This document set comprises Task Assignment (TA) Change Orders and supporting documentation for a supplemental site assessment contract between the State of Florida Department of Environmental Protection (FDEP) and Terracon Consultants, Inc. under Contract Number HW687. The project, identified as ERIC_5549, concerns environmental remediation activities at the Former 3D Oil Distribution Facility located at 1744 Segrave Street, South Daytona, Florida. The primary FDEP Project Manager is Megan Johnson, while Terracon's Project Manager is Chad Northington, P.E., with Donna Cline, P.E., Senior Remediation Engineer, serving as the contractor's authorized representative.

Task Assignment Change Order (TACO) No. 2, effective June 17, 2024, reduced the overall contract value from $71,080.66 to $66,495.16, representing a cost decrease of $4,585.50. The reduction consisted of $4,085.00 in Subtask 2 (Soil Contamination field activities) and $500.50 in Subtask 3 (Groundwater field activities), attributable to decreases in subcontractor costs including handling fees, drilling/soil boring expenses, Investigative Derived Waste (IDW) costs, and laboratory expenses. The completion date was extended from August 2, 2024 to August 23, 2024, totaling 21 additional days. Deliverables include field notes, photographic logs, chain of custody documentation, sampling logs, and a Supplemental Site Assessment Report. Invoice amounts under the revised pricing are $28,990.59 for Subtask 2, $22,509.28 for Subtask 3, and $14,995.29 for Subtasks 1 and 4 combined. Supporting invoices from subcontractors and vendors include costs for laboratory analysis, geophysical surveying, soil boring and drilling equipment rental, IDW management, and soil oxidant demand testing.

View the file

Other files

File Type Posted
CN-370000-HW687-BF01A.pdf PDF
CN-370000-HW687-BF01B.pdf PDF
CN-370000-HW687-BF02A.pdf PDF
CN-370000-HW687-BF04A.pdf PDF
CN-370000-HW687-BF04ACO3.pdf PDF
CN-370000-HW687-BIL01B.pdf PDF
CN-370000-HW687-BIL02B.pdf PDF
CN-370000-HW687-BIL03B.pdf PDF
CN-370000-HW687-BIL1BCO2.pdf PDF
CN-370000-HW687-BIL2CCO2.pdf PDF
CN-370000-HW687-CSS02.pdf PDF
CN-370000-HW687-CSS03.pdf PDF
CN-370000-HW687-DC002A.pdf PDF
CN-370000-HW687-DC002G.pdf PDF
CN-370000-HW687-DC006C.pdf PDF
CN-370000-HW687-DC008B.pdf PDF
CN-370000-HW687-DC008D.pdf PDF
CN-370000-HW687-DC009B.pdf PDF
CN-370000-HW687-DC010C.pdf PDF
CN-370000-HW687-DC012A.pdf PDF
CN-370000-HW687-DC014B.pdf PDF
CN-370000-HW687-DC014D.pdf PDF
CN-370000-HW687-DC014H.pdf PDF
CN-370000-HW687-DC015D.pdf PDF
CN-370000-HW687-DC016C.pdf PDF
CN-370000-HW687-DC01ACO9.pdf PDF
CN-370000-HW687-DC021A.pdf PDF
CN-370000-HW687-DC021C.pdf PDF
CN-370000-HW687-DC022A.pdf PDF
CN-370000-HW687-DC023B.pdf PDF
CN-370000-HW687-DC023D.pdf PDF
CN-370000-HW687-DC024B.pdf PDF
CN-370000-HW687-DC024E.pdf PDF
CN-370000-HW687-DC024F.pdf PDF
CN-370000-HW687-DC027A.pdf PDF
CN-370000-HW687-DC028A.pdf PDF
CN-370000-HW687-DC028D.pdf PDF
CN-370000-HW687-DC029C.pdf PDF
CN-370000-HW687-DC02ACO1.pdf PDF
CN-370000-HW687-DC02HCO2.pdf PDF
CN-370000-HW687-DC030A.pdf PDF
CN-370000-HW687-DC031A.pdf PDF
CN-370000-HW687-DC035A.pdf PDF
CN-370000-HW687-DC037A.pdf PDF
CN-370000-HW687-DC03CCO2.pdf PDF
CN-370000-HW687-DC044A.pdf PDF
CN-370000-HW687-DC045B.pdf PDF
CN-370000-HW687-DC049A.pdf PDF
CN-370000-HW687-DC054A.pdf PDF
CN-370000-HW687-DC056A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. ☐ There are no changes to the TA compensation.

☐ The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO ☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. ☐ There are no changes to the TA Expiration Date.

☐ The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. ☐ There are no changes to the Attachments.

☐ Attachment ___ is replaced with Attachment -____.

7. ☐ No Additional Changes.

☐ Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

BIL03A 2 HW687

Megan Johnson 850.245.899 Contractor Contractor

Contractor Contractor

Contractor

Terracon Consultants, Inc.

Chad Northington, P.E. 850.692.7185

ERIC_5549

Former 3D Oil Distribution Facility

✔ $ 66,495.16 $ 71,080.66

$ 66,495.16 $ 71,080.66 Completion

Completion✔ 08/02/2024 08/23/2024 21

✔ 1 1 1

Terracon Consultants, Inc.

Donna Cline, P.E.

Senior Remediation Engineer Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=General Users, email=Donna.Cline@terracon.com Date: 2024.06.17 11:33:50 -04'00'

Cline, Donna L

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2024.06.13 17:50:03 -04'00'

This Task Assignment Change Order is for the reduction of subcontractor, IDW, and laboratory costs under Subtasks 2 and 3, in accordance with the TACO request received from Terracon on June 5, 2024.

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 01_18

Contract Number:

Task Assignment #:

Change Order #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW687

BIL03A

$ 66,495.16

Field notes, photographic log, chain of custody, and sampling logs for soil delineation/SOD evaluation/In-Situ DVT and aquifer analysis.

Field notes, photographic log, chain of custody, and sampling logs for Baseline groundwater sampling/plume mass profiling/microbial analysis.

Supplemental Site Assessment Report; Project Management.

Department approval of field notes, photographic log, chain of custody, and sampling logs for soil delineation/SOD evaluation/In-Situ DVT and aquifer analysis. (Subtask 2)

Department approval of Project Management and Supplemental Site Assessment Report (Subtasks 1 and 4)

Department approval of field notes, photographic log, chain of custody, and sampling logs for baseline groundwater sampling/plume mass profiling/microbial analysis.

