AF Form 66 Repair East Water Tower Booster Pump.xlsx

Air Force Form XLSX spreadsheet 16 KB Posted

Attached to
East Water Tower Pump Station
Solicitation number
FA303020Q0027
Issued by

About this file

This document contains a schedule of material submittals and federal contract opportunity solicitation. The schedule of material submittals outlines various submittal requirements for a base-wide gate valve repair project, including traffic control plans, safety policies, as-built drawings, and manufacturer manuals. The federal contract opportunity solicitation is seeking offers for an above-ground, factory-built pressure booster station at East Water Tower at Goofdellow Air Force Base. The requirement will be solicited as a request for written quotation and evaluated under FAR Simplified Acquisition Procedures. This is a 100% Service-Disabled Veteran Owned Small Business set-aside with a NAICS code of 333914 and size standard of 750 employees. The anticipated award date is September 28, 2020 and period of performance is 150 days after award.

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

File Type Posted
Amendment 0002 - FA303020Q0027.zip ZIP file
Questions and Answers.pdf PDF
East Tower Booster Pump SOW_11Sept20.pdf PDF
Amendment 0001 - FA303020Q0027.zip ZIP file
Base Access Letter template.docx DOCX document
East Tower Booster Pump SOW 09Sep20.pdf PDF
Solicitation - FA303020Q0027.pdf PDF
Pictures of Site.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIAL SUBMITTALSPROJECT: Base-Wide Gate Valve RepairCP# 1035508SOLICITATION/CONTRACT NO.
TO BE COMPLETED BY THE PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL (Ref spec & para no.)CERTIFICATIONOF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'SRECOMMENDATIONSMANUFACTURER'SWARRANTYOPERATINGINSTRUCTIONSSEE PARAOTHERS AS SPECIFIEDREQUIRED SUBMISSION DATEDATE RECEIVED IN CON-TRACTINGDATE TO CIVIL ENGINEER-INGRETURN SUSPENSE DATEFOLLOW UPDATE CONTRACTOR NOTIFIEDCONTRACT-TOR RE- SUBMIT- TALFINAL APPROVALREMARKS
APPROVEDDISAPPROVED
1Para. 1.5 - Working Conditions114 Days Prior (e)FIO
2Para. 1.5.1 - Work Schedule114 Days Prior (e)GA
3Para 1.10 Portable toilet locations1(e)GA
4Para 1.7.1 - Traffic Control Plan1(e)GA
5Para 1.7.2 Company Safety Policy and Accident Prevention Plan1x(c)GA
6Para 1.13 List of Warranties and Certificates1Upon Final Acceptance by GovGA
7Para 1.14.1 Parking & Storage1(e)GA
8Para 1.15.1.1 AF Form 103 Base Work Clearance Request1(e)GA
9Para 1.15.2 Utility Outages114 Days Prior (e)GA
10Para 1.16 Waste Disposal1(d)GA
11Para 2.2 Hazardous Waste Records2x(b)GA
12Para 2.3 Haz. Material List with worksheet for each SDS2x(c)GA
13Para 2.6 Air Emissions Reports2x(b)FIO
14Para 2.7 Construction Waste Management Form2(b)GA
15Para 2.11 Contractor Responsibility2xUpon Final Acceptance by GovGA
16Para 3.3 CPM: Manufacturer's Specifications330 Days After NTPGA
17Para 3.3 e.CPM:Electrical wiring and materials330 Days After NTPGA
18Para 3.3 f. CPM: Panelboard330 Days After NTPGA
19Para 3.3 h. CPM: Reinforced concrete pad plan330 Days After NTPGA
20Para 3.3 i. CPM: Gate valves, risers and material330 Days After NTPGA
21Para 4.3.2 h. - Electrical/Controls430 Days After NTPGA
22Para 4.4 b. Lesson Planx430 Days before end of POPGA
23Para 4.5 a. As-Built Drawingsx4(b)GA
24Par 4.5 b. Manufacturer's Manuals and Materialsx4(b)GA
AF Form 66, SEP 86
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
(e) Prior to start of work.
(f) Weekly.

PAGE &P OF &N

FORM66.xls