This document contains a bridge inspection report for Structure No. 5570-099P, known as the MS Route 9 Bridge, located on the Natchez Trace Parkway in Mississippi. The report provides details on the condition assessment of the bridge components including the deck, superstructure, substructure, channel, and approaches. It finds the structure is in overall good condition with some minor deficiencies noted such as cracking and efflorescence on the deck and railings, deterioration of expansion joint material, and moderate erosion present. The report lists routine maintenance and rehabilitation/reconstruction recommendations over the next five years along with preliminary cost estimates. Accompanying photos document the current conditions described.

The related federal contract opportunity is a pre-solicitation notice for drainage improvements on the Natchez Trace Parkway in Mississippi. No other details are provided on the required products or services for the work.

View the file

Other files

File Type Posted
NTP 3H2 3 5-A.pdf PDF
NATR BMS FY20(1)_As-Built Drawings-Final.pdf PDF
NTP 3H2 3 5-B.pdf PDF
5570-092P-2020.pdf PDF
5570-093P-2020.pdf PDF
5570-098P-2020.pdf PDF
5570-106P-2022.pdf PDF
5570-105P-2018.pdf PDF
5570-103P-2022.pdf PDF
5570-094P-2020.pdf PDF
5570-106P-2018.pdf PDF
5570-096P-2020.pdf PDF
5570-110P-2018.pdf PDF
5570-097P-2022.pdf PDF
5570-101P-2022.pdf PDF
5570-103P-2018.pdf PDF
5570-097P-2018.pdf PDF
5570-107P-2018.pdf PDF
5570-104P-2020.pdf PDF
5570-093P-2022.pdf PDF
5570-091P-2022.pdf PDF
5570-108P-2022.pdf PDF
5570-109P-2022.pdf PDF
Amendment 0002 - NP-NATR 3N17 3H26.pdf PDF
5570-092P-2022.pdf PDF
5570-095P-2020.pdf PDF
5570-100P-2020.pdf PDF
5570-099P-2022.pdf PDF
5570-102P-2020.pdf PDF
5570-101P-2018.pdf PDF
5570-095P-2022.pdf PDF
5570-094P-2022.pdf PDF
5570-107P-2022.pdf PDF
5570-100P-2022.pdf PDF
5570-104P-2022.pdf PDF
5570-108P-2018.pdf PDF
5570-109P-2018.pdf PDF
5570-105P-2022.pdf PDF
5570-096P-2022.pdf PDF
5570-102P-2022.pdf PDF
5570-110P-2022.pdf PDF
5570-098P-2022.pdf PDF
Amendment 001 - NP NATR 3N17 3H26.pdf PDF
5570-090P-2020.pdf PDF
L_Pavement Rehabilitation and Safety Improvements_NPS CE.pdf PDF
5570-090P-2022.pdf PDF
5570-091P-2020.pdf PDF
G_NATR 2019 Traffic Counts MP 121 and 204.xlsx XLSX spreadsheet
B_CULVERT ASSESSMENT SUMMARY AND RECOMMENDATIONS.xlsx XLSX spreadsheet
A_MS NP NATR 3N17 3H26_ETC_concept plans.pdf PDF
Show 40 more

Latest 50 of 59 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STRUCTURE SUMMARY STRUCTURE NO. 5570-099P

MS ROUTE 9 BRIDGE INSPECTION DATE: 12/5/18

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ....... CONCRETE CONTINUOUS NO. OF MAIN SPANS:

MAIN SPAN TYPE: ............... TEE BEAM NO. OF APPR. SPANS:

# OF BEAMS, MAIN SPAN: .. 4 STRUCT. TOTAL LENGTH: .. 150.0 FT (45.7 M)

DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 60.0 FT (18.3 M)

WEARING SURFACE: .......... BITUMINOUS DECK WIDTH: ...................... 32.7 FT (10.0 M)

ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 28.3 FT (8.6 M)

PIER FOUNDATION(S): ........ SPREAD FOOTING ON PILES YEAR BUILT:

ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A

PROJ./PLAN REF. NO: ......... 3H13 / 3022A SKEW ANGLE: ..................... 48 °

NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO

STRUCTURE HISTORY: ...... 1982-JOINT REPAIR. 2007, 2009-ROADWAY RESURFACED.

