This document contains a bridge inspection report for Structure Number 5570093P0000000 on the Natchez Trace Parkway over County Road at Milepoint 201.90. The report provides details of the March 9, 2022 routine inspection including structure descriptions and inventory data, appraisal ratings of structural elements, underwater inspection requirements, load ratings, recommendations and cost estimates for maintenance, rehabilitation, and reconstruction. Near-term needs include replacing filler material, sealing cracks, tightening guardrails, and debris and vegetation removal at an estimated total cost of under $100,000. The report includes photos documenting the condition assessment.
View the file
Other files
Show 40 more
Latest 50 of 59 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRIDGE INSPECTION REPORT
COUNTY ROAD BRIDGE AT MP 201.90
NATCHEZ TRACE PARKWAY OVER COUNTY ROAD
NATCHEZ TRACE PARKWAY
LN
STRUCTURE NO. 5570-093P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 3/9/2022
ES
Report prepared by:
Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov
MILE POINT: 201.90
KILOMETER POINT: 324.86
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5570-093P
COUNTY ROAD BRIDGE AT MP 201.90 INSPECTION DATE : 03/09/2022
226 PRIORITY OF IMPROVEMENT D
A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
Item No.
Maintenance Recommendations
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
60.7
UNCOVER WEEP HOLES IN ABUTMENT BREASTWALLS.
58.5,58.7
REMOVE DEBRIS FROM INLETS AND ALONG CURBS.
222.7
INSTALL VERTICAL CLEARANCE SIGN ON WEST SIDE OF
SLAB.
PRELIM. MAINTENANCE TOTAL :
Item REHABILITATION/RECONSTRUCTION
UNIT
UNIT PRELIM. COST ESTIMATES
No. (TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. COST
REHAB RECONSTR
58.2,60.8 REPLACE FILLER MATERIAL IN CURBS,
RAILINGS, AND VERTICAL JOINTS.
58.3,222.
SEAL CRACKS IN WEARING SURFACE OVER
DECK AND AT APPROACHES.
222.3 TIGHTEN AND RE-ORIENT OFFSET BLOCK AND
REPLACE DAMAGED POST AT UNDERPASS
APPROACH GUARDRAILS.
CONTRACT COSTS FOR MOBILIZATION,
TRAFFIC CONTROL, AND CONTINGENCIES.
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5570-093P
COUNTY ROAD BRIDGE AT MP 201.90 INSPECTION DATE : 03/09/2022
226 PRIORITY OF IMPROVEMENT D
A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL :
PRELIM. REHABILITATION TOTAL :
PRELIM. RECONSTRUCTION TOTAL : ..
TOTAL ITEMIZED COSTS:
PRELIMINARY ESTIMATE TOTAL * :
(*Includes typical contract costs for mobilization, traffic control and design/construction engineering: but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for planning purposes only; they should not be used as a complete or final engineers estimate.)
Remarks : Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
STRUCTURE LOAD RATING STRUCTURE NO. 5570-093P
COUNTY ROAD BRIDGE AT MP 201.90 INSPECTION DATE: 03/08/2022
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 15 14 25 23
HS 21 19 35 32
TYPE 3 18 16 31 28
TYPE 3S2 28 25 48 44
TYPE 3-3 36 33 60 54
DESIGN LOADING: 2 - H 15
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION: 05/30/2019
LOAD RATING CONTROLLED BY:
REMARKS: RATING IS BASED ON ENGINEERING JUDGEMENT, AS PER AASHTO MANUAL FOR BRIDGE EVALUATION (MBE)SEE BRIDGE FILE FOR
LOAD RATING CALCULATIONS.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-093P
STRUCTURE IDENTIFICATION
(201) PARK: NATCHEZ TRACE PARKWAY
(202) STRUCTURE NAME:..............COUNTY ROAD BRIDGE AT MP 201.90
(203) STRUCTURE KIND:............... 1 - BRIDGE
(204) STRUCTURE NUMBER:.........5570-093 P
4 - SOUTHEAST(205) NPS REGION:
(206) ROUTE CODE NUMBER:
(207) ROAD SECTION NO:............. 093P
(208) NPS ROAD CLASS:............... 1 - PRINCIPAL PARK ROAD
(209) WITHIN NPS BNDRY?:.......... Yes
(210) OPERATING UNIT:.................DANCY
(211) PROJECT NO(S):................... 3H16
(212) DRAWING NUMBERS:...........3017A
