CN-370000-HW687-BIL2BCO1.pdf
PDF 932 KB Posted
- Contract number
- HW687
- Issued by
- Florida
About this file
This document package comprises a Task Assignment (TA) and Task Assignment Change Order (TACO) between the State of Florida Department of Environmental Protection (FDEP) and Terracon Consultants, Inc. under Contract Number HW687. The original Task Assignment BIL02B was executed on January 17, 2025, and was subsequently amended by TACO #1 on March 26, 2025. The work is being performed for the Broward County School Board Property located at the SE Corner of Broward Boulevard and South Hiatus Road in Plantation, Broward County, Florida (Site ID: ERIC_18360). Department Project Manager Megan Johnson (850.245.8994) oversees the contract on behalf of FDEP, while Shawn Ouellette (561.689.4299) serves as the contractor's project manager, with Donna Cline, P.E., Senior Remediation Engineer, as the authorized contractor signatory.
The contract requires Terracon Consultants, Inc. to perform supplemental site assessment (SSA) activities under a fixed unit rate pricing model with a total task assignment value of $40,444.85, with no cost changes in the change order. Deliverables include field notes, photographic logs, chain of custody documentation, sampling logs, and a final SSA Report, with interim deliverables due April 30, 2025, and the final deliverable due July 15, 2025, following a 63-day time extension granted in the change order (original completion date June 13, 2025, extended to August 15, 2025). The time extension was necessitated by permitting and scheduling delays, specifically the delayed approval of a right-of-way permit required before drilling operations could commence. Payment is structured in three invoicing installments totaling $40,444.85 contingent upon departmental approval of deliverables: $12,254.37 for Subtask 2 approval, $17,315.39 for Subtask 3 approval, and $10,875.09 for Project Management, IDW disposal confirmation, and final SSA Report approval.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
BIL02B 1 HW687
This Task Assignment Change Order authorizes a time extension only, for the task assignment completion date and deliverable due dates. There are no cost changes associated with this TACO.
Megan Johnson 850.245.8994 Contractor Terracon Consultants, Inc. Contractor
Contractor Shawn Ouellette Contractor 561.689.4299
ERIC_18360
Broward County School Board Property - Plantation
✔ $ 40,444.85 $ 40,444.85
$ 40,444.85 $ 40,444.85 Completion
✔ Completion 06/13/2025 08/15/2025 63
✔ 1 1 1
Terracon Consultants, Inc.
Contractor Donna Cline, P.E.
Senior Remediation Engineer Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=General Users, email=Donna.Cline@terracon.com Date: 2025.04.03 11:46:47 -04'00'
Cline, Donna L
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2025.03.26 13:31:20 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW687
BIL02B
$ 40,444.85
Field notes, photographic log, chain of custody, and sampling logs for Subtask 2 activities.
Field notes, photographic log, chain of custody, and sampling logs for Subtask 3 activities.
Confirmation of IDW disposal; Supplemental Site Assessment Report; Project Management.
Department approval of field notes, photographic log, chain of custody, and sampling logs (Subtask 2).
Department approval of Project Management, confirmation of IDW disposal, and Supplemental Site Assessment Report (Subtasks 1, 4, and 5).
Department approval of field notes, photographic log, chain of custody, and sampling logs (Subtask 3).
04/30/2025
04/30/2025
07/15/2025
$ 17,315.39
$ 12,254.37
$ 10,875.09 www.FloridaDEP.gov
FFLLORIDA DDEEPARTMENTT OOFF
EEnvironmentall Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ronn DeSantis Governor
Alexiss A.. Lambert
Secretary
Memorandum TO: Terracon Consultants, Inc., HW687 Contract File
FROM: Megan Johnson, Contract Manager
DATE: March 26, 2025
SUBJECT: Negotiation Summary – BIL22 Task Assignment (TA) Change Order #1 BIL02BC1 Broward County School Board Property – Site ID # ERIC_18360 Supplemental Site Assessment activities
This Task Assignment Change Order (TACO) extends the Task Assignment completion date and the interim and final deliverable due dates. Specific changes are detailed below:
FDEP and the contractor agreed on a time extension for the interim and final deliverables due to permitting and scheduling delays.
There is no change to the original cost of $40,444.85.
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW687
BIL02B Completion June 13, 2025
The Department approves this Task Assignment (TA) based upon the Cost Proposal and Level of Effort (CP/LOE) for supplemental site assessment (SSA) submitted to the Department on December 10, 2024, revised January 15, 2025, by Terracon Consultants, Inc., for the below referenced site. The final deliverable will be a SSA Report received by the Department no later than May 9, 2025.