(Subtask 3)

04/29/2024

04/29/2024

07/08/2024

$ 22,509.28

$ 28,990.59

$ 14,995.29 www.FloridaDEP.gov

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO: Terracon Consultants, Inc., HW687 Contract File

FROM: Megan Johnson, Contract Manager

DATE: June 13, 2024

SUBJECT: Negotiation Summary – BIL22

Task Assignment (TA) Change Order #2 – TA BIL03AC2 Former 3D Oil Distribution Facility – Site ID # ERIC_5549 Supplemental Site Assessment Activities

This Task Assignment Change Order (TACO) is for the reduction of subcontractor, IDW, and laboratory costs during supplemental site assessment activities. Specific changes are detailed below:

Subtask 1: Project Management No cost changes associated with this Subtask.

Subtask 2: Soil Contamination field activities There was a reduction in subcontractor costs, including handling fees, due to the decrease in costs associated with drilling/soil borings and DVT injection. Also, due to not needing to run SPLP analysis, there was a reduction in laboratory costs. These changes resulted in a cost actual decrease of ($4,085.00).

Subtask 3: Groundwater field activities There was a reduction in subcontractor costs, Including handling fees, due to a decrease in IDW costs. This change resulted in a cost actual decrease of ($500.50).

Subtask 4: Supplemental Site Assessment Report No cost changes associated with this Subtask.

Summary The Department’s BIL Contract Manager and Terracon’s Contract Manager have both agreed to the above changes. All changes noted above represent a total overall cost decrease of ($4,585.50), as shown in the Cost Actual LOE. The changes were noted in the TACO Request received from Terracon on June 5, 2024. The final cost associated with this TA decreased from $71,080.66 to $66,495.16. Documentation of the changes is included in the attached TACO Request, the Delta LOE spreadsheet and the Cost Actual LOE spreadsheet, and the TACO form for BIL03AC2 prepared by the Department.

http://www.floridadep.gov/

FDEP COST ESTIMATE

Contractor: Terracon FINAL

Date: 6/5/2024

Task #: SubTask 1 Project Management SubTask 6

Site: 3D Oil Distribution Facility, ERIC_5549 SubTask 2 Soil Delineation/SOD Evaluation/In-Situ DVT SubTask 7

Activity/Phase: SSA Activities, Prepare SSAR SubTask 3 Baseline GW Sampling/Plume Mass Profiling/Microbial Analysis SubTask 8

Project Manager: Megan Johnson SubTask 4 Supplementary Site Assessment Report SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Labor Rate Category

$67.74 Project Manager Donna Cline 20.32 20.32

$32.50 CADD Specialist Chelsea Fugate 15.00 0.00 15.00

$29.33 Staff Scientist/Geologist Rachael Greller 80.00 39.00 41.00 0.00

$39.90 Senior Scientist Ryan Fetter 51.00 35.00 0.00 16.00

$69.71 Senior Engineer Chad Northington 33.50 33.50

$51.97 Senior Scientist/Geologist Lydia Wing 18.50 6.00 7.00 5.50

$22.45 Field Geologist Jared Duncan 68.00 37.00 31.00 0.00

$0.00 0.00

$0.00 0.00

$0.00 0.00

$0.00 0.00

$0.00 0.00

$0.00 0.00

Total Hours 286.32 20.32 117.00 79.00 70.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $10,952.12 $1,259.98 $3,682.84 $2,262.27 $3,747.03 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 116.00% $12,704.45 $1,461.58 $4,272.09 $2,624.23 $4,346.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 56.26% $6,161.66 $708.86 $2,071.97 $1,272.75 $2,108.08 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $29,818.23 $3,430.42 $10,026.90 $6,159.25 $10,201.66 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF TERRACON Page 14

FDEP COST ESTIMATEContractor: Terracon FINAL Date: 6/5/2024

Task #: SubTask 1 Project Management SubTask 6

Site: 3D Oil Distribution Facility, ERIC_5549 SubTask 2 Soil Delineation/SOD Evaluation/In-Situ DVT SubTask 7

Activity/Phase: SSA Activities, Prepare SSAR SubTask 3 Baseline GW Sampling/Plume Mass Profiling/Microbial Analysis SubTask 8

Project Manager: Megan Johnson SubTask 4 Supplementary Site Assessment Report SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Travel

Vehicle charge $1,560.00 1,080.00$ 480.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $855.00 670.00$ 185.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $2,415.00 $1,750.00 $665.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) - GWP $5,560.00 5,560.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Surveying - SurvTech Solutions, Inc. $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW - Petrotech $135.00 $0.00 135.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Geoview - GPR Services $1,300.00 1,300.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

EnviroFlux - PFMs $4,916.00 $0.00 4,916.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $11,911.00 6,860.00$ $5,051.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $1,191.10 $686.00 $505.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $13,102.10 7,546.00$ $5,556.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $14,444.00 6,676.00$ 7,768.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $550.00 220.00$ 330.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory $14,994.00 6,896.00$ 8,098.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $285.00 159.00$ 126.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $720.00 720.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $890.00 890.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other) $1,289.00 $0.00 1,289.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $3,184.00 $1,769.00 $1,415.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $63,513.33 $3,430.42 $27,987.90 $21,893.35 $10,201.66 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Completion Fee $2,981.83 $343.04 $1,002.69 $615.93 $1,020.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $66,495.16 $3,773.46 $28,990.59 $22,509.28 $11,221.83 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF TERRACON Page 15

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : 3D Oil Distribution Facility, ERIC_5549 SUBTASK 2: Soil Delineation/SOD Evaluation/In-Situ DVT

PROPOSAL NO. PH4237429

DATE: 6/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning & Preparation

Senior Scientist/Geologist LW 2.00 Senior Scientist/Geologist LW 1.00 Senior Scientist/Geologist LW 2.00 Senior Scientist/Geologist LW 1.00 Soil Contamination Delineation/Soil Oxidant Demand (SOD) Evaluation/ In-Situ Design Verification Testing (DVT)

Time Duration: 3 days

Field Geologist JD Load/unload equipment (1 hr/day) 2.00 Senior Scientist/Geologist RF Project oversite, direct work, drilling oversight and project organization (10 hr/day) 30.00 Field Geologist JD Assist in oversight of interior borehole installation, boring and sampling logs, safety (10 hr/day) 30.00 Staff Scientist RG Assist in oversight, sampling, chain of custody documentation, and laboratory coordination 30.00 Staff Scientist RG Finalize field notes at end of day for PM evaluation (1 hour/day) 3.00 Mobilization / Demobilizations

Senior Scientist/Geologist RF 5.00 Field Geologist JD 3 Days, oversight and sampling (travel from Tampa 2.5 hrs each way) 5.00 Staff Scientist RG 3 Days, oversight and sampling (2.0 hour/day) 6.00

Personnel: LW JD RG RF CO Hours: 6.00 37.00 39.00 35.00 0.00 TOTAL LABOR 117.00

VEHICLE TYPE RATE UNIT USEAGE

Truck (Senior Scientist/Geologist) 120.00$ day 3 360.00$

Truck (Field Geologist) 120.00$ day 3 360.00$ Truck (Environmental Technician) 120.00$ day 3 360.00$

