About this file

This document is a Task Assignment (TA) DC034A issued under Contract Number HW687 between the State of Florida Department of Environmental Protection (FDEP) and Terracon Consultants, Inc. The TA authorizes work at the Dryclean World facility (ERIC_5042) located at 1451 Lee Road, Winter Park, Orange County, Florida. The assignment was executed on March 23, 2023, with a completion date of September 30, 2023. Dean Cox serves as the FDEP project manager, while Donna Cline represents Terracon as the contractor's project manager.

The TA authorizes groundwater monitoring and reporting services with a total fixed unit rate value of $9,379.49. The deliverable is a Post-Active Remediation Monitoring (PARM) Report due by June 30, 2023, with invoice authorization contingent upon FDEP approval of the report. The scope includes sampling nine monitoring wells (MW001, MW002, MW005, MW009, MW010, MW015, MW019, MW020, and MW021) for volatile organic compounds (VOHs) and five wells (MW001, MW002, MW005, MW019, and MW020) for Underground Injection Control (UIC) parameters including metals, sulfate, solids, color, and chloride. Labor costs total $5,056.36, with additional expenses including travel ($440.00), laboratory analysis ($1,755.00), field equipment and supplies ($1,512.50), subcontractor services for industrial waste disposal via Erwin Remediation ($110.00), and a completion fee ($505.63). The TA was negotiated to $9,379.49, representing a 12 percent cost reduction from the original proposal of $10,626.89.

View the file

Other files

File Type Posted
CN-370000-HW687-BF01A.pdf PDF
CN-370000-HW687-BF01B.pdf PDF
CN-370000-HW687-BF02A.pdf PDF
CN-370000-HW687-BF04A.pdf PDF
CN-370000-HW687-BF04ACO3.pdf PDF
CN-370000-HW687-BIL01B.pdf PDF
CN-370000-HW687-BIL02B.pdf PDF
CN-370000-HW687-BIL03B.pdf PDF
CN-370000-HW687-BIL1BCO2.pdf PDF
CN-370000-HW687-BIL2CCO2.pdf PDF
CN-370000-HW687-CSS02.pdf PDF
CN-370000-HW687-CSS03.pdf PDF
CN-370000-HW687-DC002A.pdf PDF
CN-370000-HW687-DC002G.pdf PDF
CN-370000-HW687-DC006C.pdf PDF
CN-370000-HW687-DC008B.pdf PDF
CN-370000-HW687-DC008D.pdf PDF
CN-370000-HW687-DC009B.pdf PDF
CN-370000-HW687-DC010C.pdf PDF
CN-370000-HW687-DC012A.pdf PDF
CN-370000-HW687-DC014B.pdf PDF
CN-370000-HW687-DC014D.pdf PDF
CN-370000-HW687-DC014H.pdf PDF
CN-370000-HW687-DC015D.pdf PDF
CN-370000-HW687-DC016C.pdf PDF
CN-370000-HW687-DC01ACO9.pdf PDF
CN-370000-HW687-DC021A.pdf PDF
CN-370000-HW687-DC021C.pdf PDF
CN-370000-HW687-DC022A.pdf PDF
CN-370000-HW687-DC023B.pdf PDF
CN-370000-HW687-DC023D.pdf PDF
CN-370000-HW687-DC024B.pdf PDF
CN-370000-HW687-DC024E.pdf PDF
CN-370000-HW687-DC024F.pdf PDF
CN-370000-HW687-DC027A.pdf PDF
CN-370000-HW687-DC028A.pdf PDF
CN-370000-HW687-DC028D.pdf PDF
CN-370000-HW687-DC029C.pdf PDF
CN-370000-HW687-DC02ACO1.pdf PDF
CN-370000-HW687-DC02HCO2.pdf PDF
CN-370000-HW687-DC030A.pdf PDF
CN-370000-HW687-DC031A.pdf PDF
CN-370000-HW687-DC035A.pdf PDF
CN-370000-HW687-DC037A.pdf PDF
CN-370000-HW687-DC03CCO2.pdf PDF
CN-370000-HW687-DC044A.pdf PDF
CN-370000-HW687-DC045B.pdf PDF
CN-370000-HW687-DC049A.pdf PDF
CN-370000-HW687-DC054A.pdf PDF
CN-370000-HW687-DC056A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW687

DC034A Completion September 30, 2023

This TA authorizes costs associated with groundwater monitoring & reporting. The total cost of this TA is $9,379.49 and this entire cost is fixed unit rate.

