,566.94.

Subtask 2: Background Soil Sampling The background sampling included in the original project plan was deemed inapplicable based on the onsite analytical data and subsequently removed. This resulted in a cost decrease of ($7,365.96).

Subtask 3: Initial Supplemental Site Assessment Activities Changes in cost associated with this Subtask were due to a reduction in fees from the drilling subcontractor and a reduction in the number of monitoring wells installed. This reduction further reduced laboratory analytical samples needed. This resulted in a cost actual decrease of ($788.00).

Subtask 4: IDW Management Changes in cost associated with this Subtask is due to a reduction of 4 drums generated during the original sampling event. This resulted in a cost decrease of ($1,215.50).

Subtask 5: Supplemental Site Assessment Report An increase in cost associated with this Subtask is for additional labor hours needed to create interim deliverables and figures. Additional labor hours were also allotted to tabulate, create figures, and evaluate the additional soil borings and monitoring wells that

Negotiation Summary – Task Assignment Change Order #1 TA BIL02AC1 Broward County School Board Property – Site ID # ERIC_18360 February 8, 2024 www.FloridaDEP.gov will be part of additional supplemental site assessment activities outlined in Subtask 6, below. This resulted in a cost increase of $8,050.42.

Subtask 6: Additional Supplemental Site Assessment Activities Under this subtask, Terracon will resample the newly installed and existing monitoring wells described in the project plan to confirm November 2023 sampling results. Terracon will also install 20 soil borings to a depth of 4 feet below ground surface (bgs) and collect soil samples at 0-0.5 feet, 0.5-2 feet, and 2-4 feet bgs. Terracon will also install three deeper soil borings at previous soil borings and new shallow well locations and analyze 4-6 feet, 6-8 feet, and 8-10 feet bgs, to account for topographic undulations. Terracon will supervise the installation of eight new shallow monitoring wells to 13 feet bgs and four deeper surficial zone monitoring wells to collect groundwater samples. All soil and groundwater samples will be analyzed for arsenic and OCP. Terracon will also supervise a specific purpose survey and onsite topographic study to support the site assessment.

The agreed upon cost of this Subtask is $63,187.72.

Subtask 7: IDW Management Under this subtask, Terracon will coordinate the collection and disposal of up to four drums of investigation derived waste. The agreed upon cost of this Subtask is $1,912.89.

Summary The Department’s BIL Contract Manager and Terracon’s Contract Manager have both agreed to the above changes. All changes noted above represent a total overall cost increase of $67,348.50, as shown in the Delta and Cost Actual CEF/LOE. Due to a rounding error in Excel, the Delta CEF shows an $0.01 error, which was corrected in the Cost Actual CEF. The changes were noted in the TACO Request received from Terracon on January 26, 2024. The final cost associated with this TA increased from $62,696.59 to $130,045.09. Documentation of the changes is included in the attached TACO Request, the Delta LOE spreadsheet and the Cost Actual LOE spreadsheet, and the TACO form for BIL02AC1 prepared by the Department.

FD

EP

C O

S T

ES

TI

M A

TE

C on tra ct or

Te rra co n

D at e:

1/

/2

Ta sk

BI

L0

2A C

Su bT as k

Pr oj ec t M an ag em en t

Su bT as k

So il Bo rin g an d

M on ito rin g W el l I ns ta lla tio ns Si te

SB

O

BC

P

LA

N

TA

TA

TI

O

N S

IT

E

Su bT as k

Ba ck gr ou nd

S oi l S am pl in g Su bT as k

ID

W

M an ag em en t

Ac tiv ity /P ha se

SS

A an d R ep or tin g

Su bT as k

So il Bo rin g an d

M on ito rin g W el l I ns ta lla tio ns Su bT as k

Pr oj ec t M an ag er

M eg an J oh ns on as k

ID

W M an ag em en t Su bT as k

Su bT as k

R ep or t P re pa ra tio n

Su bT as k

To ta ls

La bo r R at e

Ca te go ry

$5 0.

Pr oj ec t M an ag er

Sh aw n

O ue lle tte

.1

.1

$0 .0

Ad m in is tra tiv e

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$7 5.

Br ow nf ie ld

C on su lta nt To m L ew is

6.

0.

0.

0.

6.

0.

0.

0.

0.

0.

$3 2.

C

AD

D

S pe ci al is t

C he ls ea

F ug at e

.0

0.

0.

0.

.0

0.

0.

0.

0.

0.

$0 .0

D at a

An al ys t &

V is ua liz at io n Sp ec ia lis t

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

En vi ro nm en ta l T ec hn ic ia n 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

Fi el d G eo lo gi st

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

Fi el d

Sc ie nt is t 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

G

IS

T ec hn ic ia n

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

Pr in ci pa l C on su lta nt

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

Pr oj ec t G eo lo gi st 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

Pr oj ec t I nd us tri al

H yg ie ni st 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2

7.

Pr oj ec t S ci en tis t

Jo n

W rig ht

.5

0.

.5

3.

0.

0.

0.

0.

0.

0.

$0

.0

Se ni or E ng in ee r

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$5 0.

Se ni or

G eo lo gi st Sh aw n

O ue lle tte

3.

0.

4.

2.

.0

.5

2.

0.

0.

0.

$0

.0

Se ni or G

IS

A na lys t 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

Se ni or In du st ria l H yg ie ni st

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4 0.

Se ni or

S ci en tis t Je ss ic a en di co tt

3.

0.

.0

0.

.0

4.

6.

0.

0.

0.

$0

.0

St af f E ng in ee r 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

En v

Te ch ni ci an 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

To ta l H ou rs

5.

.1

0.

8.

5.

2.

1.

8.

0.

0.

0.

D ire ct L ab or

$2

1, 6.

$2 ,5

.7

$0

.0

$4 ,0

.1

$1

.5

$7

,0

.9

$7 ,5

.9

$3

.2

$0

.0

$0 .0

$0

.0

O ve rh ea d

6.

$2

5, 5.

$2 ,9

.0

$0

.0

$4 ,7

.1

$2

.7

$8

,2

.7

$8 ,8

.2

$4

.4

$0

.0

$0 .0

$0

.0

G en

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge

.2 6%

$1 2, 8.

$1

,4

.3

$0 .0

$2

,3

.3

$1

.6

$3 ,9

.1

$4

,2

.4

$1

.2

$0 .0

$0

.0

$0 .0

To ta l L

$5

9, 0.

$6 ,8

.1

$0

.0

$1 1, 6.

$4

.8

$1

9, 5.

$2 0, 0.