TOTAL VEHICLE 1,080.00$

PER DIEM STAFF RATE UNIT USEAGE

Hotel JD 150.00$ 2 300.00$ Perdiem JD 35.00$ 1 35.00$ Hotel RF 150.00$ 2 300.00$ Perdiem RF 35.00$ 1 35.00$

TOTAL PER DIEM 670.00$

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Geoview Geophysical Survey 1,300.00$ day 1 1,300.00$ Groundwater Protection 8,410.00$ each 1 8,410.00$

TOTAL SUBCONTRACTOR 9,710.00$

LABORATORY COSTS

PARAMETER RATE # SAMPLES IDW

Aromatics - Soil EPA 8260 60.00$ 20 1,200.00$ Aromatics - Soil 5035 Prep 7.00$ 20 140.00$ PAHs - Soil EPA 8270 (SIM) 110.00$ 20 2,200.00$ TRPH - Soil FL-PRO 88.00$ 20 1,760.00$ Total Organic Carbon - Soil 9060/SM5310B 36.00$ 1 36.00$ Grain Size Analysis ASTM D6913 or Equivalent 80.00$ 1 In-House Terracon CS Lab 80.00$ SPLP Zero Headspace Extraction - soilEPA 1311/1312 55.00$ 3 3 Hold Samples Pending Results 165.00$ SPLP Bottle Extraction (PAH) - soilEPA 1311/1312 45.00$ 3 3 Hold Samples Pending Results 135.00$ Aromatics - groundwater (SPLP) 60.00$ 3 3 Hold Samples Pending Results 180.00$ PAH - groundwater (SPLP) 110.00$ 3 3 Hold Samples Pending Results 330.00$ TRPH Speciation TRPH Working Group Speciation 250.00$ 2 (Eurofins Quote) 500.00$ REGENESIS Soil Oxidant Demand (SOD) Analysis 450.00$ 2 Each 900.00$ Sample Shipping Small Cooler (overnight) 110.00$ 2 (Ship SOD Sample to REGENESIS) 220.00$

TOTAL LAB 7,846.00$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 3 120.00$

Ice (Sample Preservation 2 bags/day) 6.50$ each 6 39.00$ Analytical Related Terra Core Sampler 11.00$ each 20 220.00$

Encore Sampler 16.00$ each 20 320.00$ Soil Assessment Kit 175.00$ each 2 350.00$

Drilling Related Pilot Test Kit 360.00$ day 2 720.00$

TOTAL EQUIPMENT 1,769.00$

20 vadose - 20 locations 20 vadose - 20 locations

Scope: Install 20 soil borings to 8 feet bgs and collect 20 soil samples; Collect 2 soil samples for SOD evaluation testing; Collect 1 soil sample for grain size analysis; Conduct DVT with DPT rig by injecting clear water into the subsurface

Drilling/Soil Borings and DVT injecting clear water into the subsurface

20 vadose - 20 locations

Pre-task planning, field kick-off meeting Update Health and Safety Plan and contact Sunshine 811 Prepare soil logging, DVT documents for field and finalize day-of logistics for investigation Pre-drilling meeting with site owner and driller, notify owners of field work

3 Days, oversight and project organization (travel from Tampa 2.5 hrs each way)

SUBTASK 2: Soil Delineation/SOD Evaluation/In-Situ DVT

PROPOSAL NO. PH4237429

DATE: 6/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning & Preparation

Senior Scientist/Geologist LW 2.00

Senior Scientist/Geologist LW 1.00

Senior Scientist/Geologist LW 2.00

Senior Scientist/Geologist LW 1.00

Soil Contamination Delineation/Soil Oxidant Demand (SOD) Evaluation/ In-Situ Design Verification Testing (DVT)

Time Duration: 3 days

Field Geologist JD Load/unload equipment (1 hr/day) 2.00

Senior Scientist/Geologist RF Project oversite, direct work, drilling oversight and project organization (10 hr/day) 30.00

Field Geologist JD Assist in oversight of interior borehole installation, boring and sampling logs, safety (10 hr/day) 30.00

Staff Scientist RG Assist in oversight, sampling, chain of custody documentation, and laboratory coordination 30.00

Staff Scientist RG Finalize field notes at end of day for PM evaluation (1 hour/day) 3.00

Mobilization / Demobilizations

Senior Scientist/Geologist RF 5.00

Field Geologist JD 3 Days, oversight and sampling (travel from Tampa 2.5 hrs each way) 5.00

Staff Scientist RG 3 Days, oversight and sampling (2.0 hour/day) 6.00

Personnel: LW JD RG RF CO

Hours: 6.00 37.00 39.00 35.00 0.00 TOTAL LABOR 117.00

VEHICLE TYPE RATE UNIT USEAGE

Truck (Senior Scientist/Geologist) 120.00$ day 3 360.00$

Truck (Field Geologist) 120.00$ day 3 360.00$

Truck (Environmental Technician) 120.00$ day 3 360.00$

TOTAL VEHICLE 1,080.00$

PER DIEM STAFF RATE UNIT USEAGE

Hotel JD 150.00$ 2 300.00$

Perdiem JD 35.00$ 1 35.00$

Hotel RF 150.00$ 2 300.00$

Perdiem RF 35.00$ 1 35.00$

TOTAL PER DIEM 670.00$

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Geoview Geophysical Survey 1,300.00$ day 1 1,300.00$

Groundwater Protection 8,410.00$ each 1 8,410.00$

(2,850.00)$ each 1 (2,850.00)$

TOTAL SUBCONTRACTOR 6,860.00$

LABORATORY COSTS

PARAMETER RATE # SAMPLES IDW

Aromatics - Soil EPA 8260 60.00$ 20 1,200.00$

Aromatics - Soil 5035 Prep 7.00$ 20 140.00$

Aromatics - Soil 5035 Prep 7.00$ -20 (140.00)$

PAHs - Soil EPA 8270 (SIM) 110.00$ 20 2,200.00$

TRPH - Soil FL-PRO 88.00$ 20 1,760.00$

Total Organic Carbon - Soil 9060/SM5310B 36.00$ 1 36.00$

Grain Size Analysis ASTM D6913 or Equivalent 80.00$ 1 In-House Terracon CS Lab 80.00$

SPLP Zero Headspace Extraction - soilEPA 1311/1312 55.00$ 3 3 Hold Samples Pending Results 165.00$

SPLP Zero Headspace Extraction - soilEPA 1311/1312 55.00$ -3 3 Hold Samples Pending Results (165.00)$

SPLP Bottle Extraction (PAH) - soilEPA 1311/1312 45.00$ 3 3 Hold Samples Pending Results 135.00$