Dean Cox 850-245-8969 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Terracon Consultants, Inc.

Terracon Consultants, Inc.

Donna Cline 813-321-0340

ERIC_5042

1451 Lee Road, Winter Park

Dryclean World

✔ $ 9,379.49

$ 9,379.49

Scope of Work

Kelly Crain

Kelly Crain Digitally signed by Kelly Crain Date: 2023.03.23 16:01:21 -04'00'

N/A

Cline, Donna L Typewriter Donna Cline

Sr. Remediation Engineer

3/23/2023

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Post-Active Remediation Monitoring (PARM) Report, with activities summary, field notes, lab reports, updated site tables & figs, conceptual site model, & recommended actions (Subtask 1 Project Management and Subtask 2 GW Monitoring & Reporting).

06/30/2023

DEP approval of PARM Report, with activities summary, field notes, lab reports, updated site tables & figs, conceptual site model, & recommended actions (Subtask 1 Project Management and Subtask 2 GW Monitoring & Reporting).

$ 9,379.49

$ 9,379.49

HW687

DC034A

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Interim Secretary

Memorandum

TO: HW687 Contract File FROM: Dean Cox, Contract Manager SUBJECT: DC034A Dryclean World (ERIC_5042) PARM & Reporting

DATE: 3/20/23

This TA authorizes costs associated with groundwater monitoring & reporting. The total cost of this TA is $9,379.49 and this entire cost is fixed unit rate. This TA was negotiated - the total cost is $1,247.40 or 12% less than originally proposed. A site access agreement has been sent to the new property owner, who is expecting it and committed to signing it and returning it promptly.

The purpose of this TA is PARM groundwater monitoring, including VOHs and UIC parameters. ISCO/sodium permanganate was applied via injections in 2017. UIC monitoring includes metals, sulphate, solids, color, and chloride. Some metals were above their GCTLs in 2020 PARM groundwater monitoring, but concentrations were similar to baseline conditions except in MW001. The sampling event will provide data on the continued degradation of PCE and its daughter products and may indicate any ongoing ISCO activity along with UIC parameter concentrations.

The site is and will be undergoing redevelopment. The WSCS PG expressed some concern regarding inadequate soil assessment. Terracon has similar concerns and plans to recommend a soil assessment approach and future actions considering the possible loss of some monitoring wells. Terracon is collecting GPS coordinates for monitoring wells as part of this task and has been requested to submit them, ideally as a report appendix.

FDEP COST ESTIMATE

Contractor: Terracon Date: 3/23/2023

Task #: SubTask 1 Site: Dryclean World, ERIC_5042 SubTask 2 Groundwater Monitoring and Reporting

Activity/Phase: Groundwater Monitoring and Reporting Project Manager: Dean Cox

Totals 1 2 Labor Rate Category

$64.50 Project Manager Donna Cline 3.31 3.31 $0.00 Administrative 0.00 0.00 $0.00 Brownfield Consultant 0.00 0.00

$31.25 CADD Specialist Chelsea Fugate 5.50 5.50 $0.00 Data Analyst & Visualization Specialist 0.00 0.00

$24.75 Environmental Technician Pete Christianson 22.25 22.25 $0.00 Field Geologist 0.00 0.00

$24.75 Field Scientist 0.00 0.00 $0.00 GIS Technician 0.00 0.00 $0.00 Principal Consultant 0.00 0.00 $0.00 Project Geologist 0.00 0.00 $0.00 Project Industrial Hygienist 0.00 0.00

$31.56 Project Scientist Laura Sebastian 9.50 9.50 $0.00 Senior Engineer 0.00 0.00 $0.00 Senior Geologist 0.00 0.00 $0.00 Senior GIS Analyst 0.00 0.00 $0.00 Senior Industrial Hygienist 0.00 0.00

$49.69 Senior Scientist/Geologist Lydia Wing 12.50 12.50 $0.00 Staff Engineer 0.00 0.00 $0.00 Staff Scientist 0.00 0.00 $0.00 0.00 0.00 $0.00 0.00 0.00 $0.00 0.00 0.00 $0.00 0.00 0.00 $0.00 0.00 0.00 $0.00 0.00 0.00