$9

.9

$0

.0

$0 .0

$0

.0

R

EV

C

EF

T

ER

R A

C O

N P ag e

TA

C

O C

EF

/L

O E

C O

S T

ES

TI

M A

TE

C on tra ct or

Te rra

1/

/2

BI

L0

2A C as k

Pr oj ec t M an ag em en t

Su bT as k

So il Bo rin g an d

M on ito rin g W el l I ns ta lla tio ns Si te

SB

O

BC

P

LA

N

TA

TA

TI

O

N S

IT

E

Su bT as k

Ba ck gr ou nd

S oi l S am pl in g Su bT as k

ID

W

M an ag em en t

Ac tiv ity /P ha se

SS

A an d R ep or tin g

Su bT as k

So il Bo rin g an d

M on ito rin g W el l I ns ta lla tio ns Su bT as k

Pr oj ec t M an ag er

M eg an J oh as k

ID

W M an ag em en t Su bT as k

Su bT as k

R ep or t P re pa ra tio n

Su bT as k

To ta ls

Tr av el

Ve hi cl e

R en ta l

$2 ,6

.0

$0

.0

$9

.0

$1

.0

$0 .0

$1

,4

.0

$1

.0

$0 .0

$0

.0

$0 .0

M ile ag e C os ts

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ai r F ar e

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pe r d ie m

H ot el

$2 ,7

.0

$0

.0

$8

.0

$0 .0

$0

.0

$1 ,8

.0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l T ra ve l $5

,3

.0

$0 .0

$1

,7

.0

$1

.0

$0 .0

$3

,3

.0

$1

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r

(E qu ip m en t P ro cu re m en t)

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pr oc ur em en t F ee $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r

(S er vi ce s Pr oc ur em ril lin g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

Ea rth

N ur se $2

2, 5.

$0 .0

$9

,9

.0

$0 .0

$0

.0

$1 2, 0.

$0

.0

$0 .0

$0

.0

$0 .0

M ob ile

L ab or at or y

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su rv ey in g $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

ID

W Er w in

$1 ,1

.0

$0

.0

$0 .0

$5

.0

$0

.0

$0 .0

$6

.0

$0

.0

$0 .0

$0

.0

U til iti es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

G

EO

V ie w $1

,3

.0

$0 .0

$0

.0

$0 .0

$0

.0

$1 ,3

.0

$0

.0

$0 .0

$0

.0

$0 .0

R es er ve G eo sp at ia l $6

,0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$6 ,0

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tra ct or S ub to ta l

$3 0, 5.

$0

.0

$9 ,9

.0

$5

.0

$0

.0

$1 9, 0.

$6

.0

$0

.0

$0 .0

$0

.0

H an dl in g Fe e $3

,0

.5

$0 .0

$9

.5

$5

0.

$0 .0

$1

,9

.0

$6 9.

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$3 3, 3.

$0

.0

$1 0, 1.

$5

.0

$0

.0

$2 1, 3.

$7

.0

$0

.0

$0 .0

$0

.0

La bo ra to ry

An al yt ic al C os ts

$2 0, 8.

$0

.0

$7 ,9

.0

$0

.0

$0 .0

$1

2, 4.

$0 .0

$0

.0

$0 .0

$0

.0

Fa st

T ur na ro un d

C ha rg es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Sa m pl e

Sh ip pi ng

$1 ,9

.0

$0

.0

$9

.0

$0 .0

$0

.0

$1 ,0

.0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or at or y $2

1, 8.

$0 .0

$8

,8

.0

$0 .0

$0

.0

$1 3, 4.

$0

.0

$0 .0

$0

.0

$0 .0

Fi el d

Ex pe es

Pe rs on al P ro te ct io n $3

.5

$0

.0

$1

.5

$0 .0

$0

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ex pe nd ab le s

$4

.0

$0 .0

$1

.0

$0

.0

$0 .0

$2

.0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

D ril lin g re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t ( An al yt ic al re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t (

ID

W re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

O th er

$2 ,9

.0

$0

.0

$7

.0

$0 .0

$0

.0

$2 ,1

.0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l F ie ld

E xp en se s $3

,7

.5

$0 .0

$1

,1

.5

$0 .0

$0

.0

$2 ,6

.0

$0

.0

$0 .0

$0

.0

$0 .0

Su bt ot al

$1

,1

.0

$6 ,8

.1

$0

.0

$3 3, 6.

$1

,1

.8

$1 9, 5.

$6

1, 9.

$1 ,8

.9

$0

.0

$0 .0

$0

.0

Co m pl et io n

Fe e

$5 ,9

.0

$6

.0

$0

.0

$1 ,1

.6

$4

9.

$1 ,9

.5

$2

,0

.0

$9 3.

$0

.0

$0 .0

$0

.0

To ta l E st im at ed C os t

$1

,0

.0

$7 ,5

.2

$0

.0

$3 5, 1.

$1

,2

.5

$2 1, 3.

$6

3, 7.

$1 ,9

.8

$0

.0

$0 .0

$0

.0

R

EV

C

EF

T

ER

R A

C O

N P ag e

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : SBOBC Plantation Site BFO3B SUBTASK 2: Background Soil Sampling

PROPOSAL NO. PHD237064

DATE: 10/2/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning and Coordination Background Soil Sampling Senior Geologist SO 0.00 Staff Geologist JW 0.00 Staff Geologist JW 1 day loading/unload, mobilization (PB) 0.00 Senior Geologist SO 1 day loading/unload, mobilization (PSL) 0.00 Staff Geologist JW 1 day of soil Boring Installation (12 offsite background) locations 0.00 Senior Geologist SO 1 day soil sampling (12 offsite background locations) 0.00

Personnel: SO JW CF Hours: 0.00 0.00 0.00

TOTAL LABOR 0.00

VEHICLE TYPE RATE UNIT USEAGE

SO Truck (Background soil sampling) 120 day 0 $0.00 JW Truck (Background soil sampling) 120 Day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Geo View Utility Clearance 1,300.00$ day 0 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC EQB

Arsenic EPA 6020 (soil) 14.00$ 0 0 0 $0.00 Digestions 7.00$ 0 $0.00 Arsenic EPA 6020 (water) 14.00$ 0 $0.00

TOTAL LAB $0.00

Sample Shipping Large Cooler 150.00$ 0 $0.00

TOTAL $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables 40.00$ day 0 $0.00 Personal Protection 35.00$ day 0 $0.00 Hand Auger 12.00$ Day 0 $0.00 Ice 6.50$ EA 0 $0.00 Total Survey Station (GEODE, GPS 50.00$ day 0 $0.00 55-gallon drum, new 100.00$ drum 0 $0.00

$0.00

TOTAL EQUIPMENT $0.00

PreTask Planning, prepare field sampling SOW/coordinate offsite access, kit Utilities Markout and coordination ( Includes Mobilzation)

SITE : SBOBC Plantation Site SUBTASK 3: Soil Boring and Monitoring Well Installations

PROPOSAL NO. PHD237064

DATE: 10/2/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning and Coordination Soil Boring and Monitoring Well Installation and Sampling Senior Geologist SO 3.00 Senior Staff Scientist JE 1 day loading/unload mobilization 2 Hrs Travel Each way 5.00 Staff Scientist JW 3 days loading/unload mobilization (1 Hr mob 1 hr Demob each day) 6.00 Staff Scientist JW 3 days of soil boring Installation and monitoring well installation. 30.00 Senior Staff Scientist JE 3 days of soil boring Installation and monitoring well installation. 30.00

