This document package consists of a Task Assignment Change Order (TACO) between the State of Florida Department of Environmental Protection (FDEP) and Terracon Consultants, Inc. for remedial services at the Village Cleaners site (ERIC_5205) located at 2100 45th Street Unit B8, West Palm Beach, Palm Beach County, Florida. The original Task Assignment (DC002H) under Contract HW687 was issued on December 10, 2025, with a completion date of May 29, 2026. The change order, effective March 3, 2026, was authorized by Gabriel Sostre (FDEP Project Manager) and Donna Cline (Terracon Senior Associate Remediation Engineer).
The task assignment authorizes Terracon to conduct a Mobile Aquifer Gas Sampling (MAGS) investigation in anticipation of a Remedial Action Plan Modification (RAPMOD). The scope of work encompasses four subtasks: project management, soil sampling and MAGS survey (installation of three 2-inch diameter MAGS wells with OVA screening and soil sampling for VOC analysis), IDW management, and report preparation. The original total cost was $18,094.57; the change order reduces the total cost to $17,686.57, a decrease of $408.00 (2.25 percent) due to reductions in IDW-related costs ($308.00 reduction in Subtask 3 from lower IDW disposal charges with Erwin Remediation, and $100.00 reduction in field equipment costs in Subtask 2). Invoice schedule milestones include deliverables due February 13, March 20, and April 24, 2026, with corresponding invoicing amounts of $11,904.94, $816.43, and $4,965.20, respectively.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department) Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Name:
4. ☐ There are no changes to the TA compensation.
☐ The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO ☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. ☐ There are no changes to the TA Expiration Date.
☐ The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. ☐ There are no changes to the Attachments.
☐ Attachment ___ is replaced with Attachment -____.
7. ☐ No Additional Changes.
☐ Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
DC002H 1
HW687
Gabriel Sostre 850-245-8749 Contractor Contractor
Contractor Contractor
Contractor
Terracon Consultants, Inc.
Terracon Consultants, Inc.
Donna Cline 904-479-7415
ERIC_5205
Village Cleaners
✔ $ 17,686.57 $ 18,094.57
$ 17,686.57 $ 18,094.57 ✔ Completion
Completion 05/29/2026 05/29/2026 0
✔ 1 1
Donna Cline
Senior Associate Remediation Engineer
03/03/26
Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=Domain Users, email=Donna.Cline@terracon.com Date: 2026.03.03 13:34:52 -05'00'
Cline, Donna L
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2026.03.03 10:00:41 -05'00'
N/A
This TACO authorizes a cost adjustment due to a change in IDW related costs.
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Change Order #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
BWC TAFORM 01/18
DC002H
HW687
Subtask 3: IDW Management.
Subtasks 1 & 4: Project Management; Preparation of Letter Report.
Subtask 2: MAGS Investigation: Installation of three 2-inch diameter MAGS wells, OVA screening of soils, and collection of soil samples for VOH analysis. 02/13/2026
03/20/2026
04/24/2026
Subtask 2: FDEP approval of field notes, soil boring logs, and lab reports pertaining to soil sampling and MAGS well installation.
Subtask 3: FDEP approval of signed IDW Manifests.
Subtasks 1 & 4: FDEP approval of MAGS Letter Report including updated charts, tables, graphs, exhibits, and maps.
$ 11,904.94
$ 816.43
$ 4,965.20
$ 17,686.57
Memorandum
TO:
FROM:
SUBJECT:
DATE:
Negotiation File Village Cleaners 2100 45th Street Unit B8 West Palm Beach, Palm Beach County
ERIC_5205
Gabriel Sostre, Project Manager
Negotiation Summary Task Assignment Change Order DC002H (HW687)
February 19th, 2026
This TACO authorizes a change in the cost of the TA due to a reduction in IDW related costs in Subtask
3. Subtask 3 experienced a reduction in costs of up to $308.00. Additionally, there was a reduction in Field Expense Costs in Subtask 2 amounting to $100.00.
The previous total cost of this TA was $18,094.57. The new total cost as of this Change Order is $17,686.57. This represents a decrease in the price of the TA by $408.00 or 2.25%. There is no reported Margin-of-Error by Terracon.