(21) MAINTAINED BY:......................66 - NATIONAL PARK SERVICE
(22) OWNER:................................... 66 - NATIONAL PARK SERVICE
(1) STATE:
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY / PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR:
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORIC DESIGNATION:
284 - MISSISSIPPI
28019 CHOCTAW
00000
1 6 1 00001 0
COUNTY ROAD
NATCHEZ TRACE PARKWAY
5570093P0000000
2 3 MILES SOUTH OF U.S. ROUTE 82
99.99 FT ( 99.99 M)
201.9 (KM PT: 324 8)
0 6
3 - ON FREE ROAD
5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL:..........1 - CONCRETE (44A) APPR. STR. MATERIAL:............ 0 - Other
(43B) MAIN STR. TYPE:.................. 07 - FRAME (EXCEPT FRAME (44B) APPR. STR. TYPE:.................... 00 - OTHER
CULVERTS)
(45) NO. OF MAIN SPANS:..............001 (46) NO OF APPROACH SPANS:
(48) MAX. SPAN LENGTH:..............37.5 FT ( 11.4 M)
(49) STRUCTURE LENGTH:........... 49.5 FT ( 15.1 M) (108) WEAR SURFACE/PROTECT SYSTEM:
(216A) ABUTMENT #1 FDN:........... 2 - SPREAD FTG ON BEARING MAT'L A) TYPE WEARING SURFACE:.. 6 - BITUMINOUS
(216B) ABUTMENT #2 FDN:........... 2 - SPREAD FTG ON BEARING MAT'L B) TYPE MEMBRANE:................. 0 - NONE
(217A) PREDOM. PIER FDN:.......... 6 - N/A C) TYPE PROTECTION:.............. 0 - NONE
(217B) SECOND. PIER FDN:.......... 6 - N/A (218) IS SALT USED?.......................... NO
(107) DECK TYPE:.......................... 1 - CONCRETE CAST-IN-PLACE
LOAD RATING AND POSTING
(31) DESIGN LOAD:.........................2 - H 15 (41) LOAD RESTRICTION:.................. R - POSTED FOR OTHER LOAD-
CAPACITY RESTRICTION
(66) INVENTORY RATING:..............21 TONS ( 19.1 METRIC TONS) (70) BRIDGE POSTING:...................... 5 - EQUAL TO OR ABOVE LEGAL
LOADS
(64) OPERATING RATING:..............35 TONS ( 31.8 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 03/09/2022 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL:.......... N
(220) SPECIAL STUDY TYPE: 0 - NONE INSP. EVERY MONTHS - LAST INSP:
(221) SPECIAL STUDY DATE: (B) UNDERWATER:..................... N
INSP. EVERY MONTHS - LAST INSP:
(C) SPECIAL INSPECTION:........ N
INSP. EVERY MONTHS - LAST INSP:
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-093P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE:................................ 33° 30'52.60" (51) CURB TO CURB WIDTH:............ 28.0 FT ( 8.5 M)
(17) LONGITUDE:............................ 89°10 '34.10" (52) DECK WIDTH:.......................... 32.3 FT ( 9.8 M)
(19) DETOUR LENGTH:.................. 15 MI ( 24 KM) (32) APPR. ROADWAY WIDTH:...... 32.0 FT ( 9.8 M)
(28A) LANES ON STRUCT:.............02 (213) APPR. PAVEMENT WIDTH:... 22.0 FT ( 6.7 M)
(28B) LANES UNDER STRUCT:......02 LEFT SHOULDER:............... 5 0 FT ( 1.5 M)
(42A) SERVICE ON:.........................1 - HIGHWAY RIGHT SHOULDER:.......... 5 0 FT ( 1.5 M)
(42B) SERVICE UNDER:................. 1 - HIGHWAY, WITH OR W/OUT (33) BRIDGE MEDIAN:.................... 0 - NO MEDIAN
PEDESTRIAN
(29) AVG DAILY TRAFFIC:..............1075 (34) SKEW ANGLE:......................... 40 °
(30) YEAR OF ADT:......................... 2012 (35) STRUCTURE FLARED:............ 0 - NO FLARE
(114) FUTURE ADT:.........................1183 (47) TOTAL HORIZ. CLEARANCE:.. 28 FT ( 8.5 M)
(115) YEAR OF FUTURE ADT:........2032 (50) SIDEWALKS
(101) PARALLEL STRUCTURE:......N - NO PARALLEL STRUCTURE LEFT:.................................... 0 0 FT ( 0 M)
(38) NAVIGATION CONTROL:.........N - NOT APPLICABLE, NO WATERWAY RIGHT:.................................. 0 0 FT ( 0 M)
(39) VERTICAL CLEARANCE:.........0 FT ( 0 M) (214) BRIDGE RAIL TYPE
(40) HORIZ. CLEARANCE:..............0 FT ( 0 M) RAIL CONFIGURATION:...... 1 - FULL HEIGHT (NO PARAPET)
(111) ABUT OR PIER PROT:........... MATERIAL:........................... 1 - CONCRETE