LOCATION

NATCHEZ TRACE PARKWAY MILE POINT: ..................... 195.50 (KM PT 314.62)

STATE: ................................. MISSISSIPPI LOCATION: 9.1 MILES SOUTH OF U.S. ROUTE 82

FACILITY CARRIED: ............ NATCHEZ TRACE PARKWAY

FEATURE INTERSECTED: .. MS ROUTE 9

STRUCTURE EVALUATION SUMMARY

This concrete tee beam bridge is in good condition overall. Problems include moderate erosion of both abutment slopes and the drainage ditch along the south pier; moderate rusting of the bearings at both abutments; severe deterioration of the expansion joint material in the curbs and railings; and a moderate debris accumulation at the ends of both abutment bearing seats.

In addition, the scuppers drain onto the exterior beams, which over time could cause the concrete to deteriorate.

Finally, there are no vertical clearance signs along the underpass roadway.

To address the approach pavement settlement, asphalt transition patches were added to both approaches.

Corrective action should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.

INSPECTION TEAM: M. REGER, Z. BAILEY

CONDITION ASSESSMENT:

MICHAEL REGER, P.E., FIELD TEAM LEADER 703-948-1424

REPORT REVIEW:

MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 3/31/19

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5570-099P

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

D 226 PRIORITY OF IMPROVEMENT

ITEM

NO.

ROUTINE MAINTENANCE QTY. UNIT UNIT

COST

PRELIM.

COST

ESTIMATE

59.1,7 CLEAN AND PAINT BEARING DEVICES.

58.2 REPLACE EXPANSION JOINT MATERIAL IN CURBS AND RAILINGS.

59.2 EXTEND SCUPPERS WITH TELESCOPING SPOUTS TO DIRECT DRAINAGE AWAY

FROM BEAMS.

60.3 REMOVE DEBRIS FROM BEARING SEATS.

222.7 POST VERTICAL CLEARANCE SIGNS ALONG UNDERPASS ROUTE.

PRELIM. MAINTENANCE TOTAL :

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST

PRELIM. COST

ESTIMATES

REHAB. RECONSTR.

222.6 FILL AND STABILIZE SETTLEMENT AT BOTH APPROACH.

60.9 FILL AND STABILIZE ABUTMENT SLOPES WITH ENGINEERED

RIPRAP.

60.17 REPAIR EROSION AND PROTECT DRAINAGE DITCHES AT PIERS

WITH RIPRAP.

CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL,

DESIGN, AND DESIGN CONSTRUCTION ENGINEERING (70% TOTAL

REHAB COST) PLUS PARK LOCATION FACTOR.

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

FIELD INSPECTION REPORT STRUCTURE NO. 5570-099P

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

NOT APPLICABLE

EXCELLENT CONDITION

VERY GOOD CONDITION - no problems noted.

GOOD CONDITION - some minor problems.

SATISFACTORY CONDITION - structural elements show some minor deterioration.

FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

N

58. DECK ITEM REFERENCE AND REMARKS

OTHER

ALIGNMENT

DEFLECTION AND/OR VIBRATION

FASCIA(E)

DIAPHRAGMS AND BRACING

TRUSSES

FLOOR BEAMS AND STRINGERS

ARCH(ES) OR SLAB(S)

GIRDERS OR BEAMS

BEARING DEVICES

59. SUPERSTRUCTURE

OTHER

DEFLECTION AND/OR VIBRATION

UTILITIES

DRAINS AND DRAINAGE

PARAPETS AND/OR RAILINGS

CURBS, SIDEWALKS, AND MEDIAN

RIDEABILITY

WEARING SURFACE

EXPANSION JOINTS

DECK SLAB

OTHER

SETTLEMENT OR DEFLECTION

EROSION AND/OR SCOUR

FOUNDATIONS

CAPS AND/OR BEARING SEATS

PILE BENTS

WALLS AND/OR COLUMNS

PIER(S)

OTHER

SLOPE PROTECTION

SETTLEMENT OR DEFLECTION

EROSION AND/OR SCOUR

EXPANSION JOINTS

WEEP HOLES

WINGWALLS

FOUNDATIONS

BACKWALLS AND/OR BULKHEADS

CAPS AND/OR BEARING SEATS

PILE BENTS

BREASTWALLS OR COLUMNS

ABUTMENTS

60. SUBSTRUCTURE

1.

10.

2.

3.

4.

5.

6.

7.

8.

9.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

PAINT

11.

F G N N N G N N G

N G

G N G G N G G N F G N N

G N G N F G N

11.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

12.

13.

14.

15.

16.

17.

18.

19.

58.1 MINOR TRANSVERSE CRACKING WITH EFFLORESCENCE ON DECK

UNDERSIDE AND UNDERSIDE OF OVERHANGS. MINOR

HONEYCOMBING IN SEVERAL LOCATIONS.

58.2 SEVERE DETERIORATION OR MISSING EXPANSION JOINT MATERIAL

IN CURBS AND RAILINGS.