FDEP COST ESTIMATE
Contractor: Terracon FINAL
Date: 2/19/2026 Task #: DC002 SubTask 1 Project Management SubTask 6
Site: Former Village Cleaners, ERIC_5205 SubTask 2 Soil Sampling, MAGS Survey SubTask 7 Activity/Phase: MAGS Soil Investigation SubTask 3 IDW Management SubTask 8
Project Manager: SubTask 4 Report Preparation SubTask 9 SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$72.79 Project Manager Shawn Ouellette 6.32 6.32 $36.06 CADD Specialist Chelsea Fugage 4.00 0.00 0.00 4.00 0 0 0 0 0 0
Project Geologist 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $46.44 Senior Scientist Mui Michael 14.00 3.00 0.00 11.00 0 0 0 0 0 0 $54.09 Senior Geologist Shawn Ouellette 29.75 22.25 1.50 6.00 0 0 0 0 0 0 $72.79 Senior Engineer Donna Cline 3.00 0.00 0.00 3.00 0 0 0 0 0 0 $37.00 Environmental Technician Rob Siegel 24.75 21.75 3.00 0.00 0 0 0 0 0 0
$0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0
Total Hours 81.82 6.32 47.00 4.50 24.00 0 0 0 0 0 0
Direct Labor $3,997.60 $459.90 $2,147.57 $192.14 $1,197.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 116.00% $4,637.21 $533.48 $2,491.18 $222.88 $1,389.67 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.263% $2,249.17 $258.75 $1,208.29 $108.10 $674.03 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $10,883.98 $1,252.13 $5,847.04 $523.12 $3,261.69 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 1
FDEP COST ESTIMATEContractor: Terracon FINAL
Date: 2/19/2026 Task #: DC002 SubTask 1 Project Management SubTask 6
Site: Former Village Cleaners, ERIC_5205 SubTask 2 Soil Sampling, MAGS Survey SubTask 7 Activity/Phase: MAGS Soil Investigation SubTask 3 IDW Management SubTask 8
Project Manager: SubTask 4 Report Preparation SubTask 9 SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $720.00 600.00$ 120.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 -$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $720.00 $600.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Geoview $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 IDW - Erwin $110.00 $0.00 110.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utilities Geoview $900.00 900.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $1,010.00 $900.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $101.00 $90.00 $11.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $1,111.00 $990.00 $121.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $1,659.00 1,659.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $220.00 220.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,879.00 $1,879.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $119.00 119.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $611.20 611.20$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $324.00 324.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 100.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $850.00 850.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $2,004.20 $2,004.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $16,598.18 $1,252.13 $11,320.24 $764.12 $3,261.69 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,088.39 $125.21 $584.70 $52.31 $326.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $17,686.57 $1,377.34 $11,904.94 $816.43 $3,587.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Delta ($408.00) $0.00 ($100.00) ($308.00) $0.00 0 0 0 0 0 0
Final - Delta $18,094.57 $1,377.34 $12,004.94 $1,124.43 $3,587.86 0 0 0 0 0 0
Original $18,094.57 $1,377.34 $12,004.94 $1,124.43 $3,587.86 0 0 0 0 0 0
M.O.E $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Former Village Cleaners ERIC_5205 SUBTASK 2: Soil Sampling, MAGS Survey FINAL
PROPOSAL NO. PHB257038
DATE: 2/19/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning Senior Geologist SO 1.00 Staff Engineer SO 1.00 Senior Scientist/Engineer MM 1.00
Senior Geologist SO 2.00
Senior Scientist/Engineer MM 2.00
