This bridge inspection report details the condition of and recommended improvements for Structure No. 5570-110P, known as the Black Creek Bridge within Natchez Trace Parkway. The 200-foot long, six-span concrete bridge over Black Creek was built in 1942 and last inspected on March 12, 2022. Deficiencies include cracking and spalling of the concrete deck and beams, efflorescence, and scour around piers. Recommended repairs within the next five years consist of sealing cracks, coating exposed rebar, and placing riprap to prevent further erosion at Pier 3. The estimated preliminary rehabilitation cost is provided. Routine maintenance involves periodically removing debris from the deck. The bridge is posted for loads with an inventory rating of 30 tons and operating rating of 50 tons.

The related federal contract opportunity is a pre-solicitation for Natchez Trace Parkway drainage improvements including projects NP-NATR 3N17 and 3H26 to be conducted by the Department of Transportation Federal Highway Administration. No further details are provided on the required products or services.

View the file

Other files

File Type Posted
NTP 3H2 3 5-A.pdf PDF
NATR BMS FY20(1)_As-Built Drawings-Final.pdf PDF
NTP 3H2 3 5-B.pdf PDF
5570-092P-2020.pdf PDF
5570-093P-2020.pdf PDF
5570-098P-2020.pdf PDF
5570-106P-2022.pdf PDF
5570-105P-2018.pdf PDF
5570-103P-2022.pdf PDF
5570-094P-2020.pdf PDF
5570-106P-2018.pdf PDF
5570-096P-2020.pdf PDF
5570-110P-2018.pdf PDF
5570-097P-2022.pdf PDF
5570-101P-2022.pdf PDF
5570-103P-2018.pdf PDF
5570-097P-2018.pdf PDF
5570-107P-2018.pdf PDF
5570-104P-2020.pdf PDF
5570-093P-2022.pdf PDF
5570-099P-2018.pdf PDF
5570-091P-2022.pdf PDF
5570-108P-2022.pdf PDF
5570-109P-2022.pdf PDF
Amendment 0002 - NP-NATR 3N17 3H26.pdf PDF
5570-092P-2022.pdf PDF
5570-095P-2020.pdf PDF
5570-100P-2020.pdf PDF
5570-099P-2022.pdf PDF
5570-102P-2020.pdf PDF
5570-101P-2018.pdf PDF
5570-095P-2022.pdf PDF
5570-094P-2022.pdf PDF
5570-107P-2022.pdf PDF
5570-100P-2022.pdf PDF
5570-104P-2022.pdf PDF
5570-108P-2018.pdf PDF
5570-109P-2018.pdf PDF
5570-105P-2022.pdf PDF
5570-096P-2022.pdf PDF
5570-102P-2022.pdf PDF
5570-098P-2022.pdf PDF
Amendment 001 - NP NATR 3N17 3H26.pdf PDF
5570-090P-2020.pdf PDF
L_Pavement Rehabilitation and Safety Improvements_NPS CE.pdf PDF
5570-090P-2022.pdf PDF
5570-091P-2020.pdf PDF
G_NATR 2019 Traffic Counts MP 121 and 204.xlsx XLSX spreadsheet
B_CULVERT ASSESSMENT SUMMARY AND RECOMMENDATIONS.xlsx XLSX spreadsheet
A_MS NP NATR 3N17 3H26_ETC_concept plans.pdf PDF
Show 40 more

Latest 50 of 59 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRIDGE INSPECTION REPORT

BLACK CREEK BRIDGE

NATCHEZ TRACE PARKWAY OVER BLACK CREEK

NATCHEZ TRACE PARKWAY

LS

STRUCTURE NO. 5570-110P

INSPECTION TYPE: ROUTINE

INSPECTION DATE: 3/12/2022

WU

Report prepared by:

Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov

MILE POINT: 170.78

KILOMETER POINT: 52.05

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5570-110P

BLACK CREEK BRIDGE INSPECTION DATE : 03/12/2022

226 PRIORITY OF IMPROVEMENT D

A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.