58.3 DECK SURFACE AND APPROACHES HAVE BEEN REPAVED SINCE

LAST INSPECTION; SAW CUT AND RESEALED OVER ABUTMENTS;

RANDOM AREAS OF ADHESION FAILURE.

58.5,6 MINOR TRANSVERSE CRACKING WITH EFFLORESCENCE,

POPOUTS, AND SPALLS ON CURBS AND RAILINGS. MINOR

SPALLING AT NORTH RAILING ENDS. MODERATE COLLISION

DAMAGE TO NORTH END OF EAST RAILING WITH EQUIPMENT

VEHICLE TREAD MARKS ON TOP OF RAILING.

MINOR DELAMINATION OF EAST CURB IN CENTER SPAN.

58.7, 59.2 MODERATE STAINING OF BEAMS FROM DRAINAGE THROUGH

SCUPPERS. MINOR DEBRIS ACCUMULATION ALONG CURBLINES.

59.1 SEVERE PAINT DETERIORATION WITH MODERATE RUSTING OF ALL

ROLLER BEARINGS AT BOTH ABUTMENTS. BEARINGS APPEAR TO

BE FUNCTIONING AS DESIGNED.

59.2 MINOR SCALING ON UNDERSIDE OF ALL BEAMS, POSSIBLY FROM

CASTING OF BEAMS. MINOR COLLISION DAMAGE TO BEAM #4 AT

CENTER SPAN AND OVER EASTBOUND LANE LINE.

60.1,6 MINOR VERTICAL CRACKING WITH EFFLORESCENCE ON BOTH

BREASTWALLS AND ALL WINGWALLS; MINOR DIAGONAL CRACKING

AT BREASTWALL/WINGWALL JUNCTIONS. MODERATE WATER

STAINING ON BOTH ABUTMENT BREASTWALLS. MINOR

HORIZONTAL CRACK WITH EFFLORESCENCE ON NORTH ABUTMENT

BREASTWALL ALONG MID-HEIGHT CONSTRUCTION JOINT. MINOR

POPOUT AT EAST SIDE OF NORTH ABUTMENT. MODERATE

VEGETATION GROWTH AT ENDS OF ABUTMENTS.

G G G G F N

N

F

G

G

FIELD INSPECTION REPORT STRUCTURE NO. 5570-099P

ITEM REFERENCE AND REMARKS

61. CHANNEL N

1. ALIGNMENT

2. EROSION AND/OR SCOUR

3. CHANNEL PROTECTION

4. WATERWAY OBSTRUCTIONS

5. OTHER

6. ADEQUACY OF OPENING

7. NORMAL VELOCITY

8. AVERAGE CLEAR OPENING

9. STREAM BED COMPOSITION :

222. APPROACHES 7

1. APPROACH SLABS

2. RELIEF JOINTS

3. APPROACH GUARDRAIL

4. SURFACING

5. EROSION

6. SETTLEMENT

7. SIGNS

8. ALIGNMENT

9. OTHER

N N N G G F F G N

223. RETAINING WALL N

1. WALL

2. WEEP HOLES

3. FOUNDATION

4. EROSION AND/OR SCOUR

5. SETTLEMENT OR DEFLECTION

6. OTHER

36. TRAFFIC AND SAFETY FEATURES

A. BRIDGE RAILINGS

B. TRANSITIONS

C. APPROACH GUARDRAILS

D. APPROACH GUARDRAIL ENDS

N N N

60.3 MODERATE DEBRIS ACCUMULATION ON ENDS OF BEARING SEATS.

60.6 MINOR MOWER SCRAPES ON WINGWALLS.

60.7 MINOR LOSS OF FILL THROUGH WEEP HOLES.

60.9 MODERATE EROSION (20'L X 5'W X UP TO 4'D) ALONG EAST SIDE OF

NORTH ABUTMENT SLOPE; MINOR AT WEST SIDE OF SOUTH

ABUTMENT SLOPE. MODERATE EROSION (8'L X 5'W X 5'D) ALONG

NORTHEAST WINGWALL.

60.17 MODERATE EROSION (8'W X 3'D) ALONG UNDERPASS DITCH NEXT

TO SOUTH PIER; MINOR AT NORTH PIER.

222.4 MINOR TRANSVERSE CRACKING OF PAVEMENT AT BOTH

APPROACHES ALONG SAWCUT JOINT

222.6 UP TO 2.5" OF SETTLEMENT ALONG EAST SHOULDER OF NORTH

APPROACH AT NORTH ABUTMENT REPAIRED WITH ASPHALT; 1/2"

SETTLEMENT REMAINS. NEW TRANSITION PATCHES APPLIED TO

BOTH APPROACHES SINCE LAST INSPECTION.