Total Hours 53.06 3.31 49.75

Direct Labor $1,857.18 $213.66 $1,643.52

Overhead 116.00% $2,154.33 $247.85 $1,906.48 Gen & Admin 0.00% $0.00 $0.00 $0.00 Fringe 56.26% $1,044.85 $120.21 $924.64 Total Labor $5,056.36 $581.72 $4,474.64

Project Management

REV: 02/03 CEF TERRACON Page 1

FDEP COST ESTIMATE

Contractor: Terracon Date: 3/23/2023

Task #: SubTask 1 Site: Dryclean World, ERIC_5042 SubTask 2 Groundwater Monitoring and Reporting

Activity/Phase: Groundwater Monitoring and Reporting Project Manager: Dean Cox

Totals 1 2

Project Management

Travel Vehicle Rental $440.00 $440.00 Mileage Costs $0.00 $0.00 Air Fare $0.00 $0.00 Per diem + Hotel $0.00 $0.00 Total Travel $440.00 $440.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 Procurement Fee $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 Mobile Laboratory $0.00 $0.00 Surveying $0.00 $0.00 IDW - Erwin Remediation $100.00 $100.00 Utilities $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $100.00 $100.00 Handling Fee $10.00 $10.00 Total Subcontractor Cost $110.00 $110.00

Laboratory Analytical Costs $1,755.00 $1,755.00 Fast Turnaround Charges $0.00 $0.00 Sample Shipping $0.00 $0.00 Total Laboratory $1,755.00 $1,755.00

Field Expenses Personal Protection $0.00 $0.00 Expendables $203.50 $203.50 Equipment (Drilling related) $0.00 $0.00 Equipment (Analytical related) $843.00 $843.00 Equipment (IDW related) $100.00 $100.00 Equipment (Other) $366.00 $366.00 Total Field Expenses $1,512.50 $1,512.50

Subtotal $8,873.86 $581.72 $8,292.14 Completion Fee $505.63 $58.17 $447.46

Total Estimated Cost $9,379.49 $639.89 $8,739.60

REV: 02/03 CEF TERRACON Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Dryclean World, ERIC_5042 SUBTASK 2: Groundwater Monitoring and Reporting

PROPOSAL NO. PH1227133

DATE: 3/23/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Initial Site Visit to Evaluate Site Conditions Senior Geologist LS 1.00 Senior Geologist LW 0.50 Senior Geologist LW Site walk-around, locate and evaluate site and off-site monitoring wells, and general site conditions 1.50 Project Scientist PC Site walk-around, locate and evaluate on-site site and off-site monitoring wells 1.00

Field Task Planning and Groundwater Sampling Senior Scientist LS 0.50 Senior Scientist LW 1.50 Project Scientist PC Load/unload 1.00 Project Scientist PC Mobilization/Demobilization (from Winter Park to Winter Park, 0.5 hour/event, 2 events 1.00 Project Scientist PC Access wells and replace locks and well caps (10 wells) 1.25 Project Scientist PC Measure depth to groundwater (9 wells,10 minutes per well) 1.50 Project Scientist PC Collect groundwater samples (9 wells, 1.5 hour each) 13.50 Project Scientist PC Containerize IDW, label and place IDW drum in a secure location 1.00

Coordinate IDW T&D Senior Scientist LW 0.50 Staff Scientist PC 2.00

Report Deliverable Project Scientist LS Prepare report tables and draft maps 4.00 Senior Geologist LS Prepare report 4.00 Senior Geologist LW QA/QC field and laboratory data 1.50 Senior Geologist LW Summarize Water Quality Parameters and Trend Graphs 1.00 Senior Geologist LW Summarize Groundwater Analytical Results 2.00 Senior Geologist LW

3.00 Senior Geologist LW Conclusions/Recommendations 1.00

GIS Technician CF Prepare initial base figures from the original TetraTech drawings 2.50 CF Prepare Exhibits (groundwater flow and concentrations maps) 3.00

Personnel: LS LW PC CF Hours: 9.50 12.50 22.25 5.50 TOTAL LABOR 49.75

VEHICLE TYPE RATE UNIT USEAGE

Automobile (Initial site visit) 80 day 1 $80.00

Truck (groundwater sampling) 120 day 2 $240.00 Truck (IDW pickup) 120 day 1 $120.00

