Drawings 192044 MECH REV 00.pdf

PDF 393 KB Posted

Attached to
Selfridge _ Bldg. 170 Boilers Federal contract opportunity
Solicitation number
W50S8520R0006
Issued by
Department of the Army Michigan Army National Guard

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5

A

B

C

D

A

B

C

D

SHEET OF

Engineer/Consultants

Sheet Title

REPLACE

BOILERS

AND PUMPS

B-170

MECHANICAL

DETAILS &

SCHEDULE

1 3

REVISIONS:

Project Number:

File:

Drawn By:

Designed By:

Checked By: T. Resh

T. Resh

H. Bauzon

VGLZ 192044

Mark Date Description

PROJECT

Scale: NOT TO SCALE

Date: 19 NOV 2019

NOTES:

PUMP SCHEDULE

MARK LOCATION SERVICE

BASED ON

TYPE SERIES FT.MODEL GPM

REMARKS

PHASE

VOLTAGE

MFR.

CAPACITY MOTOR

NOTES:

1. PROVIDE WITH DISCONNECT SWITCH.

2. PROVIDE WITH MOUNTING SUPPORT AS NEEDED.

3. PUMP IS FIELD WIRED FROM BOILER. REFER TO BOILER MANUFACTURER'S WIRING INSTRUCTIONS.

4. PUMP SHALL COMMUNICATE W/ BASE ALC DDC SYSTEM BACNET INTERFACE SHALL BE PROVIDED.

5. ALL PUMPS WILL HAVE INTEGRAL VFDs ON THE MOTORS.

6. ADD DDC / BACNET TO CONTROL VFD.

HOT WATER BOILER SCHEDULE

MARK LOCATION SERVICE

REMARKS

PHASE

VOLTAGE

NOTES:

1. PROVIDE ACID NEUTRALIZING KIT FOR CONDENSATE DRAIN.

2. FOR BOILER CIRCULATION PUMPS, SEE PUMP SCHEDULE FOR

DETAILS.

3. PROVIDE WITH VERTICAL 4" PVC AIR INLET AND 4" PVC FLUE VENT.

4. PROVIDE WITH SMART SYSTEM CONTROL AND BMS GATEWAY

(BACNET COMPATIBLE).

5. BOILER TO BE PROVIDED WITH FLOW SWITCH.

6. PROVIDE W/ EXPANSION TANK(FLEXCON INTAUO-ASME-14

GAL./11.5 GAL. ACCEPTANCE

7. PROVIDE WITH AIR SEPERATOR(HONEYWELL SPARCO - PV150 -1.5")

8. PROVIDE W/ CHEMICAL SHOT FEEDER SYSTEM

BASED ON

MAKE/MODELTYPE

INPUT MBH

MAX./MIN. AFUE %

110°F RWT

MAX OUTPUT

MBH @

IN. W.G.

GAS

PRESS.

120V/1ØB170-1

B170-2

BOILER ROOM HEATING HW HIGH EFFICIENCY LOCHINVAR

KBN 300

OR EQUAL

300/60 94.0 280 4"-14" - 1, 2, 3, 4, 5, 6, 7, 8

NET

AHRI

MBH

TOTAL

AMPS

2.7

HP AMPS

CHW BELL & GOSSETT E-90 1, 2MECH ROOM INLINE

CHW BELL & GOSSETTMECH ROOM INLINE

RPM

E-90 1, 2

BP-170-1 HHWMECH ROOM INLINE

1,2,3,4,5,6BP-170-2 HHWMECH ROOM INLINE

TO FLOOR

DRAIN

FLOOR MOUNTED BLADDER TYPE EXPANSION

TANK AND AIR SEPARATOR PIPING DIAGRAM

NTS (ALL NEW)

WATER MAKEUP

CHEMICAL

SHOT FEEDER

HS

HR

PRESSURE

GAUGE

AUTOMATIC

AIR VENT

CP-170-1

CP-170-2

BELL & GOSSETT

BELL & GOSSETT

BP-170-3 HHWMECH ROOM INLINEBELL & GOSSETT

1,2,3,4,5,6

1,2,3,4, REDUCED PRESSURE ZONE

BACKFLOW PREVENTER

GLOBE VALVE

AUTOMATIC AIR VENT WITH

NEW HIGH CAPACITY

FLOAT TYPE AUTOMATIC

AIR VENT EQUAL TO

METRAFLEX MV-15A

E-90

E-90

E-90

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

MATCH

EXISTING

AutoCAD SHX Text 127th WING/CIVIL ENGINEER

AutoCAD SHX Text

SELFRIDGE AIR

AutoCAD SHX Text

NATIONAL GUARD

AutoCAD SHX Text

BASE, MICHIGAN

AutoCAD SHX Text

1. THE PLAN AND UNDERGROUND THE PLAN AND UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE GOVERNMENT MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN-SERVICE OR ABANDONED. THE GOVERNMENT FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED ALTHOUGH THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM AVAILABLE INFORMATION.

