AF Form 66 _ Bldg. 170 Boilers and Pump Replacement.pdf
PDF 84 KB Posted
- Attached to
- Selfridge _ Bldg. 170 Boilers Federal contract opportunity
- Solicitation number
- W50S8520R0006
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Addendum 01.pdf | ||
| BLDG 170 Boilers _ Site Visit Sign In.pdf | ||
| Site Visit Minutes _ 170 Boilers.pdf | ||
| Amendment 1.pdf | ||
| Wage Determination _ 8May2020.pdf | ||
| Solicitation _ W50S8520R0006 _ Bldg 170 Boilers and Pumps Replacement.pdf | ||
| Division 01 Spcifications.pdf | ||
| SELFRIDGE Design Standards 10Nov2017.pdf | ||
| SOW _ Bldg 170 Boilers and Pumps Replacement.pdf | ||
| Instruction to Offerors _ Bldg 170 Boilers.pdf | ||
| Drawings 192044 MECH REV 00.pdf | ||
| Bldg 170 HVAC DDC _ Brand Name Justification ___ REDACT.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO.
VGLZ 192044
APPROVED DISAPPROVED
01.00.00 Submittal Schedule - AF Form 66 10
01.00.00
Transfer and Acceptance of DOD Real Property - DD Form 1354 60
01.00.00
Contractor Hazardous Material Identification - SANGB Form 23 10
01.00.00
Solid Waste Recycling and Disposal Reporting Form 72 60
01.00.10 Affirmative Procurement Reporting Form 60
01.00.00 DD Form 1354 60
01.32.00
Construction Schedule AF 3064 submittals 10
01.32.33 Construction Photos 45
01.35.23 Safety Documentation as stated 10
01.40.00 Schedule of Test and Inspections 21
01.40.00 Permits, Licenses and Certificates 10
01.40.00 Quality Control Plan 10
01.74.00 Warranties 10
01.75.00
Starting System -Testing, Adjusting & Balancing Reports 60
15 01.78.23 O & M Data 15
16 01.78.39 Project Record Documents Close out Documantation 60
17 01.79.00 Instructional Training Program as applicable 60
Product Data 18 23.05.13
Common Motor Requirements for HVAC Equipment
REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
RETURN
SUSPENSION
DATE
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
FOLLOW-UP
SUBMITTAL
REQUIRED
BY XX DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING
DATE
TO
CIVIL
ENGINEERING
DATE CONTRACTOR NOTIFIED
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
C
AT
AL
O
G D
AT
A
LI
N
E N
U M
BE
R
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
M
AT
ER
IA
L o r
D
AT
A
SH
O
P D
R
AW
IN
G
S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
ER
'S
R
EC
O M
M
EN
D
AT
IO
N
S
Spec Section
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
AN
D
C
LO
SE
O
U T
SOLICITATION/CONTRACT NO.PROJECT TITLE
Building 170 - Replace Boilers and Pumps
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
APPROVED DISAPPROVED
REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
RETURN
SUSPENSION
DATE
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
FOLLOW-UP
SUBMITTAL
REQUIRED
BY XX DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING
DATE
TO
CIVIL
ENGINEERING
DATE CONTRACTOR NOTIFIED
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
C
AT
AL
O
G D
AT
A
LI
N
E N
U M
BE
R
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
M
AT
ER
IA
L o r
D
AT
A
SH
O
P D
R
AW
IN
G
S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
O M
M
EN
D
AT
IO
N
S
Spec Section
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
AN
D
C
LO
SE
O
U T
SOLICITATION/CONTRACT NO.PROJECT TITLE
Building 170 - Replace Boilers and Pumps
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
Product Data 15
18 23.05.17 Sleeves and Sleeve Seal for HVAC Piping 19 Product Data for General Duty Valves 15 20 23.05.18 Escutcheons for HVAC Piping 21 Product Data as req'd 22 23.05.19 Meters and Gages for HVAC Piping
Product Data for Meters and Gages as req'd Shop Drawing as req'd O & M Data as req'd Warranty as req'd
23 23.05.23 General-Duty Valves for HVAC Piping as req'd Product Data for General Duty Valves as req'd