TOTAL VEHICLE $440.00

Provide a Conceptual Site Model of the existing groundwater plume features over time and a receptor update

Prepare waste characterization/Generator Profile and schedule pickup Coordinate IDW T&D: Meet transporter to sign manifest

Mobilization/Demobilization (from Winter Park to Winter Park) Prepare Health and Safety Plan

Request sample kit PreTask Planning, prepare field sampling SOW/coordinate site access

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Dryclean World, ERIC_5042 SUBTASK 2: Groundwater Monitoring and Reporting

PROPOSAL NO. PH1227133

DATE: 3/23/2023

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Erwin Remediation IDW Disposal 100.00$ each 1 $100.00

Subcontractor Handling Fee 10% $10.00

TOTAL SUBCONTRATOR $110.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

VOHs EPA 8260 (short list) 63.00$ 9 1 $630.00 Al EPA 6010 13.50$ 5 $67.50 Sb EPA 6020 14.00$ 5 $70.00 As EPA 6021 14.00$ 5 $70.00 Be EPA 6022 14.00$ 5 $70.00 Cd EPA 6023 14.00$ 5 $70.00 Cr EPA 6024 14.00$ 5 $70.00 Pb EPA 6025 14.00$ 5 $70.00 Mn EPA 6010 13.50$ 5 $67.50 Hg EPA 7471 26.00$ 5 $130.00 Ti EPA 6020 14.00$ 5 $70.00 Chloride 4500-CL E 24.00$ 5 $120.00 Color 13.00$ 5 $65.00 Sulfate 300.0 21.00$ 5 $105.00 Total Dissolved Solids 2540C 16.00$ 5 $80.00

TOTAL LAB $1,755.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 2 $80.00 Sample Shipping Small Cooler (2 day) 52.00$ 2 $104.00 Sample Shipping Ice 6.50$ 3 $19.50 Analytical Related Groundwater sampling kit-shallow 290.00$ day 1 $290.00

Groundwater sampling kit-deep 415.00$ day 1 $415.00 Tubing, HDPE (1/4 x 3/8) 0.40$ ft 345 $138.00

IDW Related 55-gallon drum, new 100.00$ drum 1 $100.00 Other Site Reconnaissance kit 150.00$ day 1 $150.00

Lock, key operated 7.00$ ea 9 $63.00 Well Cap, 2" 17.00$ ea 9 $153.00

TOTAL EQUIPMENT $1,512.50

5463 West Waters Avenue

Tampa, FL 33684

P (813) 221-0050 F (813) 221-0051

Terracon.com

March 9, 2023

Florida Department of Environmental Protection Waste Cleanup Program Waste Management Division 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Attn: Mr. Dean Cox, Environmental Consultant E: Dean.Cox@FloridaDep.gov W: 850-245-8969 M: 727-686-6502

Re: Proposal for Annual Groundwater Monitoring and Reporting

Dryclean World 1451 Lee Road Winter Park, Orange County, Florida

ERIC_5042

Task Assignment HW687 Terracon Proposal No. PH1227132

Dear Mr. Cox:

Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this proposal to the Florida Department of Environmental Program (FDEP) Waste Cleanup Program (WCP) to conduct Annual Groundwater Monitoring and Reporting for the Dryclean World (ERIC_5042) facility located at 1451 Lee Road, Winter Park, Orange County, Florida.

Scope of Services

Initial site visit to meet with owner/tenant, evaluate monitoring wells and general site conditions;

Field preparation, prepare health and safety plan, mobilize to site, perform groundwater sampling and laboratory analysis of ten

(10) existing monitoring wells (MW001, MW002, MW005, MW009, MW010, MW015, MW019, MW020, and MW021) for VOH; and five

(5) wells (MW001, MW002, MW005, MW019 and MW020) for UIC parameters;

Review data and prepare an Annual Groundwater Monitoring Report including development of a conceptual site model, updated tables and groundwater flow and concentration exhibits. See attached LOE for details

Schedule

Submit Annual Monitoring Report within 20 business days following receipt of laboratory results.