Survey Monitoring Well Top of Casing Senior Staff Scientist JE 2.50 Staff Scientist JW 2.50

Monitoring Well Groundwater Sampling Senior Geologist SO 1.75 Senior Staff Scientist JW 1 day loading/unload mobilization (1 Mob Demob) 5.00 Staff Scientist JE 2 Days Loading unloading mobilization 2.50 Staff Scientist JW 1.5 days of monitoring well sampling at 11 locations 15.00 Senior Staff Scientist JE 1.5 days of monitoring well sampling at 11 locations 15.00

Personnel: SO JE JW Hours: 4.75 55.00 58.50

TOTAL LABOR 118.25

VEHICLE TYPE RATE UNIT USEAGE

JW Truck (Soil Boring/Well Installation/ sampling) 480 day 1 $480.00 JE Truck (SoilBoring/Well Installation/ sampling) 480 day 1 $480.00

TOTAL VEHICLE $960.00

PER DIEM STAFF RATE UNIT USEAGE

Senior Staff Scientist Lodging $225.00 Night 3 $675.00

Meals $36.00 Each 4 $144.00

TOTAL PER DIEM $819.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Earth Nurse Soil Borings and MW Installation 9,965.00$ LS 1 $9,965.00

TOTAL $9,965.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

SOIL

Arsenic EPA 6020 (soil) 14.00$ 45 3 0 $672.00 Digestion 7.00$ 48 $336.00

OCP EPA 8081 105.00$ 45 3 $4,725.00

Sample Shipping Large Cooler 150.00$ 4 $600.00 Groundwater Arsenic EPA 6020 14.00$ 11 4 4 $266.00 Digestion 7.00$ 23 $161.00

OCP EPA 8081 105.00$ 11 4 4 $1,995.00

Sample Shipping Large Cooler 150.00$ 2 $300.00

TOTAL LAB $7,994.00

TOTAL SHIPPING $900.00

TOTAL $9,055.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables 40.00$ day 4.5 $180.00 Personal Protection 35.00$ day 4.5 $157.50 Shallow groundwater sampling kit 290.00$ day 1.5 $435.00 Tubing, HDPE 0.30$ ft 260 $78.00 Tubing, silicon (3/16 x 3/8) 3.00$ ft 5 $15.00 Total Survey Station (Geode, GPS) 50.00$ day 5 $250.00

TOTAL EQUIPMENT $778.00

PreTask Planning, prepare field sampling SOW/coordinate site access, kit

Measure TOC new and existing monitoring wells (11) Measure TOC new and existing monitoring wells (11)

PreTask Planning, prepare field sampling SOW/coordinate site access, kit

SUBTASK 4: IDW Management

PROPOSAL NO. PHD237064

DATE: 10/2/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

IDW Managemet Senior Geologist SO 2.00 Staff Scientist JW 1 Hour Onsite 1 Hour Mobilize and 1 hr Demobilize 3.00

Personnel: SO JE JW Hours: 2.00 0.00 3.00

TOTAL LABOR 5.00

VEHICLE TYPE RATE UNIT USEAGE

Truck (IDW Oversite) 120 day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

US Ecology Dispose of 4 drums of waste 500.00$ LS 1 $500.00

TOTAL $500.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables 40.00$ day 0 $0.00

TOTAL EQUIPMENT $0.00

Create Waste Generator Profile and Coordinate IDW removal

SUBTASK 5: Report Preparation

PROPOSAL NO. PHB247002

DATE: 1/24/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Review of Field Data Interim Deliverable Preparation Senior Geologist SO 2.00 Senior Staff Scientist JE Prepare Summary for Interim Deliverable 4.00

Review of Field Data Interim Data Prepare Figures and Tables conduct Stakeholder Meeting Senior Geologist SO 12.00 Senior Staff Scientist JE Prepare Summary for Interim Deliverable 12.00 Preparation of Draft Tables and Figures

Senior Staff Scientist JE 18.00 Senior Staff Scientist JE 24.00 Preparation of Report Senior Geologist SO 8.00 Senior Geologist SO Review and Summarize Water Quality Data 8.00 Senior Geologist SO Preparation of Report 28.00

Figures and Drafting Senior CADD Technician CF Draft Figures Compile Data 40.00

QA QC TL Senior Brownfields Coordinator 6.75

Personnel: SO JE JW CF TL Hours: 58.00 58.00 0.00 40.00 6.75

TOTAL LABOR 162.75

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

Review Field Data Interim Deliverable Review

Draft Tables and Figures Compile historical Tables and Figures

Review and Summarize Soil Data

Review Field Data Interim Deliverable Review

SUBTASK 6: Soil Boring and Monitoring Well Installations

PROPOSAL NO. PHB247002

DATE: 1/24/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Utility Notification and Oversite Senior Geologist SO 10.00 Senior Staff Scientist JE 1 day loading/unload mobilization 2 Hrs Travel Each way and Utility Markout overiste 12.00

Confirmation Well Sampling Senior Geologist SO 3.00 Senior Staff Scientist JE 1 day loading/unload mobilization 2 Hrs Travel Each way 5.00 Senior Staff Scientist JE Gauge (11) moitoring wells 1.50 Senior Staff Scientist JE 1 day sample (3) Monitoring wells DMW-1, GP-2, TMW-1 4.50 Senior Staff Scientist JE Containerize IDW move to staging area and secure 1.50

Field Task Planning and Coordination Soil Boring and Monitoring Well Installation and Sampling Senior Geologist SO 3.00 Senior Staff Scientist JE 1 day loading/unload mobilization 2 Hrs Travel Each way 5.00 Senior Geologist SO 1 day loading/unload mobilization 2 Hrs Travel Each way 5.00 Senior Geologist SO 4 days of soil boring Installation and monitoring well installation. 40.00 Senior Staff Scientist JE 4 days of soil boring Installation and monitoring well installation. 40.00

Survey Monitoring Well Top of Casing Senior Staff Scientist JE 2.50 Senior Geologist SO 2.50

Senior Staff Scientist JE PLS Ovesite Includes Mobilization 12.00

Monitoring Well Groundwater Sampling Senior Geologist SO 3.00 Senior Staff Scientist JE 2 day loading/unload mobilization (1 Mob Demob) 5.00 Senior Staff Scientist JE 2 days of monitoring well sampling at 13 locations 16.00

Personnel: SO JE JW Hours: 66.50 105.00 0.00

TOTAL LABOR 171.50

VEHICLE TYPE RATE UNIT USEAGE

SO Truck (Soil Boring/Well Installation/ sampling) 480.00$ Week 1 480.00$ JE Truck (SoilBoring/Well Installation/ sampling) 480.00$ Week 2 960.00$

