This document is a schedule of material submittals for a firm fixed price indefinite delivery, indefinite quantity contract to repair airfield and base pavements at Seymour Johnson Air Force Base, Fort Fisher Recreational Area, and Dare County Bomb Range in North Carolina. The contract was solicited by the Department of the Air Force Air Combat Command.
The schedule lists 80 items requiring submittals, certifications, or test results including concrete and asphalt mix designs, batch tickets, density and flexural test results, pavement marking materials, joint sealants, drainage and lighting materials, and fencing and gate components. Submittal types and required submission dates are identified. The schedule will be used to ensure the contractor provides all necessary documentation for materials and work during task order construction.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL CODES: A: WITHIN 30 DAYS AFTER 1st NTP, UNLESS STATED OTHERWISE IN CONTRACT B: DURING EACH TASK ORDER CONSTRUCTION
C:\Users\1173290990C\Desktop\Construction\New Projects\NEW Repair Airfield Base Pavements VKAG 20-1003 FOUO\IFB\Sol Atchs\Attachment 2 AF Form 66 IDIQ.xls
FA480921B0001
Attachment 2
PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NUMBER
FA480921B0001
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LIN
E
NU
MB
ER
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
CE
RT
IF
IC
AT
IO
N
OF
CO
MP
LIA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S
RE
CO
MM
EN
DA
TI
ON
S
MA
NU
FA
CT
UR
ER
'S
W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
OT
HE
R
SU
BM
IT
TA
L C
OD
E
RE
QU
IR
ED
SU
BM
IS
SI
ON
D
AT
E
DA
TE
R
EC
EI
VE
D
IN
NT
RA
CT
IN
G
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
SU
BM
IT
TA
L N
UM
BE
RS
RA
CT
OR
RE
BM
IT
TA
L
FI
NA
L A
PP
RO
VA
L
REMARKS
APPROVED DISAPPROVED
FOD Fence 1 Section 01026 3 A
Para 3.1.62 Bollards - Removable
2 Section 01026 3 A Para 3.1.37 Environmental Protection Plan
3 Section 01560 3 A Para 3 Compaction/Density Test Reports - Trench
4 Section 02221 3 B Para 9.1 Compaction/Density Test Reports
5 Section 02230 3 B Para 11 Compaction/Density Test Reports
6 Section 02233 3 B Para 9 Batch Ticket - Concrete sidewalks, 7 Curbs & Gutters 3 B Section 02450, Para 2 Alkali-Reactivity Testing
8 Cement Concrete Pavement 3 A Section 02515, Para 3.5 Concrete Job Mix Design-Portland
9 Cement Concrete Pavement 3 A Section 02515, Para 3.2 Concrete Job Mix Design-High Early
10 Portland Cement Concrete Pavement 3 A Section 02515, Para 3.2 Batch Ticket -
11 Portland Cement Concrete Pavement 3 B Section 02515, Para 3.4
VKAG 20-1003 REPAIR AIRFIELD/BASE PAVEMENTS
NUMBER OF COPIES REQUIRED
(UNLESS STATED OTHERWISE IN TASK ORDER)
SCHEDULE OF MATERIAL SUBMITTALS
DATE
CONTRACTOR
NOTIFIED
SUBMITTAL CODES: A: WITHIN 30 DAYS AFTER 1st NTP, UNLESS STATED OTHERWISE IN CONTRACT B: DURING EACH TASK ORDER CONSTRUCTION
C:\Users\1173290990C\Desktop\Construction\New Projects\NEW Repair Airfield Base Pavements VKAG 20-1003 FOUO\IFB\Sol Atchs\Attachment 2 AF Form 66 IDIQ.xls