Compensation

See attached CEF for details.

mailto:Dean.Cox@FloridaDep.gov

Proposal for Annual Monitoring and Preparation of Report Dryclean World, ERIC_5042 ■ Winter Park, FL March 9, 2023 ■ Terracon Proposal No. PH1227132

SITE RECOMMENDATIONS

Tetra Tech submitted an Annual Groundwater Monitoring Report documenting groundwater monitoring conducted in June 2019. The highest PCE concentration identified in the groundwater during the June 2019 annual groundwater sampling event was collected from MW020 at 12,400 micrograms per liter (µg/L). Geochemical data suggest an aerobic aquifer based on dissolved oxygen (DO) and oxygen reduction potential (ORP) field measurements and general lack of tetrachloroethene (PCE) daughter products. Due to the duration of over two years since the last sampling event, and over four years since the chemical oxidation injection remediation event, coupled with an overall decreasing trend in concentrations, Terracon recommends sampling nine (9) monitoring wells for VOHs, as summarized in the following table. Additionally, Terracon recommends collecting Underground Injection Control (UIC) parameters (metals, chloride, sulfate, total dissolved solids, sulfate, and color) from monitoring wells MW001, MW002, MW005, MW019 and MW020. An evaluation of current groundwater quality data from these wells will provide a clearer and more comprehensive strategy for a path forward.

MW Screened Interval (ft bgs)

Location General Comments

MW001 44 - 49 North side of dry-cleaning operations building

Last sampled in 2019, PCE < GCTL

MW002 10 - 20 North side of dry-cleaning operations building

One event in 2019 demonstrating PCE <

GCTL

MW005 10 - 20 East portion of the property Upgradient, last sampled in 2019, PCE <

GCTL

MW009 41 - 51 Offsite, northwest of property Downgradient, last sampled in 2019, PCE >

GCTL.

MW010 9 - 19 Offsite, northwest of property Downgradient, last sampled in 2019, PCE <

GCTL

MW015 40 - 50 Offsite, northwest of property Downgradient, last sampled in 2019, PCE <

GCTL

MW019 9 - 19 Offsite, north of property Downgradient, one event in 2019 demonstrating PCE and TCE < GCTL

MW020 39 - 49 Offsite, north of property Last sampled in 2019, PCE and TCE > GCTLs.

MW021 63 -68 Offsite, north of property Last sampled in 2019, PCE and TCE > GCTLs.

The Temporary Point of Compliance (TPOC) and off-site notification was submitted in January 2017, and appears to be up to date. The on-site access agreement does not appear to match the current owner and needs to be updated.

DELIVERABLES

The Annual Groundwater Monitoring Report will detail and summarize the groundwater sampling activities, field observations, and results of monitoring well analysis and will include updates to the site’s historical data tables and updated exhibits of groundwater flow and well concentrations.

Conclusions and recommendations will include a summary of results and recommendations for future sampling or remedial activities.

Proposal for Annual Monitoring and Preparation of Report Dryclean World, ERIC_5042 ■ Winter Park, FL March 9, 2023 ■ Terracon Proposal No. PH1227132

SCHEDULE

It is estimated that the wells could be sampled within two weeks from TA authorization and report issued within 20 business days of receipt of analytical results.

CLOSING REMARKS

Terracon services will be conducted in accordance with the terms and conditions, contained within DEP Waste Cleanup Program (WCP) Contract No. HW687, executed January 5, 2022. It is understood that a Task Assignment will be issued to authorize us to perform this work.

We appreciate the opportunity to provide this proposal and look forward to working with you on this project. If you should have any questions or comments regarding this proposal, please contact either of the undersigned at 813-221-0050.

Sincerely, Terracon Consultants, Inc.

Lydia Wing Donna Cline, P.E.