LATERAL UNDERCLEARANCE: DESIGN TYPE:..................... 1 - CONTINUOUS RAIL
(55) RIGHT:...............................4.00 FT ( 1.22 M) (215) BRIDGE RAIL HEIGHT:.......... 2.42 FT ( 0.74 M)
(56) LEFT:................................ 0 FT ( 0 M) (53) MIN. VRT. CLR. OVER DECK: 99.99 FT ( 99.99 M)
(54) MIN. VRT. UNDRCLRANCE:... 12.50 FT ( 3.81 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:....................................... 7 (67) STRUCTURAL EVALUATION:
(59) SUPERSTRUCTURE:...............6 (68) DECK GEOMETRY:
(60) SUBSTRUCTURE:.......... 7 (69) UNDERCLEARANCES:
(61) CHANNEL:................................N (71) WATERWAY ADEQUACY:........... N
(62) CULVERT:.................................N (72) APPROACH ALIGNMENT:
(222) APPROACHES:...................... 6 (113) SCOUR CRITICAL:.................... N - NOT OVER WATERWAY
(223) RETAINING WALL:.................N (225) PURPOSE OF IMPROVEMENT: 2 - REHAB/RECONSTRUCTION
(36) TRAFFIC SAFETY FEAT: 1 N N N (226) PRIORITY OF IMPROVEMENT: D - MINOR
(75A) TYPE OF WORK:................... (227) MAINTENANCE COST:
(75B) WORK DONE BY:.................. (228) REHAB / RECNSTR COST:
(76) IMPROVEMENT LENGTH:....... FT ( 0 M) (229) CONSTRUCTION COST:
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1982-JOINT REPAIR. 2014-STRUCTURE AND APPROACHES REPAVED, PAVEMENT SAWCUT AND SEALED OVER ENDS OF STRUCTURE, DRAINAGE INLETS
INSTALLED AT NE AND SW CORNERS.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIGURATION INFORMATION:
Inspector: Killian Baptiste Structure Number: 5570093P0000000
Inspection Date: 03/09/2022 Facility Carried: NATCHEZ TRACE PAR
Bridge Inspection Report
Pictures
PHOTO 3
Description LOOKING SOUTH TOWARD JACKSON
PHOTO 4
Description WEST SIDE
Bridge Inspection Report
Pictures
PHOTO 5
Description GENERAL TOPSIDE VIEW LOOKING NORTH
PHOTO 6
Description GENERAL UNDERSIDE VIEW OF DECK LOOKING SOUTH; NOTE WATER STAINING AND
GRAFFITI
Bridge Inspection Report
Pictures
PHOTO 7
Description SETTLEMENT CRACKING IN NORTHBOUND LANE ADJACENT TO SOUTH EXPANSION
JOINT
PHOTO 8
Description SETTLEMENT CRACKING IN NORTHBOUND LANE ADJACENT TO NORTH EXPANSION
JOINT
Bridge Inspection Report
Pictures
PHOTO 9
Description TYPICAL MISSING FILLER MATERIAL IN RAIL EXPANSION JOINTS, WEST RAILING OVER
SOUTH ABUTMENT SHOWN
PHOTO 10
Description TYPICAL TRANSVERSE CRACKING OF RAILINGS, NORTH END OF WEST RAILING SHOWN
Bridge Inspection Report
Pictures
PHOTO 11
Description TYPICAL DEBRIS ACCUMULATION ALONG CURBLINES, WEST CURBLINE SHOWN
PHOTO 12
Description TYPICAL DEBRIS ACCUMULATION AT DRAIN INLETS, SOUTHWEST DRAIN INLET SHOWN
Bridge Inspection Report
Pictures
PHOTO 13
Description EDGE SPALLS AND SCRAPES ALONG EAST FASCIA, NOTE EXPOSED REBAR
PHOTO 14
Description EDGE SPALLS AND SCRAPES ALONG WEST FASCIA
Bridge Inspection Report
Pictures
PHOTO 15
Description TYPICAL SCALING OF DECK UNDERSIDE
PHOTO 16
Description EFFLORESCENCE AT NORTH END OF DECK COLD JOINT
Bridge Inspection Report
Pictures
PHOTO 17
Description GENERAL VIEW OF SOUTH ABUTMENT
PHOTO 18
Description GENERAL VIEW OF NORTH ABUTMENT
Bridge Inspection Report
Pictures
PHOTO 19
Description TYPICAL CRACKING AT ABUTMENT-DECK INTERFACE, WEST SIDE OF NORTH ABUTMENT
SHOWN; NOTE MISSING FILLER MATERIAL IN JOINT WITH WINGWALL
PHOTO 20
Description TYPICAL VERTICAL CRACKS IN WINGWALLS, SOUTHWEST WINGWALL SHOWN; NOTE
WATER STAINING
Bridge Inspection Report
Pictures
PHOTO 21
Description TYPICAL VERTICAL CRACKING WITH EFFLORESCENCE ON WINGWALLS, NORTHWEST
WINGWALL SHOWN
PHOTO 22
Description ROTATED AND OFFSET TIMBER BLOCKS ON SOUTHWEST GUARDRAIL OF UNDERPASS
ROADWAY
Bridge Inspection Report
Pictures
PHOTO 23
Description SPLIT GUARDRAIL POST OF UNDERPASS ROADWAY, THIRD POST FROM SOUTHWEST
END SHOWN
PHOTO 24
Description TYPICAL DECAY OF GUARDRAIL POSTS FOR UNDERPASS ROADWAY