B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

Item No.

Maintenance Recommendations

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT UNIT

COST

PRELIM.

COST

ESTIMATE

58.7

PERIODICALLY REMOVE DEBRIS FROM DECK.

PRELIM. MAINTENANCE TOTAL :

Item No.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST

PRELIM. COST ESTIMATES

REHAB RECONSTR

58.2,58.3 SEAL CRACKS DUE TO ADHESION FAILURE OF

JOINTS AT DECK ENDS WITH APPROVED

SEALANT.

58.1,59.3 CLEAN AND COAT EXPOSED REBAR IN SPAN #4

WITH APPROVED PROTECTIVE SEALANT.

58.3 SEAL CRACKS ON WEARING SURFACE AT

APPROACHES AND OVER STRUCTURE.

60.17 PLACE ENGINEERED RIPRAP AT UPSTREAM

END OF PIER #3 TO PREVENT FURTHER

EROSION AND SCOUR.

CONTRACT COSTS FOR MOBILIZATION,

TRAFFIC CONTROL, AND CONTINGENCIES.

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5570-110P

BLACK CREEK BRIDGE INSPECTION DATE : 03/12/2022

226 PRIORITY OF IMPROVEMENT D

A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.

B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

COST ESTIMATE SUMMARY

PRELIM. MAINTENANCE TOTAL :

PRELIM. REHABILITATION TOTAL :

PRELIM. RECONSTRUCTION TOTAL : ..

TOTAL ITEMIZED COSTS:

PRELIMINARY ESTIMATE TOTAL * :

(*Includes typical contract costs for mobilization, traffic control and design/construction engineering: but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for planning purposes only; they should not be used as a complete or final engineers estimate.)

Remarks : Cost estimates assume that the recommended actions will be combined with similar work being performed on other structures.

STRUCTURE LOAD RATING STRUCTURE NO. 5570-110P

BLACK CREEK BRIDGE INSPECTION DATE: 03/11/2022

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 19 17 32 29

HS 30 27 50 45

TYPE 3 26 24 43 39

TYPE 3S2 43 39 73 66

TYPE 3-3 55 50 92 83

DESIGN LOADING: 2 - H 15

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION: 08/28/2015

LOAD RATING CONTROLLED BY: BOTTOM SLAB

REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-110P

BLACK CREEK BR DGE INSPECTION DATE: 03/11/2022

STRUCTURE IDENTIFICATION

(201) PARK: NATCHEZ TRACE PARKWAY

(202) STRUCTURE NAME:..............BLACK CREEK BRIDGE

(203) STRUCTURE KIND:............... 1 - BRIDGE

(204) STRUCTURE NUMBER:.........5570-110 P

4 - SOUTHEAST(205) NPS REGION:

(206) ROUTE CODE NUMBER:

(207) ROAD SECTION NO:............. 110P

(208) NPS ROAD CLASS:............... 1 - PRINCIPAL PARK ROAD

(209) WITHIN NPS BNDRY?:.......... Yes

(210) OPERATING UNIT:.................KOSCIUSKO

(211) PROJECT NO(S):................... 3K2

(212) DRAWING NUMBERS:...........2044B

(21) MAINTAINED BY:......................66 - NATIONAL PARK SERVICE

(22) OWNER:................................... 66 - NATIONAL PARK SERVICE

(1) STATE:

(2) STATE HWY. AGENCY DIST:

(3) COUNTY CODE:

(4) CITY / PLACE CODE:

(5) INVENTORY ROUTE:

(6) FEATURES INTERSECTED:

(7) FACILITY CARRIED:

(8) STATE STRUCTURE NO:

(9) LOCATION:

(10) INV. RTE. - MIN. VERT. CLR:

(11) MILE POINT:

(27) YEAR BUILT:

(106) YEAR RECONSTRUCTED:

(20) TOLL:

(37) HISTORIC DESIGNATION:

