This document summarizes a bridge inspection report for Structure Number 5570099P0000000 on the Natchez Trace Parkway over Mississippi Route 9. The inspection identified several maintenance and rehabilitation needs including replacing expansion joint material in railings, sealing cracks in the wearing surface, extending scupper outlets, repairing erosion around piers, and stabilizing abutment slopes with riprap. Estimated preliminary costs are provided for various maintenance and rehabilitation items. The overall condition of the deck, superstructure, and substructure were rated 7 out of 9, with underclearances rated 3 out of 9. The priority of improvement is listed as D for minor. Numerous photos document defects such as cracking, spalling, debris accumulation, and scour.

The related federal contract opportunity is a pre-solicitation for Natchez Trace Parkway Drainage Improvements for NP-NATR 3N17 3H26. No other details are provided on requirements, response dates, pricing terms, or agencies involved.

View the file

Other files

File Type Posted
NTP 3H2 3 5-A.pdf PDF
NATR BMS FY20(1)_As-Built Drawings-Final.pdf PDF
NTP 3H2 3 5-B.pdf PDF
5570-092P-2020.pdf PDF
5570-093P-2020.pdf PDF
5570-098P-2020.pdf PDF
5570-106P-2022.pdf PDF
5570-105P-2018.pdf PDF
5570-103P-2022.pdf PDF
5570-094P-2020.pdf PDF
5570-106P-2018.pdf PDF
5570-096P-2020.pdf PDF
5570-110P-2018.pdf PDF
5570-097P-2022.pdf PDF
5570-101P-2022.pdf PDF
5570-103P-2018.pdf PDF
5570-097P-2018.pdf PDF
5570-107P-2018.pdf PDF
5570-104P-2020.pdf PDF
5570-093P-2022.pdf PDF
5570-099P-2018.pdf PDF
5570-091P-2022.pdf PDF
5570-108P-2022.pdf PDF
5570-109P-2022.pdf PDF
Amendment 0002 - NP-NATR 3N17 3H26.pdf PDF
5570-092P-2022.pdf PDF
5570-095P-2020.pdf PDF
5570-100P-2020.pdf PDF
5570-102P-2020.pdf PDF
5570-101P-2018.pdf PDF
5570-095P-2022.pdf PDF
5570-094P-2022.pdf PDF
5570-107P-2022.pdf PDF
5570-100P-2022.pdf PDF
5570-104P-2022.pdf PDF
5570-108P-2018.pdf PDF
5570-109P-2018.pdf PDF
5570-105P-2022.pdf PDF
5570-096P-2022.pdf PDF
5570-102P-2022.pdf PDF
5570-110P-2022.pdf PDF
5570-098P-2022.pdf PDF
Amendment 001 - NP NATR 3N17 3H26.pdf PDF
5570-090P-2020.pdf PDF
L_Pavement Rehabilitation and Safety Improvements_NPS CE.pdf PDF
5570-090P-2022.pdf PDF
5570-091P-2020.pdf PDF
G_NATR 2019 Traffic Counts MP 121 and 204.xlsx XLSX spreadsheet
B_CULVERT ASSESSMENT SUMMARY AND RECOMMENDATIONS.xlsx XLSX spreadsheet
A_MS NP NATR 3N17 3H26_ETC_concept plans.pdf PDF
Show 40 more

Latest 50 of 59 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRIDGE INSPECTION REPORT

MS ROUTE 9 BRIDGE

NATCHEZ TRACE PARKWAY OVER MS ROUTE 9

NATCHEZ TRACE PARKWAY

LS

STRUCTURE NO. 5570-099P

INSPECTION TYPE: ROUTINE

INSPECTION DATE: 3/10/2022

WS

Report prepared by:

Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov

MILE POINT: 195.50

KILOMETER POINT: 59.59

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5570-099P

MS ROUTE 9 BRIDGE INSPECTION DATE : 03/10/2022

226 PRIORITY OF IMPROVEMENT D

A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.

B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

Item No.

Maintenance Recommendations

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT UNIT

COST

PRELIM.

COST

ESTIMATE

58.2

REPLACE EXPANSION JOINT MATERIAL IN RAILINGS.

222.7

POST VERTICAL CLEARANCE SIGNS ALONG UNDERPASS

ROUTE.

PRELIM. MAINTENANCE TOTAL :

Item No.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST

PRELIM. COST ESTIMATES

REHAB RECONSTR

60.9 FILL AND STABILIZE ABUTMENT SLOPES WITH

ENGINEERED RIPRAP.

59.2 EXTEND SCUPPERS WITH TELESCOPING

SPOUTS TO DIRECT DRAINAGE AWAY FROM

BEAMS.