Project Manager Senior Remediation Engineer

Attachments: Cost Spreadsheet Level of Effort

Ranking by fee

Sub Solids non-haz 55-gal drum

Liquids non-haz

55-gal drum Additional pricing conditions

Minority Y/N

Regions* Contact Name Contact # email

1 Erwin Remediation 100.00$ 100.00$ all inclusive No All Johnathan Erwin 850-292-6511 erwinremediation@gmail.com

2 Clean Earth $63+$45=$108 $65+$45 =$110 15% EEI on total disposal, stop fee $100, 55% FSC of total transportation

No All Ryan Penfield 843-562-7481 rpenfield@harsco.com

3A Whatever Waste 150.00$ 150.00$ all included No North and

Central Florida

John 904-881-1957 John@whateverwaste.com

3B Whatever Waste 200.00$ 200.00$ all included No South Florida

John 904-881-1957 John@whateverwaste.com

* Regions that are specified with "All" of Florida, are not inclusive of the Keys

Erwin Remediation is the selected IDW Contractor

IDW Contractors, All of Florida (Except the Keys)

408 Ditmar Street

Pensacola, FL 32503

ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562

(850) 292-6511

To: Mr. Sid O’Neal

Terracon

3559 Timberlane School Road

Tallahassee, FL 32312

March 4, 2022

Re: Non-Hazardous Drum Disposal – State of Florida

Mr. O’Neal:

The price for the transportation and disposal (T&D) of drums of non-hazardous soil, mud and water located in the State of Florida is listed below.

Non-Hazardous Chlorinated VOHs, Petroleum and Metals:

Description Rate Unit

T&D - Non-Haz Soil $ 100.00 Per Drum

T&D - Non-Haz Mud/Water $ 100.00 Per Drum

The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida

Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.

Respectfully, Jonathan Erwin

Erwin Remediation, Inc.

Email: ErwinRemediation@Gmail.com

Office: (850) 292-6511 mailto:Remediation@Gmail.com

Cline, Donna L

From: O'Neal, Sid L Sent: Wednesday, March 9, 2022 12:12 PM To: Cline, Donna L; Wing, Lydia; Lewis, Tom E Subject: FW: :EXTERNAL: RFQ - Non-Haz T&D

Here’s an email quote from Clean Earth. Should be the final one needed

Thanks, Sid O’Neal Senior Scientist I Environmental

3559 Timberlane School Road I Tallahassee, Florida 32312 D (850) 692-7189 I F (850) 692-7186 I M (229) 400-5108 sid.oneal@terracon.com I Terracon.com

From: Penfield, Ryan L <rpenfield@harsco.com> Sent: Wednesday, March 9, 2022 12:09 PM To: O'Neal, Sid L <Sid.O'neal@terracon.com> Subject: RE: :EXTERNAL: RFQ - Non-Haz T&D

Hello Sid, Non haz liquids (NH-L-20) $65 per drum Non haz solids (NH-S-10) $63 per drum 15% EEI on total disposal

Transportation (excluding the KEYS) Stop fee $100 Per Drum Trans $45 FSC based upon DOE currently 55% of total trans

This will be good for all of Florida except the keys.

Ryan Penfield

Environmental Specialist

M 843.562.7841 O 1.800.739.9156 rpenfield@harsco.com www.cleanearthinc.com

402 Webster Chapel Road, Glencoe , AL 35905

From: O'Neal, Sid L <Sid.O'neal@terracon.com> Sent: Wednesday, March 9, 2022 11:59 AM To: Penfield, Ryan L <rpenfield@harsco.com> Subject: :EXTERNAL: RFQ - Non-Haz T&D

Hi Larry, Was just following up from yesterday’s phone call in case you have my email wrong.

Need quote for Non-Haz Drum T&D – soil and gw waste for all Florida regions covering north, central, and south regions

Thanks, Sid O’Neal Senior Scientist I Environmental

3559 Timberlane School Road I Tallahassee, Florida 32312 D (850) 692-7189 I F (850) 692-7186 I M (229) 400-5108 sid.oneal@terracon.com I Terracon.com

Terracon provides environmental, facilities, geotechnical, and materials consulting engineering services delivered with responsiveness, resourcefulness, and reliability.

Private and confidential as detailed here (www.terracon.com/disclaimer). If you cannot access the hyperlink, please e-mail sender.

CAUTION : This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.

You don't often get email from sid.o'neal@terracon.com. Learn why this is important

Whatever Waste, LLC 904.881.1957

3834 Mandarin Woods Dr. No.

Jacksonville, Florida

32223 United States

Overview RE: Non-hazardous Waste Drum Transport & Disposal LOC: North Florida (Jacksonville >< Pensacola) Central Florida (Greater Orlando >< Greater Tampa)

Good day Sid and Tom:

Whatever Waste appreciates the opportunity to price non-hazardous waste drums at facilities or sites throughout the North and Central Florida regions.