SPLP Bottle Extraction (PAH) - soilEPA 1311/1312 45.00$ -3 3 Hold Samples Pending Results (135.00)$

Aromatics - groundwater (SPLP) 60.00$ 3 3 Hold Samples Pending Results 180.00$

Aromatics - groundwater (SPLP) 60.00$ -3 3 Hold Samples Pending Results (180.00)$

PAH - groundwater (SPLP) 110.00$ 3 3 Hold Samples Pending Results 330.00$

PAH - groundwater (SPLP) 110.00$ -3 3 Hold Samples Pending Results (330.00)$

TRPH Speciation TRPH Working Group Speciation 250.00$ 2 (Eurofins Quote) 500.00$

REGENESIS Soil Oxidant Demand (SOD) Analysis 450.00$ 2 Each 900.00$

Sample Shipping Small Cooler (overnight) 110.00$ 2 (Ship SOD Sample to REGENESIS) 220.00$

TOTAL LAB 6,896.00$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 3 120.00$

Drilling/Soil Borings and DVT injecting clear water into the subsurface

20 vadose - 20 locations

20 vadose - 20 locations

20 vadose - 20 locations

Pre-task planning, field kick-off meeting

Update Health and Safety Plan and contact Sunshine 811

Prepare soil logging, DVT documents for field and finalize day-of logistics for investigation

Pre-drilling meeting with site owner and driller, notify owners of field work

Scope: Install 20 soil borings to 8 feet bgs and collect 20 soil samples; Collect 2 soil samples for SOD evaluation testing; Collect 1 soil sample for grain size analysis; Conduct DVT with DPT rig by injecting clear water into the subsurface

SUBTASK 2: Soil Delineation/SOD Evaluation/In-Situ DVT

PROPOSAL NO. PH4237429

DATE: 6/5/2024

Ice (Sample Preservation 2 bags/day) 6.50$ each 6 39.00$

Analytical Related Terra Core Sampler 11.00$ each 20 220.00$

Encore Sampler 16.00$ each 20 320.00$

Soil Assessment Kit 175.00$ each 2 350.00$

Drilling Related Pilot Test Kit 360.00$ day 2 720.00$

TOTAL EQUIPMENT 1,769.00$

SUBTASK 3: Baseline GW Sampling/Plume Mass Profiling/Microbial Analysis

PROPOSAL NO. PH4237429

DATE: 6/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning

Senior Scientist/ Geologist LW 3.00

Senior Scientist/ Geologist LW 2.00

Baseline Groundwater Sampling/Vertical Profiling of Plume Mass/Microbial Analysis

Time Duration: 2.5 days

Staff Scientist RG Load/unload equipment (1 hr/day) 2.00

Senior Scientist/ Geologist LW 2.00

Staff Scientist RG Water level measurements, groundwater sampling, COC documentation, deploy PFMs 25.00

Field Geologist JD Water level measurements, groundwater sampling, deploy PFMs 25.00

Staff Scientist RG Finalize field notes at end of day for PM evaluation (1 hour/day) 3.00

Staff Scientist RG Retrieve PFMs 2-3 weeks after deployment 5.00

Mobilization / Demobilizations

Staff Scientist RG 2.5 Days, oversight, sampling (2.0 hour/day) 6.00

Field Geologist JD 2 Days, sampling (travel from Tampa 2.5 hrs each way) 6.00

JD

31.00

Personnel: LW RG CO CF RF

Hours: 7.00 41.00 0.00 0.00 0.00 TOTAL LABOR 79.00

VEHICLE TYPE RATE UNIT USEAGE 79.00

Truck (Field Geologist) 120.00$ day 2 240.00$

Truck (Staff Scientist) 120.00$ day 2 240.00$

TOTAL VEHICLE 480.00$

PER DIEM STAFF RATE UNIT USEAGE

Hotel JD 150.00$ 1 150.00$

Perdiem JD 35.00$ 1 35.00$

TOTAL PER DIEM 185.00$

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

EnviroFlux Passive Flux Meters Analysis 2,458.00$ each 2 4,916.00$

Petrotech SE 2 soil and 2 water IDW drums 590.00$ each 1 590.00$

Petrotech SE 2 soil and 2 water IDW drums (455.00)$ each 1 (455.00)$

TOTAL SUBCONTRACTOR 5,051.00$

LABORATORY COSTS

PARAMETER RATE # SAMPLES IDW

Aromatics - Groundwater EPA 8260 60.00$ 20 1,200.00$

PAHs - Groundwater EPA 8270 (SIM) 110.00$ 19 2,090.00$

TRPH FL-PRO 88.00$ 19 1,672.00$

Nitrate 353.2/300.0 23.00$ 9 207.00$ pH, DO, ORP - Field 17 -$

Total iron EPA 6010 13.50$ 9 121.50$

Manganese EPA 6010 13.50$ 9 121.50$

Sulfate 375.2 21.00$ 6 126.00$

Alkalinity SM2320B/310.2 15.00$ 6 90.00$

IDW: TCLP 8 RCRA metal - soil 135.00$ 1 135.00$

IDW: TCLP Volatile Organics - soil 205.00$ 1 205.00$

Microbial Insights QuantArray-Petro (DNA) 900.00$ each 2 1,800.00$

Sample Shipping Small Cooler (overnight) 110.00$ 3 (inc. Microbial + EnviroFlux) 330.00$

TOTAL LAB 8,098.00$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 2.5 100.00$

Ice (Sample Preservation 2 bags/day) 6.50$ each 4 26.00$

Other Shallow Groundwater Sampling Kit 1,160.00$ week 1 1,160.00$

HDPE Poly Tubing 0.30$ foot 340 102.00$

Silicon Tubing 3/16 x 3/8 3.00$ foot 9 27.00$

TOTAL EQUIPMENT 1,415.00$

17 + 1 DUP + 1 EB

Pre-task planning, notify property owners, project kick-off meeting

Prepare gw sampling logs, PFMs, sampling bottles, lab coordination and finalize day-of logistics

Scope: Sample 17 existing monitoring wells for petroleum constituents; 9 of the key wells will be analyzed for TEAs in addition to the petroleum constituents; Deploy passive flux meters inside 2 monitoring wells; 2 wells will be analyzed via QuantArray-Petro for functional genes analysis

Coordinate field logistics and direct operations

17 + 1 DUP + 1 EB + 1 TB

17 + 1 DUP + 1 EB

SUBTASK 4: Supplementary Site Assessment Report

PROPOSAL NO. PH4237429

DATE: 6/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Report Deliverable Senior Scientist/ Geologist RF 16.00 summary tables, draft exhibits

Senior Scientist/ Geologist LW QA/QC field and laboratory data 4.00

Senior Engineer CN 8.00

Senior Engineer CN SOD, grain sieve analysis, DNA, PFMs, TEAs, and general water Quality Parameters Summary Evaluation 4.00

Senior Engineer CN Groundwater Analytical Results and Summary Evaluation 4.00

Senior Engineer CN Remedial discussion/conference calls with FDEP to discuss assssment activities and proposed RA 1.50

Senior Scientist/ Geologist LW Remedial discussion/conference calls with FDEP to discuss assssment activities and proposed RA 1.50

Senior Engineer CN Prepare SSAR 16.00

CADD Specialist CF Prepare Exhibits (site setting, groundwater flow, cross sections, and concentrations maps) 15.00

Personnel: RF JD LW CF CN Hours: 16.00 0.00 5.50 15.00 33.50 TOTAL LABOR 70.00

Prepare report introduction, recent activities summary, and discussion of results, preparation of

Review of groundwater chemistry and analysis of reported COCs. Develop CSM based on potential fate and transport of COCs.