222.7 TYPE 3 OBJECT MARKERS ON PARAPET ENDS. NO VERTICAL

CLEARANCE SIGNS ALONG UNDERPASS ROUTE.

TRAFFIC SAFETY RATING CODES

N

Does not meet standards or a safety feature is required and none is provided.

Meets currently acceptable standards.

Not applicable or a safety feature is not required.

STRUCTURE LOAD RATING STRUCTURE NO. 5570-099P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 15 14 25 23

HS 18 16 31 28

TYPE 3 17 15 29 26

TYPE 3S2 24 22 40 36

TYPE 3-3 29 26 49 44

DESIGN LOADING: H15 (M13.5)

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION: 3/16

LOAD RATING CONTROLLED BY:

REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-099P

STRUCTURE IDENTIFICATION

(201) PARK: NATCHEZ TRACE PARKWAY (1) STATE: ....................................... 284 - MISSISSIPPI (MS)

(202) STRUCTURE NAME: .......... MS ROUTE 9 BRIDGE (2) STATE HWY. AGENCY DIST:

(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 019 - CHOCTAW

(204) STRUCTURE NUMBER: ..... 5570-099P (4) CITY/PLACE CODE:

(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:

(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... MS ROUTE 9

(207) ROAD SECTION NO: ..........099P (7) FACILITY CARRIED: .................. NATCHEZ TRACE PARKWAY

(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5570099P0000000

(209) WITHIN NPS BNDRY?: .......YES (9) LOCATION: ................................ 9.1 MILES SOUTH OF U.S. R

(210) OPERATING UNIT: ............. DANCY (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)

(211) PROJECT NO(S): ................3H13 (11) MILE POINT: .............................195.50 (KM PT 314.62)

(212) DRAWING NUMBERS: ....... 3022A (27) YEAR BUILT:

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................3 - FREE ROAD

(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

2 - CONCRETE CONTINUOUS

04 - TEE BEAM

60.0 FT (18.3 M)

150.0 FT (45.7 M)

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

3 - SPREAD FOOTING ON PILES

3 - SPREAD FOOTING ON PILES

1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION: .............. 0 - NONE

(218) IS SALT USED?: ..................... NO

LOAD RATING AND POSTING

(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... R - POSTED (OTHER)

(66) INVENTORY RATING: ...... 18.0 TONS (16.3 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 31.0 TONS (28.1 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 12/18 (91) FREQ. OF INSP: 48 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. NO

(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-099P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 33°26'25.10"

(17) LONGITUDE: ......................... 89°14'28.20"

(19) DETOUR LENGTH: ............... 15 MI (24 KM)

(28A) LANES ON STRUCT:

(28B) LANES UNDER STRUCT: ... 02

(42A) SERVICE ON: ..................... 1 - HIGHWAY

(42B) SERVICE UNDER: .............. 1 - HIGHWAY

(29) AVG. DAILY TRAFFIC:

(30) YEAR OF ADT:

(114) FUTURE ADT:

(115) YEAR OF FUTURE ADT:

(101) PARALLEL STRUCTURE: ... N - NONE

(38) NAVIGATION CONTROL?: ... N

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)

(111) ABUT. OR PIER PROT:

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 2.2 FT (0.7 M)

(56) LEFT: ......................... 0.0 FT (0.0 M)

(51) CURB TO CURB WIDTH:

(52) DECK WIDTH:

(32) APPR. ROADWAY WIDTH:

(213) APPR. PAVEMENT WIDTH:

LEFT SHOULDER:

RIGHT SHOULDER:

(33) BRIDGE MEDIAN:

(34) SKEW ANGLE:

(35) DECK FLARE?:

(47) TOTAL HORIZ. CLEARANCE:

(50) SIDEWALKS:

LEFT :

RIGHT :

(214) BRIDGE RAIL TYPE:

RAIL CONFIGURATION:

MATERIAL:

DESIGN TYPE:

(215) BRIDGE RAIL HEIGHT:

(53) MIN. VRT. CLEAR. OVER DECK:

(54) MIN. VRT. UNDERCLEARANCE:

28.3 FT (8.6 M)

32.7 FT (10.0 M)

32.0 FT (9.8 M)

22.0 FT (6.7 M)

5.0 FT (1.5 M)

5.0 FT (1.5 M)

0 - NO MEDIAN

48 °

NO

28.3 FT (8.6 M)

0.0 FT (0.0 M)

0.0 FT (0.0 M)

1 - FULL HEIGHT (NO PARAPE

1 - CONCRETE

1 - CONTINUOUS RAIL

2.37 FT (0.72 M)

99.99 FT (99.99 M)

16.08 FT (4.90 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL: .......................... N

(62) CULVERT: ...........................N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 0NNN

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

N - Not over waterway.