FA480921B0001
Attachment 2
PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NUMBER
FA480921B0001
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LIN
E
NU
MB
ER
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
CE
RT
IF
IC
AT
IO
LIA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S
RE
CO
MM
EN
DA
TI
ON
S
MA
NU
FA
CT
UR
ER
'S
W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
OT
HE
R
SU
BM
IT
TA
L C
OD
E
RE
QU
IS
SI
ON
D
AT
E
DA
TE
R
EC
EI
VE
RA
CT
IN
G
DA
TE
T O
CI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
SU
BM
IT
TA
L N
UM
RA
BM
IT
TA
L
FI
NA
L A
PP
RO
VA
L
REMARKS
APPROVED DISAPPROVED
VKAG 20-1003 REPAIR AIRFIELD/BASE PAVEMENTS
NUMBER OF COPIES REQUIRED
(UNLESS STATED OTHERWISE IN TASK ORDER)
SCHEDULE OF MATERIAL SUBMITTALS
DATE
CONTRACTOR
NOTIFIED
Batch Ticket - High Early 12 Portland Cement Concrete Pavement 3 B
Section 02515, Para 3.4 Elevation Survey
13 Portland Cement Concrete Pavement 3 B Section 02515, Para 3.3 Flexural Test Results
14 Portland Cement Concrete Pavement 3 B Section 02515, Para 10.7 Flexural Test Results - High Early
15 Portland Cement Concrete Pavement 3 B Section 02515, Para 10.7 Paint-Pavement Markings
16 Section 02578 3 A Para 2 Paint-Pavement Markings
17 Section 02578 3 A Para 2 Reflective Media-Pvmt Markings
18 Section 02578 3 A Para 2 Reflective Media-Pvmt Markings
19 Section 02578 3 A Para 2 Concrete Mix Design - Patching Systems
20 Section 02579 3 A Para 1.5 Patching Systems
21 Section 02579 3 A Para 1.5 Test Results
22 Section 02579 3 B Para 3.4.1
SUBMITTAL CODES: A: WITHIN 30 DAYS AFTER 1st NTP, UNLESS STATED OTHERWISE IN CONTRACT B: DURING EACH TASK ORDER CONSTRUCTION
C:\Users\1173290990C\Desktop\Construction\New Projects\NEW Repair Airfield Base Pavements VKAG 20-1003 FOUO\IFB\Sol Atchs\Attachment 2 AF Form 66 IDIQ.xls
FA480921B0001
Attachment 2
PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NUMBER
FA480921B0001
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LIN
E
NU
MB
ER
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
CE
RT
IF
IC
AT
IO
LIA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S
RE
CO
MM
EN
DA
TI
ON
S
MA
NU
FA
CT
UR
ER
'S
W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
OT
HE
R
SU
BM
IT
TA
L C
OD
E
RE
QU
IS
SI
ON
D
AT
E
DA
TE
R
EC
EI
VE
RA
CT
IN
G
DA
TE
T O
CI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
SU
BM
IT
TA
L N
UM
RA
BM
IT
TA
L
FI
NA
L A
PP
RO
VA
L
REMARKS
APPROVED DISAPPROVED
VKAG 20-1003 REPAIR AIRFIELD/BASE PAVEMENTS
NUMBER OF COPIES REQUIRED
(UNLESS STATED OTHERWISE IN TASK ORDER)
SCHEDULE OF MATERIAL SUBMITTALS
DATE
CONTRACTOR
NOTIFIED
Flexural Test Results - Patching Systems 23 Section 02579 3 B
Para 3.4.2 Joint Sealing
24 Section 02580 3 A Para 3 Joint Sealing
25 Section 02580 3 A Para 3 Joint Sealing
26 Section 02580 3 A Para 3 Preformed Joint Sealant
27 Section 02582 3 A Para 3.1 Asphalt Mix HDS (3000lb stability)