Overview Manifest, transport and dispose of non-hazardous petroleum contaminated soil, solids or liquids (including but not limited to PCW, IDW, groundwater, well drilling, and tank cleaning) in 55-gallon DOT shippable drums

Pricing

Prepared For Sid O'Neal Sr. Scientist

Terracon 3559 Timberlane School Road

Tallahassee, FL 32312

Proposal Number 030822.1

Proposal Date 03/08/2022

Description Rate Qty Line Total

Solids or Liquids Drums (each)

$150.00 1 $150.00

$0.00 1 $0.00

Notes Pricing includes assisting with waste profiling and analytical testing advisement unless the waste stream falls under a blanket profile.

Pricing and non-hazardous disposal acceptance of the drums is based on the waste being on-specification and RCRA non-hazardous. Required analytical testing data TBD based on disposal facility requirements DOT shippable drums must be on a hard surface and accessible location.

Drum pickup time frame can range from one week to several weeks based on location Whatever Waste also quotes hazardous waste drum transport and disposal

Terms

Whatever Waste will invoice actual amounts or volumes unless minimum quantities apply Due to pricing volatility in national and international energy sectors the non-hazardous waste drum transport and disposal rate will increase by $15.00 per drum for every $0.50 per gallon over $5.00 per gallon No-load stop fee if called off in transit or on-site $125.00 Payment is due in 30 days from email receipt of invoice

Sid O'Neal Sr. Scientist, Terracon

Subtotal

Tax

150.00

0.00

Proposal Total (USD) $150.00

Whatever Waste, LLC 904.881.1957

3834 Mandarin Woods Dr. No.

Jacksonville, Florida

32223 United States

Overview RE: Non-hazardous Waste Drum Transport & Disposal LOC: South Florida (south of Lake Okeechobee north end) Florida Keys

Good day Sid and Tom:

Whatever Waste appreciates the opportunity to price non-hazardous waste drums at facilities or sites throughout South Florida and the Florida Keys.

Overview Manifest, transport and dispose of non-hazardous petroleum contaminated soil, solids or liquids (including but not limited to PCW, IDW, groundwater, well drilling, and tank cleaning) in 55-gallon DOT shippable drums

Pricing

Prepared For Sid O'Neal Sr. Scientist

Terracon 3559 Timberlane School Road

Tallahassee, FL 32312

Proposal Number 030822.2

Proposal Date 03/08/2022

Description Rate Qty Line Total

Solids or Liquids Drums (each) (South Florida)

$200.00 1 $200.00

Solids or Liquid Drums (each) (Florida Keys)

$275.00 1 $275.00

Notes Pricing includes assisting with waste profiling and analytical testing advisement unless the waste stream falls under a blanket profile.

Pricing and non-hazardous disposal acceptance of the drums is based on the waste being on-specification and RCRA non-hazardous. Required analytical testing data TBD based on disposal facility requirements DOT shippable drums must be on a hard surface and accessible location.

Drum pickup time frame can range from one week to several weeks based on location Whatever Waste also quotes hazardous waste drum transport and disposal

Terms

Whatever Waste will invoice actual amounts or volumes unless minimum quantities apply Due to pricing volatility in national and international energy sectors the non-hazardous waste drum transport and disposal rate will increase by $15.00 per drum for every $0.50 per gallon over $5.00 per gallon No-load stop fee if called off in transit or on-site $175.00 Payment is due in 30 days from email receipt of invoice

Sid O'Neal Sr. Scientist, Terracon

Subtotal

Tax

475.00

0.00

Proposal Total (USD) $475.00

DC034A CEF-LOEfinal2.pdf
Cost Estimate
LOE Subtask 2
HW687 DC034A.pdf
HW687 DC034A.pdf
DC034A.pdf
DC034A memo.pdf
Binder1.pdf
HW687 Terracon Dryclean World ERIC_5042_03-09-2023.pdf
Site Recommendations
deliverables
Schedule
closing remarks
IDWbids.pdf
ErwinRemediation Quote - Terracon - Drum - All Regions - 03.04.2022
Clean Earth
Whatever Waste - Drum Quote Proposal 030822.1
Whatever Waste Proposal 030822.2 - South Region

File details come from the government source that posted it. Updated .