Contractor: Terracon DELTA

Date: 6/5/2024

Task #: SubTask 1 Project Management SubTask 6

Site: 3D Oil Distribution Facility, ERIC_5549 SubTask 2 Soil Delineation/SOD Evaluation/In-Situ DVT SubTask 7

Activity/Phase: SSA Activities, Prepare SSAR SubTask 3 Baseline GW Sampling/Plume Mass Profiling/Microbial Analysis SubTask 8

Project Manager: Megan Johnson SubTask 4 Supplementary Site Assessment Report SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Labor Rate Category

$67.74 Project Manager Donna Cline 20.32 20.32

$32.50 CADD Specialist Chelsea Fugate 0.00 0.00 0.00

$29.33 Staff Scientist/Geologist Rachael Greller 0.00 0.00 0.00 0.00

$39.90 Senior Scientist Ryan Fetter 0.00 0.00 0.00 0.00

$69.71 Senior Engineer Chad Northington 0.00 0.00

$51.97 Senior Scientist/Geologist Lydia Wing 0.00 0.00 0.00 0.00

$22.45 Field Geologist Jared Duncan 0.00 0.00 0.00 0.00

$0.00 0.00

$0.00 0.00

$0.00 0.00

$0.00 0.00

$0.00 0.00

$0.00 0.00

Total Hours 20.32 20.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 116.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 56.26% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF TERRACON Page 24

FDEP COST ESTIMATEContractor: Terracon DELTA

Task #: SubTask 1 Project Management SubTask 6

Site: 3D Oil Distribution Facility, ERIC_5549 SubTask 2 Soil Delineation/SOD Evaluation/In-Situ DVT SubTask 7

Activity/Phase: SSA Activities, Prepare SSAR SubTask 3 Baseline GW Sampling/Plume Mass Profiling/Microbial Analysis SubTask 8

Project Manager: Megan Johnson SubTask 4 Supplementary Site Assessment Report SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Travel

Vehicle charge $0.00 -$ -$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 -$ -$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) - GWP ($2,850.00) (2,850.00)$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Surveying - SurvTech Solutions, Inc. $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW - Petrotech ($455.00) $0.00 (455.00)$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Geoview - GPR Services $0.00 -$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

EnviroFlux - PFMs $0.00 $0.00 -$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal ($3,305.00) (2,850.00)$ ($455.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee ($330.50) ($285.00) ($45.50) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost ($3,635.50) (3,135.00)$ ($500.50) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs ($950.00) (950.00)$ -$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $0.00 -$ -$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory ($950.00) (950.00)$ -$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $0.00 -$ -$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $0.00 -$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $0.00 -$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other) $0.00 $0.00 -$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal ($4,585.50) $0.00 ($4,085.00) ($500.50) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Completion Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost ($4,585.50) $0.00 ($4,085.00) ($500.50) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF TERRACON Page 25

SUBTASK 2: Soil Delineation/SOD Evaluation/In-Situ DVT

PROPOSAL NO. PH4237429

DATE: 6/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning & Preparation

Senior Scientist/Geologist LW 0.00

Senior Scientist/Geologist LW 0.00

Senior Scientist/Geologist LW 0.00

Senior Scientist/Geologist LW 0.00

Soil Contamination Delineation/Soil Oxidant Demand (SOD) Evaluation/ In-Situ Design Verification Testing (DVT)

Time Duration: 3 days

Field Geologist JD Load/unload equipment (1 hr/day) 0.00

Senior Scientist/Geologist RF Project oversite, direct work, drilling oversight and project organization (10 hr/day) 0.00

Field Geologist JD Assist in oversight of interior borehole installation, boring and sampling logs, safety (10 hr/day) 0.00

Staff Scientist RG Assist in oversight, sampling, chain of custody documentation, and laboratory coordination 0.00

Staff Scientist RG Finalize field notes at end of day for PM evaluation (1 hour/day) 0.00

Mobilization / Demobilizations

Senior Scientist/Geologist RF 0.00

Field Geologist JD 3 Days, oversight and sampling (travel from Tampa 2.5 hrs each way) 0.00

Staff Scientist RG 3 Days, oversight and sampling (2.0 hour/day) 0.00

Personnel: LW JD RG RF CO

Hours: 0.00 0.00 0.00 0.00 0.00 TOTAL LABOR 0.00

VEHICLE TYPE RATE UNIT USEAGE

Truck (Senior Scientist/Geologist) 120.00$ day 0 -$

Truck (Field Geologist) 120.00$ day 0 -$

Truck (Environmental Technician) 120.00$ day 0 -$

TOTAL VEHICLE -$

PER DIEM STAFF RATE UNIT USEAGE

Hotel JD 150.00$ 0 -$

Perdiem JD 35.00$ 0 -$

Hotel RF 150.00$ 0 -$

Perdiem RF 35.00$ 0 -$

TOTAL PER DIEM -$

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Geoview Geophysical Survey 1,300.00$ day 0 -$

Groundwater Protection 8,410.00$ each 0 -$

(2,850.00)$ each 1 (2,850.00)$

TOTAL SUBCONTRACTOR (2,850.00)$

LABORATORY COSTS

PARAMETER RATE # SAMPLES IDW

Aromatics - Soil EPA 8260 60.00$ 0 -$

Aromatics - Soil 5035 Prep 7.00$ -20 (140.00)$

PAHs - Soil EPA 8270 (SIM) 110.00$ 0 -$

TRPH - Soil FL-PRO 88.00$ 0 -$

Total Organic Carbon - Soil 9060/SM5310B 36.00$ 0 -$

Grain Size Analysis ASTM D6913 or Equivalent 80.00$ 0 In-House Terracon CS Lab -$

SPLP Zero Headspace Extraction - soilEPA 1311/1312 55.00$ -3 3 Hold Samples Pending Results (165.00)$

SPLP Bottle Extraction (PAH) - soilEPA 1311/1312 45.00$ -3 3 Hold Samples Pending Results (135.00)$