284 - MISSISSIPPI

28007 ATTALA

00000

1 6 1 00001 0

BLACK CREEK

NATCHEZ TRACE PARKWAY

5570110P0000000

5.1 MILES NORTH OF MS ROUTE 12

99.99 FT ( 99.99 M)

170.7 (KM PT: 52.05)

3 - ON FREE ROAD

5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL:..........2 - CONCRETE CONTINUOUS (44A) APPR. STR. MATERIAL:............ 0 - Other

(43B) MAIN STR. TYPE:.................. 01 - SLAB (44B) APPR. STR. TYPE:.................... 00 - OTHER

(45) NO. OF MAIN SPANS:..............006 (46) NO OF APPROACH SPANS:

(48) MAX. SPAN LENGTH:..............36 FT ( 11 M)

(49) STRUCTURE LENGTH:........... 200. FT ( 61 M) (108) WEAR SURFACE/PROTECT SYSTEM:

(216A) ABUTMENT #1 FDN:........... 3 - SPREAD FOOTING ON PILES A) TYPE WEARING SURFACE:.. 6 - BITUMINOUS

(216B) ABUTMENT #2 FDN:........... 3 - SPREAD FOOTING ON PILES B) TYPE MEMBRANE:................. 0 - NONE

(217A) PREDOM. PIER FDN:.......... 3 - SPREAD FOOTING ON PILES C) TYPE PROTECTION:.............. 0 - NONE

(217B) SECOND. PIER FDN:.......... 3 - SPREAD FOOTING ON PILES (218) IS SALT USED?.......................... NO

(107) DECK TYPE:.......................... 1 - CONCRETE CAST-IN-PLACE

LOAD RATING AND POSTING

(31) DESIGN LOAD:.........................2 - H 15 (41) LOAD RESTRICTION:.................. R - POSTED FOR OTHER LOAD-

CAPACITY RESTRICTION

(66) INVENTORY RATING:..............30 TONS ( 27.2 METRIC TONS) (70) BRIDGE POSTING:...................... 5 - EQUAL TO OR ABOVE LEGAL

LOADS

(64) OPERATING RATING:..............50 TONS ( 45.4 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 03/12/2022 (91) FREQ. OF INSP: 48 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL:.......... N

(220) SPECIAL STUDY TYPE: 0 - NONE INSP. EVERY MONTHS - LAST INSP:

(221) SPECIAL STUDY DATE: (B) UNDERWATER:..................... N

INSP. EVERY MONTHS - LAST INSP:

(C) SPECIAL INSPECTION:........ N

INSP. EVERY MONTHS - LAST INSP:

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-110P

BLACK CREEK BR DGE INSPECTION DATE: 03/11/2022

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE:................................ 33° 09'41.60" (51) CURB TO CURB WIDTH:............ 30.0 FT ( 9.1 M)

(17) LONGITUDE:............................ 89°28 '04 20" (52) DECK WIDTH:.......................... 34.2 FT ( 10.4 M)

(19) DETOUR LENGTH:.................. 24 MI ( 39 KM) (32) APPR. ROADWAY WIDTH:...... 32.0 FT ( 9.8 M)

(28A) LANES ON STRUCT:.............02 (213) APPR. PAVEMENT WIDTH:... 22.0 FT ( 6.7 M)

(28B) LANES UNDER STRUCT:......00 LEFT SHOULDER:............... 5 0 FT ( 1.5 M)

(42A) SERVICE ON:.........................1 - HIGHWAY RIGHT SHOULDER:.......... 5 0 FT ( 1.5 M)

(42B) SERVICE UNDER:................. 5 - WATERWAY (33) BRIDGE MEDIAN:.................... 0 - NO MEDIAN

(29) AVG DAILY TRAFFIC:..............1140 (34) SKEW ANGLE:......................... 0 °

(30) YEAR OF ADT:......................... 2012 (35) STRUCTURE FLARED:............ 0 - NO FLARE

(114) FUTURE ADT:.........................1254 (47) TOTAL HORIZ. CLEARANCE:.. 30 FT ( 9.1 M)

