Attachment 1 - AF Form 66_Ipava Drop Zone Repair.pdf

PDF 19 KB Posted

Attached to
Ipava Drop Zone Repairs Federal contract opportunity
Solicitation number
W50S7T-20-R-9998
Issued by
Department of the Army Illinois Army National Guard

About this file

This document contains an AF Form 66 schedule of material submittals for the Ipava Drop Zone Repairs project. The project involves repairing a drop zone for the Illinois Army National Guard, with required submittals including subgrade material, geotextiles, bedding material, stone riprap, filter fabric, and channel maintenance procedures. The contractor must also provide a written guarantee and material certifications for items like grass seed, fertilizer, pesticides, herbicides, and aggregate. Test reports are required for fill and backfill classification and compaction. The schedule lists 25 submittal line items and includes spaces for approval dates, received dates, suspension dates, remarks, and required resubmittals.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 Schedule of Work X

2 Material Safety Data Sheets X

3 Contractor Hazardous Material Part 1 X

4 Contractor Hazardous Material Part 2 X

5 Security Affidavits X

6 Geotextiles X

7 Controlled low-strength Materials X

8 Qualification Data for qualified testing agency X

9 Test Reports for fill and backfill - Classification X

Test Reports for fill and backfill - Lab Compaction Curve

X

11 Field Quality Test and Insepction Reports X

12 Pre-Excavation Photos / Videos X

13 Grass Seed Certification X

14 Fertilizer Certification X

15 Pesticide X

16 Herbicides X

17 Turf Maintenance Data X

18 Aggregate Certification X

TO BE COMPLETED BY PROJECT ENGINEER

1 COPY of all SUBMITTALS REQUIRED

LI

N

E N

U M

BE

R ITEM OR

DESCRIPTION OF

ITEM, CONTRACT

REFERENCE, TYPE

OF SUBMITTAL

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

AN

D

C

LO

SE

O U

T

SH

O P

D R

AW

IN

G S

C O

LO

R

S

EL

EC

TI

O N

FO

LL

O W

-U P

SA

M

PL

ES

DATE CONTRACTOR

NOTIFIED

C O

N

TR

AC

TO

R

ES

U

BM

IT

TA

L

M

AN

U

FA

C

TU

R

ER

'S

EC

O M

M

EN

D

AT

IO

N

S

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

C

AT

AL

O

G D

AT

A

APPROVED

D

AT

E

TO C

IV

IL

EN

G

IN

EE

R

IN

G

O

TH

ER

M

AT

ER

IA

L o r

D

AT

A

SOLICITATION/CONTRACT NO.

O

PE

R

AT

IN

G

IN

ST

R U

C

TI

O N

S

SU

BM

IT

TA

L R

EQ

U

IR

ED

BY

DISAPPROVED

D

AT

E R

EC

EI

VE

IN

C

O N

TR

AC

TI

N

G

FI

N

AL

AP

PR

O

VA

L

R

EM

AR

KS

R

ET

U R

N

SU

SP

EN

SI

O

N

AT

E

SCHEDULE OF MATERIAL SUBMITTALS

(AF Form 66 Modified)

WORK ORDER #

201900530

PROJECT TITLE

Ipava Drop Zone Repairs

19 Subgrade Material X

20 Goetextiles X

21 Bedding Material X

22 Stone Riprap X

23 Filter Fabric X

24 Channel Maintenance Procedures X

25 Written Guarantee X

12. AF Form 66

File details come from the government source that posted it. Updated .