Aromatics - groundwater (SPLP) 60.00$ -3 3 Hold Samples Pending Results (180.00)$

PAH - groundwater (SPLP) 110.00$ -3 3 Hold Samples Pending Results (330.00)$

TRPH Speciation TRPH Working Group Speciation 250.00$ 0 (Eurofins Quote) -$

REGENESIS Soil Oxidant Demand (SOD) Analysis 450.00$ 0 Each -$

Sample Shipping Small Cooler (overnight) 110.00$ 0 (Ship SOD Sample to REGENESIS) -$

TOTAL LAB (950.00)$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 0 -$

Ice (Sample Preservation 2 bags/day) 6.50$ each 0 -$

Analytical Related Terra Core Sampler 11.00$ each 0 -$

Encore Sampler 16.00$ each 0 -$

Soil Assessment Kit 175.00$ each 0 -$

Drilling Related Pilot Test Kit 360.00$ day 0 -$

Drilling/Soil Borings and DVT injecting clear water into the subsurface

20 vadose - 20 locations

20 vadose - 20 locations

20 vadose - 20 locations

Pre-task planning, field kick-off meeting

Update Health and Safety Plan and contact Sunshine 811

Prepare soil logging, DVT documents for field and finalize day-of logistics for investigation

Pre-drilling meeting with site owner and driller, notify owners of field work

Scope: Install 20 soil borings to 8 feet bgs and collect 20 soil samples; Collect 2 soil samples for SOD evaluation testing; Collect 1 soil sample for grain size analysis; Conduct DVT with DPT rig by injecting clear water into the subsurface

SUBTASK 2: Soil Delineation/SOD Evaluation/In-Situ DVT

PROPOSAL NO. PH4237429

DATE: 6/5/2024

TOTAL EQUIPMENT -$

SUBTASK 3: Baseline GW Sampling/Plume Mass Profiling/Microbial Analysis

PROPOSAL NO. PH4237429

DATE: 6/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning

Senior Scientist/ Geologist LW 0.00

Senior Scientist/ Geologist LW 0.00

Baseline Groundwater Sampling/Vertical Profiling of Plume Mass/Microbial Analysis

Time Duration: 2.5 days

Staff Scientist RG Load/unload equipment (1 hr/day) 0.00

Senior Scientist/ Geologist LW 0.00

Staff Scientist RG Water level measurements, groundwater sampling, COC documentation, deploy PFMs 0.00

Field Geologist JD Water level measurements, groundwater sampling, deploy PFMs 0.00

Staff Scientist RG Finalize field notes at end of day for PM evaluation (1 hour/day) 0.00

Staff Scientist RG Retrieve PFMs 2-3 weeks after deployment 0.00

Mobilization / Demobilizations

Staff Scientist RG 2.5 Days, oversight, sampling (2.0 hour/day) 0.00

Field Geologist JD 2 Days, sampling (travel from Tampa 2.5 hrs each way) 0.00

JD

0.00

Personnel: LW RG CO CF RF

Hours: 0.00 0.00 0.00 0.00 0.00 TOTAL LABOR 0.00

VEHICLE TYPE RATE UNIT USEAGE 0.00

Truck (Field Geologist) 120.00$ day 2 -$

Truck (Staff Scientist) 120.00$ day 2 -$

TOTAL VEHICLE

PER DIEM STAFF RATE UNIT USEAGE

Hotel JD 150.00$ 1 -$

Perdiem JD 35.00$ 1 -$

TOTAL PER DIEM -$

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

EnviroFlux Passive Flux Meters Analysis 2,458.00$ each 2 -$

Petrotech SE 2 soil and 2 water IDW drums (455.00)$ each 1 (455.00)$

TOTAL SUBCONTRACTOR (455.00)$

LABORATORY COSTS

PARAMETER RATE # SAMPLES IDW

Aromatics - Groundwater EPA 8260 60.00$ 0 -$

PAHs - Groundwater EPA 8270 (SIM) 110.00$ 0 -$

TRPH FL-PRO 88.00$ 0 -$

Nitrate 353.2/300.0 23.00$ 0 -$ pH, DO, ORP - Field 0 -$

Total iron EPA 6010 13.50$ 0 -$

Manganese EPA 6010 13.50$ 0 -$

Sulfate 375.2 21.00$ 0 -$

Alkalinity SM2320B/310.2 15.00$ 0 -$

IDW: TCLP 8 RCRA metal - soil 135.00$ 0 -$

IDW: TCLP Volatile Organics - soil 205.00$ 0 -$

Microbial Insights QuantArray-Petro (DNA) 900.00$ each 0 -$

Sample Shipping Small Cooler (overnight) 110.00$ 0 (inc. Microbial + EnviroFlux) -$

TOTAL LAB -$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 0 -$

Ice (Sample Preservation 2 bags/day) 6.50$ each 0 -$

Other Shallow Groundwater Sampling Kit 1,160.00$ week 0 -$

HDPE Poly Tubing 0.30$ foot 0 -$

Silicon Tubing 3/16 x 3/8 3.00$ foot 0 -$

TOTAL EQUIPMENT -$

17 + 1 DUP + 1 EB

Pre-task planning, notify property owners, project kick-off meeting

Prepare gw sampling logs, PFMs, sampling bottles, lab coordination and finalize day-of logistics

Scope: Sample 17 existing monitoring wells for petroleum constituents; 9 of the key wells will be analyzed for TEAs in addition to the petroleum constituents; Deploy passive flux meters inside 2 monitoring wells; 2 wells will be analyzed via QuantArray-Petro for functional genes analysis

Coordinate field logistics and direct operations

17 + 1 DUP + 1 EB + 1 TB

SUBTASK 4: Supplementary Site Assessment Report

PROPOSAL NO. PH4237429

DATE: 6/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Report Deliverable Senior Scientist/ Geologist RF 0.00 summary tables, draft exhibits

Senior Scientist/ Geologist LW QA/QC field and laboratory data 0.00

Senior Engineer CN 0.00

Senior Engineer CN SOD, grain sieve analysis, DNA, PFMs, TEAs, and general water Quality Parameters Summary Evaluation 0.00

Senior Engineer CN Groundwater Analytical Results and Summary Evaluation 0.00

Senior Engineer CN Remedial discussion/conference calls with FDEP to discuss assssment activities and proposed RA 0.00

Senior Scientist/ Geologist LW Remedial discussion/conference calls with FDEP to discuss assssment activities and proposed RA 0.00

Senior Engineer CN Prepare SSAR 0.00

CADD Specialist CF Prepare Exhibits (site setting, groundwater flow, cross sections, and concentrations maps) 0.00

