Task Order

Base Protective Coating IDIQ

Opportunity #1106628

Location:

Exterior Paint Facilities: B-140, B-409, B-3012, B-3458, B-3510, B-57005, B-57024, North and

South Perimeter walls, North and South Gate walls, and Recreation

Camp Pavilions 1-12

Project #/Title: Base Protective Coating IDIQ Seed Project. CP #1042064

Point of Contact (Name/phone #): Mr. Roberto Hernandez 325-654-6104

Mr. Garret Emmons 325-654-6104

(1) Project Inspectors: Mr. Roberto Hernandez/Mr. Garret Emmons

(2) Using Activity/Organization: Base Wide and Recreation Camp

Scope of Work:

B-140: Provide Exterior Painting for Doors and Door Frames. Provide Exterior Surface

Preparation. Provide Sealants and Caulking. Provide Power Washing of Exterior Brick/CMU.

B-409 Fire Escapes: Provide Exterior Surface Preparation. Provide Painting for

Balustrades/Pipe Type Railing.

B-3012: Provide Power Washing of Exterior Brick/CMU

B-3510: Provide Power Washing of Exterior Brick/CMU

B-3458: Provide Exterior Painting for Walls and Ceilings to Include Cut In. Provide Exterior

Surface Preparation.

Rec Camp Pavilion 1-12: Provide Exterior Painting for Walls and Ceilings to Include Cut In.

Provide Exterior Surface Preparation. Provide Painting for Conduit/Poles.

B-57005: Provide Exterior Painting for Walls and Ceilings to Include Cut In. Provide Exterior

Painting for Doors and Door Frames. Provide Exterior Surface Preparation.

B-57024: Provide Exterior Painting for Walls and Ceilings to Include Cut In. Provide Exterior

Painting for Doors and Door Frames. Provide Exterior Surface Preparation.

North and South Perimeter Wall: Provide Power Washing of Exterior Brick/CMU

North and South Gate Walls: Provide Power Washing of Exterior Brick/CMU

See Base Protective Coating IDIQ 2021 Specifications for further Detail. (See drawings).

Phasing Requirements: NONE

Special Requirements/Security/Submittals: AF Form 103, Work Clearance Permit/Parking Lot

Closure due to paint overspray. B-3012 and B3510 shall be completed at Off Peak Hours, to continue operations with the least possible interference and inconvenience.

Desired Task Order Construction Completion Date: 90 days after Task Order Issuance

Cost Estimate Breakdown Worksheet (Reference Bid Schedule)

CLIN Description Estimated

Quantity

Unit Unit

Price

Total

0001 AA

Provide Exterior Painting for Walls

& Ceilings to Include Cut In (Wood

To Include To Include Equipment >

12' High)

3,212 SF

0001 AB

Provide Exterior Painting for Walls

& Ceilings to Include Cut In

(Metal/Steel To Include Equipment

> 12' High)

5,941 SF

0001 AC

Provide Exterior Painting for Walls

& Ceilings to Include Cut In

(Concrete/CMU To Include

Equipment > 12' High)

6,978 SF

0001 AD

Provide Exterior Painting for Walls

& Ceilings to Include Cut In

(Stucco To Include Equipment > 12'

High)

29,228 SF

0002 Equipment Rental Aerial Lift

(Weekly) 4 Ea

0003 AA Provide Ext. Painting for Doors &

Door Frames 19 Ea

0003 AB Provide Ext. Painting for Doors &

Door Frames (Louvered) 3 Ea

0010 AA Provide Painting for Conduit/Poles

(1"-4" Diameter)

108 LF

0010 AB Provide Painting for Conduit/Poles

(5"-8" Diameter)

512 LF

Provide Painting for

Balustrades/Pipe Type Railing

(Interior/Exterior/Ladders)

723 SF

0013 AB

Provide Sealants and Caulking

(Masonry Joint Sealant To Include

Cut Out, & Equipment > 12' High)

1,460 LF

0014 AA

Power wash Exterior Brick/CMU

(Muriatic Acid To Include

Equipment > 12' High)

25,997 SF

Seal Exterior Brick/CMU 25,997 SF

Total Amount $__________

Work Hours: 7:30 AM to 4:30 PM, Monday – Friday, exclusive of Federal Holidays

Special Conditions: Note: All Scheduled Utility Outages, parking lot closures shall be submitted in writing, to the Contracting Officer, 7 days in advance.