(115) YEAR OF FUTURE ADT:........2032 (50) SIDEWALKS

(101) PARALLEL STRUCTURE:......N - NO PARALLEL STRUCTURE LEFT:.................................... 0 0 FT ( 0 M)

(38) NAVIGATION CONTROL:.........0 - NO NAVIGATION CONTROL ON RIGHT:.................................. 0 0 FT ( 0 M)

WATERWAY (BRIDGE PERMIT NOT

REQUIRED)

(39) VERTICAL CLEARANCE:.........0 FT ( 0 M) (214) BRIDGE RAIL TYPE

3 - PARAPET ONLY(40) HORIZ. CLEARANCE:..............0 FT ( 0 M) RAIL CONFIGURATION:

(111) ABUT OR PIER PROT:........... MATERIAL:........................... 1 - CONCRETE

LATERAL UNDERCLEARANCE: DESIGN TYPE:..................... 1 - CONTINUOUS RAIL

(55) RIGHT:...............................00 FT ( 0 M) (215) BRIDGE RAIL HEIGHT:.......... 2.42 FT ( 0.74 M)

(56) LEFT:................................ 0 FT ( 0 M) (53) MIN. VRT. CLR. OVER DECK: 99.99 FT ( 99.99 M)

(54) MIN. VRT. UNDRCLRANCE:... .00 FT ( 0 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:....................................... 7 (67) STRUCTURAL EVALUATION:

(59) SUPERSTRUCTURE:...............7 (68) DECK GEOMETRY:

(60) SUBSTRUCTURE:.......... 6 (69) UNDERCLEARANCES:................ N

(61) CHANNEL:................................7 (71) WATERWAY ADEQUACY:

(62) CULVERT:.................................N (72) APPROACH ALIGNMENT:

(222) APPROACHES:...................... 8 (113) SCOUR CRITICAL:.................... 5 - SCOUR WITHIN LIMITS OF

FOOTING OR PILES

(223) RETAINING WALL:.................N (225) PURPOSE OF IMPROVEMENT: 2 - REHAB/RECONSTRUCTION

(36) TRAFFIC SAFETY FEAT: 1 N N N (226) PRIORITY OF IMPROVEMENT: D - MINOR

(75A) TYPE OF WORK:................... (227) MAINTENANCE COST:

(75B) WORK DONE BY:.................. (228) REHAB / RECNSTR COST:

(76) IMPROVEMENT LENGTH:....... FT ( 0 M) (229) CONSTRUCTION COST:

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1982-JOINT REPAIR.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIGURATION INFORMATION:

Inspector: Killian Baptiste Structure Number: 5570110P0000000

Inspection Date: 03/12/2022 Facility Carried: NATCHEZ TRACE PAR

Bridge Inspection Report

Pictures

PHOTO 3

Description LOOKING NORTH TOWARD TUPELO (PHOTO FROM 2020 REPORT)