28 Section 02680 3 A Para 3.1 Asphalt Mix SF-9.5A
29 Section 02680 3 A Para 3.2 Asphalt Mix I-19.0B
30 Section 02680 3 A Para 3.2 Asphalt Mix B-25.0B
31 Section 02680 3 A Para 3.2 Asphalt Mix Certification HDS
32 Section 02680 3 A Para 3 Asphalt Mix Certification SF-9.5A
33 Section 02680 3 A Para 3 Asphalt Mix Certification I-19.0B
34 Section 02680 3 A Para 3
SUBMITTAL CODES: A: WITHIN 30 DAYS AFTER 1st NTP, UNLESS STATED OTHERWISE IN CONTRACT B: DURING EACH TASK ORDER CONSTRUCTION
C:\Users\1173290990C\Desktop\Construction\New Projects\NEW Repair Airfield Base Pavements VKAG 20-1003 FOUO\IFB\Sol Atchs\Attachment 2 AF Form 66 IDIQ.xls
FA480921B0001
Attachment 2
PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NUMBER
FA480921B0001
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LIN
E
NU
MB
ER
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
CE
RT
IF
IC
AT
IO
LIA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S
RE
CO
MM
EN
DA
TI
ON
S
MA
NU
FA
CT
UR
ER
'S
W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
OT
HE
R
SU
BM
IT
TA
L C
OD
E
RE
QU
IS
SI
ON
D
AT
E
DA
TE
R
EC
EI
VE
RA
CT
IN
G
DA
TE
T O
CI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
SU
BM
IT
TA
L N
UM
RA
BM
IT
TA
L
FI
NA
L A
PP
RO
VA
L
REMARKS
APPROVED DISAPPROVED
VKAG 20-1003 REPAIR AIRFIELD/BASE PAVEMENTS
NUMBER OF COPIES REQUIRED
(UNLESS STATED OTHERWISE IN TASK ORDER)
SCHEDULE OF MATERIAL SUBMITTALS
DATE
CONTRACTOR
NOTIFIED
Asphalt Mix Certification B-25.0B 35 Section 02680 3 A
Para 3 Job Mix Test
36 Section 02680 3 B Para 9.2 Density Test Results
37 Section 02680 3 B Para 9.3 Batch Tickets
38 Section 02680 3 B Para 9.4 Asphalt and Asphalt Cement
39 Section 02681 3 A Para 2.1.a Non-Woven Fabric
40 Section 02681 3 A Para 2.1.b Base Course Material
41 Section 02681 3 A Para 2.1.c Job Mix Formula - HDS
42 Section 02681 3 A Para 2.2 Job Mix Formula - SF-9.5A
43 Section 02681 3 A Para 2.2 Job Mix Formula - I-19.0B
44 Section 02681 3 A Para 2.2 Job Mix Formula - B-25.0B
45 Section 02681 3 A Para 2.2 Material Tests/Reports Bituminous
46 Section 02681 3 A Para 2.3
SUBMITTAL CODES: A: WITHIN 30 DAYS AFTER 1st NTP, UNLESS STATED OTHERWISE IN CONTRACT B: DURING EACH TASK ORDER CONSTRUCTION
C:\Users\1173290990C\Desktop\Construction\New Projects\NEW Repair Airfield Base Pavements VKAG 20-1003 FOUO\IFB\Sol Atchs\Attachment 2 AF Form 66 IDIQ.xls
FA480921B0001
Attachment 2
PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NUMBER
FA480921B0001
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LIN
E
NU
MB
ER
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
CE
RT
IF
IC
AT
IO
LIA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S
RE
CO
MM
EN
DA
TI
ON
S
MA
NU
FA
CT
UR
ER
'S
W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
OT
HE
R
SU
BM
IT
TA
L C
OD
E
RE
QU
IS
SI
ON
D
AT
E
DA
TE
R
EC
EI
VE
RA
CT
IN
G
DA
TE
T O
CI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
SU
BM
IT
TA
L N
UM
RA
BM
IT
TA
L
FI
NA
L A
PP
RO
VA
L
REMARKS
APPROVED DISAPPROVED