AutoCAD SHX Text NOTE: FOR INFORMATION PURPOSES ONLY. NOT FOR DESIGN OR CONSTRUCTION. FIELD VERIFY DIMENSIONS PRIOR TO DESIGN AND PRIOR TO CONSTRUCTION.

A

B

C

D

A

B

D

SHEET OF

Engineer/Consultants

Sheet Title

REPLACE

BOILERS

AND PUMPS

B-170

NEW HEATING

HW BOILERS

PIPING &

CONTROLS

2 3

REVISIONS:

Project Number:

File:

Drawn By:

Designed By:

Checked By: T. Resh

T. Resh

H. Bauzon

VGLZ 192044

Mark Date Description

PROJECT

Scale: NOT TO SCALE

Date: 19 NOV 2019

NOTES:

WELD NECK

FLANGE

CHECK

VALVE

LONG RADIUS

ELBOW

BUTTERFLY

VALVE

SIDE VIEW

FLANGE

WELD NECKWELD NECK

FLANGE

PLAN VIEW

PARALLEL PUMP INSTALLATION

NOT TO SCALE

HEATING PLANT PIPING DIAGRAM

NOT TO SCALE

BP-170-1

B-170-1CONDENSATE TRAP

REDUCER AS

REQUIRED (TYP.)

TEMPERATURE AND PRESSURE RELIEF VALVE. PIPE FULL SIZE

TO FLOOR DRAIN

PRESSURE GAUGE

3" CONCRETE

HOUSEKEEPING PAD 3/4" ACIDIC CONDENSATE

ROUTE TO ACID

NEUTRALIZATION TANK

CONDENSATE ACID WASTE

NEUTRALIZATION TANK (BY BOILER

MANUFACTURER)

EX. FLOOR DRAIN

NON-SLAM CHECK

VALVE

BOILER CIRC. PUMP

3/4" DRAIN COCK W/ THREADED HOSE CONN. AND

CAP (TYP.)

BLADDER

EXPANSION

TANK

PRESSURE

GAUGE

B&G #87 AIR

VENT OR

EQUAL

HWS TEMP. SENSOR BY

TEMPERATURE CONTROLS

CONTRACTOR. MOUNT IN

THERMOWELL.

TAP OFF

SIDE

CIRCUIT SETTER BALANCING

VALVE

DIRT LEG (TYP.)

TO FLOOR DRAIN

BOILER FLOW SWITCH. MOUNT IN

PIPE WELL

LOCAL VENT W/

GOOSENECK

UNION (TYP.) 1 1/4"G SITE

GLASS

CHECK

VALVE

VENT STACK

THERMOMETER (TYP.)

COMBUSTION AIR INTAKE

BUTTERFLY

ISOLATION VALVE

(TYP.)

PLUG VALVE

STRAINER

HWR TO

SYSTEM

B-170-2

EXTEND TO FLOOR DRAIN

FS FS

HW

SHW

R

HWR HWS

HWSHWS

T

HWR

HWS BP-170-2

HWS

TO AHU

COIL

TO VAVs

BP-170-3

BOILER CIRC. PUMP

FLOOR MOUNTED BLADDER

EXPANSION TANK WITH SHOT

FEEDER AND AIR SEPARATOR

AND MAKEUP WATER

CONNECTION.

3 WAY VALVE

HWR

HWS

SEE SHEET 1

P

NEW DIFFRERENTIAL PRESSURE SENSOR

LOCATE SOUTH LAB

NEAR TU-7 BOX

AutoCAD SHX Text 127th WING/CIVIL ENGINEER

AutoCAD SHX Text

SELFRIDGE AIR

AutoCAD SHX Text

NATIONAL GUARD

AutoCAD SHX Text

BASE, MICHIGAN

AutoCAD SHX Text

1. THE PLAN AND UNDERGROUND THE PLAN AND UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE GOVERNMENT MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN-SERVICE OR ABANDONED. THE GOVERNMENT FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED ALTHOUGH THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM AVAILABLE INFORMATION.