Soil Sampling / MAGS Well Installation Scope: Install 3 MAGS wells to a depth of 6.5 ft bgs with soil investigation
Time Duration: 1 day Environmental Tech RS Load/unload equipment (1 hour/day) 1.00 Senior Geologist SO Direct work, daily safety debrief, record lithological descriptions, MAGS well installs (1 day) 8.50 Environmental Tech RS Collect sample at 0.5, 2, and 4 ft and 6ft bgs for laboratory analysis (SPLP and VOCs) and OVA screening 8.50 Environmental Tech RS Containerize IDW (0.5 hours/day) 0.50 Senior Geologist SO Finalize field notes at end of day (1 hour/day) 1.00 MAGS Test Time Duration: 1 Day to pickup system, 1 Day 3@ MAGS points @ 45 minutes per test 3 @ 15min move and set ups, 1 Step Test 45 minutes Environmental Tech RS Drop off system to site ( PSL to WPB) 1.00
RS Setup/Prep system at site, calibrate equipment, evaluate logistics 3.00 Senior Geologist SO Perform and direct MAGS sampling test 60 minutes Per Location (includes move and set up) + additional Step test a 3.75 Environmental Tech RS Maintain system operation of the MAGS system, reduce vacuum / flows as directed by Engineer / 3.75
Maintain hoses / fresh air flush between MAGS wells Senior Geologist SO Finalize field notes at end of day (1 hour/day) 1.00 Mobilization / Demobilizations Senior Geologist SO 2 Days, (from PSL, 2 hour/ day mobilization ) 4.00 Environmental Tech RS 4.00
Personnel: SO MM RS Hours: 22.25 3.00 21.75 TOTAL LABOR 47.00
VEHICLE TYPE RATE UNIT USEAGE
Truck (Senior Geologist) 120 day 2 240.00$ Truck (Field Technician) 120 days 3 360.00$
TOTAL VEHICLE 600.00$
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM -$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
Geoview Interior Utility Survey $900 each 1 900.00$
TOTAL SUBCONTRACTOR 900.00$
Pre Task Planning Prepare Health and Safety Plan Review technical approach to soil / MAGS Investigation Meet with owner and conduct pre-drilling site walk with property owner, current tenants and field crew. Designate IDW staging areas, decon pad location, and MAGS system staging area.
Prepare soil logging materials and order soil installation kit, Mags Kit and Order Well materials
2 Days (from PSL, 2 hours/ day mobilization)
SUBTASK 2: Soil Sampling, MAGS Survey FINAL
PROPOSAL NO. PHB257038
DATE: 2/19/2026
LABORATORY COSTS
PARAMETER RATE # SAMPLES
Halocarbons EPA 8260 73.00$ 12 876.00$ VOCs (soil-prep) 5035 prep 7.00$ 12 84.00$ VOCs EPA8260 Shortlist 60.00$ 0 Handled as WCD -$ SPLP Bottle Extraction Method 1312 45.00$ 0 VOCs Soil Vapor- Full Sc TO-15 200.00$ 3 600.00$
Summa Canister 33.00$ 3 99.00$ Sample Shipping 110.00$ 2 220.00$
TOTAL LAB 1,879.00$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables Expendables 40.00$ day 2 80.00$ Ice (Sample Preservation) 6.50$ each 6 39.00$
Mags Well Installation related Portland Cement 10.55$ Each 2 21.10$ Filter Sand 8.15$ Each 2 16.30$ Fine Sand 7.00$ Each 1 7.00$ Bentonite Seal 17.25$ EACH 0 -$ PVC Screen 23.85$ Each 3 71.55$ PVC Casing 19.15$ Each 3 57.45$ Fill Box 3-1/2" OD 47.50$ Each 3 142.50$ PVC Fittings 7.05$ Each 6 (3 male , 3 female) 42.30$ Locking Plug 6.00$ EACH 3 18.00$ Soil Sampling Kit 235.00$ day 1 Concrete Corer/ Generator 235.00$
Analytical related Encore Sampler 16.00$ each 12 (SPLP samples - hold) 192.00$ Terra Core Sampler 11.00$ each 12 (VOH samples) 132.00$ Soil Assessment Kit 175.00$ day 1 175.00$ MAGS Investigation Kit 500.00$ day 1 500.00$
-$ day 0 -$ HDPE Tubing 0.30$ LF 0 -$ Silicon Tubing 3.00$ LF 0 -$
IDW related Drums 100.00$ each 1 100.00$ Other Global Positioning System 175.00$ day 1 175.00$
TOTAL EQUIPMENT 2,004.20$
SUBTASK 3: IDW Disposal FINAL
PROPOSAL NO. PHB257038
DATE: 2/19/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Coordinate IDW T&D
Senior Scientist/Geologist SO 1.50 Env. Technician RS 3.00
Personnel: SO RS CF Hours: 1.50 3.00 0.00 TOTAL LABOR 4.5
VEHICLE TYPE RATE UNIT USEAGE
Pickup (IDW site visit) 120 day 1 120.00$
TOTAL VEHICLE 120.00$
