Atch 5-AF form 66 VLSB 24-0019 V2.xlsx
Air Force Form XLSX spreadsheet 27 KB Posted
- Solicitation number
- FA4803250001
About this file
This is an AF Form 66 Schedule of Material Submittals for the FAMCAMP Expansion project at Shaw AFB (solicitation VLSB 24-0019). The form outlines required contractor submittals including a construction schedule due within one week of Notice to Proceed, light pole and Wi-Fi pole specifications with manufacturer's recommendations required before ordering, light specifications, 95% drawings, as-built drawings, asphalt mix design documentation required at time of paving, and soil compaction test results required prior to paving.
The form corresponds to a small business set-aside pre-solicitation for adding 14 recreational vehicle parking spaces at Shaw Air Force Base Family Camp Site, which will include asphalt drives, electrical systems, concrete RV pads, water, and sewer infrastructure. A site visit is scheduled for February 7 at 10:00 AM EST, with bids due April 7, 2025 at 2:00 PM under an upcoming Invitation for Bids (IFB). This is a Non-Appropriated Fund Instrumentality (NAFI) requirement under the Department of the Air Force Air Combat Command.
View the file
Other versions and copies of AF Form 66
Show all 20
Who attaches AF Form 66
| State | Files |
|---|---|
| Iowa | 1 |
| Massachusetts | 1 |
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NCOC-A
| PROJECT NUMBER : | PROJECT TITLE: | SOLICITATION/CONTRACT NO.: | |
| SCHEDULE OF MATERIAL SUBMITTALS | VLSB 24-0019 | FAMCAMP Expansion | |
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR |
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | OTHER | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DIS- APPROVED | |||||||||||||||||||
| 1 | Construction Schedule | x | Within 1 week of NTP | |||||||||||||||||
| 2 | Light Pole Specs | x | x | Before ordering | ||||||||||||||||
| 3 | Light Specs | x | Before ordering | |||||||||||||||||
| 4 | Wi-Fi Pole Specs | x | x | Before ordering | ||||||||||||||||
| 5 | 95% Drawings | |||||||||||||||||||
| 6 | As-Built Drawings | |||||||||||||||||||
| 7 | Asphalt Mix Design | x | At time of paving | |||||||||||||||||
| 8 | Soil Compaction Test Results | x | Prior to paving | |||||||||||||||||
| 9 | ||||||||||||||||||||
| 10 | ||||||||||||||||||||
| 11 | ||||||||||||||||||||
| 12 | ||||||||||||||||||||
| 13 | ||||||||||||||||||||
| 14 | ||||||||||||||||||||
| 15 | ||||||||||||||||||||
| 16 | ||||||||||||||||||||
| 17 | ||||||||||||||||||||
| 18 | ||||||||||||||||||||
| 19 |
Solicitation No. F38604-99-1480 Attachment 6
AF FORM 66
(Computer Generated) PAGE &P of &N
File details come from the government source that posted it. Updated .