AutoCAD SHX Text NOTE: FOR INFORMATION PURPOSES ONLY. NOT FOR DESIGN OR CONSTRUCTION. FIELD VERIFY DIMENSIONS PRIOR TO DESIGN AND PRIOR TO CONSTRUCTION.

AutoCAD SHX Text

REDUCER

AutoCAD SHX Text

NEEDLE VALVE

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text

PRESSURE GAUGE

AutoCAD SHX Text

PUMP

AutoCAD SHX Text

PUMP

AutoCAD SHX Text

REDUCER

PUMP

A

B

C

D

A

B

D

SHEET OF

Engineer/Consultants

Sheet Title

REPLACE

BOILERS

AND PUMPS

B-170

NEW HEATING

HW BOILERS

PIPING &

CONTROLS

3 3

REVISIONS:

Project Number:

File:

Drawn By:

Designed By:

Checked By: T. Resh

T. Resh

H. Bauzon

VGLZ 192044

Mark Date Description

PROJECT

Scale: NOT TO SCALE

Date: 19 NOV 2019

NOTES:

115VGRD

DDC CONTROLLER & PANEL WITH OPERATOR INTERFACE

CSR

BU

RN

ER

AC

TI

VE

ST

AT

US

CO

MM

ON

AL

AR

M

ST

AT

US

FA

ILU

RE

BOILER CP

BU

RN

ER

AC

TI

VE

ST

AT

US

SY

ST

EM

EN

AB

LE

CO

MM

ON

AL

AR

M

ST

AT

US

FA

ILU

RE

SUN

SHIELD

OA TEMP.

REFERENCE

SENSOR

G

LO

BA

L O

A

TE

MP

RE

FE

RE

NC

E

SYSTEM DIAGRAM AND SEQUENCE BASED ON LOCHINVAR, KBN SERIES MFR TECHNOLOGY

B-170-1

MEMBER 1 BP-170-2

HP-170-2

NORTH FACE OF

BUILDING EXTERIOR

LOOP TEMP. RANGE 120°F-180°F BASED

ON RESET - 60°F-0°F AMBIENT

TO BLDG. RADIATORS

SECONDARY LOOP

FROM BLDG. RADIATORS

SECONDARY LOOP

VFD

ST

AT

US

AL

AR

M

HS

T

EM

P

HR

T

EM

P

SEQUENCE OF OPERATIONS:

DI

FF

ER

EN

TI

AL

PR

ES

SU

RE

BP-170-1

BOILER AND BOILER FUEL SYSTEMS EMERGENCY STOP:

THE FOLLOWING SHALL BE PROVIDED BY AND COORDINATED BY THE TEMPERATURE

CONTROLS CONTRACTOR.

THE FOLLOWING SEQUENCE SHALL BE INITIATED UPON ACTIVATION OF MAIN BOILER PLANT

EMERGENCY STOP CONTROL SWITCHES TO BE LOCATED AT THE EGRESS DOORWAYS TO THE

MECH/BOILER ROOM PER CODE. THESE SWITCHES SHALL BE PUSH-PULL, MAINTAINED

CONTACT TYPE, WITH MUSHROOM HEADS, AS NORMALLY PROVIDED FOR THIS SERVICE.

UPON ACTIVATION OF THE E-STOP SWITCH, THE BOILERS SHALL BE COMMANDED OFF AND THE

DDC SHALL CONTINUE TO RUN THE ACTIVE PRIMARY AND SECONDARY HEATING PUMPS UNTIL

THE SECONDARY HEATING LOOP SUPPLY TEMPERATURE DROPS 20°F (ADJ) BELOW LOOP

TEMPERATURE SETPOINT IN ORDER TO DISSIPATE THE RESIDUAL HEAT IN THE FORMERLY

ACTIVE BOILERS AT WHICH POINT THE PUMPS WILL BE COMMANDED OFF.

POWERED OPEN/ NORMALLY CLOSED SAFETY SHUT-OFF SOLENOID VALVE LOCATED ON THE

MAIN NATURAL GAS BOILER FUEL SOURCE SHALL BE INTERLOCKED TO CLOSE WHEN THE

EMERGENCY STOP IS ACTIVATED.