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM -$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
Erwin IDW Disposal 110.00$ each 1 110.00$ Handling Fee 11.00$
TOTAL 121.00$
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB -$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT -$
Prepare waste characterization/Generator Profile Coordinate IDW T&D: Mobilize to site, meet transporter to unlock secure area for pickup
SITE : Village Cleaners ERIC_5205 SUBTASK 4: Report Preparation FINAL
PROPOSAL NO. PHB257038
DATE: 2/19/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Report Deliverable Senior Geologist SO Prepare report tables 4.00 Senior Scientist MM Prepare report, radius of influence calculations, calculate intrinsic permeability 9.00 Senior Scientist SO Review field and laboratory data 2.00 Senior Scientist MM Conclusions/Recommendations 2.00 Senior Engineer DC Senior Subject Matter Expert Review 3.00 CADD Specialist CF Prepare base figures and Exhibits 4.00
Personnel: SO MM CF DC Hours: 6.00 11.00 4.00 3.00 TOTAL LABOR 24.00
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Contractor: Terracon DELTA
Date: 2/19/2026 Task #: DC002 SubTask 1 Project Management SubTask 6
Site: Former Village Cleaners, ERIC_5205 SubTask 2 Soil Sampling, MAGS Survey SubTask 7 Activity/Phase: MAGS Soil Investigation SubTask 3 IDW Management SubTask 8
Project Manager: SubTask 4 Report Preparation SubTask 9 SubTask 5 0 SubTask 10
Totals 1 2 3 0 5 6 7 8 9 10
Labor Rate Category 0 $72.79 Project Manager Shawn Ouellette 0.00 0.00 0.00 $36.06 CADD Specialist Chelsea Fugage 0.00 0.00 0.00 0.00 0 0 0 0 0 0
Project Geologist 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $46.44 Senior Scientist Mui Michael 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $54.09 Senior Geologist Shawn Ouellette 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $72.79 Senior Engineer Donna Cline 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $37.00 Environmental Technician Rob Siegel 0.00 0.00 0.00 0.00 0 0 0 0 0 0
$0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0
Total Hours 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0
Direct Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 116.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.263% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
FDEP COST ESTIMATEContractor: Terracon DELTA
Task #: DC002 SubTask 1 Project Management SubTask 6
Site: Former Village Cleaners, ERIC_5205 SubTask 2 Soil Sampling, MAGS Survey SubTask 7 Activity/Phase: MAGS Soil Investigation SubTask 3 IDW Management SubTask 8
Project Manager: SubTask 4 Report Preparation SubTask 9 SubTask 5 0 SubTask 10
Totals 1 2 3 0 5 6 7 8 9 10
Travel $0.00 Vehicle Rental $0.00 -$ -$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 -$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) $0.00 Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Geoview $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 IDW - Erwin ($280.00) $0.00 (280.00)$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utilities Geoview $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal ($280.00) $0.00 ($280.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee ($28.00) $0.00 ($28.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost ($308.00) $0.00 ($308.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory $0.00 Analytical Costs $0.00 -$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 -$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) ($100.00) (100.00)$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses ($100.00) ($100.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal ($408.00) $0.00 ($100.00) ($308.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost ($408.00) $0.00 ($100.00) ($308.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
SUBTASK 2: Soil Sampling, MAGS Survey DELTA