TOTAL VEHICLE 1,440.00$

PER DIEM STAFF RATE UNIT USEAGE

Senior Staff Scientist Lodging 225.00$ Night 4 900.00$

Meals 36.00$ Each 5 180.00$ Senior Geologist

Lodging 225.00$ Night 3 675.00$ Meals 36.00$ Each 4 144.00$

TOTAL PER DIEM 1,899.00$

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Geoview Utility Markout locating 1,300.00$ day 1 1,300.00$ Earth Nurse Soil Borings and MW Installation 12,080.00$ LS 1 12,080.00$ Reserve Geospatial Specific Purpose Survey and Topo study 6,050.00$ Each 1 6,050.00$

TOTAL 19,430.00$

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

SOIL

Arsenic EPA 6020 (soil) 14.00$ 72 4 0 1,064.00$ Digestion 7.00$ 72 504.00$

OCP EPA 8081 105.00$ 72 4 7,560.00$

Sample Shipping Large Cooler 150.00$ 4 600.00$ Groundwater Arsenic EPA 6020 14.00$ 16 4 1 294.00$ Digestion 7.00$ 16 112.00$

OCP EPA 8081 105.00$ 16 4 4 2,520.00$

Sample Shipping Large Cooler 150.00$ 3 450.00$

TOTAL LAB 12,054.00$

TOTAL SHIPPING 1,050.00$

TOTAL 13,104.00$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables 40.00$ day 6 240.00$ Personal Protection 35.00$ day 6 210.00$ Monitoing well Install Kit $325 DAy 4 1,300.00$ Shallow groundwater sampling kit 290.00$ day 2 580.00$ Tubing, HDPE 0.30$ ft 260 78.00$ Tubing, silicon (3/16 x 3/8) 3.00$ ft 5 15.00$ Total Survey Station (Geode, GPS) 200.00$ week 1 200.00$

TOTAL EQUIPMENT 2,173.00$

PreTask Planning, prepare field sampling SOW/coordinate offsite access, kit

PreTask Planning, prepare field sampling SOW/coordinate site access, kit

Measure TOC new monitoring wells (13) Measure TOC new monitoring wells (13)

PreTask Planning, prepare field sampling SOW/coordinate site access, kit

SUBTASK 7: IDW Management

PROPOSAL NO. PHB247002

DATE: 1/24/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

IDW Managemet Senior Geologist SO 2.00 Senior Staff Scientist JE 1 Hour Onsite 4 Hour Mobilize and 1 hr Demobilize 6.00

Personnel: SO JE JW Hours: 2.00 6.00 0.00

TOTAL LABOR 8.00

VEHICLE TYPE RATE UNIT USEAGE

Truck (IDW Oversite) 120 day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Erwin Remediation, Inc. Dispose of 4 drums of waste 690.00$ LS 1 $690.00

TOTAL $690.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables 40.00$ day 0 $0.00

TOTAL EQUIPMENT $0.00

C O

S T

ES

TI

M A

TE

C on tra ct or

Te rra

/2 /2 as k

Pr oj ec t M an ag em en t Su bT as k

So il

Bo rin g an d M on ito rin g

W el l I ns ta lla tio ns

Si te

SB

O

BC

P

LA

N

TA

TA

TI

O N

S

IT

E Su bT as k

Ba ck gr ou nd S oi l S am pl in g

Su bT as k

ID

W M an ag em en t Ac tiv ity

/P ha se

SS

A an d

R ep or tin g Su bT as k

So il

Bo rin g an d M on ito rin g

W el l I ns ta lla tio ns

Su bT as k

Pr oj ec t M an ag er

M eg an

J oh as k

ID

W

M an ag em en t

Su bT as k

Su bT as k

R ep or t P re pa ra tio n Su bT as k

To ta ls

La bo r R at e

Ca te go ry

$5 0.

Pr oj ec t M an n

O ue lle tte

.8

.8

$2 0.

Ad m in is tra tiv e

As hl ey M ille r

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$7 5.

Br ow nf ie ld

C on su lta nt To m L ew is

3.

0.

0.

0.

3.

0.

0.

0.

0.

0.

$3 2.

C

AD

D

S pe ci al is t

C he ls ea

F ug at e

5.

0.

0.

0.

5.

0.

0.

0.

0.

0.

$0 .0

D at a

An al ys t &

V is ua liz at io n Sp ec ia lis t

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

En vi ro nm en ta l T ec hn ic ia n 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

Fi el d G eo lo gi st

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

Fi el d

Sc ie nt is t 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

G

IS

T ec hn ic ia n

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

Pr in ci pa l C on su lta nt

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

Pr oj ec t G eo lo gi st 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

Pr oj ec t I nd us tri al

H yg ie ni st 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2

7.

Pr oj ec t S ci en tis t

Jo n

W rig ht -2

2.

-2 2.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

Se ni or E ng in ee r

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$5 0.

Se ni or

G eo lo gi st Sh aw n

O ue lle tte

.2

-1

7.

0.

0.

.0

.5

2.

0.

0.

0.

$0 .0

Se ni or

G

IS

A na lys t

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

Se ni or

In du st ria l H yg ie ni st 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4

0.

Se ni or S ci en tis t

Je ss ic a en di co tt

2.

0.

0.

0.

.0

4.

6.

0.

0.

0.

$0

.0

St af f E ng in ee r 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

En v

Te ch ni ci an 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

To ta l H ou rs

1.

.8

-3 9.

0.

0.

.0

1.

8.

0.

0.

0.

D ire ct L

$1

0, 2.

$1 ,1

.0

1, 7.

$0

.0

$0 .0

$2

,6

.0

$7 ,5

.9

$3

.2

$0

.0

$0 .0

$0

.0

O ve rh ea d

6.

$1

2, 9.

$1 ,3

.5

1, 2.

$0

.0

$0 .0

$3

,1

.1

$8 ,8

.2

$4

.4

$0

.0

$0 .0

$0

.0

G en

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge

.2 6%

$5 ,8

.4

$6

.0

5.

$0 .0

$0

.0

$1 ,5

.3

$4

,2

.4

$1

.2

$0 .0

$0

.0

$0 .0

To ta l L

$2

8, 6.

$3 ,2

.6

3, 5.

$0

.0

$0 .0

$7

,3

.5

$2 0, 0.

$9

.9

$0

.0

$0 .0

$0

.0

R

EV

C

EF

T

ER

R A

C O

N P ag e

C O

S T

ES

TI

M A

TE

C on tra ct or

Te rra

/2 as k

Pr oj ec t M an ag em en t Su bT as k

So il

Bo rin g an d M on ito rin g

W el l I ns ta lla tio ns

Si te

SB

O

BC

P

LA

N

TA

TA

TI

O N

S

IT

E Su bT as k

Ba ck gr ou nd S oi l S am pl in g

Su bT as k

ID

W M an ag em en t Ac tiv ity

/P ha se

SS

A an d

R ep or tin g Su bT as k

So il

Bo rin g an d M on ito rin g

W el l I ns ta lla tio ns

Su bT as k

Pr oj ec t M an ag er

M eg an

J oh as k

ID

W

M an ag em en t

Su bT as k

Su bT as k

R ep or t P re pa ra tio n Su bT as k

To ta ls

Tr av el

Ve hi cl e

R en ta l

$1 ,3

.0

0.