VKAG 20-1003 REPAIR AIRFIELD/BASE PAVEMENTS
NUMBER OF COPIES REQUIRED
(UNLESS STATED OTHERWISE IN TASK ORDER)
SCHEDULE OF MATERIAL SUBMITTALS
DATE
CONTRACTOR
NOTIFIED
Job Mix Test Results 47 Section 02681 3 B
Para 7 Density Test Results
48 Section 02681 3 B Para 7c Batch Tickets
49 Section 02681 3 B Para 7d Joint material
50 Section 02721 3 B Para 3.1 Joint material
51 Section 02721 3 A Para 3.1 Pipe
52 Section 02721 3 A Para 3.1 Precast Materials
53 Section 02721 3 A Para 3.1 Precast Materials
54 Section 02721 3 A Para 3.1 Pipe Test Reports
55 Section 02721 3 A Para 4 Acrylic Bound Synthetic Track
56 Section 02794 3 A Para 1.5 Concrete Edging
57 Section 03310 3 A Para 2
SUBMITTAL CODES: A: WITHIN 30 DAYS AFTER 1st NTP, UNLESS STATED OTHERWISE IN CONTRACT B: DURING EACH TASK ORDER CONSTRUCTION
C:\Users\1173290990C\Desktop\Construction\New Projects\NEW Repair Airfield Base Pavements VKAG 20-1003 FOUO\IFB\Sol Atchs\Attachment 2 AF Form 66 IDIQ.xls
FA480921B0001
Attachment 2
PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NUMBER
FA480921B0001
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LIN
E
NU
MB
ER
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
CE
RT
IF
IC
AT
IO
LIA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S
RE
CO
MM
EN
DA
TI
ON
S
MA
NU
FA
CT
UR
ER
'S
W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
OT
HE
R
SU
BM
IT
TA
L C
OD
E
RE
QU
IS
SI
ON
D
AT
E
DA
TE
R
EC
EI
VE
RA
CT
IN
G
DA
TE
T O
CI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
SU
BM
IT
TA
L N
UM
RA
BM
IT
TA
L
FI
NA
L A
PP
RO
VA
L
REMARKS
APPROVED DISAPPROVED
VKAG 20-1003 REPAIR AIRFIELD/BASE PAVEMENTS
NUMBER OF COPIES REQUIRED
(UNLESS STATED OTHERWISE IN TASK ORDER)
SCHEDULE OF MATERIAL SUBMITTALS
DATE
CONTRACTOR
NOTIFIED
Railroad Crossing 58 Section 05650 3 A
Para 3 Railroad Crossing
59 Section 05650 3 A Para 3 Airfield Lighting
60 Section 16526 3 A Para 1.4 Airfield Lighting
61 Section 16526 3 A Para 1.4 Airfield Lighting
62 Section 16526 3 A Para 1.5 Airfield Lighting
63 Section 16526 3 A Para 1.4 Airfield Lighting-Test Results
64 Section 16526 3 A Para 1.4.4 Airfield Lighting Certification
65 Section 16526 3 B Para 1.4.5 Airfield Lighting- Maint. Manual
66 Section 16526 3 B Para 1.4.6 Poly Panels
67 Section 10000 3 A Para 3.1 Anchor Studs
68 Section 10000 3 A Para 3.2
SUBMITTAL CODES: A: WITHIN 30 DAYS AFTER 1st NTP, UNLESS STATED OTHERWISE IN CONTRACT B: DURING EACH TASK ORDER CONSTRUCTION
C:\Users\1173290990C\Desktop\Construction\New Projects\NEW Repair Airfield Base Pavements VKAG 20-1003 FOUO\IFB\Sol Atchs\Attachment 2 AF Form 66 IDIQ.xls
FA480921B0001
Attachment 2
PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NUMBER
FA480921B0001
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LIN
E
NU
MB
ER
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
CE
RT
IF
IC
AT
IO
LIA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S
RE
CO
MM
EN
DA
TI
ON
S
MA
NU
FA
CT
UR
ER
'S
W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
