Attach 3) AF Form 66.pdf

PDF 130 KB Posted

Attached to
Protective Coating IDIQ - Solicitation Federal contract opportunity
Solicitation number
FA303022R0010
Issued by
Department of the Air Force Air Education and Training Command

View the file

Other files for this federal contract opportunity

Other files attached to Protective Coating IDIQ - Solicitation, newest first.
File Type Posted
Attach 10) 2nd Q and A.pdf PDF
Solicitation Amendment FA303022R00100004.pdf PDF
Solicitation Amendment FA303022R00100003.pdf PDF
Solicitation Amendment FA303022R00100002.pdf PDF
Solicitation Amendment - FA303022R00100001.pdf PDF
Attach 9) Q and A.pdf PDF
Solicitation - FA303022R0010.pdf PDF
Attach 6) Seed Proj Drawings Vol 2.pdf PDF
Attach 4) Drawing - Base.pdf PDF
Attach 1) Protective Coating Specifications.pdf PDF
Attach 2) SEED Task Order Paint.pdf PDF
Attach 5) Seed Proj Drawings Vol 1.pdf PDF
Attach 7) Wage Determination TX20220282.pdf PDF
Attach 8) BAL Template Jul 22.docx DOCX document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

Section 01010, 2.3, Work Phasing Plan 4 a GA

Section 01010, 2.4, Management Plan 4 a FIO

Section 01010, 2.12, 2.13, Traffic Control/Maint. Plan

4 d GA

Section 01010, 2.17, Task Order Closeout 4 b GA

Section 01010, 4.2,

4.3 Company Safety

Policy and Accident Prevention Plan, Confined Space

4 x c FIO

Section 01010, 4.3, Confined Space Permit

4 c GA

Section 01010, 7.1, Storage Area 4 c GA

Section 01010, 15.1, List of Warranties 4 b GA

Section 01020, 2.1, Work Clearance Request, AF Form

4 7 Days Prior c

GA

Section 01020, 3.1, Plan Utility Outages 4 14 Days Prior c

GA

PROJECT NUMBER: 1106674

SA

MP

LE

S

PROJECT TITLE: Base Protective Coating IDIQ Task Order 2022

FINAL

APPROVAL

MA

NU

FA

CT

UR

ER

'S R

EC

OM

ME

ND

AT

IO

NS

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

FORM66.xls

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

PROJECT NUMBER: 1106674

SA

MP

LE

S

PROJECT TITLE: Base Protective Coating IDIQ Task Order 2022

FINAL

APPROVAL

MA

NU

FA

CT

UR

ER

'S R

EC

OM

ME

ND

AT

IO

NS

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

Section 01020, 4, Temporary Utilities 4 c GA

Section 01020, 4, Fire Hydrant Usage 4 c GA

Section 1400, 3.4, 3.4.1, 3.4.2. 3.4.3, 3.4.4, Storm Water Pollution Prevention Plan

4 d GA/FIO

Section 01400, 4.1, 4.2, 4.2.1, 4.3,4.4, 4.4.1, 4.5, 4.6, 4.7,4.8, 4.9, 4.12,

4.14 , Certification and Notification of Use, SDS

4 x c GA

Section 01400, 5.2, Disposal of Special Waste

4 x b FIO

Section 01400, 6.1, 6.2, 6.3.6.1, 6.3.7, Hazardous Waste Records

4 x c FIO

Section 01400, 9.1, Spill Notification 4 x d FIO

Section 01400, 11.3, Asbestos Free Certification

4 c GA

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

PROJECT NUMBER: 1106674

SA

MP

LE

S

PROJECT TITLE: Base Protective Coating IDIQ Task Order 2022

FINAL

APPROVAL

MA

NU

FA

CT

UR

ER

'S R

EC

OM

ME

ND

AT

IO

NS

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

Section 01400, 13, Release of Fluids into Sanitary Sewer System

4 x d GA

Section 01400, 15.1, Air Emission Reporting

4 b FIO

Section 01400, 16.2, Solid Waste Report 4 b FIO

Section 01540, 1.3.1, Affirmative Pollution Prevention Procurement Reporting Form

4 d GA

Section 01540, 1.3.2, Manufacturer Data, Certificates, & Samples

4 x d GA

Section 02072, 1.3.1, Work Plan 4 d GA

Section 02072, 1.3.2, Working Drawings 4 d GA

Section 02072, 2.1, 3.3.1, Brick Cleaner and Sealant

4 c GA

Section 02577, 1.2.1, Traffic Paint 4 c GA

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

PROJECT NUMBER: 1106674

SA

MP

LE

S

PROJECT TITLE: Base Protective Coating IDIQ Task Order 2022

FINAL

APPROVAL

MA

NU

FA

CT

UR

ER

'S R

EC

OM

ME

ND

AT

IO

NS

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

Section 02577, 1.2.2, Pavement Markers 4 b GA

Section 07920, 1.2, 1.2.1, 1.2.2 Color Samples

4 a GA

Section 09900, 1.2.1, Product Data SDS 4 c GA

Section 09915, 1.3, Samples, Color Schedule

4 a GA

AF Form 66

(a) No Later Than 7 Calendar Days after Task Order NTP

(b) Prior to Final Inspection of Task Order

(c) Prior to Use

(d) As Required

File details come from the government source that posted it. Updated .