$0 .0

$0

.0

$0 .0

$1

,4

.0

$1

.0

$0 .0

$0

.0

$0 .0

M ile ag e C os ts

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ai r F ar e

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pe r d ie m

H ot el

$1 ,8

.0

$0

.0

$0 .0

$0

.0

$0 .0

$1

,8

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l T ra ve l

$3 ,2

.0

0.

$0 .0

$0

.0

$0 .0

$3

,3

.0

$1

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r

(E qu ip m en t P ro cu re m

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pr oc ur em en t F ee $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r

(S er vi ce s Pr oc ur em lin g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

Ea rth

N ur se $1

1, 0.

$0 .0

0.

$0 .0

$0

.0

$1 2, 0.

$0

.0

$0 .0

$0

.0

$0 .0

M ob ile

L ab or at or y

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su rv ey in g $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

ID

W Er w in

5.

$0

.0

$0 .0

1, 5.

$0

.0

$0 .0

$6

.0

$0

.0

$0 .0

$0

.0

U til iti es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

G

EO

V ie w $0

.0

1, 0.

$0 .0

$0

.0

$0 .0

$1

,3

.0

$0 .0

$0

.0

$0 .0

$0

.0

R es er ve

G eo

Sp at ia l

$6 ,0

.0

$0

.0

$0 .0

$0

.0

$0 .0

$6

,0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tra ct or

S ub to ta l $1

7, 5.

1, 0.

0.

1, 5.

$0

.0

$1 9, 0.

$6

.0

$0

.0

$0 .0

$0

.0

H an dl in g Fe e $1

,7

.5

0.

.0

0)

0.

$0 .0

$1

,9

.0

$6 9.

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$1 8, 6.

1, 0.

0.

1, 5.

$0 .0

$2

1, 3.

$7

.0

$0 .0

$0

.0

$0 .0

La bo ra yt ic al

C os ts $1

0, 0.

6.

8.

$0 .0

$0

.0

$1 2, 4.

$0

.0

$0 .0

$0

.0

$0 .0

Fa st T ur na ro un d C ha rg es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Sa m pl e Sh ip pi ng $7

.0

0.

$0 .0

$0

.0

$0 .0

$1

,0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L ab or at or y

$1 1, 0.

1, 6.

8.

$0 .0

$0

.0

$1 3, 4.

$0

.0

$0 .0

$0

.0

$0 .0

Fi el d

Ex pe on al P ro te ct io n $1

.0

.0

0) $0

.0

$0 .0

$0

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ex pe nd ab le s

$2

.0

.0 0)

$0 .0

$0

.0

$0 .0

$2

.0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

D ril lin g re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t ( An al yt ic al re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t (

ID

W re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

O th er

$2 ,0

.0

0.

$0 .0

$0

.0

$0 .0

$2

,1

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l F ie ld E xp en se s

$2 ,4

.0

5.

$0 .0

$0

.0

$0 .0

$2

,6

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bt ot al

$6 4, 9.

$3

,2

.6

6, 6.

8.

1, 5.

$7

,3

.5

$6 1, 9.

$1

,8

.9

$0 .0

$0

.0

$0 .0

Co m pl et io n Fe e $2

,8

.6

$3

.2

9.

$0

.0

$0 .0

$7

.8

$2

,0

.0

$9 3.

$0

.0

$0 .0

$0

.0

To ta l E st im at ed C os t

$6 7, 8.

$3

,5

.9

7, 5.

8.

1, 5.

$8

,0

.4

$6 3, 7.

$1

,9

.8

$0 .0

$0

.0

$0 .0

R

EV

C

EF

T

ER

R A

C O

N P ag e

D el ta C

EF

/L

SUBTASK 2: Background Soil Sampling

PROPOSAL NO. PHD237064

DATE: 10/2/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning and Coordination Background Soil Sampling Senior Geologist SO (2.75) Staff Geologist JW (10.00) Staff Geologist JW 1 day loading/unload, mobilization (PB) (2.00) Senior Geologist SO 1 day loading/unload, mobilization (PSL) (4.50) Staff Geologist JW 1 day of soil Boring Installation (12 offsite background) locations (10.00) Senior Geologist SO 1 day soil sampling (12 offsite background locations) (10.00)

Personnel: SO JW CF Hours: (17.25) (22.00) 0.00

TOTAL LABOR -39.25

VEHICLE TYPE RATE UNIT USEAGE

SO Truck (Background soil sampling) 120 day -1 ($120.00) JW Truck (Background soil sampling) 120 Day -1 ($120.00)

TOTAL VEHICLE ($240.00)

PER DIEM STAFF RATE UNIT USEAGE

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Geo View Utility Clearance 1,300.00$ day -1 ($1,300.00)

TOTAL ($1,300.00)

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC EQB

Arsenic EPA 6020 (soil) 14.00$ -36 -2 0 ($532.00) Digestions 7.00$ -38 ($266.00) Arsenic EPA 6020 (water) 14.00$ -2 ($28.00)

TOTAL LAB ($826.00)

Sample Shipping Large Cooler 150.00$ -2 ($300.00)

TOTAL ($1,126.00)

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables 40.00$ day -1 ($40.00) Personal Protection 35.00$ day -1 ($35.00) Hand Auger 12.00$ Day -2 ($24.00) Ice 6.50$ EA -4 ($26.00) Total Survey Station (GEODE, GPS 50.00$ day -1 ($50.00) 55-gallon drum, new 100.00$ drum 0 $0.00

$0.00

TOTAL EQUIPMENT ($100.00)

PreTask Planning, prepare field sampling SOW/coordinate offsite access, kit

SUBTASK 3: Soil Boring and Monitoring Well Installations

PROPOSAL NO. PHD237064

DATE: 10/2/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning and Coordination Soil Boring and Monitoring Well Installation and Sampling Senior Geologist SO 0.00 Senior Staff Scientist JE 1 day loading/unload mobilization 2 Hrs Travel Each way 0.00 Staff Scientist JW 3 days loading/unload mobilization (1 Hr mob 1 hr Demob each day) 0.00 Staff Scientist JW 3 days of soil boring Installation and monitoring well installation. 0.00 Senior Staff Scientist JE 3 days of soil boring Installation and monitoring well installation. 0.00

Survey Monitoring Well Top of Casing Senior Staff Scientist JE 0.00 Staff Scientist JW 0.00