OT
HE
R
SU
BM
IT
TA
L C
OD
E
RE
QU
IS
SI
ON
D
AT
E
DA
TE
R
EC
EI
VE
RA
CT
IN
G
DA
TE
T O
CI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
SU
BM
IT
TA
L N
UM
RA
BM
IT
TA
L
FI
NA
L A
PP
RO
VA
L
REMARKS
APPROVED DISAPPROVED
VKAG 20-1003 REPAIR AIRFIELD/BASE PAVEMENTS
NUMBER OF COPIES REQUIRED
(UNLESS STATED OTHERWISE IN TASK ORDER)
SCHEDULE OF MATERIAL SUBMITTALS
DATE
CONTRACTOR
NOTIFIED
Tie-down anchors 69 Section 10000 3 A
Para 3.3 Medium Volt Cable Product Data
70 Section 16320 3 B Para 1.02 Medium Volt Cable Test Data
71 Section 16320 3 B Para 1.03 Medium Volt Cable Warranty
72 Section 16320 3 B Para 2.08 Medium Volt Cable Hi Pot Test
73 Section 16320 3 B Para 1.03.D Duct Bank Shop Drawings
73 Section 16330 3 B Para 1.02.A MV XFMR Product Data
75 Section 16361 3 B Para 1.02.A MV XFMR Product Certificates
76 Section 16361 3 B Para 1.02.B MV XFMR Factory Test Reports
77 Section 16361 3 B Para 1.02.C MV XFMR Field Tests
78 Section 16361 3 B Para 1.02 Lighting Fixtures Product Data
79 Section 16515 3 B Para 1.02.A Lighting Fixtures Shop Drawings
80 Section 16515 3 B Para 1.02.B
SUBMITTAL CODES: A: WITHIN 30 DAYS AFTER 1st NTP, UNLESS STATED OTHERWISE IN CONTRACT B: DURING EACH TASK ORDER CONSTRUCTION
C:\Users\1173290990C\Desktop\Construction\New Projects\NEW Repair Airfield Base Pavements VKAG 20-1003 FOUO\IFB\Sol Atchs\Attachment 2 AF Form 66 IDIQ.xls
FA480921B0001
Attachment 2
PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NUMBER
FA480921B0001
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LIN
E
NU
MB
ER
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
CE
RT
IF
IC
AT
IO
LIA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S
RE
CO
MM
EN
DA
TI
ON
S
MA
NU
FA
CT
UR
ER
'S
W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
OT
HE
R
SU
BM
IT
TA
L C
OD
E
RE
QU
IS
SI
ON
D
AT
E
DA
TE
R
EC
EI
VE
RA
CT
IN
G
DA
TE
T O
CI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
SU
BM
IT
TA
L N
UM
RA
BM
IT
TA
L
FI
NA
L A
PP
RO
VA
L
REMARKS
APPROVED DISAPPROVED
VKAG 20-1003 REPAIR AIRFIELD/BASE PAVEMENTS
NUMBER OF COPIES REQUIRED
(UNLESS STATED OTHERWISE IN TASK ORDER)
SCHEDULE OF MATERIAL SUBMITTALS
DATE
CONTRACTOR
NOTIFIED
Lighting Fixtures Maint Data 81 Section 16515 3 B
Para 1.02.C Disconnect Product Data
82 Section 16010 3 B Para 1.05 Conduit Product Data
83 Section 16330 3 B Para 1.02 600V Conductor Product data
84 Section 16515 3 B Para 2.02 Asphalt Tack
85 32 01 17 3 A Para 3.1 Interlayer Grid/fabric
86 32 01 17 3 A Para 3.2 Concrete Mix
87 33 11 16 3 A Para 2a Fence and gate post, rails, and fittings
88 32 31 19 3 3 3 A Para 2.A, 2.B, 2.C Gates and hardware
89 32 31 19 3 3 3 A Para 2.A, 2.B, 2.C Fence fabric and hardware
90 32 31 20 3 A Para 2a, 2b, 2c Grounding Rods
91 34 73 13 3 A Para C1 Bonding method
92 34 73 13 3 A Para C2 Earthwork
93 31 00 00 3 A Para 1.5A Earthwork
94 31 00 00 3 B Para 1.5B, 1.5C, 1.5D
AF 66
File details come from the government source that posted it. Updated .