PROVIDE AN INTERLOCK TO THE LOCAL FIRE ALARM SYSTEM PANEL IF PRESENT TO ACHIEVE THE

SAME SEQUENCE AS DESCRIBED ABOVE UPON FIRE ALARM STATUS. COORDINATE WITH THE

FIRE ALARM SYSTEM VENDOR/CONTRACTOR.

ST

AT

US

AL

AR

M

ST

AR

T/

ST

OP

HIGH-EFFICIENCY HEATING HOT WATER

BOILERS CONTROL DIAGRAM

NOT TO SCALE

ST

AR

T/S

TO

P

HR

HR

HR

DI DI DI DI DI DIDO DO AI AI AI AI

M

B-170-1

LEADER

BOILER CP

CSR

M

CSR

M

T

T

TT

F

HS

HS

T

CSR

M

DI DO

BOILERS & HEATING PUMPS:

BOILER SYSTEM RUN CONDITIONS:

THE BOILER SYSTEM SHALL BE ENABLED TO RUN WHENEVER:

· A DEFINABLE NUMBER OF HOT WATER COILS NEED HEATING.

· RUNS YEAR ROUND.

TO PREVENT SHORT CYCLING, THE BOILER SYSTEM SHALL RUN FOR AND BE OFF FOR MINIMUM ADJUSTABLE TIMES

(BOTH USER DEFINABLE), UNLESS SHUTDOWN ON SAFETIES OR OUTSIDE AIR CONDITIONS.

THE BOILER SHALL RUN SUBJECT TO ITS OWN INTERNAL SAFETIES AND CONTROLS.

THE BOILER SYSTEM SHALL ALSO RUN FOR FREEZE PROTECTION WHENEVER THE OUTSIDE AIR TEMPERATURE IS

LESS THAN 38°F (ADJ.).

ALARMS SHALL BE PROVIDED AS FOLLOWS:

· FAILURE: COMMANDED ON, BUT THE STATUS IS OFF.

· RUNNING IN HAND: COMMANDED OFF, BUT THE STATUS IS ON.

BOILER LEAD/LAG OPERATION:

THE BOILER OPERATING CONTROLLERS TO BE SET AT 190°F TO OPERATE AS A SECONDARY HIGH LIMIT.

THE TWO BOILERS SHALL OPERATE IN A LEAD/LAG FASHION ALONG WITH THEIR RESPECTIVE BOILER PUMPS.

· THE LEAD BOILER SHALL RUN FIRST.

· AS HOT WATER TEMPERATURE DROPS BELOW A LAG BOILER SETPOINT, THE LAG BOILER SHALL STAGE ON

AND RUN IN UNISON WITH THE LEAD BOILER TO MAINTAIN HOT WATER TEMPERATURE SETPOINT.

· AS HOT WATER TEMPERATURE DROPS BELOW A SECOND LAG BOILER SETPOINT (IF AVAILABLE), THE SECOND

LAG BOILER SHALL STAGE ON AND RUN IN UNISON WITH THE LEAD & LAG BOILER TO MAINTAIN HOT WATER

TEMPERATURE SETPOINT.

· AS HOT WATER TEMPERATURE RISES BACK TO 20°F (ADJ.) ABOVE SETPOINT, THE LAG BOILER SHALL STAGE

OFF.

· AS HOT WATER TEMPERATURE RISES BACK TO 10°F (ADJ.) ABOVE SETPOINT, THE LAG BOILER SHALL STAGE

OFF.

THE DESIGNATED LEAD BOILER SHALL ROTATE UPON ONE OF THE FOLLOWING CONDITIONS: (USER SELECTABLE):

· MANUALLY THROUGH A SOFTWARE SWITCH

· IF BOILER RUNTIME (ADJ.) IS EXCEEDED

· DAILY

· WEEKLY

· MONTHLY

ALARMS SHALL BE PROVIDED AS FOLLOWS:

· LOW WATER TEMPERATURE

· BOILER FAILURE

HOT WATER SUPPLY TEMPERATURE SETPOINT RESET: ( BY TWO METHODS)

1) THE HOT WATER SUPPLY TEMPERATURE SETPOINT SHALL RESET USING A TRIM AND

RESPOND ALGORITHM BASED ON HEATING REQUIREMENTS. AS THE FACILITY'S DEMAND FOR

HEATING GOES BEYOND A USER DEFINABLE AMOUNT OF REQUESTS, THE SETPOINT SHALL

RESET TO A HIGHER VALUE (ADJ.). ONCE THE HEATING REQUESTS ARE SATISFIED THE

SETPOINT SHALL GRADUALLY LOWER OVER TIME TO REDUCE HEATING ENERGY USE.