PROPOSAL NO. PHB257038
DATE: 2/19/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning Senior Geologist SO 0.00 Staff Engineer SO 0.00 Senior Scientist/Engineer MM 0.00
Senior Geologist SO 0.00
Senior Scientist/Engineer MM 0.00
Soil Sampling / MAGS Well Installation Scope: Install 3 MAGS wells to a depth of 6.5 ft bgs with soil investigation
Time Duration: 1 day Environmental Tech RS Load/unload equipment (1 hour/day) 0.00 Senior Geologist SO Direct work, daily safety debrief, record lithological descriptions, MAGS well installs (1 day) 0.00 Environmental Tech RS Collect sample at 0.5, 2, and 4 ft and 6ft bgs for laboratory analysis (SPLP and VOCs) and OVA screening 0.00 Environmental Tech RS Containerize IDW (0.5 hours/day) 0.00 Senior Geologist SO Finalize field notes at end of day (1 hour/day) 0.00 MAGS Test Time Duration: 1 Day to pickup system, 1 Day 3@ MAGS points @ 45 minutes per test 3 @ 15min move and set ups, 1 Step Test 45 minutes Environmental Tech RS Drop off system to site ( PSL to WPB) 0.00
RS Setup/Prep system at site, calibrate equipment, evaluate logistics 0.00 Senior Geologist SO Perform and direct MAGS sampling test 60 minutes Per Location (includes move and set up) + additional Step test a 0.00 Environmental Tech RS Maintain system operation of the MAGS system, reduce vacuum / flows as directed by Engineer / 0.00
Maintain hoses / fresh air flush between MAGS wells Senior Geologist SO Finalize field notes at end of day (1 hour/day) 0.00 Mobilization / Demobilizations Senior Geologist SO 2 Days, (from PSL, 2 hour/ day mobilization ) 0.00 Environmental Tech RS 0.00
Personnel: SO MM RS Hours: 0.00 0.00 0.00 TOTAL LABOR 0.00
VEHICLE TYPE RATE UNIT USEAGE
Truck (Senior Geologist) 120 day 0 -$ Truck (Field Technician) 120 days 0 -$
TOTAL VEHICLE -$
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM -$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
Geoview Interior Utility Survey $900 each 0 -$
TOTAL SUBCONTRACTOR -$
Pre Task Planning Prepare Health and Safety Plan Review technical approach to soil / MAGS Investigation Meet with owner and conduct pre-drilling site walk with property owner, current tenants and field crew. Designate IDW staging areas, decon pad location, and MAGS system staging area.
Prepare soil logging materials and order soil installation kit, Mags Kit and Order Well materials
2 Days (from PSL, 2 hours/ day mobilization)
SUBTASK 2: Soil Sampling, MAGS Survey DELTA
PROPOSAL NO. PHB257038
DATE: 2/19/2026
LABORATORY COSTS
PARAMETER RATE # SAMPLES
Halocarbons EPA 8260 73.00$ 0 -$ VOCs (soil-prep) 5035 prep 7.00$ 0 -$ VOCs EPA8260 Shortlist 60.00$ 0 Handled as WCD -$ SPLP Bottle Extraction Method 1312 45.00$ 0 VOCs Soil Vapor- Full Sc TO-15 200.00$ 0 -$
Summa Canister 33.00$ 0 -$ Sample Shipping 110.00$ 0 -$
TOTAL LAB -$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables Expendables 40.00$ day 0 -$ Ice (Sample Preservation) 6.50$ each 0 -$
Mags Well Installation related 0 Portland Cement 10.55$ Each 0 -$ Filter Sand 8.15$ Each 0 -$ Fine Sand 7.00$ Each 0 -$ Bentonite Seal 17.25$ EACH 0 -$ PVC Screen 23.85$ Each 0 -$ PVC Casing 19.15$ Each 0 -$ Fill Box 3-1/2" OD 47.50$ Each 0 -$ PVC Fittings 7.05$ Each 0 (3 male , 3 female) -$ Locking Plug 6.00$ EACH 0 -$ Soil Sampling Kit 235.00$ day 0 Concrete Corer/ Generator -$
Analytical related Encore Sampler 16.00$ each 0 (SPLP samples - hold) -$ Terra Core Sampler 11.00$ each 0 (VOH samples) -$ Soil Assessment Kit 175.00$ day 0 -$ MAGS Investigation Kit 500.00$ day 0 -$
-$ day 0 -$ HDPE Tubing 0.30$ LF 0 -$ Silicon Tubing 3.00$ LF 0 -$
IDW related Drums 100.00$ each -1 (100.00)$ Other Global Positioning System 175.00$ day 0 -$
TOTAL EQUIPMENT (100.00)$
SUBTASK 3: IDW Disposal DELTA
PROPOSAL NO. PHB257038
DATE: 2/19/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Coordinate IDW T&D
Senior Scientist/Geologist SO 0.00 Env. Technician RS 0.00