Monitoring Well Groundwater Sampling Senior Geologist SO 0.00 Senior Staff Scientist JW 1 day loading/unload mobilization (1 Mob Demob) 0.00 Staff Scientist JE 2 Days Loading unloading mobilization 0.00 Staff Scientist JW 1.5 days of monitoring well sampling at 11 locations 0.00 Senior Staff Scientist JE 1.5 days of monitoring well sampling at 11 locations 0.00

Personnel: SO JE JW Hours: 0.00 0.00 0.00

TOTAL LABOR 0.00

VEHICLE TYPE RATE UNIT USEAGE

JW Truck (Soil Boring/Well Installation/ sampling) 120 day 0 $0.00 JE Truck (SoilBoring/Well Installation/ sampling) 120 day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

Senior Staff Scientist Lodging $225.00 Night 0 $0.00

Meals $36.00 Each 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Earth Nurse Soil Borings and MW Installation (500.00)$ LS 1 ($500.00)

TOTAL ($500.00)

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

SOIL

Arsenic EPA 6020 (soil) 14.00$ 0 0 0 $0.00 Digestion 7.00$ 0 $0.00

OCP EPA 8081 105.00$ 0 0 $0.00

Sample Shipping Large Cooler 150.00$ 0 $0.00 Groundwater Arsenic EPA 6020 14.00$ -2 0 0 ($28.00) Digestion 7.00$ 0 0 $0.00

OCP EPA 8081 105.00$ -2 0 0 ($210.00)

Sample Shipping Large Cooler 150.00$ 0 $0.00

TOTAL LAB ($238.00)

TOTAL SHIPPING $0.00

TOTAL ($238.00)

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables 40.00$ day 0 $0.00 Personal Protection 35.00$ day 0 $0.00 Shallow groundwater sampling kit 290.00$ day 0 $0.00 Tubing, HDPE 0.30$ ft 0 $0.00 Tubing, silicon (3/16 x 3/8) 3.00$ ft 0 $0.00 Total Survey Station (Geode, GPS) 50.00$ day 0 $0.00

TOTAL EQUIPMENT $0.00

PreTask Planning, prepare field sampling SOW/coordinate site access, kit

Measure TOC new and existing monitoring wells (11) Measure TOC new and existing monitoring wells (11)

SUBTASK 4: IDW Management

PROPOSAL NO. PHD237064

DATE: 10/2/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

IDW Managemet Senior Geologist SO 0.00 Staff Scientist JW 1 Hour Onsite 1 Hour Mobilize and 1 hr Demobilize 0.00

Personnel: SO JE JW Hours: 0.00 0.00 0.00

TOTAL LABOR 0.00

VEHICLE TYPE RATE UNIT USEAGE

Truck (IDW Oversite) 120 day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Erwin Remediation Dispose of 4 drums of waste (1,105.00)$ LS 1 ($1,105.00)

TOTAL ($1,105.00)

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables 40.00$ day 0 $0.00

TOTAL EQUIPMENT $0.00

SUBTASK 5: Report Preparation

PROPOSAL NO. PHB247002

DATE: 1/24/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Review of Field Data Interim Deliverable Preparation Senior Geologist SO 0.00 Senior Staff Scientist JE Prepare Summary for Interim Deliverable 0.00

Review of Field Data Interim Data Prepare Figures and Tables conduct Stakeholder Meeting Senior Geologist SO 12.00 Senior Staff Scientist JE Prepare Summary for Interim Deliverable 12.00 Preparation of Draft Tables and Figures

Senior Staff Scientist JE 6.00 Senior Staff Scientist JE 4.00 Preparation of Report Senior Geologist SO 4.00 Senior Geologist SO Review and Summarize Water Quality Data 4.00 Senior Geologist SO Preparation of Report 8.00

Figures and Drafting Senior CADD Technician CF Draft Figures Compile Data 5.00

QA QC TL Senior Brownfields Coordinator 3.00

Personnel: SO JE JW CF TL Hours: 28.00 22.00 0.00 5.00 3.00

TOTAL LABOR 58.00

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

Review and Summarize Soil Data

Review Field Data Interim Deliverable Review

Review Field Data Interim Deliverable Review

Draft Tables and Figures Compile historical Tables and Figures

SUBTASK 6: Soil Boring and Monitoring Well Installations

PROPOSAL NO. PHB247002

DATE: 1/24/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

ty Notification and Oversite Senior Geologist SO 10.00 Senior Staff Scientist JE 1 day loading/unload mobilization 2 Hrs Travel Each way and Utility Markout overiste 12.00 Confirmation Well Sampling Senior Geologist SO 3.00 Senior Staff Scientist JE 1 day loading/unload mobilization 2 Hrs Travel Each way 5.00 Senior Staff Scientist JE Gauge (11) moitoring wells 1.00 Senior Staff Scientist JE 1 day sample (3) Monitoring wells DMW-1, GP-2, TMW-1 4.50 Senior Staff Scientist JE Containerize IDW move to staging area and secure 1.50

Field Task Planning and Coordination Soil Boring and Monitoring Well Installation and Sampling Senior Geologist SO 3.00 Senior Staff Scientist JE 1 day loading/unload mobilization 2 Hrs Travel Each way 5.00 Senior Geologist SO 1 days loading/unload mobilization (1 Hr mob 1 hr Demob each day) 5.00 Senior Geologist SO 4 days of soil boring Installation and monitoring well installation. 40.00 Senior Staff Scientist JE 4 days of soil boring Installation and monitoring well installation. 40.00

Survey Monitoring Well Top of Casing Senior Staff Scientist JE 2.50 Senior Geologist SO 2.50 Senior Staff Scientist JE 12.00 Monitoring Well Groundwater Sampling Senior Geologist SO 3.00 Senior Staff Scientist JE 2 day loading/unload mobilization (1 Mob Demob) 5.00 Senior Staff Scientist JE 2 days of monitoring well sampling at 13 locations 16.00

Personnel: SO JE JW Hours: 66.50 104.50 0.00

TOTAL LABOR 171.00

VEHICLE TYPE RATE UNIT USEAGE

SO Truck (Soil Boring/Well Installation/ sampling) 480 Week 1 $480.00 JE Truck (SoilBoring/Well Installation/ sampling) 480 Week 2 $960.00

TOTAL VEHICLE $1,440.00

PER DIEM STAFF RATE UNIT USEAGE

Senior Staff Scientist Lodging $225.00 Night 4 $900.00

Meals $36.00 Each 5 $180.00 Senior Geologist

Lodging $225.00 Night 3 $675.00 Meals $36.00 Each 4 $144.00

TOTAL PER DIEM $1,899.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Geoview Utility Markout locating $1,300 day 1 $1,300.00 Earth Nurse Soil Borings and MW Installation 12,080.00$ LS 1 $12,080.00 Reserve Geospatial Specifc Purpose Survey and Topo Study 6,050.00$ Each 1 $6,050.00