2 - REHAB/RECONSTRUCTION

D - MINOR

$14,000

$110,000

$0

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1982-JOINT REPAIR. 2007, 2009-ROADWAY RESURFACED.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

https://89�14'28.20 https://33�26'25.10

APPENDIX STRUCTURE NO. 5570-099P

PHOTOGRAPHS STRUCTURE NO. 5570-099P

PHOTO #1 - LOOKING SOUTHBOUND TOWARD JACKSON

PHOTO #2 - WEST SIDE

PHOTO #3 - GENERAL TOPSIDE VIEW OF

STRUCTURE LOOKING SOUTH

PHOTO #4 - TYPICAL ADHESION FAILURE OF

SAWCUT JOINT SEALANT OVER DECK JOINTS,

JOINT OVER NORTH ABUTMENT SHOWN;

NOTE PAVEMENT DISTRESS IN SOUTHBOUND

LANE

PHOTO #5 - TYPICAL MISSING FILLER MATERIAL IN CURB AND RAILING

EXPANSION JOINTS, WEST CURB AND RAIL OVER NORTH ABUTMENT

SHOWN; NOTE SPALL

PHOTO #6 - TYPICAL TRANSVERSE CRACKS IN RAILING, EAST RAILING

IN NORTH SPAN SHOWN; NOTE EQUIPMENT VEHICLE TREAD MARKS

ON TOP OF RAILING

PHOTO #7 - COLLISION DAMAGE TO NORTH

END OF EAST RAILING

PHOTO #8 - TYPICAL DEBRIS ACCUMULATION

ALONG EAST CURB

PHOTO #9 - GENERAL UNDERSIDE VIEW OF STRUCTURE IN CENTER

SPAN LOOKING NORTH

PHOTO #10 - TYPICAL TRANSVERSE CRACKING WITH

EFFLORESCENCE ON DECK UNDERSIDE, BAYS #2 AND #3 IN CENTER

SPAN SHOWN

PHOTO #11 - PAINT DETERIORATION WITH MODERATE RUSTING OF ALL

ROLLER BEARINGS AT BOTH ABUTMENTS, BEARING #2 AT SOUTH

ABUTMENT SHOWN (PHOTO FROM 1/14/2016 INSPECTION REPORT)

PHOTO #12 - CLOSE-UP VIEW OF RUSTING OF ROLLER BEARINGS AT

BOTH ABUTMENTS, BEARING #2 AT NORTH ABUTMENT SHOWN

PHOTO #13 - COLLISION DAMAGE TO BEAM #4 IN CENTER SPAN

PHOTO #14 - COLLISION DAMAGE TO BEAM #4 IN CENTER SPAN, OVER

EASTBOUND LANE LINE

PHOTO #15 - TYPICAL SCALING ON UNDERSIDE OF ALL BEAMS, BEAM

#3 NEAR NORTH ABUTMENT

PHOTO #16 - TYPICAL STAINING ON EXTERIOR BEAMS BELOW DECK

DRAINS, BEAM #1 IN NORTH SPAN

PHOTO #17 - GENERAL VIEW OF SOUTH ABUTMENT; NOTE CRACKS

WITH EFFLORESCENCE AND WATER STAINING ON BREASTWALL: ALSO

NOTE EROSION ON ABUTMENT SLOPE

PHOTO #18 - GENERAL VIEW OF NORTH ABUTMENT; NOTE CRACKS

WITH EFFLORESCENCE AND WATER STAINING ON BREASTWALL;

NOTE EROSION AT EAST SIDE

PHOTO #19 - GENERAL VIEW OF EROSION

ALONG EAST SIDE OF NORTH ABUTMENT

SLOPE

PHOTO #20 - EROSION ALONG UNDERPASS

DITCH, SOUTH SIDE OF SOUTH PIER

PHOTO #21 - GENERAL VIEW OF NORTH FACE OF NORTH PIER

PHOTO #22 - SETTLEMENT OF SOUTH APPROACH PAVEMENT WITH

ASPHALT PATCHES; NOTE TRANSVERSE CRACK IN APPROACH

PAVEMENT

PHOTO #23 - SETTLEMENT OF NORTH

APPROACH PAVEMENT WITH ASPHALT PATCH;

NOTE PAVEMENT DISTRESS AT CURB AND

CENTERLINE

File details come from the government source that posted it. Updated .