Personnel: SO RS CF 0.00 Hours: 0.00 0.00 0.00 TOTAL LABOR 0.0
VEHICLE TYPE RATE UNIT USEAGE -$
Pickup (IDW site visit) 120 day 0 -$
TOTAL VEHICLE -$
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM -$
SUBCONTRACTOR COSTS -$
NAME PURPOSE COST UNIT USEAGE -$
Erwin IDW Disposal (280.00)$ each 1 (280.00)$ Handling Fee (28.00)$
TOTAL (308.00)$
LABORATORY COSTS -$
PARAMETER RATE # SAMPLES #QAQC -$
TOTAL LAB -$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE -$
TOTAL EQUIPMENT -$
Prepare waste characterization/Generator Profile Coordinate IDW T&D: Mobilize to site, meet transporter to unlock secure area for pickup
Contractor: Terracon ORIGINAL
Date: 2/19/2026 Task #: DC002 SubTask 1 Project Management SubTask 6
Site: Former Village Cleaners, ERIC_5205 SubTask 2 Soil Sampling, MAGS Survey SubTask 7 Activity/Phase: MAGS Soil Investigation SubTask 3 IDW Management SubTask 8
Project Manager: SubTask 4 Report Preparation SubTask 9 SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$72.79 Project Manager Shawn Ouellette 6.32 6.32 $36.06 CADD Specialist Chelsea Fugage 4.00 0.00 0.00 4.00 0 0 0 0 0 0
Project Geologist 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $46.44 Senior Scientist Mui Michael 14.00 3.00 0.00 11.00 0 0 0 0 0 0 $54.09 Senior Geologist Shawn Ouellette 29.75 22.25 1.50 6.00 0 0 0 0 0 0 $72.79 Senior Engineer Donna Cline 3.00 0.00 0.00 3.00 0 0 0 0 0 0 $37.00 Environmental Technician Rob Siegel 24.75 21.75 3.00 0.00 0 0 0 0 0 0
$0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0
Total Hours 81.82 6.32 47.00 4.50 24.00 0 0 0 0 0 0
Direct Labor $3,997.60 $459.90 $2,147.57 $192.14 $1,197.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 116.00% $4,637.21 $533.48 $2,491.18 $222.88 $1,389.67 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.263% $2,249.17 $258.75 $1,208.29 $108.10 $674.03 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $10,883.98 $1,252.13 $5,847.04 $523.12 $3,261.69 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
FDEP COST ESTIMATEContractor: Terracon ORIGINAL
Task #: DC002 SubTask 1 Project Management SubTask 6
Site: Former Village Cleaners, ERIC_5205 SubTask 2 Soil Sampling, MAGS Survey SubTask 7 Activity/Phase: MAGS Soil Investigation SubTask 3 IDW Management SubTask 8
Project Manager: SubTask 4 Report Preparation SubTask 9 SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $720.00 600.00$ 120.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 -$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $720.00 $600.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Geoview $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 IDW - Erwin $390.00 $0.00 390.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utilities Geoview $900.00 $900.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $1,290.00 $900.00 $390.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $129.00 $90.00 $39.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $1,419.00 $990.00 $429.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $1,659.00 1,659.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $220.00 220.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,879.00 $1,879.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $119.00 119.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $611.20 611.20$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $324.00 324.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $200.00 200.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $850.00 850.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $2,104.20 $2,104.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $17,006.18 $1,252.13 $11,420.24 $1,072.12 $3,261.69 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,088.39 $125.21 $584.70 $52.31 $326.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $18,094.57 $1,377.34 $12,004.94 $1,124.43 $3,587.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
ITEM
NO.