TOTAL $19,430.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

SOIL

Arsenic EPA 6020 (soil) 14.00$ 72 4 0 $1,064.00 Digestion 7.00$ 72 $504.00

OCP EPA 8081 105.00$ 72 4 $7,560.00

Sample Shipping Large Cooler 150.00$ 4 $600.00 Groundwater Arsenic EPA 6020 14.00$ 16 4 1 $294.00 Digestion 7.00$ 16 $112.00

OCP EPA 8081 105.00$ 16 4 4 $2,520.00

Sample Shipping Large Cooler 150.00$ 3 $450.00

TOTAL LAB $12,054.00

1050 TOTAL SHIPPING

TOTAL $13,104.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables 40.00$ day 6 $240.00 Personal Protection 35.00$ day 6 $210.00 Monitor Well Install Kit 325.00$ Day 4 $1,300.00 Shallow groundwater sampling kit 290.00$ day 2 $580.00 Tubing, HDPE 0.30$ ft 260 $78.00 Tubing, silicon (3/16 x 3/8) 3.00$ ft 5 $15.00 Total Survey Station (Geode, GPS) 200.00$ week 1 $200.00

TOTAL EQUIPMENT $2,173.00

PreTask Planning, prepare field sampling SOW/coordinate site access, kit

PLS Oversite Includes Mobilization

PreTask Planning, prepare field sampling SOW/coordinate off site access, kit

PreTask Planning, prepare field sampling SOW/coordinate site access, kit

PreTask Planning, prepare field sampling SOW/coordinate site access, kit

Measure TOC new and existing monitoring wells (13) Measure TOC new and existing monitoring wells (13)

SUBTASK 7: IDW Management

PROPOSAL NO. PHB247002

DATE: 1/24/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

IDW Managemet Senior Geologist SO 2.00 Senior Staff Scientist JE 1 Hour Onsite 4 Hour Mobilize and 1 hr Demobilize 6.00

Personnel: SO JE JW Hours: 2.00 6.00 0.00

TOTAL LABOR 8.00

VEHICLE TYPE RATE UNIT USEAGE

Truck (IDW Oversite) 120 day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Erwin Remediation, Inc. Dispose of 4 drums of waste 690.00$ LS 1 $690.00

TOTAL $690.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables 40.00$ day 0 $0.00

TOTAL EQUIPMENT $0.00

C O

S T

ES

TI

M A

TE

C on tra ct or

Te rra

/2

BI

L0

2A as k

Pr oj ec t M an ag em en t

Su bT as k

Si te

SB

O

BC

P

LA

N

TA

TA

TI

O

N S

IT

E

Su bT as k

Ba ck gr ou nd

S oi l S am pl in g Su bT as k

Ac tiv ity /P ha se

SS

A an d R ep or tin g

Su bT as k

So il Bo rin g an d

M on ito rin g W el l I ns ta lla tio ns Su bT as k

Pr oj ec t M an ag er

M eg an J oh as k

ID

W M an ag em en t Su bT as k

Su bT as k

R ep or t P re pa ra tio n

Su bT as k

To ta ls

La bo r R at e

Ca te go ry

$5 0.

Pr oj ec t M an n

O ue lle tte

.3

.3

$0 .0

Ad m in is tra tiv e

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$7 5.

Br ow nf ie ld

C on su lta nt To m L ew is

3.

0.

0.

0.

3.

0.

0.

0.

0.

0.

$3 2.

C

AD

D

S pe ci al is t

C he ls ea

F ug at e

.0

0.

0.

0.

.0

0.

0.

0.

0.

0.

$0 .0

D at a

An al ys t &

V is ua liz at io n Sp ec ia lis t

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

En vi ro nm en ta l T ec hn ic ia n 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

Fi el d G eo lo gi st

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

Fi el d

Sc ie nt is t 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

G

IS

T ec hn ic ia n

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

Pr in ci pa l C on su lta nt

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

Pr oj ec t G eo lo gi st 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

Pr oj ec t I nd us tri al

H yg ie ni st 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2

7.

Pr oj ec t S ci en tis t

Jo n

W rig ht

.5

.0

.5

3.

0.

0.

0.

0.

0.

0.

$0 .0

Se ni or

E ng in ee r 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$5

0.

Se ni or G eo lo gi st

Sh aw n O ue lle tte

.0

.2

4.

2.

.0

0.

0.

0.

0.

0.

$0 .0

Se ni or

G

IS

A na lys t

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

Se ni or

In du st ria l H yg ie ni st 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4

0.

Se ni or S ci en tis t

Je ss ic a en di co tt

.0

0.

.0

0.

.0

0.

0.

0.

0.

0.

$0

.0

St af f E ng in ee r 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

En v

Te ch ni ci an 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

To ta l H ou rs

3.

.3

.2

8.

5.

4.

0.

0.

0.

0.

0.

D ire ct L

$1

3.

$1 ,3

.6

$1

,4

.5

$4 ,0

.1

$1

.5

$4

,3

.8

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

O ve rh ea d

6.

$1

3, 6.

$1 ,5

.5

$1

,7

.3

$4 ,7

.1

$2

.7

$5

,0

.5

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

G en

A dm in 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fr in ge

.2

6% $6

,4

.8

$7

.3

$8

.6

$2 ,3

.3

$1

.6

$2

,4

.8

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L

$3

3.

$3 ,5

.5

$3

,9

.4

$1 1, 6.

$4

.8

$1

1, 7.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

R

EV

C

EF

T

ER

R A

C O

N P ag e

O rig in al

C

EF

/L

C O

S T

ES

TI

M A

TE

C on tra ct or

Te rra

/2

BI

L0

2A as k

Pr oj ec t M an ag em en t

Su bT as k

Si te

SB

O

BC

P

LA

N

TA

TA

TI

O

N S

IT

E

Su bT as k

Ba ck gr ou nd

S oi l S am pl in g Su bT as k

Ac tiv ity /P ha se

SS

A an d R ep or tin g

Su bT as k

So il Bo rin g an d

M on ito rin g W el l I ns ta lla tio ns Su bT as k

Pr oj ec t M an ag er

M eg an J oh as k

ID

W M an ag em en t Su bT as k

Su bT as k

R ep or t P re pa ra tio n

Su bT as k

To ta ls

Tr av el

Ve hi cl e

R en ta l

$1 ,3

.0

$2

.0

$9

.0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ile ag e C os ts

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ai r F ar e

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pe r d ie m

H ot el

$8

.0

$0 .0

$8

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l T ra ve l

$2 ,1

.0

$2

.0

$1

,7

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tr ac to r (E qu ip m en t P ro cu re m

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tra ct or

S ub to ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Pr oc ur em en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tr ac to r (S er vi ce s

Pr oc ur em lin g (C on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

D ril lin g

(N on

-c on ve nt io na

l) Ea rth N ur se

$1 0, 5.

