Attach 3) AF Form 66.pdf
PDF 130 KB Posted
- Attached to
- Protective Coating IDIQ - Solicitation Federal contract opportunity
- Solicitation number
- FA303022R0010
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attach 10) 2nd Q and A.pdf | ||
| Solicitation Amendment FA303022R00100004.pdf | ||
| Solicitation Amendment FA303022R00100003.pdf | ||
| Solicitation Amendment FA303022R00100002.pdf | ||
| Solicitation Amendment - FA303022R00100001.pdf | ||
| Attach 9) Q and A.pdf | ||
| Solicitation - FA303022R0010.pdf | ||
| Attach 6) Seed Proj Drawings Vol 2.pdf | ||
| Attach 4) Drawing - Base.pdf | ||
| Attach 1) Protective Coating Specifications.pdf | ||
| Attach 2) SEED Task Order Paint.pdf | ||
| Attach 5) Seed Proj Drawings Vol 1.pdf | ||
| Attach 7) Wage Determination TX20220282.pdf | ||
| Attach 8) BAL Template Jul 22.docx | DOCX document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF MATERIAL SUBMITTALS
SOLICITATION/CONTRACT NO.:
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
Section 01010, 2.3, Work Phasing Plan 4 a GA
Section 01010, 2.4, Management Plan 4 a FIO
Section 01010, 2.12, 2.13, Traffic Control/Maint. Plan
4 d GA
Section 01010, 2.17, Task Order Closeout 4 b GA
Section 01010, 4.2,
4.3 Company Safety
Policy and Accident Prevention Plan, Confined Space
4 x c FIO
Section 01010, 4.3, Confined Space Permit
4 c GA
Section 01010, 7.1, Storage Area 4 c GA
Section 01010, 15.1, List of Warranties 4 b GA
Section 01020, 2.1, Work Clearance Request, AF Form
4 7 Days Prior c
GA
Section 01020, 3.1, Plan Utility Outages 4 14 Days Prior c
GA
PROJECT NUMBER: 1106674
SA
MP
LE
S
PROJECT TITLE: Base Protective Coating IDIQ Task Order 2022
FINAL
APPROVAL
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
CO
LO
R
SE
LE
CT
IO
N
SE
E
P
AR
A
ON
C
OP
IE
S
OT
HE
RS
A
S
SP
EC
IF
IE
D
REQUIRED
SUBMISSION
DATE
REMARKS
DATE
RECEIVED IN
CON-TRACTING
DATE TO CIVIL
ENGINEER-ING
RETURN
SUSPENSE
DATE
FOLLOW UP CONTRACT-TOR
RE-SUBMITTAL
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SH
OP
D
RA
W
IN
GS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
FORM66.xls
SOLICITATION/CONTRACT NO.:
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT NUMBER: 1106674
SA
MP
LE
S
PROJECT TITLE: Base Protective Coating IDIQ Task Order 2022
FINAL
APPROVAL
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
CO
LO
R
SE
LE
CT
IO
N
SE
E
P
AR
A
ON
C
OP
IE
S
OT
HE
RS
A
S
SP
EC
IF
IE
D
REQUIRED
SUBMISSION
DATE
REMARKS
DATE
RECEIVED IN
CON-TRACTING
DATE TO CIVIL
ENGINEER-ING
RETURN
SUSPENSE
DATE
FOLLOW UP CONTRACT-TOR
RE-SUBMITTAL
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SH
OP
D
RA
W
IN
GS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
Section 01020, 4, Temporary Utilities 4 c GA
Section 01020, 4, Fire Hydrant Usage 4 c GA
Section 1400, 3.4, 3.4.1, 3.4.2. 3.4.3, 3.4.4, Storm Water Pollution Prevention Plan
4 d GA/FIO
Section 01400, 4.1, 4.2, 4.2.1, 4.3,4.4, 4.4.1, 4.5, 4.6, 4.7,4.8, 4.9, 4.12,
4.14 , Certification and Notification of Use, SDS
4 x c GA
Section 01400, 5.2, Disposal of Special Waste
4 x b FIO
Section 01400, 6.1, 6.2, 6.3.6.1, 6.3.7, Hazardous Waste Records
4 x c FIO
Section 01400, 9.1, Spill Notification 4 x d FIO
Section 01400, 11.3, Asbestos Free Certification
4 c GA
SOLICITATION/CONTRACT NO.:
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT NUMBER: 1106674
SA
MP
LE
S
PROJECT TITLE: Base Protective Coating IDIQ Task Order 2022
FINAL
APPROVAL
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
CO
LO
R
SE
LE
CT
IO
N
SE
E
P
AR
A
ON
C
OP
IE
S
OT
HE
RS
A
S
SP
EC
IF
IE
D
REQUIRED
SUBMISSION
DATE
REMARKS
DATE
RECEIVED IN
CON-TRACTING
DATE TO CIVIL
ENGINEER-ING
RETURN
SUSPENSE
DATE
FOLLOW UP CONTRACT-TOR
RE-SUBMITTAL
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SH
OP
D
RA
W
IN
GS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
Section 01400, 13, Release of Fluids into Sanitary Sewer System
4 x d GA
Section 01400, 15.1, Air Emission Reporting
4 b FIO
Section 01400, 16.2, Solid Waste Report 4 b FIO
Section 01540, 1.3.1, Affirmative Pollution Prevention Procurement Reporting Form
4 d GA
Section 01540, 1.3.2, Manufacturer Data, Certificates, & Samples
4 x d GA
Section 02072, 1.3.1, Work Plan 4 d GA
Section 02072, 1.3.2, Working Drawings 4 d GA
Section 02072, 2.1, 3.3.1, Brick Cleaner and Sealant
4 c GA
Section 02577, 1.2.1, Traffic Paint 4 c GA
SOLICITATION/CONTRACT NO.:
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT NUMBER: 1106674
SA
MP
LE
S
PROJECT TITLE: Base Protective Coating IDIQ Task Order 2022
FINAL
APPROVAL
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
CO
LO
R
SE
LE
CT
IO
N
SE
E
P
AR
A
ON
C
OP
IE
S
OT
HE
RS
A
S
SP
EC
IF
IE
D
REQUIRED
SUBMISSION
DATE
REMARKS
DATE
RECEIVED IN
CON-TRACTING
DATE TO CIVIL
ENGINEER-ING
RETURN
SUSPENSE
DATE
FOLLOW UP CONTRACT-TOR
RE-SUBMITTAL
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SH
OP
D
RA
W
IN
GS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
Section 02577, 1.2.2, Pavement Markers 4 b GA
Section 07920, 1.2, 1.2.1, 1.2.2 Color Samples
4 a GA
Section 09900, 1.2.1, Product Data SDS 4 c GA
Section 09915, 1.3, Samples, Color Schedule
4 a GA
AF Form 66
(a) No Later Than 7 Calendar Days after Task Order NTP
(b) Prior to Final Inspection of Task Order
(c) Prior to Use
(d) As Required
File details come from the government source that posted it. Updated .