2) OUTSIDE AIR RESET. (USER SELECTABLE)

PRIMARY HOT WATER TEMPERATURE MONITORING:

THE FOLLOWING TEMPERATURES SHALL BE MONITORED:

· PRIMARY HOT WATER SUPPLY.

· PRIMARY HOT WATER RETURN.

ALARMS SHALL BE PROVIDED AS FOLLOWS:

· HIGH PRIMARY HOT WATER SUPPLY TEMP: IF GREATER THAN 200°F (ADJ.).

· LOW PRIMARY HOT WATER SUPPLY TEMP: IF LESS THAN 130°F (ADJ.).

AHU COIL - HOT WATER LOOP:

HOT WATER VALVE:

THE HOT WATER VALVE SHALL MODULATE TO MAINTAIN THE DISCHARGE AIR SETPOINT AS

MEASURED BY THE TEMPERATURE SENSOR.

HP-170-3

HP-170-1

SECONDARY HOT WATER PUMPS(RADIATION LOOP(CP-18-1 & CP-18-1A)

HOT WATER PUMPS: THE HOT WATER PUMPS ARE VARIABLE SPEED PUMPS. EACH PUMP MAY BE

STARTED AND STOPPED MANUALLY AT ITS ASSOCIATED MOTOR STARTER BY PLACING THE

HAND-OFF-AUTO SWITCH IN THE HAND POSITION. EACH PUMP MAY ALSO BE STARTED AND STOPPED

AUTOMATICALLY BY THE DDC SYSTEM WHEN THE HAND-OFF-AUTO SWITCH IS IN THE AUTO

POSITION.

ONE HOT WATER PUMP SHALL OPERATE CONTINUOUSLY. THE PUMPS SHALL OPERATE IN A

LEAD-LAG MANNER AS PROGRAMMED THROUGH THE DDC SYSTEM TO ENSURE EQUAL RUN-TIME ON

EACH PUMP. STATUS OF EACH PUMP SHALL BE MONITORED BY THE DDC SYSTEM THROUGH EACH

PUMPS ASSOCIATED CURRENT SENSOR. IF THE OPERATING PUMP SHOULD FAIL AS INDICATED BY

THE CURRENT SENSOR, THE DDC SYSTEM WILL ISSUE A STOP COMMAND TO THAT PUMP AND A

START COMMAND TO THE PUMP ACTING AS STAND-BY. THE DDC SYSTEM WILL ALSO INITIATE A

PUMP FAILURE ALARM. LEAD PUMP SHALL MODULATE TO MAINTAIN A DIFFERENTIAL PRESSURE

SETPOINT OF 7 PSI ( ADJUSTABLE)

TO VAV BOXES

TO AHU-170-1

HEATING COIL

DI DO

CSR

M

ST

AT

US

AL

AR

M

ST

AR

T/S

TO

P

DO AO

SE

TP

OI

NT

ON

/O

FF

VFD

DI DO AO

SE

TP

OI

NT

ON

/O

FF

MOTOR

STARTER

VFD

VFD

AO

SE

TP

OI

NT

AO

SE

TP

OI

NT

AutoCAD SHX Text 127th WING/CIVIL ENGINEER

AutoCAD SHX Text

SELFRIDGE AIR

AutoCAD SHX Text

NATIONAL GUARD

AutoCAD SHX Text

BASE, MICHIGAN

AutoCAD SHX Text

1. THE PLAN AND UNDERGROUND THE PLAN AND UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE GOVERNMENT MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN-SERVICE OR ABANDONED. THE GOVERNMENT FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED ALTHOUGH THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM AVAILABLE INFORMATION.

NOTE: FOR INFORMATION PURPOSES ONLY. NOT FOR DESIGN OR CONSTRUCTION. FIELD VERIFY DIMENSIONS PRIOR TO DESIGN AND PRIOR TO CONSTRUCTION.

Sheets and Views
192044 MECH REV 00-Model
192044 MECH REV 00-S1 of 3
192044 MECH REV 00-S2 of 3
192044 MECH REV 00-S3 of 3

File details come from the government source that posted it. Updated .