$0

.0

$1 0, 5.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su rv ey in g

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

U S

Ec ol og y

$1 ,6

.0

$0

.0

$0 .0

$1

,6

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til iti es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

G

EO

V ie w $1

,3

.0

$1 ,3

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tra ct or S ub to ta l

$1 3, 0.

$1

,3

.0

$1 0, 5.

$1

,6

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

H an dl in g Fe e $1

,3

.0

$1

.0

$1 ,0

.5

$1

.5

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $1

4, 7.

$1 ,4

.0

$1

1, 1.

$1 ,7

.5

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

La bo ra yt ic al

C os ts $9

,0

.0

$8

.0

$8 ,2

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fa st

T ur na ro un d

C ha rg es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Sa m pl e

Sh ip pi ng

$1 ,2

.0

$3

.0

$9

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L ab or at or y

$1 0, 8.

$1

,1

.0

$9 ,1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fi el d Ex pe on al

P ro te ct io n

$1

.5

$3 5.

$1

.5

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ex pe nd ab le s

$2

.0

$4 0.

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t ( D ril lin g re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

An al yt ic al re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

ID

W re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t ( O th er

$8

.0

$1

.0

$7

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l F ie ld E xp en se s

$1 ,2

.5

$1

.0

$1

,1

.5

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bt ot al

$5 9, 8.

$3

,5

.5

$6 ,9

.4

$3

4, 4.

$2 ,3

.3

$1

1, 7.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Co m pl et io n Fe e $3

,1

.3

$3

.7

$3

.5

$1 ,1

.6

$4

9.

$1 ,1

.7

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l E st im at ed C os t

$6 2, 6.

$3

,9

.2

$7 ,3

.9

$3

5, 9.

$2 ,4

.0

$1

3, 3.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

R

EV

C

EF

T

ER

R A

C O

N P ag e

SUBTASK 2: Background Soil Sampling

PROPOSAL NO. PHD237064

DATE: 10/2/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning and Coordination Background Soil Sampling Senior Geologist SO 2.75 Staff Geologist JW 10.00 Staff Geologist JW 1 day loading/unload, mobilization (PB) 2.00 Senior Geologist SO 1 day loading/unload, mobilization (PSL) 4.50 Staff Geologist JW 1 day of soil Boring Installation (12 offsite background) locations 10.00 Senior Geologist SO 1 day soil sampling (12 offsite background locations) 10.00

Personnel: SO JW CF Hours: 17.25 22.00 0.00

TOTAL LABOR 39.25

VEHICLE TYPE RATE UNIT USEAGE

SO Truck (Background soil sampling) 120 day 1 $120.00 JW Truck (Background soil sampling) 120 Day 1 $120.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Geo View Utility Clearance 1,350.00$ day 1 $1,300.00

TOTAL $1,300.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC EQB

Arsenic EPA 6020 (soil) 14.00$ 36 2 0 $532.00 Digestions 7.00$ 38 $266.00 Arsenic EPA 6020 (water) 14.00$ 2 $28.00

TOTAL LAB $826.00

Sample Shipping Large Cooler 150.00$ 2 $300.00

TOTAL $1,126.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables 40.00$ day 1 $40.00 Personal Protection 35.00$ day 1 $35.00 Hand Auger 12.00$ Day 2 $24.00 Ice 6.50$ EA 4 $26.00 Total Survey Station (GEODE, GPS 50.00$ day 1 $50.00 55-gallon drum, new 100.00$ drum 0 $0.00

$0.00

TOTAL EQUIPMENT $100.00

PreTask Planning, prepare field sampling SOW/coordinate offsite access, kit

SUBTASK 3: Soil Boring and Monitoring Well Installations

PROPOSAL NO. PHD237064

DATE: 10/2/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning and Coordination Soil Boring and Monitoring Well Installation and Sampling Senior Geologist SO 3.00 Senior Staff Scientist JE 1 day loading/unload mobilization 2 Hrs Travel Each way 5.00 Staff Scientist JW 3 days loading/unload mobilization (1 Hr mob 1 hr Demob each day) 6.00 Staff Scientist JW 3 days of soil boring Installation and monitoring well installation. 30.00 Senior Staff Scientist JE 3 days of soil boring Installation and monitoring well installation. 30.00

Survey Monitoring Well Top of Casing Senior Staff Scientist JE 2.50 Staff Scientist JW 2.50

Monitoring Well Groundwater Sampling Senior Geologist SO 1.75 Senior Staff Scientist JW 1 day loading/unload mobilization (1 Mob Demob) 5.00 Staff Scientist JE 2 Days Loading unloading mobilization 2.50 Staff Scientist JW 1.5 days of monitoring well sampling at 13 locations 15.00 Senior Staff Scientist JE 1.5 days of monitoring well sampling at 13 locations 15.00

Personnel: SO JE JW Hours: 4.75 55.00 58.50

TOTAL LABOR 118.25

VEHICLE TYPE RATE UNIT USEAGE

JW Truck (Soil Boring/Well Installation/ sampling) 480 week 1 $480.00 JE Truck (SoilBoring/Well Installation/ sampling) 480 week 1 $480.00

TOTAL VEHICLE $960.00

PER DIEM STAFF RATE UNIT USEAGE

Senior Staff Scientist Lodging $225.00 Night 3 $675.00

Meals $36.00 Each 4 $144.00

TOTAL PER DIEM $819.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Earth Nurse Soil Borings and MW Installation 10,465.00$ LS 1 $10,465.00

TOTAL $10,465.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

SOIL

Arsenic EPA 6020 (soil) 14.00$ 45 3 0 $672.00 Digestion 7.00$ 48 $336.00

OCP EPA 8081 105.00$ 45 3 $4,725.00

Sample Shipping Large Cooler 150.00$ 4 $600.00 Groundwater Arsenic EPA 6020 14.00$ 13 4 4 $294.00 Digestion 7.00$ 23 $161.00

OCP EPA 8081 105.00$ 13 4 4 $2,205.00

Sample Shipping Large Cooler 150.00$ 2 $300.00

TOTAL LAB $8,232.00

TOTAL SHIPPING $900.00

TOTAL $9,293.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables 40.00$ day 4.5 $180.00 Personal Protection 35.00$ day 4.5 $157.50 Shallow groundwater sampling kit 290.00$ day 1.5 $435.00 Tubing, HDPE 0.30$ ft 260 $78.00 Tubing, silicon (3/16 x 3/8) 3.00$ ft 5 $15.00 Total Survey Station (Geode, GPS) 50.00$ day 5 $250.00

TOTAL EQUIPMENT $778.00

PreTask Planning, prepare field sampling SOW/coordinate site access, kit

Measure TOC new and existing monitoring wells (13) Measure TOC new and existing monitoring wells (13)

SUBTASK 4: IDW Management

PROPOSAL NO. PHD237064

DATE: 10/2/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

IDW Managemet Senior Geologist SO 2.00 Staff Scientist…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .