Summary

This document comprises a Task Assignment (TA) and supporting proposal materials issued by the State of Florida, Department of Environmental Protection (FDEP), to Terracon Consultants, Inc., under existing Contract Number HW687. The task assignment authorizes work at the Best Cleaners & Laundry site (ERIC_5517) located at 224 South Florida Avenue, DeLand, Florida. The parties include the FDEP's Waste Site Cleanup Section, represented by Department Project Manager Dean Cox, and Terracon Consultants, Inc., represented by Senior Remediation Engineer Donna Cline. The project is governed by the terms and conditions of the underlying DEP Waste Cleanup Program Contract HW687, executed January 5, 2022.

Task Assignment DC010A authorizes Terracon to conduct site review services including site access evaluation, file review, collection of groundwater levels at 16 monitoring and MAGS wells, and preparation of an email deliverable summarizing results. The total contract value is $1,941.95, based on a fixed unit rate with 16.11 hours of labor. Labor costs were reduced by 4.29 hours compared to the original proposal, resulting in a $110.15 cost reduction. The deliverable is due June 30, 2022, within 20 business days of authorization to proceed. Cost components include direct labor ($600.01), overhead at 116 percent ($696.01), fringe benefits at 56.26 percent ($337.57), vehicle rental ($120.00), and equipment costs ($25.00), with a completion fee of $163.36. The task assignment was executed on May 3, 2022, with a completion date of September 30, 2022.

View the file

Other files

File Type Posted
CN-370000-HW687-BF01ACO1.pdf PDF
CN-370000-HW687-BF03ACO1.pdf PDF
CN-370000-HW687-BIL01A.pdf PDF
CN-370000-HW687-BIL2ACO1.pdf PDF
CN-370000-HW687-BIL2BCO1.pdf PDF
CN-370000-HW687-BIL2CCO1.pdf PDF
CN-370000-HW687-BIL3ACO2.pdf PDF
CN-370000-HW687-BIO1ACO1.pdf PDF
CN-370000-HW687-DC001A.pdf PDF
CN-370000-HW687-DC003A.pdf PDF
CN-370000-HW687-DC003D.pdf PDF
CN-370000-HW687-DC005D.pdf PDF
CN-370000-HW687-DC006A.pdf PDF
CN-370000-HW687-DC006B.pdf PDF
CN-370000-HW687-DC008C.pdf PDF
CN-370000-HW687-DC010B.pdf PDF
CN-370000-HW687-DC011F.pdf PDF
CN-370000-HW687-DC011H.pdf PDF
CN-370000-HW687-DC012D.pdf PDF
CN-370000-HW687-DC013C.pdf PDF
CN-370000-HW687-DC015A.pdf PDF
CN-370000-HW687-DC015C.pdf PDF
CN-370000-HW687-DC019A.pdf PDF
CN-370000-HW687-DC01ACO2.pdf PDF
CN-370000-HW687-DC020A.pdf PDF
CN-370000-HW687-DC020B.pdf PDF
CN-370000-HW687-DC020C.pdf PDF
CN-370000-HW687-DC020D.pdf PDF
CN-370000-HW687-DC023C.pdf PDF
CN-370000-HW687-DC025B.pdf PDF
CN-370000-HW687-DC025C.pdf PDF
CN-370000-HW687-DC025F.pdf PDF
CN-370000-HW687-DC027B.pdf PDF
CN-370000-HW687-DC027C.pdf PDF
CN-370000-HW687-DC02BCO1.pdf PDF
CN-370000-HW687-DC02CCO2.pdf PDF
CN-370000-HW687-DC02DCO1.pdf PDF
CN-370000-HW687-DC02HCO1.pdf PDF
CN-370000-HW687-DC032A.pdf PDF
CN-370000-HW687-DC034A.pdf PDF
CN-370000-HW687-DC034C.pdf PDF
CN-370000-HW687-DC034D.pdf PDF
CN-370000-HW687-DC035F.pdf PDF
CN-370000-HW687-DC036A.pdf PDF
CN-370000-HW687-DC03CCO1.pdf PDF
CN-370000-HW687-DC041C.pdf PDF
CN-370000-HW687-DC041D.pdf PDF
CN-370000-HW687-DC048A.pdf PDF
CN-370000-HW687-DC048B.pdf PDF
CN-370000-HW687-DC04BCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW687

DC010A Completion September 30, 2022

This task assignment (TA) authorizes costs for site review including site access review, collection of groundwater levels, and email deliverable. The total cost of this TA is $1,941.95 with 16.11 hours of labor. All costs are fixed unit rate.

Dean Cox 850-245-8969 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Terracon Consultants, Inc.

Terracon Consultants, Inc.

Donna Cline 813-321-0340

ERIC_5517

224 S. Florida Avenue, Deland

Best Cleaners & Laundry

✔ $ 1,941.95

$ 1,941.95

Scope of Work

William E. Burns

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2022.05.03 16:06:16 -04'00'

N/A dlcline Typewriter Donna Cline dlcline Typewriter Senior Remediation Engineer

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Email with site review and water level results summary 06/30/2022

Email with site review and water level results summary (Subtask 1 Project Management and Subtask 2 Site Access, File Review & Site Visit) $ 1,941.95

$ 1,941.95

HW687

DC010A

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Interim Secretary

Memorandum

TO: HW687 Contract File FROM: Dean Cox, Contract Manager SUBJECT: DC010A TA – Best Cleaners & Laundry Site Review & Water Levels

DATE: 5/3/2022

This task assignment (TA) authorizes costs for site review including site access review, collection of groundwater levels, and email deliverable. The total cost of this TA is $1,941.95 with 16.11 hours of labor. All costs are fixed unit rate.

Labor costs in this TA were reduced compared to the original TA proposal as follows.

Labor hours were reduced by 4.29 hours. This reduction in labor resulted in a $110.15 cost reduction in this TA.

FDEP COST ESTIMATE

Contractor: Terracon

Date: 5/3/2022 Task #: DC010A SubTask 1 Project Management SubTask 6

Site: Best Cleaners ERIC_5517 SubTask 2 Site Acces, File Review and Site Visit (water levels) SubTask 7 Activity/Phase: Site Access, File Review, Site Visit (water levels) SubTask 3 SubTask 8

Project Manager: Dean Cox SubTask 4 SubTask 9 SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$62.02 Project Manager Donna Cline 1.11 1.11 $0.00 Administrative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Brownfield Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$21.25 CADD Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Data Analyst & Visualization Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$24.75 Environmental Technician Pete Christianson 5.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 GIS Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$31.56 Project Scientist Laura Sebastian 3.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior GIS Analyst 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$49.69 Senior Scientist/Geologis Lydia Wing 3.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $40.87 Senior Scientist/Engineer Michael Mui 4.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Hours 16.11 1.11 15.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $600.01 $69.03 $530.98 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 116.00% $696.01 $80.07 $615.94 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.26% $337.57 $38.84 $298.73 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $1,633.59 $187.94 $1,445.65 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF TERRACON Page 1

FDEP COST ESTIMATEContractor: Terracon Date: 5/3/2022

Task #: DC010A SubTask 1 Project Management SubTask 6 Site: Best Cleaners ERIC_5517 SubTask 2 Site Acces, File Review and Site Visit (water levels) SubTask 7

Activity/Phase: Site Access, File Review, Site Visit (water levels) SubTask 3 SubTask 8 Project Manager: Dean Cox SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $120.00 120.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $25.00 25.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $25.00 $25.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $1,778.59 $187.94 $1,590.65 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $163.36 $18.79 $144.57 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $1,941.95 $206.73 $1,735.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF TERRACON Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Best Cleaners & Laundry ERIC_5517 SUBTASK 2: Site Access, File Review and Site Visit (water levels)

PROPOSAL NO. PH1227422

DATE: 5/3/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

File Review and Site Access Agreement

Senior Scientist/Geologist LS 0.00

Senior Scientist/Geologist LS 1.00

Senior Scientist/Engineer MM 4.00

Senior Scientist/Geologist LS 1.00

Field Task Planning and Site Visit (Depth to Water Readings)

Senior Scientist/Geologist LW 1.00 Senior Scientist/Geologist LW 0.50

Env Technician PC Load/unload 0.50 Env Technician PC Mobilization/Demobilization (from Winter Park) 2.00 Env Technician PC Collect groundwater levels (16 wells,10 minutes per well) 2.50

Report Deliverable Project Scientist LS Prepare Historical Water Level Data Entry for Tables and Update to groundwater depths 1.00 Senior Scientist/Geologist LW Email/Document Preparation 1.50

TOTAL LABOR 15.00

VEHICLE TYPE RATE UNIT USEAGE

Truck (Depth to water) 120.00$ day 1 120.00$

TOTAL VEHICLE 120.00$

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM -$

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

0 -$ 0 -$

TOTAL -$

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC* #IDW TOTALS

0 0 -$

TOTAL LAB -$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Water Level Indicator 25.00$ day 1 25.00$

TOTAL EQUIPMENT 25.00$

Site access agreement search, provide FDEP with property and owner information if there is a need for signed agreements (this task is WAIVED as it was provided to Terracon).

Off-site notice search, completed as part of site review, provide FDEP property and owner information if there is a need for notice(s).

Site review - critical document review with associated evaluation of any assessment / monitoring / O&M needs and cleanup /closure path needs.

Final FDEP Site Status table preparation.

Prepare Health and Safety Plan PreTask Planning, prepare field sampling SOW/coordinate site access

5463 West Waters Avenue, Suite 830

Tampa, FL 33584

P (813) 221-0050

F (813) 221-0051

Terracon.com

May 3, 2022

Florida Department of Environmental Protection Waste Site Cleanup Section Waste Management Division 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Attn: Mr. Dean Cox, P.E., Environmental Consultant E: Dean.Cox@FloridaDep.gov W: 850-245-8969 M: 727-686-6502

Re: Proposal for Site Access, File Review, and Site Visit (Water Levels), Rev. 1

Best Cleaners & Laundry 224 South Florida Avenue DeLand, Volusia County, Florida

ERIC_5517

Terracon Proposal No. PH1227422

Dear Mr. Cox:

Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this proposal to the Florida Department of Environmental Program (FDEP) Waste Site Cleanup Section (WSCS) to perform the following scope of services:

Scope of Services (see Section 2.0 of attached Proposal Detail)

▪ Evaluate site access and perform file review;

▪ Conduct site visit to measure depth to water readings in existing monitoring and MAGS wells at the site;

▪ Prepare email deliverable.

Schedule (see Section 4.0 of attached Proposal Detail)

Deliverable (of emailed summary) within 20 business days following receipt of authorization-to-proceed.

Compensation (see Section 4.0 of attached Proposal Detail)

See attached Cost Estimate Form (CEF)

Terracon services will be conducted in accordance with the terms and conditions, contained within DEP Waste Cleanup Program (WCP) Contract No. HW687, executed January 5, 2022. It is understood that a Task Assignment will be issued to authorize us to perform this work.

Site Access, File Review and Site Visit (Proposal Details)

Best Cleaners & Laundry, ERIC_5517 ■ DeLand, FL

May 3, 2022 ■ Terracon Proposal No. PH1227422

1.0 PROJECT INFORMATION

Best Cleaners & Laundry was formerly a stand-alone building that was demolished in 2016 and is located in a residential/commercial land use area of Deland, Florida. The property is currently vacant and houses the foundation of the former building. The City of Deland is currently preparing conceptual plans to redevelop the property, and evaluating the potential construction of a homeless shelter on the property.

Various remedial efforts at the former facility conducted since 2000 under the Drycleaning Solvent Cleanup Program. In October 2000, approximately 150 tons of impacted soil was removed from the source area on the exterior of the building. A remediation system consisting of air sparging and soil vapor extraction (AS/SVE) was installed in February 2001 and was operated intermittently from February 2001 until October 2005. The system was modified in 2008 with the use of shallow and deep SVE wells. The system was shut down in June 2010 and restarted in February 2011. Operations and Maintenance (O&M) was performed at the site until a system malfunction in May 2012. The remediation system was disassembled and removed in January 2013.

Soil assessment activities were conducted by PSI/Intertek in November 2019 and recommended an Interim Source Removal.

2.0 SCOPE OF SERVICES

As discussed in the Site Review Meeting on April 26, 2022, the potential for a perched water table would affect the recommended assessment/remediation approach, therefore this scope includes a site visit to conduct depth to water readings at the following wells:

▪ Source area for wells MW010, MW011, MW012, MW028 and MW029; and for geological spatial reference MW018, MW019 (to the SE of the source area),

▪ Shallow MAGS wells (16 feet depth): MP001, MP002, MPP005, MP007, MP008,

▪ Deep MAGS wells (33 to 34 feet depth): MAGS002D, MAGS004, MAGS006, MAGS009

At your request, the proposed scope of work consists of the following subtasks:

Subtask Description

Subtask 1: Project Management

This scope is provided for in the template worksheets

Subtask 2: File Review and Site Access

▪ Evaluate site access and perform file review Mobilization to the Site

▪ Open existing groundwater monitoring and MAGS wells and document depths to water level.

▪ Prepare an email summary of results deliverable as detailed in Section 3.0.

Site Access, File Review and Site Visit (Proposal Details)

Best Cleaners & Laundry, ERIC_5517 ■ DeLand, FL

May 3, 2022 ■ Terracon Proposal No. PH1227422

3.0 DELIVERABLES

As part of the file review, Terracon will provide copies of any Site Access Agreements, Off-site Notice information, and any recommended or proposed changes to the FDEP Site Status Summary Table.

The depth to water information will be included in an email with a brief interpretation of the data with respect to appropriate and effective remediation strategies relative to the depth to water influence. A team conference call will be scheduled to evaluate the appropriate technical approach for the site based on the depth to water information and brief discussion with the City of DeLand regarding property development plans and timelines.

4.0 SCHEDULE AND FEE

It is estimated that the deliverable(s) will be submitted to FDEP within 20 business days following receipt of authorization to proceed.

The Scope of Services outlined in this proposal will be conducted as proposed in the attached Level of Effort (LOE) and Cost Estimate Form (CEF). If additional services are required that are outside the scope of this proposal, you will be contacted to discuss associated costs. FDEP authorization will be obtained prior to commencement of additional services outside the scope of this proposal.

DC010A.pdf
DC010A memo.pdf
CEF&LOE220503wMyEdits.pdf
Cost Estimate
LOE Subtask 2
Pages from DC010A proposal220503-2.pdf
CLsigPage.pdf

File details come from the government source that posted it. Updated .