DESCRIPTION UNIT OF
MEASURE
ESTIMATED
QUANTITY
UNIT
PRICE
EXTENDED
PRICE
ITEM
NO.
DESCRIPTION UNIT OF
MEASURE
ESTIMATED
QUANTITY
UNIT
PRICE
EXTENDED
PRICE
ITEM
NO.
DESCRIPTION UNIT OF
MEASURE
ESTIMATED
QUANTITY
UNIT
PRICE
EXTENDED
PRICE
1/2 Day GPR Services EA 1 $900.00 $900.00 1
1/2 Day GPR Services EA 2 $446.00 $892.00 1
1/2 Day GPR Services EA 2 $125.00 $250.00
TOTAL $900.00 TOTAL $1,700.00 TOTAL $2,910.00
Low Bid: Geoview
GPR
THREE BID SUMMARY EVALUATION
Geoview Trinity Survtech Solutions
Please see specific Vendor bids for details and equipment
Original
ITEM
NO.
DESCRIPTION UNIT OF
MEASURE
ESTIMATED
QUANTITY
UNIT
PRICE
EXTENDED
PRICE
ITEM
NO.
DESCRIPTION UNIT OF
MEASURE
ESTIMATED
QUANTITY
UNIT
PRICE
EXTENDED
PRICE
ITEM
NO.
DESCRIPTION UNIT OF
MEASURE
ESTIMATED
QUANTITY
UNIT
PRICE
EXTENDED
PRICE
IDW Pickup, Manifest, Transportation
EA 2 $195.00 $390.00 1
Disposal (PFAS Impacted Wastes)
EA 2 $446.00 $892.00 1
Disposal
EA 2 $125.00 $250.00
2 Profiling fee (PFAS impacted waste)
EA
$350.00 $0.00
Transportation (51 - 100 mi orlando) ($250
EA 1 $250.00 $250.00
2 Transportation 1
$300.00 $300.00
3 Manifest Admin Fee
EA 1 $254.00 $254.00
3 Stop Charge 1 1 $125.00 $125.00
4 Fuel Surcharge 1 1 $15.50 $15.50
TOTAL $390.00 TOTAL $1,396.00 TOTAL $690.50
Low Bid: Erwin
IDW
THREE BID SUMMARY EVALUATION
Erwin Remediation Clean Earth Common Ground Environmental
Please see specific Vendor bids for details and equipment
Original
INVOICES
Invoice
Date
2/18/2026
Invoice #
TC277
Terracon Attn: Jessica Endicott 645 NW Enterprise Drive, Suite 107 Port Saint Lucie, FL 34986
P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511 ErwinRemediation@gmail.com
Site City
West Palm Beach
P00271087
Site Name
Village Cleaners
Total
Balance Due
Payments/Credits
Quantity Rate AmountDate Item
1 110.00 110.002/11/2026 Drum Disp - Non-Haz Soil
Thank you for your business.
We sincerely appreciate it.