Megan Johnson 850.245.8994 Contractor Terracon Consultants, Inc. Contractor
Contractor Shawn Ouellette Contractor 561.689.4299
ERIC_18360
SE Corner of Broward Blvd. and South Hiatus Road, Plantation, Broward County
Broward County School Board Property - Plantation
Contractor Contractor
✔ $ 40,444.85
$ 40,444.85
Scope of Work
Terracon Consultants, Inc.
Contractor Donna Cline, P.E.
Senior Remediation Engineer
1/17/2025
Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=General Users, email=Donna.Cline@terracon.com Date: 2025.01.17 11:18:59 -05'00'
Cline, Donna L
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2025.01.16 15:02:43 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Field notes, photographic log, chain of custody, and sampling logs for Subtask 2 activities. 03/14/2025
Field notes, photographic log, chain of custody, and sampling logs for Subtask 3 activities. 03/14/2025
Confirmation of IDW disposal; Supplemental Site Assessment Report; Project Management. 05/09/2025
Department approval of field notes, photographic log, chain of custody, and sampling logs (Subtask 2). $ 12,254.37
Department approval of field notes, photographic log, chain of custody, and sampling logs (Subtask 3). $ 17,315.39
Department approval of Project Management, confirmation of IDW disposal, and Supplemental Site Assessment Report (Subtasks 1, 4, and 5). $ 10,875.09
$ 40,444.85
HW687
BIL02B
From: Ouellette, Shawn To: Johnson, Megan R Cc: Cline, Donna L; Sweeney, Scott L Subject: RE: HW_687_BIL02A_ CO3_SBOBC Plantation SIte Broward County FL Date: Tuesday, March 11, 2025 2:18:40 PM Attachments: image001.png
EXTERNAL MESSAGE
This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.
Hi Megan, We have the drillers set up for 3-25-25 and the ROW sampling and pre groundwater sampling will take place next week.
Hope all is well with you!
Regards, Shawn Ouellette, P.G.
Group Manager, WPB/PSL Environmental Division
645 I NW Enterprise Drive Suite 107 I Port St Lucie, FL 34986 D (561) 494-7052 I F (772) 343-9404 I M (772) 408-2959 Shawn.ouellette@terracon.com
From: Johnson, Megan R <Megan.R.Johnson@FloridaDEP.gov> Sent: Monday, March 3, 2025 3:52 PM To: Ouellette, Shawn <Shawn.Ouellette@terracon.com> Cc: Cline, Donna L <Donna.Cline@terracon.com>; Sweeney, Scott L <Scott.L.Sweeney@FloridaDEP.gov> Subject: RE: HW_687_BIL02A_ CO3_SBOBC Plantation SIte Broward County FL
Hey Shawn, I saw the permit announcement; sorry it took so long to get! No worries about extending the deliverable and TA completion dates. We can take care of that with a time extension TACO. Let me know when the drillers are for sure scheduled, and we can adjust the dates accordingly.
Thanks!
Megan
From: Ouellette, Shawn <Shawn.Ouellette@terracon.com> Sent: Monday, March 3, 2025 7:51 AM To: Johnson, Megan R <Megan.R.Johnson@FloridaDEP.gov> Cc: Cline, Donna L <Donna.Cline@terracon.com> Subject: HW_687_BIL02A_ CO3_SBOBC Plantation SIte Broward County FL
EXTERNAL MESSAGE
This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.
Hi Megan, Hope you are doing well.
It looks like we finally got the ROW permit for the SBOBC project. To say it was tedious is an understatement.
Trying to set up drilling on the week of March 24 so we may need to extend the contract and deliverables to accommodate the delays in permitting.
Thanks Shawn Ouellette, P.G.
Group Manager, WPB/PSL Environmental Division
645 I NW Enterprise Drive Suite 107 I Port St Lucie, FL 34986 D (561) 494-7052 I F (772) 343-9404 I M (772) 408-2959 Shawn.ouellette@terracon.com
Terracon provides environmental, facilities, geotechnical, and materials consulting engineering services delivered with responsiveness, resourcefulness, and reliability.
Private and confidential as detailed here (www.terracon.com/disclaimer). If you cannot access the hyperlink, please e-mail sender.
File details come from the government source that posted it. Updated .