60.17 REPAIR EROSION AND PROTECT DRAINAGE

DITCHES AT PIERS WITH RIPRAP.

CONTRACT COSTS FOR MOBILIZATION,

TRAFFIC CONTROL, AND CONTINGENCIES.

58.3,222.

SEAL CRACKS IN WEARING SURFACE OVER

STRUCTURE AND AT APPROACHES.

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5570-099P

MS ROUTE 9 BRIDGE INSPECTION DATE : 03/10/2022

226 PRIORITY OF IMPROVEMENT D

A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.

B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

COST ESTIMATE SUMMARY

PRELIM. MAINTENANCE TOTAL :

PRELIM. REHABILITATION TOTAL :

PRELIM. RECONSTRUCTION TOTAL : .

TOTAL ITEMIZED COSTS:

PRELIMINARY ESTIMATE TOTAL * :

(*Includes typical contract costs for mobilization, traffic control and design/construction engineering: but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for planning purposes only; they should not be used as a complete or final engineers estimate.)

Remarks : Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-099P

MS ROUTE 9 BRIDGE INSPECTION DATE: 03/09/2022

STRUCTURE IDENTIFICATION

(201) PARK: NATCHEZ TRACE PARKWAY

(202) STRUCTURE NAME:..............MS ROUTE 9 BRIDGE

(203) STRUCTURE KIND:............... 1 - BRIDGE

(204) STRUCTURE NUMBER:.........5570-099 P

4 - SOUTHEAST(205) NPS REGION:

(206) ROUTE CODE NUMBER:

(207) ROAD SECTION NO:............. 099P

(208) NPS ROAD CLASS:............... 1 - PRINCIPAL PARK ROAD

(209) WITHIN NPS BNDRY?:.......... Yes

(210) OPERATING UNIT:.................DANCY

(211) PROJECT NO(S):................... 3H13

(212) DRAWING NUMBERS:...........3022A

(21) MAINTAINED BY:......................66 - NATIONAL PARK SERVICE

(22) OWNER:................................... 66 - NATIONAL PARK SERVICE

(1) STATE:

(2) STATE HWY. AGENCY DIST:

(3) COUNTY CODE:

(4) CITY / PLACE CODE:

(5) INVENTORY ROUTE:

(6) FEATURES INTERSECTED:

(7) FACILITY CARRIED:

(8) STATE STRUCTURE NO:

(9) LOCATION:

(10) INV. RTE. - MIN. VERT. CLR:

(11) MILE POINT:

(27) YEAR BUILT:

(106) YEAR RECONSTRUCTED:

(20) TOLL:

(37) HISTORIC DESIGNATION:

284 - MISSISSIPPI

28019 CHOCTAW

00000

1 6 1 00001 0

MS ROUTE 9

NATCHEZ TRACE PARKWAY

5570099P0000000

9.1 MILES SOUTH OF U.S. ROUTE 82

99.99 FT ( 99.99 M)

195.5 (KM PT: 59.59)

3 - ON FREE ROAD

5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL:..........2 - CONCRETE CONTINUOUS (44A) APPR. STR. MATERIAL:............ 0 - Other

(43B) MAIN STR. TYPE:.................. 04 - TEE BEAM (44B) APPR. STR. TYPE:.................... 00 - OTHER

(45) NO. OF MAIN SPANS:..............003 (46) NO OF APPROACH SPANS:

(48) MAX. SPAN LENGTH:..............60 FT ( 18.3 M)

(49) STRUCTURE LENGTH:........... 150. FT ( 45.7 M) (108) WEAR SURFACE/PROTECT SYSTEM:

(216A) ABUTMENT #1 FDN:........... 2 - SPREAD FTG ON BEARING MAT'L A) TYPE WEARING SURFACE:.. 6 - BITUMINOUS

(216B) ABUTMENT #2 FDN:........... 2 - SPREAD FTG ON BEARING MAT'L B) TYPE MEMBRANE:................. 0 - NONE

(217A) PREDOM. PIER FDN:.......... 3 - SPREAD FOOTING ON PILES C) TYPE PROTECTION:.............. 0 - NONE

(217B) SECOND. PIER FDN:.......... 3 - SPREAD FOOTING ON PILES (218) IS SALT USED?.......................... NO

(107) DECK TYPE:.......................... 1 - CONCRETE CAST-IN-PLACE

LOAD RATING AND POSTING

(31) DESIGN LOAD:.........................2 - H 15 (41) LOAD RESTRICTION:.................. R - POSTED FOR OTHER LOAD-

CAPACITY RESTRICTION

(66) INVENTORY RATING:..............18 TONS ( 16.3 METRIC TONS) (70) BRIDGE POSTING:...................... 5 - EQUAL TO OR ABOVE LEGAL