$110.00
$110.00
$0.00
������������������������������� !"�#$��$%�&'()*+,���-�./00+,1�2�3./00+,14()*+,���5�/661,�)4,�78��9�:;��<=>?=<@<A�?BCD�EF & G�0�6/-�H1I6+/��3H1I6+/�4G�0�6/5J��6+*1*/K4L�M8�N ��/��/��/-�G;1O)�3G;1O)4��/��/��/5�/661,�)4,�78P�Q�+)/-�R�))1�2�3R�))14Q�+)/5�/661,�)4,�78<�1��1,;7/)�0�ST�FUVWXAYD�RQ@@<WZ>�[+��1L/�Q�/1)/60�(\]Q̂C<@C�2�(�1)*�Q(�FEHG�:EQ�Z>4_�0_P�WXAYD�:EQ�Z@>�RQ@@<WZ>�[+��1L/�Q�/1)/60(\]Q̂C<@C�FEHG4K*JP àb̀cdef�g h̀heì:;+0�/71+���6+L+)1�/*����0+*/��J�R(j4�j�/10/��0/�,1��+�)�O;/)��K/)+)L�1��1,;7/)�0-�,�+,�+)L��+)�0-��66/0K�)*+)L�����;+0�/71+�4kl�mnopq�rspntp�tpp�nunvwpx�yz{|�}~���{���k��lssn�p�{spn�p�t����{�������zm����p�����|�p�nss�xpv�pntp�l��v~t��}�~����q��������~����q�������������������ywlt��nv~�lt��~��pv~�vlsp�n��px�v�~��l������v~t�t�� ¡¢£¤¥�¦§̈ © ª¢«¬�«�®«̈̄©�°±²̈¤̈�³¬¤¢�¬́�µ¶··̧··� ¡¢£¤¥�¹§̈ © ª¢«¬�«�º»¼�¤ ¡ª¬¢½£ª¢¬½�³¬¤¢�¬́�µ¦¾·̧··§̈ © ª¢«¬�«�¤ ¡ª¬¢½£ª¢¬½�¿£©̄«À�́̈ �̈¬́�µ¦¾̧··� ¡¢£¤¥�Á�¬�³¿£À̈¤Ã¿£¥¤�£À£«�́¬½�¢¿̈�¬²²¬½¢ «¢Ä�¢¬�ª¬© ª¢�¢¿«¤�£¤¤«ÀÅ̈ ¢� ©̈½�¢¿̈�ƼÇȾÉ�ª¬¢½£ª¢̧�¼ �̈£²²½̈ª«£¢̈¢¿̈�ª¬¢« ̈©�ª¬¢½£ª¢«À�Ê«¢¿� ¤�£©�̄¬¬¥�́¬½Ê£½©�¢¬�©«¤ª ¤¤«À�¢¿̈�̈±¢�¤¢̈²¤�¬�¢¿«¤�²½¬Ë̈ª¢̧Ì̄ £̈¤̈�©¬�¬¢�¿̈¤«¢£¢̈�¢¬�ª¬¢£ª¢� ¤�Ê«¢¿�£Ä�Í ̈¤¢«¬¤Î�ª¬ÅÅ̈ ¢¤�¬½�ª¬ª̈½¤̧ÏÐÑÑÒÓÔ�ÕÖ×ÒÓØÙÙÚ�ÛÜÝÜÞßàáâãä�åâàæàçèéä�ê�ëìíèßàìîâìäïæ�ðèíèéèàìñèäâ�òìíâéäèçïäèàì�ïìó�ôâîâóèïäèàìõö÷�ø���������� �� ���������ö��õ ��÷õ���ö�ö������������� ���ö����ö�ö���!���� ��ö���ö�ö�"#$$%&'()*+%&,--./#00'&,*(&,1�2�34556789:78;��
<=>?=<@A�>BCDE�FG Gïèæ�H�ñàéäßâA�åïIßèâæ�H�JKäæààL
MääNéC==àKäæààLOàPPèãâOãàî=îïèæ=èìIàQ=èó=FFLFRçFFFFFFSTUðëïNîëã<IVFWXFWY<Zë[çBFóïòZâ\ðäñ]åòï\áIS\̂FàUF_ôFâçNçFF̀ìïäèíâaâßéèb >=<
ORIGINAL TASK AUTHORIZATION
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW687
DC002H May 29, 2026
This Task Assignment authorizes Terracon to conduct MAGS in anticipation of a RAPMOD at the Village Cleaners site.
Gabriel Sostre 850-245-8749 Terracon Consultants, Inc.
Donna Cline 904-479-7415
ERIC_5205
2100 45th Street Unit B8, West Palm Beach, Palm Beach County
Village Cleaners
$ 18,094.57
$ 18,094.57
Scope of Work
Terracon Consultants, Inc.
Donna Cline
Senior Associate
12/10/25
Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=Domain Users, email=Donna.Cline@terracon.com Date: 2025.12.10 01:03:57 -05'00'
Cline, Donna L
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2025.12.09 13:17:36 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
BWC TAFORM 01/18
| Untitled |
| Untitled |
File details come from the government source that posted it. Updated .