24 22.05.29 Hangers & Supports for HVAC Piping & Equipment Product Data as req'd Shop Drawing as req'd O & M Data as req'd Warranty as req'd
23.05.53
Identifcation for HVAC Piping and Equipment
Product Data as req'd Sample for ID as req'd Equipment Label Schedule / Scheme as req'd Valve Schedule as req'd
26 23.05.93 Testing, Adjusting, & Balancing for HVAC Qualification Data Contract Document Examination Report 60 Certified TAB Reports 60
27 23.07.19 HVAC Piping Insulation
Product Data on Insulation as req'd Samples of Insulation as req'd
28 23.09.00 Instrumentation & Control for HVAC Product Data on DDC System & Controls 15 Shop Drawing 15 Data Comm. Protocol Certificates 15
APPROVED DISAPPROVED
REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
RETURN
SUSPENSION
DATE
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
FOLLOW-UP
SUBMITTAL
REQUIRED
BY XX DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING
DATE
TO
CIVIL
ENGINEERING
DATE CONTRACTOR NOTIFIED
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
C
AT
AL
O
G D
AT
A
LI
N
E N
U M
BE
R
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
M
AT
ER
IA
L o r
D
AT
A
SH
O
P D
R
AW
IN
G
S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
O M
M
EN
D
AT
IO
N
S
Spec Section
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
AN
D
C
LO
SE
O
U T
SOLICITATION/CONTRACT NO.PROJECT TITLE
Building 170 - Replace Boilers and Pumps
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
29 23.09.23.11 Control Valves Product Data 15 Shop Drawing 15 O & M Data 15 Warranty 15
30 23.09.23.12 Control Dampers Product Data as req'd Shop Drawing as req'd O & M Data as req'd Warranty as req'd
31 23.09.93.11 Sequence of Operation for HVAC DDC Control Sequences 15
33 23.21.13 Hydronic Piping Product Data on the following Material: 15 Air Control Devices 15 Hydronic Specialties 15 O & M Data 15
34 23.21.16 Hydronic Piping Specialities Product Data 15 Shop Drawing 15 Warranty 15 O & M Data 15
35 23.21.23 Hydronic Pumps Product Data 15 Shop Drawing 15 Warranty 15 O & M Data 15
36 23.25.13 Water Treatment for Closed-Loop Hydronic Systems Product Data 15 Shop Drawing 15 Warranty 15 O & M Data 15
37 23.52.16 Condensing Boilers Product Data 15 Shop Drawing 15 Warranty 15 O & M Data 15
APPROVED DISAPPROVED
REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
RETURN
SUSPENSION
DATE
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
FOLLOW-UP
SUBMITTAL
REQUIRED
BY XX DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING
DATE
TO
CIVIL
ENGINEERING
DATE CONTRACTOR NOTIFIED
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
C
AT
AL
O
G D
AT
A
LI
N
E N
U M
BE
R
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
M
AT
ER
IA
L o r
D
AT
A
SH
O
P D
R
AW
IN
G
S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
O M
M
EN
D
AT
IO
N
S
Spec Section
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
AN
D
C
LO
SE
O
U T
SOLICITATION/CONTRACT NO.PROJECT TITLE
Building 170 - Replace Boilers and Pumps
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
38 26.05.19 Low-Voltage Electrical Power Conductors & Cables Product Data for Each Type of Cable as req'd
39 26.05.26 Grounding & Bonding for Electrical Systems O & M Data as req'd
40 26.05.33 Raceway & Boxes for Electrical Systems Product Data on the following Material: as req'd Metal Conduit & Tubing as req'd Metal Wireways as req'd Surface Raceways as req'd Boxes, Enclosures, Cabinets as req'd
41 26.24.16 Panelboards Product Data as req'd Shop Drawings as req'd O & M Data as req'd Warranty as req'd
42 26.28.16 Enclosed Switches Product Data as req'd Shop Drawings as req'd O & M Data as req'd
43 26.29.13 Enclosed Controllers Product Data as req'd Shop Drawings as req'd O & M Data as req'd