Personnel: RF JD LW CF CN Hours: 0.00 0.00 0.00 0.00 0.00 TOTAL LABOR 0.00

Prepare report introduction, recent activities summary, and discussion of results, preparation of

Review of groundwater chemistry and analysis of reported COCs. Develop CSM based on potential

Contractor: Terracon ORIGINAL

Date: 6/5/2024 Task #: SubTask 1 Project Management SubTask 6

Site: 3D Oil Distribution Facility, ERIC_5549 SubTask 2 Soil Delineation/SOD Evaluation/In-Situ DVT SubTask 7 Activity/Phase: SSA Activities, Prepare SSAR SubTask 3 Baseline GW Sampling/Plume Mass Profiling/Microbial Analysis SubTask 8

Project Manager: Megan Johnson SubTask 4 Supplementary Site Assessment Report SubTask 9 SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$67.74 Project Manager Donna Cline 20.32 20.32 $32.50 CADD Specialist Chelsea Fugate 15.00 0.00 15.00 $29.33 Staff Scientist/Geologist Rachael Greller 80.00 39.00 41.00 0.00 $39.90 Senior Scientist Ryan Fetter 51.00 35.00 0.00 16.00 $69.71 Senior Engineer Chad Northington 33.50 33.50 $51.97 Senior Scientist/Geologist Lydia Wing 18.50 6.00 7.00 5.50 $22.45 Field Geologist Jared Duncan 68.00 37.00 31.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00

Total Hours 286.32 20.32 117.00 79.00 70.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $10,952.12 $1,259.98 $3,682.84 $2,262.27 $3,747.03 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 116.00% $12,704.45 $1,461.58 $4,272.09 $2,624.23 $4,346.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.26% $6,161.66 $708.86 $2,071.97 $1,272.75 $2,108.08 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF TERRACON Page 1

FDEP COST ESTIMATEContractor: Terracon ORIGINAL

Task #: SubTask 1 Project Management SubTask 6 Site: 3D Oil Distribution Facility, ERIC_5549 SubTask 2 Soil Delineation/SOD Evaluation/In-Situ DVT SubTask 7

Activity/Phase: SSA Activities, Prepare SSAR SubTask 3 Baseline GW Sampling/Plume Mass Profiling/Microbial Analysis SubTask 8 Project Manager: Megan Johnson SubTask 4 Supplementary Site Assessment Report SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle charge $1,560.00 1,080.00$ 480.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $855.00 670.00$ 185.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $2,415.00 $1,750.00 $665.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) - GWP $8,410.00 8,410.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying - SurvTech Solutions, Inc. $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 IDW - Petrotech $590.00 $0.00 590.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Geoview - GPR Services $1,300.00 1,300.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 EnviroFlux - PFMs $4,916.00 $0.00 4,916.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subcontractor Subtotal $15,216.00 9,710.00$ $5,506.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $1,521.60 $971.00 $550.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $16,737.60 10,681.00$ $6,056.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $15,394.00 7,626.00$ 7,768.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $550.00 220.00$ 330.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $15,944.00 7,846.00$ 8,098.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $285.00 159.00$ 126.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $720.00 720.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $890.00 890.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $1,289.00 $0.00 1,289.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $3,184.00 $1,769.00 $1,415.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $68,098.83 $3,430.42 $32,072.90 $22,393.85 $10,201.66 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $2,981.83 $343.04 $1,002.69 $615.93 $1,020.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $71,080.66 $3,773.46 $33,075.59 $23,009.78 $11,221.83 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF TERRACON Page 2

SUBTASK 2: Soil Delineation/SOD Evaluation/In-Situ DVT

PROPOSAL NO. PH4237429

DATE: 1/17/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning & Preparation

Senior Scientist/Geologist LW 2.00 Senior Scientist/Geologist LW 1.00 Senior Scientist/Geologist LW 2.00 Senior Scientist/Geologist LW 1.00 Soil Contamination Delineation/Soil Oxidant Demand (SOD) Evaluation/ In-Situ Design Verification Testing (DVT)

Time Duration: 3 days

Field Geologist JD Load/unload equipment (1 hr/day) 2.00 Senior Scientist/Geologist RF Project oversite, direct work, drilling oversight and project organization (10 hr/day) 30.00 Field Geologist JD Assist in oversight of interior borehole installation, boring and sampling logs, safety (10 hr/day) 30.00 Staff Scientist RG Assist in oversight, sampling, chain of custody documentation, and laboratory coordination 30.00 Staff Scientist RG Finalize field notes at end of day for PM evaluation (1 hour/day) 3.00 Mobilization / Demobilizations

Senior Scientist/Geologist RF 5.00 Field Geologist JD 3 Days, oversight and sampling (travel from Tampa 2.5 hrs each way) 5.00 Staff Scientist RG 3 Days, oversight and sampling (2.0 hour/day) 6.00

Personnel: LW JD RG RF CO Hours: 6.00 37.00 39.00 35.00 0.00 TOTAL LABOR 117.00

VEHICLE TYPE RATE UNIT USEAGE

Truck (Senior Scientist/Geologist) 120.00$ day 3 360.00$

Truck (Field Geologist) 120.00$ day 3 360.00$ Truck (Environmental Technician) 120.00$ day 3 360.00$

TOTAL VEHICLE 1,080.00$

PER DIEM STAFF RATE UNIT USEAGE

Hotel JD 150.00$ 2 300.00$ Perdiem JD 35.00$ 1 35.00$ Hotel RF 150.00$ 2 300.00$ Perdiem RF 35.00$ 1 35.00$

TOTAL PER DIEM 670.00$

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Geoview Geophysical Survey 1,300.00$ day 1 1,300.00$ Groundwater Protection 8,410.00$ each 1 8,410.00$

TOTAL SUBCONTRACTOR 9,710.00$

LABORATORY COSTS

PARAMETER RATE # SAMPLES IDW

Aromatics - Soil EPA 8260 60.00$ 20 1,200.00$ Aromatics - Soil 5035 Prep 7.00$ 20 140.00$ PAHs - Soil EPA 8270 (SIM) 110.00$ 20 2,200.00$ TRPH - Soil FL-PRO 88.00$ 20 1,760.00$ Total Organic Carbon - Soil 9060/SM5310B 36.00$ 1 36.00$ Grain Size Analysis ASTM D6913 or Equivalent 80.00$ 1 In-House Terracon CS Lab 80.00$ SPLP Zero Headspace Extraction - soilEPA 1311/1312 55.00$ 3 3 Hold Samples Pending Results 165.00$ SPLP Bottle Extraction (PAH) - soilEPA 1311/1312 45.00$ 3 3 Hold Samples Pending Results 135.00$ Aromatics - groundwater (SPLP) 60.00$ 3 3 Hold Samples Pending Results 180.00$ PAH - groundwater (SPLP) 110.00$ 3 3 Hold Samples Pending Results 330.00$ TRPH Speciation TRPH Working Group Speciation 250.00$ 2 (Eurofins Quote) 500.00$ REGENESIS Soil Oxidant Demand (SOD) Analysis 450.00$ 2 Each 900.00$ Sample Shipping Small Cooler (overnight) 110.00$ 2 (Ship SOD Sample to REGENESIS) 220.00$