PHOTO 4

Description EAST (DOWNSTREAM) SIDE

Bridge Inspection Report

Pictures

PHOTO 5

Description GENERAL TOPSIDE VIEW LOOKING NORTH

PHOTO 6

Description TYPICAL DEBRIS ACCUMULATION ALONG CURBLINES, WEST CURBLINE SHOWN

Bridge Inspection Report

Pictures

PHOTO 7

Description GENERAL UNDERSIDE VIEW OF SPAN #1 LOOKING SOUTH

PHOTO 8

Description GENERAL UNDERSIDE VIEW OF SPAN #2 LOOKING SOUTH

Bridge Inspection Report

Pictures

PHOTO 9

Description GENERAL UNDERSIDE VIEW OF SPAN #3 LOOKING SOUTH

PHOTO 10

Description GENERAL UNDERSIDE VIEW OF SPAN #4 LOOKING SOUTH

Bridge Inspection Report

Pictures

PHOTO 11

Description GENERAL UNDERSIDE VIEW OF SPAN #5 LOOKING SOUTH

PHOTO 12

Description GENERAL UNDERSIDE VIEW OF SPAN #6 LOOKING NORTH

Bridge Inspection Report

Pictures

PHOTO 13

Description TYPICAL MISSING FILLER MATERIAL IN RAIL EXPANSION JOINTS, EAST RAILING OVER

NORTH ABUTMENT SHOWN

PHOTO 14

Description TYPICAL SETTLEMENT CRACKING IN SHOULDERS OVER ABUTMENTS, EAST SHOULDER

OVER NORTH ABUTMENT SHOWN

Bridge Inspection Report

Pictures

PHOTO 15

Description TYPICAL LONGITUDINAL CRACKING OF WEARING SURFACE, NORTHBOUND LANE AT

MIDSPAN SHOWN

PHOTO 16

Description TYPICAL ADHESION FAILURE OF SAWCUT JOINT MATERIAL, NORTH JOINT SHOWN; NOTE

FULL WIDTH TRANSVERSE CRACK

Bridge Inspection Report

Pictures

PHOTO 17

Description TYPICAL TRANSVERSE CRACKING OF RAILING, SOUTH END OF WEST RAILING SHOWN

PHOTO 18

Description TYPICAL MOSS GROWTH ON RAILINGS, WEST RAILING SHOWN

Bridge Inspection Report

Pictures

PHOTO 19

Description TYPICAL MOSS GROWTH ALONG FASCIAS, WEST FASCIA SHOWN

PHOTO 20

Description GENERAL VIEW OF NORTH ABUTMENT

Bridge Inspection Report

Pictures

PHOTO 21

Description SPALL WITH EXPOSED REBAR AT CENTER OF NORTH ABUTMENT

PHOTO 22

Description LONGITUDINAL CRACK WITH EFFLORESCENCE IN SPAN #1

Bridge Inspection Report

Pictures

PHOTO 23

Description TYPICAL HONEYCOMBING OF OVERHANGS, EAST OVERHANG NEAR NORTH ABUTMENT

SHOWN

PHOTO 24

Description HORIZONTAL CRACK ON PIER #1, NORTH FACE SHOWN

Bridge Inspection Report

Pictures

PHOTO 25

Description TYPICAL SCALING AND HONEYCOMBING OF FASCIA BEAMS, EAST FASCIA OVER SPAN #2

SHOWN

PHOTO 26

Description TYPICAL VERTICAL CRACKS IN BEAMS, CENTER OF EAST FASCIA OVER SPAN #2 SHOWN

Bridge Inspection Report

Pictures

PHOTO 27

Description GENERAL VIEW OF SOUTH FACE OF PIER #2

PHOTO 28

Description TYPICAL VERTICAL CRACKS IN PIERS, NORTH FACE OF PIER #2 SHOWN

Bridge Inspection Report

Pictures

PHOTO 29

Description TYPICAL EROSION AND SCOUR AROUND PIERS, WEST END OF PIER #2 SHOWN

PHOTO 30

Description GENERAL VIEW OF NORTH FACE OF PIER #3

Bridge Inspection Report

Pictures

PHOTO 31

Description EROSION AND SCOUR ON WEST END OF PIER #3; NOTE FOOTING EXPOSED UP TO 1"

AND SCALING

PHOTO 32

Description LONGITUDINAL CRACK ALONG CENTERLINE OF SPAN #3

Bridge Inspection Report

Pictures

PHOTO 33

Description LONGITUDINAL CRACK ALONG CENTERLINE OF SPAN #4; NOTE SPALL WITH EXPOSED

REBAR

PHOTO 34

Description GENERAL VIEW OF SOUTH ABUTMENT

Bridge Inspection Report

Pictures

PHOTO 35

Description WATER LEAKAGE AND STAINING ALONG SOUTH ABUTMENT

PHOTO 36

Description LOOKING UPSTREAM FROM DECK

Bridge Inspection Report

Pictures

PHOTO 37

Description LOOKING DOWNSTREAM FROM DECK