LOADS

(64) OPERATING RATING:..............31 TONS ( 28.1 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 03/10/2022 (91) FREQ. OF INSP: 48 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL:.......... N

(220) SPECIAL STUDY TYPE: 0 - NONE INSP. EVERY MONTHS - LAST INSP:

(221) SPECIAL STUDY DATE: (B) UNDERWATER:..................... N

INSP. EVERY MONTHS - LAST INSP:

(C) SPECIAL INSPECTION:........ N

INSP. EVERY MONTHS - LAST INSP:

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-099P

MS ROUTE 9 BRIDGE INSPECTION DATE: 03/09/2022

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE:................................ 33° 26'25.10" (51) CURB TO CURB WIDTH:............ 28.3 FT ( 8.6 M)

(17) LONGITUDE:............................ 89°14 '28 20" (52) DECK WIDTH:.......................... 32.7 FT ( 10 M)

(19) DETOUR LENGTH:.................. 15 MI ( 24 KM) (32) APPR. ROADWAY WIDTH:...... 32.0 FT ( 9.8 M)

(28A) LANES ON STRUCT:.............02 (213) APPR. PAVEMENT WIDTH:... 22.0 FT ( 6.7 M)

(28B) LANES UNDER STRUCT:......02 LEFT SHOULDER:............... 5 0 FT ( 1.5 M)

(42A) SERVICE ON:.........................1 - HIGHWAY RIGHT SHOULDER:.......... 5 0 FT ( 1.5 M)

(42B) SERVICE UNDER:................. 1 - HIGHWAY, WITH OR W/OUT (33) BRIDGE MEDIAN:.................... 0 - NO MEDIAN

PEDESTRIAN

(29) AVG DAILY TRAFFIC:..............1075 (34) SKEW ANGLE:......................... 48 °

(30) YEAR OF ADT:......................... 2012 (35) STRUCTURE FLARED:............ 0 - NO FLARE

(114) FUTURE ADT:.........................1183 (47) TOTAL HORIZ. CLEARANCE:.. 28.3 FT ( 8.6 M)

(115) YEAR OF FUTURE ADT:........2032 (50) SIDEWALKS

(101) PARALLEL STRUCTURE:......N - NO PARALLEL STRUCTURE LEFT:.................................... 0 0 FT ( 0 M)

(38) NAVIGATION CONTROL:.........N - NOT APPLICABLE, NO WATERWAY RIGHT:.................................. 0 0 FT ( 0 M)

(39) VERTICAL CLEARANCE:.........0 FT ( 0 M) (214) BRIDGE RAIL TYPE

(40) HORIZ. CLEARANCE:..............0 FT ( 0 M) RAIL CONFIGURATION:...... 1 - FULL HEIGHT (NO PARAPET)

(111) ABUT OR PIER PROT:........... MATERIAL:........................... 1 - CONCRETE

LATERAL UNDERCLEARANCE: DESIGN TYPE:..................... 1 - CONTINUOUS RAIL

(55) RIGHT:..............................2.20 FT ( 0.67 M) (215) BRIDGE RAIL HEIGHT:.......... 2 37 FT ( 0.72 M)

(56) LEFT:................................ 0 FT ( 0 M) (53) MIN. VRT. CLR. OVER DECK: 99.99 FT ( 99.99 M)

(54) MIN. VRT. UNDRCLRANCE:... 16.08 FT ( 4.9 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:....................................... 7 (67) STRUCTURAL EVALUATION:

(59) SUPERSTRUCTURE:...............7 (68) DECK GEOMETRY:

(60) SUBSTRUCTURE:.......... 7 (69) UNDERCLEARANCES:

(61) CHANNEL:................................N (71) WATERWAY ADEQUACY:........... N

(62) CULVERT:.................................N (72) APPROACH ALIGNMENT:

(222) APPROACHES:...................... 7 (113) SCOUR CRITICAL:.................... N - NOT OVER WATERWAY

(223) RETAINING WALL:.................N (225) PURPOSE OF IMPROVEMENT: 2 - REHAB/RECONSTRUCTION

(36) TRAFFIC SAFETY FEAT: 0 N N N (226) PRIORITY OF IMPROVEMENT: D - MINOR

(75A) TYPE OF WORK:................... (227) MAINTENANCE COST:

(75B) WORK DONE BY:.................. (228) REHAB / RECNSTR COST:

(76) IMPROVEMENT LENGTH:....... FT ( 0 M) (229) CONSTRUCTION COST:

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1982-JOINT REPAIR. 2007, 2009-ROADWAY RESURFACED.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIGURATION INFORMATION:

Inspector: Killian Baptiste Structure Number: 5570099P0000000

Inspection Date: 03/10/2022 Facility Carried: NATCHEZ TRACE PAR

Bridge Inspection Report

Pictures

PHOTO 3

Description LOOKING NORTH TOWARD TUPELO

PHOTO 4

Description EAST SIDE

Bridge Inspection Report

Pictures

PHOTO 5

Description GENERAL TOPSIDE VIEW LOOKING SOUTH

PHOTO 6

Description GENERAL UNDERSIDE VIEW OF NORTH SPAN LOOKING NORTH

Bridge Inspection Report

Pictures

PHOTO 7

Description GENERAL UNDERSIDE VIEW OF CENTER SPAN LOOKING SOUTH

PHOTO 8

Description GENERAL UNDERSIDE VIEW OF SOUTH SPAN LOOKING SOUTH

Bridge Inspection Report

Pictures

PHOTO 9

Description TYPICAL LONGITUDINAL CRACK IN WEARING SURFACE, NORTH END OF SOUTHBOUND

LANE SHOWN

PHOTO 10

Description TYPICAL ADHESION FAILURE OF SAWCUT JOINT SEALANT OVER DECK JOINTS, JOINT

OVER NORTH ABUTMENT SHOWN; NOTE PAVEMENT CRACKING IN SOUTHBOUND LANE

Bridge Inspection Report

Pictures

PHOTO 11

Description TYPICAL MISSING FILLER MATERIAL IN RAILING EXPANSION JOINTS, WEST RAILING

OVER NORTH ABUTMENT SHOWN

PHOTO 12

Description TRANSVERSE CRACK AND SPALL IN EAST RAILING OVER NORTH SPAN

Bridge Inspection Report

Pictures

PHOTO 13

Description SPALLING WITH EXPOSED REBAR IN WEST RAILING OVER SOUTH ABUTMENT

PHOTO 14

Description TYPICAL DEBRIS ACCUMULATION ALONG CURBLINES, WEST CURBLINE SHOWN

Bridge Inspection Report

Pictures

PHOTO 15

Description TYPICAL ROLLER BEARING, BEARING #3 AT NORTH ABUTMENT SHOWN

PHOTO 16

Description SOUTH PIER BEARING AREA

Bridge Inspection Report

Pictures

PHOTO 17

Description NORTH PIER CAP AND BEARING AREA

PHOTO 18

Description TYPICAL TRANSVERSE CRACKS IN BAYS, BAY #1 IN CENTER SPAN SHOWN

Bridge Inspection Report

Pictures

PHOTO 19

Description TYPICAL SCALING OF BOTTOM OF BEAMS, BEAM #3 OVER CENTER SPAN SHOWN

PHOTO 20

Description TYPICAL IMPACT DAMAGE ON EXTERIOR BEAMS, EAST EXTERIOR BEAM SHOWN

Bridge Inspection Report

Pictures

PHOTO 21

Description TYPICAL WATER STAINING OF EXTERIOR BEAMS UNDER SCUPPERS, WEST SIDE OF

NORTH SPAN SHOWN

PHOTO 22

Description GENERAL VIEW OF NORTH ABUTMENT

Bridge Inspection Report

Pictures

PHOTO 23

Description CRACK WITH EFFLORESCENCE ON NORTH ABUTMENT, EAST END SHOWN

PHOTO 24

Description TYPICAL VERTICAL CRACKS IN ABUTMENTS, NORTH ABUTMENT UNDER BEARING #3

SHOWN

Bridge Inspection Report

Pictures

PHOTO 25

Description EROSION AT EAST END OF NORTH ABUTMENT

PHOTO 26

Description GENERAL VIEW OF SOUTH FACE OF NORTH PIER

Bridge Inspection Report

Pictures

PHOTO 27

Description GENERAL VIEW OF NORTH FACE OF SOUTH PIER

PHOTO 28

Description GENERAL VIEW OF SOUTH ABUTMENT

Bridge Inspection Report

Pictures

PHOTO 29

Description EROSION OF SOUTH DRAINAGE DITCH

PHOTO 30

Description TYPICAL EROSION OF DRAINAGE DITCHES, NORTH DRAINAGE DITCH SHOWN

Bridge Inspection Report

Pictures

PHOTO 31

Description SETTLEMENT OF NORTH APPROACH PAVEMENT WITH ASPHALT PATCH; NOTE PAVEMENT

CRACKING AT CURB

PHOTO 32

Description SOUTH APPROACH PAVEMENT NEAR END OF BRIDGE; NOTE PATCHES FOR SETTLEMENT

AND SEALED CRACKS