TOTAL LAB 7,846.00$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 3 120.00$

Ice (Sample Preservation 2 bags/day) 6.50$ each 6 39.00$ Analytical Related Terra Core Sampler 11.00$ each 20 220.00$

Encore Sampler 16.00$ each 20 320.00$ Soil Assessment Kit 175.00$ each 2 350.00$

Drilling Related Pilot Test Kit 360.00$ day 2 720.00$

TOTAL EQUIPMENT 1,769.00$

Pre-task planning, field kick-off meeting Update Health and Safety Plan and contact Sunshine 811 Prepare soil logging, DVT documents for field and finalize day-of logistics for investigation Pre-drilling meeting with site owner and driller, notify owners of field work

3 Days, oversight and project organization (travel from Tampa 2.5 hrs each way)

20 vadose - 20 locations 20 vadose - 20 locations

Scope: Install 20 soil borings to 8 feet bgs and collect 20 soil samples; Collect 2 soil samples for SOD evaluation testing; Collect 1 soil sample for grain size analysis; Conduct DVT with DPT rig by injecting clear water into the subsurface

Drilling/Soil Borings and DVT injecting clear water into the subsurface

20 vadose - 20 locations

SUBTASK 3: Baseline GW Sampling/Plume Mass Profiling/Microbial Analysis

PROPOSAL NO. PH4237429

DATE: 1/17/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning

Senior Scientist/ Geologist LW 3.00 Senior Scientist/ Geologist LW 2.00 Baseline Groundwater Sampling/Vertical Profiling of Plume Mass/Microbial Analysis

Time Duration: 2.5 days

Staff Scientist RG Load/unload equipment (1 hr/day) 2.00 Senior Scientist/ Geologist LW 2.00 Staff Scientist RG Water level measurements, groundwater sampling, COC documentation, deploy PFMs 25.00 Field Geologist JD Water level measurements, groundwater sampling, deploy PFMs 25.00 Staff Scientist RG Finalize field notes at end of day for PM evaluation (1 hour/day) 3.00 Staff Scientist RG Retrieve PFMs 2-3 weeks after deployment 5.00 Mobilization / Demobilizations

Staff Scientist RG 2.5 Days, oversight, sampling (2.0 hour/day) 6.00 Field Geologist JD 2 Days, sampling (travel from Tampa 2.5 hrs each way) 6.00

JD

31.00

Personnel: LW RG CO CF RF Hours: 7.00 41.00 0.00 0.00 0.00 TOTAL LABOR 79.00

VEHICLE TYPE RATE UNIT USEAGE 79.00

Truck (Field Geologist) 120.00$ day 2 240.00$ Truck (Staff Scientist) 120.00$ day 2 240.00$

TOTAL VEHICLE 480.00$

PER DIEM STAFF RATE UNIT USEAGE

Hotel JD 150.00$ 1 150.00$ Perdiem JD 35.00$ 1 35.00$

TOTAL PER DIEM 185.00$

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

EnviroFlux Passive Flux Meters Analysis 2,458.00$ each 2 4,916.00$ Petrotech SE 2 soil and 2 water IDW drums 590.00$ each 1 590.00$

TOTAL SUBCONTRACTOR 5,506.00$

LABORATORY COSTS

PARAMETER RATE # SAMPLES IDW

Aromatics - Groundwater EPA 8260 60.00$ 20 1,200.00$ PAHs - Groundwater EPA 8270 (SIM) 110.00$ 19 2,090.00$

TRPH FL-PRO 88.00$ 19 1,672.00$

Nitrate 353.2/300.0 23.00$ 9 207.00$ pH, DO, ORP - Field 17 -$ Total iron EPA 6010 13.50$ 9 121.50$ Manganese EPA 6010 13.50$ 9 121.50$ Sulfate 375.2 21.00$ 6 126.00$ Alkalinity SM2320B/310.2 15.00$ 6 90.00$ IDW: TCLP 8 RCRA metal - soil 135.00$ 1 135.00$ IDW: TCLP Volatile Organics - soil 205.00$ 1 205.00$ Microbial Insights QuantArray-Petro (DNA) 900.00$ each 2 1,800.00$ Sample Shipping Small Cooler (overnight) 110.00$ 3 (inc. Microbial + EnviroFlux) 330.00$

TOTAL LAB 8,098.00$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 2.5 100.00$

Ice (Sample Preservation 2 bags/day) 6.50$ each 4 26.00$ Other Shallow Groundwater Sampling Kit 1,160.00$ week 1 1,160.00$

HDPE Poly Tubing 0.30$ foot 340 102.00$ Silicon Tubing 3/16 x 3/8 3.00$ foot 9 27.00$

TOTAL EQUIPMENT 1,415.00$

17 + 1 DUP + 1 EB

17 + 1 DUP + 1 EB

Pre-task planning, notify property owners, project kick-off meeting Prepare gw sampling logs, PFMs, sampling bottles, lab coordination and finalize day-of logistics

Coordinate field logistics and direct operations

Scope: Sample 17 existing monitoring wells for petroleum constituents; 9 of the key wells will be analyzed for TEAs in addition to the petroleum constituents; Deploy passive flux meters inside 2 monitoring wells; 2 wells will be analyzed via QuantArray-Petro for functional genes analysis

17 + 1 DUP + 1 EB + 1 TB

SUBTASK 4: Supplementary Site Assessment Report

PROPOSAL NO. PH4237429

DATE: 1/17/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Report Deliverable

Senior Scientist/ Geologist RF 16.00 summary tables, draft exhibits

Senior Scientist/ Geologist LW QA/QC field and laboratory data 4.00

Senior Engineer CN 8.00 Senior Engineer CN SOD, grain sieve analysis, DNA, PFMs, TEAs, and general water Quality Parameters Summary Evaluation 4.00 Senior Engineer CN Groundwater Analytical Results and Summary Evaluation 4.00 Senior Engineer CN Remedial discussion/conference calls with FDEP to discuss assssment activities and proposed RA 1.50 Senior Scientist/ Geologist LW Remedial discussion/conference calls with FDEP to discuss assssment activities and proposed RA 1.50 Senior Engineer CN Prepare SSAR 16.00

CADD Specialist CF Prepare Exhibits (site setting, groundwater flow, cross sections, and concentrations maps) 15.00

Personnel: RF JD LW CF CN Hours: 16.00 0.00 5.50 15.00 33.50 TOTAL LABOR 70.00